Anda di halaman 1dari 4

1

15

14

13

12

12a

11

7
10

9a

2200

110

TRUE & PLANT NORTH

6
2200

8a

10

2 OF 4

12

13

14

15

16

5800

5200

5200

5200

5200

5200

5200

5200

5200

7200

4000

PRE
VAIL
ING

WIN
D

A3
200

7200

200

800

12000

12000

3 of 4

3 of 4

18

REFRENCE DWG.

800

5200

B02

17

80400

11

ARCHITECTURAL STANDARD DRAWINGS


ARCHITECTURAL BASIS OF DESIGN

3000

SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001

7200

MV
Transformer
Room

24
8400

A2

FINISH FLOOR + -0.15

NOTES

4000

9700

FINISH FLOOR + 1.65


FINISH FLOOR + 1.65

1900

1700

+ 0.30

1900

+ 0.30

1900

T/PAVEMENT 0.00

5600

700

3000

1-ALL DIMENSIONS ARE IN MILLIMETER UNLESS NOTED OTHERWISE.


2-ALL ELEVATIONS ARE IN METER.

3500

A1
A

200

42700

200

3700

5500

5600

ITR

Control room

15

MV
Switchgear

14300

FINISH FLOOR + 1.70

19

10800

10800

Ship Ladder
?

11200

10800

Anti Chemical Tile/Epoxy


?
Flooring

PDCS room

11800

200

LEGEND

11800

CONT

5500

22

Battery room
21

Ladder
?

FINISH FLOOR + 0.30

FB

FINISH FLOOR + 0.30

200

200

Eye Wash ?
and Shower

FFL

200

2700

200

4000

Safety
Storage for
FM200

1800

4400
3000

10800

18

10

3500

GALV

GALVANIZED

HPL

HIGH POINT LEVEL

MAX

MAXIMUM

MIN

MINIMUM

PL

PLATE

TH

THICKNESS

B/

BOTTOM OF

T/

TOP OF

KEY PLAN

2100

3 of 4

1300
PRE
V

Instrumental
workshop

4400

5000

Safety
Storage for
CO2

200

FINISH FLOOR + 0.00

HVAC room
17

25

Pantry
14

10400

1100

12
FINISH FLOOR + 0.15

Switchgear
1
1 : 100

11

10

Instrumental
office
7

N 200.00

Locker and
Shower

T/PAVEMENT 0.00

Ship Ladder
?

6200

1100 100

12

3800

2200

Storage
13

13

1200

2100

N 240.00

11

2 OF 4

14

4900

100 1200

Lavatory

CIVIL HIGH POINT LEVEL -0.15

1600

2000

F1

1200

7200

N 280.00

1800

200

700

4000

GAURD HOUSE

Electrical
office

200

200

200

1200

5000

200

3600

1600

5000

200

MAIN GATE

200

200

5000

200

4000

1800

5000

200

5500

200

5900
5000

200

110

G
WIN
D

5500

11800

23

CIVIL HIGH POINT LEVEL -0.15

1100

5900

FINISH FLOOR + 1.65

LV
Transformer
Room

600

A ILIN

2800
17900

T/PAVEMENT 0.00

2200

3500

1700

F2

TRUE & PLANT NORTH

5500

2100

FINISH FLOOR + 0.30

200

16

1000

10200

FINISH FLOOR + 0.15

4900

FLAT BAR

Telecom/
Permit room

200

200

Electrical
workshop

Main hall and


Corridor

3500

Ladder
?

Building/LCR

1800

120.00
N 160.00

FINISH FLOOR + 0.15

FINISH FLOOR + 0.15


CIVIL HIGH POINT LEVEL -0.15

H
5800

5200

12
5200

11
5200

10

5200

5200

3000

13

AIR
CO M P R E S S O R
PA C K A G E
PK-0 07

P-080B
P-080A
F-080

HOLD
V-050

V-051

AE-001

V-003

F-001

V-004

T-001
V-005

5200

NI TR O GE N
INER T G AS
PA C K A G E
PK-0 07

TK-070

LAYDOWN AREA

V-006

P-070B
P-070A

N 040.00

Number

5500

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Grand total

5500

J
22100

Ladder
?

Cable gallery

5800

26

5500

FINISH FLOOR -1.15

5500

1
3 of 4

Cable Gallery
1 : 100

Control room
Engineer room
Shift supervisor
Printer room
Telecom/ Permit room
Electrical office
Instrumental office
Electrical workshop
Instrumental workshop
Safety Storage for FM200
Locker and Shower
Lavatory
Storage
Pantry
ITR
Main hall and Corridor
HVAC room
HVAC Electrical panel
MV Switchgear
LV Switchgear
Battery room
PDCS room
LV Transformer Room
MV Transformer Room
Safety Storage for CO2
Cable gallery

Number

Name

1
2
3
4
Grand total

Cable Gallery
Electrical Spaces
Instrumental Spaces
Suportive Spaces

Number

B02

B02

J
B02 21-Jan-2014
B01 08-Oct-2013
REV.

