15
14
13
12
12a
11
7
10
9a
2200
110
6
2200
8a
10
2 OF 4
12
13
14
15
16
5800
5200
5200
5200
5200
5200
5200
5200
5200
7200
4000
PRE
VAIL
ING
WIN
D
A3
200
7200
200
800
12000
12000
3 of 4
3 of 4
18
REFRENCE DWG.
800
5200
B02
17
80400
11
3000
SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001
7200
MV
Transformer
Room
24
8400
A2
NOTES
4000
9700
1900
1700
+ 0.30
1900
+ 0.30
1900
T/PAVEMENT 0.00
5600
700
3000
3500
A1
A
200
42700
200
3700
5500
5600
ITR
Control room
15
MV
Switchgear
14300
19
10800
10800
Ship Ladder
?
11200
10800
PDCS room
11800
200
LEGEND
11800
CONT
5500
22
Battery room
21
Ladder
?
FB
200
200
Eye Wash ?
and Shower
FFL
200
2700
200
4000
Safety
Storage for
FM200
1800
4400
3000
10800
18
10
3500
GALV
GALVANIZED
HPL
MAX
MAXIMUM
MIN
MINIMUM
PL
PLATE
TH
THICKNESS
B/
BOTTOM OF
T/
TOP OF
KEY PLAN
2100
3 of 4
1300
PRE
V
Instrumental
workshop
4400
5000
Safety
Storage for
CO2
200
HVAC room
17
25
Pantry
14
10400
1100
12
FINISH FLOOR + 0.15
Switchgear
1
1 : 100
11
10
Instrumental
office
7
N 200.00
Locker and
Shower
T/PAVEMENT 0.00
Ship Ladder
?
6200
1100 100
12
3800
2200
Storage
13
13
1200
2100
N 240.00
11
2 OF 4
14
4900
100 1200
Lavatory
1600
2000
F1
1200
7200
N 280.00
1800
200
700
4000
GAURD HOUSE
Electrical
office
200
200
200
1200
5000
200
3600
1600
5000
200
MAIN GATE
200
200
5000
200
4000
1800
5000
200
5500
200
5900
5000
200
110
G
WIN
D
5500
11800
23
1100
5900
LV
Transformer
Room
600
A ILIN
2800
17900
T/PAVEMENT 0.00
2200
3500
1700
F2
5500
2100
200
16
1000
10200
4900
FLAT BAR
Telecom/
Permit room
200
200
Electrical
workshop
3500
Ladder
?
Building/LCR
1800
120.00
N 160.00
H
5800
5200
12
5200
11
5200
10
5200
5200
3000
13
AIR
CO M P R E S S O R
PA C K A G E
PK-0 07
P-080B
P-080A
F-080
HOLD
V-050
V-051
AE-001
V-003
F-001
V-004
T-001
V-005
5200
NI TR O GE N
INER T G AS
PA C K A G E
PK-0 07
TK-070
LAYDOWN AREA
V-006
P-070B
P-070A
N 040.00
Number
5500
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Grand total
5500
J
22100
Ladder
?
Cable gallery
5800
26
5500
5500
1
3 of 4
Cable Gallery
1 : 100
Control room
Engineer room
Shift supervisor
Printer room
Telecom/ Permit room
Electrical office
Instrumental office
Electrical workshop
Instrumental workshop
Safety Storage for FM200
Locker and Shower
Lavatory
Storage
Pantry
ITR
Main hall and Corridor
HVAC room
HVAC Electrical panel
MV Switchgear
LV Switchgear
Battery room
PDCS room
LV Transformer Room
MV Transformer Room
Safety Storage for CO2
Cable gallery
Number
Name
1
2
3
4
Grand total
Cable Gallery
Electrical Spaces
Instrumental Spaces
Suportive Spaces
Number
B02
B02
J
B02 21-Jan-2014
B01 08-Oct-2013
REV.
DESCRIPTION
DATE
SAZEH
CONSULTANTS
P.E.D.E.C
PROJECT NAME:
Area
1150 m
1510 m
360 m
640 m
3660 m
DRAWING TITLE :
ARCHITECTURAL DRAWING OF
CONTROL BUILDING/LCR
Others
3.35
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.80
2.80
3.00
3.00
3.35
3.00
6.00
6.00
5.50
5.50
5.50
5.50
3.80
4.80
3.45
2.20
PERIMETER FENCE
PLANS
3000
130 m
10 m
10 m
10 m
10 m
20 m
30 m
10 m
10 m
20 m
10 m
0 m
10 m
10 m
170 m
40 m
190 m
20 m
470 m
500 m
60 m
40 m
170 m
180 m
70 m
1090 m
3290 m
N 000.00
1400
Net Area
46900
Ladder
?
