PERFORMANCE TEST CALCULATION

SAN GABRIEL 450MW CCPP


[SG2-EPC-2013-02/03]

27 Aug 2016
Submitted to: First NatGas Power Corp (FNPC)
Submitted by: WSP | Parsons Brinckerhoff
www.wsp-pb.com

San Gabriel 450MW CCPP

WSP | Parsons Brinckerhoff


1. Summary of Performance Test Results
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

3.00 PM

5.00 PM

6.00 PM

Performance test stop time

3.00 PM

4.00 PM

6.00 PM

7.00 PM

6,200.0

6,200.0

Performance test date

Corrected Test Results


Net Electrical Output

[kW]

421,267.5

421,240.6

Net Plant Heat Rate

[kJ/kWh]

5,786.4

5,849.2

Average Net Electrical Output

[kW]

Average Net Plant Heat Rate

[kJ/kWh]

421,254.1
5,817.8

6,200.0

Performance Guarantee
Net Electrical Output

414,100

[kW]

Measured values of Net Heat Rate

[kJ/kWh]

Net Weighted Heat Rate

[kJ/kWh]

6,096

6,281
6,152

Minimum Performance Requirements


Net Electrical Output
Net Weighted Heat Rate

[%]

96%

[kW]

397,536

[%]

104%

[kJ/kWh]

6,398

Final Test Results


Net Electrical Output
Net Weighted Heat Rate

[kW]

421,254

[kJ/kWh]

5,932

[kW]

7,154

Differences
of Net Electrical Output
of Net Weighted Heat Rate

Performance Test Calculation

[kJ/kWh]

Confidential

219

1 of 7

San Gabriel 450MW CCPP

WSP | Parsons Brinckerhoff


2. Measured Variables from Test Instruments
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

4.00 PM

6.00 PM

7.00 PM

Performance test stop time

3.00 PM

5.00 PM

7.00 PM

8.00 PM

Performance test date

Electrical measurements
Net active power

7016_P

801

[kW]

406,101.1

405,472.9

314,105.0

314,009.4

Net voltage

7016_U

802

[V]

230,324.7

231,000.9

231,890.3

232,643.8

Net current

7016_I

803

[A]

1,037.0

1,028.8

801.4

793.8

Generator speed

7038_f

810

[1/s]

3,599.4

3,599.1

3,600.3

3,600.7

Gross active power

7038_P

811

[kW]

413,567.3

412,828.9

320,087.8

319,903.3

Gross voltage

7038_U

812

[V]

22,903.2

22,902.4

22,903.5

22,903.7

Gross current

7038_I

813

[A]

11,012.4

10,922.9

8,524.0

8,439.7

SPPA-T3000

814

[A]

2,539.1

2,495.9

2,144.1

2,068.8

Excitation current
Gas turbine measurements
Compressor inlet P

3006100

300_1

[mbar]

20.559

20.521

14.033

14.093

Compressor inlet P

3006103

300_2

[mbar]

20.764

20.719

14.166

14.224

Compressor inlet P

3006101

300_3

[mbar]

20.832

20.791

14.231

14.290

Compressor inlet P
GT inlet DBT (GT filer house)

3006094

300_4

[mbar]

20.586

20.538

14.106

14.168

5K150-0151

302

[C]

30.25

30.35

29.14

28.81

GT inlet DBT (GT filer house)

5K150-0121

303

[C]

30.21

30.37

29.16

28.83

GT inlet DBT (GT filer house)

5K150-0153

304

[C]

30.21

30.36

29.15

28.81

GT inlet DBT (GT filer house)

5K150-0119

305

[C]

30.29

30.35

29.20

28.83

GT inlet DBT (GT filer house)

5K150-0150

306

[C]

30.37

30.51

29.29

28.93

GT inlet DBT (GT filer house)

5K150-0115

307

[C]

30.29

30.44

29.22

28.85

GT inlet DBT (GT filer house)

5K150-0154

308

[C]

30.09

30.15

28.99

28.60

GT inlet DBT (GT filer house)

5K150-0122

309

[C]

30.37

30.43

29.29

28.89

GT inlet DBT (GT filer house)

5K150-0099

310

[C]

30.37

30.45

29.25

28.89

GT compressor inlet DBT

5UK150-0037

311

[C]

30.29

30.42

29.25

28.91

GT compressor inlet DBT

5UK150-0038

312

[C]

30.24

30.37

29.22

28.89

GT compressor inlet DBT

5UK150-0039

313

[C]

