ANALISIS UNITARIOS

INSUMOS

informacion para la industria de la construccion


CALI
ESCUELA MILTAR DE AVIACION MARCO FIDEL SUAREZ
EMAVI - GRUAP - INSTALACIONES
CODIGO

ACTIVIDAD

1000
1001

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

080102 HORA CUADRILLA AA

ALBAIL.

EXCAVACION MECANICA SIN RETIRO

070104 CARGADOR FRONTAL,20 M3


1003

CANT

PRELIMINARES
DESCAPOTE

070123 HERRAMIENTA MENOR


1002

UND

DESCAPOTE A MAQUINA MAS RETIRO

SM

2,070.00

2,070.00

HH

0.35

9,908.54

3,467.99

0.02

88,000.00

1,760.00

331.20

2,070.00

3,467.99

1,760.00

3,520.00

M3
DD
M3

070121 VOLQUETA 6 M3

M3

0.17

72,000.00

12,240.00

1,958.40

14,198.40

070104 CARGADOR FRONTAL,20 M3

DD

0.02

88,000.00

1,760.00

1,760.00

3,520.00

0.04

104,000.00

4,160.00

665.60

4,825.60

1004

EXPLANACION EXTENDIDA

070113 MOTONIVELADORA CAT 12-F


1005

EXPLANACION Y RETIRO

070103 BULLDOZER

M3
HRS
M3
HR

0.03

12,500.00

375.00

60.00

435.00

070121 VOLQUETA 6 M3

M3

0.28

72,000.00

20,160.00

3,225.60

23,385.60

070104 CARGADOR FRONTAL,20 M3

DD

0.02

88,000.00

1,760.00

281.60

2,041.60

1006

D-6

RELLENOS EN TIERRA

M3
HRS

0.047

104,000.00

4,888.00

782.08

5,670.08

070121 VOLQUETA 6 M3

070113 MOTONIVELADORA CAT 12-F

M3

0.047

72,000.00

3,384.00

541.44

3,925.44

070116 TANQUE AGUA FORD 600

HH

0.002

265,000.00

530.00

84.80

614.80

HH

0.045

9,908.54

445.88

445.88

080102 HORA CUADRILLA AA


1007

ALBAIL.

REPLANTEO

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.002

2,000.00

4.00

0.64

4.64

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

0.05

1,624.00

81.20

12.99

94.19
24.36

070123 HERRAMIENTA MENOR


050185 PIOLA GRUESA
070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA

ALBAIL.

CUADRILLA TOPOGRAFICA 1 CADENERO 1


080127 TOPOGRAFO
1008

CAMPAMENTO 9 M2

GBL

0.015

1,400.00

21.00

3.36

ROLLO

0.01

2,500.00

25.00

4.00

29.00

GBL

0.1

1,400.00

140.00

22.40

162.40

HH

0.015

9,908.54

148.63

148.63

HH

0.015

44,975.00

674.63

674.63

UND

010497 TEJA ETERNIT No 6 0001620000

UND

17,241.00

137,928.00

22,068.48

159,996.48

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

16

341.00

5,456.00

872.96

6,328.96

050201 PORTACANDADO CON CERRADURA GALVANIZADAGSA


2", 2

822.00

1,644.00

263.04

1,907.04

050216 PUNTILLA 2" C.C / 13010200

LB

2,000.00

6,000.00

960.00

6,960.00

UND

1,500.00

4,500.00

720.00

5,220.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

90

3,500.00

315,000.00

50,400.00

365,400.00

050369 VIGA ROLLIZA DE 5mts

ML

37.2

1,750.00

65,100.00

10,416.00

75,516.00

010414 ROCA MUERTA

M3

1.17

14,800.00

17,316.00

2,770.56

20,086.56

GBL

1,400.00

2,800.00

448.00

3,248.00

HH

18.3

9,908.54

181,326.33

181,326.33

050121 BISAGRA 3x3 COBRIZADA

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
1009

ALBAIL.

CAMPAMENTO 18 M2

UND

010497 TEJA ETERNIT No 6 0001620000

UND

16

17,241.00

275,856.00

44,136.96

319,992.96

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

32

341.00

10,912.00

1,745.92

12,657.92

050201 PORTACANDADO CON CERRADURA GALVANIZADAGSA


2", 2

822.00

1,644.00

263.04

1,907.04

050216 PUNTILLA 2" C.C / 13010200

2,000.00

10,000.00

1,600.00

11,600.00

050121 BISAGRA 3x3 COBRIZADA

LB
UND

1,500.00

9,000.00

1,440.00

10,440.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

175

3,500.00

612,500.00

98,000.00

710,500.00

050369 VIGA ROLLIZA DE 5mts

ML

66.3

1,750.00

116,025.00

18,564.00

134,589.00

010414 ROCA MUERTA

M3

2.34

14,800.00

34,632.00

5,541.12

40,173.12

Preparado Por LEONARDO ROJO HENAO

CODIGO

ACTIVIDAD

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
1010

ALBAIL.

UND

CANT

GBL

VR. UNIT.
1,400.00

VR. PARCIAL
2,800.00

HH

26.84

9,908.54

265,945.28

IVA 16%
$

448.00

SUBTOTAL
$

3,248.00

265,945.28

CAMPAMENTO 36 M2

UND

010497 TEJA ETERNIT No 6 0001620000

UND

28

17,241.00

482,748.00

77,239.68

559,987.68

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

56

341.00

19,096.00

3,055.36

22,151.36

050201 PORTACANDADO CON CERRADURA GALVANIZADAGSA


2", 2

822.00

2,466.00

394.56

2,860.56

050216 PUNTILLA 2" C.C / 13010200

2,000.00

14,000.00

2,240.00

16,240.00

UND

1,500.00

13,500.00

2,160.00

15,660.00

ML

270

3,500.00

945,000.00

151,200.00

1,096,200.00

UND

111.5

100.00

11,150.00

1,784.00

12,934.00

M3

4.68

14,800.00

69,264.00

11,082.24

80,346.24

M3

1.8

GBL

2.8

1,400.00

3,920.00

4,547.20

HH

52.3

9,908.54

518,216.77

518,216.77

050121 BISAGRA 3x3 COBRIZADA


050246 TABLA COMUN SAJO 1"x10"X3mt
050372 GUIAS SUPERIORES REF 8025
010414 ROCA MUERTA
010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
1011

ALBAIL.

CAMPAM. CONTEN. ALQUILA.

LB

#N/A

#N/A

#N/A
$

627.20

#N/A

MS

070108 CONTENEDOR BODEGA 20

MS

1,006,500.00

3,019,500.00

3,019,500.00

070112 MONTACARGA 3.5 TN

HR

60,000.00

120,000.00

120,000.00

070117 TRANSPORTE CONTENEDOR 20

UN

240,000.00

480,000.00

480,000.00

1012

CAMPAM. SHELTER ALQUILA.

MS

070111 MONTACARGA 5 TN

HR

64,000.00

070115 SHELTER OFICINA 40

MS

5,902,380.00

UN

070117 TRANSPORTE CONTENEDOR 20


1013

128,000.00

128,000.00

$ 17,707,140.00

17,707,140.00

240,000.00

480,000.00

480,000.00

LETRINA EN TABLA (2x1)

UND

020403 SANITARIO BLANCO 02632 TREVI

UND

208,400.00

208,400.00

33,344.00

241,744.00

010493 TEJA ETERNIT No 4 0001420000

UND

12,261.00

49,044.00

7,847.04

56,891.04

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

341.00

2,728.00

436.48

3,164.48

050204 PUERTA FORTEC RESIDENCIAL

UND

51,995.00

51,995.00

8,319.20

60,314.20
2,320.00

050216 PUNTILLA 2" C.C / 13010200

LB

2,000.00

2,000.00

320.00

UND

1,500.00

4,500.00

720.00

5,220.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

42

3,500.00

147,000.00

23,520.00

170,520.00

050369 VIGA ROLLIZA DE 5mts

ML

14

1,750.00

24,500.00

3,920.00

28,420.00

010414 ROCA MUERTA

M3

0.1

14,800.00

1,480.00

236.80

1,716.80

M3

0.1

ML

10

4,200.00

42,000.00

6,720.00

48,720.00

GBL

11

1,400.00

15,400.00

2,464.00

17,864.00

HH

9,908.54

79,268.34

79,268.34

050121 BISAGRA 3x3 COBRIZADA

010233 CONCRETO 1 : 3 : 5

( 2,000 PSI)

010511 TUBO CORTINA DUCHA


070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
1014

ALBAIL.

CERCA EN TABLA

#N/A

#N/A

#N/A

#N/A

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.07

2,000.00

140.00

22.40

162.40

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

3.33

3,500.00

11,655.00

1,864.80

13,519.80

050372 GUIAS SUPERIORES REF 8025

UND

1.25

100.00

125.00

20.00

145.00

070123 HERRAMIENTA MENOR

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.32

9,908.54

3,170.73

3,170.73

080102 HORA CUADRILLA AA


1015

ALBAIL.

CERCA EN ALAMBRE DE PUA

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.03

2,000.00

60.00

9.60

69.60

010109 ALAMBRE DE PUA No 14

ML

1,800.00

7,200.00

1,152.00

8,352.00

050369 VIGA ROLLIZA DE 5mts

ML

0.8

1,750.00

1,400.00

224.00

1,624.00

070123 HERRAMIENTA MENOR

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.32

9,908.54

3,170.73

3,170.73

080102 HORA CUADRILLA AA


1016

ALBAIL.

CERCA EN LAMINA (2.00)

ML

010238 CUBIERTA TRAPEZOIDAL 106

UND

0.54

115,000.00

62,100.00

9,936.00

72,036.00

050332 TERMINAL SIN SALIDA ETERNIT

UND

6.55

4,680.00

30,654.00

4,904.64

35,558.64

ML

2.45

17,500.00

42,875.00

6,860.00

49,735.00

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.6

9,908.54

5,945.13

5,945.13

KG

34.6

2,160.00

74,736.00

11,957.76

86,693.76

UND

125

320.00

40,000.00

6,400.00

46,400.00

010359 PERFIL ACESCO PAG 230-18


070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
1017

ALBAIL.

MATERIAL CAMARA TIPO D

010111 ALAMBRE NEGRO # 18 050318


010151 BLOQUE PARA CAMARA TELEFON.

UND

Preparado Por LEONARDO ROJO HENAO

CODIGO

ACTIVIDAD

UND

CANT

010236 CONSOLA PARA CAMARA 0.8

UND

60,088.00

240,352.00

38,456.32

278,808.32

M2

4.5

28,710.00

129,195.00

20,671.20

149,866.20

010265 FORMALETA TAPAS


1018

CERCA LAMINA/ BASE (2.25)

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

ML

010238 CUBIERTA TRAPEZOIDAL 106

UND

0.54

115,000.00

62,100.00

9,936.00

72,036.00

050332 TERMINAL SIN SALIDA ETERNIT

UND

6.55

4,680.00

30,654.00

4,904.64

35,558.64

010296 LADRILLO COMUN

UND

2.45

750.00

1,837.50

294.00

2,131.50

010359 PERFIL ACESCO PAG 230-18

ML

2.45

17,500.00

42,875.00

6,860.00

49,735.00

010177 CEMENTO GRIS CONQUISTADOR

KG

5.16

521.68

2,691.87

430.70

3,122.57

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010108 AGUA

LT

3.07

150.00

460.50

73.68

534.18

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

1.85

9,908.54

18,330.80

18,330.80
820,758.00

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
1019

ALBAIL.

RED AGUA PROVIS. (50 MTS)

HH

020500 TORRES PARA DUCHA GRICOL

UND

50

14,151.00

707,550.00

113,208.00

020184 CODO CPVC PRESION 1/2" X 45

UND

575.00

2,875.00

460.00

3,335.00

020371 REGISTRO CIM PD

UND

17,250.00

17,250.00

2,760.00

20,010.00

UND

13,600.00

68,000.00

10,880.00

78,880.00

ML

10

1,630.00

16,300.00

2,608.00

18,908.00

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

50

9,908.54

495,427.13

495,427.13

1/2"

020296 LLAVE TERMINAL CR 01-9978-11 GRICOL


050168 CUARTON OTOBO 2"x4"x2.9mts
070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
1020

ALBAIL.

RED ELECT PROVIS. (50 MTS)

UND

030250 TABLERO DE 4 CIRCUITOS

26,500.00

26,500.00

4,240.00

30,740.00

030161 CABLE Cu ENCAUCH. 2x6 AWG / 0460124C/ST/600V ML

UND

100

910.00

91,000.00

14,560.00

105,560.00

030157 CABLE AISLADO

ML

50

3,480.00

174,000.00

27,840.00

201,840.00

UND

6,500.00

26,000.00

4,160.00

30,160.00

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

1,624.00

8,120.00

1,299.20

9,419.20

050372 GUIAS SUPERIORES REF 8025

UND

30

100.00

3,000.00

480.00

3,480.00

070123 HERRAMIENTA MENOR

GBL

31

1,400.00

43,400.00

6,944.00

50,344.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

20

10,899.40

217,987.94

217,987.94

M3

0.12

72,000.00

8,640.00

10,022.40

HH

0.084

9,908.54

832.08

832.08

M3

0.1

72,000.00

7,200.00

8,352.00

HH

9,908.54

9,908.54

9,908.54

030139 BREAKER 30 AM GENERAL

1021

DESMONTE APARATO SANITARIO POR BATERIA


(INODORO + LAVAMANOS + GRIFERIA DUCHA +
INCRUSTACIONES)

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1022

ALBAIL.

DESMONT MARCO / PUERTA

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1023

ALBAIL.

RELLENO MATERIAL EN SITO

070103 BULLDOZER

1,382.40

UND
$

1,152.00

M3
HR

0.02

12,500.00

250.00

40.00

290.00

070120 VIBROCOMPACTADOR ELECTRICO

DD

0.03

60,000.00

1,800.00

288.00

2,088.00

070121 VOLQUETA 6 M3

M3

0.45

72,000.00

32,400.00

5,184.00

37,584.00

M3

0.05

72,000.00

3,600.00

576.00

4,176.00

HH

0.6

9,908.54

5,945.13

5,945.13

M3

0.05

72,000.00

3,600.00

4,176.00

HH

0.5

9,908.54

4,954.27

4,954.27

M3

0.06

72,000.00

4,320.00

HH

0.1202

9,908.54

1,191.36

M3

0.08

72,000.00

5,760.00

HH

0.2

9,908.54

1,981.71

HR

0.2

17,250.00

3,450.00

M3

0.1

72,000.00

7,200.00

HH

9,908.54

9,908.54

1024

D-6

UND

DESMONTE VENTANAS

M2

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1025

ALBAIL.

DEMOLICION CUBIERTA A.C.

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1026

ALBAIL.

DEMOLICION DE MAMPOSTERIA, INCLUYE


REPELLO

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1027

ALBAIL.

DEMOLICION MUROS 0.25

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1028

ALBAIL.

DEMOL PLACA MACIZA 0.15

070107 COMPRESOR

MARTILLOS

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

ALBAIL.

576.00

691.20

5,011.20

1,191.36

6,681.60

1,981.71

552.00

4,002.00

1,152.00

8,352.00

9,908.54

M2
$

921.60

M2

Preparado Por LEONARDO ROJO HENAO

CODIGO
1029

ACTIVIDAD

UND

DEMOL PLACA MACIZA 0.3

070107 COMPRESOR

MARTILLOS

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1030

ALBAIL.

DEMOL PLACA ALIGER. 0.25

1031

ALBAIL.

DEMOL PLACA ALIGER. 0.45

1032

ALBAIL.

DEMOL VIGAS Y COLUMNAS

070107 COMPRESOR

1033

MARTILLOS
ALBAIL.

DEMOL PLACA PISO ESP. 20 CM

070107 COMPRESOR

1034

SUBTOTAL

HR

0.8

17,250.00

13,800.00

2,208.00

16,008.00

M3

0.4

72,000.00

28,800.00

4,608.00

33,408.00

HH

1.5

9,908.54

14,862.81

14,862.81

M3

0.32

72,000.00

23,040.00

26,726.40

HH

9,908.54

9,908.54

9,908.54

M3

0.52

72,000.00

37,440.00

43,430.40

HH

1.8

9,908.54

17,835.38

17,835.38

HR

17,250.00

34,500.00

5,520.00

40,020.00

M3

72,000.00

72,000.00

11,520.00

83,520.00

HH

9,908.54

79,268.34

79,268.34

HR

0.0511

17,250.00

881.08

140.97

1,022.05

M3

0.03

72,000.00

2,160.00

345.60

2,505.60

HH

0.03

9,908.54

297.26

297.26
23,675.60

3,686.40

5,990.40

M2

MARTILLOS

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

IVA 16%

M3

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

VR. PARCIAL

M2

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

VR. UNIT.

M2

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

CANT

M2

ALBAIL.

RED PROVIS. TELEFONOS

UND

030169 CABLE TELEFONOS DOS PARES

ML

65

314.00

20,410.00

3,265.60

030174 CAJA GALVANIZADA 2x4

UND

1,125.00

6,750.00

1,080.00

7,830.00

030267 TOMA TELEFONO DOBLE PLUS

UND

5,290.00

26,450.00

4,232.00

30,682.00

HH

20

9,908.54

198,170.85

198,170.85
188.38

080102 HORA CUADRILLA AA


1035

ALBAIL.

REPLANTEO DE CANCHAS

M2

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

0.1

1,624.00

162.40

25.98

050372 GUIAS SUPERIORES REF 8025

UND

0.1

100.00

10.00

1.60

11.60

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.1

1,630.00

163.00

26.08

189.08

080102 HORA CUADRILLA AA

HH

0.1

9,908.54

990.85

990.85

M3

0.01

72,000.00

722.81

HH

0.3

9,908.54

2,972.56

1036

ALBAIL.

DEMOLICION DE ENCHAPE DE PISO INCLUYE


ALISTADO

M2

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1037

ALBAIL.

DEMOLICION ENCHAPE TIPO VINISOL INCLUYE


ALISTADO

070121 VOLQUETA 6 M3
1038

M3

0.01

72,000.00

722.81

HH

0.03

9,908.54

297.26

DEMOLICION POYO EN CONCRETO

ML
M3

0.03

72,000.00

2,160.00

HH

0.0393

9,908.54

388.93

M3

0.027

72,000.00

1,944.00

HH

0.0228

9,908.54

225.98

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1039

ALBAIL.

DEMOLICION GUARDAESCOBA EN CERAMICA

1040

838.46

2,972.56

115.65

838.46

297.26

345.60

2,505.60

388.93

2,255.04

225.98

ML

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

115.65

M2

ALBAIL.

080102 HORA CUADRILLA AA

ALBAIL.

DEMOLICION ENCHAPE DE MURO INCLUYE


DEMOLICION DE PAETE

311.04

M2

070121 VOLQUETA 6 M3

M3

0.01

72,000.00

720.00

115.20

835.20

010343 MORTERO 1 : 3

M3

0.005

275,000.00

1,375.00

220.00

1,595.00

HH

0.0575

9,908.54

570.08

570.08

M3

0.07

72,000.00

5,040.00

5,846.40

HH

0.0255

9,908.54

252.78

252.78

M3

0.2

72,000.00

14,400.00

16,704.00

HH

0.5051

9,908.54

5,004.96

5,004.96

080102 HORA CUADRILLA AA

1041

ALBAIL.

DESMONTE DE CIELO-RASO EN LAMINA


SUPERBOARD, DRYWALL, MACHIMBRE Y/O
SIMILAR, INCLUYE DESMONTE DE ESTRUCTURA
DE SOPORTE

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1042

ALBAIL.

DEMOLICION DE LAVADERO INCLUYE PUNTOS


SANITARIOS E HIDRAULICOS

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

ALBAIL.

M2

806.40

UND

Preparado Por LEONARDO ROJO HENAO

2,304.00

CODIGO
1043

ACTIVIDAD

UND

DEMOLICION TORTA EN CONCRETO BAJO


PLACA

070121 VOLQUETA 6 M3

M3

0.04

72,000.00

2,880.00

0.0617

9,908.54

611.20

DESMONTE DE CUBIERTA ETERNIT,


TERMOACUSTICA O SIMILAR

M2
M3

0.06

72,000.00

4,320.00

HH

0.1724

9,908.54

1,708.24

M3

0.06

72,000.00

4,320.00

HH

0.2037

9,908.54

2,018.37

M3

0.015

72,000.00

1,080.00

HH

0.1344

9,908.54

1,331.60

M3

0.2

72,000.00

14,400.00

HH

0.5051

9,908.54

5,004.96

M3

0.0315

72,000.00

2,264.92

HH

0.1

9,908.54

990.85

M3

0.0438

72,000.00

3,156.09

HH

0.1

9,908.54

990.85

080102 HORA CUADRILLA AA

ALBAIL.

DESMONTE DE ESTRUCTURA DE CUBIERTA EN


MADERA

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
1046

ALBAIL.

080102 HORA CUADRILLA AA

ALBAIL.

DEMOLICION MESON

1048

ALBAIL.

CORTE DE MURO

1049

ALBAIL.

DEMOLICION CANECILLO

1050

ALBAIL.

DESMONTE COCINA INTEGRAL

1051

M3

0.4

72,000.00

28,800.00

HH

0.6693

9,908.54

6,632.00

ESCARIFICADO DE PLACA DE PISO

M2
M3

0.0317

72,000.00

2,283.75

HH

0.1

9,908.54

990.85

070121 VOLQUETA 6 M3

1052

ALBAIL.

DESMONTE Y REINSTALACION DE REJA


METALICA

611.20

5,011.20

1,708.24

691.20

5,011.20

2,018.37

172.80

1,252.80

1,331.60

2,304.00

16,704.00

5,004.96

362.39

2,627.31

990.85

504.97

3,661.07

990.85

4,608.00

33,408.00

6,632.00

365.40

2,649.15

990.85

ML

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

3,340.80

M2

ALBAIL.

080102 HORA CUADRILLA AA

691.20

$
$

UND

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

460.80

ML

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

ML

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

SUBTOTAL

ML

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

IVA 16%

ML

DESMONTE DE CANAL EN LAMINA EXISTENTE

070121 VOLQUETA 6 M3
1047

VR. PARCIAL

HH

070121 VOLQUETA 6 M3

1045

VR. UNIT.

ALBAIL.

080102 HORA CUADRILLA AA


1044

CANT

ALBAIL.

M3

0.0317

72,000.00

2,284.64

2,650.19

HH

0.1

9,908.54

990.85

365.54

990.85

HH

3.2

9,908.54

31,707.34

31,707.34

9,908.54

19,817.09

19,817.09

0.15

9,908.54

1,486.28

1,486.28

0.04

11,890.00

475.60

475.60

M3

0.06

72,000.00

4,320.00

HH

1.3

9,908.54

12,881.11

9,908.54

17,500.56

DESMONTE DE APARATOS SANITARIOS POR


BATERIA (INODORO + LAVAMANOS + GRIFERIA
DE DUCHA + INCRUSTACIONES)
080102 HORA CUADRILLA AA
1054

080102 HORA CUADRILLA AA

1055

ALBAIL.

DEMOLICION DE CAJA SANITARIA

UND

ALBAIL.

HH

RASQUETEADO DE MURO HASTA ALCANZAR


UNA SUPERFICIE SANA Y APTA PARA APLICAR
PINTURA

080102 HORA CUADRILLA AA

M2

ALBAIL.

HH

1056

DESMONTE DE MALLA PLASTICA TIPO


GALLINERO

M2

1055

HORA CUADRILLA EE HORNAMENTACION

HH

1057

DESMONTE DE CUBIERTA ETERNIT,


TERMOACUSTICA O SIMILAR (ALTURA< 20 MTS)

M2

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

2000
2001

ALBAIL.

691.20

5,011.20

12,881.11

17,500.56

CIMIENTOS
EXCAVACION MANUAL

M3

070123

#N/A #N/A

080102

HORA CUADRILLA AA

3000

ESTRUCTURAS CONCRETOS MAMPOSTERIA


5

ALBAIL.

HH

1
1.7662

#N/A

#N/A

Preparado Por LEONARDO ROJO HENAO

#N/A

#N/A

CODIGO
3001

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

DEM.CIMIENT, ENTERRADOS

M3

070107

COMPRESOR

HR

3.5

17,250.00

60,375.00

9,660.00

70,035.00

070121

VOLQUETA 6 M3

M3

0.5

72,000.00

36,000.00

5,760.00

41,760.00

080102

HORA CUADRILLA AA

HH

9,908.54

59,451.26

59,451.26

3002

MARTILLOS
ALBAIL.

DEMOL. CABEZA PILOTES

M3

070107

COMPRESOR

HR

17,250.00

51,750.00

8,280.00

60,030.00

070121

VOLQUETA 6 M3

M3

0.5

72,000.00

36,000.00

5,760.00

41,760.00

080102

HORA CUADRILLA AA

HH

9,908.54

49,542.71

49,542.71

1.7423

9,908.54

17,263.79

17,263.79

M3

0.2

72,000.00

14,400.00

16,704.00

HH

0.4

9,908.54

3,963.42

3,963.42

3003
080102
3004

MARTILLOS

RELLENOS DE NIVELACION Y COMPACTACION


EN MATERIAL SELECCIONADO DE LA
EXCAVACION

M3

HORA CUADRILLA AA

HH

ALBAIL.

RETIRO SOBRANTE TIERRA

070121

VOLQUETA 6 M3

080102

HORA CUADRILLA AA

3005

ALBAIL.

M3

ALBAIL.

2,304.00

BASE ROCA MUERTA

M3

070120

VIBROCOMPACTADOR ELECTRICO

DD

0.04

60,000.00

2,400.00

384.00

2,784.00

010414

ROCA MUERTA

M3

1.3

14,800.00

19,240.00

3,078.40

22,318.40

070120

VIBROCOMPACTADOR ELECTRICO

DD

0.04

60,000.00

2,400.00

384.00

2,784.00

010177

CEMENTO GRIS CONQUISTADOR

KG

113.1

521.68

59,002.01

9,440.32

68,442.33

010118 ARENA MEDIANA

M3

1.61

26,950.00

43,389.50

6,942.32

50,331.82

010108 AGUA

LT

234

150.00

35,100.00

5,616.00

40,716.00

HH

0.9

9,908.54

8,917.69

8,917.69

1,624.00

4,805.91

080102 HORA CUADRILLA AA


3006

ALBAIL.

SOLADO DE LIMPIEZA EN CONCRETO DE 2500


psi ESPESOR = 5 cm

010231 CONCRETO 1 : 3 : 3

M2

(2,500 PSI)

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
3007

ALBAIL.

CONCRETO CICLOPEO BASE VIGA DE


CIMENTACION, INCLUYE MANO DE OBRA
MAQUINARIA Y EQUIPO NECESARIO

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

070123 HERRAMIENTA MENOR

3008

0.035
1

1,400.00

#N/A
$

1,400.00

#N/A

HH

0.485

9,908.54

4,805.91

#N/A
$

224.00

#N/A

M3

010366 PIEDRA DE RIO


080102 HORA CUADRILLA AA

M3
GBL

ALBAIL.

ZAPATAS EN CONCRETO REFORZADO DE 3.000


psi, INCLUYE CONCRETO REFORZADO PARA
PEDESTALES DE ANCLAJE, ACERO Fy = 60.000
psi REFUERZO EN VARILLA No. 4 CADA 15 cm
EN AMBOS SENTIDOS

M3

0.5

#N/A

#N/A

#N/A

#N/A

M3

0.6

24,221.00

14,532.60

2,325.22

GBL

1,400.00

1,400.00

224.00

16,857.82
1,624.00

HH

5.1767

9,908.54

51,293.96

8,207.03

59,500.99

261.00

M3

070118 VIBRADOR

DD

0.1

2,250.00

225.00

36.00

050216 PUNTILLA 2" C.C / 13010200

LB

0.06

2,000.00

120.00

19.20

139.20

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.29

3,500.00

1,015.00

162.40

1,177.40

010513 VARETA 1"x1"x 3 MT OTOBO

ML

2.38

650.00

1,547.00

247.52

1,794.52

010529 REFUERZO HIERRO DE 60.000 PSI

TN

0.2

1,737,367.58

347,473.52

55,595.76

403,069.28
349,385.05

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA

3009

ALBAIL.

VIGA AEREA DE CONCRETO DE 21 MPA,


SECCION 15x25 cm INCLUYE ACERO DE
REFUERZO Fy = 420 MPA, REFUERZO
LONGITUDINAL EN VARILLA No. 4 ESTRIBOS EN
No. 3 CADA 10 cm AMARRE A ESTRUCTURA
EXISTENTE DE REFUERZO, MANO DE OBRA,
FORMALETA Y EQUIPO NECESARIO

M3

1.03

292,421.37

301,194.01

48,191.04

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

5.6637

9,908.54

56,118.67

56,118.67

ML

Preparado Por LEONARDO ROJO HENAO

CODIGO

UND

CANT

050216 PUNTILLA 2" C.C / 13010200

ACTIVIDAD

LB

1.2

2,000.00

2,400.00

384.00

2,784.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

1.2808

3,500.00

4,482.91

717.27

5,200.17

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

1.5

1,630.00

2,445.00

391.20

2,836.20

070110 MEZCLADORA CONCRETO 1 BT

DD

0.4

17,250.00

6,900.00

1,104.00

8,004.00

010229 CONCRETO 1 : 2 : 3

M3

0.03

292,421.37

8,772.64

1,403.62

10,176.26

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.3

9,908.54

2,972.56

2,972.56

(3,100 PSI)

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
3010

ALBAIL.

VIGA TEE ( 25x25x20x50)

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M3

070118 VIBRADOR

DD

0.04

2,250.00

90.00

14.40

104.40

050216 PUNTILLA 2" C.C / 13010200

LB

0.6

2,000.00

1,200.00

192.00

1,392.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

2.35

3,500.00

8,225.00

1,316.00

9,541.00

010513 VARETA 1"x1"x 3 MT OTOBO

ML

2.35

650.00

1,527.50

244.40

1,771.90

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

16.25

9,908.54

161,013.82

161,013.82

3011

REFUERZO HIERRO 37.000

TN

010279 HIERRO CHIPA 3/8"

KG

1.05

1,800.00

1,890.00

302.40

2,192.40

010111 ALAMBRE NEGRO # 18 050318

KG

30

2,160.00

64,800.00

10,368.00

75,168.00

080102 HORA CUADRILLA AA

HH

54

9,908.54

535,061.30

535,061.30

3012

ALBAIL.

S/CIMIENTO CONCRET. 25x25

M3

070118 VIBRADOR

DD

0.04

2,250.00

90.00

14.40

104.40

050216 PUNTILLA 2" C.C / 13010200

LB

2.67

2,000.00

5,340.00

854.40

6,194.40

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

9.35

3,500.00

32,725.00

5,236.00

37,961.00

010513 VARETA 1"x1"x 3 MT OTOBO

ML

10.1

650.00

6,565.00

1,050.40

7,615.40

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

14.62

9,908.54

144,862.89

144,862.89

3013

S/CIMIENTO CONCRET. 15x15

M3

070118 VIBRADOR

DD

0.04

2,250.00

90.00

14.40

104.40

050216 PUNTILLA 2" C.C / 13010200

LB

1.6

2,000.00

3,200.00

512.00

3,712.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

5.6

3,500.00

19,600.00

3,136.00

22,736.00

010513 VARETA 1"x1"x 3 MT OTOBO

ML

6.5

650.00

4,225.00

676.00

4,901.00

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

14.62

9,908.54

144,862.89

144,862.89

3014

PLACA BASE EN CONCRETO 3000 psi DE 10 cm


DE ESPESOR REFORZADO CON MALLA M-131 Y
POLIETILENO

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.03

2,000.00

60.00

9.60

69.60

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.11

3,500.00

385.00

61.60

446.60

010513 VARETA 1"x1"x 3 MT OTOBO

ML

0.11

650.00

71.50

11.44

82.94

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.1

292,421.37

29,242.14

4,678.74

33,920.88

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.8041

9,908.54

7,967.52

7,967.52

3015

REFUERZO HIERRO 60.000

TN

050236 SEGUETA SIN MARCO

DD

30

2,200.00

66,000.00

10,560.00

76,560.00

010280 HIERRO CHIPA 3/8"

KG

1000

1,800.00

1,800,000.00

288,000.00

2,088,000.00

010111 ALAMBRE NEGRO # 18 050318

KG

30

2,160.00

64,800.00

10,368.00

75,168.00

HH

54

9,908.54

535,061.30

535,061.30

080102 HORA CUADRILLA AA


3016

ALBAIL.

REFUERZO HIERRO 60.000

KG

050236 SEGUETA SIN MARCO

DD

0.03

2,200.00

66.00

10.56

76.56

010280 HIERRO CHIPA 3/8"

KG

1,800.00

1,800.00

288.00

2,088.00

10.37

75.17

535.06

67,711.71

010111 ALAMBRE NEGRO # 18 050318

KG

0.03

2,160.00

64.80

080102 HORA CUADRILLA AA

HH

0.054

9,908.54

535.06

1.03

56,672.00

58,372.16

3017

PILOTES INCADOS

010368 PILOTES INCADOS 25x25

ALBAIL.

ML
ML

Preparado Por LEONARDO ROJO HENAO

9,339.55

CODIGO

3018

ACTIVIDAD

UND

VIGA DE CIMENTACION EN CONCRETO


REFORZADO F'c = 3.000 psi, SECCION
(25x30cm), REFUERZO LONGITUDINAL EN
VARILLA No. 4 ESTRIBOS EN VARILLA No. 3
CADA 12.5 cm. INCLUYE ACERO DE REFUERZO
Fy = 60.000 psi ANCLAJE DE REFUERZO A LA
ESTRUCTURA EXISTENTE MEDIANTE LA
APLICACION DE EPOXICO DE ALTA
RESISTENCIA. IMPERMEABILIZANTE INTEGRAL
PARA CONCRETO Y DEMAS INSUMOS Y
ACTIVIDADES REQUERIDAS PARA GARANTIZAR
LA PERFECTA EJECUCION DE LA ACTIVIDAD

010229 CONCRETO 1 : 2 : 3

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M3

M3

292,421.37

292,421.37

46,787.42

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

010529 REFUERZO HIERRO DE 60.000 PSI

TN

0.13

1,737,367.58

225,857.79

36,137.25

261,995.03

050216 PUNTILLA 2" C.C / 13010200

LB

1.47

2,000.00

2,940.00

470.40

3,410.40

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

3.52

3,500.00

12,320.00

1,971.20

14,291.20

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

3.11

1,630.00

5,069.30

811.09

5,880.39

EPOXICO ALTA RESISTENCIA DOS


050370 COMPONENTES

UND

0.6785

125,000.00

84,808.88

13,569.42

98,378.30

070123 HERRAMIENTA MENOR

GBL

1,400.00

1,400.00

224.00

1,624.00

070110 MEZCLADORA CONCRETO 1 BT

DD

17,250.00

17,250.00

2,760.00

20,010.00

080102 HORA CUADRILLA AA

HH

3.5

9,908.54

34,679.90

34,679.90

349,385.05

3019

(3,100 PSI)

CANT

ALBAIL.

COLUMNA EN CONCRETO F'c = 21 MPA,


SECCION (30x30cm) INCLUYE ACERO DE
REFUERZO Fy = 420 MPA, LONGITUD 06
VARILLAS REFUERZO TRANSVERSAL EN
VARILLA No. 3 CADA 15 cm, MANO DE OBRA
FORMALETAS MAQUINARIA Y EQUIPO
NECESARIO

010229 CONCRETO 1 : 2 : 3

339,208.78

M3

M3

1.03

292,421.37

301,194.01

48,191.04

070118 VIBRADOR

(3,100 PSI)

DD

0.4

2,250.00

900.00

144.00

1,044.00

010529 REFUERZO HIERRO DE 60.000 PSI

TN

0.19

1,737,367.58

330,099.84

52,815.97

382,915.81

050216 PUNTILLA 2" C.C / 13010200

LB

1.5

2,000.00

3,000.00

480.00

3,480.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

3.52

3,500.00

12,320.00

1,971.20

14,291.20
6,428.72

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

3.4

1,630.00

5,542.00

886.72

070123 HERRAMIENTA MENOR

GBL

1,400.00

1,400.00

224.00

1,624.00

070110 MEZCLADORA CONCRETO 1 BT

DD

17,250.00

17,250.00

2,760.00

20,010.00

080102 HORA CUADRILLA AA

HH

3.9297

9,908.54

38,937.24

38,937.24

M3

0.03

265,043.82

7,951.31

1,272.21

9,223.52

UND

0.08

125,000.00

10,000.00

1,600.00

11,600.00

2,701.94

3020

ALBAIL.

SELLADO DE FISURAS EN MAMPOSTERIA CON


ACERO DE REFUERZO VARILLA No.3
INCRUSTADO EN MAMPOSTERIA H=5cm CON
EPOXICO DE ALTA RESISTENCIA, INCLUYE
RESANE DE PAETE Y ESTUCO

010344 MORTERO 1 : 4
EPOXICO ALTA RESISTENCIA DOS
050370 COMPONENTES

010278 HIERRO CHIPA 3/8"


040128 ESTUCO PLASTICO PINTUCO
080102 HORA CUADRILLA AA

3021

ALBAIL.

PAETE IMPERMEABILIZADO MUROS 1:3 E: 1.5


cms (INCLUYE FILOS, DILATACIONES Y
CARTERAS), INCLUYE PREPARACION DE
SUPERFICIE PARA ADHERENCIA ADECUADA

ML

KG

1.294

1,800.00

2,329.26

372.68

GLN

0.5

7,463.00

3,731.50

597.04

4,328.54

HH

9,908.54

29,725.63

4,756.10

34,481.73

M2

010343 MORTERO 1 : 3

M3

0.013

275,000.00

3,575.00

572.00

4,147.00

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.0447

1,950.00

87.07

13.93

101.00

Preparado Por LEONARDO ROJO HENAO

CODIGO

ACTIVIDAD

080102 HORA CUADRILLA AA

3022

ALBAIL.

ENCOROZADO DE BLOQUE ALTURA: O,20 mts


(INCLUYE PAETE Y PINTURA KORAZA) PARA
CIERRE DE MURO Y/O VIGAS CON CUBIERTA

UND

CANT

HH

0.9

VR. UNIT.
9,908.54

VR. PARCIAL

IVA 16%

8,917.69

SUBTOTAL

1,426.83

10,344.52

ML

010348 PARED EN DRY WALL E/0.1

M2

0.1965

31,487.00

6,188.62

990.18

7,178.80

080102 HORA CUADRILLA AA

HH

9,908.54

29,725.63

4,756.10

34,481.73

3023

ALBAIL.

MURO EN BLOQUE DE ARCILLA, INCLUYE


PAETE POR DOS CARAS

M2

010343 REPELLO MORTERO 1:3 MURO (M2 DOS CARAS)

M2

2.1

11,397.00

23,933.70

3,829.39

27,763.09

010296 LADRILLO COMUN

UND

10

750.00

7,500.00

1,200.00

8,700.00

070123 HERRAMIENTA MENOR

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

1.5

9,908.54

14,862.81

2,378.05

17,240.86

1,400.00

080102 HORA CUADRILLA AA

3024

ALBAIL.

MAMPOSTERIA EN LADRILLO ESTRUCTURAL,


INCLUYE REFUERZO VERTICAL EN VARILLA No.
3 CADA 50cm REFUERZO LONGITUDINAL 2
VARILLAS No.3 ENTRE LADRILLO,
PERFORACION DE ESTRUCTURA EXISTENTE E
INYECCION DE EPOXICO DE ALTA RESISTENCIA,
PAETE POR AMBAS CARAS

070123 HERRAMIENTA MENOR


010150 BLOQUE ESTRUCTURAL

10x28

010343 MORTERO 1 : 3
EPOXICO ALTA RESISTENCIA DOS
050370 COMPONENTES

M2

GBL

1,400.00

1,400.00

224.00

UND

18

350.00

6,300.00

1,008.00

6,300.00

M3

0.07

275,000.00

19,250.00

3,080.00

19,250.00

UND

0.01

125,000.00

1,250.00

200.00

1,250.00

010529 REFUERZO HIERRO DE 60.000 PSI

TN

0.015

1,737,367.58

26,060.51

4,169.68

26,060.51

080102 HORA CUADRILLA AA

HH

1.7084

9,908.54

16,928.22

2,708.52

16,928.22

UND

0.4907

125,000.00

61,331.46

9,813.03

61,331.46

HH

9,908.54

9,908.54

1,585.37

9,908.54

UND

0.1184

125,000.00

14,805.73

2,368.92

14,805.73

HH

0.5

9,908.54

4,954.27

792.68

4,954.27

3025

ALBAIL.

RESINA DE ALTA RESISTENCIA DE DOS


COMPONENTES, DE ELEVADA FLUIDEZ PARA
INYECCION DE GRIETAS, APLICACIN DE
ACUERDO AL FABRICANTE. TIPO SIKA DUR 52 O
SIMILAR

EPOXICO ALTA RESISTENCIA DOS


050370 COMPONENTES
080102 HORA CUADRILLA AA

3026

ALBAIL.