Name
Net
Height
E 240.00
800
E 200.00
5200
SEWER
RETENSION
POUND
E 160.00
5200
Room Schedule
TK-001
E 120.00
3 of 4
E 080.00
5200
E 040.00
1500
E 000.00
P-005A
P-005B
V-060
2500
PK-010
TK-080
C-001A
14
PK-011
C-001B
15
3000
N 080.00
6a
B02
10
11
12
Name
Paved area
13
15
A0
DWG NO.
SHEET NO.
SYCV-ARBASC-ENAR-DWAR-0002
1 of 4
2970 m
14
SIZE:
SCALE: 1:100
Area
16
17
REV.
B02
18
This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
4000
2 OF 4
33000
2000
HVAC
Electrical
panel
46600
2700
4000
20
2 OF 4
1800
200
200
7900
200
200
4000
5500
4700
LV
Switchgear
Shift
supervisor
4700
Printer room
3300
3300
Engineer
room
CONTINUOUS
10
11
12
13
14
15
16
17
18
REFRENCE DWG.
A
A1
A2
A3
SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001
T/PARAPET + 7.15
B/BEAM + 5.70
T/PARAPET + 4.75
NOTES
Exposed?Concrete
2300
2700
T/PAVEMENT 0.00
White Stone
? Base
Cement Rendering
?
C
1
South Elevation
1 : 100
8a
10
9a
11
12
13
12a
14
LEGEND
15
CONT
FFL
B02
FB
Ship Ladder
?
Exposed?Concrete
T/PARAPET + 7.15
B/BEAM + 5.70
T/PARAPET + 4.75
FLAT BAR
GALV
GALVANIZED
HPL
MAX
MAXIMUM
MIN
MINIMUM
PL
PLATE
TH
THICKNESS
B/
BOTTOM OF
T/
TOP OF
KEY PLAN
2500
2200
2500
3000
B/BEAM + 3.80
CONTINUOUS
White Stone
? Base
East Elevation
2
1 : 100
A3
A2
A1
F2
F1
G
Ship Ladder
?
Exposed?Concrete
T/PARAPET + 8.65
B/BEAM + 7.20
T/PARAPET + 5.05
B/BEAM + 5.00
B/BEAM + 3.95
B02
T/WALL + 3.20
3000
T/WALL + 3.20
Ship Ladder
?
T/PAVEMENT 0.00
White Stone
? Base
Cement Rendering
?
15
14
13
12
11
10
North Elevation
1 : 100
6a
T/PARAPET + 8.65
B02
Ship Ladder
?
Exposed?Concrete
B02 21-Jan-2014
B01 08-Oct-2013
T/PARAPET + 7.20
REV.
DESCRIPTION
DATE
B/BEAM + 5.70
Corrugated
? Sheet
Ship Ladder
?
T/PARAPET + 5.10
SAZEH
B/BEAM + 3.80
2200
2600
P.E.D.E.C
PROJECT NAME:
3000
2500
DRAWING TITLE :
ARCHITECTURAL DRAWING OF
Cement Rendering
?
CONTROL BUILDING/LCR
White Stone
? Base
ELEVATIONS
West Elevation
1 : 100
SIZE:
SCALE: 1:100
CONSULTANTS
10
11
12
13
14
15
L
A0
DWG NO.
SHEET NO.
SYCV-ARBASC-ENAR-DWAR-0002
2 of 4
16
17
REV.
B02
18
This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
T/PARAPET + 4.75
10
11
12
13
14
15
16
17
18
REFRENCE DWG.
A
SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001
B
15
14
13
12
11
10
NOTES
Ship Ladder
?