30.28

30.42

29.22

28.88

GT compressor inlet DBT

5UK150-0041

314

[C]

30.36

30.49

29.29

28.94

GT compressor inlet DBT

5UK150-0042

315

[C]

30.44

30.58

29.44

29.08

GT compressor inlet DBT

5UK150-0043

316

[C]

30.49

30.66

29.41

29.04

GT compressor inlet DBT

5UK150-0044

317

[C]

30.56

30.65

29.46

29.07

GT compressor inlet DBT

5UK150-0045

318

[C]

30.53

30.63

29.44

29.05

GT compressor inlet DBT

5UK150-0046

319

[C]

30.53

30.64

29.46

29.10

GT Equivalent Base Hours (EBH)

SPPA-T3000

[hr]

1,142.0

1,144.0

1,146.0

1,147.0

[C]

28.56

28.53

28.35

28.29

Water steam system


Condenser CW inlet temperature

5K150-0104

191

Ambient conditions
Ambient pressure

2002065

350

[bar]

1.0034

1.0030

1.0041

1.0046

Ambient pressure

2002059

351

[bar]

1.0035

1.0031

1.0040

1.0046

2002063

352

[bar]

1.0030

1.0028

1.0037

1.0042

Ambient DBT

Ambient pressure

5K100-0030

353

[C]

30.70

30.99

29.54

29.10

Ambient WBT

5K100-0029

354

[C]

26.45

25.66

25.76

26.04

Ambient DBT

5K100-0034

355

[C]

30.61

30.82

29.42

29.01

Ambient WBT

5K100-0033

356

[C]

26.36

25.54

25.67

25.96

252

[Hz]

1,155.38

1,151.30

907.15

908.41

1050030

253

[bar]

40.00

39.98

40.14

40.15

5EX150-0028

256

[C]

43.29

42.60

40.76

40.93

4KUK650-0030

257

[C]

217.60

217.60

217.90

217.80
0.01770

Fuel gas system


GT fuel gas flow
GT fuel gas pressure
GT fuel gas temperature
GT NG temperature after preheating
Dew point heater NG flow

DCS

259

[kg/s]

0.02263

0.02293

0.01748

Dew point heater NG temperature

DCS

260

[C]

28.29

28.2

23.6

23.1

Dew point heater NG pressure

DCS

261

[bar]

3.06

3.06

3.07

3.07

Performance Test Calculation

Confidential

2 of 7

San Gabriel 450MW CCPP

WSP | Parsons Brinckerhoff


3. Calculation of Correction Factors
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

4.00 PM

6.00 PM

7.00 PM

Performance test stop time

3.00 PM

5.00 PM

7.00 PM

8.00 PM

Performance test date

Measured value of reference parameters


Ambient temperature (external)
Ambient pressure (external)
Ambient humidity (external)
Fuel analysis (external)

C/H ratio

Power grid frequency (external)

[C]

30.27

30.38

29.19

28.83

[mbar]

1.0033

1.0030

1.0039

1.0045

[%]

71.89

65.73

74.35

78.67

[-]

3.1061

3.1062

3.1074

3.1074

[Hz]

59.99

59.99

60.01

60.01

Inlet pressure drop (operating)

[mbar]

20.685

20.642

14.134

14.194

Unit degradation (operating)

[EOH]

1142.037

1144.037

1146.037

1147.037

[C]

28.56

28.53

28.35

28.29

[-]

OFF

OFF

OFF

OFF

Condenser CW inlet temperature


Evaporative cooler
Inputs for correction factors
Ambient temperature (external)

30

Ambient pressure (external)

1.006

Ambient humidity (external)


Fuel analysis (external)

C/H ratio

[C]

0.27

0.38

-0.81

-1.17

[mbar]

-2.700

-3.033

-2.067

-1.533

70

[%]

1.89

-4.27

4.35

8.67

3.118

[-]

3.1061

3.1062

3.1074

3.1074

Power grid frequency (external)

60

[%]

-0.018

-0.025

0.009

0.019

Inlet pressure drop (operating)

11.8/7.6

[mbar]

9.085

9.042

6.534

6.594

Unit degradation (operating)

1320

[EBH]

Condenser CW inlet temperature

28.0

[C]

0.56

0.53

0.35

0.29

[-]

OFF

OFF

OFF

OFF

Evaporative cooler
Summary of Correction factors to plant power output
Ambient temperature (external)

1]

