ANNEXURE - 1

PLPL, 2x30 MW

SOAK PIT SIZING CALCULATIONS

29/11/2010

PLPL-2X30MW - SOAK PIT CALCULATIONS FOR TRANSFORMERS


INPUT DATA
Transformers
Tranmsformer Dimensions
Length (a)
Width (b)
Height (C)
Oil Qty
A TRAFO PIT CALCULATIONS
I Trafo Soak Pit Dimensions
Length
Width
Depth
Total Volume

40 MVA
GT
5m
5.3 m
5.7 m
13.6 kL

29.11.10
12 MVA
Adora
4.8 m
4.9 m
4.7 m
7.6 kL

10 MVA
MV UAT
5.2 m
4m
4.1 m
7.4 kL

2.5 MVA
LV UAT
2.27 m
2.42 m
2.36 m
1.6 kL

=LXWXD

6.40
6.80
1.00
43.52

m
m
m
m3

5.30
5.50
1.00
29.15

m
m
m
m3

5.80
5.00
0.90
26.10

m
m
m
m3

3.30
3.00
0.75
7.43

m
m
m
m3

II Area occupied by Foundation


Length
Width
Depth
Total Volume occupied

=LXWXD

4.40
2.40
1.00
10.56

m
m
m
m3

3.310
2.165
1.00
7.17

m
m
m
m3

3.90
1.80
0.90
6.32

m
m
m
m3

4.60
0.45
0.75
1.55

m
m
m
m3

III Net Volume of soak pit

= Soak Pit Volume - Foundation Volume (I-II)

3
32.96 m

3
21.98 m

3
19.78 m

3
5.87 m

3
23.07 m

3
15.39 m

3
13.85 m

3
4.11 m

3
9.89 m

3
6.60 m

3
5.93 m

3
1.76 m

2
143.92 m

2
114.70 m

2
96.24 m

2
27.63 m

IV Volume Occupied by Gravel

Considered as 70 % of Net Soak Pit Volume

V Net Volume availbale for Oil &Water

= Net Volume of soak pit - Volume occupied by Gravel

VI Surface Area of Transformer

= (axb) + 2(bxc) + 2(axc)

VII Qty of Water for 10 min

= 10.2 lit / m2 / min

14.68 KL

11.70 KL

9.82 KL

2.82 KL

VIII Total qty of Oil and Water

= Transformer oil qty + Water qty

28.28 KL

19.30 KL

17.22 KL

4.42 KL

IX Soak Pit size required

Considered as 1/3 of Qty of (Oil + Water)

3
9.43 m

3
6.43 m

3
5.74 m

3
1.47 m

Net Volume available > Oil + Water quantity , thus OK


B MAIN SOAK PIT CALCULATIONS
Largest Oil qty
+ Water Qty
+10% Oil
Total Qty of Oil + Water
Slope of Pipe is 1: 100 mm
Total Length of Pipe
Slope
PIT Dimensions
Length
Width
Depth
Depth of drain pipe
Invert level of oil pit
Depth of of oil pit from FGL
Net Volume avaialble for oil + water
Volume avlb > Oil+ Water qty , thus OK

Trafo-soak pit-PLPL

Refer Input Data


As Calculated above

= Length of pipe / Slope

= LXWXD

13.60
14.68
1.36
29.64

KL
KL
KL
KL

7.40
9.82
0.74
17.96

KL
KL
KL
KL

1.60
2.82
0.16
4.58

KL
KL
KL
KL

30000.00 mm
300.00 mm

30000.00 mm
300.00 mm

30000.00 mm
300.00 mm

6.00
3.50
1.41
1.50
3.01
2.71
29.64

6.00
2.50
1.20
1.40
2.70
2.40
17.96

2.50
1.50
1.22
1.25
2.57
2.27
4.58

m
m
m
m
m
m
m3

m
m
m
m
m
m
m3

m
m
m
m
m
m
m3