ANCLAJE DE ACERO DE REFUERZO


LONGITUDINAL DE LAS ESTRUCTURAS DE
CONCRETO, MEDIANTE EPOXICO DE ALTA
RESISTENCIA A LA TRACCION DE ESTRUCTURA
NUEVA EN ESTRUCTURA DE CONCRETO
EXISTENTE

EPOXICO ALTA RESISTENCIA DOS


050370 COMPONENTES
080102 HORA CUADRILLA AA

ALBAIL.

ML

PTO

4000 INSTALACIONES HIDRAULICAS


4001

ACOMETIDA PVC 1/2" 5 M

UND

020500

#N/A #N/A

5.15

#N/A

#N/A

#N/A

#N/A

020184

#N/A #N/A

2.05

#N/A

#N/A

#N/A

#N/A

020155

#N/A #N/A

1.05

#N/A

#N/A

#N/A

#N/A

020371

#N/A #N/A

1.05

#N/A

#N/A

#N/A

#N/A

020439

#N/A #N/A

0.05

#N/A

#N/A

#N/A

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4002

ACOMETIDA PVC 3/4" 5 M

HH

10,899.40

32,698.19

#N/A
$

32,698.19
84,538.07

UND

020497 TORRES PARA DUCHA GRICOL

UND

5.15

14,151.00

72,877.65

11,660.42

020182 CODO PRESION PVC 3/4" X 45

UND

2.05

595.00

1,219.75

195.16

1,414.91

020156 CHEQUE RED WHITE 3/4"

UND

1.05

21,500.00

22,575.00

3,612.00

26,187.00

020372 REGISTRO CIM PD

3/4"

UND

1.05

23,900.00

25,095.00

4,015.20

29,110.20

020439 SOLDADURA PAVCO x 1/4

GLN

0.05

29,872.00

1,493.60

238.98

1,732.58

HH

10,899.40

32,698.19

32,698.19

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4003

RED SUMINISTRO PVC 1/2"

ML

Preparado Por LEONARDO ROJO HENAO

CODIGO

UND

CANT

020515 TUBO PRESION DE 1/2" PAVCO PVC

ACTIVIDAD

UND

0.1452

4,726.00

686.29

109.81

020184 CODO CPVC PRESION 1/2" X 45

UND

575.00

575.00

92.00

667.00

020439 SOLDADURA PAVCO x 1/4

GLN

0.05

29,872.00

1,493.60

238.98

1,732.58

HH

0.2

10,899.40

2,179.88

2,179.88
1,675.19

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4004

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL
796.09

RED SUMINISTRO PVC 3/4"

ML

020516 TUBO PRESION DE 3/4" PAVCO PVC

UND

0.2444

5,910.00

1,444.13

231.06

020182 CODO PRESION PVC 3/4" X 45

UND

595.00

595.00

95.20

690.20

020439 SOLDADURA PAVCO x 1/4

GLN

0.05

29,872.00

1,493.60

238.98

1,732.58

HH

0.25

10,899.40

2,724.85

2,724.85
5,772.37

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4005

RED SUMINISTRO PVC 1"

ML

020514 TUBO PRESION DE 1" PAVCO PVC

UND

0.5679

8,762.00

4,976.19

796.19

020181 CODO PRESION PVC 1" X 90

UND

595.00

595.00

95.20

690.20

020439 SOLDADURA PAVCO x 1/4

GLN

0.05

29,872.00

1,493.60

238.98

1,732.58

HH

0.25

10,899.40

2,724.85

2,724.85

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4006

RED SUMINISTRO PVC 1 1/2"

ML

020517 TUBO SANITARIO 1.1/2" PAVCO PVC

UND

0.3295

19,830.00

6,534.73

1,045.56

7,580.28

020179 CODO PRESION PVC 1 1/2" X 90

UND

1,970.00

1,970.00

315.20

2,285.20

020439 SOLDADURA PAVCO x 1/4

GLN

0.05

29,872.00

1,493.60

238.98

1,732.58

HH

0.1

10,899.40

1,089.94

1,089.94

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4007

RED SUMINISTRO PVC 2"

ML

020496 TORRES PARA DUCHA GRICOL

UND

1.05

14,151.00

14,858.55

2,377.37

17,235.92

020180 CODO PRESION PVC 2" X 90

UND

2.05

3,420.00

7,011.00

1,121.76

8,132.76

020439 SOLDADURA PAVCO x 1/4

GLN

0.05

29,872.00

1,493.60

238.98

1,732.58

HH

0.25

10,899.40

2,724.85

2,724.85

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4008

RED SUMINISTRO CPVC 1/2"

ML

020505 TUBO CPVC 1/2" PAVCO

UND

0.1661

8,250.00

1,370.45

219.27

1,589.72

020177 CODO PRESION CPVC 1/2" X 90

UND

787.00

787.00

125.92

912.92

020439 SOLDADURA PAVCO x 1/4

GLN

0.02

29,872.00

597.44

95.59

693.03

HH

0.2

10,899.40

2,179.88

2,179.88

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4009

RED SUMINISTRO CPVC 3/4"

ML

020506 TUBO CPVC 3/4" PAVCO

UND

0.2

13,700.00

2,740.00

438.40

3,178.40

020178 CODO PRESION CPVC 3/4" X 90

UND

1,453.00

1,453.00

232.48

1,685.48

020439 SOLDADURA PAVCO x 1/4

GLN

0.0264

29,872.00

789.82

126.37

916.19

HH

0.2

10,899.40

2,179.88

2,179.88

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4010

PUNTO DESAGUE PVC ( 3" , 4")

UND

020519 TUBO SANITARIO 3" PAVCO PVC

UND

0.27 $

47,318.00

12,775.86

2,044.14

14,820.00

020520 TUBO SANITARIO 4" PAVCO PVC

UND

0.27 $

60,000.00

16,200.00

2,592.00

18,792.00

020190 CODO SANITARIO CxC 3"x90 PAVCO PVC

UND

2 $

2,720.00

5,440.00

870.40

6,310.40

020192 CODO SANITARIO 4"x90 PAVCO PVC

UND

2 $

4,572.00

9,144.00

1,463.04

10,607.04

020439 SOLDADURA PAVCO x 1/4

GLN

0.05 $

29,872.00

1,493.60

238.98

1,732.58

HH

2.68 $

10,899.40

29,210.38

29,210.38
2,741.08

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


PUNTO DE AGUA FRIA PVC

UND

020515 TUBO PRESION DE 1/2" PAVCO PVC

4011

UND

0.5 $

4,726.00

2,363.00

378.08

020181 CODO PRESION PVC 1" X 90

UND

0.77 $

595.00

458.15

73.30

531.45

020179 CODO PRESION PVC 1 1/2" X 90

UND

0.74 $

1,970.00

1,457.80

233.25

1,691.05

020372 REGISTRO CIM PD

3/4"

UND

0.5053 $

23,900.00

12,076.48

1,932.24

14,008.72

020439 SOLDADURA PAVCO x 1/4

GLN

0.04 $

29,872.00

1,194.88

191.18

1,386.06

HH

1.3 $

10,899.40

14,169.22

14,169.22

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4012

PUNTO DE AGUA CALIENTE CPVC

UND

020505 TUBO CPVC 1/2" PAVCO

UND

1.5913 $

8,250.00

13,128.63

2,100.58

15,229.21

020177 CODO PRESION CPVC 1/2" X 90

UND

2.35 $

787.00

1,849.45

295.91

2,145.36

020118 ADAPTADOR MACHO DE1/2" CPVC PAVCO

UND

2.13 $

1,190.00

2,534.70

405.55

2,940.25

020439 SOLDADURA PAVCO x 1/4

GLN

0.02 $

29,872.00

597.44

95.59

693.03

HH

1.8 $

10,899.40

19,618.91

19,618.91

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4013

BAJANTE A. LL. PVC 3"

ML

020502 TORRES PARA DUCHA GRICOL

UND

1.05 $

14,151.00

14,858.55

2,377.37

17,235.92

020190 CODO SANITARIO CxC 3"x90 PAVCO PVC

UND

0.05 $

2,720.00

136.00

21.76

157.76

10

Preparado Por LEONARDO ROJO HENAO

10

CODIGO

ACTIVIDAD

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4014

BAJANTE A. LL. PVC 4"

UND

CANT

HH

VR. UNIT.

VR. PARCIAL

0.5 $

10,899.40

5,449.70

IVA 16%

SUBTOTAL
$

5,449.70
17,235.92

ML

020503 TORRES PARA DUCHA GRICOL

UND

1.05 $

14,151.00

14,858.55

2,377.37

020192 CODO SANITARIO 4"x90 PAVCO PVC

UND

0.06 $

4,572.00

274.32

43.89

318.21

HH

0.55 $

10,899.40

5,994.67

5,994.67
17,235.92

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4015

REVENTILACION PVC 3"

ML

020502 TORRES PARA DUCHA GRICOL

UND

1.05 $

14,151.00

14,858.55

2,377.37

020192 CODO SANITARIO 4"x90 PAVCO PVC

UND

0.14 $

4,572.00

640.08

102.41

742.49

HH

0.5 $

10,899.40

5,449.70

5,449.70
57,633.32

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


BAJANTE A. N. PVC 3"

ML

020519 TUBO SANITARIO 3" PAVCO PVC

4016

UND

1.05 $

47,318.00

49,683.90

7,949.42

020190 CODO SANITARIO CxC 3"x90 PAVCO PVC

UND

0.05 $

2,720.00

136.00

21.76

157.76

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

0.5 $

10,899.40

5,449.70

5,449.70
98,890.64

BAJANTE A. N. PVC 4"

ML

020520 TUBO SANITARIO 4" PAVCO PVC

4017

UND

1.05

81,191.00

85,250.55

13,640.09

020192 CODO SANITARIO 4"x90 PAVCO PVC

UND

0.06

4,572.00

274.32

43.89

318.21

HH

0.55

10,899.40

5,994.67

5,994.67

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4018

INSTALACION APARATO SANITARIO

UND

010176

#N/A #N/A

0.5

#N/A

#N/A

080103

#N/A #N/A

#N/A

#N/A

4019

CONEX. TANQUE ELEVADO PVC

#N/A

#N/A
#N/A

UND

020500

#N/A #N/A

1.05

#N/A

#N/A

#N/A

#N/A

020496

#N/A #N/A

10.75

#N/A

#N/A

#N/A

#N/A

020181

#N/A #N/A

2.1

#N/A

#N/A

#N/A

#N/A

020180

#N/A #N/A

2.1

#N/A

#N/A

#N/A

020370 REGISTRO TOYA P. DIRECTO 2"

UND

2.1 $

95,700.00

020439 SOLDADURA PAVCO x 1/4

GLN

1.05 $

29,872.00

10 $

10,899.40

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4020

HH

INST. EQUIPO HIDRONEUMATICO

UND

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

90

10,899.40

020444 SUBCONTRATO SANITARIO

38

171,800.00

4021

INST. BOMBAS DE AGUA

HH

26

10,899.40

020444 SUBCONTRATO SANITARIO

38

171,800.00

ACOMETIDA GALV. 1/2"

32,155.20

233,125.20

31,365.60

5,018.50

36,384.10

108,993.97

108,993.97

980,945.71

980,945.71

171,800.00

283,384.32

171,800.00
184,238.16

UND

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4022

#N/A

200,970.00

283,384.32

UND

020512 TUBO GALVANIZADO 1/2"x6mt

UND

5.15 $

30,840.00

158,826.00

25,412.16

020175 CODO GALVANIZADO 1/2"

UND

2.05 $

700.00

1,435.00

229.60

1,664.60

020155 CHEQUE RED WHITE 1/2"

UND

1.05 $

18,500.00

19,425.00

3,108.00

22,533.00

020371 REGISTRO CIM PD

UND

1.05 $

17,250.00

18,112.50

2,898.00

21,010.50

4 $

10,899.40

43,597.59

43,597.59
37,563.12

1/2"

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4023

RED SUMINISTRO GALVANIZ. 1/2"

HH
ML

020512 TUBO GALVANIZADO 1/2"x6mt

UND

1.05 $

30,840.00

32,382.00

5,181.12

020175 CODO GALVANIZADO 1/2"

UND

0.5 $

700.00

350.00

56.00

406.00

HH

0.4 $

10,899.40

4,359.76

4,359.76
53,226.60

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4024

RED SUMINISTRO GALVANIZ. 3/4"

ML

020513 TUBO GALVANIZADO 3/4"x6mt

UND

1.05 $

43,700.00

45,885.00

7,341.60

020176 CODO GALVANIZADO 3/4"

UND

0.5 $

1,000.00

500.00

80.00

580.00

HH

0.4 $

10,899.40

4,359.76

4,359.76

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4025

RED SUMINISTRO GALVANIZ. 1"

ML

020510 TUBO GALVANIZADO 1"x6mt

UND

1.05 $

55,920.00

58,716.00

9,394.56

68,110.56

020173 CODO GALVANIZADO 1"

UND

0.5 $

1,900.00

950.00

152.00

1,102.00

HH

0.4 $

10,899.40

4,359.76

4,359.76

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4026

RED SUMINISTRO GALVANIZ.1 1/2"

ML

020511 TUBO GALVANIZADO 1.1/2"x6mt

UND

1.05 $

57,050.00

59,902.50

9,584.40

69,486.90

020174 CODO GALVANIZADO 1.1/2"

UND

0.5 $

3,280.00

1,640.00

262.40

1,902.40

HH

0.5 $

10,899.40

5,449.70

5,449.70

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

11

Preparado Por LEONARDO ROJO HENAO

11

CODIGO
4027

ACTIVIDAD

UND

SIPS LLAVE TRERMINAL DE BRONCE PARA


MANGUERA 1/2"

020371 REGISTRO CIM PD

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

1/2"

020542 UNIVERSAL GALVANIZADA 1/2"


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
4028

CANT

UND

0.4 $

17,250.00

6,900.00

1,104.00

8,004.00

UND

0.4 $

4,800.00

1,920.00

307.20

2,227.20

0.2279 $

10,899.40

2,484.05

2,484.05

HH

REGISTRO VALVULAS 1"

UND

020374 REGISTRO CIM PD 1"

UND

1 $

28,600.00

28,600.00

4,576.00

33,176.00

020546 UNIVERSAL GALVANIZADA 3/4"

UND

1 $

3,358.00

3,358.00

537.28

3,895.28

0.9 $

10,899.40

9,809.46

9,809.46

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4029

HH

PUNTO SUMINISTRO GALV.

UND

020512 TUBO GALVANIZADO 1/2"x6mt

UND

2.62 $

30,840.00

80,800.80

12,928.13

93,728.93

020513 TUBO GALVANIZADO 3/4"x6mt

UND

0.58 $

43,700.00

25,346.00

4,055.36

29,401.36

020510 TUBO GALVANIZADO 1"x6mt

UND

0.49 $

55,920.00

27,400.80

4,384.13

31,784.93

020511 TUBO GALVANIZADO 1.1/2"x6mt

UND

0.43 $

57,050.00

24,531.50

3,925.04

28,456.54

020175 CODO GALVANIZADO 1/2"

UND

2.46 $

700.00

1,722.00

275.52

1,997.52

020176 CODO GALVANIZADO 3/4"

UND

1.51 $

1,000.00

1,510.00

241.60

1,751.60

020173 CODO GALVANIZADO 1"

UND

1.07 $

1,900.00

2,033.00

325.28

2,358.28

020372 REGISTRO CIM PD

UND

0.5 $

23,900.00

11,950.00

1,912.00

13,862.00

HH

1.85 $

10,899.40

20,163.88

3,226.22

23,390.11

3/4"

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4030

CONEX. TANQUE ELEVADO GALV.

UND

020510 TUBO GALVANIZADO 1"x6mt

UND

1.05 $

55,920.00

58,716.00

9,394.56

68,110.56

020511 TUBO GALVANIZADO 1.1/2"x6mt

UND

10.75 $

57,050.00

613,287.50

98,126.00

711,413.50

020173 CODO GALVANIZADO 1"

UND

2.1 $

1,900.00

3,990.00

638.40

4,628.40

020174 CODO GALVANIZADO 1.1/2"

UND

2.1 $

3,280.00

6,888.00

1,102.08

7,990.08

020373 REGISTRO P. DIRECTO 1 1/2"

UND

2.1 $

30,345.00

63,724.50

10,195.92

73,920.42

HH

14 $

10,899.40

152,591.55

24,414.65

177,006.20

1.05 $

5,933.00

6,229.65

996.74

7,226.39
333.50

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4031

RED DE COBRE 1/2"

ML

020508 TUBO DE COBRE TIPO L 1/2" 40515

ML

020165 CODO 90 COBRE CxC 1/2" 46520

UND

0.5 $

575.00

287.50

46.00

020434 SOLDADURA CPVC 1/4

GLN

0.01 $

31,091.00

310.91

49.75

360.66

HH

0.8 $

10,899.40

8,719.52

8,719.52

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4032

FLOTADOR MECANICO

UND

020233 FLOTADOR METALICO 2"


020442 SUB CONTRATO HIDRAUICO Y SANITAR
4033

LLAVE MANGUERA

1.00

70,520.00

70,520.00

0.38

31,085.00

11,812.30

UND

1.00

24,900.00

24,900.00

0.38

31,085.00

11,812.30

020442 SUB CONTRATO HIDRAUICO Y SANITAR


NIPLE PASAMURO 4"

UND

020347 NIPLE PASAMURO 4"

UND

1 $

43,200.00

43,200.00

38 $

31,085.00

1,181,230.00

1 $

13,480.00

13,480.00

0.38 $

31,085.00

11,812.30

020442 SUB CONTRATO HIDRAUICO Y SANITAR


4035

NIPLE PASAMURO 2"

UND

020346 NIPLE PASAMURO 2"

UND

020442 SUB CONTRATO HIDRAUICO Y SANITAR


4036

11,283.20

81,803.20

11,812.30

28,884.00

11,812.30

UND

020315 LLAVE INDIVIDUAL CIERRE RAPIDO GALAXIA REF


4034

UND

SIPS DE REGISTRO PRINCIPAL DE CORTE,


INCLUYE CAJA EN CONCRETO DE 3000 psi Y
TAPA EN HIERRO FUNDIDO

3,984.00

6,912.00

2,156.80

50,112.00

1,181,230.00

15,636.80

11,812.30

UND

VALVULA DE ESFERA ITALIANA 1/2"REF 10020561 0103-30 GRICOL

UND

9,500.00

9,500.00

1,520.00

9,500.00

020584 CAJA MEDIDOR DE AGUA EN CONCRETO

UND

55,000.00

55,000.00

8,800.00

55,000.00

010470 TAPA PARA TRAFICO PESADO

UND

58,998.00

58,998.00

9,439.68

58,998.00

HH

2.8389

10,899.40

30,942.00

4,950.72

30,942.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


4037

REGISTRO Y VALVULAS DE 1/2", 3/4", 1"


CON CAJA Y TAPA PARA AGUA FRIA

UND

VALVULA DE ESFERA ITALIANA 1/2"REF 10020561 0103-30 GRICOL

UND

9,500.00

9,500.00

1,520.00

9,500.00

VALVULA DE ESFERA ITALIANA 3/4" REF 10020562 0103-34 GRICOL

UND

14,500.00

14,500.00

2,320.00

14,500.00

VALVULA DE ESFERA ITALIANA REF 1" 10-0103020563 31 GRICOL

UND

21,800.00

21,800.00

3,488.00

21,800.00

12

Preparado Por LEONARDO ROJO HENAO

12

CODIGO

ACTIVIDAD

010471 TAPAS REGISTRO 20x20


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
4038

REGISTRO Y VALVULAS DE 1/2", 3/4", 1"


CON CAJA Y TAPA PARA AGUA CALIENTE

UND

CANT

UND

VR. UNIT.
1,500.00

VR. PARCIAL
1,500.00

IVA 16%
240.00

SUBTOTAL
1,500.00

HH

1.6356

10,899.40

17,826.88

2,852.30

17,826.88

UND

VALVULA DE ESFERA ITALIANA 1/2"REF 10020561 0103-30 GRICOL

UND

9,500.00

9,500.00

1,520.00

9,500.00

VALVULA DE ESFERA ITALIANA 3/4" REF 10020562 0103-34 GRICOL

UND

14,500.00

14,500.00

2,320.00

14,500.00

VALVULA DE ESFERA ITALIANA REF 1" 10-0103020563 31 GRICOL

UND

21,800.00

21,800.00

3,488.00

21,800.00

010471 TAPAS REGISTRO 20x20

UND

1,500.00

1,500.00

240.00

1,500.00

HH

1.6356

10,899.40

17,826.88

2,852.30

17,826.88

0.65

9,908.54

6,440.55

6,440.55

0.6

9,908.54

5,945.13

5,945.13

M3

0.37

72,000.00

26,640.00

30,902.40

HH

0.4

9,908.54

3,963.42

3,963.42
1,250.48

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

5000 INFRAESTRUCTURA E INSTALACIONES SANITARIAS


5001

EXCAVACON MANUAL

M3

080102 HORA CUADRILLA AA


5002

ALBAIL.

RELENO DE EXCAVACION

080102 HORA CUADRILLA AA


5003

M3
ALBAIL.

RETIRO SOBRANTES TIERRA

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
5004

HH

ALBAIL.

TUBERIA PVC SANITARIA 2"

HH
M3

4,262.40

ML

010118 ARENA MEDIANA

M3

0.04

26,950.00

1,078.00

172.48

010108 AGUA

LT

0.8

150.00

120.00

19.20

139.20

UND

1.05

5,400.00

5,670.00

907.20

6,577.20

HH

0.8444

9,908.54

8,366.53

8,366.53
312.62

020518 TUBO SANITARIO 2" PAVCO PVC


080102 HORA CUADRILLA AA
5005

ALBAIL.

TUBERIA PVC SANITARIA 4"

ML

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

010108 AGUA

LT

0.76

150.00

114.00

18.24

132.24

UND

0.4205

81,191.00

34,140.28

5,462.45

39,602.73

HH

0.4

9,908.54

3,963.42

3,963.42
312.62

020520 TUBO SANITARIO 4" PAVCO PVC


080102 HORA CUADRILLA AA
5006

ALBAIL.

TUBERIA PVC SANITARIA 6"

ML

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

010108 AGUA

LT

1.59

150.00

238.50

38.16

276.66

UND

0.3333

86,171.00

28,723.67

4,595.79

33,319.45

HH

0.5

9,908.54

4,954.27

4,954.27

020521 TUBO SANITARIO 6" PAVCO PVC


080102 HORA CUADRILLA AA
5007

TUBERIA DE GRES

ALBAIL.

10"

ML

010177 CEMENTO GRIS CONQUISTADOR

KG

3.96

521.68

2,065.85

330.54

2,396.39

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

3.33

150.00

499.50

79.92

579.42

010509 TUBO CORTINA DUCHA

ML

1.03

4,200.00

4,326.00

692.16

5,018.16

HH

1.12

9,908.54

11,097.57

11,097.57

080102 HORA CUADRILLA AA


5008

TUBERIA DRENAGE

ALBAIL.
4"

ML

010177 CEMENTO GRIS CONQUISTADOR

KG

1.5

521.68

782.52

125.20

907.72

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010108 AGUA

LT

1.6

150.00

240.00

38.40

278.40

010511 TUBO CORTINA DUCHA

ML

1.03

4,200.00

4,326.00

692.16

5,018.16

HH

0.4

9,908.54

3,963.42

3,963.42

080102 HORA CUADRILLA AA


5009

ALBAIL.

TUBERIA DRENAGE PVC" 100MM

ML

010270 GRAVA 1/2" 5 M3

M3

0.03

47,500.00

1,425.00

228.00

1,653.00

010507 TRITURADO FINO

M3

35,844.00

35,844.00

5,735.04

41,579.04

HH

0.4

9,908.54

3,963.42

3,963.42

080102 HORA CUADRILLA AA


5010

TUBERIA CONCRETO

ALBAIL.
8"

ML

010177 CEMENTO GRIS CONQUISTADOR

KG

2.48

521.68

1,293.77

207.00

1,500.77

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010108 AGUA

LT

2.11

150.00

316.50

50.64

367.14

010509 TUBO CORTINA DUCHA

ML

10.3

4,200.00

43,260.00

6,921.60

50,181.60

13

Preparado Por LEONARDO ROJO HENAO

13

CODIGO

ACTIVIDAD

080102 HORA CUADRILLA AA


5011

TUBERIA CONCRETO

ALBAIL.
10"

UND

CANT

HH

0.76

VR. UNIT.
$

9,908.54

VR. PARCIAL
$

IVA 16%

7,530.49

SUBTOTAL
$

7,530.49

ML

010177

#N/A #N/A

4.36

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

3.71

#N/A

#N/A

#N/A

#N/A

010506

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.12

#N/A

#N/A

5012

TUBERIA CONCRETO

12"

#N/A

ML

010177 CEMENTO GRIS CONQUISTADOR

KG

6.2

521.68

3,234.42

517.51

3,751.92

010118 ARENA MEDIANA

M3

0.03

26,950.00

808.50

129.36

937.86

010108 AGUA

LT

5.27

150.00

790.50

126.48

916.98

010505 TRITURADO FINO

M3

1.03

35,844.00

36,919.32

5,907.09

42,826.41

HH

1.12

9,908.54

11,097.57

11,097.57

080102 HORA CUADRILLA AA


5013

ALBAIL.

PUNTO PVC SANITARIO 2"

UND

020518 TUBO SANITARIO 2" PAVCO PVC

UND

0.929

20,800.00

19,323.65

3,091.78

22,415.43

020188 CODO SANITARIO CxC 2"x90 PAVCO PVC

UND

1,782.00

1,782.00

285.12

2,067.12

HH

0.2

9,908.54

1,981.71

1,981.71

080102 HORA CUADRILLA AA


5014

ALBAIL.

PUNTO SANITARIO DE 3"

UND

020190

#N/A #N/A

0.76

#N/A

#N/A

#N/A

#N/A

020519

#N/A #N/A

0.5463

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.3

#N/A

#N/A

5015

PUNTO SANITARIO DE 6"

020520

#N/A #N/A

020192 CODO SANITARIO 4"x90 PAVCO PVC


080102 HORA CUADRILLA AA
5016

#N/A

UND

ALBAIL.

CAJA DE INSPECCION 40x40

0.8646

#N/A

#N/A

UND

0.8

4,572.00

3,657.60

HH

0.4

9,908.54

3,963.42

#N/A
$

585.22

#N/A
$

4,242.82

3,963.42
1,252.80

UND

010279 HIERRO CHIPA 3/8"

KG

0.6

1,800.00

1,080.00

172.80

010111 ALAMBRE NEGRO # 18 050318

KG

0.01

2,160.00

21.60

3.46

25.06

010414 ROCA MUERTA

M3

0.1

14,800.00

1,480.00

236.80

1,716.80

UND

10,500.00

42,000.00

6,720.00

48,720.00

M3

0.15

M3

0.07

72,000.00

5,846.40

GBL

0.05

1,400.00

HH

2.9

9,908.54

050247 TABLA OTOBO 1"x10"x 2.9mts


010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

070121 VOLQUETA 6 M3
070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
5017

ALBAIL.

CAJA DE INSPECCION 50x50

#N/A

#N/A

#N/A

#N/A

5,040.00

806.40

70.00

11.20

81.20

28,734.77

28,734.77
1,566.00

UND

010279 HIERRO CHIPA 3/8"

KG

0.75

1,800.00

1,350.00

216.00

010111 ALAMBRE NEGRO # 18 050318

KG

0.02

2,160.00

43.20

6.91

50.11

010414 ROCA MUERTA

M3

0.12

14,800.00

1,776.00

284.16

2,060.16

UND

10,500.00

42,000.00

6,720.00

48,720.00

M3

0.22

M3

0.06

72,000.00

5,011.20

GBL

0.13

1,400.00

HH

2.5

9,908.54

050247 TABLA OTOBO 1"x10"x 2.9mts


010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

070121 VOLQUETA 6 M3
070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
5018

ALBAIL.

RELLENO GRAVILLA DE RIO

#N/A

#N/A

#N/A

#N/A

4,320.00

691.20

182.00

29.12

211.12

24,771.36

24,771.36

M3

010272 GRAVA 3/4" 5 M3

M3

47,500.00

47,500.00

7,600.00

55,100.00

070119 VIBROCOMPACT. A GASOLINA

DD

0.04

89,900.00

3,596.00

575.36

4,171.36

080102 HORA CUADRILLA AA

HH

0.6

9,908.54

5,945.13

5,945.13

5019

ALBAIL.

CAJA DE INSPECCION 60x60

UND

010279

#N/A #N/A

4.9372

#N/A

#N/A

#N/A

#N/A

010111

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010296

#N/A #N/A

68.81

#N/A

#N/A

#N/A

#N/A

010343

#N/A #N/A

0.38

#N/A

#N/A

#N/A

#N/A

010414

#N/A #N/A

0.09

#N/A

#N/A

#N/A

#N/A

070123

#N/A #N/A

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


5020

ALBAIL.

CAJA DE INSPECCION 80x80

010279 HIERRO CHIPA 3/8"

14

HH

9,908.54

19,817.09

3.2

1,800.00

5,760.00

#N/A
$

19,817.09

6,681.60

UND
KG

Preparado Por LEONARDO ROJO HENAO

921.60

14

CODIGO

ACTIVIDAD

UND

CANT

KG

0.09

2,160.00

194.40

31.10

225.50

UND

188.64

750.00

141,480.00

22,636.80

164,116.80

010343 MORTERO 1 : 3

M3

0.22

275,000.00

60,500.00

9,680.00

70,180.00

010414 ROCA MUERTA

M3

0.16

14,800.00

2,368.00

378.88

2,746.88

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

2.45

9,908.54

24,275.93

24,275.93
8,352.00

010111 ALAMBRE NEGRO # 18 050318


010296 LADRILLO COMUN

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
5021

ALBAIL.

CAJA DE INSPEC. 100x100

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

010280 HIERRO CHIPA 3/8"

KG

1,800.00

7,200.00

1,152.00

010111 ALAMBRE NEGRO # 18 050318

KG

0.12

2,160.00

259.20

41.47

300.67

UND

235.8

750.00

176,850.00

28,296.00

205,146.00

010343 MORTERO 1 : 3

M3

0.32

275,000.00

88,000.00

14,080.00

102,080.00

010414 ROCA MUERTA

M3

0.22

14,800.00

3,256.00

520.96

3,776.96

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

2.65

9,908.54

26,257.64

4,201.22

30,458.86

010296 LADRILLO COMUN

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
5022

CAJA INS. FIBRIT. TR.

ALBAIL.
LIV

010414 ROCA MUERTA

UND
M3

0.02

14,800.00

296.00

47.36

343.36

010155 CAJA CONTAD. ACUEDUCTO

UND

36,343.00

36,343.00

5,814.88

42,157.88

010470 TAPA PARA TRAFICO PESADO

UND

58,998.00

58,998.00

9,439.68

68,437.68

HH

9,908.54

9,908.54

9,908.54

UND

36,343.00

36,343.00

5,814.88

42,157.88

M3

0.02

14,800.00

296.00

47.36

343.36

HH

1.2

9,908.54

11,890.25

11,890.25

080102 HORA CUADRILLA AA


5023

ALBAIL.

CAJA CONTAD. AGUA FIBRIT.

010154 CAJA CONTAD. ACUEDUCTO


010414 ROCA MUERTA
080102 HORA CUADRILLA AA
5024

ALBAIL.

CAJA INSP. FIBRIT. TR. PES

010414 ROCA MUERTA

UND

UND
M3

0.02

14,800.00

296.00

47.36

343.36

010155 CAJA CONTAD. ACUEDUCTO

UND

36,343.00

36,343.00

5,814.88

42,157.88

010470 TAPA PARA TRAFICO PESADO

UND

58,998.00

58,998.00

9,439.68

68,437.68

HH

9,908.54

9,908.54

9,908.54

080102 HORA CUADRILLA AA


5025

ALBAIL.

CAMAR. ELECTRIC. DOBLES

UND

010280 HIERRO CHIPA 3/8"

KG

20.63

1,800.00

37,134.00

5,941.44

43,075.44

010111 ALAMBRE NEGRO # 18 050318

KG

0.62

2,160.00

1,339.20

214.27

1,553.47

010296

#N/A #N/A

527.4

#N/A

#N/A

#N/A

#N/A

010270

#N/A #N/A

0.34

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

256

#N/A

#N/A

#N/A

#N/A

010414

#N/A #N/A

36

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

46

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

#N/A

#N/A

5026

DUCTOS ELECTRIC. PVC. 3"

#N/A

ML

030208 DUCTO ELECTRICO LIVIANO 3"

ML

1.03

6,398.00

6,589.94

1,054.39

7,644.33

030285 TUBO FLUORESCENTE x48" SLIM

UND

0.21

3,600.00

756.00

120.96

876.96

M3

0.01

14,800.00

148.00

23.68

171.68

HH

9,908.54

39,634.17

39,634.17

010414 ROCA MUERTA


080102 HORA CUADRILLA AA
5027

ALBAIL.

DUCTOS ELECTRICOS A.C. 4"

010414 ROCA MUERTA

ML
M3

0.01

14,800.00

148.00

23.68

171.68

030281 TUBO CONDUIT DE 3/4" PAVCO

UND

1.03

2,658.00

2,737.74

438.04

3,175.78

030284 TUBO FLUORESCENTE x48" SLIM

UND

0.21

3,600.00

756.00

120.96

876.96

HH

0.65

9,908.54

6,440.55

6,440.55

080102 HORA CUADRILLA AA


5028

ALBAIL.

DUCTOS ELECTRICOS PVC 4"

010414 ROCA MUERTA

ML
M3

0.01

14,800.00

148.00

23.68

171.68

030281 TUBO CONDUIT DE 3/4" PAVCO

UND

1.03

2,658.00

2,737.74

438.04

3,175.78

030285 TUBO FLUORESCENTE x48" SLIM

UND

0.21

3,600.00

756.00

120.96

876.96

HH

0.65

9,908.54

6,440.55

6,440.55

080102 HORA CUADRILLA AA


5029

TAPA SUMIDERO

ALBAIL.

68x 33

010438 SUBCONTRATO GAS DOMICILIARIO


020327 MARCO SUMIDERO 78x38x14
080102 HORA CUADRILLA AA
5030

TAPA SUMIDERO

15

ALBAIL.

95 x 45

UND
%

375,000.00

375,000.00

60,000.00

435,000.00

UND

26,407.00

26,407.00

4,225.12

30,632.12

HH

0.65

9,908.54

6,440.55

6,440.55

UND

Preparado Por LEONARDO ROJO HENAO

15

CODIGO

UND

CANT

010526 SUMIDERO VIAL 95x45x10

ACTIVIDAD

UND

177,632.00

177,632.00

28,421.12

206,053.12

020584 MARCO SUMIDERO 100x50x14

UND

66,212.00

66,212.00

10,593.92

76,805.92

HH

9,908.54

9,908.54

9,908.54

080102 HORA CUADRILLA AA


5031

ALBAIL.

TAPA POZO EN VIA

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

020447 TANQUE SEPTICO ETERNIT

UND

459,352.00

459,352.00

73,496.32

532,848.32

020328 MARCO TAPA POZO

UND

45,767.00

45,767.00

7,322.72

53,089.72

HH

9,908.54

9,908.54

9,908.54

UND

459,352.00

459,352.00

73,496.32

532,848.32

M3

0.1

14,800.00

1,480.00

236.80

1,716.80

080102 HORA CUADRILLA AA


5032

ALBAIL.

POZO SEPTICO ETERNIT

UND

020446 TANQUE SEPTICO ETERNIT


010414 ROCA MUERTA
5033

BAJANTE A. N. PVC 6"

ML

020521 TUBO SANITARIO 6" PAVCO PVC

UND

0.27

86,171.00

23,485.30

3,757.65

27,242.94

020194 CODO SANITARIO CxC 6"x90 PAVCO PVC

UND

0.04

39,280.00

1,571.20

251.39

1,822.59

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

0.89

10,899.40

9,700.46

9,700.46

UND

0.3967

1,983.00

786.57

HH

0.4

10,899.40

4,359.76

UND

0.11

5,680.00

600.59

HH

0.6

10,899.40

6,539.64

UND

0.08

8,984.00

697.45

HH

0.4

10,899.40

4,359.76

UND

1,200.00

1,200.00

HH

1.2475

10,899.40

13,597.52

5034

SIFON 2"

UND

020422 SIFON SANITARIO 2" PAVCO PVC


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
5035

SIFON 3"

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


SIFON 4"

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


TAPON DE INSPECCION DE 4"

912.42

4,359.76

96.09

696.68

6,539.64

111.59

809.04

4,359.76

UND

020455 TAPON DE PRUEBA 4" PAVCO


080103 HORA CUADRILLA BB (PLOM. Y ELECT)

5038

UND

020424 SIFON SANITARIO 4" PAVCO PVC

5037

125.85

UND

020423 SIFON SANITARIO 3" PAVCO PVC


5036

PUNTO SANITARIO DE 1" DESAGUE PARA AIRE


ACONDICIONADO (INC. REGATA, RESANE)

192.00

1,392.00

13,597.52

10,570.48

UND

020514 TUBO PRESION DE 1" PAVCO PVC

UND

1.04

8,762.00

9,112.48

1,458.00

020181 CODO PRESION PVC 1" X 90

UND

1.03

595.00

612.85

98.06

710.91

HH

2.35

9,908.54

23,246.20

23,246.20

40,020.00

080102 HORA CUADRILLA AA

5039

ALBAIL.

SIPS DE CANAL EN LAMINA DESARROLLO


MENOR A 1M EN LAMINA CALIBRE 20 INCLUYE
DOS MANOS DE PINTURA, ANTICORROSIVO,
SOSCO Y ELEMENTOS DE FIJACION PARA SU
ADECUADO FUNCIONAMIENTO

ML

010158 CANAL GALVANIZ. DESARRO. 0.75


020189 CODO SANITARIO CxC 3"x45 PAVCO PVC
080102 HORA CUADRILLA AA

5040

ALBAIL.

SIPS DE CANAL EN LAMINA DESARROLLO


MAYOR E IGUAL 1,5 ML EN LAMINA CALIBRE 20
INCLUYE DOS MANOS DE PINTURA,
ANTICORROSIVO, SOSCO Y ELEMENTOS DE
FIJACION PARA SU ADECUADO
FUNCIONAMIENTO

010158 CANAL GALVANIZ. DESARRO. 1,5


020194 CODO SANITARIO CxC 8"x90 PAVCO PVC
080102 HORA CUADRILLA AA
5041

ALBAIL.

PUNTO SANITARIO DE 4"

ML

34,500.00

34,500.00

5,520.00

UND

0.3

3,090.00

927.00

148.32

1,075.32

HH

2.35

9,908.54

23,246.20

23,246.20

ML
ML

45,300.00

45,300.00

7,248.00

52,548.00

UND

0.2

199,500.00

39,900.00

6,384.00

46,284.00

HH

2.60

9,908.54

25,762.21

25,762.21

UND

020192 CODO SANITARIO 4"x90 PAVCO PVC

UND

4,572.00

4,572.00

731.52

5,303.52

020520 TUBO SANITARIO 4" PAVCO PVC

UND

0.3

81,191.00

24,357.30

3,897.17

28,254.47

HH

0.3

9,908.54

2,972.56

2,972.56

080102 HORA CUADRILLA AA

16

ALBAIL.