[-]

1.00145

1.00202

0.99637

0.99478

Ambient pressure (external)

2]

[-]

1.00264

1.00296

1.00199

1.00148

Ambient humidity (external)

3]

[-]

0.99980

1.00043

1.00286

1.00562

Fuel analysis (external)

5]

[-]

0.99983

0.99982

0.99983

0.99984

Power grid frequency (external)

[KP,1 grid]

[-]

1.00031

1.00043

0.99989

0.99977

Inlet pressure drop (operating)

[-]

1.01027

1.01022

1.01116

1.01126

Unit degradation (operating)

[KP,2 inlet P]
[KP,3 deg]

[-]

1.00000

1.00000

1.00000

1.00000

Evaporative cooler

[KP,5 evap, MCR]

[-]

1.02378

1.02378

2]

[-]

-706.292

-740.434

-371.271

-424.365

Circulating water temperature difference than design

Generator power factor

[kW]

189.268

178.796

86.257

71.189

Measured power different than design

[-]

Summary of Correction factors to heat rate


Ambient temperature (external)

f 1]

[-]

1.00000

1.00000

1.00007

1.00010

Ambient pressure (external)

f 2]

[-]

1.00003

1.00004

0.99998

0.99999

Ambient humidity (external)

f 3]
[KHR,1 grid]

[-]

1.00002

0.99995

0.99948

0.99899

[-]

0.99998

0.99998

1.00000

1.00001

[-]

0.99896

0.99896

0.99803

0.99801

Unit degradation (operating)

[KHR,2 inlet P]
[KHR,3 deg]

[-]

1.00000

1.00000

1.00000

1.00000

Evaporative cooler

[KHR,5 evap, MCR]

[-]

1.00047

1.00047

Power grid frequency (external)


Inlet pressure drop (operating)

Performance Test Calculation

Confidential

3 of 7

San Gabriel CCPP

WSP | Parsons Brinckerhoff


4. Calculation Power Factor Correction
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

4.00 PM

6.00 PM

7.00 PM

Performance test stop time

3.00 PM

5.00 PM

7.00 PM

8.00 PM

Performance test date

Gross power

P'gross,meas

[kW]

413,567

412,829

320,088

319,903

Gross voltage

U'gross,meas

[V]

22,903

22,902

22,904

22,904

Gross current

I'gross,meas

[A]

11,012

10,923

8,524

8,440

pf'

[-]

0.95

0.95

0.95

0.96

[kW]

406,101

405,473

314,105

314,009

Net voltage

[V]

230,325

231,001

231,890

232,644

Net current

[A]

1,037

1,029

801

794

Excitation current

[A]

2,539

2,496

2,144

2,069

[A]

12,213.5

12,191.7

9,452.8

9,447.4

[kVA]

486,550

485,681

376,574

376,357

Actual power factor


Net power

Generator losses at nominal power factor


Generator current at nominal power factor
Apparent power at nominal power factor
Field current
Friction losses at nominal power factor

Igross, pfN
Sgross
If

[A}

3,083

3,077

2,470

2,469

PL,FR,N

[kW]

1,500.00

1,500.00

1,500.00

1,500.00
558.57

Core losses at nominal power factor

PL,FE,N

[kW]

558.54

558.49

558.56

Brush contact losses at nominal power factor

PL,SC,N

[kW]

6.17

6.15

4.94

4.94

Field I2R losses at nominal power factor


Short-circuit losses at nominal power factor

PL,Exc,pfN

[kW]

1,383.04

1,378.33

887.74

886.94

Total generator losses at nominal power factor

PL,SC,pfN

[kW]

415.08

413.60

248.64

248.36

PL,pfN

[kW]

3,862.82

3,856.57

3,199.88

3,198.81

Generator losses at actual power factor


Friction losses at actual power factor

P'L,FR

[kW]

1,500.00

1,500.00

1,500.00

1,500.00

Core losses at actual power factor

P'L,FE

[kW]

558.54

558.49

558.56

558.57

Brush contact losses at actual power factor

P'L,SC

[kW]

5.08

4.99

4.29

4.14

Field I2R losses at actual power factor


Short-circuit losses at actual power factor

P'L,Exc

[kW]

938.29

906.68

669.04

622.88

Total generator losses at actual power factor


Power factor correction for the generator

P'L,Sc

[kW]

337.45

331.99

202.18

198.20

P'L

[kW]

3,339.37

3,302.16

2,934.07

2,883.80

PGen

[kW]

