PERMANENT FORMWORK
Bond-Dek
s unique side-lap interlocking system pro-vides for fast and simple construction.
The speed of erection results in major labour
cost savings.
The
The
900 cover
Depth
of
Slab
75
General
1. Bond-Dek floor slabs are basically one-way slabs designed to
carry uniformly distributed loads. The design does not cater for
heavy concentrated loads. The design does not cater for heavy
concentrated loads or moving loads. Where these occur the
design should be referred to a civil / structural engineer.
2. Calculations are generally in accordance with ISO 9001:2008
Quality Management System. Deflection during construction
calculated at span/180.
3. Where the Bond-Dek is not fixed directly to the end supports
(e.g. shear studs, hilti nails, etc.) steel closer pieces or transverse
straps are required along the ends.
4. For normal applications of Bond-Dek floors, welded steel mesh
reinforcement of 8 mm diameter steel bars at 200 mm spacing in
each direction is required, with minimum top cover along
supports (typically on top of shear studs).
MATERIAL:
ASTM446 grade C
(galvanised to Z275)
Accessories
The following accessories are available for use with Bond-Dek:
Steel side and end closers, self-tapping screws, pop rivets, hammer
drive screws and flashings made to order.
Effective
0,76
0,96
1,16
993
1 254
1 515
Neutral axis
Minimum
Mass per
Reduces I Effective depth from bottom
reduced Z
square
metre per metre width per metre width of Bond-Dek of Bond-Dek
(mm)
(10 5 mm4 )
(mm)
(10mm)
(kg/m)
7,8
9,85
11,9
22,2
30,3
38,7
0,884
1,170
1,463
74,76
74,96
75,16
35,05
36,38
37,37
0,8mm THICK
Nominal
Depth dead load
of slab
of slab
(mm)
(Dn)
(kN/m)
140
150
160
170
180
190
200
210
220
230
240
250
2,52
2,75
2,99
3,22
3,46
3,69
3,93
4,17
4,40
4,64
4,87
5,11
ALLOWABLE
LOAD TABLE
2,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,25
8,72
9,61
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,50
7,80
8,60
9,39
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
140
2,7
2,75
6,84
7,53
8,21
8,79
9,43
10,00
10,00
10,00
10,00
10,00
10,00
10,00
3,00
6,10
6,70
7,29
7,89
8,48
9,17
10,00
10,00
10,00
10,00
10,00
10,00
Span in metres
3,25
3,50
5,37
4,80
5,93
5,30
6,46
5,79
7,01
6,29
7,54
6,78
8,11
7,27
8,49
7,76
9,03
8,24
9,58
8,74
10,00
9,23
10,00
10,00
10,00
10,00
3,75
4,00
4,25
4,50
6,13
6,50
6,94
7,36
7,86
8,28
8,74
9,14
5,87
6,26
6,64
7,14
7,53
7,93
8,32
5,66
5,99
6,42
6,75
7,11
7,51
5,16
5,44
5,84
6,13
6,42
6,82
Spans to the right of the solid line require propping during construction.
1,0 mm THICK
Nominal
Depth dead load
of slab
of slab
(mm)
(Dn)
(kN/m)
140
150
160
170
180
190
200
210
220
230
240
250
2,53
2,75
2,99
3,22
3,46
3,69
3,93
4,17
4,40
4,64
4,87
5,11
2,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,25
8,72
9,61
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,50
7,80
8,60
9,39
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,75
6,84
7,53
8,21
8,79
9,43
10,00
10,00
10,00
10,00
10,00
10,00
10,00
140
3,2
Nominal
Depth dead load
of slab
of slab
(mm)
(Dn)
(kN/m)
2,56
2,79
3,03
3,27
3,50
3,74
3,97
4,21
4,44
4,68
4,91
5,15
3,75
4,00
4,25
4,50
6,13
6,50
6,94
7,36
7,86
8,28
8,74
9,14
5,87
6,26
6,64
7,14
7,53
7,93
8,32
5,66
5,99
6,42
6,75
7,11
7,51
5,16
5,44
5,84
6,13
6,42
6,82
Spans to the right of the solid line require propping during construction.