Preparado Por LEONARDO ROJO HENAO

16

CODIGO
5042

ACTIVIDAD

UND

BAJANTE A. LL PVC 8"

ML

020521A TUBO SANITARIO 8" PAVCO PVC

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

0.1667

570,000.00

95,000.00

15,200.00

110,200.00

020192 CODO SANITARIO CxC 8"x90 PAVCO PVC

UND

0.01

199,500.00

1,995.00

319.20

2,314.20

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

0.55

10,899.40

5,994.67

5,994.67

ML

1 $

998.00

998.00

159.68

1,157.68

UND

1 $

3,789.00

3,789.00

606.24

4,395.24

HH

3 $

10,899.40

32,698.19

32,698.19

6000 INSTALACIONES ELECTRICAS


6001

ACOMETIDA 1" 3"

No 10 +12

ML

030147

#N/A #N/A

030148 CABLE DE COBRE THW 12 AWG


030275 TUBO CONDUIT DE 1" PAVCO
080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6002

ACOMETIDA 1 1/2" 3" No 12 +12

#N/A

#N/A

#N/A

#N/A

ML

030148 CABLE DE COBRE THW 12 AWG


030276 TUBO CONDUIT DE 1.1/2" PAVCO
080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6003

ACOMETIDA 1 1/2" 3" No 8 +10

ML

4 $

998.00

3,992.00

638.72

4,630.72

UND

1 $

11,300.00

11,300.00

1,808.00

13,108.00

HH

3 $

10,899.40

32,698.19

32,698.19
12,110.40

ML

030157 CABLE AISLADO

ML

3 $

3,480.00

10,440.00

1,670.40

030147 CABLE DE COBRE THW 10 AWG

ML

1 $

1,434.00

1,434.00

229.44

1,663.44

UND

1 $

11,300.00

11,300.00

1,808.00

13,108.00

HH

3 $

10,899.40

32,698.19

32,698.19
4,524.00

030276 TUBO CONDUIT DE 1.1/2" PAVCO


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6004

ACOMETIDA 2" 3"

No 2 + 1

ML

030145 CABLE ALM. AISLADO PVC 1" AWG

ML

1 $

3,900.00

3,900.00

624.00

030146 CABLE ALM. DESNUDO AM 2 / 0

ML

3 $

388.00

1,164.00

186.24

1,350.24

UND

1 $

18,350.00

18,350.00

2,936.00

21,286.00

HH

3 $

10,899.40

32,698.19

32,698.19

030279 TUBO CONDUIT DE 2" PAVCO


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6005

ACOMETIDA 3/4" 3" No 10 + 12

ML

030147 CABLE DE COBRE THW 10 AWG

ML

3 $

1,434.00

4,302.00

688.32

4,990.32

030148 CABLE DE COBRE THW 12 AWG

ML

1 $

998.00

998.00

159.68

1,157.68

UND

1 $

2,658.00

2,658.00

425.28

3,083.28

HH

3 $

10,899.40

32,698.19

32,698.19
1,151.88

030280 TUBO CONDUIT DE 3/4" PAVCO


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6006

ACOMETIDA AEREA 10 MT / CN

UND

030104 ADAP. TERMINAL CONDUIT 1"

UND

3 $

331.00

993.00

158.88

030105 ADAP. TERMINAL CONDUIT 1/2"

UND

4 $

135.00

540.00

86.40

626.40

ML

3 $

1,434.00

4,302.00

688.32

4,990.32

030147 CABLE DE COBRE THW 10 AWG


030148 CABLE DE COBRE THW 12 AWG

ML

1 $

998.00

998.00

159.68

1,157.68

030170 CAJA 60x60x12CM

UND

1 $

28,750.00

28,750.00

4,600.00

33,350.00

030275 TUBO CONDUIT DE 1" PAVCO

UND

1 $

3,789.00

3,789.00

606.24

4,395.24

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

1 $

2,250.00

2,250.00

360.00

2,610.00

HH

3 $

10,899.40

32,698.19

32,698.19

3 $

388.00

1,164.00

186.24

1,350.24

5,231.71

37,929.90

322,734.00

4,060.00

3,098.67

12,653.28

12,394.69

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6007

ACOMETIDA GRAL 3 x 2 x 0

ML

030146 CABLE ALM. DESNUDO AM 2 / 0

ML

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

3 $

10,899.40

32,698.19

010437 SUBCONTRATO ELECTRICO

38 $

8,493.00

322,734.00

6008

BALA DE ALUMINIO No 12

UND

030124 BALA DE ALUMINIO No 12


080107 HORA OFICIAL PLOM. Y ELECT.
6009

UND
BB

BALA INCANDESCENTE 100 W

6010

3,500.00

3,500.00

6,197.34

3,098.67

UND

1 $

10,908.00

10,908.00

HH

2 $

6,197.34

12,394.69

560.00

UND

030123 BALA INCANDESCENTE 100 W


080107 HORA OFICIAL PLOM. Y ELECT.

1 $
0.5 $

HH

BB

CAJA 10 x 10

030172 CAJA SENCILLA CONDUIT

1,745.28

UND
1 $

1,850.00

1,850.00

296.00

2,146.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

0.33 $

10,899.40

3,596.80

575.49

4,172.29

010437 SUBCONTRATO ELECTRICO

0.38 $

8,493.00

3,227.34

3,227.34

6011

CAJA DE PASO 10 x 10 T V

030172 CAJA SENCILLA CONDUIT

UND

UND
1 $

1,850.00

1,850.00

296.00

2,146.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

0.5 $

10,899.40

5,449.70

871.95

6,321.65

010437 SUBCONTRATO ELECTRICO

0.38 $

8,493.00

3,227.34

3,227.34

17

UND

Preparado Por LEONARDO ROJO HENAO

17

CODIGO
6012

ACTIVIDAD

UND

LAMPARA TOMA / ECONOMICA

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

030105 ADAP. TERMINAL CONDUIT 1/2"


030148 CABLE DE COBRE THW 12 AWG
030149 CABLE DE COBRE THW 14 AWG

UND

3 $

135.00

405.00

64.80

469.80

ML

11 $

998.00

10,978.00

1,756.48

12,734.48

ML

5.5 $

465.00

2,557.50

409.20

2,966.70

030171 CAJA SENCILLA CONDUIT

UND

2 $

1,850.00

3,700.00

592.00

4,292.00

030215 INTERRUPTOR SENCILLO

UND

1 $

5,100.00

5,100.00

816.00

5,916.00

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

5 $

2,250.00

11,250.00

1,800.00

13,050.00

030228 PLAFON DE LOZA

UND

1 $

1,100.00

1,100.00

176.00

1,276.00

030260 TOMA DOBLE LEVINTON

UND

1 $

4,400.00

4,400.00

704.00

5,104.00

HH

3 $

10,899.40

32,698.19

32,698.19

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


SALIDA BIFASICA PVC

UND

030105 ADAP. TERMINAL CONDUIT 1/2"

6013

UND

2.1 $

135.00

283.50

45.36

328.86

ML

9.24 $

998.00

9,221.52

1,475.44

10,696.96

030171 CAJA SENCILLA CONDUIT

UND

1.05 $

1,850.00

1,942.50

310.80

2,253.30

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

5 $

2,250.00

11,250.00

1,800.00

13,050.00

030260 TOMA DOBLE LEVINTON

UND

1.05 $

4,400.00

4,620.00

739.20

5,359.20

HH

3.2 $

10,899.40

34,878.07

34,878.07

030148 CABLE DE COBRE THW 12 AWG

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

6014

SIPS SALIDA CON TOMA PARA TELEVISION CON


CONECTORES EN LA PARTE POSTERIOR PARA
ENTRADA Y DERIVACION DEL COAXIAL,
INCLUYE ACOMETIDA INDIVIDUAL POR PUNTO
DESDE LA CAJA PRINCIPAL HASTA EL SITIO
INDICADO POR EL SUPERVISOR DEL PUNTO,
GRADUACION DEL NIVEL DE ATENUACION DE
LA SEAL DE 0 A 30 DB, DUCTERIA PVC DB 1 x
3/4, CABLE COAXIAL RG 6/U 90%

UND

030105 ADAP. TERMINAL CONDUIT 1/2"

UND

2.1 $

135.00

283.50

45.36

328.86

030171 CAJA SENCILLA CONDUIT

UND

1 $

1,850.00

1,850.00

296.00

2,146.00

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

2 $

2,250.00

4,500.00

720.00

5,220.00

030263 TOMA COAXIAL +TELEFONO

UND

8 $

4,850.00

38,800.00

6,208.00

45,008.00

1.5098 $

10,899.40

16,455.68

16,455.68

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6015

HH

SALIDA LAMPARA CONMUT. C.N

UND

030105 ADAP. TERMINAL CONDUIT 1/2"

UND

3.36 $

135.00

453.60

72.58

526.18

ML

4.56 $

998.00

4,550.88

728.14

5,279.02

030148 CABLE DE COBRE THW 12 AWG


030149 CABLE DE COBRE THW 14 AWG

ML

7.44 $

465.00

3,459.60

553.54

4,013.14

030171 CAJA SENCILLA CONDUIT

UND

1.89 $

1,850.00

3,496.50

559.44

4,055.94

030210 INTERRUPTOR CONMUTABLE DOBLE

UND

0.84 $

5,211.00

4,377.24

700.36

5,077.60

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

4.28 $

2,250.00

9,630.00

1,540.80

11,170.80

030228 PLAFON DE LOZA

UND

1.05 $

1,100.00

1,155.00

184.80

1,339.80

HH

3.5 $

10,899.40

38,147.89

38,147.89

UND

3.36 $

135.00

453.60

72.58

526.18

ML

4.56 $

998.00

4,550.88

728.14

5,279.02

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6016

SALIDA LAMPARA CONMUT. PVC

UND

030105 ADAP. TERMINAL CONDUIT 1/2"


030148 CABLE DE COBRE THW 12 AWG
030149 CABLE DE COBRE THW 14 AWG

ML

11.16 $

465.00

5,189.40

830.30

6,019.70

030171 CAJA SENCILLA CONDUIT

UND

1.89 $

1,850.00

3,496.50

559.44

4,055.94

030210 INTERRUPTOR CONMUTABLE DOBLE

UND

0.84 $

5,211.00

4,377.24

700.36

5,077.60

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

4.28 $

2,250.00

9,630.00

1,540.80

11,170.80

030228 PLAFON DE LOZA

UND

1.05 $

1,100.00

1,155.00

184.80

1,339.80

HH

3.2 $

10,899.40

34,878.07

34,878.07

UND

2.61 $

135.00

352.35

56.38

408.73

ML

4.61 $

998.00

4,600.78

736.12

5,336.90

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6017

SIPS SALIDA ALUMBRADO CON LUMINARIA TIPO


APLIQUE (PLAFON)

030105 ADAP. TERMINAL CONDUIT 1/2"


030148 CABLE DE COBRE THW 12 AWG
030149 CABLE DE COBRE THW 14 AWG

UND

ML

2.79 $

465.00

1,297.35

207.58

1,504.93

030171 CAJA SENCILLA CONDUIT

UND

1.35 $

1,850.00

2,497.50

399.60

2,897.10

030214 INTERRUPTOR DOBLE SIN L LPTO LUMIN.

UND

1 $

4,215.00

4,215.00

674.40

4,889.40

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

3.38 $

2,250.00

7,605.00

1,216.80

8,821.80

18

Preparado Por LEONARDO ROJO HENAO

18

CODIGO

ACTIVIDAD

UND

030228 PLAFON DE LOZA

UND

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6018

HH

SALIDA PUNTO ALARMA CN

CANT

VR. UNIT.

VR. PARCIAL

1 $

1,100.00

1,100.00

1.53 $

10,899.40

16,701.41

IVA 16%
$

176.00

SUBTOTAL
$

1,276.00

16,701.41
309,720.00

UND

030290 VARILLA COOPERWELL COBRIZADA 2.0mts

UND

2 $

133,500.00

267,000.00

42,720.00

030171 CAJA SENCILLA CONDUIT

UND

1 $

1,850.00

1,850.00

296.00

2,146.00

030233 BOMBILLO AHORRADOR 2x26W/120 V.

UND

1 $

18,400.00

18,400.00

2,944.00

21,344.00

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

3,240.00

23,490.00

5,449.70

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6019

9 $

2,250.00

20,250.00

0.5 $

10,899.40

5,449.70

UND

2.61 $

135.00

352.35

56.38

408.73

ML

9.87 $

460.00

4,540.20

726.43

5,266.63

HH

SALIDA TELEFONO PVC

UND

030105 ADAP. TERMINAL CONDUIT 1/2"


030114 ALAMBRE TELEFONO 2 x 22
030171 CAJA SENCILLA CONDUIT

UND

1 $

1,850.00

1,850.00

296.00

2,146.00

030266 TOMA PATA TRABADA / LX 030CPT

UND

1 $

15,173.00

15,173.00

2,427.68

17,600.68

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

9.66 $

2,250.00

21,735.00

3,477.60

25,212.60

HH

3.2 $

10,899.40

34,878.07

34,878.07

UND

2.1 $

135.00

283.50

45.36

328.86

ML

5.13 $

460.00

2,359.80

377.57

2,737.37

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6020

SIPS SALIDA PARA TIMBRE INCLUYE EL


APARATO CON TODOS SUS ACCESORIOS PARA
SU ADECUADO FUNCIONAMIENTO

030105 ADAP. TERMINAL CONDUIT 1/2"


030114 ALAMBRE TELEFONO 2 x 22

UND

030171 CAJA SENCILLA CONDUIT

UND

1 $

1,850.00

1,850.00

296.00

2,146.00

030266 TOMA PATA TRABADA / LX 030CPT

UND

1 $

15,173.00

15,173.00

2,427.68

17,600.68

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

3.9 $

2,250.00

8,775.00

1,404.00

10,179.00

1.2601 $

10,899.40

13,734.04

13,734.04

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6021

HH

TABLERO CON PUERTA 36 CIRC.

UND

030227 PLACA IDENTIFICADORA 2x1 CM


030240 TABLERO CON PUERTA 36 CIRC.
080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6022

TABLERO CON PUERTA 24 CIRC.

36 $

1,805.00

64,980.00

10,396.80

75,376.80

ND

1 $

233,160.00

233,160.00

37,305.60

270,465.60

HH

4 $

10,899.40

43,597.59

43,597.59

UND

030227 PLACA IDENTIFICADORA 2x1 CM


030239 TABLERO CON PUERTA 24 CIRC.
080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6023

UND

TABLERO PARCIAL 4 CIRC.

UND

24 $

1,805.00

43,320.00

6,931.20

50,251.20

ND

1 $

233,160.00

233,160.00

37,305.60

270,465.60

HH

4 $

10,899.40

43,597.59

43,597.59

UND

030250 TABLERO DE 4 CIRCUITOS

UND

1 $

26,500.00

26,500.00

4,240.00

30,740.00

030137 BREAKER 20 AM GENERAL

UND

4 $

6,500.00

26,000.00

4,160.00

30,160.00

2.05 $

10,899.40

22,343.76

22,343.76

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

6024

HH

SIPS TABLERO DE DISTRIBUCION TRIFASICO


EMPOTRADO EN PARED, CON ESPACIO PARA
TOTALIZADOR (12) CIRCUITOS, CON PUERTA,
UND
CHAPA Y LLAVES, INCLUYE TOTALIZADOR,
BARRA DE NEUTRO, BARRA DE TIERRA AISLADA
DEL CERREMIENTO METALICO, BREAKERS,
TRASLADO DE ACOMETIDAS ELECTRICAS
PROVISIOSIONALES Y ACCESORIOS, INCLUYE
EL DESMONTE DEL EXISTENTE Y RESANE DE
PAREDES DE SER NECESARIO

030245 TABLERO DE 12 CIRCUITOS

UND

1.03 $

658,000.00

677,740.00

108,438.40

786,178.40

030137 BREAKER 20 AM GENERAL

UND

20 $

6,500.00

130,000.00

20,800.00

150,800.00

5.44 $

10,899.40

59,341.60

59,341.60

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6025

HH

TABLERO PARCIAL 18 CIRC.

UND

030247 TABLERO DE 18 CIRCUITOS

UND

1 $

266,800.00

266,800.00

42,688.00

309,488.00

030137 BREAKER 20 AM GENERAL

UND

18 $

6,500.00

117,000.00

18,720.00

135,720.00

4.11 $

10,899.40

44,796.52

44,796.52

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

DESMONTE Y SUMINISTRO DE
TOMACORRIENTE DOBLE MONOFASICO

UND

030264 TOMA CORRIENTE DOBLE CON POLO A TIERRA

UND

1 $

4,950.00

4,950.00

792.00

5,742.00

030105 ADAP. TERMINAL CONDUIT 1/2"

UND

1 $

135.00

135.00

21.60

156.60

6026

19

Preparado Por LEONARDO ROJO HENAO

19

CODIGO

ACTIVIDAD

UND

030148 CABLE DE COBRE THW 12 AWG

ML

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

5.05 $

998.00

5,039.90

806.38

5,846.28

030171 CAJA SENCILLA CONDUIT

UND

1 $

1,850.00

1,850.00

296.00

2,146.00

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

2.05 $

2,250.00

4,612.50

738.00

5,350.50

030210 INTERRUPTOR CONMUTABLE DOBLE

UND

1 $

5,211.00

5,211.00

833.76

6,044.76

2.0809 $

10,899.40

22,680.32

22,680.32

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6027

HH

TUBERIA CONDUIT 3/4"

ML

030290 VARILLA COOPERWELL COBRIZADA 2.0mts

UND

2 $

133,500.00

267,000.00

42,720.00

309,720.00

020291 LIMPIADOR PAVCO x 1/4

GLN

0.01 $

17,827.00

178.27

28.52

206.79

020426 SIFON SANITARIO 4" PAVCO PVC

UND

0.01 $

8,984.00

89.84

14.37

104.21

030280 TUBO CONDUIT DE 3/4" PAVCO

UND

1 $

2,658.00

2,658.00

425.28

3,083.28

0.1 $

10,899.40

1,089.94

1,089.94

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6028

HH

TUBERIA CONDUIT 1"

#N/A

030136 BOQUILLAS JUEGO 1"

UND

0.33 $

182.00

60.06

9.61

69.67

020291 LIMPIADOR PAVCO x 1/4

GLN

0.01 $

17,827.00

178.27

28.52

206.79

020426 SIFON SANITARIO 4" PAVCO PVC

UND

0.01 $

8,984.00

89.84

14.37

104.21

030275 TUBO CONDUIT DE 1" PAVCO

UND

1 $

3,789.00

3,789.00

606.24

4,395.24

0.33 $

10,899.40

3,596.80

3,596.80

6,044.76

2,351.03

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6029

HH

CONMUTABLE SENCILLO

UND

030210 INTERRUPTOR CONMUTABLE DOBLE

UND

1.00 $

5,211.00

5,211.00

HH

0.5 $

4,702.05

2,351.03

UND

1.00 $

135.00

135.00

21.60

156.60

ML

5.5 $

998.00

5,489.00

878.24

6,367.24

030171 CAJA SENCILLA CONDUIT

UND

1.5 $

1,850.00

2,775.00

444.00

3,219.00

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

2.5 $

2,250.00

5,625.00

900.00

6,525.00

030210 INTERRUPTOR CONMUTABLE DOBLE

UND

1.03 $

5,211.00

5,367.33

858.77

6,226.10

HH

2.33 $

10,899.40

25,431.17

25,431.17

UND

1.00 $

6,500.00

6,500.00

7,540.00

HH

0.25 $

4,702.05

1,175.51

1,175.51

70,760.00

27,368.40

080111 HORA AYUDANTE PLOM. Y ELECT.


6030

BB

DESMONTE Y SUMINISTRO DE INTERUPTOR


CONMUTABLE DOBLE MONOFASICO

030148 CABLE DE COBRE THW 12 AWG

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

INTER AUT ENCH 1 x 30 AM

UND

030137 BREAKER 20 AM GENERAL


080111 HORA AYUDANTE PLOM. Y ELECT.
6032

BB

SIPS SALIDA ALUMBRADO CON LUMINARIA TIPO


BALA A EMPOTRAR EN CIELOFALSO BOMBILLA
TIPO LED. 6"

030234 LUMINARIA TIPO LED 18W


080103 HORA CUADRILLA BB (PLOM. Y ELECT)
6033

833.76

UND

030105 ADAP. TERMINAL CONDUIT 1/2"

6031

LAMPARA 2x40" BAJO PLACA

1,040.00

UND
UND
HH

1 $

61,000.00

61,000.00

2.51 $

10,899.40

27,368.40

9,760.00

UND

030182 CAMPANA RECIRCULADORA DE AIRE

UND

6 $

125,400.00

752,400.00

120,384.00

872,784.00

030222 LAMPARA FLUORESCENTE 2x40 X 2KM

UND

1 $

88,551.00

88,551.00

14,168.16

102,719.16

030226 PERNO 1/2" 1 3/4"

UND

6 $

437.00

2,622.00

419.52

3,041.52

0.5 $

10,899.40

5,449.70

5,449.70

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

6034

HH

SIPS TABLERO DE DISTRIBUCION MONOFASICO


EMPOTRADO EN PARED, CON ESPACIO PARA
TOTALIZADOR (08) CIRCUITOS, CON PUERTA,
UND
CHAPA Y LLAVES, INCLUYE TOTALIZADOR,
BARRA DE NEUTRO, BARRA DE TIERRA AISLADA
DEL CERREMIENTO METALICO, BREAKERS,
TRASLADO DE ACOMETIDAS ELECTRICAS
PROVISIOSIONALES Y ACCESORIOS, INCLUYE
EL DESMONTE DEL EXISTENTE Y RESANE DE
PAREDES DE SER NECESARIO

030252 TABLERO DE 8 CIRCUITOS

UND

1.03 $

185,000.00

190,550.00

30,488.00

221,038.00

030137 BREAKER 20 AM GENERAL

UND

8 $

6,500.00

52,000.00

8,320.00

60,320.00

5.04 $

10,899.40

54,924.13

54,924.13

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

20

HH

Preparado Por LEONARDO ROJO HENAO

20

CODIGO
6035

ACTIVIDAD

UND

DESMONTE SUMINISTRO E INSTALACION DE


APARATOS ELECTRICOS TIPO LUMINEX, EN
ZONAS HUMEDAS GFCI

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

030269 TOMA ZONA HUMEDA GFCI

UND

1.03 $

25,500.00

26,265.00

4,202.40

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

1.03 $

2,250.00

2,317.50

370.80

2,688.30

HH

1.06 $

10,899.40

11,502.73

11,502.73

UND

2.1 $

135.00

283.50

45.36

328.86

ML

7.24 $

998.00

7,225.52

1,156.08

8,381.60

030171 CAJA SENCILLA CONDUIT

UND

1.05 $

1,850.00

1,942.50

310.80

2,253.30

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

3 $

2,250.00

6,750.00

1,080.00

7,830.00

030260 TOMA DOBLE LEVINTON

UND

1.05 $

4,400.00

4,620.00

739.20

5,359.20

HH

2.18 $

10,899.40

23,772.15

23,772.15

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6036

SIPS SALIDA CON TOMA CORRIENTE DOBLE


MONOFASICO 15A./120V. (1+N+PT) (RED
NORMAL)

UND

030105 ADAP. TERMINAL CONDUIT 1/2"


030148 CABLE DE COBRE THW 12 AWG

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


6037

30,467.40

DESMONTE Y SUMINISTRO DE INTERRUPTOR


SENCILLO Y/O DOBLE (TESTIGO
FOSFORESENTE)

UND

030215 INTERRUPTOR SENCILLO

UND

1.03 $

5,100.00

5,253.00

840.48

6,093.48

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

2.03 $

2,250.00

4,567.50

730.80

5,298.30

ML

5.03 $

998.00

5,019.94

803.19

5,823.13

UND

1.03 $

1,850.00

1,905.50

304.88

2,210.38

3.4295 $

4,702.05

16,125.72

16,125.72

030148 CABLE DE COBRE THW 12 AWG


030171 CAJA SENCILLA CONDUIT
080111 HORA AYUDANTE PLOM. Y ELECT.

6038

BB

HH

SIPS SALIDA PARA UNIDADES


CONDENSADORAS DE 18000 BTU/HR, INCLUYE:
CIRCUITO DE POTENCIA EN CABLE 2xCuxTHW
No. 10 (FASES) + 1xCuxDESNx AWG No. 10
(TIERRA), DESDE EL TABLERO DE
DISTRIBUCION A PUNTO ELECTRICO), INCLUYE
TOMA TIPO MIRADA CHINA, TUBERIA CONDUIT Y
ACCESOSORIOS REQUERIDOS PARA SU
CORRECTA INSTALACION Y PUESTA EN
SERVICIO.

030105 ADAP. TERMINAL CONDUIT 1/2"

UND

UND

2.1 $

135.00

283.50

45.36

328.86

ML

12.24 $

998.00

12,215.52

1,954.48

14,170.00

030259 TOMA MIRADA CHINA

UND

1.24 $

12,500.00

15,500.00

2,480.00

17,980.00

030171 CAJA SENCILLA CONDUIT

UND

1.05 $

1,850.00

1,942.50

310.80

2,253.30

030278 TUBO CONDUIT DE 1/2" PAVCO

UND

3 $

2,250.00

6,750.00

1,080.00

7,830.00

030260 TOMA DOBLE LEVINTON

UND

1.05 $

4,400.00

4,620.00

739.20

5,359.20

HH

2.87 $

10,899.40

31,254.32

31,254.32

8,270.08

827,008.00

827,008.00

030148 CABLE DE COBRE THW 12 AWG

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

6039

SUMINSTRO E INSTALACION DE CALENTADOR


DE AGUA A GAS NATURAL DE 14 lts/min SIN
LLAMA PERMANENTE, CON DISPLAY
INDICADOR DE TEMPERATURA, TEMPORIZADR
DE APAGADO, SENSOR DE
SOBRECALENTAMIENTO, CON LOS SIGUIENTES
SISTEMAS DE SEGURIDAD: ELECTRONICO, ODS,
CONATO DE INCENDIO, OBSTRUCCION DEL
CONDUCTO DE EVACUACION Y SOBREPRESION
DEL AGUA.

010435 SUBCONRATO DE INSTALACION

21

UND

100

Preparado Por LEONARDO ROJO HENAO

132,321.28

21

CODIGO

ACTIVIDAD

UND

6040

REVISION Y MANTENIMIENTO DE PUNTOS DE


GAS POR PARTE DE LA EMPRESA PRESTADORA
DEL SERVICIO.

UND

010415 SUBCONTRATO REVISION PUNTOS DE GAS


6041

030182 CAMPANA RECIRCULADORA DE AIRE


080102 HORA CUADRILLA AA
6042

ALBAIL.

PUNTO DE GAS NATURAL PARA INSTALACION


DOMICILIARIA, INTERNA

010438 SUBCONTRATO GAS DOMICILIARIO

7000
7001

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

325,634.40

325,634.40

52,101.50

325,634.40

UND

1.03

125,400.00

129,162.00

20,665.92

129,162.00

HH

1.83

9,908.54

18,148.80

18,148.80

375,000.00

375,000.00

375,000.00

CAMPANA RECIRCULADORA 1 VELOCIDAD PARA


COCINA INTEGRAL

CANT

UND

UND
%

60,000.00

CUBIERTAS
ENTRAMADO TEJA ONDULADA

M2

050216

#N/A #N/A

0.2

#N/A

#N/A

#N/A

#N/A

010461

#N/A #N/A

2.62

#N/A

#N/A

#N/A

#N/A

050167

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

#N/A

#N/A

7002

ENTRAMADO TEJA DE BARRO

050216

M2
#N/A #N/A

010461 TABLON SAJO 2"x10"x 3mts

0.02

#N/A

#N/A

ML

0.21 $

13,425.00

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.51 $

1,630.00

080102 HORA CUADRILLA AA

HH

1 $

9,908.54
6,645.69

7003

ALBAIL.

INMUNIZANTE CUBIERTA

#N/A

#N/A

2,819.25

451.08

3,270.33

831.30

133.01

964.31

9,908.54

9,908.54

M2

010100 A. C. P. M.

GLN

040113
080102
7004

#N/A

TEJA ETERNIT No 4

0.001

6.65

#N/A #N/A

0.02

#N/A

#N/A

#N/A #N/A

0.2

#N/A

#N/A

1.06

#N/A

6.65
#N/A
#N/A

M2

010493

#N/A #N/A

1.01

#N/A

#N/A

#N/A

#N/A

010268

#N/A #N/A

2.02

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.4

#N/A

#N/A

7005

TEJA ETERNIT No 6

#N/A

M2

010497 TEJA ETERNIT No 6 0001620000

UND

0.65

17,241.00

11,206.65

1,793.06

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

1.3

341.00

443.30

70.93

514.23

HH

0.45

9,908.54

4,458.84

4,458.84
14,204.20

080102 HORA CUADRILLA AA


7006

ALBAIL.

TEJA ETERNIT No 8

12,999.71

HH

010496 TEJA ETERNIT No 8 0001820000

UND

0.5

24,490.00

12,245.00

1,959.20

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

1.1

341.00

375.10

60.02

435.12

HH

0.45

9,908.54

4,458.84

4,458.84

080102 HORA CUADRILLA AA


7007

ALBAIL.

CABALLETE TEJA ETERNIT

ML

010153 CABALLETE ETERNIT PF/ 7FIJO 00101000

UND

1.15

18,027.00

20,731.05

3,316.97

24,048.02

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

4.6

341.00

1,568.60

250.98

1,819.58

HH

0.45

9,908.54

4,458.84

4,458.84

ML

1.56

5,280.00

8,236.80

1,317.89

9,554.69

LB

0.05

2,000.00

100.00

16.00

116.00

080102 HORA CUADRILLA AA


7008

ALBAIL.

ALISTA. IMPER. TEJA DE BARRO

010363 PERGOLA

VLU 20

050216 PUNTILLA 2" C.C / 13010200

M2

010111

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010109

#N/A #N/A

6.3

#N/A

#N/A

#N/A

#N/A

050174

#N/A #N/A

0.85

#N/A

#N/A

#N/A

#N/A

010233

#N/A #N/A

0.05

#N/A

#N/A

#N/A

#N/A

010120

#N/A #N/A

1.02

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.8

#N/A

#N/A

7009

TEJA DE BARRO

#N/A

M2

010490 TEJA DE BARRO

UND

21.45

502.00

10,767.90

1,722.86

12,490.76

010177 CEMENTO GRIS CONQUISTADOR

KG

9.67

521.68

5,044.65

807.14

5,851.79

010118 ARENA MEDIANA

M3

0.05

26,950.00

1,347.50

215.60

1,563.10

HH

1.2

9,908.54

11,890.25

11,890.25

080102 HORA CUADRILLA AA


7010

ALBAIL.

CABALLETE TEJA DE BARRO

22

ML

Preparado Por LEONARDO ROJO HENAO

22

CODIGO

ACTIVIDAD

UND

CANT

UND

3.28

502.00

1,646.56

263.45

1,910.01

010177 CEMENTO GRIS CONQUISTADOR

KG

1.48

521.68

772.09

123.53

895.62

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

HH

0.25

9,908.54

2,477.14

2,477.14

UND

29.1

502.00

14,608.20

2,337.31

16,945.51

010177 CEMENTO GRIS CONQUISTADOR

KG

7.5

521.68

3,912.60

626.02

4,538.62

010118 ARENA MEDIANA

M3

0.04

26,950.00

1,078.00

172.48

1,250.48

HH

0.8

9,908.54

7,926.83

7,926.83

010490 TEJA DE BARRO

080102 HORA CUADRILLA AA


7011

ALBAIL.

TEJA DE BARRO S/ ETERNIT

010490 TEJA DE BARRO

080102 HORA CUADRILLA AA


7012

ALBAIL.

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

CANALETA 90 DE 3.75 M

M2

010502 TORNILLO METALICO CANALETA 90

UND

0.32

1,770.00

566.40

90.62

657.02

010165 CANAL GALVANIZ. DESARRO. 0.75

ML

0.32

34,500.00

11,040.00

1,766.40

12,806.40

010285 IGAS GRIS

KG

0.28

4,100.00

1,148.00

183.68

1,331.68

HH

9,908.54

9,908.54

9,908.54

UNDx 5 KG

080102 HORA CUADRILLA AA


7013

ALBAIL.

CANALETA 90 DE 4.5 M

M2

010502 TORNILLO METALICO CANALETA 90

UND

0.26

1,770.00

460.20

73.63

533.83

010166 CANAL GALVANIZ. DESARRO. 0.75

ML

0.26

34,500.00

8,970.00

1,435.20

10,405.20

010285 IGAS GRIS

KG

0.28

4,100.00

1,148.00

183.68

1,331.68

HH

9,908.54

9,908.54

9,908.54

UNDx 5 KG

080102 HORA CUADRILLA AA


7014

ALBAIL.

CANALETA 90 DE 5.25 M

M2

010502 TORNILLO METALICO CANALETA 90

UND

0.23

1,770.00

407.10

65.14

472.24

010167 CANAL GALVANIZ. DESARRO. 0.75

ML

0.23

34,500.00

7,935.00

1,269.60

9,204.60

010285 IGAS GRIS

KG

0.28

4,100.00

1,148.00

183.68

1,331.68

HH

9,908.54

9,908.54

9,908.54

UNDx 5 KG

080102 HORA CUADRILLA AA


7015

ALBAIL.

CANALETA 90 DE 6 M

M2

010502 TORNILLO METALICO CANALETA 90

UND

0.4

1,770.00

708.00

113.28

821.28

010168 CANAL GALVANIZ. DESARRO. 0.75

ML

0.2

34,500.00

6,900.00

1,104.00

8,004.00

010285 IGAS GRIS

KG

0.28

4,100.00

1,148.00

183.68

1,331.68

HH

1.1

9,908.54

10,899.40

10,899.40

UND

0.39

1,770.00

690.30

110.45

800.75

010169 CANAL GALVANIZ. DESARRO. 0.75

ML

0.13

34,500.00

4,485.00

717.60

5,202.60

010285 IGAS GRIS

KG

0.28

4,100.00

1,148.00

183.68

1,331.68

HH

1.1

9,908.54

10,899.40

10,899.40

UND

0.26

1,770.00

460.20

73.63

533.83

010170 CANAL GALVANIZ. DESARRO. 0.75

ML

0.26

34,500.00

8,970.00

1,435.20

10,405.20

010285 IGAS GRIS

KG

0.28

4,100.00

1,148.00

183.68

1,331.68

HH

9,908.54

9,908.54

9,908.54

0.7

1,770.00

1,239.00

198.24

1,437.24
28,014.00

UNDx 5 KG

080102 HORA CUADRILLA AA


7016

ALBAIL.

CANALETA 90 DE 7.5 M

M2

010502 TORNILLO METALICO CANALETA 90


UNDx 5 KG

080102 HORA CUADRILLA AA


7017

ALBAIL.

CANALETA 90 DE 9 M

M2

010502 TORNILLO METALICO CANALETA 90


UNDx 5 KG

080102 HORA CUADRILLA AA


7018

ALBAIL.

CANALETA 43 DE 3.5 M

M2

010502 TORNILLO METALICO CANALETA 90

UND

010159 CANAL GALVANIZ. DESARRO. 0.75

ML

0.7

34,500.00

24,150.00

3,864.00

010285 IGAS GRIS

KG

0.12

4,100.00

492.00

78.72

570.72

HH

1.1

9,908.54

10,899.40

10,899.40

UND

0.6

1,770.00

1,062.00

169.92

1,231.92

010160 CANAL GALVANIZ. DESARRO. 0.75

ML

0.6

34,500.00

20,700.00

3,312.00

24,012.00

010285 IGAS GRIS

KG

0.12

4,100.00

492.00

78.72

570.72

HH

1.1

9,908.54

10,899.40

10,899.40

UND

0.53

1,770.00

938.10

150.10

1,088.20

010161 CANAL GALVANIZ. DESARRO. 0.75

ML

0.53

34,500.00

18,285.00

2,925.60

21,210.60

010285 IGAS GRIS

KG

0.12

4,100.00

492.00

78.72

HH

1.2

9,908.54

11,890.25

UND

0.48

1,770.00

849.60

135.94

985.54

ML

0.48

34,500.00

16,560.00

2,649.60

16,560.00

UNDx 5 KG

080102 HORA CUADRILLA AA


7019

ALBAIL.

CANALETA 43 DE 4 M

M2

010502 TORNILLO METALICO CANALETA 90


UNDx 5 KG

080102 HORA CUADRILLA AA


7020

ALBAIL.

CANALETA 43 DE 4.5 M

M2

010502 TORNILLO METALICO CANALETA 90


UNDx 5 KG

080102 HORA CUADRILLA AA


7021

ALBAIL.

CANALETA 43 DE 5 M

010502 TORNILLO METALICO CANALETA 90


010162 CANAL GALVANIZ. DESARRO. 0.75

23

570.72

11,890.25

M2

Preparado Por LEONARDO ROJO HENAO

23

CODIGO

ACTIVIDAD

010285 IGAS GRIS

080102 HORA CUADRILLA AA


7022

UND

CANT

KG

0.12

4,100.00

492.00

HH

1.2

9,908.54

11,890.25

UND

0.86

1,770.00

1,522.20

#N/A #N/A

0.43

UNDx 5 KG
ALBAIL.

CANALETA 43 DE 5.5 M

010163
UNDx 5 KG

080102 HORA CUADRILLA AA


7023

VR. PARCIAL

IVA 16%
$

78.72

SUBTOTAL
$

570.72

11,890.25

1,765.75

570.72

11,890.25

M2

010502 TORNILLO METALICO CANALETA 90


010285 IGAS GRIS

VR. UNIT.

ALBAIL.

CANALETA 43 DE 6 M

#N/A

#N/A

KG

0.12

4,100.00

492.00

HH

1.2

9,908.54

11,890.25

243.55
#N/A

78.72

#N/A

M2

010502 TORNILLO METALICO CANALETA 90

UND

0.78

1,770.00

1,380.60

220.90

1,601.50

010164 CANAL GALVANIZ. DESARRO. 0.75

ML

0.39

34,500.00

13,455.00

2,152.80

15,607.80

010285 IGAS GRIS

KG

0.12

4,100.00

492.00

78.72

HH

1.2

9,908.54

11,890.25

UNDx 5 KG

080102 HORA CUADRILLA AA


7024

ALBAIL.

AFINADO CUBIERTAS PLANAS

570.72

11,890.25

M2

010177

#N/A #N/A

23.38

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.06

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

3.93

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.63

#N/A

#N/A

7025

IMPER. PERMA PLY 3 CAPAS

#N/A

M2

010363

#N/A #N/A

1.56

#N/A

#N/A

#N/A

010112

#N/A #N/A

0.24

#N/A

#N/A

#N/A

010120 ASFALTO
080102 HORA CUADRILLA AA
7026

IMPERMEAB.

ALBAIL.

GRAN EDIL

1.02

161,472.00

164,701.44

HH

0.63

9,908.54

30,723.00

26,352.23

#N/A
$

191,053.67

6,242.38

6,242.38

30,723.00

30,723.00

8,426.00
57,420.00

M2

010328 MALLA ELECTROSOLDADA U. 221


7027

M3

#N/A

UND

IMPERMEAB. EDIL ESPECIAL

M2

010329 MANTO EDIL ESPECIAL

UND

8,426.00

8,426.00

7028 SHINGLE CON IMPERMEAB.


010500 TEJA SIN TRASLAPO

M2
UND

2.2

22,500.00

49,500.00

7,920.00

050216 PUNTILLA 2" C.C / 13010200

LB

0.3

2,000.00

600.00

96.00

696.00

UND

47,264.00

94,528.00

15,124.48

109,652.48

UND

792.00

2,376.00

380.16

2,756.16

HH

0.82

9,908.54

8,125.00

8,125.00

010243 EMULSION ASFALTICA


010137 BASE FELT

FIBERGLASS

080102 HORA CUADRILLA AA


7029

ALBAIL.

TEJA ESPAOLA ETERNIT

M2

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

1.59

341.00

542.19

86.75

628.94

010492 TEJA ESPAOLA 1.6

UND

0.53

20,769.00

11,007.57

1,761.21

12,768.78

UND

0.26

7,969.50

2,072.07

331.53

2,403.60

HH

0.45

9,908.54

4,458.84

4,458.84
26,243.84

010491 TEJA ESPAOLA 0.7


080102 HORA CUADRILLA AA
7030

ALBAIL.

TEJA TRANSPARENTE No 4

M2

010482 TEJA AJOVER No 4

UND

1.01

22,400.00

22,624.00

3,619.84

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

2.02

341.00

688.82

110.21

799.03

HH

0.45

9,908.54

4,458.84

4,458.84
24,429.60

080102 HORA CUADRILLA AA


7031

TEJA TRANSPARENTE

ALBAIL.
No 6

M2

010480 TEJA AJOVER No 6

UND

0.65

32,400.00

21,060.00

3,369.60

010268 GANCHO TEJA ETERNIT 150MM/ 93000010

UND

1.3

341.00

443.30

70.93

514.23

HH

0.45

9,908.54

4,458.84

4,458.84
17,423.49

080102 HORA CUADRILLA AA


7032

ALBAIL.

CANALETA ACESCO

4.5

M2

010477 CANALETA ACESCO

4.5

UND

0.25

60,081.00

15,020.25

2,403.24

UND

0.59

1,770.00

1,044.30

167.09

1,211.39

HH

0.8

9,908.54

7,926.83

1,268.29

9,195.13

010502 TORNILLO METALICO CANALETA 90


080102 HORA CUADRILLA AA
7033

DOMO CIRCULAR

010241 DOMO CIRCULAR

ALBAIL.
D = 1.2

UND

1.4

UND

127,050.00

127,050.00

20,328.00

147,378.00

UND

4,680.00

37,440.00

5,990.40

43,430.40

HH

1.5

9,908.54

14,862.81

2,378.05

17,240.86

UND

0.25

30,452.00

7,613.00

1,218.08

8,831.08

KG

0.4

3,208.00

1,283.20

205.31

1,488.51

050332 TERMINAL SIN SALIDA ETERNIT


080102 HORA CUADRILLA AA
7034

CANAL EN LATON

ALBAIL.