ISSUED FOR DESIGN


ISSUE FOR COMMENT

A.A. M.K. A.B.


A.A. M.K. A.B.
PREP. CHK. APPR.

DESCRIPTION

DATE

SAZEH

CONSULTANTS

ENGINEERING & CONSTRUCTION

P.E.D.E.C
PROJECT NAME:

YARAN OIL FIELD DEVELOPMENT PROJECT

Area
1150 m
1510 m
360 m
640 m
3660 m

DRAWING TITLE :

ARCHITECTURAL DRAWING OF
CONTROL BUILDING/LCR

Others

FINISH FLOOR -1.15

3.35
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.80
2.80
3.00
3.00
3.35
3.00
6.00
6.00
5.50
5.50
5.50
5.50
3.80
4.80
3.45
2.20

PERIMETER FENCE

PLANS

3000

130 m
10 m
10 m
10 m
10 m
20 m
30 m
10 m
10 m
20 m
10 m
0 m
10 m
10 m
170 m
40 m
190 m
20 m
470 m
500 m
60 m
40 m
170 m
180 m
70 m
1090 m
3290 m

N 000.00

1400

Net Area

Built Area Schedule

46900

Ladder
?

Name

Net
Height

E 240.00

800

E 200.00

5200

SEWER
RETENSION
POUND

E 160.00

5200

Room Schedule

TK-001

E 120.00

3 of 4

E 080.00

5200

E 040.00

1500

FINISH FLOOR -1.15

E 000.00

P-005A
P-005B

V-060

2500

PK-010

TK-080

C-001A

14

PK-011

C-001B

15

3000

N 080.00

FIRE WATER PUMPS

FIRE WATER TANKS

6a

B02

10

11

12

Name
Paved area

13

15

A0

DWG NO.

SHEET NO.

SYCV-ARBASC-ENAR-DWAR-0002

1 of 4

2970 m

14

SIZE:

SCALE: 1:100

Area

16

17

REV.

B02

18

This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

File : D:\d-akbari\Yaran\Documents\Control building\titles


SAZ. P.O.I. : IFD2

FINISH FLOOR LEVEL

4000

2 OF 4

33000

2000

HVAC
Electrical
panel

46600

FINISH FLOOR + 1.70

2700

4000

20

2 OF 4

1800

200

200

7900

200

200

4000

5500

4700

LV
Switchgear

Shift
supervisor
4700

Printer room

3300

FINISH FLOOR + 1.65

3300

Engineer
room

CONTINUOUS

10

11

12

13

14

15

16

17

18

REFRENCE DWG.
A

A1

A2

ARCHITECTURAL STANDARD DRAWINGS


ARCHITECTURAL BASIS OF DESIGN

A3

SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001

T/PARAPET + 7.15

B/BEAM + 5.70

T/PARAPET + 4.75

NOTES
Exposed?Concrete

2300

2700

1-ALL DIMENSIONS ARE IN MILLIMETER UNLESS NOTED OTHERWISE.


2-ALL ELEVATIONS ARE IN METER.
FINISH FLOOR + 0.30

FINISH FLOOR + 0.30


T/PAVEMENT 0.00 Civil HIGH POINT LEVEL -0.15

T/PAVEMENT 0.00

White Stone
? Base
Cement Rendering
?

C
1

South Elevation
1 : 100

8a

10

9a

11

12

13

12a

14

LEGEND

15

CONT
FFL

B02

FB

Ship Ladder
?

Exposed?Concrete
T/PARAPET + 7.15

B/BEAM + 5.70
T/PARAPET + 4.75

FLAT BAR

GALV

GALVANIZED

HPL

HIGH POINT LEVEL

MAX

MAXIMUM

MIN

MINIMUM

PL

PLATE

TH

THICKNESS

B/

BOTTOM OF

T/

TOP OF

KEY PLAN

FINISH FLOOR + 1.65

2500

FINISH FLOOR + 1.65

FINISH FLOOR LEVEL

2200

2500

3000

B/BEAM + 3.80

CONTINUOUS

FINISH FLOOR + 0.30


T/PAVEMENT 0.00
Civil HIGH POINT LEVEL -0.15

White Stone
? Base

East Elevation
2
1 : 100

A3

A2

A1

F2

F1

G
Ship Ladder
?
Exposed?Concrete

T/PARAPET + 8.65

B/BEAM + 7.20

T/PARAPET + 5.05

B/BEAM + 5.00

B/BEAM + 3.95

B02

FINISH FLOOR + 1.65

T/WALL + 3.20

3000

T/WALL + 3.20

Ship Ladder
?