-523.46

-554.42

-265.81

-315.01

369,423

BAT Transformer losses at nominal power factor


Apparent net power at nominal power
BAT transformer short-circuit losses
Total BAT transformer losses at nominal power factor

Snet,pfN

[kVA]

477,766

477,027

369,535

Psc,Tra,pfN

[kW]

730.71

728.45

437.15

436.88

PL,tra,pfN

[kW]

730.71

728.45

437.15

436.88

319,863

BAT Transformer losses at actual power factor


Actual apparent net power
BAT transformer short-circuit losses
Total BAT transformer losses at actual power factor
Power factor correction for the BAT transformer

Power factor correction

Performance Test Calculation

S'net

[kVA]

413,698

411,639

321,888

P'sc,Tra

[kW]

547.88

542.44

331.68

327.53

P'L,tra

[kW]

547.88

542.44

331.68

327.53

PTra

-182.84

-186.02

-105.46

-109.36

-706.29

-740.43

-371.27

-424.36

Confidential

4 of 7

San Gabriel CCPP

WSP | Parsons Brinckerhoff


4. Calculation Power Factor Correction
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

4.00 PM

6.00 PM

7.00 PM

Performance test stop time

3.00 PM

5.00 PM

7.00 PM

8.00 PM

Performance test date

Generator Shop Test Results


30527688

Generator serial no
Apparent power nominal

SN

[kVA]

Power factor nominal

pfN

[-]

0.85

Ugross,N

[V]

23,000

[ ]
[%]

0.11247357
100%

75%

50%

25%

Apparent power

Sgross

[kVA]

521,000

390,750

260,500

130,250

Stator current

Igross

[A]

13,078

9,809

6,539

3,270

Active power

[kW]

442,850

332,138

221,425

110,713

Voltage
Rotor winding R20
Load point

521,000

Field current

If,pfN

[A]

3,296

2,543

1,926

1,423

Friction losses

PL,FR

[kW]

1,500

1,500

1,500

1,500
565

Core losses

PL,FE

[kW]

565

565

565

Short-circuit losses

PL,SC

[kW]

1,472

828

368

92

Field I2R losses


Additional losses

PL,Exc

[kW]

1,581

941

540

295

PL,Add

[kW]

147

122

107

97

Brush contact losses

PL,C

[kW]

PL

[kW]

5,272

3,961

3,084

2,552

[%]

98.82%

98.82%

98.63%

97.75%

Total losses
Efficiency
BAT Transformer Shop Test Results

2014-220-94

BAT transformer serial no


Transformer nominal apparent power

[kVA]

555,000

Transformer no-load losses

[kW]

202.294

Transformer short-circuit losses

[kW]

986.057

[V]

23,000

Transformer LV voltage

Performance Test Calculation

Confidential

5 of 7

San Gabriel CCPP

WSP | Parsons Brinckerhoff


5. Electrical Calculation
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

4.00 PM

6.00 PM

7.00 PM

Performance test stop time

3.00 PM

5.00 PM

7.00 PM

8.00 PM

Performance test date

Cables losses
Cable losses at at nominal power
Nominal current of the cable
Net current measured
Total cable losses

[kW]

116.0

116.0

116.0

116.0

[A]

1,223.0

1,223.0

1,223.0

1,223.0

[A]

1037.0

1028.8

801.4

793.8

[kW]

83.40

82.09

49.81

48.87

314,154.8

314,058.3

317,665.7
317,683.0

317,700.3

Calculation of corrected net power


Net power output
Corrected net power output @ 100% load

Corrected net heat rate @ 100% load

Corrected net power output @ 100% load

Corrected net heat rate @ 100% load

Performance Test Calculation

Pnet,pfn

[kW]

406,184.5

405,554.9

Pcorr

[kW]

421,267.5
421,254.1

421,240.6

HRCorr

Pcorr

HRCorr

[kJ/kWh]

[kW]

5786.35
5,817.8

5849.21

[kJ/kWh]

Confidential

6 of 7

San Gabriel CCPP

WSP | Parsons Brinckerhoff


6. Fuel Gas Analysis
Test run 1

Performance test run


Performance test load case

Test run 2

100CC-GAS

100CC-GAS

75CC-GAS

75CC-GAS

25-Aug-16

25-Aug-16

25-Aug-16

25-Aug-16

Performance test start time

2.00 PM

4.00 PM

6.00 PM

7.00 PM

Performance test stop time

3.00 PM

5.00 PM

7.00 PM

8.00 PM

90.3585

Performance test date

Fuel Gas Composition


Methane

CH5

[% mol]