D = 0.50

ML

010306 LAMINA GALVANIZADA 22


010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

24

Preparado Por LEONARDO ROJO HENAO

24

CODIGO

ACTIVIDAD

UND

CANT

0.8

8,493.00

6,794.40

UND

0.38

30,452.00

11,571.76

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.6

3,208.00

1,924.80

010437 SUBCONTRATO ELECTRICO

0.8

8,493.00

6,794.40

UND

0.5

30,452.00

15,226.00

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.8

3,208.00

2,566.40

010437 SUBCONTRATO ELECTRICO

0.8

8,493.00

6,794.40

UND

0.2

30,452.00

6,090.40

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.3

3,208.00

962.40

010437 SUBCONTRATO ELECTRICO

0.8

8,493.00

6,794.40

UND

0.2

30,452.00

6,090.40

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.3

3,208.00

962.40

010437 SUBCONTRATO ELECTRICO

0.8

8,493.00

6,794.40

UND

4,680.00

18,720.00

ML

1.03

5,292.00

5,450.76

UND

0.68

259,305.00

176,327.40

RAINGO

UND

0.34

3,073.00

020401 S/PORTE CANAL PVC RAINGO

UND

2.74

1,015.00

HH

0.74

9,908.54

7,332.32

TUBO

0.08

5,200.00

416.00

66.56

482.56

ML

1.05

6,048.00

6,350.40

1,016.06

7,366.46

UND

0.06

1,925.00

115.50

18.48

133.98

HH

0.51

9,908.54

5,053.36

5,053.36

521.68

521.68

605.15

5,113.28

4,954.27
605.15

010437 SUBCONTRATO ELECTRICO


7035

CANAL EN LATON

D = 0.75

CANAL EN LATON

D=1

BAJANTE LATON 12x 6

FLANCHE LATON 0.08

CANAL

PVC 3"

RAINGO

PVC 3"

RAINGO

020448 TAPA EXTERNA PVC

RAINGO

020526 UNION CANAL PVC


080102 HORA CUADRILLA AA
7040

BAJANTE PVC 3"

ALBAIL.

RAINGO
RAINGO

020159 CODO BAJANTE PVC RAINGO


080102 HORA CUADRILLA AA
7041

TRAGANTE

ALBAIL.

4"

010118

KG
#N/A #N/A

020220 CUPULA TRAGANTE 4"


080102 HORA CUADRILLA AA
TRAGANTE

13,423.24

307.97

2,232.77

6,794.40

2,436.16

17,662.16

410.62

2,977.02

6,794.40

974.46

7,064.86

153.98

1,116.38

6,794.40

974.46

7,064.86

153.98

1,116.38

6,794.40

2,995.20

21,715.20

872.12

6,322.88

28,212.38

204,539.78

1,044.82

167.17

1,211.99

2,781.10

444.98

3,226.08

7,332.32

UND

010177 CEMENTO GRIS CONQUISTADOR

7042

ML

010422 SILICONA TRANSPARENTE x 11oz


020132 BAJANTE PVC 3"

1,851.48

ML

050332 TERMINAL SIN SALIDA ETERNIT


020144 CANAL

6,794.40

ML

010306 LAMINA GALVANIZADA 22

7039

SUBTOTAL
$

ML

010306 LAMINA GALVANIZADA 22

7038

IVA 16%

ML

010306 LAMINA GALVANIZADA 22

7037

VR. PARCIAL

ML

010306 LAMINA GALVANIZADA 22

7036

VR. UNIT.

ALBAIL.

6"

0.01

#N/A

#N/A

UND

4,408.00

4,408.00

HH

0.5

9,908.54

4,954.27

83.47
#N/A

705.28

#N/A

UND

010177 CEMENTO GRIS CONQUISTADOR

KG

521.68

521.68

83.47

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

UND

9,636.50

9,636.50

1,541.84

11,178.34

HH

0.5

9,908.54

4,954.27

4,954.27

TUBO

0.08

5,200.00

416.00

66.56

482.56

ML

1.05

6,048.00

6,350.40

1,016.06

7,366.46

UND

0.06

1,925.00

115.50

18.48

133.98

HH

0.51

9,908.54

5,053.36

5,053.36

8,845.00

1,035.00

020221 CUPULA TRAGANTE 6"x4"


080102 HORA CUADRILLA AA
7043

BAJANTE PVC 4"

ALBAIL.

RAINGO

ML

010422 SILICONA TRANSPARENTE x 11oz


020132 BAJANTE PVC 3"

RAINGO

020159 CODO BAJANTE PVC RAINGO


080102 HORA CUADRILLA AA

7044

ALBAIL.

CINTA ASFALTICA AUTOADHESIVA, PROVISTA EN


UNA DE SUS CARAS DE UNA LAMINA DE
ALUMINIO, ESPESOR 15 cm TIPO MULTISEAL
SIKA

ML

010421 CINTA ASFALTICA AUTOADHESIVA MULTISEAL

ML

7,625.00

7,625.00

080102 HORA CUADRILLA AA

HH

0.1045

9,908.54

1,035.00

7045

ALBAIL.

1,220.00

ESTRUCTURA METALICA PARA CUBIERTA,


INCLUYE DOS MANOS DE ANTICORROSIVO Y O1
MANO DE PINTURA ESMALTE

KG

SOLDADURA 6011 x 1/8"""

KG

0.05

7,632.00

381.60

61.06

442.66

ANTICORROSIVO PHCL

GL

0.001

40,152.80

40.15

6.42

46.58

25

Preparado Por LEONARDO ROJO HENAO

25

CODIGO

UND

CANT

HIERR.DE 60000 PSI 420 MPA

ACTIVIDAD

KL

0.134

2,491.00

333.79

53.41

387.20

ACERO ESTRUCT. ASTM A-36

KL

3,074.00

3,074.00

491.84

3,565.84

MANO OBRA ALBANILERIA 3 AYUDANTE

HC

0.02

19,610.00

392.20

392.20

HC

MANO OBRA METALISTERIA 1 AYUDANTE-1 OFI

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

0.061

21,306.00

1,299.67

1,299.67

MANO OBRA PINTURA 1 AYUDANTE-1 OFI

HC

0.01

19,186.00

191.86

191.86

SOLDADOR ELECTRICO

DIA

0.012

31,800.00

381.60

61.06

442.66

HERRAMIENTA MENOR

GLB

0.035

1,590.00

55.65

8.90

64.55

OXICORTE (OXIGENO-ACETILENO)

DIA

0.005

29,892.00

149.46

23.91

173.37

ANDAMIO METALICO

UND

0.3

2,000.00

600.00

96.00

696.00

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.44

9,908.54

4,371.81

4,371.81

GR

0.08

65,500.00

5,240.00

838.40

6,078.40

M3

0.03

275,000.00

8,250.00

1,320.00

9,570.00

HH

0.37

9,908.54

3,696.46

3,696.46

KG

0.61

45,500.00

27,720.32

27,720.32

HH

1.00

9,908.54

9,908.54

9,908.54

7046

M2
DESMONTE DE MANTO IMPERMEABILIZANTE
DETERIORADO, UTILIZANDO EQUIPOS
ELECTRICOS PARA SU CORRECTA REMOCION

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA

7047

ALBAIL.

AFINADO CUBIERTAS Y/O CANALES; EN


MORTERO DE 2500 psi CON ADITIVO 4 EN 1
PARA MEJORAR LA ADHERENCIA MORTERO
VIEJO-NUEVO, APLICAR DE ACUERDO A
DOSIFICACION Y RECOMENDACIONES DEL
FABRICANTE, INCLUYE CAYUELAS EN LOS
SITIOS INDICADOS POR EL SUPERVISOR. TIPO
SIKA VISCO-BOND O SIMILAR

M2

SIKA VISCO-BOND
010343 MORTERO 1 : 3
080102 HORA CUADRILLA AA

7048

ALBAIL.

EMULSION CON BASE EN RESINAS ACRILICAS


ESTIRENADAS, PARA LA IMPERMEABILIZACION
FLEXIBLE DE CUBIERTA Y TERRAZAS, DE
APLICACIN EN FRIO, APLICACIN DE
ACUERDO A LAS RECOMENDACIONES DEL
FABRICANTE. TIPO SIKA-FILL 10 AOS O
SIMILAR, INCLUYE LIMPIEZA DE LA SUPERFICIE
Y AFINADO EN MORTERO DE SER NECESARIO.

010419 SIKA EMULSION


080102 HORA CUADRILLA AA
7049

ALBAIL.

SUMINISTRO E INSTALACION DE GARGOLAS


PARA EVACUACION DE AGUAS LLUVIAS SOBRE
PLACA

010343 MORTERO 1 : 3
020518 TUBO SANITARIO 2" PAVCO PVC
080102 HORA CUADRILLA AA
7050

ALBAIL.

SUMINISTRO E INSTALACION DE CUBIERTA


METALICA TIPO ARQUITECTONICO SIN
TRASLAPO CALIBRE 24

M2

4,435.25

UND
M3

0.0638

275,000.00

17,546.02

2,807.36

17,546.02

UND

0.15

20,800.00

3,120.00

499.20

3,120.00

HH

0.40

9,908.54

3,963.42

3,963.42

M2

010499 TEJA SIN TRASLAPO

UND

23,500.00

23,500.00

3,760.00

27,260.00

070101 ANDAMIO TUBULAR

SM

0.6

3,500.00

2,100.00

336.00

2,436.00

HH

0.40

9,908.54

3,963.42

3,963.42

17,241.00

17,241.00

19,999.56

080102 HORA CUADRILLA AA

7051

ALBAIL.

MANTENIMIENTO DE CUBIERTA INCLUYE


DESMONTE E INSTALACION DE CUBIERTA EN
TEJA SUPERTERMOACUSTICA, LIMATESA,
LIMAHOYA Y CAMBIO DE TEJAS DE SER
NECESARIO DE ACUERDO A CONCEPTO
TECNICO DEL SUPERVISOR

010497 TEJA ETERNIT No 6 0001620000

26

M2

UND

Preparado Por LEONARDO ROJO HENAO

2,758.56

26

CODIGO

ACTIVIDAD

070101 ANDAMIO TUBULAR


080102 HORA CUADRILLA AA
7052

ALBAIL.

CABALLETE Y REMATES EN LAMINA PREPINTADA CALIBRE 24 DESARROLLO 600mm

UND

CANT

SM

0.6

VR. UNIT.
3,500.00

VR. PARCIAL
2,100.00

HH

0.60

9,908.54

5,945.13

IVA 16%
$

336.00

SUBTOTAL
$

2,436.00

5,945.13

ML

010153 CABALLETE ETERNIT PF/ 7FIJO 00101000

UND

18,027.00

18,027.00

2,884.32

18,027.00

010304 LAMINA GALVANIZADA 16 / 401521 1x2m

UND

0.07

88,385.00

6,186.95

989.91

6,186.95

HH

0.44

9,908.54

4,382.79

4,382.79

17,241.00

1,400.00

080102 HORA CUADRILLA AA

7053

ALBAIL.

MANTENIMIENTO DE CUBIERTA INCLUYE


DESMONTE E INSTALACION DE CUBIERTA EN
TEJA SUPERTERMOACUSTICA, LIMATESA,
LIMAHOYA Y CAMBIO DE TEJAS DE SER
NECESARIO DE ACUERDO A CONCEPTO
TECNICO DEL SUPERVISOR. ALTURA < 20 MTS

M2

010497 TEJA ETERNIT No 6 0001620000

UND

17,241.00

17,241.00

070123 HERRAMIENTA MENOR

GBL

1,400.00

1,400.00

070101 ANDAMIO TUBULAR

SM

0.6

3,500.00

2,100.00

HH

1.20

9,908.54

11,890.25

080102 HORA CUADRILLA AA

8000
8001

ALBAIL.

2,758.56
336.00

2,100.00

11,890.25

CIELO RASOS/MAMPOSTERIA LIVIANA


MALLA PARA REPELLO

M2

050216 PUNTILLA 2" C.C / 13010200


010325 MALLA CON VENA 2x0.6
080102 HORA CUADRILLA AA
8002

ALBAIL.

ARMADURA MADERA MALLA

LB

0.02

2,000.00

40.00

6.40

46.40

UND

0.73

3,162.00

2,308.26

369.32

2,677.58

HH

0.4

9,908.54

3,963.42

3,963.42

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.02

2,000.00

40.00

6.40

46.40

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.51

1,630.00

831.30

133.01

964.31

UND

0.73

3,162.00

2,308.26

369.32

2,677.58

HH

0.4

9,908.54

3,963.42

3,963.42

010325 MALLA CON VENA 2x0.6


080102 HORA CUADRILLA AA
8003

LISTON

ALBAIL.

M. H. OTOBO

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.27

2,000.00

540.00

86.40

626.40

010513 VARETA 1"x1"x 3 MT OTOBO

ML

4.32

650.00

2,808.00

449.28

3,257.28

ML

1.08

1,624.00

1,753.92

280.63

2,034.55

211.53

10,899.40

050112 BASTIDOR OTOBO 2"x2"x2.9mts


010152

#N/A #N/A

010338 MERULEX

H UN x 16 KG

080102 HORA CUADRILLA AA


8004

LISTON

ALBAIL.

M. H. PEINEMONO

0.54

#N/A

#N/A

KG

0.05

3,647.00

182.35

HH

1.1

9,908.54

10,899.40

#N/A
$

29.18

#N/A

M2

050216

#N/A #N/A

0.27

#N/A

#N/A

#N/A

#N/A

010513

#N/A #N/A

4.32

#N/A

#N/A

#N/A

#N/A

050112

#N/A #N/A

1.08

#N/A

#N/A

#N/A

#N/A

010152

#N/A #N/A

0.54

#N/A

#N/A

#N/A

#N/A

010338

#N/A #N/A

0.05

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.1

#N/A

#N/A

8005

LISTON

M. H. GUAYACAN

#N/A

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.27

2,000.00

540.00

86.40

626.40

010513 VARETA 1"x1"x 3 MT OTOBO

ML

4.32

650.00

2,808.00

449.28

3,257.28

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

1.08

1,624.00

1,753.92

280.63

2,034.55

UND

0.54

320.00

172.80

27.65

200.45

KG

0.05

3,647.00

182.35

29.18

211.53

HH

1.1

9,908.54

10,899.40

10,899.40

010152 BLOQUE PARA CAMARA TELEFON.


010338 MERULEX

H UN x 16 KG

080102 HORA CUADRILLA AA


8006

ALBAIL.

TABLESA

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.27

2,000.00

540.00

86.40

626.40

010513 VARETA 1"x1"x 3 MT OTOBO

ML

4.32

650.00

2,808.00

449.28

3,257.28

010441 TABLA AMARILLO 1"x10"X3mt

UND

1.08

6,728.00

7,266.24

1,162.60

8,428.84

010152 BLOQUE PARA CAMARA TELEFON.

UND

0.54

320.00

172.80

27.65

200.45

KG

0.05

3,647.00

182.35

29.18

211.53

HH

1.1

9,908.54

10,899.40

10,899.40

010338 MERULEX

H UN x 16 KG

080102 HORA CUADRILLA AA

27

ALBAIL.

Preparado Por LEONARDO ROJO HENAO

27

CODIGO
8007

ACTIVIDAD

UND

CANES EN TABLON

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

ML

050216 PUNTILLA 2" C.C / 13010200

LB

0.27

2,000.00

540.00

86.40

626.40

010461 TABLON SAJO 2"x10"x 3mts

ML

3.58

13,425.00

48,061.50

7,689.84

55,751.34

HH

1.1

9,908.54

10,899.40

10,899.40
6,958.52

080102 HORA CUADRILLA AA


8008

ALBAIL.

LAMINA PLANA ETERNIT

M2

010532 PLACA PLANA ETERNIT 0,6x1,2x4mm

UND

1.03

5,824.00

5,998.72

959.80

050216 PUNTILLA 2" C.C / 13010200

LB

0.27

2,000.00

540.00

86.40

626.40

010513 VARETA 1"x1"x 3 MT OTOBO

ML

4.32

650.00

2,808.00

449.28

3,257.28

UND

0.54

320.00

172.80

27.65

200.45

KG

0.01

3,647.00

36.47

5.84

42.31

HH

0.8

9,908.54

7,926.83

7,926.83

1.03

3,208.00

3,304.24

528.68

3,832.92

1.03

94,885.00

97,731.55

15,637.05

113,368.60

1.03

55,867.00

57,543.01

9,206.88

66,749.89

1.03

61,897.50

63,754.43

10,200.71

73,955.13

1.03

56,430.00

58,122.90

9,299.66

67,422.56

1.03

44,047.00

45,368.41

7,258.95

52,627.36

66,258.50

66,258.50

10,601.36

76,859.86

36,575.00

36,575.00

5,852.00

42,427.00

010152 BLOQUE PARA CAMARA TELEFON.


010338 MERULEX

H UN x 16 KG

080102 HORA CUADRILLA AA


8009

ALBAIL.

SONOCOR ESTRUCTURA ALUMINIO

M2

010424 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"


8010

FIBROCEL

M2

010439 SUMIDERO VIAL 68x33x10


8011

LUXACELL

UND

ACERO

M2

010320 LOZA MACIZA H = 0.12


8012

M2

LUXALON ALUMINIO P 80

M2

010323 LUXALON PERFIL ALUMINIO


8013

80

LUXALON ACERO

8016

80

UND
M2

OCULTO

UND
M2

VISTA

UND

MOLDURAS DE YESO 4.7 x 4.7

010340 MOLDURA F1

UND
M2

ESCAYOLA CARRIL VISTO

010251 ESCAYOLA SUSPEN


8017

130 B

ESCAYOLA CARRIL OCULTO

010250 ESCAYOLA SUSPEN

UND
M2

P 80

010322 LUXALON PERFIL ACERO


8015

LUXALON ALUMINIO P 130

010324 LUXALON PERFIL ALUMINIO


8014

KG

UND

7,390.00

7,390.00

1,182.40

8,572.40

010358 PEGACOR x 40 KG

BTO

0.05

22,210.00

1,110.50

177.68

1,288.18

010289 INSTALACION MOLDURAS DE YESO

UND

1,500.00

1,500.00

1,500.00

8018

14x15

ML

MOLDURAS DE YESO 6.2 x 6.2

010341 MOLDURA F3

UND

11,277.00

11,277.00

1,804.32

13,081.32

010358 PEGACOR x 40 KG

BTO

0.05

22,210.00

1,110.50

177.68

1,288.18

010289 INSTALACION MOLDURAS DE YESO

UND

1,500.00

1,500.00

1,500.00

8019

12x60

ML

CORNISAS YESO 19 x 19

010237 CORNISAS

ML

20,338.00

20,338.00

3,254.08

23,592.08

010358 PEGACOR x 40 KG

BTO

0.05

22,210.00

1,110.50

177.68

1,288.18

010289 INSTALACION MOLDURAS DE YESO

UND

1,500.00

1,500.00

1,500.00

LB

2.06

2,000.00

4,120.00

659.20

4,779.20

8020

L. IND

ML

C-10

CIELORASO EN TRIPLEX

9MM

050216 PUNTILLA 2" C.C / 13010200


050167 CUARTON OTOBO 2"x4"x2.9mts
010453 TABLEX PIZANO
010338 MERULEX

H UN x 16 KG

080102 HORA CUADRILLA AA


8021

9 MM
ALBAIL.

APLIQUE YESO

ML

2.54

1,630.00

4,140.20

662.43

4,802.63

UND

0.27

19,789.00

5,343.03

854.88

6,197.91

KG

0.2

3,647.00

729.40

116.70

846.10

HH

1.1

9,908.54

10,899.40

10,899.40

25,000.00

25,000.00

4,000.00

29,000.00

ML

030122 APLIQUE DE LUZ


8022

M2

UND

CIELORASO BOVEDAS DRYWALL

M2

010220 CHAZO MADERA 10x10

UND

250.00

250.00

40.00

290.00

040178 VINILTEX BLANCO ALMANDRA 1561

GLN

0.04

30,520.00

1,220.80

195.33

1,416.13

HH

1.13

12,881.11

14,555.65

2,328.90

16,884.55

8,696.00

8,696.00

8,696.00

080105 HORA CUADRILLA DD

CARPINT.

010436 SUBCONTRATO INSTALACION

8023

CIELORASO DRYWALL O SUPERBOAR


(INCLUYE ESTRUCTURA PORTANTE)
MASILLADO, LIJADO Y PINTADO VINILO TIPO 1
COLOR BLANCO (3 MANOS).

M2

ALAMBRE GALVANIZADO # 10

KL

3,850.00

3,850.00

616.00

4,466.00

AGUA

LTS

0.02

20.00

0.40

0.06

0.46

28

Preparado Por LEONARDO ROJO HENAO

28

CODIGO

UND

CANT

CANAL 40 GUIA L.GALV 3.05M

ACTIVIDAD

UND

0.355

4,900.00

1,739.50

278.32

2,017.82

ANGULO 29x29x2440MM C.26

UND

0.55

2,830.00

1,556.50

249.04

1,805.54

TORN PANEL 6 x 1

UND

12

20.00

240.00

38.40

278.40

PL

0.02

975.00

19.50

3.12

22.62

UND

0.7

4,880.00

3,416.00

546.56

3,962.56

LIJA 400
PERFIL D OMEGA 60 244-C26
PUNTILLA 1.1/2 AC

8024

IVA 16%

SUBTOTAL

LB

0.05

3,650.00

182.50

29.20

211.70

UND

0.336

23,900.00

8,030.40

1,284.86

9,315.26

CINTA SELLO 2""(PANEL-YES

ROL

0.005

13,200.00

66.00

10.56

76.56

PASTA MASTIQUE(PANEL-YESO)

GLN

0.165

9,550.00

1,575.75

252.12

1,827.87

CHAZO EXPANDIBLE 3/8""

UND

0.5

605.00

302.50

48.40

350.90

VINILO TIPO 2

GLN

0.04

35,500.00

1,420.00

227.20

1,647.20

MANO OBRA PANELERIA 1 OFICIAL-1AYUDANTE

HC

0.5

16,000.00

8,000.00

1,280.00

9,280.00

MANO OBRA PINTURA 1 AYUDANTE-1 OFI

HC

0.12

17,050.00

2,046.00

327.36

2,373.36

HERRAMIENTA MENOR

GLB

1.5

1,380.00

2,070.00

331.20

2,401.20

ANDAMIO METALICO TUBULAR

U/D

0.1

3,120.00

312.00

49.92

361.92

HH

2.06

9,908.54

20,411.60

3,265.86

23,677.45

TABLEX

19MM

M2
ALBAIL.

050167 CUARTON OTOBO 2"x4"x2.9mts


010453 TABLEX PIZANO
010338 MERULEX

9 MM

H UN x 16 KG

080102 HORA CUADRILLA AA

ALBAIL.

CIELORASO DURACUSTIC

080105 HORA CUADRILLA DD

ML

2.54

1,630.00

4,140.20

662.43

4,802.63

UND

0.27

19,789.00

5,343.03

854.88

6,197.91

KG

0.2

3,647.00

729.40

116.70

846.10

HH

1.1

9,908.54

10,899.40

10,899.40

UND

1.03

1,390.00

1,431.70

229.07

1,660.77

HH

12,881.11

12,881.11

2,060.98

14,942.08

8,696.00

8,696.00

8,696.00

M2

010263 FAROL 6 HUECOS LIMPIO


CARPINT.

010436 SUBCONTRATO INSTALACION


8026

VR. PARCIAL

PLACA YESO 12.7M-GYPLAC RH

080102 HORA CUADRILLA AA

8025

VR. UNIT.

CIELOFALSO EN ICOPOR Y ALUMINIO

M2

010400 PLACA PLANA ICOPOR 0.61x 1.22x 4CM

UND

1.03

5,120.00

5,273.60

843.78

6,117.38

050103 ANGULO ALUM. ANOLOCK 3/4" x 6mts

UND

7,000.00

7,000.00

1,120.00

8,120.00

050258 TACHUELA No 6

UND

18.00

54.00

8.64

62.64

LB

0.07

1,850.00

129.50

20.72

150.22

CAJA

0.05

12,760.00

638.00

102.08

740.08

#N/A #N/A

0.1

23,185.99

050220 PUNTILLA 3/4" C.C


050225 REMACHE POP
010110
080105 HORA CUADRILLA DD

8027

CARPINT.

HH

PINTURA SOBRE CIELO RASO, 2 MANOS TIPO


2 O SIMILAR INCLUYE FILOS, DILATACIONES Y
CARTERAS

#N/A

12,881.11

#N/A

23,185.99

#N/A

M2

RODILLO FELPA

UND

0.05 $

4,700.00

235.00

37.60

272.60

VINILO TIPO 2

GLN

0.04 $

35,500.00

1,420.00

227.20

1,647.20

BROCHA CERDA MONA 4

UND

0.02 $

13,000.00

260.00

41.60

301.60

HC

0.15 $

18,000.00

2,700.00

432.00

3,132.00

0.02 $

MANO OBRA PINTURA 1 AYUDANTE-1 OFI

8028

1.8

#N/A

HERRAMIENTA MENOR

GLB

ANDAMIO METALICO TUBULAR

U/D

CIELORASO DESCOLGADO EN PVC CON


ESTRUCTURA METALICA, CON CLARABOYAS
PARA INSPECCIONAR Y LIMPIAR.

M2

1,400.00

28.00

4.48

32.48

0.1

3,120.00

312.00

49.92

361.92

ALAMBRE GALVANIZADO # 10

KL

3,850.00

3,850.00

616.00

4,466.00

CANAL 40 GUIA L.GALV 3.05M

UND

0.355

4,900.00

1,739.50

278.32

2,017.82

ANGULO 29x29x2440MM C.26

UND

0.55

2,830.00

1,556.50

249.04

1,805.54

TORN PANEL 6 x 1

UND

12

20.00

240.00

38.40

278.40

PERFIL D OMEGA 60 244-C26

UND

0.6

4,880.00

2,928.00

468.48

3,396.48

29.20

211.70

30,066.67

PUNTILLA 1.1/2 AC

LB

0.05

3,650.00

182.50

PERFIL PVC BLANCO 300X25CM X 4 UND

PQT

0.3333

90,200.00

30,066.67

CHAZO EXPANDIBLE 3/8""

UND

0.5

605.00

302.50

48.40

350.90

MANO OBRA PANELERIA 1 OFICIAL-1AYUDANTE

HC

0.6

12,000.00

7,200.00

1,152.00

8,352.00

HERRAMIENTA MENOR

GLB

1.5

1,380.00

2,070.00

331.20

2,401.20

ANDAMIO METALICO TUBULAR

U/D

0.1

3,120.00

312.00

49.92

361.92

29

Preparado Por LEONARDO ROJO HENAO

29

CODIGO
8029

ACTIVIDAD

UND

CARTERA CIELORASO DESCOLGADO EN PVC


CON ESTRUCTURA METALICA.

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

ML

ALAMBRE GALVANIZADO # 10

KL

3,850.00

3,850.00

616.00

4,466.00

CANAL 40 GUIA L.GALV 3.05M

UND

0.4

4,900.00

1,960.00

313.60

2,273.60

ANGULO 29x29x2440MM C.26

UND

0.6

2,830.00

1,698.00

271.68

1,969.68

TORN PANEL 6 x 1

UND

12

20.00

240.00

38.40

278.40

PERFIL D OMEGA 60 244-C26

UND

0.4

4,880.00

1,952.00

312.32

2,264.32

11.68

84.68

5,682.60

PUNTILLA 1.1/2 AC

LB

0.02

3,650.00

73.00

PERFIL PVC BLANCO 300X25CM X 4 UND

PQT

0.063

90,200.00

5,682.60

CHAZO EXPANDIBLE 3/8""

UND

0.5

605.00

302.50

48.40

350.90

MANO OBRA PANELERIA 1 OFICIAL-1AYUDANTE

HC

0.4

12,000.00

4,800.00

768.00

5,568.00

HERRAMIENTA MENOR

GLB

1.5

1,380.00

2,070.00

331.20

2,401.20

ANDAMIO METALICO TUBULAR

U/D

0.1

3,120.00

312.00

49.92

361.92

CARPINTERIA DE MADERA Y
METALICA

9000
9001

CANT

HOJA PUERTA TRIPLEX 0.60

UND

050209

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

050343

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

050137

#N/A #N/A

0.32

#N/A

#N/A

#N/A

#N/A

050164

#N/A #N/A

0.15

#N/A

#N/A

#N/A

#N/A

080105

#N/A #N/A

1.72

#N/A

#N/A

9002

HOJA PUERTA TRIPLEX

0.80

050209

#N/A

UND
#N/A #N/A

#N/A

#N/A

#N/A

#N/A

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

2 $

16,000.00

32,000.00

5,120.00

37,120.00

050137 CAOBA

UND

0.34 $

11,250.00

3,825.00

612.00

4,437.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9003

HOJA PUERTA TRIPLEX

CARPINT.
0.90

050209 PUNTILLA 1" S.C / 13020100

UND
3.1 $

1,605.00

4,975.50

796.08

5,771.58

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

2 $

16,000.00

32,000.00

5,120.00

37,120.00

050137 CAOBA

UND

0.36 $

11,250.00

4,050.00

648.00

4,698.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9004

CARPINT.

HOJA PUERTA MADEFLEX 0.60

050209 PUNTILLA 1" S.C / 13020100

LB

UND
LB

3 $

1,605.00

4,815.00

770.40

5,585.40

050184 MADEFLEX LISO 1.22x 2.44 ESP. 3mm

UND

2 $

9,442.00

18,884.00

3,021.44

21,905.44

050137 CAOBA

UND

0.32 $

11,250.00

3,600.00

576.00

4,176.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9005

CARPINT.

HOJA PUERTA MADEFLEX 0.80

050209 PUNTILLA 1" S.C / 13020100

UND
LB

3 $

1,605.00

4,815.00

770.40

5,585.40

050184 MADEFLEX LISO 1.22x 2.44 ESP. 3mm

UND

2 $

9,442.00

18,884.00

3,021.44

21,905.44

050137 CAOBA

UND

0.32 $

11,250.00

3,600.00

576.00

4,176.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9006

CARPINT.

HOJA PUERTA MADEFLEX 0.90

050209 PUNTILLA 1" S.C / 13020100

UND
3.1 $

1,605.00

4,975.50

796.08

5,771.58

050184 MADEFLEX LISO 1.22x 2.44 ESP. 3mm

UND

2 $

9,442.00

18,884.00

3,021.44

21,905.44

050137 CAOBA

UND

0.36 $

11,250.00

4,050.00

648.00

4,698.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD

9007

CARPINT.

PUERTA ENTAMBORADA EN TRIPLEX COLOR


WENGLE CON DINTEL, TIPO DEKO, INCLUYE
MARCO

050340 TORNILLO PARA MADERA 2" x 8


050209 PUNTILLA 1" S.C / 13020100
050120 BISAGRA 3x3 COBRIZADA

30

LB

UND
UND

24 $

25.00

600.00

96.00

696.00

LB

2 $

1,605.00

3,210.00

513.60

3,723.60

UND

3 $

1,500.00

4,500.00

720.00

5,220.00

Preparado Por LEONARDO ROJO HENAO

30

CODIGO

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

2.04 $

16,000.00

32,640.00

5,222.40

37,862.40

050137 CAOBA

UND

2.2 $

11,250.00

24,750.00

3,960.00

28,710.00

050164 COLBON MADERA

GLN

0.4 $

5,200.00

2,080.00

332.80

2,412.80

040172 TINTE WENGLE

GLN

1.2 $

25,800.00

30,960.00

4,953.60

35,913.60

GLN

1.2 $

22,637.00

27,164.40

4,346.30

31,510.70

HH

8.44 $

12,881.11

108,750.90

108,750.90

(PIEZA )

040166 THINNER FINO 121-134


080105 HORA CUADRILLA DD
9008

CARPINT.

CLOSET TIPO A FORRADO

050340 TORNILLO PARA MADERA 2" x 8

UND
UND

4.68 $

25.00

117.00

18.72

135.72

LB

6.54 $

1,605.00

10,496.70

1,679.47

12,176.17

050120 BISAGRA 3x3 COBRIZADA

UND

1.39 $

1,500.00

2,085.00

333.60

2,418.60

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

2.18 $

16,000.00

34,880.00

5,580.80

40,460.80

050137 CAOBA

UND

1.04 $

11,250.00

11,700.00

1,872.00

13,572.00

GLN

0.25 $

5,200.00

1,300.00

208.00

1,508.00

HH

9.21 $

12,881.11

118,634.98

118,634.98

4.68 $

25.00

117.00

18.72

135.72

4 $

1,605.00

6,420.00

1,027.20

7,447.20

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9009

CARPINT.

CLOSET TIPO B

UND

050340 TORNILLO PARA MADERA 2" x 8


050209 PUNTILLA 1" S.C / 13020100

UND
LB

050120 BISAGRA 3x3 COBRIZADA

UND

0.76 $

1,500.00

1,140.00

182.40

1,322.40

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

1.07 $

16,000.00

17,120.00

2,739.20

19,859.20

050137 CAOBA

UND

0.87 $

11,250.00

9,787.50

1,566.00

11,353.50

GLN

0.25 $

5,200.00

1,300.00

208.00

1,508.00

HH

6.31 $

12,881.11

81,279.77

81,279.77

4.56 $

25.00

114.00

18.24

132.24

4 $

1,605.00

6,420.00

1,027.20

7,447.20

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9010

CARPINT.

MUEBLE TIPO LINOIS

M2

050340 TORNILLO PARA MADERA 2" x 8

UND

050209 PUNTILLA 1" S.C / 13020100

LB

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

0.8 $

16,000.00

12,800.00

2,048.00

14,848.00

050137 CAOBA

UND

0.87 $

11,250.00

9,787.50

1,566.00

11,353.50

GLN

0.2 $

5,200.00

1,040.00

166.40

1,206.40

6 $

12,881.11

77,286.63

77,286.63

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9011

CARPINT.

MUEBLE BAJO 0.80

HH
UND

050340 TORNILLO PARA MADERA 2" x 8

UND

6.98 $

25.00

174.50

27.92

202.42

LB

5.84 $

1,605.00

9,373.20

1,499.71

10,872.91

050120 BISAGRA 3x3 COBRIZADA

UND

4.66 $

1,500.00

6,990.00

1,118.40

8,108.40

050343 TRIPLEX PIZANO 4mm 2.44x1.22

UND

1.74 $

16,000.00

27,840.00

4,454.40

32,294.40

050137 CAOBA

UND

0.9 $

11,250.00

10,125.00

1,620.00

11,745.00

GLN

0.2 $

5,200.00

1,040.00

166.40

1,206.40

HH

8.45 $

12,881.11

108,845.34

108,845.34

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9012

DIFUSOR

CARPINT.

( MARCO P / VIDRIO)

ML

050340 TORNILLO PARA MADERA 2" x 8

UND

1.12 $

25.00

28.00

4.48

32.48

050137 CAOBA

UND

0.8 $

11,250.00

9,000.00

1,440.00

10,440.00

GLN

0.1 $

5,200.00

520.00

83.20

603.20

HH

2.69 $

12,881.11

34,650.17

34,650.17

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9013

CARPINT.

PIRLANES DE MADERA 0.1

ML

050340 TORNILLO PARA MADERA 2" x 8

UND

2 $

25.00

50.00

8.00

58.00

050137 CAOBA

UND

0.14 $

11,250.00

1,575.00

252.00

1,827.00

GLN

0.09 $

5,200.00

468.00

74.88

HH

0.92 $

12,881.11

11,850.62

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9014

CARPINT.

PASAMANOS ESCALERA 15 x 20

542.88

11,850.62

ML

050340 TORNILLO PARA MADERA 2" x 8

UND

2 $

25.00

50.00

8.00

58.00

050137 CAOBA

UND

0.25 $

11,250.00

2,812.50

450.00

3,262.50

GLN

0.17 $

5,200.00

884.00

141.44

1 $

12,881.11

12,881.11

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9015

CARPINT.

ENCHAPE MUROS EN TRIPLEX

HH

1,025.44

12,881.11

M2

TORNILLO PARA MADERA CON CORAZON DE


050342 ACERO

GSA

0.36 $

39.00

14.04

2.25

16.29

050196 PEGANTE AXW

GLN

0.1 $

36,675.00

3,667.50

586.80

4,254.30

050265 TERMINAL SIN SALIDA ETERNIT

UND

2 $

4,680.00

9,360.00

1,497.60

10,857.60

31

Preparado Por LEONARDO ROJO HENAO

31

CODIGO

ACTIVIDAD

080105 HORA CUADRILLA DD

9016

CARPINT.

SIPS VENTANERIA CORREDERA TIPO PESADO


DE ALUMINIO INCLUYE MARCO PARA ANGEO,
ANGEO TIPO INDUSTRIAL Y VIDRIO 4MM

050361 VIDRIO 4 MM

UND
HH

CANT

VR. UNIT.

VR. PARCIAL

0.5 $

12,881.11

6,440.55

IVA 16%

SUBTOTAL
$

6,440.55

M2
M2

1 $

50,000.00

50,000.00

8,000.00

58,000.00

050371 RODAMIENTO REF 8025 (ACERO)

UND

2 $

3,500.00

7,000.00

1,120.00

8,120.00

050372 GUIAS SUPERIORES REF 8025

UND

1 $

100.00

100.00

16.00

116.00

050373 GUIAS INFERIORES REF 8025

UND

1 $

100.00

100.00

16.00

116.00

050374 HAMBA REF 8025

UND

1 $

10,000.00

10,000.00

1,600.00

11,600.00

050375 SILLAR REF 8025

UND

1 $

10,000.00

10,000.00

1,600.00

11,600.00

050376 CABEZAL REF 8025

UND

1 $

10,000.00

10,000.00

1,600.00

11,600.00

050377 HORIZONTAL INFERIOR

UND

1 $

10,000.00

10,000.00

1,600.00

11,600.00

050378 HORIZONTAL SUPERIOR

UND

1 $

10,000.00

10,000.00

1,600.00

11,600.00

050379 ENGANCHE 8025

UND

1 $

10,000.00

10,000.00

1,600.00

11,600.00

050380 TRASLAPE 8025

UND

2 $

10,000.00

20,000.00

3,200.00

23,200.00

2.68 $

12,000.00

32,122.76

5,139.64

37,262.40

12 $

15.00

180.00

28.80

208.80

1.72 $

12,881.11

22,155.50

22,155.50

050381 EMPAQUE 8025 PARA 4MM


TORNILLO DRYWAL AVELLANADO DE 1 1/2" x
050382 8MM
080105 HORA CUADRILLA DD
9017

CARPINT.

HOJA PUERTA FLORMORADO 0.6

050209 PUNTILLA 1" S.C / 13020100

ML
UND
HH
UND
LB

3 $

1,605.00

4,815.00

770.40

5,585.40

050347 TRIPLEX DE 9mm

LAM

2 $

64,728.00

129,456.00

20,712.96

150,168.96

050137 CAOBA

UND

0.34 $

11,250.00

3,825.00

612.00

4,437.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9018

CARPINT.

HOJA PUERTA FLORMORADO 0.8

050209 PUNTILLA 1" S.C / 13020100

UND
LB

3 $

1,605.00

4,815.00

770.40

5,585.40

050347 TRIPLEX DE 9mm

LAM

2 $

64,728.00

129,456.00

20,712.96

150,168.96

050137 CAOBA

UND

0.34 $

11,250.00

3,825.00

612.00

4,437.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9019

CARPINT.

HOJA PUERTA FLORMORADO 0.9

050209 PUNTILLA 1" S.C / 13020100

UND
3.1 $

1,605.00

4,975.50

796.08

5,771.58

050347 TRIPLEX DE 9mm

LAM

2 $

64,728.00

129,456.00

20,712.96

150,168.96

050137 CAOBA

UND

0.34 $

11,250.00

3,825.00

612.00

4,437.00

GLN

0.15 $

5,200.00

780.00

124.80

904.80

HH

1.72 $

12,881.11

22,155.50

22,155.50

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9020

CARPINT.

PUERTA FLORM MARCO Y HOJA

050340 TORNILLO PARA MADERA 2" x 8


050209 PUNTILLA 1" S.C / 13020100

LB

UND
UND

18 $

25.00

450.00

72.00

522.00

LB

4 $

1,605.00

6,420.00

1,027.20

7,447.20

050120 BISAGRA 3x3 COBRIZADA

UND

3 $

1,500.00

4,500.00

720.00

5,220.00

050347 TRIPLEX DE 9mm

LAM

0.36 $

64,728.00

23,302.08

3,728.33

27,030.41

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050164 COLBON MADERA

GLN

0.2 $

5,200.00

1,040.00

166.40

1,206.40

3 $

12,881.11

38,643.32

38,643.32

080105 HORA CUADRILLA DD


9021

CARPINT.

CLOSET FORRADO FLORMORADO

050340 TORNILLO PARA MADERA 2" x 8

HH
M2
UND

3.85 $

25.00

96.25

15.40

111.65

LB

6.54 $

1,605.00

10,496.70

1,679.47

12,176.17

050120 BISAGRA 3x3 COBRIZADA

UND

1.39 $

1,500.00

2,085.00

333.60

2,418.60

050347 TRIPLEX DE 9mm

LAM

0.36 $

64,728.00

23,302.08

3,728.33

27,030.41

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050137 CAOBA

UND

1.04 $

11,250.00

11,700.00

1,872.00

13,572.00

GLN

0.25 $

5,200.00

1,300.00

208.00

HH

9.21 $

12,881.11

118,634.98

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD

32

CARPINT.