FINISH FLOOR + 1.65

T/PAVEMENT 0.00

Civil HIGH POINT LEVEL -0.15

White Stone
? Base
Cement Rendering
?

15

14

13

12

11

10

North Elevation
1 : 100

6a

T/PARAPET + 8.65

B02

Ship Ladder
?

Exposed?Concrete

B02 21-Jan-2014
B01 08-Oct-2013

T/PARAPET + 7.20

REV.

ISSUED FOR DESIGN


ISSUE FOR COMMENT

A.A. M.K. A.B.


A.A. M.K. A.B.
PREP. CHK. APPR.

DESCRIPTION

DATE

B/BEAM + 5.70

Corrugated
? Sheet
Ship Ladder
?

T/PARAPET + 5.10

SAZEH

B/BEAM + 3.80

ENGINEERING & CONSTRUCTION

2200

2600

P.E.D.E.C
PROJECT NAME:

YARAN OIL FIELD DEVELOPMENT PROJECT

3000

FINISH FLOOR + 1.65

2500

FINISH FLOOR + 1.65

FINISH FLOOR + 0.30


T/PAVEMENT 0.00
Civil HIGH POINT LEVEL -0.15

DRAWING TITLE :

ARCHITECTURAL DRAWING OF

Cement Rendering
?

CONTROL BUILDING/LCR

White Stone
? Base

ELEVATIONS

West Elevation
1 : 100

SIZE:

SCALE: 1:100

CONSULTANTS

10

11

12

13

14

15

L
A0

DWG NO.

SHEET NO.

SYCV-ARBASC-ENAR-DWAR-0002

2 of 4

16

17

REV.

B02

18

This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

File : D:\d-akbari\Yaran\Documents\Control building\B02\titles


SAZ. P.O.I. : IFD2

T/PARAPET + 4.75

10

11

12

13

14

15

16

17

18

REFRENCE DWG.
A

ARCHITECTURAL STANDARD DRAWINGS


ARCHITECTURAL BASIS OF DESIGN

SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001

B
15

14

13

12

11

10

NOTES

Ship Ladder
?

1-ALL DIMENSIONS ARE IN MILLIMETER UNLESS NOTED OTHERWISE.


2-ALL ELEVATIONS ARE IN METER.

T/PARAPET + 8.70

T/PARAPET + 7.20

B02

T/SLAB + 6.30

T/PARAPET + 4.80
T/SLAB + 4.20

2400

5500

LV
Switchgear

2200

HVAC room

2200

Main hall and


Corridor
16

FINISH FLOOR + 0.30

FINISH FLOOR + 0.15

T/PAVEMENT 0.00

Cable gallery

2200

Civil HIGH POINT LEVEL -0.15

2600

T/SLAB + 1.65

2800

Electrical
workshop

17

3000

2600

3100

100

20

26

CONT

FINISH FLOOR -1.15

LEGEND

T/PAVEMENT 0.00 Civil HIGH POINT LEVEL -0.15

FFL
FB

Section A
1 : 100

CONTINUOUS

FINISH FLOOR LEVEL


FLAT BAR

GALV

GALVANIZED

HPL

HIGH POINT LEVEL

MAX

MAXIMUM

MIN

MINIMUM

PL

PLATE

TH

THICKNESS

B/

BOTTOM OF

T/

TOP OF

KEY PLAN
A

F
T/PARAPET + 7.20

100

2400

2100

T/SLAB + 6.30

Control room

3000

Main hall and


Corridor

3000

3000

1300

3400

FINISH FLOOR + 0.30

1500

900

16

False?Floor

Locker and
Shower
11

FINISH FLOOR + 0.30

T/PAVEMENT 0.00
Civil HIGH POINT LEVEL -0.15

T/SLAB -1.15

Section B
2
1 : 100

I
G

F2

A1

A2

A3

T/PARAPET + 8.70
T/SLAB + 7.80

Ship Ladder
?
T/PARAPET + 5.10
5500

LV
Switchgear

T/SLAB + 4.20

PDCS room

20

22

B02 21-Jan-2014
B01 08-Oct-2013

3000

T/WALL + 3.20

Safety
Storage for
CO2

REV.

A.A. M.K. A.B.


A.A. M.K. A.B.
PREP. CHK. APPR.