2,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,25
8,75
9,46
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
2,50
7,80
8,50
9,29
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
10,00
Span in metres
3,25
3,50
5,37
4,80
5,93
5,30
6,46
5,79
7,01
6,29
7,54
6,78
8,11
7,27
8,49
7,76
9,03
8,24
9,58
8,74
10,00
9,23
10,00
10,00
10,00
10,00
1,2 mm THICK
140
150
160
170
180
190
200
210
220
230
240
250
3,00
6,10
6,70
7,29
7,89
8,48
9,17
10,00
10,00
10,00
10,00
10,00
10,00
140
3,5
2,75
6,80
7,45
8,16
8,78
9,48
10,00
10,00
10,00
10,00
10,00
10,00
10,00
3,00
6,00
6,60
7,29
7,88
8,48
9,06
10,00
10,00
10,00
10,00
10,00
10,00
Span in metres
3,25
3,50
5,34
4,80
5,89
5,30
6,45
5,79
7,00
6,28
7,54
6,78
8,06
7,26
8,76
7,76
9,33
8,24
9,69
8,74
10,00
9,13
10,00
10,00
10,00
10,00
3,75
4,00
4,25
4,50
6,49
6,94
7,36
7,81
8,19
8,63
9,09
5,86
6,26
6,64
7,04
7,43
7,83
8,22
5,66
5,99
6,33
6,72
7,07
7,41
5,16
5,44
5,74
6,13
6,42
6,72
Spans to the right of the solid line require propping during construction.
0,8mm THICK
Nominal
Depth dead load
of slab
of slab
(mm)
(Dn)
(kN/m)
140
150
160
170
180
190
200
210
220
230
240
250
2,52
2,75
2,99
3,22
3,46
3,69
3,93
4,17
4,40
4,64
4,87
5,11
2,00
19,53
19,85
20,19
20,51
20,84
21,17
21,50
21,84
22,16
22,50
22,82
23,15
2,25
17,48
19,22
20,19
20,51
20,84
21,17
21,50
21,84
22,16
22,50
22,82
23,15
2,50
16,01
17,62
19,20
20,51
20,84
21,17
21,50
21,84
22,16
22,50
22,82
23,15
2,75
14,47
15,90
17,32
18,57
19,93
21,17
21,50
21,84
22,16
22,50
22,82
23,15
140
2,7
Span in metres
3,25
3,50
12,13
11,21
13,33
12,34
14,52
13,44
15,72
14,57
16,91
15,69
18,15
16,80
19,08
17,92
20,29
19,03
21,48
20,15
22,50
21,26
22,82
22,82
23,15
23,15
3,75
4,00
4,25
4,50
14,64
15,57
16,61
17,62
18,73
19,74
20,81
21,77
14,56
15,52
16,47
17,59
18,54
19,50
20,46
14,56
15,42
16,44
17,30
18,20
19,16
13,76
14,55
15,51
16,30
17,10
18,06
Spans to the right of the solid line require propping during construction.
1,0 mm THICK
2,53
2,77
3,00
3,24
3,48
3,71
3,95
4,19
4,42
4,66
4,89
5,13
3,00
13,29
14,85
15,84
17,13
18,41
19,84
21,50
21,84
22,16
22,50
22,82
23,15
Nominal
Depth dead load
of slab
of slab
(mm)
(Dn)
(kN/m)
140
150
160
170
180
190
200
210
220
230
240
250
FACTORED
LOAD TABLE
2,00
19,54
19,88
20,20
20,54
20,87
21,19
21,53
21,87
22,19
22,52
22,85
23,18
2,25
17,50
19,25
20,20
20,54
20,87
21,19
21,53
21,87
22,19
22,52
22,85
23,18
2,50
16,04
17,64
19,23
20,54
20,87
21,19
21,53
21,87
22,19
22,52
22,85
23,18
140
3,2
2,75
14,49
15,93
17,34
18,60
19,92
21,19
21,53
21,87
22,19
22,52
22,85
23,18
3,00
13,32
14,60
15,87
17,15
18,44
19,70
21,53
21,87
22,19
22,52
22,85
23,18
Span in metres
3,25
3,50
12,15
11,24
13,36
12,36
14,54
13,47
15,75
14,59
16,94
15,72
18,09
16,82
19,12
17,95
20,32
19,05
21,54
20,18
22,52
21,28
22,85
22,85
23,18
23,18
3,75
4,00
4,25
4,50
14,67
15,59
16,64
17,65
18,68
19,71
20,59
21,55
14,58
15,55
16,49
17,46
18,40
19,37
20,33
14,59
15,45
16,32
17,27
18,16
19,12
13,79
14,57
15,38
16,32
17,13
18,09
Spans to the right of the solid line require propping during construction.