Preparado Por LEONARDO ROJO HENAO

1,508.00

118,634.98

32

CODIGO

9022

ACTIVIDAD

UND

MANTENIMIENTO CLOSET Y/O MUEBLES EN


MADERA, ESTRUCTURA EN CEDRO MACHO Y/O
AMARGO, PUERTAS ENTAMBORADAS EN
LAMINA DE TRIPLEZ DE 5MM, CAMBIO DE
ENTREPAOS EN TRIPLEX DE 5MM, HERRAJES
GUIAS, PINTURA EN GENERAL DEL MUEBLE
(COLOR A ESCOGER POR LA SUPERVISION) Y
DEMAS ACTIVIDADES PARA SU PERFECTO
FUNCIONAMIENTO

050340 TORNILLO PARA MADERA 2" x 8


050209 PUNTILLA 1" S.C / 13020100

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

UND

6 $

25.00

150.00

24.00

174.00

LB

1 $

1,605.00

1,605.00

256.80

1,861.80

050120 BISAGRA 3x3 COBRIZADA

UND

0.7 $

1,500.00

1,050.00

168.00

1,218.00

050345 TRIPLEX DE 4mm

LAM

0.4 $

23,250.00

9,300.00

1,488.00

10,788.00

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.4 $

13,900.00

5,560.00

889.60

6,449.60

050137 CAOBA

UND

0.8 $

11,250.00

9,000.00

1,440.00

10,440.00

166.40

1,206.40

7,145.08

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9023

CARPINT.

MUBLE FLORMORADO LINOIS

050340 TORNILLO PARA MADERA 2" x 8


050209 PUNTILLA 1" S.C / 13020100

GLN

0.2 $

5,200.00

1,040.00

HH

0.55 $

12,881.11

7,145.08

4.56 $

25.00

114.00

18.24

132.24

4 $

1,605.00

6,420.00

1,027.20

7,447.20
27,030.41

M2
UND
LB

050347 TRIPLEX DE 9mm

LAM

0.36 $

64,728.00

23,302.08

3,728.33

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050137 CAOBA

UND

0.87 $

11,250.00

9,787.50

1,566.00

11,353.50

GLN

0.2 $

5,200.00

1,040.00

166.40

1,206.40

6 $

12,881.11

77,286.63

77,286.63

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9024

CARPINT.

MUEBLE BAJO ( 0.8) FLORM.

050340 TORNILLO PARA MADERA 2" x 8

HH
ML
UND

6.98 $

25.00

174.50

27.92

202.42

LB

5.84 $

1,605.00

9,373.20

1,499.71

10,872.91

050120 BISAGRA 3x3 COBRIZADA

UND

4.66 $

1,500.00

6,990.00

1,118.40

8,108.40

050347 TRIPLEX DE 9mm

LAM

0.36 $

64,728.00

23,302.08

3,728.33

27,030.41

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050137 CAOBA

UND

0.9 $

11,250.00

10,125.00

1,620.00

11,745.00

166.40

1,206.40

108,845.34
2,085.22

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9025

CARPINT.

DIFUSOR FLORMORADO

GLN

0.2 $

5,200.00

1,040.00

HH

8.45 $

12,881.11

108,845.34

M2

050209 PUNTILLA 1" S.C / 13020100

LB

1.12 $

1,605.00

1,797.60

287.62

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050137 CAOBA

UND

0.8 $

11,250.00

9,000.00

1,440.00

10,440.00

83.20

603.20

34,650.17

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9026

CARPINT.

PIRLANES FLORMORADOS

050340 TORNILLO PARA MADERA 2" x 8

GLN

0.1 $

5,200.00

520.00

HH

2.69 $

12,881.11

34,650.17

ML
2 $

25.00

50.00

8.00

58.00

LB

0.14 $

1,605.00

224.70

35.95

260.65

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050137 CAOBA

UND

0.09 $

11,250.00

1,012.50

162.00

1,174.50

HH

0.92 $

12,881.11

11,850.62

11,850.62

2 $

25.00

50.00

8.00

58.00

050209 PUNTILLA 1" S.C / 13020100


(PIEZA )

080105 HORA CUADRILLA DD


9027

CARPINT.

PASAM. FLORM. ESCAL. 15 x 20

050340 TORNILLO PARA MADERA 2" x 8


050209 PUNTILLA 1" S.C / 13020100

UND

ML
UND
LB

0.25 $

1,605.00

401.25

64.20

465.45

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

050137 CAOBA

UND

0.17 $

11,250.00

1,912.50

306.00

1 $

12,881.11

12,881.11

(PIEZA )

080105 HORA CUADRILLA DD


9028

CARPINT.

ENCHAPES MUROS FLORM.

HH

2,218.50

12,881.11

M2

TORNILLO PARA MADERA CON CORAZON DE


050342 ACERO

GSA

0.36 $

39.00

14.04

2.25

16.29

050196 PEGANTE AXW

GLN

0.1 $

36,675.00

3,667.50

586.80

4,254.30

050265 TERMINAL SIN SALIDA ETERNIT

UND

2 $

4,680.00

9,360.00

1,497.60

10,857.60

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.44 $

13,900.00

6,116.00

978.56

7,094.56

33

Preparado Por LEONARDO ROJO HENAO

33

CODIGO

ACTIVIDAD

080105 HORA CUADRILLA DD


9029

UND

CARPINT.

HH

BARANDA EN MADERA

050209 PUNTILLA 1" S.C / 13020100


050340 TORNILLO PARA MADERA 2" x 8
9030

24,150.00

401.25

2 $

25.00

50.00

0.5 $

12,881.11

6,440.55

1 $

104,400.00

104,400.00

1 $

104,400.00

104,400.00

1 $

104,400.00

1 $

104,400.00

1 $

M2
M2

CLOSET FOLDING DOOR VENECIA

M2

28,014.00

64.20

465.45

8.00

58.00

6,440.55

16,704.00

121,104.00

16,704.00

121,104.00

104,400.00

16,704.00

121,104.00

104,400.00

16,704.00

121,104.00

130,000.00

130,000.00

20,800.00

150,800.00

8,319.20

60,314.20

901.68

60,314.20

901.68

M2
M2

HOJA PUERTA FORTEC 0.70

UND
UND

CARPINT.

HH

HOJA PUERTA FORTEC 0.90

UND

CARPINT.

51,995.00

12,881.11

901.68

1 $

51,995.00

51,995.00

12,881.11

901.68

M3

0.08 $

72,000.00

5,864.86

HH

1.4 $

9,908.54

13,871.96

8,319.20

UND

ALBAIL.

MANTENIMIENTO CLOSET METALICO INCLUYE


TRATAMIENTO DE ANTICORROSIVO, CAMBIO DE
BALINERAS Y GUIAS PARA SU ADECUADO
FUNCIONAMIENTO

050209 PUNTILLA 1" S.C / 13020100

51,995.00

0.07 $

HH

070121 VOLQUETA 6 M3

050340 TORNILLO PARA MADERA 2" x 8

1 $
0.07 $

UND

DESMONTE DE MUEBLES EN MADERA Y/O


METALICOS (CLOSET, GABINETE, VENTANAS,
PUERTAS Y DIVISIONES DE BAO), INCLUYE
MARCO

080102 HORA CUADRILLA AA

3,864.00

M2

CLOSET VARTEL MADERA

080105 HORA CUADRILLA DD

6,440.55

M2

050203 PUERTA FORTEC RESIDENCIAL

9038

1,605.00

SUBTOTAL
$

M2

CLOSET FOLDING DOOR SEVILLA

080105 HORA CUADRILLA DD

9037

34,500.00

0.25 $

M2

CLOSET FOLDING DOOR AMERICA

050203 PUERTA FORTEC RESIDENCIAL


9036

0.7 $

LB

M2

050160 CLOSET MADERA TRIPLEX


9035

UND

CLOSET FOLDING DOOR AMERICA

050163 CLOSET AMERICANO METAL


9034

6,440.55

HH

050162 CLOSET AMERICANO METAL


9033

IVA 16%

CARPINT.

050161 CLOSET AMERICANO METAL


9032

VR. PARCIAL

12,881.11

UND

050161 CLOSET AMERICANO METAL


9031

VR. UNIT.

0.5 $

ML

050138 CEDRO MACHO PIEZA 3.0

080105 HORA CUADRILLA DD

CANT

938.38

6,803.24

13,871.96

M2

UND

6 $

25.00

150.00

24.00

174.00

LB

1 $

1,605.00

1,605.00

256.80

1,861.80

050120 BISAGRA 3x3 COBRIZADA

UND

3 $

1,500.00

4,500.00

720.00

5,220.00

050345 TRIPLEX DE 4mm

LAM

0.5 $

23,250.00

11,625.00

1,860.00

13,485.00

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.6 $

13,900.00

8,340.00

1,334.40

9,674.40

050137 CAOBA

UND

0.8 $

11,250.00

9,000.00

1,440.00

10,440.00

166.40

1,206.40

7,042.00

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD

9039

CARPINT.

DESMONTE Y MANTENIMIENTO DE LACENA


INCLUYE CAMBIO DE ESTRUCTURAS
AVERIADAS, CAMBIO DE ENTREPAOS Y
HERRAJES, PINTURA A ESCOGER POR LA
SUPERVISION Y DEMAS ACTIVIDADS PARA SU
ADECUADO FUNCIONAMIENTO

050340 TORNILLO PARA MADERA 2" x 8

GLN

0.2 $

5,200.00

1,040.00

HH

0.55 $

12,881.11

7,042.00

UND

UND

25 $

25.00

625.00

100.00

725.00

LB

2 $

1,605.00

3,210.00

513.60

3,723.60

050120 BISAGRA 3x3 COBRIZADA

UND

3 $

1,500.00

4,500.00

720.00

5,220.00

050345 TRIPLEX DE 4mm

LAM

2 $

23,250.00

46,500.00

7,440.00

53,940.00

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.70 $

13,900.00

9,663.61

1,546.18

11,209.79

050137 CAOBA

UND

5 $

11,250.00

56,250.00

9,000.00

65,250.00

1 $

5,200.00

5,200.00

832.00

6,032.00

2.00 $

12,881.11

25,762.21

25,762.21

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD

34

GLN
CARPINT.

HH

Preparado Por LEONARDO ROJO HENAO

34

CODIGO

9040

ACTIVIDAD

UND

CLOSET EN MADERA TIPO CEDRO O RH PARA


ALCOBAS, DE ACUERDO A DISEO
PRESENTADO POR EL CONTRATISTA Y AVALADO
POR EL SUPERVISOR, CON PUEERTAS
ENTAMBORADAS EN LAMINA DE TRIPLEX DE
5MM, CON CAJONES, MALETERO, BOLILLOS,
ENTREPAOS Y ZAPATERO.

050340 TORNILLO PARA MADERA 2" x 8

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

UND

25 $

25.00

625.00

100.00

725.00

LB

2 $

1,605.00

3,210.00

513.60

3,723.60

050120 BISAGRA 3x3 COBRIZADA

UND

6 $

1,500.00

9,000.00

1,440.00

10,440.00

050345 TRIPLEX DE 4mm

LAM

3 $

23,250.00

69,750.00

11,160.00

80,910.00

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.70 $

13,900.00

9,663.61

1,546.18

11,209.79

050137 CAOBA

UND

6 $

11,250.00

67,500.00

10,800.00

78,300.00

665.60

4,825.60

32,124.41

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD

9041

CARPINT.

MUEBLE LAVAMANOS Y/O MUEBLE DE BAO EN


MADERA CON ADICION DE RESINA RESISTENTE
A LA HUMEDAD, TINTILLA COLOR WENGUE
OSCURO, ANCHO 0,85 mts x ALTO 0,80 mts x
PROFUNDO 0,60 mts. MESON EN MARMOL
COLOR VERDE UBATUBA CON CANTO PEGADO
A LA PARED PARA EVITAR HUMEDADES EN EL
MUEBLE. PUERTAS EN MADERA CON TOPES DE
BURBUJA, CON DIVISIONES Y PARALES EN
MADERA MASIZA DE 2 cms. BISAGRAS EN
ACERO NIQUELADA, MANIJAS EN ALUMINIO
ACABADO MATE, PATAS EN ACERO NIQUEL
CEPILLADO ALTURA 10 cm.

080105 HORA CUADRILLA DD

CARPINT.

010537 SUBCONTRATO DE CARPINTERIA DE MADERA

9042

MANTENIMIENTO DE PUERTA DE MADERA Y


MARCO INCLUYE 02 MANOS DE SELLADOR,
PINTURA EN TINTILLA COLOR WENGUE,
CAMBIO DE TABLERO EN TRIPLEX DE 4mm
ENTAMBORADA DE SER NECESARIO CHAPA
TIPO YALE O SIMILAR, HERRAJES Y TOPES.

GLN

0.8 $

5,200.00

4,160.00

HH

2.49 $

12,881.11

32,124.41

UND

HH

0.10

12,881.11

1,288.11

206.10

1,288.11

55

4,500.00

247,500.00

39,600.00

247,500.00

UND

050340 TORNILLO PARA MADERA 2" x 8

UND

12 $

25.00

300.00

48.00

348.00

LB

1 $

1,605.00

1,605.00

256.80

1,861.80

050120 BISAGRA 3x3 COBRIZADA

UND

3 $

1,500.00

4,500.00

720.00

5,220.00

050345 TRIPLEX DE 4mm

LAM

1 $

23,250.00

23,250.00

3,720.00

26,970.00

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.70 $

13,900.00

9,663.61

1,546.18

11,209.79

050137 CAOBA

UND

1.5 $

11,250.00

16,875.00

2,700.00

19,575.00

166.40

1,206.40

16,745.44

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD

9043

CARPINT.

SUMINISTRO E INSTALACION DE COCINA


INTEGRAL EN MADERA TIPO CEDRO MACHO O
MADERA TIPO RH, ENTREPAOS EN TRIPLEX DE
5mm, MESON EN MARMOL VERDE UBATUBA,
LAVAPLATOS EN ACERO INOXIDABLE, INCLUYE
GRIFERIA LAVAPLATOS EN ACERO INOXIDABLE
TIPO CUELLO DE GANSO O SIMILAR, HERRAJES
EN ACERO CROMADO, ESTUFA DE 4 PUESTOS A
GAS DE EMPOTRAR, CAMPANA EXTRACTORA Y
HORNO A GAS CON DOBLE COMPARTIMENTO Y
DEMAS ACCESORIOS PARA SU ADECUADO
FUNCIONAMIENTO, DISEO A ESCOGER POR LA
SUPERVISION

080105 HORA CUADRILLA DD

CARPINT.

010538 SUBCONTRATO CARPINTERIA METALICA

35

GLN

0.2 $

5,200.00

1,040.00

HH

1.30 $

12,881.11

16,745.44

M2

HH

1.52

12,881.11

19,522.40

3,123.58

19,522.40

100

16,500.00

1,650,000.00

264,000.00

1,650,000.00

Preparado Por LEONARDO ROJO HENAO

35

CODIGO

ACTIVIDAD

UND

9044

SUMINISTRO E INSTALACION DE GABINETE


PARA LACENA A INSTALAR EN COCINA
FABRICADO EN CEDRO MACHO O MADERA TIPO
RH, ENTREPAO EN TRIPLEX DE 5MM, DISEO A
ESCOGER POR LA SUPERVISION.

M2

050340 TORNILLO PARA MADERA 2" x 8

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

UND

25 $

25.00

625.00

100.00

725.00

LB

2 $

1,605.00

3,210.00

513.60

3,723.60

050120 BISAGRA 3x3 COBRIZADA

UND

6 $

1,500.00

9,000.00

1,440.00

10,440.00

050345 MADERA RH

LAM

2 $

23,250.00

46,500.00

7,440.00

53,940.00

050177 FALLEBA DE PIE NEGRA 1056 GATO

GSA

0.70 $

13,900.00

9,663.61

1,546.18

11,209.79

050137 CAOBA

UND

6 $

11,250.00

67,500.00

10,800.00

78,300.00

1 $

5,200.00

5,200.00

832.00

6,032.00

2.11 $

12,881.11

27,207.61

27,207.61

050209 PUNTILLA 1" S.C / 13020100

(PIEZA )

050164 COLBON MADERA


080105 HORA CUADRILLA DD
9045

GLN
CARPINT.

PINTURA DE PUERTAS EXISTENTES EN


ESMALTE INCLUYE MARCOS COLOR BLANCO

040141 LIJA # 150


040126 ESMALTE SINTETICO COLORES VARIOS

040167 THINNER CORRIENTE


080104 HORA CUADRILLA CC

9046

PINTURA

HH
UND
UND

0.5

1,100.00

550.00

88.00

550.00

GL

0.3

21,828.00

6,548.40

1,047.74

6,548.40

GLN

0.3

9,500.00

2,850.00

456.00

2,850.00

HH

1.1

11,890.25

12,794.32

12,794.32

SUMINISTRO E INSTALACION DE PUERTA


ENTAMBORADA EN LAMINA GALVANIZADA CAL
16, INCLUYE MARCO EN EL MISMO MATERIAL, UND
HERRAJES , BISAGRAS, CERRADURA Y DEMAS
ACCESORIOS
PARA
SU
ADECUADO
FUNCIONAMIENTO, CON ANTICORROSIVO Y
ACABADO EN ESMALTE BLANCO.

010304 LAMINA GALVANIZADA 16 / 401521 1x2m

UND

88,385.00

176,770.00

28,283.20

176,770.00

050238 SOLDADURA 60.13 DE 1/8"

KG

0.80

10,408.00

8,326.40

1,332.22

8,326.40

080128 HORA CUADRILLA EE HORNAMENTACION

HH

22

11,890.00

263,713.46

263,713.46

UND

0.3

88,385.00

26,515.50

4,242.48

26,515.50

KG

0.35

10,408.00

3,616.19

578.59

3,616.19

GL

0.50

45,800.00

22,900.00

3,664.00

22,900.00

HH

2.80

11,890.00

33,292.00

33,292.00

9047

MANTENIMIENTO DE COMODAS METALICAS


INCLUYE REPOSICION O CAMBIO BISAGRAS EN
MAL ESTADO, PUNTOS DE SOLDADURA,
SEGURO EN SECRETO, PINTURA ESMALTE, UND
FABRICACION DE MUEBLE METALICO DE 3
ENTREPAOS (AREA DE ENTREPAO = 0,35 m x
0,35 M Y DEMAS ACCESORIOS PARA SU
ADECUADO FUNCIONAMIENTO.

010304 LAMINA GALVANIZADA 16 / 401521 1x2m


050238 SOLDADURA 60.13 DE 1/8"
PINTURA ESMALTE
080128 HORA CUADRILLA EE HORNAMENTACION

36

Preparado Por LEONARDO ROJO HENAO

36

CODIGO

9048

ACTIVIDAD

UND

SUMINISTRO E INSTALACION DE PUERTA EN


ACERO INOXIDABLE 304, DE 1.70x1.00 INCLUYE
MARCO EN MISMO MATERIAL, HERRAJES
BISAGRAS Y DEMAS ACCESORIOS PARA SU
ADECUADO FUNCIONAMIENTO.

020443 SUBCONTRATO DE LATONERIA

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

100,419.59

$ 10,041,959.00

$ 1,606,713.44

$ 10,041,959.00

MALLA
ESLABONADA
DE
ALAMBRE
GALVANIZADO
CALIBRE
10
HUECO
DE
21/4X21/4" COLOR NEGRO, ROLLO 2 MTS ALTO
050186 X 20 MTS LOG
ROLLO 0.025

535,800.00

13,395.00

2,143.20

15,538.20

050198 PLATINA HIERRO 1/2" x 1/8"

ML

0.1111

5,260.00

584.44

93.51

677.96

050238 SOLDADURA 60.13 DE 1/8"

KG

0.05

10,408.00

520.40

83.26

603.66

9049

CERRAMIENTO EN MALLA ESLABONADA DE


ALAMBRE GALVANIZADO CALIBRE 10 CON
RECUBRIMIENTO EN PVC Y HUECO DE
21/4X21/4" PLASTIFICADA COLOR NEGRO,
PISADA CON PLATINA DE 1/2" X 1/8", REMATE
INFERIOR EN NGULO DE 1 1/2" X 3/16" Y
REMATE SUPERIOR CON GUAYA GALVANIZADA
DE Y DEMAS ACCESORIOS PARA SU
ADECUADO FUNCIONAMIENTO DE ACUERDO A
PLANO DE DISEO

GUAYA EN ACERO GALVANIZADO DE 1/2" Y


010274A ACCESORIOS (PERROS ETC)

100

M2

ML

0.08

12,200.00

976.00

156.16

1,132.16

010121 ANGULO 1 1/2"x1/8"

UND

0.0417

28,090.00

1,170.42

187.27

1,357.68

040106 ANTICORROSIVO GRIS

GLN

0.01

22,000.00

220.00

35.20

255.20

GL

0.01

52,828.00

528.28

84.52

612.80

GBL

0.8

1,400.00

1,120.00

179.20

1,299.20

HH

0.09

103,048.84

9,274.40

9,274.40

040126 ESMALTE SINTETICO COLORES VARIOS


070123 HERRAMIENTA MENOR
080128 HORA CUADRILLA EE HORNAMENTACION

10000 APARATOS SANITARIOS Y ACCESORIOS


10001

BRINDISI 20x25

M2

010108

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.7

#N/A

#N/A

#N/A

#N/A

010195

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010357

#N/A #N/A

3.15

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.85

#N/A

#N/A

10002

CERAMICA PARED ITALIA

010108

#N/A #N/A

010176 CEMENTO BLANCO NARE


010396 PISO PARKET GUAYACAN
010357 PEGACOR x 40 KG
080102 HORA CUADRILLA AA
10003

#N/A

M2

ALBAIL.

ENCHAPE FACHADA TABLETA

#N/A

#N/A

#N/A

#N/A

KG

0.7

726.40

508.48

81.36

589.84

M2

1.03

80,000.00

82,400.00

13,184.00

95,584.00

BTO

3.15

22,210.00

69,961.50

11,193.84

81,155.34

HH

0.85

9,908.54

8,422.26

8,422.26

M2

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010177 CEMENTO GRIS CONQUISTADOR

KG

6.12

521.68

3,192.68

510.83

3,703.51

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.19

1,950.00

370.50

59.28

429.78

010445 TABLETA 10 x 10

M2

6,000.00

6,000.00

960.00

6,960.00

HH

0.8

9,908.54

7,926.83

7,926.83

080102 HORA CUADRILLA AA


10004

ALBAIL.

GABINETES BAO DE SERVICIO

010176 CEMENTO BLANCO NARE


010266 GABINETES WC DE SERVICIO
080102 HORA CUADRILLA AA
10005

ALBAIL.

GABINETES BAO P.PAL

010267 GABINETES WC P.PAL


10006

ALBAIL.

JABONERA PORCELANA ACUARIO

37

KG

726.40

726.40

116.22

842.62

UND

29,000.00

29,000.00

4,640.00

33,640.00

HH

94

9,908.54

931,403.00

931,403.00

UND

010176 CEMENTO BLANCO NARE


080102 HORA CUADRILLA AA

UND

KG

726.40

1,452.80

232.45

1,685.25

UND

34,500.00

34,500.00

5,520.00

40,020.00

HH

1.29

9,908.54

12,782.02

12,782.02

UND

Preparado Por LEONARDO ROJO HENAO

37

CODIGO

ACTIVIDAD

010176 CEMENTO BLANCO NARE


010290 JABONER GRANDE ACUACER
080102 HORA CUADRILLA AA

10007

ALBAIL.

JUEGOS DE INCRUSTACIONES EN ACERO


INOXIDABLE, DISEO DE ACUERDO A
SUPERVISION, PAPELERA, JABONERA,
CEPILLERO, GANCHO TOALLERO.

010422 SILICONA TRANSPARENTE x 11oz


010292 JUEGOS DE INCR. COMPLETO ACUARIO
080102 HORA CUADRILLA AA
10008

ALBAIL.

JUEGOS DE INCRUSTAR STILO

010176 CEMENTO BLANCO NARE


010293 JUEGOS DE INCR. COMPLETO ACUARIO
080102 HORA CUADRILLA AA
10009

ALBAIL.

JUEGOS DE INCRUSTAR ACUARIO

010176 CEMENTO BLANCO NARE


010291 JUEGOS DE INCR. COMPLETO ACUARIO
080102 HORA CUADRILLA AA
10010

ALBAIL.

MARMOL GRIS 30 x 15

UND

CANT

KG

0.5

VR. UNIT.
726.40

VR. PARCIAL
363.20

IVA 16%
58.11

SUBTOTAL
421.31

UND

1.05

6,600.00

6,930.00

1,108.80

8,038.80

HH

0.5

9,908.54

4,954.27

4,954.27

TUBO

0.8

5,200.00

4,160.00

665.60

4,825.60

JGO

1.03

16,500.00

16,995.00

2,719.20

19,714.20

HH

1.8

9,908.54

17,689.30

17,689.30

UND

UND
KG

1.54

726.40

1,118.66

178.98

1,297.64

JGO

1.03

16,500.00

16,995.00

2,719.20

19,714.20

HH

2.5

9,908.54

24,771.36

24,771.36

UND
KG

1.54

726.40

1,118.66

178.98

1,297.64

JGO

1.03

16,500.00

16,995.00

2,719.20

19,714.20

HH

9,908.54

19,817.09

19,817.09

M2

010108

#N/A #N/A

6.5

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

9.5

#N/A

#N/A

#N/A

#N/A

010335

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.3

#N/A

#N/A

10011

MARMOL TRAVERTINO ROMANO

#N/A

M2

010108 AGUA

LT

6.5

150.00

010118 ARENA MEDIANA

M3

0.04

26,950.00

1,078.00

172.48

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

9.5

521.68

4,955.96

792.95

5,748.91

010335 MARMOL TRAVERTINO ROMANO CLASICO

M2

1.03

116,870.00

120,376.10

19,260.18

139,636.28

080102 HORA CUADRILLA AA

HH

1.3

9,908.54

12,881.11

2,060.98

14,942.08

10012

ALBAIL.

CERAMICA SILEX

1,250.48

M2

010533 PLACA PLANA ETERNIT 0,6x1,2x4mm

UND

3.5

5,824.00

20,384.00

3,261.44

23,645.44

010534 PLACA PLANA ETERNIT 0,6x1,2x4mm

UND

1.03

5,824.00

5,998.72

959.80

6,958.52

010176 CEMENTO BLANCO NARE

KG

0.5

726.40

363.20

58.11

421.31

010519 WAIPE

KG

0.3

1,950.00

585.00

93.60

678.60

010108

#N/A #N/A

#N/A

#N/A

080102

#N/A #N/A

1.3

#N/A

#N/A

10013

ZOCALO CERAMICA SILEX

#N/A

#N/A
#N/A

ML

010534

#N/A #N/A

0.076

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

1.2

#N/A

#N/A

#N/A

#N/A

010519

#N/A #N/A

0.05

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


10014

ALBAIL.

OLIMPIA BRILLANTE BASE 20x20

HH

0.35

#N/A

9,908.54

3,467.99

554.88

4,022.87

M2

010108 AGUA

LT

3 $

150.00

450.00

72.00

522.00

010176 CEMENTO BLANCO NARE

KG

0.7 $

726.40

508.48

81.36

589.84

010177 CEMENTO GRIS CONQUISTADOR

KG

1.05 $

521.68

547.76

87.64

635.41

010180 CEMENTO GRIS CONQUISTADOR

KG

0.85 $

521.68

443.43

70.95

514.38

080102 HORA CUADRILLA AA

HH

10015

ALBAIL.

PAPEL DE COLGADURA WOODCREST

3.15

9,908.54

31,211.91

4,993.91

36,205.81

0.21

5,100.00

1,071.00

171.36

1,242.36

0.21

11,890.00

2,496.90

399.50

2,896.40

M2

010347 PAPEL WOODCREST

RLL

10016

PAPEL DE COLGADURA TIPO 1

M2

10017

HORA CUADRILLA EE HORNAMENTACION

HH

10017

PIEDRA CREMA

M2

010108

#N/A #N/A

6.5

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

38

Preparado Por LEONARDO ROJO HENAO

38

CODIGO

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

9.5

#N/A

#N/A

#N/A

#N/A

010365

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.3

#N/A

#N/A

10018

PIEDRA MUECA

#N/A

M2

010108 AGUA

LT

6.5

150.00

975.00

156.00

1,131.00

010118 ARENA MEDIANA

M3

0.04

26,950.00

1,078.00

172.48

1,250.48

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

9.5

521.68

4,955.96

792.95

5,748.91

010367 PIEDRA MUECA E= 20 mm

M2

1.03

65,900.00

67,877.00

10,860.32

080102 HORA CUADRILLA AA

HH

1.3

9,908.54

12,881.11

10019

ALBAIL.

PORCEL. ESFUMADO BASE 20x20

78,737.32

12,881.11
522.00

M2

010108 AGUA

LT

150.00

450.00

72.00

010176 CEMENTO BLANCO NARE

KG

0.9

726.40

653.76

104.60

758.36

UND

1.05

5,824.00

6,115.20

978.43

7,093.63

010209 CERAMICA ALFA LISA 30x30 / TRAF. 4

M2

3.15

20,500.00

64,575.00

10,332.00

74,907.00

080102 HORA CUADRILLA AA

HH

0.85

9,908.54

8,422.26

1,347.56

9,769.82
842.62

010533 PLACA PLANA ETERNIT 0,6x1,2x4mm

10020

ALBAIL.

REJILLAS PLAT. SOSCO 3x2

010176 CEMENTO BLANCO NARE


010411 REJILLAS PLAT. SOSCO 3x2
080102 HORA CUADRILLA AA
10021

ALBAIL.

REJILLA SIFON

010412 REJILLAS SIFON 4.5x3.5


10022

KG

726.40

726.40

116.22

UND

0.2

2,800.00

560.00

89.60

649.60

HH

0.85

9,908.54

8,422.26

1,347.56

9,769.82

UND

010176 CEMENTO BLANCO NARE


080102 HORA CUADRILLA AA

UND

ALBAIL.

REJILLA SIFON 20x20

KG

0.6

726.40

435.84

69.73

505.57

UND

4,800.00

4,800.00

768.00

5,568.00

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

UND

010176 CEMENTO BLANCO NARE

KG

726.40

726.40

116.22

842.62

010413 REJILLAS SIFON PC 20x20

UND

9,200.00

9,200.00

1,472.00

10,672.00

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

080102 HORA CUADRILLA AA


10023

ALBAIL.

SIPS REJILLA CON SOSCO 3x2

UND

010176 CEMENTO BLANCO NARE

KG

726.40

726.40

116.22

842.62

010410 REJILLA CON SOSCO 3x2

UND

0.2

7,100.00

1,420.00

227.20

1,647.20

HH

0.2331

9,908.54

2,309.46

369.51

2,678.98

080102 HORA CUADRILLA AA


10024

ALBAIL.

REJILLA VENTILACION 20x20

UND

010176 CEMENTO BLANCO NARE

KG

726.40

726.40

116.22

842.62

010410 REJILLA CON SOSCO 3x2

UND

0.2

7,100.00

1,420.00

227.20

1,647.20

HH

0.3

9,908.54

2,972.56

475.61

3,448.17
8,769.60

080102 HORA CUADRILLA AA


10025

ALBAIL.

REMATES BOCEL ALUMINIO

ML

010370 PIRAGUA ANOLOCK x 6mts

UND

1.05

7,200.00

7,560.00

1,209.60

010176 CEMENTO BLANCO NARE

KG

0.2

726.40

145.28

23.24

168.52

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

080102 HORA CUADRILLA AA


10026

ALBAIL.

SPACATTO BLANCO

M2

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010433

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.6

#N/A

#N/A

10027

SPACATTO TRAVERTINO

#N/A

M2

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

010176

#N/A #N/A

#N/A

#N/A

#N/A

010434 SPACATTO TRAVERTINO BOSCONIA


080102 HORA CUADRILLA AA
10028

ALBAIL.

M2

1.03

36,200.00

37,286.00

HH

1.6

9,908.54

15,853.67

5,965.76

#N/A
#N/A
$

43,251.76

15,853.67
1,740.00

TAPAS REGISTRO 20x20

UND

010471 TAPAS REGISTRO 20x20

UND

1,500.00

1,500.00

240.00

010176 CEMENTO BLANCO NARE

KG

0.2

726.40

145.28

23.24

168.52

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

4,100.00

4,100.00

656.00

4,756.00

080102 HORA CUADRILLA AA


10029

ALBAIL.

TAPAS REGISTRO 6x6

UND

010472 TAPAS REGISTRO 6x6

UND

39

Preparado Por LEONARDO ROJO HENAO

39

CODIGO

ACTIVIDAD

010176 CEMENTO BLANCO NARE


080102 HORA CUADRILLA AA
10030

ALBAIL.

TRACIA 20x20

0.2

726.40

145.28

23.24

168.52

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

#N/A #N/A

010176 CEMENTO BLANCO NARE


010194 CERAMICA ALFA LISA 30x30 / TRAF. 4
010533 PLACA PLANA ETERNIT 0,6x1,2x4mm
080102 HORA CUADRILLA AA

ALBAIL.

TUBO CORTINA DUCHA

010508 TUBO CORTINA DUCHA


080102 HORA CUADRILLA AA

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

#N/A

#N/A

#N/A

#N/A

KG

0.7

726.40

508.48

81.36

589.84

M2

1.05

20,500.00

21,525.00

3,444.00

24,969.00

UND

3.15

5,824.00

18,345.60

2,935.30

21,280.90

HH

0.85

9,908.54

8,422.26

1,347.56

9,769.82

UND

600.00

1,200.00

192.00

1,392.00

ML

4,200.00

4,200.00

672.00

4,872.00

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

UND

010253 ESCUADRA PARA PERFIL

10032

CANT

KG
M2

010108

10031

UND

ALBAIL.

VALVULA LAVADERO 2"

UND

020569 VALVULA LAVADERO 2"

UND

78.00

78.00

12.48

90.48

010177 CEMENTO GRIS CONQUISTADOR

KG

0.2

521.68

104.34

16.69

121.03

080102 HORA CUADRILLA AA

HH

0.3

9,908.54

2,972.56

475.61

3,448.17

10033

ALBAIL.

SIPS SANITARIO BAOS "ACUACER O SIMILAR "


(INCLUYE GRIFERIA Y ACCESORIOS PARA SU
INSTALACION) DISEO DE ACUARDO A
SUPERVISION

010176 CEMENTO BLANCO NARE


020403 SANITARIO
SIPS LAVAMANOS
BLANCO
BAOS
02632 EN
TREVI
VIDRIO TEMPLADO
SOBREPONER
SIMILAR
080103 DE
HORA
CUADRILLA TIPO
BB PLATINO
(PLOM. Y O
ELECT)
(INCLUYE GRIFERIA MEZCLADOR DE CUELLO
10034 LARGO Y ACCESORIOS PARA SU INSTALACION)
DISEO DE ACUERDO A SUPERVISION.
020218

CONJUNTO MEZCLADOR LAVAMANOS 4"


PRISMA REF 51150

UND
KG

0.45

726.40

329.69

52.75

329.69

UND

208,400.00

208,400.00

33,344.00

208,400.00

HH

10,899.40

21,798.79

3,487.81

21,798.79

UND
UND

0.45

41,200.00

18,699.18

2,991.87

18,699.18

DESAGUE SIFON PARA LAVAMANOS Y ORINAL


020228
NEUTRO REF 93300

UND

6,500.00

6,500.00

1,040.00

6,500.00

020101 ACCESORIO LAVAMANOS

UND

5,568.00

5,568.00

890.88

5,568.00

020253 LAVAMANOS PEDESTAL MANCESA TORINO

UND

66,000.00

132,000.00

21,120.00

132,000.00

HH

0.8345

10,899.40

9,095.42

1,455.27

9,095.42

UND

1.00

55,633.00

55,633.00

8,901.28

55,633.00

HH

1.34

10,899.40

14,559.30

2,329.49

14,559.30

1.00

195,000.00

195,000.00

31,200.00

195,000.00

UND

1.00

45,500.00

45,500.00

7,280.00

45,500.00

HH

1.52

10,899.40

16,525.60

2,644.10

16,525.60

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


10035

SIPS DUCHA CROMADA COMPLETA GRIVAL Y/O


SIMILAR (CONJUNTO MEZCLADOR)

020211

CONJU NTO DUCHA SENCILLA GALAXIA REF


50430

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

10036

DIVISION DE BAO EN VIDRIO DE 6mm


TEMPLADO PULIDO, CON SISTEMA DE FIJACION,
BARRA DESLIZANTE EN ACERO Y MANIJA TIPO
TOALLERO EN ACERO CROMADO Y DEMAS
ACCESORIOS PARA SU ADECUADO
FUNCIONAMIENTO, INCLUYE DESMONTE DE
DIVISION EXISTE.

010539 SUBCONTRATO DIVISION DE BAO EN VIDRIO

10037

UND

M2

M2

SUMIISTRO E INSTALACION DE EXTRACTOR DE


OLORES DE 21" INCLUYE ACOMETIDA
ELECTRICA PARA ENCENDIDO CON LUMINARIA
PRINCIPAL.

010540 ESTRACTOR DE OLORES


SUMINISTRO E INSTALACION DE ESPEJO
080103 HORA
CUADRILLA
BB ACUERDO
(PLOM. Y ELECT)
BISELADO
DISEO DE
A LA
10038 SUPERVISION

UND

M2

050583 ESPEJO BISELADO DE 4mm

M2

1.00

65,500.00

65,500.00

10,480.00

65,500.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

2.98

10,899.40

32,527.92

5,204.47

32,527.92

1.00

345,580.00

345,580.00

55,292.80

345,580.00

10039

SUMINISTRO E INSTALALCION Y PUESTA EN


SERVICIO DE LAVADERO EN FIBRA DE VIDRIO
CON TANQUE DE ALMACENAMIENTO, INCLUYE
GRIFERIA Y DEMAS ACCESORIOS PARA SU
ADECUADO FUNCIONAMIENTO

020585 LAVADERO EN FIBRA DE VIDRIO

40

UND

UND

Preparado Por LEONARDO ROJO HENAO

40

CODIGO DESAGUE SENCILLO


ACTIVIDAD
CON REBOSE COLOR GRIS
020225 REF 01-1930-04 GRICOL

080103 HORA CUADRILLA BB (PLOM. Y ELECT)


10040

LAVAMANOS CON SEMI-PEDESTAL GANAMAX O


SIMILAR
INCLUYE
GRIFERIA
MONOCONTROL
CONJUNTO
MEZCLADOR
LAVAMANOS
4"

UND

CANT

UND

1.00

VR. UNIT.
22,000.00

VR. PARCIAL
22,000.00

IVA 16%
3,520.00

SUBTOTAL
22,000.00

HH

3.74

10,899.40

40,755.20

6,520.83

40,755.20

41,200.00

41,200.00

6,592.00

41,200.00

UND

020218 PRISMA REF 51150

UND

1.00

020101 ACCESORIO LAVAMANOS

UND

5,568.00

5,568.00

890.88

5,568.00

020254 LAVAMANOS SEMI-PEDESTAL MANCESA

UND

76,000.00

76,000.00

12,160.00

76,000.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

5.3

10,899.40

58,140.00

9,302.40

58,140.00

10040

LAVAMANOS CORRIDO DE TRES PUESTOS EN


MARMOL COLOR VERDE UBATUBA O NEGRO
SAN GIL CON SALPICADERO Y FRENTERO DE
ACUERDO A DISEO O A LA VAMANOS
EXISTENTES

020218

CONJUNTO MEZCLADOR LAVAMANOS 4"


PRISMA REF 51150

UND

UND

1.00

41,200.00

41,200.00

6,592.00

41,200.00

020101 ACCESORIO LAVAMANOS

UND

5,568.00

5,568.00

890.88

5,568.00

LAVAMANOS CORRIDO TRES PUESTOS MARMOL


020255 COLOR VERDE UBATUBA

UND

250,000.00

750,000.00

120,000.00

750,000.00

080103 HORA CUADRILLA BB (PLOM. Y ELECT)

HH

5.3

10,899.40

58,140.00

9,302.40

58,140.00

11000

HH

11001

PISOS Y ENCHAPES
ADOQUIN CONCRETO 6 CM

M2

010106

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

6.27

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

#N/A

#N/A

11002

ADOQUIN CONCRETO 8 CM

010107

#N/A

M2
#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010177 CEMENTO GRIS CONQUISTADOR

KG

8.36

521.68

4,361.24

697.80

5,059.04

010118 ARENA MEDIANA

M3

0.03

26,950.00

808.50

129.36

937.86

010108 AGUA

LT

4.53

150.00

679.50

108.72

788.22

HH

1.05

9,908.54

10,403.97

10,403.97

080102 HORA CUADRILLA AA


11003

ALBAIL.