90.3951

90.3815

90.3499

Ethane

C2H6

[% mol]

2.8844

2.8852

2.8864

2.8822

Propane

C3H8

[% mol]

1.2255

1.2262

1.2301

1.2288

n-Butane

nC4H10

[% mol]

0.3809

0.3819

0.3865

0.3869

Iso-Butane

iC4H10

[% mol]

0.2918

0.2919

0.2941

0.2940

n-Pentane

nC5H12

[% mol]

0.0798

0.0803

0.0830

0.0833

Iso-Pentane

iC5H12

[% mol]

0.1092

0.1098

0.1128

0.1131

neo-Pentane

neoC5H12

[% mol]

0.0000

0.0000

0.0000

0.0000

C6H14+

[% mol]

0.0773

0.0776

0.0837

0.0842
0.6058

Hexane (and higher)


Nitrogen
Carbon Dioxide
Hydrogen

N2

[% mol]

0.6073

0.6092

0.6061

CO2

[% mol]

3.9488

3.9563

3.9674

3.9632

H2

[% mol]

0.0000

0.0000

0.0000

0.0000

Helium

He

[% mol]

0.0000

0.0000

0.0000

0.0000

Oxygen

O2

[% mol]

0.0000

0.0000

0.0000

0.0000

Water

H2O

[% mol]

0.0000

0.0000

0.0000

0.0000

[% mol]

100.0000

100.0000

100.0000

100.0000

Total
Fuel gas pressure

[bar]

40.00

39.98

40.14

40.15

Fuel gas temperature

[C]

43.29

42.60

40.76

40.93

[kJ/kg]

44,476.9

44,467.1

44,456.7

44,461.6

Calculated Fuel Gas Properties


Lower Heating Value (LHV)
Fuel gas density @ measured pressure & temperature
C/H Ratio (CO2 free)

[kg/m ]
[-]

29.603

30.0353

30.4227

30.4039

3.1061

3.1062

3.1074

3.1074

Elster-Istromet

Elster-Istromet

Elster-Istromet

Elster-Istromet

10521012

10521012

10521012

10521012

200

200

200

200

PIGSAR

PIGSAR

PIGSAR

PIGSAR
23-Sep-14

Ultrasonic Gas Flow Meter


Gas flow meter manufacturer
Gas flow meter serial no
Nominal diameter

[DN]

Calibration laboratory
Calibration date
Impulse / m3
Fuel gas pressure
Fuel gas temperature
Fuel gas density
Measured frequency

23-Sep-14

23-Sep-14

23-Sep-14

[1/m3]

2250

2250

2250

2250

[bar]

40.00

39.98

40.14

40.15

[C]

43.29

42.60

40.76

40.93

[kg/m3]

29.603

30.0353

30.4227

30.4039

[1/s]

1,155.38

1,151.30

907.15

908.41

GT fuel gas mass flow (corrected)

[kg/s]

15.2013

15.3687

12.2658

12.2753

Dew point heat fuel gas flow

[kg/s]

0.0226

0.0229

0.0175

0.0177

Total Fuel Gas Mass Flow

[kg/s]

15.2239

15.3917

12.2833

12.2930

Total Fuel Gas Heat Input

[KJ/s]

677,111.7

684,423.3

546,072.9

546,564.5

Performance Test Calculation

Confidential

7 of 7

ABOUT WSP | PARSONS BRINCKERHOFF


WSP | Parsons Brinckerhoff is one of the worlds leading
engineering professional services consulting firms. We bring
together a unique pool of technical experts and strategic
advisors including engineers, technicians, scientists, architects,
planners, surveyors and environmental specialists, as well as
other design, program and construction management
professionals. The depth of our expertise and advice spans
across the Property & Buildings, Transportation & Infrastructure,
Environment, Industry, Resources (including Mining and Oil &
Gas) and Power & Energy sectors as well as project delivery
and strategic consulting services. With approximately 34,000
talented people in 500 offices across 40 countries, we are
uniquely positioned to deliver successful and sustainable
projects, wherever our clients need us.

WSP | Parsons Brinckerhoff


300 Beach Road, #11-00
The Concourse
Singapore 199 555
Tel: +65 6533 7333
Fax: +65 6533 7707
www.wsp-pb.com

Anda mungkin juga menyukai