1,2 mm THICK
Nominal
Depth dead load
of slab
of slab
(mm)
(Dn)
(kN/m)
140
150
160
170
180
190
200
210
220
230
240
250
2,56
2,79
3,03
3,27
3,50
3,74
3,97
4,21
4,44
4,68
4,91
5,15
2,00
19,58
19,91
20,24
20,58
20,90
21,24
21,56
21,89
22,22
22,55
22,87
23,21
2,25
17,58
19,04
20,24
20,58
20,90
21,24
21,56
21,89
22,22
22,55
22,87
23,21
2,50
16,07
17,51
19,10
20,58
20,90
21,24
21,56
21,89
22,22
22,55
22,87
23,21
140
3,5
2,75
14,46
15,83
17,29
18,62
20,06
21,24
21,56
21,89
22,22
22,55
22,87
23,21
3,00
13,19
14,47
15,90
17,18
18,46
19,73
21,56
21,89
22,22
22,55
22,87
23,21
Span in metres
3,25
3,50
12,13
11,27
13,34
12,39
14,56
13,50
15,78
14,64
16,97
15,74
18,13
16,87
19,57
17,97
20,81
19,08
21,72
20,20
22,55
21,15
22,87
22,87
23,21
23,21
3,75
4,00
4,25
4,50
14,69
15,64
16,67
17,67
18,71
19,66
20,68
21,75
14,62
15,57
16,52
17,48
18,43
19,39
20,36
14,62
15,47
16,35
17,30
18,18
19,06
13,81
14,60
15,40
16,35
17,15
17,96
Spans to the right of the solid line require propping during construction.
INSTALLATION PROCEDURE
READ ENTIRE PROCEDURE BEFORE POURING CONCRETE
Bond-Dek panels act as formwork for wet concrete and reinforcing for the slab. to commence installation the first Bond-Dek
panel is placed in the required position with the male interlocking rib pointing in the direction of laying as per sketch below.
Place the female interlocking rib to the outside. Place the interlocking female rib of the second panel onto the male rib of the
first panel at an approximate 45 angle and then lower panel down onto supports locking the side lap together (see sketch,
right). Repeat for each additional panel.
STRUCTURAL STEELWORK
Bond-Dek panels can be conveniently fixed to steel
supports with either Top Speed screws or shot driven
fasteners. One fixing in each pan is required.
Top Speed screws or shot driven fasteners
SHEAR STUDS
25
Shear stud
lap
Overlapping panel
1 mm thick
Stabilizing strap
75 mm
500 mm
500 mm
500 mm
500 mm
500 mm
500 mm
500 mm
500 mm
FIXING TO CONCRETE
Weld in continuous
support around
column
Fixing with Top Speed screws or Shot driven fasteners at 500 mm centres
KERB FLASHING
Straps at 450 mm
centres
450 mm
Slab
thickness
450 mm
25
Galv. steel Strap
Bond-Dek
Slab
thickness
25
Bond-Dek
35
FIRE APPLICATIONS
For Fire Applications of Bond-Dek floors, welded steel mesh reinforcement of 8 mm diameter steel bars at 200 mm centres
in each direction is required with minimum top cover along supports (typically on top of shear studs).
8 mm dia Welded mesh
25 mm min cover
over shear stud
Shear studs
POURING CONCRETE
Pour concrete over load bearing beams. Never exceed a concrete height of 300 mm and avoid load concentration, i.e.
excessive equipment or manpower.
140
2,7
140
3,2
140
3,5
VERSION 2011
GRS Isando
HH Robertson
Tel:+27(0)11 392 9800
GRS Boksburg
Brownbuilt
Tel:+27(0)11 898 2900
GRS Rustenburg
Roofzone
Tel:+27(0)14 596 6121
Country Roofing
Namibia
Tel:+264(0)61 263 890
GRS Durban
Tel:+27(0)31 579 7555
GRS Bloemfontein
Tel:+27(0)51 432 3724
CALL US NATIONWIDE ON
0861 564 477
www.globalroofs.co.za
10