ADOQUIN GRES PEATONAL

M2

010103 ADOQUIN PEATONAL

M3

1.03

20,600.00

21,218.00

3,394.88

24,612.88

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

040119 COLOR MINERAL

KG

1.03

5,600.00

5,768.00

922.88

6,690.88

LT

2.85

150.00

427.50

68.40

495.90

HH

1.05

9,908.54

10,403.97

10,403.97

010108 AGUA
080102 HORA CUADRILLA AA
11004

ALBAIL.

ADOQUIN GRES VEHICULAR

M2

010105

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

8.36

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.03

#N/A

#N/A

#N/A

#N/A

040119

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

4.53

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.05

#N/A

#N/A

11005

BALDOSIN DE CEMENTO

#N/A

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

1.03

521.68

537.33

85.97

623.30

010176 CEMENTO BLANCO NARE

KG

6.27

726.40

4,554.53

728.72

5,283.25

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010125 ASFALTO

M3

1.03

161,472.00

166,316.16

26,610.59

192,926.75

LT

2.85

150.00

427.50

68.40

495.90

HH

0.95

9,908.54

9,413.12

9,413.12

010108 AGUA
080102 HORA CUADRILLA AA

41

ALBAIL.

Preparado Por LEONARDO ROJO HENAO

41

CODIGO
11006

ACTIVIDAD
BALDOSIN GRANITO 20x20

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

010176 CEMENTO BLANCO NARE

KG

1.03

726.40

748.19

119.71

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010123 ASFALTO

M3

1.03

161,472.00

166,316.16

26,610.59

192,926.75

523.35

3,794.28

9,413.12
867.90

010108

#N/A #N/A

2.85

#N/A

#N/A

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

080102 HORA CUADRILLA AA

HH

0.95

9,908.54

9,413.12

11007

ALBAIL.

BALDOSIN GRANITO 30x30

#N/A

867.90

#N/A

M2

010176 CEMENTO BLANCO NARE

KG

1.03

726.40

748.19

119.71

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010124 ASFALTO

M3

1.03

161,472.00

166,316.16

26,610.59

192,926.75

523.35

3,794.28

9,413.12
102,492.33

010108

#N/A #N/A

2.85

#N/A

#N/A

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

080102 HORA CUADRILLA AA

HH

0.95

9,908.54

9,413.12

11008

ALBAIL.

PLANCHUELA MARMOL NEGRO

#N/A

#N/A

M2

010336 MARMOL NEGRO 30x30

M2

1.03

85,782.00

88,355.46

14,136.87

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


11009

ALBAIL.

PLANCHUELA MARMOL GRIS

HH

1.1

9,908.54

10,899.40

#N/A
#N/A
$

10,899.40
139,636.28

M2

010334 MARMOL TRAVERT. 30x30

M2

1.03

116,870.00

120,376.10

19,260.18

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

2.85

150.00

427.50

68.40

495.90

HH

1.1

9,908.54

10,899.40

10,899.40
139,636.28

080102 HORA CUADRILLA AA


11010

ALBAIL.

PLANCHUELA MARMOL TRAVERT.

M2

010332 MARMOL TRAVERT. 30x30

M2

1.03

116,870.00

120,376.10

19,260.18

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

2.85

150.00

427.50

68.40

495.90

ALBAIL.

HH

1.1

9,908.54

10,899.40

10,899.40

PLANCHUELA TRAVERT. PERUANO

M2
139,636.28

080102 HORA CUADRILLA AA


11011

010333 MARMOL TRAVERT. 30x30

M2

1.03

116,870.00

120,376.10

19,260.18

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

M3

0.02

26,950.00

539.00

86.24

625.24

010118 ARENA MEDIANA


010108
080102
11012

ZOCALO MARMOL NEGRO

#N/A #N/A

2.85

#N/A

#N/A

#N/A #N/A

1.1

#N/A

#N/A

#N/A

#N/A
#N/A

ML

010524 ZOCALO MARMOL NEGRO

UND

1.03

6,500.00

6,695.00

1,071.20

010176 CEMENTO BLANCO NARE

KG

0.1

726.40

72.64

11.62

84.26

010177 CEMENTO GRIS CONQUISTADOR

KG

0.98

521.68

511.25

81.80

593.05

10.80

78.30

7,926.83
7,766.20

010118

#N/A #N/A

010108 AGUA
080102 HORA CUADRILLA AA
11013

ALBAIL.

ZOCALO MARMOL GRIS

0.01

#N/A

#N/A

LT

0.45

150.00

67.50

HH

0.8

9,908.54

7,926.83

#N/A

7,766.20

#N/A

ML

010523 ZOCALO MARMOL GRIS

UND

1.03

6,500.00

6,695.00

1,071.20

010176 CEMENTO BLANCO NARE

KG

0.1

726.40

72.64

11.62

84.26

010177 CEMENTO GRIS CONQUISTADOR

KG

0.98

521.68

511.25

81.80

593.05

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010108 AGUA

LT

0.45

150.00

67.50

10.80

78.30

HH

0.8

9,908.54

7,926.83

7,926.83

080102 HORA CUADRILLA AA


11014

ALBAIL.

ZOCALO MARMOL TRAVERT.

42

ML

Preparado Por LEONARDO ROJO HENAO

42

CODIGO

ACTIVIDAD

UND

CANT

UND

1.03

6,500.00

6,695.00

1,071.20

010176 CEMENTO BLANCO NARE

KG

0.1

726.40

72.64

11.62

84.26

010177 CEMENTO GRIS CONQUISTADOR

KG

0.98

521.68

511.25

81.80

593.05

M3

0.1

26,950.00

2,695.00

431.20

3,126.20

010523 ZOCALO MARMOL GRIS

010118 ARENA MEDIANA

VR. UNIT.

VR. PARCIAL

010108

#N/A #N/A

45

#N/A

#N/A

080102

#N/A #N/A

0.8

#N/A

#N/A

11015

PISO VENECIA PLANO 20x20

010523 ZOCALO MARMOL GRIS

IVA 16%

SUBTOTAL

#N/A

7,766.20

#N/A
#N/A

M2
UND

1.03

6,500.00

6,695.00

1,071.20

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

2.85

150.00

427.50

68.40

495.90

HH

0.95

9,908.54

9,413.12

9,413.12

080102 HORA CUADRILLA AA


11016

ALBAIL.

PISO VENECIA DECOR 20x20

7,766.20

M2

010397

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

6.27

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.95

#N/A

#N/A

11017

PISO ACENTO COLOR 20x20

#N/A

M2

010375 CEMENTO BLANCO NARE

BTO

1.03

25,800.00

26,574.00

4,251.84

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

2.85

150.00

427.50

68.40

495.90

HH

0.95

9,908.54

9,413.12

9,413.12
30,825.84

080102 HORA CUADRILLA AA


11018

ALBAIL.

PISO BOSQUE COLOR 30x30

30,825.84

M2

010376 CEMENTO BLANCO NARE

BTO

1.03

25,800.00

26,574.00

4,251.84

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

M3

0.02

26,950.00

539.00

86.24

625.24

010118 ARENA MEDIANA


010108

#N/A #N/A

2.85

#N/A

#N/A

080102

#N/A #N/A

3.85

#N/A

#N/A

11019

PISO IMPERIO COLOR 30x30

#N/A

#N/A
#N/A

M2

010379

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

6.27

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

010108 AGUA
080102 HORA CUADRILLA AA
DECORPISO

11x22

010239 DECORPISO

11020

11x22

ALBAIL.

LT

2.85

150.00

427.50

HH

0.95

9,908.54

9,413.12

68.40

#N/A
$

495.90

9,413.12
23,298.60

M2
M2

1.03

19,500.00

20,085.00

3,213.60

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

2.85

150.00

427.50

68.40

495.90

HH

0.95

9,908.54

9,413.12

9,413.12

080102 HORA CUADRILLA AA


11021

PISO GRANITO

ALBAIL.

M2

010240

#N/A #N/A

1.36

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.21

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

18.7

#N/A

#N/A

#N/A

#N/A

040130

#N/A #N/A

0.5

#N/A

#N/A

#N/A

#N/A

040132

#N/A #N/A

0.75

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.09

#N/A

#N/A

#N/A

#N/A

040142

#N/A #N/A

0.5

#N/A

#N/A

#N/A

040119 COLOR MINERAL

43

KG

0.33

5,600.00

1,848.00

Preparado Por LEONARDO ROJO HENAO

295.68

#N/A
$

2,143.68

43

CODIGO

ACTIVIDAD

010108 AGUA
080102 HORA CUADRILLA AA
11022

ALBAIL.

PISO ESCALERA GRANITO

UND

CANT

LT

7.41

VR. UNIT.
150.00

VR. PARCIAL
1,111.50

HH

2.5

9,908.54

24,771.36

IVA 16%
$

177.84

SUBTOTAL
$

1,289.34

24,771.36

ML

010371 PIRLAN ALUMINIO DORADO

UND

0.8

8,500.00

6,800.00

1,088.00

7,888.00

010240 DILATACION EN BRONCE

UND

0.2

7,200.00

1,440.00

230.40

1,670.40

010176 CEMENTO BLANCO NARE

KG

10.5

726.40

7,627.20

1,220.35

8,847.55

010177 CEMENTO GRIS CONQUISTADOR

KG

12

521.68

6,260.16

1,001.63

7,261.79

040130 GRANITO NO 1

BTO

0.38

2,300.00

874.00

139.84

1,013.84

040132 GRANITO NO 3

BTO

0.38

2,300.00

874.00

139.84

1,013.84

010118 ARENA MEDIANA

M3

0.07

26,950.00

1,886.50

301.84

2,188.34

040142 MARMOLINA

BT

0.25

6,000.00

1,500.00

240.00

1,740.00

040119 COLOR MINERAL

KG

0.15

5,600.00

840.00

134.40

974.40

010108

#N/A #N/A

3.7

#N/A

#N/A

080102

#N/A #N/A

4.5

#N/A

#N/A

11023

G / ESCOBA GRANITO

#N/A

#N/A
#N/A

ML

010176

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

040132

#N/A #N/A

0.06

#N/A

#N/A

#N/A

#N/A

040142

#N/A #N/A

0.1

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

1.3

#N/A

#N/A

11024

GRAVILLA LAVADA

#N/A

M2

010240 DILATACION EN BRONCE

UND

0.8

7,200.00

5,760.00

921.60

6,681.60

010177 CEMENTO GRIS CONQUISTADOR

KG

6.98

521.68

3,641.33

582.61

4,223.94

010118 ARENA MEDIANA

M3

0.03

26,950.00

808.50

129.36

937.86

010272 GRAVA 3/4" 5 M3

M3

0.02

47,500.00

950.00

152.00

1,102.00

LT

3.18

150.00

477.00

76.32

553.32

HH

2.5

9,908.54

24,771.36

24,771.36

010108 AGUA
080102 HORA CUADRILLA AA
11025

ALBAIL.

GRADAS GRAVILLA

ML

010272 GRAVA 3/4" 5 M3

M3

0.01

47,500.00

475.00

76.00

551.00

010177 CEMENTO GRIS CONQUISTADOR

KG

3.5

521.68

1,825.88

292.14

2,118.02

M3

0.01

26,950.00

269.50

43.12

312.62

010118 ARENA MEDIANA


010108

#N/A #N/A

1.59

#N/A

#N/A

080102

#N/A #N/A

2.5

#N/A

#N/A

11026

G / ESCOBA GRAVILLA

#N/A

#N/A
#N/A

ML

010272

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

0.7

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

0.32

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


11027

ALBAIL.

PISO EN TABLON GRES

HH

9,908.54

9,908.54

#N/A
$

9,908.54

M2

010457 TABLON CUCUTA 30x30 LISO

M2

1.03

18,800.00

19,364.00

3,098.24

22,462.24

010177 CEMENTO GRIS CONQUISTADOR

KG

12.5

521.68

6,521.00

1,043.36

7,564.36

010118 ARENA MEDIANA

M3

0.1

26,950.00

2,695.00

431.20

3,126.20

010108 AGUA

LT

7.4

150.00

1,110.00

177.60

1,287.60

HH

0.98

9,908.54

9,759.60

9,759.60

080102 HORA CUADRILLA AA


11028

ALBAIL.

TABLON CORRIENTE 25x25

010456 TABLILLA

No

10

M2
ML

1.03

1,500.00

1,545.00

247.20

1,792.20

010177 CEMENTO GRIS CONQUISTADOR

KG

9.41

521.68

4,909.01

785.44

5,694.45

010118 ARENA MEDIANA

M3

0.04

26,950.00

1,078.00

172.48

1,250.48

9,413.12

010108

#N/A #N/A

080102 HORA CUADRILLA AA


11029

ALBAIL.

TABLETA GRES 10x10

HH

6.48

#N/A

#N/A

0.95

9,908.54

9,413.12

#N/A

#N/A

M2

010451 TABLETA 20 NATURAL 20x10

M2

1.03

10,120.00

10,423.60

1,667.78

12,091.38

010177 CEMENTO GRIS CONQUISTADOR

KG

6.59

521.68

3,437.87

550.06

3,987.93

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

9,413.12

010108

#N/A #N/A

080102 HORA CUADRILLA AA


11030

TABLETA GRES 20.6x10

44

ALBAIL.

HH

3
0.95

#N/A
$

9,908.54

#N/A
$

9,413.12

#N/A

#N/A

M2

Preparado Por LEONARDO ROJO HENAO

44

CODIGO

UND

CANT

010452 TABLETA 20 NATURAL 20x10

ACTIVIDAD

M2

1.03

VR. UNIT.
10,120.00

VR. PARCIAL
10,423.60

IVA 16%
1,667.78

SUBTOTAL
12,091.38

010177 CEMENTO GRIS CONQUISTADOR

KG

6.59

521.68

3,437.87

550.06

3,987.93

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.95

#N/A

#N/A

11031

ZOCALO P / TABLETA H = 7.5

#N/A

ML

010522

#N/A #N/A

1.05

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

0.63

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.01

#N/A

#N/A

#N/A

010108 AGUA
080102 HORA CUADRILLA AA
11032

ALBAIL.

PIRLANES EN ALUMINIO

LT

0.29

150.00

43.50

HH

0.5

9,908.54

4,954.27

6.96

#N/A
$

50.46

4,954.27

ML

050332 TERMINAL SIN SALIDA ETERNIT

UND

3.09

4,680.00

14,461.20

2,313.79

16,774.99

010371 PIRLAN ALUMINIO DORADO

UND

0.17

8,500.00

1,445.00

231.20

1,676.20

HH

0.3

9,908.54

2,972.56

2,972.56

080102 HORA CUADRILLA AA


11033

ALBAIL.

PIRLANES EN LADRILLO

ML

010296 LADRILLO COMUN

UND

15.84

750.00

11,880.00

1,900.80

13,780.80

010177 CEMENTO GRIS CONQUISTADOR

KG

3.32

521.68

1,731.98

277.12

2,009.09

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

HH

0.84

9,908.54

8,323.18

1,331.71

9,654.88

20,034.27

20,034.27

20,034.27
626.40

080102 HORA CUADRILLA AA


11034

ALBAIL.

PULIDA PISO TABLON DE GRANITO HASTA


ALCANZAR UNA SUPERFICIE BRILLANTE Y LISA

010409 PULIDA PISO GRANITO


11035

LISTON M. H.

M2
M2

AMARILLO

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.27

2,000.00

540.00

86.40

010513 VARETA 1"x1"x 3 MT OTOBO

ML

0.4

650.00

260.00

41.60

301.60

UND

1.1

3,000.00

3,300.00

528.00

3,828.00

HH

1.2

9,908.54

11,890.25

1,902.44

13,792.69

050111 BASTIDOR EN AMARILLO 2"X2"


080102 HORA CUADRILLA AA
11036

ALBAIL.

ENCHAPE MURO EN BALDOSA CERAMICA DE


PRIMERA CALIDAD, DISEO A ESCOGER POR LA
SUPERVISION

M2

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

5.27

#N/A

#N/A

#N/A

#N/A

010188

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010357

#N/A #N/A

0.08

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.38

#N/A

#N/A

11037

GUARDAESCOBA VINISOL 6.8 CM

ML

010273 GUARDAESCOBA VINISOL 6.8 CM

ML

11038

PISO EN PORCELANATO DE 0,5x0,5 mts


TRAFICO PESADP REF. ALFA, CORONA O
SIMILAR DISEO A ESCOGER POR LA
SUPERVISION

1.03

1,500.00

1,545.00

#N/A
$

1,545.00

M2

010108 AGUA

LT

2.85

150.00

427.50

68.40

495.90

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010176 CEMENTO BLANCO NARE

KG

0.51

726.40

370.46

59.27

429.74

010177 CEMENTO GRIS CONQUISTADOR

KG

6.27

521.68

3,270.93

523.35

3,794.28

5,777.28

41,885.28

6,654.30

010349 PORCELANATO 0,5x0,5 TRAF. PESADO

M2

1.02

35,400.00

36,108.00

080102 HORA CUADRILLA AA

HH

0.6716

9,908.54

6,654.30

11039

ALBAIL.

PISO EN BALDOSA CERMICA DE PRIMERA


CALIDAD DISEO A ESCOGER POR LA
SUPERVISION

M2

010108 AGUA

LT

2.85

150.00

427.50

68.40

427.50

010118 ARENA MEDIANA

M3

0.06

26,950.00

1,617.00

258.72

1,875.72

010176 CEMENTO BLANCO NARE

KG

0.81

726.40

588.38

94.14

682.53

010177 CEMENTO GRIS CONQUISTADOR

KG

8.27

521.68

4,314.29

690.29

5,004.58

010188 CERAMICA ALFA LISA 30x30 / TRAF. 4

M2

1.03

20,500.00

21,115.00

3,378.40

24,493.40

45

Preparado Por LEONARDO ROJO HENAO

45

CODIGO

ACTIVIDAD

080102 HORA CUADRILLA AA


11040

ALBAIL.

OLIMPIA BRILLANTE 20 x 20

UND

CANT

HH

0.87

VR. UNIT.
$

9,908.54

VR. PARCIAL
$

IVA 16%

8,599.51

SUBTOTAL
$

8,599.51

M2

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

6.27

#N/A

#N/A

#N/A

#N/A

010181

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.85

#N/A

#N/A

11041

PISO ESCALERA

010355 PORCELANATO 0,5x0,5 TRAF. PESADO


11042

M2

PISO EN GRAMA

11043

1.03

35,400.00

36,462.00

M2

1.1

1,850.00

2,035.00

HH

0.1

9,908.54

990.85

36,462.00

2,360.60

990.85

M2

010269 GRAMA SEMILLA


080102 HORA CUADRILLA AA

#N/A

UN

ALBAIL.

PISO EN POLVO DE LADRILLO

325.60

M3

010407 POLVO DE LADRILLO

M3

1.2

74,520.00

89,424.00

14,307.84

103,731.84

070119 VIBROCOMPACT. A GASOLINA

DD

0.04

89,900.00

3,596.00

575.36

4,171.36

080102 HORA CUADRILLA AA

HH

0.7

9,908.54

6,935.98

6,935.98

80,000.00

80,000.00

80,000.00

34,500.00

34,500.00

34,500.00

34,500.00

34,500.00

34,500.00

11044

ALBAIL.

PISO PARKET GUAYACAN

M2

010395 PISO PARKET GUAYACAN

M2

11045

PISO SINTETICO TENISLEIBO

M2

010172 CANAL GALVANIZ. DESARRO. 0.75


11046

ML

PISO SINTETICO TENISSINCO

M2

010173 CANAL GALVANIZ. DESARRO. 0.75


11047

ML

PISO VINILO PISOPAK 1.6 MM

M2

010288 INST. PISO VINILO C/ PEGANTE

M2

1,500.00

1,500.00

010399 PISO PARKET GUAYACAN

M2

80,000.00

80,000.00

GLN

0.1

25,541.00

2,554.10

M2

20,034.27

20,034.27

11048

PULIDA LACADA PISO MADERA

240.00

1,740.00

80,000.00

M2

040108 ANTICORROSIVO BASE ACEITE


010409 PULIDA PISO GRANITO
11049

TRACIA 20 x 20

408.66

2,962.76

20,034.27

M2

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

6.27

#N/A

#N/A

#N/A

#N/A

010178

#N/A #N/A

1.03

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.85

#N/A

#N/A

11050

VINISOL 2 MM

010517 VINISOL COMERCIAL 2 MM


11051

M2

VINISOL 3 MM

1.03

15,500.00

15,965.00

15,965.00

1.03

20,000.00

20,600.00

20,600.00

M2

010518 VINISOL TRAFICO PESADO 3 MM


11052

#N/A

M2

M2

AFINADO PLACA IMPERMEABILIZADO

M2

010343 MORTERO 1 : 3

M3

0.03

275,000.00

8,250.00

1,320.00

9,570.00

010420 SIKA MORTERO

KG

0.90

2,624.00

2,361.60

377.86

2,361.60

HH

0.40

9,908.54

3,963.42

634.15

3,963.42

20,500.00

6,150.00

984.00

6,150.00

080102 HORA CUADRILLA AA


11053

ALBAIL.

GUARDA ESCOBA EN BALDOSA CERAMICA DE


PRIMERA CALIDAD DISEO A ESCOGER POR LA
SUPERVISION ALTURA >=0,07 mts

ML

010188 CERAMICA ALFA LISA 30x30 / TRAF. 4

M2

0.30

010176 CEMENTO BLANCO NARE

KG

1.10

726.40

795.71

127.31

795.71

HH

0.43

9,908.54

4,260.67

681.71

4,260.67

6,568.09

080102 HORA CUADRILLA AA


11054

ALBAIL.

GUARDA ESCOBA EN EN PORCELANATO


ALTURA >=0,07 mts

ML

010349 PORCELANATO 0,5x0,5 TRAF. PESADO

M2

0.19

35,400.00

6,568.09

1,050.89

010176 CEMENTO BLANCO NARE

KG

0.70

726.40

508.48

81.36

508.48

HH

0.23

9,908.54

2,278.96

364.63

2,278.96

080102 HORA CUADRILLA AA

46

ALBAIL.

Preparado Por LEONARDO ROJO HENAO

46

CODIGO
11055

ACTIVIDAD

UND

CENEFA CERAMICA MALLA ALFA O SIMILAR


(0,1x0,25 mts ) EN AREA DE BAOS , DISEO A
ESCOGER POR LA SUPERVISION

010357 PEGACOR x 40 KG

11056

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

ML

010188 CERAMICA ALFA LISA 30x30 / TRAF. 4


080102 HORA CUADRILLA AA

CANT

ALBAIL.

PIRLANES EN BOCAPUERTAS EN ENCHAPE


TIPO EXPORTACION ANCHO: IGUAL AL ANCHO
DEL MARCO DE LA PUERTA: IGUAL ANCHO DE
MURO

010357 PEGACOR x 40 KG

M2

0.55

20,500.00

11,275.00

1,804.00

11,275.00

BTO

0.34

22,210.00

7,580.31

1,212.85

7,580.31

HH

0.23

9,908.54

2,278.96

364.63

2,278.96

ML
BTO

0.37

22,210.00

8,127.12

1,300.34

8,127.12

010188 CERAMICA ALFA LISA 30x30 / TRAF. 4

M2

0.40

20,500.00

8,200.00

1,312.00

8,200.00

080102 HORA CUADRILLA AA

HH

9,908.54

9,908.54

9,908.54

11036

ALBAIL.

ENCHAPE EN CERMICA IMPORTADO


ANTIDESLIZANTE, DISEO A ESCOGER POR LA
SUPERVISIN.

M2

010108 AGUA

LT

3.85

150.00

577.50

92.40

577.50

010176 BOQUILLA

KG

7.00

726.40

5,084.80

813.57

5,084.80

010188 CERAMICA IMPORTADA


010357 PEGACOR x 40 KG
080102 HORA CUADRILLA AA

12000
12001

ALBAIL.

M2

1.00

25,500.00

25,500.00

4,080.00

25,500.00

BTO

0.1899

22,210.00

4,218.26

674.92

4,893.19

HH

1.20

9,908.54

11,890.25

11,890.25

PINTURA Y ACABADOS
ESTUCO PLASTICO SUBRE MURO

M2

ESTUCO PLASTICO INTERIOR

GLN

0.25 $

11,900.00

2,975.00

476.00

3,451.00

MANO OBRA PINTURA 1 OFI

HC

0.2 $

10,250.00

2,050.00

328.00

2,378.00

HERRAMIENTA MENOR

GLB

0.05 $

1,400.00

70.00

11.20

81.20

ANDAMIO METALICO TUBULAR

U/D

0.05 $

3,200.00

160.00

25.60

185.60

UND

0.02 $

1,100.00

22.00

3.52

25.52

010177 CEMENTO GRIS CONQUISTADOR

KG

0.1 $

521.68

52.17

8.35

60.51

040181 YESO ANCLA x 25 K

BTO

0.01 $

9,300.00

93.00

14.88

107.88

040117 CAOLIN LA ROCA x 25 KG

BTO

0.01 $

8,400.00

84.00

13.44

97.44

080104 HORA CUADRILLA CC

HH

0.16 $

11,890.25

1,902.44

1,902.44

12002

FILOS Y DILATACIONES

ML

040141 LIJA # 150

12003

PINTURA

PINTURA INTERIOR 3 MANOS TIPO 1, INCLUYE ,


RASQUETEADO, FILOS, DILATACIONES Y
CARTERAS, REPARACION DE PAETE, ESTUCO
Y TRATAMIENTO DE IMPERMEABILIZACIONES
DE SER NECESARIO PARA ALCANZAR
SUPERFICIE SANA DE HUMEDAD Y LISA
AGUA

LTS

0.04 $

17.00

0.68

0.68

VINILO TIPO 1

GLN

0.045 $

48,500.00

2,182.50

2,182.50

RODILLO FELPA

UND

0.03 $

5,000.00

150.00

150.00

CINTA ENMASCARAR

ROL

0.01 $

4,000.00

40.00

40.00

BROCHA CERDA MONA 4

UND

0.01 $

12,500.00

125.00

125.00
3,240.00

MANO OBRA PINTURA 1 AYUDANTE-1 OFI

12004

M2

HC

0.18 $

18,000.00

3,240.00

HERRAMIENTA MENOR

GLB

0.05 $

1,500.00

75.00

75.00

ANDAMIO METALICO TUBULAR

U/D

0.2 $

3,200.00

640.00

640.00

LIJA 150 AGUA

PLI

0.015 $

1,000.00

15.00

15.00

YESO BLANCO ESTUCADOR

BTO

0.07 $

22,500.00

1,575.00

1,575.00

PROCOPIL

GLN

0.015 $

20,000.00

300.00

300.00

PINTURA EXTERIOR 2 MANOS SOBRE


GRANIPLAST, TIPO KORAZA O SIMILAR,
INCLUYE REPARACION DE PAETE Y
TRATAMIENTO DE IMPERMEABILIZACION DE
SER NECESARIO PARA ALCANZAR UNA
SUPERFICIE SANA DE HUMEDAD, SUPERFICIE
DE COLUMNAS, VIGAS, FILOS, DILATACIONES Y
CARTERAS

47

M2

Preparado Por LEONARDO ROJO HENAO

47

CODIGO

ACTIVIDAD

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

GLN

0.045 $

65,500.00

2,947.50

2,947.50

RODILLO FELPA

UND

0.03 $

5,000.00

150.00

150.00

CINTA ENMASCARAR

ROL

0.01 $

4,000.00

40.00

40.00

BROCHA CERDA MONA 4

UND

0.01 $

12,500.00

125.00

125.00
3,240.00

MANO OBRA PINTURA 1 AYUDANTE-1 OFI

12004

UND

KORAZA

HC

0.18 $

18,000.00

3,240.00

HERRAMIENTA MENOR

GLB

0.05 $

1,500.00

75.00

75.00

ANDAMIO METALICO TUBULAR

U/D

0.2 $

3,200.00

640.00

640.00

LIJA 150 AGUA

PLI

0.015 $

1,000.00

15.00

15.00

YESO BLANCO ESTUCADOR

BTO

0.07 $

22,500.00

1,575.00

1,575.00

MARMOLINA S / REPELLO

M2

010176 CEMENTO BLANCO NARE

KG

0.02 $

726.40

14.53

2.32

16.85

040142 MARMOLINA

BT

0.1 $

6,000.00

600.00

96.00

696.00

BTO

0.01 $

9,480.00

94.80

15.17

109.97

1,902.44

2,832.26

1,545.73

3,299.04

1,080.32

010174 CARBURO
010108

#N/A #N/A

080104 HORA CUADRILLA CC


12005

PINTURA

VINILO S / REPELLO 2 MANOS

040178 VINILTEX BLANCO ALMANDRA 1561


080104 HORA CUADRILLA CC
12006

PINTURA

CABURO S / MURO

PINTURA

ESMALTE S/ LAMINA LINEL

040141 LIJA # 150


040126 ESMALTE SINTETICO COLORES VARIOS
040167 THINNER CORRIENTE
12008

PINTURA

ESMALTE REJAS - VENTANAS, BALCONES

040141 LIJA # 150


040126 ESMALTE SINTETICO COLORES VARIOS
040167 THINNER CORRIENTE
080104 HORA CUADRILLA CC
12009

11,890.25

1,902.44

GLN

0.08 $

30,520.00

2,441.60

HH

0.13 $

11,890.25

1,545.73

0.3 $

9,480.00

2,844.00

#N/A

#N/A

M2

#N/A #N/A

080104 HORA CUADRILLA CC

#N/A

0.16 $

BTO

010108
080104 HORA CUADRILLA CC

#N/A

390.66

M2

010174 CARBURO

12007

HH

0.01

PINTURA

ESMALTE S/ MARCOS DE MADERA

040141 LIJA # 150

HH

0.2
0.09 $

#N/A

#N/A

11,890.25

1,080.32

455.04
#N/A

#N/A

ML
UND

0.16 $

1,100.00

176.00

28.16

204.16

GL

0.02 $

21,828.00

436.56

69.85

506.41

GLN

0.01 $

9,500.00

95.00

15.20

110.20

HH

0.07 $

11,890.25

832.32

832.32

M2
UND

0.4 $

1,100.00

440.00

70.40

510.40

GL

0.07 $

52,828.00

3,697.96

591.67

4,289.63

GLN

0.02 $

9,500.00

190.00

30.40

220.40

HH

0.13 $

11,890.25

1,545.73

1,545.73
765.60

M2
UND

0.6 $

1,100.00

660.00

105.60

040165 TAPAPOROS NOGAL

GL

0.04 $

12,400.00

496.00

79.36

575.36

040126 ESMALTE SINTETICO COLORES VARIOS

GL

0.11 $

21,828.00

2,401.08

384.17

2,785.25

GLN

0.01 $

9,500.00

95.00

15.20

110.20

HH

0.17 $

11,890.25

2,021.34

2,021.34

040167 THINNER CORRIENTE


080104 HORA CUADRILLA CC
12010

PINTURA

ESMALTE S/ MADERA LLENA

040141 LIJA # 150


040165 TAPAPOROS NOGAL
040126 ESMALTE SINTETICO COLORES VARIOS
040167 THINNER CORRIENTE
080104 HORA CUADRILLA CC
12011

PINTURA

ESMALTE S/ MADERA LINEAL

040141 LIJA # 150

M2
UND

1.05 $

1,100.00

1,155.00

184.80

1,339.80

GL

0.08 $

12,400.00

992.00

158.72

1,150.72
4,810.89

GL

0.19 $

21,828.00

4,147.32

663.57

GLN

0.02 $

9,500.00

190.00

30.40

220.40

HH

0.33 $

11,890.25

3,923.78

3,923.78
204.16

M2
UND

0.16 $

1,100.00

176.00

28.16

040165 TAPAPOROS NOGAL

GL

0.04 $

12,400.00

496.00

79.36

575.36

040126 ESMALTE SINTETICO COLORES VARIOS

GL

0.04 $

21,828.00

873.12

139.70

1,012.82

GL

0.01 $

9,500.00

95.00

15.20

110.20

HH

0.07 $

11,890.25

832.32

832.32

040167 THINNER CORRIENTE


080104 HORA CUADRILLA CC
12012

PINTURA

TINTILLA S/ MADERA LLENA

040141 LIJA # 150


040165 TAPAPOROS NOGAL

M2
UND

0.5 $

1,100.00

550.00

88.00

638.00

GL

0.08 $

12,400.00

992.00

158.72

1,150.72

327.36

2,373.36

4,875.00

204.16

040168 TINTILLA NOGAL PREPARADA

GL

0.11 $

18,600.00

2,046.00

080104 HORA CUADRILLA CC

HH

0.41 $

11,890.25

4,875.00

0.16 $

1,100.00

176.00

12013

PINTURA

TINTILLA S/ MADERA LINEAL

040141 LIJA # 150

48

M2
UND

Preparado Por LEONARDO ROJO HENAO

28.16

48

CODIGO

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

040165 TAPAPOROS NOGAL

GL

0.04 $

12,400.00

496.00

79.36

575.36

040168 TINTILLA NOGAL PREPARADA

GL

0.04 $

18,600.00

744.00

119.04

863.04

080104 HORA CUADRILLA CC

HH

0.07 $

11,890.25

832.32

832.32
4,019.40

12014

PINTURA

TINTILLA S/ MUEBLES

M2

040141 LIJA # 150

UND

3.15 $

1,100.00

3,465.00

554.40

040165 TAPAPOROS NOGAL

GL

0.45 $

12,400.00

5,580.00

892.80

6,472.80

040168 TINTILLA NOGAL PREPARADA

GL

0.72 $

18,600.00

13,392.00

2,142.72

15,534.72

080104 HORA CUADRILLA CC

HH

1.23 $

11,890.25

14,625.01

14,625.01
8,932.00

12015

PINTURA

ESMALTE S/ MUEBLES

M2

040141 LIJA # 150

7 $

1,100.00

7,700.00

1,232.00

040165 TAPAPOROS NOGAL

UND
GL

0.45 $

12,400.00

5,580.00

892.80

6,472.80

040126 ESMALTE SINTETICO COLORES VARIOS

GL

0.57 $

21,828.00

12,441.96

1,990.71

14,432.67

GLN

0.12 $

9,500.00

1,140.00

182.40

1,322.40

HH

1.23 $

11,890.25

14,625.01

14,625.01

040167 THINNER CORRIENTE


080104 HORA CUADRILLA CC
12016

PINTURA

BARNIZ S / MUEBLES

M2

040141 LIJA # 150


040165 TAPAPOROS NOGAL
040109 ANTICORROSIVO BASE ACEITE
080104 HORA CUADRILLA CC
12017

LACA PISO

PINTURA

MADERA

UND

3.5 $

1,100.00

3,850.00

616.00

4,466.00

GL

0.45 $

12,500.00

5,625.00

900.00

6,525.00

GLN

0.23 $

25,541.00

5,874.43

939.91

6,814.34

HH

1.23 $

11,890.25

14,625.01

14,625.01

M2

040167 THINNER CORRIENTE

GLN

0.01 $

9,500.00

95.00

15.20

110.20

040108 ANTICORROSIVO BASE ACEITE

GLN

0.02 $

25,541.00

510.82

81.73

592.55

HH

1.23 $

11,890.25

14,625.01

14,625.01

1 $

13,396.00

13,396.00

2,143.36

15,539.36

1 $

10,000.00

10,000.00

1,600.00

11,600.00

1 $

1,637.00

1,637.00

261.92

1,898.92

1 $

7,834.00

7,834.00

1,253.44

9,087.44

080104 HORA CUADRILLA CC


12018

ESGRAFIADO

PINTURA

FACHADA

M2

040125 ESGRAFIADO

GL

12019

MARMOPLAST FACHADA

M2

040143 MARMOPLAST
12020

M2

COLORPLAST

FACHADA

040159 RODILLO FELPA FINO 8"


12021

SILCOPLAST

M2
UND

FACHADA

M2

040163 SIKA TRANSPARENTE

KG

12022

ML

ANTICORROSIVO S/ LAMINA LINEL

040141 LIJA # 150

UND

0.1 $

1,100.00

110.00

17.60

127.60

040104 ANTICORROSIVO ROJO

GLN

0.07 $

22,000.00

1,540.00

246.40

1,786.40

GLN

0.02 $

7,000.00

140.00

22.40

162.40

0.2 $

11,890.25

2,378.05

2,378.05

040102 AGUARRAS
080104 HORA CUADRILLA CC
12023

PINTURA

ANTICORROSIVO S/ LAMINA LLENA

HH
M2

040141 LIJA # 150

UND

1.05 $

1,100.00

1,155.00

184.80

1,339.80

040104 ANTICORROSIVO ROJO

GLN

0.12 $

22,000.00

2,640.00

422.40

3,062.40

040167 THINNER CORRIENTE

GLN

0.02 $

9,500.00

190.00

30.40

220.40

HH

0.33 $

11,890.25

3,923.78

3,923.78

080104 HORA CUADRILLA CC


12024

PINTURA

WASH PREMIER S / ALUMINIO

040141 LIJA # 150

M2
UND

1.05 $

1,100.00

1,155.00

184.80

1,339.80

040179 WASH PREMIER A PINTURA

M2

0.48 $

14,150.00

6,792.00

1,086.72

7,878.72

040180 WASH PREMIER B CATALIZADOR

M2

0.48 $

8,542.00

4,100.16

656.03

4,756.19

080104 HORA CUADRILLA CC

HH

0.5 $

11,890.25

5,945.13

5,945.13
2,957.42

12025

LINEAS TRAFICO

PINTURA
0.10

040113 BROCHA 5" PICASSO

ML
UND

0.05 $

50,990.00

2,549.50

407.92

040150 PINTURA TRAFICO AMARILLA

GL

0.01 $

41,207.00

412.07

65.93

478.00

080104 HORA CUADRILLA CC

HH

0.5 $

11,890.25

5,945.13

5,945.13

KG

0.15 $

7,834.00

1,175.10

1,363.12

HH

0.3 $

9,908.54

2,972.56

2,972.56

BT

0.1 $

6,000.00

600.00

HH

0.3 $

9,908.54

2,972.56

12026

ANTIHUMEDAD

PINTURA

FACHADA

040162 SIKA TRANSPARENTE


080102 HORA CUADRILLA AA
12027

ALBAIL.

DEMARCACION CON MARMOLINA

040142 MARMOLINA
080102 HORA CUADRILLA AA
12028

MARMOLINA

49

ALBAIL.

SOBRE REPELLO

M2
$

188.02

ML
$

96.00

696.00

2,972.56

M2

Preparado Por LEONARDO ROJO HENAO

49

CODIGO

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

010108

#N/A #N/A

0.16

#N/A

#N/A

#N/A

#N/A

010174

#N/A #N/A

0.17

#N/A

#N/A

#N/A

#N/A

010176

#N/A #N/A

1.05

#N/A

#N/A

#N/A

#N/A

040142

#N/A #N/A

0.36

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.16

#N/A

#N/A

12029

INTERVINILO S / ESTUCO 3 MANOS

040136

#N/A #N/A

010275 HERRAMIENTA MENOR


080112 HORA AYUDANTE PINTURA
12030

CC

VINILO S / ESTUCO 3 MANOS

010275 HERRAMIENTA MENOR


12031

0.1

#N/A

#N/A

#N/A

0.1 $

50.00

5.00

HH

0.23 $

5,129.51

1,179.79

GLN

0.1 $

30,520.00

3,052.00

0.1 $

50.00

5.00

HH

0.23 $

5,129.51

1,179.79

0.80

#N/A
$

5.80

1,179.79

488.32

3,540.32

0.80

5.80

1,179.79
2,252.52

M2

040178 VINILTEX BLANCO ALMANDRA 1561


080112 HORA AYUDANTE PINTURA

#N/A

M2

CC

INTERVINILO S / ESTUCO 2 MANOS

M2

040136 INTERVINILO BLANCO

GLN

0.085 $

22,845.00

1,941.83

310.69

010275 HERRAMIENTA MENOR

0.1 $

50.00

5.00

0.80

5.80

HH

0.23 $

5,129.51

1,179.79

1,179.79
3,009.27

080112 HORA AYUDANTE PINTURA


12032

CC

VINILO S / ESTUCO 2 MANOS

M2

040178 VINILTEX BLANCO ALMANDRA 1561

GLN

010275 HERRAMIENTA MENOR


080112 HORA AYUDANTE PINTURA
12033

CC

BARNIZ S/ BARNIZ

040110 BARNIZ BRILLANTE


12034

30,520.00

2,594.20

415.07

0.1 $

50.00

5.00

0.80

5.80

HH

0.23 $

5,129.51

1,179.79

1,179.79

M2

010275 HERRAMIENTA MENOR


080112 HORA AYUDANTE PINTURA

0.085 $

CC

PINTURA BAJANTE AGUAS LLUVIAS

0.1 $

50.00

5.00

0.80

5.80

GLN

1.1 $

21,585.00

23,743.50

3,798.96

27,542.46

HH

0.23 $

5,129.51

1,179.79

1,179.79

ML

040113 BROCHA 5" PICASSO

UND

0.01 $

50,990.00

509.90

81.58

591.48

040178 VINILTEX BLANCO ALMANDRA 1561

GLN

0.06 $

30,520.00

1,855.85

296.94

2,152.78

HH

0.06 $

5,129.51

307.77

49.24

357.01

81.58

080112 HORA AYUDANTE PINTURA


12035

CC

PINTURA ESMALTE VIGAS EN MADERA, INCLUYE


PREPARACION DE LA SUPERFICIE

040113 BROCHA 5" PICASSO

ML
UND

0.01 $

50,990.00

509.90

591.48

040126 ESMALTE SINTETICO COLORES VARIOS

GL

0.09 $

52,828.00

4,754.52

4,754.52

080112 HORA AYUDANTE PINTURA

HH

0.4 $

5,129.51

2,051.81

2,051.81

12036

CC

GRANIPLAST SOBRE MURO

M2

040129 GRANIPLAST

GLN

0.4 $

13,396.00

5,358.40

857.34

6,215.74

040111 BASE PARA GRANIPLAST

GLN

0.2 $

9,883.00

1,976.60

316.26

2,292.86

HH

0.8 $

5,129.51

4,103.61

4,103.61

GLN

0.1 $

84,200.00

8,420.00

9,767.20

HH

0.5 $

5,129.51

2,564.76

2,564.76

GLN

0.07 $

84,200.00

5,894.00

943.04

6,837.04

HH

0.6 $

5,129.51

3,077.71

492.43

3,570.14

72,000.00

14,400.00

2,304.00

14,400.00

080112 HORA AYUDANTE PINTURA

12037

CC

PINTURA EPOXICA SUPERFICIE INCLUYE ,


RASQUETEADO, FILOS, DILATACIONES Y
CARTERAS, REPARACION DE PAETE, ESTUCO
Y TRATAMIENTO DE IMPERMEABILIZACIONES
DE SER NECESARIO PARA ALCANZAR
SUPERFICIE SANA DE HUMEDAD Y LISA

040183 PINTURA EPOXICA DIF COLORES


080112 HORA AYUDANTE PINTURA
12038

CC

PINTURA EPOXICA LINEAL

1,347.20

ML

040183 PINTURA EPOXICA DIF COLORES


080112 HORA AYUDANTE PINTURA

M2

CC

13000 ASEO Y RETIRO DE ESCOMBROS

3004

RETIRO DE ESCOMBROS DE CADA UNO DE LOS


SECTORES A INTEVENIR A UN LUGAR AVALADO
POR LA AUTORIDAD AMBIENTAL DEL MUNICIPIO,
INCLUYE EL ASEO GENERAL DE LAS
INSTALACIONES Y/O VIVIENDAS O
ALOJAMIENTOS.