DESCRIPTION

DATE

3200

T/SLAB + 1.65

ISSUED FOR DESIGN


ISSUE FOR COMMENT

25

Cable gallery
26

Civil HIGH POINT LEVEL -0.15

SAZEH

FINISH FLOOR -1.15

CONSULTANTS

ENGINEERING & CONSTRUCTION

P.E.D.E.C
PROJECT NAME:

YARAN OIL FIELD DEVELOPMENT PROJECT


DRAWING TITLE :

Section C
1 : 100

ARCHITECTURAL DRAWING OF
CONTROL BUILDING/LCR
SECTIONS

SIZE:

SCALE: 1:100

10

11

12

13

14

15

L
A0

DWG NO.

SHEET NO.

SYCV-ARBASC-ENAR-DWAR-0002

3 of 4

16

17

REV.

B02

18

This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

File : D:\d-akbari\Yaran\Documents\Control building\B02\titles


SAZ. P.O.I. : IFD2

T/PARAPET 0.00

Ladder
?
2200

FINISH FLOOR + 0.15

2900

Civil HIGH POINT LEVEL -0.15

FINISH FLOOR + 0.15

10

11

12

13

14

15

16

17

18

REFRENCE DWG.
A

ARCHITECTURAL STANDARD DRAWINGS


ARCHITECTURAL BASIS OF DESIGN

110

TRUE & PLANT NORTH

SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001

PRE
VAIL
ING

WIN
D

B
15

14

13

12

12a

11

10

2200
5800

5200

8a

3000

5200

5200

A3

5200

800

5200

5200

NOTES

80400
5200

5200

5200

LOW POINT OF ROOF + 5.36

800

12000

12000

3 of 4

3 of 4

1-ALL DIMENSIONS ARE IN MILLIMETER UNLESS NOTED OTHERWISE.


2-ALL ELEVATIONS ARE IN METER.

3000

4000

9a

22900

8500

A2
4000

LEGEND

CONT

A1

FB

700

52900

24300

2800

11200

11100

5500

FFL

HIGH POINT OF ROOF + 7.06

15700

FINISH FLOOR LEVEL


FLAT BAR

GALV

GALVANIZED

HPL

HIGH POINT LEVEL

MAX

MAXIMUM

MIN

MINIMUM

PL

PLATE

TH

THICKNESS

B/

BOTTOM OF

T/

TOP OF

KEY PLAN

21000

22300

TRUE & PLANT NORTH

5500

16300

CONTINUOUS

PRE
V

5800

A ILIN

110

G
WIN
D

5500

FINISH FLOOR + 8.00

MAIN GATE

2 OF 4

GAURD HOUSE

2 OF 4

N 280.00

33100

33300

11100

D
N 240.00

15700

FINISH FLOOR + 4.40

21000

5500

10500

B02

G
N 200.00

1
3 of 4

47100
22200

F2

Building/LCR

HIGH POINT OF ROOF + 5.51

6200

5500

N 080.00

FIRE WATER PUMPS

FINISH FLOOR + 6.50

FIRE WATER TANKS

5500

120.00
N 160.00

PK-011

V-050

FINISH FLOOR + 4.40

700

V-051

AE-001

V-003

F-001

V-004

T-001
V-005

10700

LOW POINT OF ROOF + 4.31

C-001B

P-080B
P-080A
F-080

HOLD

31800

PK-010

TK-080

C-001A

AIR
CO M P R E S S O R
PA C K A G E
PK-0 07

NI TR O GE N
INER T G AS
PA C K A G E
PK-0 07

TK-070

LAYDOWN AREA

V-006

P-070B
P-070A

N 040.00

P-005A
P-005B

V-060

TK-001

SEWER
RETENSION
POUND

F1

14

13

12

11

10

12200

7300

E 240.00

E 200.00

E 160.00

PERIMETER FENCE

E 120.00

E 080.00

E 040.00

5500

4
2 OF 4

E 000.00

N 000.00

12200

24300

6a

J
ROOF PLAN
1 : 100

B02 21-Jan-2014
REV.

A.A. M.K. A.B.

ISSUED FOR DESIGN


-

PREP. CHK. APPR.

DESCRIPTION

DATE

SAZEH

CONSULTANTS

ENGINEERING & CONSTRUCTION

P.E.D.E.C
PROJECT NAME:

YARAN OIL FIELD DEVELOPMENT PROJECT


DRAWING TITLE :

ARCHITECTURAL DRAWING OF
CONTROL BUILDING/LCR
ROOF PLAN

SIZE:

SCALE: 1:100

10

11

12

13

14

15

A0

DWG NO.

SHEET NO.

SYCV-ARBASC-ENAR-DWAR-0002

4 of 4

16

17

REV.

B02

18

This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

File : D:\d-akbari\Yaran\Documents\Control building\titles


SAZ. P.O.I. : IFD2

Anda mungkin juga menyukai