Pekerjaan Persiapan

Pembersihan Lokasi Proyek

Bowplank

Start: 27/12/06

ID: 1

Start: 27/12/06

ID: 2

Start: 27/12/06

ID: 3

Finish: 27/12/06

Dur: 1 day

Finish: 27/12/06

Dur: 1 day

Finish: 27/12/06

Dur: 1 day

Comp: 0%

Res:

Pek erja[2]; Mandor

Res:

Tuk ang Kay u[2]; Kepala Tuk ang Kay u; Mandor; Pak u Biasa[0,5 k g]; Kay u Klas IV[0,2 m3]

Pekerjaan Galian dan Pondasi

Galian Tanah

Urgan Pasir Bawah Pondasi

Pasangan Pondasi batu kali

Urugan Tanah Kembali Bekas Galian

Start: 27/12/06

ID: 4

Start: 27/12/06

ID: 5

Start: 29/12/06

ID: 6

Start: 01/01/07

ID: 7

Start: 08/01/07

ID: 8

Finish: 08/01/07

Dur: 9 day s

Finish: 29/12/06

Dur: 3 day s

Finish: 29/12/06

Dur: 1 day

Finish: 05/01/07

Dur: 5 day s

Finish: 08/01/07

Dur: 1 day

Comp: 0%

Res:

Pek erja[4]; Mandor

Res:

Pek erja[2]; Mandor; Pasir Pasang[1 m3]

Res:

Pek erja[3]; Mandor

Res:

Pekerjaan Beton

Penulangan Sloof Pagar

Penulangan Kolom Pagar

Penulangan Ring Balok Pagar

Pemasangan Bekisting Sloof Pagar

Sloof Beton Pagar

Kolom Beton Pagar

Pemasangan Bekisting Ring Balok

Ring Balok Beton pagar

Start: 28/12/06

ID: 9

Start: 28/12/06

ID: 10

Start: 01/01/07

ID: 11

Start: 03/01/07

ID: 12

Start: 09/01/07

ID: 13

Start: 09/01/07

ID: 16

Start: 10/01/07

ID: 17

Start: 16/01/07

ID: 15

Start: 16/01/07

ID: 18

Finish: 22/01/07

Dur: 17,5 day s

Finish: 29/12/06

Dur: 2 day s

Finish: 02/01/07

Dur: 2 day s

Finish: 04/01/07

Dur: 2 day s

Finish: 09/01/07

Dur: 4 hrs

Finish: 11/01/07

Dur: 2 day s

Finish: 15/01/07

Dur: 4 day s

Finish: 16/01/07

Dur: 4 hrs

Finish: 22/01/07

Dur: 4 day s

Comp: 0%

Res:

Tuk ang Besi[2]; Kepala Tuk ang Besi; Mandor; Kawat Pengik
Res:
at[0,5
Tuk
k g];
angPek
Besi[2];
erja[2];
Kepala
Besi Tuk
Beton[40
ang Besi;
k g] Mandor; Kawat Pengik
Res:
at[0,5
Tuk
k g];
angPek
Besi[2];
erja[2];
Kepala
Besi Tuk
Beton[40
ang Besi;
k g] Mandor; Kawat Pengik at[0,5 k g]; Pek erja[2]; Besi Beton[40 k g]

Res:

Pek erja[2]; Tuk ang Kay u[2]; Kepala Tuk ang Kay u; Mandor;
Res:PakPek
u Biasa[1
erja[2];k g];
TukKay
anguBesi[2];
Klas IV[0,1
Kepala
m3]Tuk ang Besi; Mandor;Res:
Pasir Pasang[6
Pek erja[2];
m3];
TukSemen
ang Besi[2];
Portland[10
Kepalazak
Tuk
] ang Besi; Mandor;Res:
Pasir Pasang[6
Pek erja[2];
m3];
TukSemen
ang Kay
Portland[10
u[2]; Kepala
zakTuk
] ang Kay u; Mandor;
Res:PakPek
u Biasa[1
erja[2];k g];
TukKay
anguBesi[2];
Klas IV[0,1
Kepala
m3]Tuk ang Besi; Mandor; Pasir Pasang[6 m3]; Semen Portland[10 zak ]

Pemasangan Bekisting Kolom


Start: 09/01/07

ID: 14

Finish: 09/01/07

Dur: 4 hrs

Res:

Pek erja[2]; Tuk ang Kay u[2]; Kepala Tuk ang Kay u; Mandor; Pak u Biasa[1 k g]; Kay u Klas IV[0,1 m3]

Pekerjaan Dinding

Pas Dinding batu bata 1:4

Plesteran Dinding Pagar 1:2

Acian

Start: 22/01/07

ID: 19

Start: 22/01/07

ID: 20

Start: 26/01/07

ID: 21

Start: 30/01/07

ID: 22

Start: 01/02/07

ID: 23

Finish: 05/02/07

Dur: 10 day s

Finish: 26/01/07

Dur: 4 day s

Finish: 31/01/07

Dur: 3 day s

Finish: 02/02/07

Dur: 3 day s

Finish: 05/02/07

Dur: 2 day s

Comp: 0%

Res:

Page 1

Cat-Catan

Tuk ang Batu[2]; Kepala Tuk ang Batu; Mandor[2]; Batu Bata[120
Res: Tuk
bh];
ang
Pasir
Batu[2];
Pasang[1
Kepala
m3];
Tuk
Semen
ang Batu;
Portland[1
Pek erja[2];
zak ] Mandor;
Res:
PasirKepala
Pasang[1
Tukm3];
ang Batu;
Semen
Tuk
Portland[8
ang Batu;zak
Pek
] erja[2]; Mandor; Semen
Res: Tuk
Portland[9
ang Cat[2];
zak ] Kepala Tuk ang Cat; Pek erja[2]; Mandor; Plamir Tembok [4 k

Project: pembangunan pagar tembok


Date: Mon 25/02/13

Critical

Noncritical

Critical Milestone

Milestone

Critical Summary

Summary

Critical Inserted

Inserted

Critical Marked

Marked

Critical External

External

Project Summary
Page 2

Highlighted Critical

Highlighted Noncritical