T/PARAPET + 8.70
T/PARAPET + 7.20
B02
T/SLAB + 6.30
T/PARAPET + 4.80
T/SLAB + 4.20
2400
5500
LV
Switchgear
2200
HVAC room
2200
T/PAVEMENT 0.00
Cable gallery
2200
2600
T/SLAB + 1.65
2800
Electrical
workshop
17
3000
2600
3100
100
20
26
CONT
LEGEND
FFL
FB
Section A
1 : 100
CONTINUOUS
GALV
GALVANIZED
HPL
MAX
MAXIMUM
MIN
MINIMUM
PL
PLATE
TH
THICKNESS
B/
BOTTOM OF
T/
TOP OF
KEY PLAN
A
F
T/PARAPET + 7.20
100
2400
2100
T/SLAB + 6.30
Control room
3000
3000
3000
1300
3400
1500
900
16
False?Floor
Locker and
Shower
11
T/PAVEMENT 0.00
Civil HIGH POINT LEVEL -0.15
T/SLAB -1.15
Section B
2
1 : 100
I
G
F2
A1
A2
A3
T/PARAPET + 8.70
T/SLAB + 7.80
Ship Ladder
?
T/PARAPET + 5.10
5500
LV
Switchgear
T/SLAB + 4.20
PDCS room
20
22
B02 21-Jan-2014
B01 08-Oct-2013
3000
T/WALL + 3.20
Safety
Storage for
CO2
REV.
DESCRIPTION
DATE
3200
T/SLAB + 1.65
25
Cable gallery
26
SAZEH
CONSULTANTS
P.E.D.E.C
PROJECT NAME:
Section C
1 : 100
ARCHITECTURAL DRAWING OF
CONTROL BUILDING/LCR
SECTIONS
SIZE:
SCALE: 1:100
10
11
12
13
14
15
L
A0
DWG NO.
SHEET NO.
SYCV-ARBASC-ENAR-DWAR-0002
3 of 4
16
17
REV.
B02
18
This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
T/PARAPET 0.00
Ladder
?
2200
2900
10
11
12
13
14
15
16
17
18
REFRENCE DWG.
A
110
SYCV-ARBASC-ENAR-DWAR-0001
SYCV-ARBASC-ENAR-BSDE-0001
PRE
VAIL
ING
WIN
D
B
15
14
13
12
12a
11
10
2200
5800
5200
8a
3000
5200
5200
A3
5200
800
5200
5200
NOTES
80400
5200
5200
5200
800
12000
12000
3 of 4
3 of 4
3000
4000
9a
22900
8500
A2
4000
LEGEND
CONT
A1
FB
700
52900
24300
2800
11200
11100
5500
FFL
15700
GALV
GALVANIZED
HPL
MAX
MAXIMUM
MIN
MINIMUM
PL
PLATE
TH
THICKNESS
B/
BOTTOM OF
T/
TOP OF
KEY PLAN
21000
22300
5500
16300
CONTINUOUS
PRE
V
5800
A ILIN
110
G
WIN
D
5500
MAIN GATE
2 OF 4
GAURD HOUSE
2 OF 4
N 280.00
33100
33300
11100
D
N 240.00
15700
21000
5500
10500
B02
G
N 200.00
1
3 of 4
47100
22200
F2
Building/LCR
6200
5500
N 080.00
5500
120.00
N 160.00
PK-011
V-050
700
V-051
AE-001
V-003
F-001
V-004
T-001
V-005
10700
C-001B
P-080B
P-080A
F-080
HOLD
31800
PK-010
TK-080
C-001A
AIR
CO M P R E S S O R
PA C K A G E
PK-0 07
NI TR O GE N
INER T G AS
PA C K A G E
PK-0 07
TK-070
LAYDOWN AREA
V-006
P-070B
P-070A
N 040.00
P-005A
P-005B
V-060
TK-001
SEWER
RETENSION
POUND
F1
14
13
12
11
10
12200
7300
E 240.00
E 200.00
E 160.00
PERIMETER FENCE
E 120.00
E 080.00
E 040.00
5500
4
2 OF 4
E 000.00
N 000.00
12200
24300
6a
J
ROOF PLAN
1 : 100
B02 21-Jan-2014
REV.
DESCRIPTION
DATE
SAZEH
CONSULTANTS
P.E.D.E.C
PROJECT NAME:
ARCHITECTURAL DRAWING OF
CONTROL BUILDING/LCR
ROOF PLAN
SIZE:
SCALE: 1:100
10
11
12
13
14
15
A0
DWG NO.
SHEET NO.
SYCV-ARBASC-ENAR-DWAR-0002
4 of 4
16
17
REV.
B02
18
This document is the property of OWNER. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.