POWER SYSTEM PROTECTION AND RELAYING


UI: EE 525
Homework #1
Due: Session 4 [Thats September 2 (on-campus) and September 16 (outreach)]

1. Name the devices identified by the following abbreviations


(a) CT
(b) CCVT
(c) NO
(d) PT
(e) NC
(f) BT
(g) VAR
(h) VT
2. Name the devices identified by the following numbers
(a) 21
(b) 27
(c) 32
(d) 37
(e) 40
(f) 50
(g) 51
(h) 87
(i) 67
(j) 78

UI: ECE 525/NTU: PS 756-S


Power Systems Protection and Relaying

Session 2; Page 2/2


Fall 2004

3. The one-line diagram for a three phase distribution feeder is shown below. Neglect exciting branch
of transformer. The three phase load consists of WYE connected series R-L elements with the values
given.
(a) Sketch per unit, per phase diagram for the system. Use a VA base of 200 kVA and a high side
voltage base of 2400V line-to-line.
(b) Determine V1 line-to-line if the load sees a voltage of 235V line-to-line.
2400:240V
150 kVA
X = 10%
LOAD

V1

R = 0.44
3 phase, high voltage feeder.

3 phase, low voltage feeder.

Series impedance of

Series impedance of

0.25 + j 1.0 /phase

4. Problem 2.5 in your text book


5. Problem 2.6 in your text book

0.0008 + j0.0033 /phase

X = 0.33