070121 VOLQUETA 6 M3

50

M3
M3

0.20

Preparado Por LEONARDO ROJO HENAO

50

CODIGO

ACTIVIDAD

080102 HORA CUADRILLA AA

UND

CANT

HH

0.40

VR. UNIT.
$

9,908.54

KG

0.16 $

050122 BISAGRA ALUMINIO EXT 2"

UND

050187 MANIJA ALUMINIO VENTANA

UND

14000
15001

ALBAIL.

VR. PARCIAL
$

3,963.42

3,208.00

1.05 $

935.00

1 $

2,000.00

IVA 16%
$

634.15

513.28

981.75

2,000.00

SUBTOTAL
$

3,963.42

82.12

595.40

157.08

1,138.83

320.00

2,320.00

CARPINTERIA METALICA
VENTANAS LAMINA

010302

M2
#N/A #N/A

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

0.44

#N/A

#N/A

#N/A

#N/A

010116

#N/A #N/A

1.94

#N/A

#N/A

#N/A

#N/A

040104

#N/A #N/A

0.23

#N/A

#N/A

#N/A

#N/A

020543

#N/A #N/A

50

#N/A

#N/A

15002

PUERTA VENTANAS LAMINA

#N/A

M2

010302

#N/A #N/A

0.67

#N/A

#N/A

#N/A

#N/A

010423

#N/A #N/A

0.08

#N/A

#N/A

#N/A

#N/A

050122

#N/A #N/A

#N/A

#N/A

#N/A

040104 ANTICORROSIVO ROJO

GLN

0.11 $

22,000.00

2,420.00

50 $

23,087.89

1,154,394.50

387.20

#N/A
$

2,807.20

1,154,394.50
159.50

020543 SUBCONTRATO DE ORNAMENTACION

15003

PUERTA VENTANAS LAMINA

M2

010302 LADRILLO PRENSADO S. FE 5.5 CM

UND

0.55 $

250.00

137.50

22.00

KG

0.16 $

3,208.00

513.28

82.12

595.40

050122 BISAGRA ALUMINIO EXT 2"

UND

1.75 $

935.00

1,636.25

261.80

1,898.05

010116 ANGULO 3/4"x3/16

UND

1.05 $

5,170.00

5,428.50

868.56

6,297.06

040104 ANTICORROSIVO ROJO

GLN

0.91 $

22,000.00

20,020.00

3,203.20

23,223.20

50 $

23,087.89

1,154,394.50

1,154,394.50

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

020543 SUBCONTRATO DE ORNAMENTACION

15004

M2

REJAS LAMINA

010302 LADRILLO PRENSADO S. FE 5.5 CM


010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"
050350 TUBO MUEBLE (CUADRA.) CAL 18 1"
040104 ANTICORROSIVO ROJO
020543 SUBCONTRATO DE ORNAMENTACION
15005

UND

0.21 $

250.00

52.50

8.40

60.90

KG

0.46 $

3,208.00

1,475.68

236.11

1,711.79

ML

7.35 $

1,645.00

12,090.75

1,934.52

14,025.27

GLN

0.11 $

22,000.00

2,420.00

387.20

2,807.20

50 $

23,087.89

1,154,394.50

1,154,394.50

PUERTA LAMINA

M2

010302 LADRILLO PRENSADO S. FE 5.5 CM


010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

UND

1.5 $

250.00

375.00

60.00

435.00

KG

0.97 $

3,208.00

3,111.76

497.88

3,609.64
1,084.60

050122 BISAGRA ALUMINIO EXT 2"

UND

1 $

935.00

935.00

149.60

040104 ANTICORROSIVO ROJO

GLN

0.23 $

22,000.00

5,060.00

809.60

5,869.60

50 $

23,087.89

1,154,394.50

1,154,394.50
124.70

020543 SUBCONTRATO DE ORNAMENTACION


15006

MARQUESINAS LAMINA

M2

010302 LADRILLO PRENSADO S. FE 5.5 CM

UND

0.43 $

250.00

107.50

17.20

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.22 $

3,208.00

705.76

112.92

818.68

050350 TUBO MUEBLE (CUADRA.) CAL 18 1"

ML

1.05 $

1,645.00

1,727.25

276.36

2,003.61

GLN

0.11 $

22,000.00

2,420.00

387.20

2,807.20

50 $

23,087.89

1,154,394.50

1,154,394.50

040104 ANTICORROSIVO ROJO


020543 SUBCONTRATO DE ORNAMENTACION
15007

CAJAS CONTADORES AGUA

UND

010302 LADRILLO PRENSADO S. FE 5.5 CM

UND

0.37 $

250.00

92.50

14.80

107.30

KG

0.68 $

3,208.00

2,181.44

349.03

2,530.47

050122 BISAGRA ALUMINIO EXT 2"

UND

0.51 $

935.00

476.85

76.30

553.15

040104 ANTICORROSIVO ROJO

GLN

0.08 $

22,000.00

1,760.00

281.60

2,041.60

50 $

23,087.89

1,154,394.50

1,154,394.50

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

020543 SUBCONTRATO DE ORNAMENTACION


15008

TAPAS SHUT LAMINA

UND

010302 LADRILLO PRENSADO S. FE 5.5 CM


010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"
040104 ANTICORROSIVO ROJO
020543 SUBCONTRATO DE ORNAMENTACION
15009

0.5 $

250.00

125.00

20.00

145.00

KG

0.46 $

3,208.00

1,475.68

236.11

1,711.79

GLN

0.11 $

22,000.00

2,420.00

387.20

2,807.20

50 $

23,087.89

1,154,394.50

1,154,394.50

1 $

3,208.00

3,208.00

3,721.28

21,798.72

REJILLAS PISO 0.30

ML

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"


010116

UND

#N/A

#N/A #N/A

010282 HIERRO CHIPA 3/8"

51

KG

4.1
10.44 $

#N/A
1,800.00

#N/A
$

18,792.00

Preparado Por LEONARDO ROJO HENAO

513.28
#N/A

3,006.72

#N/A

51

CODIGO

ACTIVIDAD

UND

040104 ANTICORROSIVO ROJO

GLN

020543 SUBCONTRATO DE ORNAMENTACION


15010

MARCO TAPAS C. INSPECCION

CANT

010116

KG

#N/A #N/A

880.00

50 $

23,087.89

1,154,394.50

0.2 $

3,208.00

641.60

3.36

050199 PLATINA11/4"x1/4

KG

3.36 $

010282 HIERRO CHIPA 3/8"

KG

020543 SUBCONTRATO DE ORNAMENTACION

REJA

VR. PARCIAL

22,000.00

IVA 16%
$

140.80

SUBTOTAL
$

1,020.80

1,154,394.50

744.26
3,118.08

UND

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

15011

VR. UNIT.

0.04 $

BANCARIA

#N/A

#N/A

800.00

8.4 $

1,800.00

50 $

23,087.89

102.66
#N/A

#N/A

2,688.00

430.08

15,120.00

2,419.20

17,539.20

1,154,394.50

1,154,394.50

M2

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.6 $

3,208.00

1,924.80

307.97

2,232.77

010280 HIERRO CHIPA 3/8"

KG

1.74 $

1,800.00

3,132.00

501.12

3,633.12

GLN

0.2 $

22,000.00

4,400.00

704.00

5,104.00

50 $

23,087.89

1,154,394.50

1,154,394.50

040104 ANTICORROSIVO ROJO


020543 SUBCONTRATO DE ORNAMENTACION
15012

ESCALERA DE GATO

ML

010423 SOLDADURA ELECTRICA WEST ARCO 6013 1/8"

KG

0.01 $

3,208.00

32.08

5.13

37.21

020510 TUBO GALVANIZADO 1"x6mt

UND

5 $

55,920.00

279,600.00

44,736.00

324,336.00

040104 ANTICORROSIVO ROJO

GLN

0.04 $

22,000.00

880.00

140.80

1,020.80

50 $

23,087.89

1,154,394.50

1,154,394.50

1 $

46,000.00

46,000.00

7,360.00

53,360.00

1 $

72,000.00

72,000.00

11,520.00

83,520.00

1 $

90,000.00

90,000.00

14,400.00

104,400.00

1 $

64,000.00

64,000.00

10,240.00

74,240.00

1 $

60,000.00

60,000.00

9,600.00

69,600.00

4 $

9,908.54

39,634.17

6,341.47

45,975.64

020543 SUBCONTRATO DE ORNAMENTACION

15013

VENTANA ALUMINIO FIJAS

M2

050357 VENTANA ALUMINIO FIJAS

M2

15014

M2

VENTANA ALUMINIO GUILLOTINA

050359 VENTANA ALUMINIO PROYECTANTE

M2

15015

VENTANA ALUMINIO CORREDIZA

M2

050360 VENTANA ALUMINIO CORREDIZA

M2

15016

VENTANA ECONOMICA

M2

050358 VENTANA ECONOMICA

M2

15017

M2

CELOSIA ALUMINIO

050139 CELOSIA EN ALUMINIO

M2

15018

PS

INSTALACION SHUT BASURAS

080102 HORA CUADRILLA AA


15019

ALBAIL.

HH

PUERTA CANCHA TENIS 1x1

UND

050105

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

050186

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

050198

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010423

#N/A #N/A

0.05

#N/A

#N/A

#N/A

#N/A

020510

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

020543

#N/A #N/A

50

#N/A

#N/A

15020

#N/A

PUERTA ELECTRICA CORREDIZA

UND

050202 PUERTA ELECTRICA CORREDIZA

UND

1 $

3,800,000.00

3,800,000.00

608,000.00

HH

4 $

9,908.54

39,634.17

6,341.47

45,975.64

50 $

23,087.89

1,154,394.50

1,154,394.50

080102 HORA CUADRILLA AA

ALBAIL.

020543 SUBCONTRATO DE ORNAMENTACION

4,408,000.00

18000 MORTEROS Y CONCRETOS


18001

MORTERO

1 : 2

M3

010177

#N/A #N/A

626

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.97

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

250

#N/A

#N/A

#N/A

#N/A

070123

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080110

#N/A #N/A

#N/A

#N/A

18002

MORTERO

1 : 3

#N/A

M3

010177

#N/A #N/A

454

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.9

#N/A

#N/A

#N/A

010108 AGUA

LT

070123 HERRAMIENTA MENOR


080110 HORA AYUDANTE ALBAIL
18003

MORTERO

1 : 4

010177 CEMENTO GRIS CONQUISTADOR

52

AA

220 $

150.00

GBL

1 $

1,400.00

HH

4 $

4,274.59

364 $

521.68

#N/A
#N/A

33,000.00

5,280.00

38,280.00

1,400.00

224.00

1,624.00

17,098.38

17,098.38

189,891.52

220,274.16

M3
KG

Preparado Por LEONARDO ROJO HENAO

30,382.64

52

CODIGO

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

010118 ARENA MEDIANA

M3

1.16 $

26,950.00

31,262.00

5,001.92

36,263.92

010108 AGUA

LT

185 $

150.00

27,750.00

4,440.00

32,190.00

GBL

1 $

1,400.00

1,400.00

224.00

1,624.00

HH

4 $

4,274.59

17,098.38

17,098.38

070123 HERRAMIENTA MENOR


080110 HORA AYUDANTE ALBAIL
18004

MORTERO

AA

1 : 5

M3

010177 CEMENTO GRIS CONQUISTADOR

KG

302 $

521.68

157,547.36

25,207.58

182,754.94

010118 ARENA MEDIANA

M3

1.18 $

26,950.00

31,801.00

5,088.16

36,889.16

010108 AGUA

LT

170 $

150.00

25,500.00

4,080.00

29,580.00

GBL

1 $

1,400.00

1,400.00

224.00

1,624.00

HH

4 $

4,274.59

17,098.38

17,098.38

070123 HERRAMIENTA MENOR


080110 HORA AYUDANTE ALBAIL
18005

MORTERO

AA

1 : 6

M3

010177 CEMENTO GRIS CONQUISTADOR

KG

260 $

521.68

135,636.80

21,701.89

157,338.69

010118 ARENA MEDIANA

M3

1.2 $

26,950.00

32,340.00

5,174.40

37,514.40

010108

#N/A #N/A

150

#N/A

#N/A

#N/A

#N/A

070123

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080110

#N/A #N/A

#N/A

#N/A

18006

CONCRETO 1 : 2 : 2

(3,500 PSI)

#N/A

M3

070110

#N/A #N/A

0.06

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

420

#N/A

#N/A

#N/A

#N/A

010270

#N/A #N/A

0.67

#N/A

#N/A

#N/A

010118 ARENA MEDIANA


010108 AGUA
070123 HERRAMIENTA MENOR
080110 HORA AYUDANTE ALBAIL
080106 HORA OFICIAL ALBAILERIA
18007

CONCRETO 1 : 2 : 3

AA
AA

M3

0.67 $

LT

#N/A

26,950.00

18,056.50

2,889.04

20,945.54

200 $

150.00

30,000.00

4,800.00

34,800.00

GBL

1 $

1,400.00

1,400.00

224.00

1,624.00

HH

2 $

4,274.59

8,549.19

1,367.87

9,917.06

HH

0.5 $

5,633.95

2,816.97

2,816.97

(3,000 PSI)

M3

070110 MEZCLADORA CONCRETO 1 BT

DD

0.06 $

17,250.00

1,035.00

165.60

1,200.60

010177 CEMENTO GRIS CONQUISTADOR

KG

380 $

521.68

198,238.40

31,718.14

229,956.54

010270 GRAVA 1/2" 5 M3

M3

0.76 $

47,500.00

36,100.00

5,776.00

41,876.00

010118 ARENA MEDIANA

M3

0.6 $

26,950.00

16,170.00

2,587.20

18,757.20

010108 AGUA

LT

190 $

150.00

28,500.00

4,560.00

33,060.00

GBL

1 $

1,400.00

1,400.00

224.00

1,624.00

HH

2 $

4,274.59

8,549.19

1,367.87

9,917.06

HH

0.5 $

5,633.95

2,816.97

2,816.97

070123 HERRAMIENTA MENOR


080110 HORA AYUDANTE ALBAIL
080106 HORA OFICIAL ALBAILERIA
18008

CONCRETO 1 : 2 : 4

AA
AA

(2,850 PSI)

M3

070110 MEZCLADORA CONCRETO 1 BT

DD

0.06 $

17,250.00

1,035.00

165.60

1,200.60

010177 CEMENTO GRIS CONQUISTADOR

KG

300 $

521.68

156,504.00

25,040.64

181,544.64

010270 GRAVA 1/2" 5 M3

M3

0.95 $

47,500.00

45,125.00

7,220.00

52,345.00

010118 ARENA MEDIANA

M3

0.48 $

26,950.00

12,936.00

2,069.76

15,005.76

010108

#N/A #N/A

170

#N/A

#N/A

#N/A

#N/A

070123

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080110

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080106

#N/A #N/A

0.5

#N/A

#N/A

18009

CONCRETO 1 : 3 : 3

(2,400 PSI)

#N/A

M3

070110

#N/A #N/A

0.06

#N/A

#N/A

#N/A

010177

#N/A #N/A

300

#N/A

#N/A

#N/A

#N/A
#N/A

010270 GRAVA 1/2" 5 M3

M3

0.72 $

47,500.00

34,200.00

5,472.00

39,672.00

010118 ARENA MEDIANA

M3

0.72 $

26,950.00

19,404.00

3,104.64

22,508.64

010108 AGUA

LT

170 $

150.00

25,500.00

4,080.00

29,580.00

GBL

1 $

1,400.00

1,400.00

224.00

1,624.00

HH

2 $

4,274.59

8,549.19

1,367.87

9,917.06

HH

0.5 $

5,633.95

2,816.97

2,816.97

070123 HERRAMIENTA MENOR


080110 HORA AYUDANTE ALBAIL
080106 HORA OFICIAL ALBAILERIA
18010

CONCRETO 1 : 3 : 4

AA
AA

(2,280 PSI)

M3

070110 MEZCLADORA CONCRETO 1 BT

DD

0.06 $

17,250.00

1,035.00

165.60

1,200.60

010177 CEMENTO GRIS CONQUISTADOR

KG

260 $

521.68

135,636.80

21,701.89

157,338.69

010270 GRAVA 1/2" 5 M3

M3

0.83 $

47,500.00

39,425.00

6,308.00

45,733.00

010118 ARENA MEDIANA

M3

0.63 $

26,950.00

16,978.50

2,716.56

19,695.06

53

Preparado Por LEONARDO ROJO HENAO

53

CODIGO

ACTIVIDAD

UND

010108 AGUA

LT

070123 HERRAMIENTA MENOR


080110 HORA AYUDANTE ALBAIL
080106 HORA OFICIAL ALBAILERIA
18011

AA
AA

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

185 $

150.00

27,750.00

4,440.00

32,190.00

GBL

1 $

1,400.00

1,400.00

224.00

1,624.00

HH

2 $

4,274.59

8,549.19

1,367.87

9,917.06

HH

0.5 $

5,633.95

2,816.97

2,816.97

CONCRETO 1 : 3 : 5 ( 2,000 PSI)

M3

070110 MEZCLADORA CONCRETO 1 BT

DD

0.06 $

17,250.00

1,035.00

165.60

1,200.60

010177 CEMENTO GRIS CONQUISTADOR

KG

230 $

521.68

119,986.40

19,197.82

139,184.22

010270 GRAVA 1/2" 5 M3

M3

0.92 $

47,500.00

43,700.00

6,992.00

50,692.00

010118 ARENA MEDIANA

M3

0.56 $

26,950.00

15,092.00

2,414.72

17,506.72

010108

#N/A #N/A

160

#N/A

#N/A

#N/A

#N/A

070123

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080110

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

080106

#N/A #N/A

0.5

#N/A

#N/A

19000
19001

#N/A

OBRAS EXTERIORES
ADOQUIN CONCRETO 6CM

010104 ADOQUIN CONC. MODUL. 11x6x20

M2
UND

50 $

300.00

15,000.00

2,400.00

17,400.00

010108

#N/A #N/A

2.85

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

19002

ASEO GENERAL

010119
19003

#N/A

M2
#N/A #N/A

CAJA DE INSPECCION 80 x 80

#N/A

#N/A

UND

010101 ACERO FIGURADO DE 60.000 PSI

KG

3.2 $

800.00

2,560.00

409.60

010111 ALAMBRE NEGRO # 18 050318

KG

0.09 $

2,160.00

194.40

31.10

2,969.60
225.50

010118 ARENA MEDIANA

M3

0.19 $

26,950.00

5,120.50

819.28

5,939.78

010414 ROCA MUERTA

M3

0.16 $

14,800.00

2,368.00

378.88

2,746.88

010177 CEMENTO GRIS CONQUISTADOR

KG

94.38 $

521.68

49,236.16

7,877.79

57,113.94

010272 GRAVA 3/4" 5 M3

M3

010296 LADRILLO COMUN

UND

080102 HORA CUADRILLA AA


19004

ALBAIL.

CAJA DE INSPECCION 100 x 100

010101

HH

0.09 $

47,500.00

4,275.00

684.00

4,959.00

188.64 $

750.00

141,480.00

22,636.80

164,116.80

5.4 $

9,908.54

53,506.13

53,506.13

237.60

38.02

275.62

UND
#N/A #N/A

#N/A

#N/A

010111 ALAMBRE NEGRO # 18 050318

KG

0.11 $

2,160.00

#N/A

#N/A

010118 ARENA MEDIANA

M3

0.22 $

26,950.00

5,929.00

948.64

6,877.64

010414 ROCA MUERTA

M3

3.8 $

14,800.00

56,240.00

8,998.40

65,238.40

010177 CEMENTO GRIS CONQUISTADOR

KG

118 $

521.68

61,558.24

9,849.32

71,407.56

010272 GRAVA 3/4" 5 M3

M3

0.11 $

47,500.00

5,225.00

836.00

6,061.00

010296 LADRILLO COMUN

UND

236 $

750.00

177,000.00

28,320.00

205,320.00

HH

5.8 $

9,908.54

57,469.55

57,469.55

080102 HORA CUADRILLA AA


19005

ALBAIL.

CAJA DE INSPECCION 0.60 x 0.60

UND

010101

#N/A #N/A

2.6

#N/A

#N/A

#N/A

#N/A

010111

#N/A #N/A

0.08

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.16

#N/A

#N/A

#N/A

#N/A

010414

#N/A #N/A

0.16

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

80

#N/A

#N/A

#N/A

#N/A

010272

#N/A #N/A

0.08

#N/A

#N/A

#N/A

010296 LADRILLO COMUN


080102 HORA CUADRILLA AA
19006

CONCRETO ANDENES

010230 CONCRETO 1 : 2 : 4
010316 LISTON

(2,850 PSI)
ALBAIL.

CONCRETO ESTRIADO RAMPAS

010230 CONCRETO 1 : 2 : 4
010316 LISTON

(2,850 PSI)

M. H. OTOBO

080102 HORA CUADRILLA AA


19008

ALBAIL.
0.1

M. H. OTOBO

080102 HORA CUADRILLA AA


19007

UND

ALBAIL.

CONCRETO SARDINELES 0.40

54

HH

150 $

750.00

112,500.00

5 $

9,908.54

49,542.71

18,000.00

#N/A
$

130,500.00

49,542.71

8,282.40

6,539.64

8,282.40

8,719.52

M2
M3

0.11

ML

1.02 $

7,000.00

#N/A
$

7,140.00

#N/A

HH

0.66 $

9,908.54

6,539.64

#N/A
$

1,142.40

#N/A

M2
M3

0.16

ML

1.02 $

7,000.00

#N/A
$

7,140.00

#N/A

HH

0.88 $

9,908.54

8,719.52

#N/A
$

1,142.40

#N/A

M3

Preparado Por LEONARDO ROJO HENAO

54

CODIGO

ACTIVIDAD

010230 CONCRETO 1 : 2 : 4
010316 LISTON

M. H. OTOBO

080102 HORA CUADRILLA AA


19009

(2,850 PSI)
ALBAIL.

DESCAPOTE A MAQUINA

UND

CANT

VR. UNIT.

VR. PARCIAL

M3

0.16

#N/A

ML

1.02 $

7,000.00

7,140.00

HH

0.88 $

9,908.54

8,719.52

IVA 16%

#N/A
$

DD

0.01 $

88,000.00

880.00

070121 VOLQUETA 6 M3

M3

0.17 $

72,000.00

12,240.00

1 $

13,340.00

13,340.00

1 $

24,380.00

24,380.00

M3

0.37 $

72,000.00

26,640.00

HH

1.05 $

9,908.54

10,403.97

ENSAYOS DENSIDAD DE TERRENO

010245 ENSAYOS DENSIDAD TERRENO


19011

UND
UND

010246 ENSAYOS PROCTOR

UND

EXCAVACION MANUAL

19013

ALBAIL.

EXCAVACION MECANICA

1,020.80
12,240.00

2,134.40

15,474.40

3,900.80

28,280.80

4,262.40

30,902.40

10,403.97

0.02 $

88,000.00

1,760.00

M3

0.37 $

72,000.00

26,640.00

0.02 $

12,500.00

250.00

HR

0.03 $

12,500.00

375.00

DD

0.02 $

88,000.00

1,760.00

M3

0.28 $

72,000.00

20,160.00

EXPLANACION Y EXTENDIDA
D-6
D-6

070121 VOLQUETA 6 M3
CAMARA INSP. DOBLE 140x60

010296 LADRILLO COMUN


010316 LISTON

M. H. OTOBO

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

010345 MORTERO 1 : 5
010279 HIERRO CHIPA 3/8"
010331 MANTO EDIL ESPECIAL

19017

2,041.60

26,640.00

40.00

290.00

60.00

435.00

281.60

2,041.60

3,225.60

23,385.60

UND
UND

93 $

750.00

69,750.00

11,160.00

80,910.00

ML

6 $

7,000.00

42,000.00

6,720.00

48,720.00

M3

M3

1.68 $

230,988.62

62,089.74

450,150.62

KG

0.02 $

1,800.00

1 $

8,426.00

M3

1.12 $

HH

1.05 $

UND

010414 ROCA MUERTA


080102 HORA CUADRILLA AA

281.60

M3

070104 CARGADOR FRONTAL,20 M3


19016

M3
HR

EXPLANACION Y RETIRO

070103 BULLDOZER

140.80

M3
DD

19015

8,719.52

070121 VOLQUETA 6 M3
19014

$
$

070104 CARGADOR FRONTAL,20 M3

070103 BULLDOZER

8,282.40

M3

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

#N/A
$

UND

ENSAYOS PROCTOR

19012

1,142.40

M3

070104 CARGADOR FRONTAL,20 M3


19010

SUBTOTAL

#N/A

ALBAIL.

MARCO P/TAPA CAMARA DOBLE

#N/A

#N/A

#N/A

#N/A

388,060.88

36.00

5.76

41.76

8,426.00

1,348.16

9,774.16

14,800.00

16,576.00

2,652.16

19,228.16

9,908.54

10,403.97

10,403.97

UND

050105

#N/A #N/A

4.36

#N/A

#N/A

#N/A

#N/A

010535

#N/A #N/A

0.12

#N/A

#N/A

#N/A

#N/A

040126

#N/A #N/A

0.12

#N/A

#N/A

#N/A

#N/A

010405

#N/A #N/A

1.44

#N/A

#N/A

#N/A

#N/A

010423

#N/A #N/A

0.31

#N/A

#N/A

#N/A

#N/A

080104

#N/A #N/A

1.05

#N/A

#N/A

19018

PISO EN GRAMA

010269 GRAMA SEMILLA


080102 HORA CUADRILLA AA
19019

#N/A

M2
ALBAIL.

RELLENO AGREGADO PETREO

M2

1.1 $

1,850.00

2,035.00

HH

0.1 $

9,908.54

990.85

325.60

2,360.60

990.85

M3

010414 ROCA MUERTA

M3

1.34 $

14,800.00

19,832.00

3,173.12

23,005.12

070119 VIBROCOMPACT. A GASOLINA

DD

0.04 $

89,900.00

3,596.00

575.36

4,171.36

080102 HORA CUADRILLA AA

HH

0.85 $

9,908.54

8,422.26

1,347.56

9,769.82

0.6 $

9,908.54

5,945.13

951.22

6,896.35

M3

0.4 $

72,000.00

28,800.00

4,608.00

33,408.00

HH

0.37 $

9,908.54

3,666.16

3,666.16

19020

RELLENOS DE EXCAVACION

080102 HORA CUADRILLA AA


19021

ALBAIL.
ALBAIL.

RETIRO SOBRANTES TIERRA

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
19022

ALBAIL.

TAPA SUMIDERO 68x33

010438 SUBCONTRATO GAS DOMICILIARIO


19023

ALBAIL.

TAPA SUMIDERO 95x45

010330 MANTO EDIL ESPECIAL


010438 SUBCONTRATO GAS DOMICILIARIO

55

HH
M3

UND

010330 MANTO EDIL ESPECIAL


080102 HORA CUADRILLA AA

M3

UND

1 $

8,426.00

8,426.00

1,348.16

9,774.16

1 $

375,000.00

375,000.00

60,000.00

435,000.00

HH

0.8 $

9,908.54

7,926.83

1,268.29

9,195.13

UND
UND

1 $

8,426.00

8,426.00

1,348.16

9,774.16

1 $

375,000.00

375,000.00

60,000.00

435,000.00

Preparado Por LEONARDO ROJO HENAO

55

CODIGO

ACTIVIDAD

080102 HORA CUADRILLA AA

4000

ALBAIL.

UND

CANT

HH

VR. UNIT.

VR. PARCIAL

1 $

9,908.54

9,908.54

11,890.00

35,670.00

IVA 16%
$

1,585.37

SUBTOTAL
$

11,493.91

35,670.00

MAMPOSTERIA

0802102 HORA CUADRILLA EE HORNAMENTACION


4001 SOBRECIMIENTO

0.15

HH

ML

010418

#N/A #N/A

0.35

#N/A

#N/A

#N/A

#N/A

010296

#N/A #N/A

12.1

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

11.69

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.03

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

4.63

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.45

#N/A

#N/A

4002

SOBRECIMIENTO

0.25

#N/A

ML

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.53

1,950.00

1,033.50

165.36

1,198.86

UND

24.21

750.00

18,157.50

2,905.20

21,062.70

010177 CEMENTO GRIS CONQUISTADOR

KG

17.77

521.68

9,270.25

1,483.24

10,753.49

010118 ARENA MEDIANA

M3

0.4

26,950.00

10,780.00

1,724.80

12,504.80

010108 AGUA

LT

7.04

150.00

1,056.00

168.96

1,224.96

HH

0.8

9,908.54

7,926.83

7,926.83

UND

24

750.00

18,000.00

2,880.00

20,880.00

M3

0.08

275,000.00

22,000.00

3,520.00

25,520.00

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.5

9,908.54

4,954.27

4,954.27

UND

58.13

750.00

43,597.50

6,975.60

50,573.10

M3

0.025

265,043.82

6,626.10

1,060.18

7,686.27

010296 LADRILLO COMUN

080102 HORA CUADRILLA AA


4003

ALBAIL.

LADRILLO COMUN 0.05

M2

010296 LADRILLO COMUN


010343 MORTERO 1 : 3
070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
4004

ALBAIL.

LADRILLO COMUN 0.10

M2

010296 LADRILLO COMUN


010344 MORTERO 1 : 4
070123

#N/A #N/A

#N/A

#N/A

080102

#N/A #N/A

0.7

#N/A

#N/A

4005

LADRILLO COMUN 0.20

#N/A

#N/A

M2

010296

#N/A #N/A

14.05

#N/A

#N/A

#N/A

010343

#N/A #N/A

0.08

#N/A

#N/A

#N/A

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
4006

ALBAIL.

LADRILLO FAROL No 3 0.07

010259 FAROL 3 HUECOS COMUN


010343 MORTERO 1 : 3
070123 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
4007

ALBAIL.

LADRILLO FAROL No 6 0.10

010261 FAROL 6 HUECOS COMUN


010343 MORTERO 1 : 3

GBL

1,400.00

1,400.00

HH

1.1

9,908.54

10,899.40

224.00

#N/A
$

1,624.00

10,899.40

UND

15.5

1,115.00

17,282.50

2,765.20

20,047.70

M3

0.09

275,000.00

24,750.00

3,960.00

28,710.00

GBL

1,400.00

1,400.00

224.00

1,624.00

HH

0.62

9,908.54

6,143.30

6,143.30

UND

15.5

1,200.00

18,600.00

2,976.00

21,576.00

M3

0.09

275,000.00

24,750.00

3,960.00

28,710.00

M2

#N/A #N/A

3.74

#N/A

#N/A

080102

#N/A #N/A

0.62

#N/A

#N/A

LADRILLO FAROL No 6 0.20

#N/A

M2

070123
4008

#N/A

#N/A

#N/A
#N/A

M2

010261

#N/A #N/A

25.4

#N/A

#N/A

#N/A

#N/A

010343

#N/A #N/A

0.08

#N/A

#N/A

#N/A

#N/A

070123

#N/A #N/A

0.6

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA

0.94

9,908.54

9,314.03

UND

32.96

1,200.00

39,552.00

010177 CEMENTO GRIS CONQUISTADOR

KG

4.04

521.68

2,107.59

010118 ARENA MEDIANA

M3

0.1

26,950.00

2,695.00

010108 AGUA

LT

2.41

150.00

361.50

HH

0.58

9,908.54

5,746.95

UND

50

318.00

15,900.00

M3

0.1

265,043.82

26,504.38

4009

CALICANTO

ALBAIL.

0.12

4010

LADRILLO A LA VISTA

ALBAIL.
0.10

010295 LADRILLO LIMPIO No 12


010344 MORTERO 1 : 4

56

#N/A
$

9,314.03

6,328.32

45,880.32

337.21

2,444.80

431.20

3,126.20

57.84

419.34

5,746.95

2,544.00

18,444.00

4,240.70

30,745.08

M2

010261 FAROL 6 HUECOS COMUN

080102 HORA CUADRILLA AA

HH

M2

Preparado Por LEONARDO ROJO HENAO

56

CODIGO

ACTIVIDAD

070123 HERRAMIENTA MENOR


080102 HORA CUADRILLA AA
4011

LADRILLO A LA VISTA

ALBAIL.
0.20

CANT

GBL

VR. UNIT.
1,400.00

VR. PARCIAL
1,400.00

IVA 16%

HH

0.97

9,908.54

9,611.29

UND

121.73

318.00

38,710.14

M3

0.12

265,043.82

31,805.26

GBL

0.5

1,400.00

700.00

#N/A #N/A

1.8

#N/A

#N/A

224.00

SUBTOTAL
$

1,624.00

9,611.29

6,193.62

44,903.76

5,088.84

36,894.10

112.00

812.00

M2

010295 LADRILLO LIMPIO No 12


010344 MORTERO 1 : 4
070123 HERRAMIENTA MENOR
080102
4012

UND

BLOQUE ESTRUCTURAL SULTANA

#N/A

M2

010418

#N/A #N/A

0.3

#N/A

#N/A

#N/A

#N/A

010150

#N/A #N/A

38.08

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

9.53

#N/A

#N/A

#N/A

#N/A

010270

#N/A #N/A

0.02

#N/A

#N/A

#N/A

010408 PROMICAL

KG

0.5

LT

5.25

150.00

HH

0.97

9,908.54

UND

11.76

45,500.00

535,080.00

010177 CEMENTO GRIS CONQUISTADOR

KG

4.91

521.68

2,561.45

010270 GRAVA 1/2" 5 M3

M3

0.2

47,500.00

9,500.00

010108 AGUA
080102 HORA CUADRILLA AA
4013

BLOQUE CERAMICO

ALBAIL.
0.10

3,900.00

1,950.00

312.00

787.50

126.00

9,611.29

010108

#N/A #N/A

3.43

#N/A

#N/A

080102

#N/A #N/A

0.6

#N/A

#N/A

BLOQUE CONCRETO

2,262.00

913.50

9,611.29

85,612.80

620,692.80

409.83

2,971.28

1,520.00

11,020.00

M2

010548 ESTRACTOR DE OLORES

4014

#N/A
$

0.10

#N/A

#N/A
#N/A

M2

010148

#N/A #N/A

11.61

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

4.67

#N/A

#N/A

#N/A

#N/A

010270

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

2.78

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA

0.6

9,908.54

5,945.13

UND

11.49

350.00

4,021.50

010177 CEMENTO GRIS CONQUISTADOR

KG

9.33

521.68

4,867.27

010270 GRAVA 1/2" 5 M3

M3

0.04

47,500.00

1,900.00

4015

BLOQUE CONCRETO

ALBAIL.
0.2

HH

010108

#N/A #N/A

5.56

#N/A

#N/A

080102

#N/A #N/A

0.94

#N/A

#N/A

DINTEL EN LADRILLO FAROL

5,945.13

643.44

4,664.94

778.76

5,646.04

304.00

2,204.00

M2

010148 BLOQUE CONCRETO 10x20x40

4016

#N/A
$

No 3

#N/A

#N/A
#N/A

ML

010279

#N/A #N/A

1.14

#N/A

#N/A

#N/A

#N/A

010261

#N/A #N/A

3.6

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

3.15

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

010108 AGUA
080102 HORA CUADRILLA AA
4017

ALBAIL.

DINTEL EN LADRILLO FAROL

No 6

010279 HIERRO CHIPA 3/8"

LT

2.66

150.00

399.00

HH

0.86

9,908.54

8,521.35

63.84

#N/A
$

462.84

8,521.35
2,944.08

ML
KG

1.41

1,800.00

2,538.00

406.08

UND

3.6

1,200.00

4,320.00

691.20

5,011.20

010177 CEMENTO GRIS CONQUISTADOR

KG

3.15

521.68

1,643.29

262.93

1,906.22

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

2.66

150.00

399.00

63.84

462.84

HH

0.86

9,908.54

8,521.35

8,521.35
4,698.00

010261 FAROL 6 HUECOS COMUN

080102 HORA CUADRILLA AA


4018

ALBAIL.

DINTEL EN VARILLA

ML

010279 HIERRO CHIPA 3/8"

KG

2.25

1,800.00

4,050.00

648.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.2

3,500.00

700.00

112.00

812.00

010177 CEMENTO GRIS CONQUISTADOR

KG

2.1

521.68

1,095.53

175.28

1,270.81

M3

0.01

26,950.00

269.50

43.12

312.62

010118 ARENA MEDIANA


010108

#N/A #N/A

1.77

#N/A

#N/A

080102

#N/A #N/A

0.65

#N/A

#N/A

4019

DINTEL EN CONCRETO 15x20

#N/A

#N/A
#N/A

ML

010279

#N/A #N/A

2.9

#N/A

#N/A

#N/A

#N/A

010111

#N/A #N/A

0.11

#N/A

#N/A

#N/A

#N/A

57

Preparado Por LEONARDO ROJO HENAO

57

CODIGO

ACTIVIDAD

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

050246

#N/A #N/A

0.15

#N/A

#N/A

#N/A

#N/A

050369

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

2.5

#N/A

#N/A

#N/A

#N/A

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010270 GRAVA 1/2" 5 M3

M3

0.01

47,500.00

475.00

76.00

551.00

010108 AGUA

LT

1.8

150.00

270.00

43.20

313.20

HH

1.5

9,908.54

14,862.81

14,862.81

080102 HORA CUADRILLA AA


4020

ALBAIL.

ALFAGIA BLOQ. ESTRUC. SULT

ML

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.09

1,950.00

175.50

28.08

203.58

UND

11.2

350.00

3,920.00

627.20

4,547.20

010177 CEMENTO GRIS CONQUISTADOR

KG

2.81

521.68

1,465.92

234.55

1,700.47

010270 GRAVA 1/2" 5 M3

M3

0.01

47,500.00

475.00

76.00

551.00

010108 AGUA

LT

1.5

150.00

225.00

36.00

261.00

HH

0.97

9,908.54

9,611.29

9,611.29

UND

15.85

750.00

11,887.50

1,902.00

13,789.50

010177 CEMENTO GRIS CONQUISTADOR

KG

2.94

521.68

1,533.74

245.40

1,779.14

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010150 BLOQUE ESTRUCTURAL

080102 HORA CUADRILLA AA


4021

10x28

ALBAIL.

