LINK NAME
PROJECT
TESTED BY
LOKASI TES
Sta
PROVINCE
f2
DATE OF TESTING
Sta
bxf
2,54
8+000
Sta
TYPE f (Cm)
bxf
2,54
SPP
10
10
15
20
15 20
25
30
35
40
45
10
10
20
20
30
30
40 40
50 50
60 60
70 70
80 80
90 90
20
10
10
15
20
15 20
25
30
35
40
45
10
20
30 30
40 40
50 50
60 60
70 70
80 80
90
90
CBR =
0,0 %
bxf
2,54
Sta
8+200
10
15
20
25
30
Sta
OVERLYING PAVEMENT
TYPE f (Cm)
bxf
2,54
8+400
TYPE f (Cm)
STRUCTURAL
SPP
35
40
45
10
20
20
30
30
4040
5050
6060
7070
8080
9090
10
05
STRUCTURAL
SPP
0,0 %
40
10
15
20
25
30
2010
3020
30
40
40
50
50
60
60
7070
8080
9090
CBR =
0,0 %
20
30
40
50 50
60 60
70 70
80
90
80
90
CBR =
0,0 %
SPP
10 15 20 25 30 35 40 45 50
10 0
20 10
30
bxf
2,54
10 15 20 25 30 35 40 45 50
OVERLYING PAVEMENT
25 30 35 40 45 50
CBR =
10
10
STRUCTURAL
n
0,0 %
CBR =
25 30 35 40 45 50
8+200
TYPE f (Cm)
SPP
OVERLYING PAVEMENT
STRUCTURAL
OVERLYING PAVEMENT
STRUCTURAL
n
8+000
f (Cm)
Reading D
Pen.
D
Lampung
f1
OVERLYING PAVEMENT
TYPE
LINK No.
n = no. of blows
Penetration A D
SPP =
D/n
CBR %
35
40
45
50