REMATES EN LADRILLO LIMPIO

010296 LADRILLO COMUN

ML

010108

#N/A #N/A

1.75

#N/A

#N/A

080102

#N/A #N/A

1.1

#N/A

#N/A

4022

ARCOS 025 LADRILLO A LA VISTA

#N/A

#N/A
#N/A

ML

050216

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

010295

#N/A #N/A

15.85

#N/A

#N/A

#N/A

#N/A

050246

#N/A #N/A

1.58

#N/A

#N/A

#N/A

#N/A

010513

#N/A #N/A

#N/A

#N/A

#N/A

050244 TABLA AMARILLO 1"x10"2.9mts

UND

2.5

#N/A

8,500.00

21,250.00

3,400.00

24,650.00
3,025.74

010177 CEMENTO GRIS CONQUISTADOR

KG

521.68

2,608.40

417.34

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

ALBAIL.

HH

4.35

9,908.54

43,102.16

43,102.16

BOVEDAS EN LADRILLO A LA VISTA

ML

080102 HORA CUADRILLA AA


4023

050216 PUNTILLA 2" C.C / 13010200

LB

1.6

2,000.00

3,200.00

512.00

3,712.00

UND

63.34

318.00

20,142.12

3,222.74

23,364.86

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

6.32

3,500.00

22,120.00

3,539.20

25,659.20

010513 VARETA 1"x1"x 3 MT OTOBO

ML

16.1

650.00

10,465.00

1,674.40

12,139.40

UND

10.1

8,500.00

85,850.00

13,736.00

99,586.00

010177 CEMENTO GRIS CONQUISTADOR

KG

7.25

521.68

3,782.18

605.15

4,387.33

010118 ARENA MEDIANA

M3

0.03

26,950.00

808.50

129.36

937.86

HH

3.75

9,908.54

37,157.03

37,157.03

010295 LADRILLO LIMPIO No 12

050244 TABLA AMARILLO 1"x10"2.9mts

080102 HORA CUADRILLA AA


4024

ALBAIL.

ENCHAPE FACHADA TABLETA

ML

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.19

1,950.00

370.50

59.28

429.78

010454 TABLILLA

ML

1.03

1,500.00

1,545.00

247.20

1,792.20

010177 CEMENTO GRIS CONQUISTADOR

KG

6.71

521.68

3,500.47

560.08

4,060.55

010118 ARENA MEDIANA

M3

0.03

26,950.00

808.50

129.36

937.86

No

10

010108

#N/A #N/A

#N/A

#N/A

080102

#N/A #N/A

#N/A

#N/A

4025

ALFAGIAS EN TABLON

#N/A

#N/A
#N/A

ML

010177

#N/A #N/A

0.93

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010455

#N/A #N/A

0.26

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

0.6

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA

0.77

9,908.54

7,629.58

UND

12.87

318.00

4,092.66

010177 CEMENTO GRIS CONQUISTADOR

KG

521.68

2,608.40

010118 ARENA MEDIANA

M3

0.1

26,950.00

2,695.00

010108 AGUA

LT

1.42

150.00

213.00

HH

0.97

9,908.54

9,611.29

4026

ALBAIL.

ALFAGIA EN LADRILLO A LA VISTA

010295 LADRILLO LIMPIO No 12

080102 HORA CUADRILLA AA

58

ALBAIL.

HH

#N/A
$

7,629.58

654.83

4,747.49

417.34

3,025.74

431.20

3,126.20

34.08

247.08

9,611.29

ML

Preparado Por LEONARDO ROJO HENAO

58

CODIGO
4027

ACTIVIDAD
ALFAGIA EN CONCRETO 0.15

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

ML

010279 HIERRO CHIPA 3/8"

KG

0.73

1,800.00

1,314.00

210.24

010111 ALAMBRE NEGRO # 18 050318

KG

0.02

2,160.00

43.20

6.91

1,524.24
50.11

010513 VARETA 1"x1"x 3 MT OTOBO

ML

0.18

650.00

117.00

18.72

135.72

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

0.36

1,624.00

584.64

93.54

678.18

010177 CEMENTO GRIS CONQUISTADOR

KG

10

521.68

5,216.80

834.69

6,051.49

010118 ARENA MEDIANA

M3

0.1

26,950.00

2,695.00

431.20

3,126.20

010270 GRAVA 1/2" 5 M3

M3

0.08

47,500.00

3,800.00

608.00

4,408.00

010108

#N/A #N/A

1.8

#N/A

#N/A

080102

#N/A #N/A

2.5

#N/A

#N/A

4028

ALFAGIA CONCRETO 0.25

#N/A

#N/A
#N/A

ML

010279

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010111

#N/A #N/A

0.03

#N/A

#N/A

#N/A

#N/A

010513

#N/A #N/A

0.18

#N/A

#N/A

#N/A

#N/A

050112

#N/A #N/A

0.36

#N/A

#N/A

#N/A

010177 CEMENTO GRIS CONQUISTADOR

KG

1.19

521.68

010118 ARENA MEDIANA

M3

0.02

26,950.00

010270 GRAVA 1/2" 5 M3

M3

0.09

47,500.00

LT

1.8

150.00

HH

9,908.54

UND

62.12

010177 CEMENTO GRIS CONQUISTADOR

KG

8.05

010118 ARENA MEDIANA

M3

0.04

010108 AGUA

LT
HH

010108 AGUA
080102 HORA CUADRILLA AA
4029

ALBAIL.

ENCHAPE LADRILLO LIMPIO

010295 LADRILLO LIMPIO No 12

080102 HORA CUADRILLA AA


4030

INSTALACION CHUT BASURAS

080102 HORA CUADRILLA AA


4031

ALBAIL.
ALBAIL.

RECOCIDO 0.25

620.80

539.00

4,275.00

270.00

19,817.09

318.00

19,754.16

521.68

4,199.52

26,950.00

1,078.00

5.2

150.00

780.00

1.1

9,908.54

1.1

9,908.54

#N/A

99.33

720.13

86.24

625.24

684.00

4,959.00

43.20

313.20

19,817.09

3,160.67

22,914.83

671.92

4,871.45

172.48

1,250.48

124.80

904.80

10,899.40

10,899.40

10,899.40

10,899.40

M2

PS
HH
M2

010118 ARENA MEDIANA

M3

0.1

26,950.00

2,695.00

431.20

3,126.20

010177 CEMENTO GRIS CONQUISTADOR

KG

18.66

521.68

9,734.55

1,557.53

11,292.08

9,801.60

71,061.60

18,429.89

010108
010296 LADRILLO COMUN
080102 HORA CUADRILLA AA
4032

ALBAIL.

MESONES EN CONCRETO

#N/A #N/A

11.12

UND

81.68

750.00

#N/A
$

61,260.00

#N/A

HH

1.86

9,908.54

18,429.89

#N/A

#N/A

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.19

2,000.00

380.00

60.80

440.80

010279 HIERRO CHIPA 3/8"

KG

1,800.00

14,400.00

2,304.00

16,704.00

010111 ALAMBRE NEGRO # 18 050318

KG

0.24

2,160.00

518.40

82.94

601.34

010513 VARETA 1"x1"x 3 MT OTOBO

ML

0.18

650.00

117.00

18.72

135.72

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

0.36

1,624.00

584.64

93.54

678.18

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

2.5

3,500.00

8,750.00

1,400.00

10,150.00

15

521.68

7,825.20

1,252.03

9,077.23

3,857.00

19,817.09

60.51

010177 CEMENTO GRIS CONQUISTADOR


010118
010270 GRAVA 1/2" 5 M3

M3

010108

#N/A #N/A

080102 HORA CUADRILLA AA


4033

KG
#N/A #N/A

ALBAIL.

ALFAGIA EN LADRILLO ESTRUCTUR.

010177 CEMENTO GRIS CONQUISTADOR

HH

0.08
0.07

#N/A
$

47,500.00

0.1

2.5

#N/A
$

3,325.00

9,908.54

19,817.09

521.68

52.17

#N/A

#N/A
$

#N/A

532.00

#N/A

#N/A

#N/A

ML
KG

8.35

010118

#N/A #N/A

2.81

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

1.5

#N/A

#N/A

#N/A

#N/A

010297

#N/A #N/A

11.2

#N/A

#N/A

#N/A

#N/A

010418

#N/A #N/A

0.09

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

#N/A

#N/A

4034

BLOQUE No 4 S. FE 0.23

010145

#N/A #N/A

010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA

59

ALBAIL.

#N/A

M2
13.3

#N/A

#N/A

M3

0.02

230,988.62

4,619.77

HH

1.19

9,908.54

11,791.17

Preparado Por LEONARDO ROJO HENAO

#N/A
$

739.16

#N/A
$

5,358.94

11,791.17

59

CODIGO
4035

ACTIVIDAD
BLOQUE No 5 S. FE 0.12

010146 BLOQUE No 5 S. FE
010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA
4036

ALBAIL.

BLOQUE No 5 S. FE 0.23

010146 BLOQUE No 5 S. FE
010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA
4037

ALBAIL.

BLOQUE No 6 S. FE 0.23

010147 BLOQUE No 6 S. FE
010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA
4038

ALBAIL.

BLOQUE No 4 SAN JOSE 0.09

010143 BLOQUE No 4 SAN JOSE


010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA
4039

ALBAIL.

BLOQUE No 5 SAN JOSE 0.12

010144 BLOQUE No 5 SAN JOSE


010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA
4040

ALBAIL.

CHAZOS P/CAR. MADERA

010177 CEMENTO GRIS CONQUISTADOR


010118
010219 CHAZO MADERA 10x10
080102 HORA CUADRILLA AA
4041

ALBAIL.

MURO EN DRY WALL E/ 0.1MT

010348 PARED EN DRY WALL E/0.1


040176 VINILTEX BLANCO ALMENDRA 1561
080105 HORA CUADRILLA DD
4042

CARPINT.

MURO EN DRY WALL E/ 0.15MT

010348 PARED EN DRY WALL E/0.1

IVA 16%

SUBTOTAL

UND

13.3

250.00

3,325.00

532.00

3,857.00

M3

0.01

230,988.62

2,309.89

369.58

2,679.47

HH

0.51

9,908.54

5,053.36

5,053.36

UND

26.7

250.00

6,675.00

1,068.00

7,743.00

M3

0.02

230,988.62

4,619.77

739.16

5,358.94

HH

1.15

9,908.54

11,394.82

11,394.82

UND

22

250.00

5,500.00

880.00

6,380.00

M3

0.04

230,988.62

9,239.54

1,478.33

10,717.87

HH

0.8

9,908.54

7,926.83

7,926.83

UND

13.3

250.00

3,325.00

532.00

3,857.00

M3

0.06

230,988.62

13,859.32

2,217.49

16,076.81

HH

0.51

9,908.54

5,053.36

5,053.36

UND

13.3

250.00

3,325.00

532.00

3,857.00

M3

0.01

230,988.62

2,309.89

369.58

2,679.47

HH

1.19

9,908.54

11,791.17

11,791.17

0.1

521.68

52.17

60.51

2,987.00

1,486.28
36,524.92

M2

M2

M2

M2

UN
KG
#N/A #N/A

0.1

#N/A

UND

10.3

250.00

2,575.00

HH

0.15

9,908.54

1,486.28

#N/A

8.35
#N/A

412.00

#N/A

M2
M2

31,487.00

31,487.00

5,037.92

CTO

0.04

10,800.00

432.00

69.12

501.12

HH

1.43

12,881.11

18,419.98

18,419.98
36,524.92

M2
1

31,487.00

31,487.00

5,037.92

10,800.00

432.00

69.12

501.12

HH

1.43

12,881.11

18,419.98

18,419.98

UND

71.32

250.00

17,830.00

2,852.80

20,682.80

M3

0.08

230,988.62

18,479.09

2,956.65

21,435.74

ALBAIL.

HH

0.96

9,908.54

9,512.20

9,512.20

MURO PANDERETA S. FE 0.12 CM

M2
UND

118

250.00

29,500.00

4,720.00

34,220.00

M3

0.07

230,988.62

16,169.20

2,587.07

18,756.28

HH

0.86

9,908.54

8,521.35

8,521.35

9,908.54

9,512.20

11,034.15

CARPINT.

MURO PANDERETA S. FE 5.5 CM

010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA

010298 LADRILLO PRENSADO S. FE 5.5 CM


010345 MORTERO 1 : 5
080102 HORA CUADRILLA AA

ALBAIL.

INSTALACION CARP. METALICA

M2

M2

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

M3

0.01

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.96

5000
5001

VR. PARCIAL

0.04

010298 LADRILLO PRENSADO S. FE 5.5 CM

4045

VR. UNIT.

M2

080105 HORA CUADRILLA DD

4044

CANT

M2

CTO

040176 VINILTEX BLANCO ALMENDRA 1561


4043

UND

#N/A

#N/A

#N/A
$

1,521.95

#N/A

REPELLOS
FILOS Y DILATACIONES

ML

010177

#N/A #N/A

8.27

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

8.83

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.39

#N/A

#N/A

5002

GOTEROS

010177

#N/A #N/A

010118 ARENA MEDIANA


010108 AGUA
080102 HORA CUADRILLA AA
5003

ALBAIL.

REPELLO LISO MUROS 1:2

010177 CEMENTO GRIS CONQUISTADOR

60

#N/A

ML
8.27

#N/A

M3

0.01

LT

8.83

HH

0.49
9.53

#N/A

#N/A

#N/A

26,950.00

269.50

43.12

312.62

150.00

1,324.50

211.92

1,536.42

9,908.54

4,855.19

4,855.19

521.68

4,971.61

5,767.07

M2
KG

Preparado Por LEONARDO ROJO HENAO

795.46

60

CODIGO

UND

CANT

010118 ARENA MEDIANA

ACTIVIDAD

M3

0.06

26,950.00

1,617.00

258.72

1,875.72

010108 AGUA

LT

17.66

150.00

2,649.00

423.84

3,072.84

HH

0.86

9,908.54

8,521.35

8,521.35

080102 HORA CUADRILLA AA


5004

ALBAIL.

REPELLO LISO MUROS 1:3

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

6.17

521.68

3,218.77

515.00

3,733.77

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

5,548.78

010108

#N/A #N/A

080102 HORA CUADRILLA AA


5005

ALBAIL.

HH

8.56

#N/A

0.56

#N/A

9,908.54

5,548.78

#N/A

#N/A

REPELLO LISO MUROS IMP. 1:4

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

6.46

521.68

3,370.05

539.21

3,909.26

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

497.64

5,548.78

3,909.26

010108

#N/A #N/A

13.38

#N/A

#N/A

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.22

1,950.00

429.00

080102 HORA CUADRILLA AA

HH

0.56

9,908.54

5,548.78

6.46

521.68

3,370.05

5006

ALBAIL.

REPELLO RUSTICO MUROS 1:5

010177 CEMENTO GRIS CONQUISTADOR

#N/A
$

68.64

#N/A

M2
KG

539.21

010118

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

13.38

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.56

#N/A

#N/A

5007

REPELLO LISO PLACA

1:2

#N/A

M2

010177

#N/A #N/A

11.59

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

010108 AGUA
080102 HORA CUADRILLA AA
5008

REPELLO LISO PLACA

ALBAIL.
1:3

LT

23.99

150.00

3,598.50

HH

0.52

9,908.54

5,152.44

575.76

#N/A
#N/A
$

4,174.26

5,152.44
5,313.21

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

8.78

521.68

4,580.35

732.86

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

18.17

150.00

2,725.50

436.08

3,161.58

HH

0.52

9,908.54

5,152.44

5,152.44
4,248.14

080102 HORA CUADRILLA AA


5009

REPELLO LISO PLACA

ALBAIL.
1:4

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

7.02

521.68

3,662.19

585.95

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

14.54

150.00

2,181.00

348.96

2,529.96

HH

0.52

9,908.54

5,152.44

5,152.44

080102 HORA CUADRILLA AA


5010

REPELLO LISO PLACA

ALBAIL.
1:5

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

5.62

521.68

2,931.84

469.09

3,400.94

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108

#N/A #N/A

11.63

#N/A

#N/A

080102

#N/A #N/A

0.52

#N/A

#N/A

5011

REPELLO RUSTICO PLACA

1:3

#N/A

#N/A
#N/A

M2

010177

#N/A #N/A

13.71

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.03

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

22.3

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


5012

ALBAIL.

REPELLO RUSTICO PLACA

HH

0.61

9,908.54

6,044.21

#N/A
$

6,044.21
8,925.94

1:2

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

14.75

521.68

7,694.78

1,231.16

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

30.53

150.00

4,579.50

732.72

5,312.22

HH

0.54

9,908.54

5,350.61

5,350.61
6,759.51

080102 HORA CUADRILLA AA


5013

ALBAIL.

REPELLO BAJO MALLA 1 : 3

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

11.17

521.68

5,827.17

932.35

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

010108 AGUA

LT

23.13

150.00

3,469.50

555.12

4,024.62

HH

0.54

9,908.54

5,350.61

5,350.61

080102 HORA CUADRILLA AA


5014

ALBAIL.

REPELLO BAJO MALLA 1 : 4

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

8.94

521.68

4,663.82

746.21

5,410.03

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

61

Preparado Por LEONARDO ROJO HENAO

61

CODIGO

ACTIVIDAD

010108
080102 HORA CUADRILLA AA
5015

UND
#N/A #N/A

ALBAIL.

REPELLO BAJO ESTERILLA

HH

CANT

VR. UNIT.

18.5

VR. PARCIAL

#N/A

0.54

IVA 16%

#N/A

9,908.54

5,350.61

SUBTOTAL

#N/A

#N/A
$

5,350.61

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

8.94

521.68

4,663.82

746.21

5,410.03

010118 ARENA MEDIANA

M3

0.02

26,950.00

539.00

86.24

625.24

10,403.97

14,281.51

010108

#N/A #N/A

080102 HORA CUADRILLA AA


5016

CULATAS

ALBAIL.

1:2

HH

18.5

#N/A

#N/A

1.05

9,908.54

10,403.97

23.6

521.68

12,311.65

#N/A

#N/A

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

1,969.86

010118

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

48.84

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.52

#N/A

#N/A

5017

CULATAS

1:3

#N/A

M2

010177

#N/A #N/A

17.88

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

37

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


5018

CULATAS

ALBAIL.

1:4

HH

0.52

9,908.54

5,152.44

#N/A
$

5,152.44

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

14.3

521.68

7,460.02

1,193.60

8,653.63

010118 ARENA MEDIANA

M3

0.04

26,950.00

1,078.00

172.48

1,250.48

010108 AGUA

LT

29.6

150.00

4,440.00

710.40

5,150.40

HH

0.52

9,908.54

5,152.44

5,152.44

475.02

990.85

080102 HORA CUADRILLA AA


5019

ALBAIL.

IMPER. INTEGRAL MORTERO

M2

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.21

1,950.00

409.50

080102 HORA CUADRILLA AA

HH

0.1

9,908.54

990.85

5020

ALBAIL.

ENTRAMADO MADERA CIELORASO

65.52

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.04

2,000.00

80.00

12.80

92.80

010461 TABLON SAJO 2"x10"x 3mts

ML

0.73

13,425.00

9,800.25

1,568.04

11,368.29

HH

0.4

9,908.54

3,963.42

3,963.42

0.2

2,000.00

400.00

464.00

754.00

4,954.27

080102 HORA CUADRILLA AA


5021

ALBAIL.

ESTERILLA BAJO ENTRAMADO

050216 PUNTILLA 2" C.C / 13010200


010111

M2
LB
#N/A #N/A

0.05

#N/A

010513 VARETA 1"x1"x 3 MT OTOBO

ML

650.00

650.00

080102 HORA CUADRILLA AA

HH

0.5

9,908.54

4,954.27

5022

ALBAIL.

REPELLO IMPR. MUROS 1 : 3

#N/A

64.00
#N/A

104.00

#N/A

M2

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.7

1,950.00

1,365.00

218.40

1,583.40

010177 CEMENTO GRIS CONQUISTADOR

KG

0.48

521.68

250.41

40.07

290.47

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

010108

#N/A #N/A

29.6

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.52

9,908.54

5,152.44

#N/A
#N/A
$

5,152.44

6000 ESTRUCTURAS EN CONCRETO


6001

BLOQ. ESTRUCTUR. LA SULTANA

M2

010418

#N/A #N/A

0.3

#N/A

#N/A

#N/A

#N/A

010150

#N/A #N/A

38.08

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

9.53

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010408

#N/A #N/A

0.5

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

5.25

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.97

#N/A

#N/A

6002

EXCAVACION A MANO

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
6003
6004

ALBAIL.

RELLENOS DE EXCAVACION

080102 HORA CUADRILLA AA

ALBAIL.

RETIRO SOBRANTE TIERRA

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA

62

#N/A

M3

ALBAIL.

M3

0.37

72,000.00

26,640.00

30,902.40

HH

0.65

9,908.54

6,440.55

4,262.40

6,440.55

0.6

9,908.54

5,945.13

5,945.13

M3

0.37

72,000.00

26,640.00

30,902.40

HH

0.6

9,908.54

5,945.13

5,945.13

M3
HH
M3

Preparado Por LEONARDO ROJO HENAO

4,262.40

62

CODIGO
6005

ACTIVIDAD
DEMOLICION CABEZAS PILOTES

070107 COMPRESOR

MARTILLOS

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
6006

ALBAIL.

BASE DE CONCRETO POBRE 0.05

UND

CANT

VR. UNIT.

VR. PARCIAL

17,250.00

51,750.00

8,280.00

60,030.00

M3

0.5

72,000.00

36,000.00

5,760.00

41,760.00

HH

9,908.54

49,542.71

49,542.71

5,350.61
261.00

M2

(2,850 PSI)

M3

0.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.54

9,908.54

5,350.61

ZAPATAS

SUBTOTAL

HR

010230 CONCRETO 1 : 2 : 4
6007

IVA 16%

M3

#N/A

#N/A

#N/A

#N/A

M3

070118 VIBRADOR

DD

0.1

2,250.00

225.00

36.00

050216 PUNTILLA 2" C.C / 13010200

LB

0.06

2,000.00

120.00

19.20

139.20

010461 TABLON SAJO 2"x10"x 3mts

ML

0.29

13,425.00

3,893.25

622.92

4,516.17

050369 VIGA ROLLIZA DE 5mts

ML

0.51

1,750.00

892.50

142.80

1,035.30

010513 VARETA 1"x1"x 3 MT OTOBO

ML

2.39

650.00

1,553.50

248.56

1,802.06

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

11.92

9,908.54

118,109.83

118,109.83

6008

VIGAS CIMENTACION

M3

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

050216 PUNTILLA 2" C.C / 13010200

LB

2.2

2,000.00

4,400.00

704.00

5,104.00

010461 TABLON SAJO 2"x10"x 3mts

ML

3.58

13,425.00

48,061.50

7,689.84

55,751.34

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

2.88

1,630.00

4,694.40

751.10

5,445.50

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

14.62

9,908.54

144,862.89

144,862.89

6009

COLUMNAS

M3

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

070122 PARAL METALICO

SM

30

2,070.00

62,100.00

9,936.00

72,036.00

070101 ANDAMIO TUBULAR

SM

3,500.00

17,500.00

2,800.00

20,300.00

050216 PUNTILLA 2" C.C / 13010200

LB

2,000.00

16,000.00

2,560.00

18,560.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

2.64

3,500.00

9,240.00

1,478.40

10,718.40

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

7.26

1,630.00

11,833.80

1,893.41

13,727.21

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

16.46

9,908.54

163,094.61

163,094.61

6010

ESCALERAS

HH

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

050216 PUNTILLA 2" C.C / 13010200

LB

0.72

2,000.00

1,440.00

230.40

1,670.40

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

4.77

3,500.00

16,695.00

2,671.20

19,366.20

050369 VIGA ROLLIZA DE 5mts

ML

1.04

1,750.00

1,820.00

291.20

2,111.20

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

HH

23.24

9,908.54

230,274.53

230,274.53

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

080102 HORA CUADRILLA AA

ALBAIL.

6011

PASOS PREF. ESCALERA L = M

UND

050216 PUNTILLA 2" C.C / 13010200

LB

0.01

2,000.00

20.00

3.20

23.20

010279 HIERRO CHIPA 3/8"

KG

2.97

1,800.00

5,346.00

855.36

6,201.36

3,500.00

385.00

61.60

446.60

010111

#N/A #N/A

0.12

#N/A

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.11

#N/A

#N/A

#N/A

050112 BASTIDOR OTOBO 2"x2"x2.9mts

ML

0.08

1,624.00

129.92

20.79

150.71

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.01

292,421.37

2,924.21

467.87

3,392.09

080102 HORA CUADRILLA AA

ALBAIL.

HH

1.45

9,908.54

14,367.39

14,367.39

6012

MUROS DE CONTENCION H = 2

M3

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

050216 PUNTILLA 2" C.C / 13010200

LB

2.12

2,000.00

4,240.00

678.40

4,918.40

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

1.97

1,630.00

3,211.10

513.78

3,724.88

050369 VIGA ROLLIZA DE 5mts

ML

2.56

1,750.00

4,480.00

716.80

5,196.80

48,191.04

349,385.05

158,041.25

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

080102 HORA CUADRILLA AA

ALBAIL.

HH

15.95

9,908.54

158,041.25

6013

TANQUE SUBTERRANEO

M3

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

070109 FORMALETA ENTREPISO M2

MS

9.6

1,800.00

17,280.00

2,764.80

20,044.80

050216 PUNTILLA 2" C.C / 13010200

LB

2.12

2,000.00

4,240.00

678.40

4,918.40

63

Preparado Por LEONARDO ROJO HENAO

63

CODIGO

UND

CANT

050246 TABLA COMUN SAJO 1"x10"X3mt

ACTIVIDAD

ML

0.76

VR. UNIT.
3,500.00

VR. PARCIAL
2,660.00

425.60

050369 VIGA ROLLIZA DE 5mts

ML

0.47

1,750.00

822.50

131.60

954.10

M3

0.05

292,421.37

14,621.07

2,339.37

16,960.44

158,041.25

158,041.25

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

010233 CONCRETO 1 : 3 : 5

( 2,000 PSI)

M3

1.03

ALBAIL.

HH

15.95

9,908.54

080102 HORA CUADRILLA AA


6014

TANQUE ELEVADO

#N/A

IVA 16%

#N/A

SUBTOTAL

#N/A

3,085.60

#N/A

M3

070118 VIBRADOR

DD

0.1

2,250.00

225.00

36.00

261.00

050216 PUNTILLA 2" C.C / 13010200

LB

1.6

2,000.00

3,200.00

512.00

3,712.00

050369 VIGA ROLLIZA DE 5mts

ML

1,750.00

14,000.00

2,240.00

16,240.00

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

1.05

1,630.00

1,711.50

273.84

1,985.34

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

3,500.00

14,000.00

2,240.00

16,240.00

48,191.04

349,385.05

237,805.02

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

080102 HORA CUADRILLA AA

ALBAIL.

HH

24

9,908.54

237,805.02

6015

VIGAS AEREAS

M3

070118 VIBRADOR

DD

0.2

2,250.00

450.00

72.00

522.00

050216 PUNTILLA 2" C.C / 13010200

LB

3.8

2,000.00

7,600.00

1,216.00

8,816.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

3,500.00

24,500.00

3,920.00

28,420.00

050369 VIGA ROLLIZA DE 5mts

ML

4.12

1,750.00

7,210.00

1,153.60

8,363.60

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

4.53

1,630.00

7,383.90

1,181.42

8,565.32

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

1.03

292,421.37

301,194.01

48,191.04

349,385.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

29.9

9,908.54

296,265.42

296,265.42

6016

LOSA MACIZA H = 0.1 M2

M2

070118 VIBRADOR

DD

0.01

2,250.00

22.50

3.60

26.10

070102 BOMBA PARA CONCRETO

M3

0.11

8,500.00

935.00

149.60

1,084.60

070109 FORMALETA ENTREPISO M2

MS

1.1

1,800.00

1,980.00

316.80

2,296.80

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.11

292,421.37

32,166.35

5,146.62

37,312.97

080102 HORA CUADRILLA AA

ALBAIL.

HH

2.4

9,908.54

23,780.50

23,780.50

6017

LOSA MACIZA H = 0.12 M2

M2

070118 VIBRADOR

DD

0.01

2,250.00

22.50

3.60

26.10

070102 BOMBA PARA CONCRETO

M3

0.13

8,500.00

1,105.00

176.80

1,281.80

070109 FORMALETA ENTREPISO M2

MS

1.1

1,800.00

1,980.00

316.80

2,296.80

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.13

292,421.37

38,014.78

6,082.36

44,097.14

080102 HORA CUADRILLA AA

ALBAIL.

HH

2.8

9,908.54

27,743.92

27,743.92

6018

LOSA MACIZA H = 0.15 M2

M2

070118 VIBRADOR

DD

0.01

2,250.00

22.50

3.60

26.10

070102 BOMBA PARA CONCRETO

M3

0.16

8,500.00

1,360.00

217.60

1,577.60

070109 FORMALETA ENTREPISO M2

MS

0.15

1,800.00

270.00

43.20

313.20

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.16

292,421.37

46,787.42

7,485.99

54,273.41

080102 HORA CUADRILLA AA

ALBAIL.

HH

3.2

9,908.54

31,707.34

31,707.34

1.1

2,000.00

2,200.00

352.00

2,552.00

6019

CASETON DE EST. H = 0.9

M2

050216 PUNTILLA 2" C.C / 13010200

LB

010111 ALAMBRE NEGRO # 18 050318

KG

0.3

2,160.00

648.00

103.68

751.68

010513 VARETA 1"x1"x 3 MT OTOBO

ML

22.5

650.00

14,625.00

2,340.00

16,965.00

UND

4,500.00

22,500.00

3,600.00

26,100.00

HH

0.9

9,908.54

8,917.69

8,917.69
1,740.00

050174 ESTERILLA x 4 mts


080102 HORA CUADRILLA AA
6020

ALBAIL.

CASETON DE EST. H = 0.7

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.75

2,000.00

1,500.00

240.00

010111 ALAMBRE NEGRO # 18 050318

KG

0.2

2,160.00

432.00

69.12

501.12

010513 VARETA 1"x1"x 3 MT OTOBO

ML

19.5

650.00

12,675.00

2,028.00

14,703.00

UND

3.75

4,500.00

16,875.00

2,700.00

19,575.00

HH

0.7

9,908.54

6,935.98

6,935.98
1,740.00

050174 ESTERILLA x 4 mts


080102 HORA CUADRILLA AA
6021

ALBAIL.

CASETON DE EST. H = 0.3

M2

050216 PUNTILLA 2" C.C / 13010200

LB

0.75

2,000.00

1,500.00

240.00

010111 ALAMBRE NEGRO # 18 050318

KG

0.2

2,160.00

432.00

69.12

501.12

010513 VARETA 1"x1"x 3 MT OTOBO

ML

19.5

650.00

12,675.00

2,028.00

14,703.00

UND

3.75

4,500.00

16,875.00

2,700.00

19,575.00

HH

0.7

9,908.54

6,935.98

6,935.98

050174 ESTERILLA x 4 mts


080102 HORA CUADRILLA AA

64

ALBAIL.

Preparado Por LEONARDO ROJO HENAO

64

CODIGO
6022

ACTIVIDAD
PLACA FLOTANTE H = 0.9

UND

CANT

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

010175

#N/A #N/A

0.57

#N/A

#N/A

#N/A

#N/A

070118

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

070102

#N/A #N/A

0.46

#N/A

#N/A

#N/A

#N/A

050216

#N/A #N/A

0.03

#N/A

#N/A

#N/A

#N/A

050246

#N/A #N/A

0.11

#N/A

#N/A

#N/A

#N/A

050167

#N/A #N/A

0.11

#N/A

#N/A

#N/A

#N/A

010229

#N/A #N/A

0.46

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


6023

ALBAIL.

ENTREP. CASETON SIN VIGAS

HH

3.5

9,908.54

34,679.90

#N/A
$

34,679.90

M2

070118 VIBRADOR

DD

0.01

2,250.00

22.50

3.60

26.10

070109 FORMALETA ENTREPISO M2

MS

0.88

1,800.00

1,584.00

253.44

1,837.44

050216 PUNTILLA 2" C.C / 13010200

LB

0.02

2,000.00

40.00

6.40

46.40

010279 HIERRO CHIPA 3/8"

KG

1,800.00

7,200.00

1,152.00

8,352.00

010111 ALAMBRE NEGRO # 18 050318

KG

0.14

2,160.00

302.40

48.38

350.78

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.06

3,500.00

210.00

33.60

243.60

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.05

1,630.00

81.50

13.04

94.54

010513 VARETA 1"x1"x 3 MT OTOBO

ML

3.87

650.00

2,515.50

402.48

2,917.98

050174 ESTERILLA x 4 mts

UND

1.43

4,500.00

6,435.00

1,029.60

7,464.60

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.09

292,421.37

26,317.92

4,210.87

30,528.79

080102 HORA CUADRILLA AA

ALBAIL.

HH

2.5

9,908.54

24,771.36

24,771.36

6024

ENTREP. CASETON CON VIGAS

M2

070118 VIBRADOR

DD

0.01

2,250.00

22.50

3.60

26.10

070109 FORMALETA ENTREPISO M2

MS

0.88

1,800.00

1,584.00

253.44

1,837.44

050216 PUNTILLA 2" C.C / 13010200

LB

0.02

2,000.00

40.00

6.40

46.40

010279 HIERRO CHIPA 3/8"

KG

4.5

1,800.00

8,100.00

1,296.00

9,396.00

210.00

33.60

243.60

010111

#N/A #N/A

0.14

#N/A

#N/A

#N/A

#N/A

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.06

3,500.00

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.05

1,630.00

81.50

13.04

94.54

010513 VARETA 1"x1"x 3 MT OTOBO

ML

3.87

650.00

2,515.50

402.48

2,917.98

050174 ESTERILLA x 4 mts

UND

1.43

4,500.00

6,435.00

1,029.60

7,464.60

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.17

292,421.37

49,711.63

7,953.86

57,665.49

080102 HORA CUADRILLA AA

ALBAIL.

HH

9,908.54

29,725.63

29,725.63

ML

1.03

5,280.00

5,438.40

870.14

6,308.54

M2

1.03

13,977.00

14,396.31

2,303.41

16,699.72

050216 PUNTILLA 2" C.C / 13010200

LB

0.02

2,000.00

40.00

6.40

46.40

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.06

3,500.00

210.00

33.60

243.60

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.05

1,630.00

81.50

13.04

94.54

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.17

292,421.37

49,711.63

7,953.86

57,665.49

080102 HORA CUADRILLA AA

ALBAIL.

HH

9,908.54

29,725.63

29,725.63

ML

1.03

5,280.00

5,438.40

870.14

6,308.54

M2

1.03

13,977.00

14,396.31

2,303.41

16,699.72

050216 PUNTILLA 2" C.C / 13010200

LB

0.02

2,000.00

40.00

6.40

46.40

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.07

3,500.00

245.00

39.20

284.20

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.07

1,630.00

114.10

18.26

132.36

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.05

292,421.37

14,621.07

2,339.37

16,960.44

080102 HORA CUADRILLA AA

ALBAIL.

HH

1.45

9,908.54

14,367.39

14,367.39

ML

1.03

5,280.00

5,438.40

870.14

6,308.54

M2

1.03

13,977.00

14,396.31

2,303.41

16,699.72

050216 PUNTILLA 2" C.C / 13010200

LB

0.02

2,000.00

40.00

6.40

46.40

010279 HIERRO CHIPA 3/8"

KG

0.24

1,800.00

432.00

69.12

501.12

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.07

3,500.00

245.00

39.20

284.20

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.06

1,630.00

97.80

15.65

113.45

010229 CONCRETO 1 : 2 : 3

M3

0.06

292,421.37

17,545.28

2,807.25

20,352.53

6025

VIGUETA BLOQUE H - 17

010362 PERGOLA

M2

VLU 20

010248 ENTREPISO VH : 11 BH:17

6026

VIGUETA BLOQUE H - 20

010362 PERGOLA

M2

VLU 20

010248 ENTREPISO VH : 11 BH:17

6027

VIGUETA BLOQUE H - 25

010362 PERGOLA

M2

VLU 20

010248 ENTREPISO VH : 11 BH:17

65

(3,100 PSI)

Preparado Por LEONARDO ROJO HENAO

65

CODIGO

ACTIVIDAD

080102 HORA CUADRILLA AA


6028

ALBAIL.

VIGUETA BLOQUE H - 32

010362 PERGOLA

UND

CANT

HH

1.45

VR. UNIT.
$

VR. PARCIAL

9,908.54

IVA 16%

14,367.39

SUBTOTAL
$

14,367.39

M2

VLU 20

ML

1.03 $

5,280.00

5,438.40

870.14

6,308.54

M2

1.03 $

13,977.00

14,396.31

2,303.41

16,699.72

050216 PUNTILLA 2" C.C / 13010200

LB

0.02 $

2,000.00

40.00

6.40

46.40

010279 HIERRO CHIPA 3/8"

KG

0.24 $

1,800.00

432.00

69.12

501.12

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.07 $

3,500.00

245.00

39.20

284.20

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.07 $

1,630.00

114.10

18.26

132.36

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.07 $

292,421.37

20,469.50

3,275.12

23,744.61

080102 HORA CUADRILLA AA

ALBAIL.

HH

1.07 $

9,908.54

10,602.14

10,602.14

010248 ENTREPISO VH : 11 BH:17

6029

VIGUETA BLOQUE H - 37

010362 PERGOLA

M2

VLU 20

ML

1.03 $

5,280.00

5,438.40

870.14

6,308.54

M2

1.03 $

13,977.00

14,396.31

2,303.41

16,699.72

050216 PUNTILLA 2" C.C / 13010200

LB

0.02 $

2,000.00

40.00

6.40

46.40

010279 HIERRO CHIPA 3/8"

KG

0.24 $

1,800.00

432.00

69.12

501.12

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.07 $

3,500.00

245.00

39.20

284.20

050167 CUARTON OTOBO 2"x4"x2.9mts

ML

0.07 $

1,630.00

114.10

18.26

132.36

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.1 $

292,421.37

29,242.14

4,678.74

33,920.88

080102 HORA CUADRILLA AA

ALBAIL.

HH

1.58 $

9,908.54

15,655.50

15,655.50

UND

2.16 $

75,800.00

163,728.00

189,924.48

HH

0.2 $

9,908.54

1,981.71

1,981.71

UND

0.02 $

30,723.00

614.46

712.77

HH

0.06 $

9,908.54

594.51

594.51

340,518.00

99,085.43
1,136.15

010248 ENTREPISO VH : 11 BH:17

6030

IMPER. INTEGRAL CONCRETO

010403 PERLIN METALICO DE 4"


080102 HORA CUADRILLA AA
6031

ALBAIL.

REFUERZOS MALLA

080102 HORA CUADRILLA AA

ALBAIL.

CONCRETO FLUIDO

M3

1.03 $

285,000.00

293,550.00

080102 HORA CUADRILLA AA

HH

10 $

9,908.54

99,085.43

ESTRUCTURA T. C.

26,196.48

98.31

M3

010234 CONCRETO FLUIDO 3000 PSI


6033

KG

010327 MALLA ELECTROSOLDADA U. 221


6032

M3

ALBAIL.
6 PISOS

010257 EXCAVACION MANUAL

46,968.00

M2
M3

0.14 $

6,996.00

979.44

156.71

M2

0.05 $

15,135.00

756.75

121.08

877.83

010521 ZAPATAS

M3

0.07 $

356,091.00

24,926.37

3,988.22

28,914.59

010227 CIELORASO PLANO DRYWALL

M2

0.04 $

28,336.00

1,133.44

181.35

1,314.79

010528 ENTREP. CASETON CON VIGAS

M2

1.12 $

79,400.00

88,928.00

14,228.48

103,156.48

TN

0.02 $

1,737,367.58

34,747.35

34,747.35
1,055.00

010139 BASE CONCRETO POBRE

0.05

010529 REFUERZO HIERRO DE 60.000 PSI


6034

ESTRUCTURA T. C.

5 PISOS

010257 EXCAVACION MANUAL

M2
M3

0.13 $

6,996.00

909.48

145.52

M2

0.13 $

15,135.00

1,967.55

314.81

2,282.36

010521 ZAPATAS

M3

0.03 $

356,091.00

10,682.73

1,709.24

12,391.97

010227 CIELORASO PLANO DRYWALL

M2

0.03 $

28,336.00

850.08

136.01

986.09

010528 ENTREP. CASETON CON VIGAS

M2

0.86 $

79,400.00

68,284.00

10,925.44

79,209.44

010529 REFUERZO HIERRO DE 60.000 PSI

TN

0.02 $

1,737,367.58

34,747.35

5,559.58

40,306.93

010515 VIGAS CIMENTACION

M3

0.02 $

383,859.00

7,677.18

1,228.35

8,905.53

010514 VIGAS AEREAS

M3

0.01 $

495,329.00

4,953.29

792.53

5,745.82

010249 ESCALERAS

M3

0.01 $

432,430.00

4,324.30

691.89

5,016.19

010469 TANQUE SUTERRANEO

M3

0.01 $

413,916.00

4,139.16

662.27

4,801.43

010319 LOZA MACIZA H = 0.12

M2

0.03 $

55,867.00

1,676.01

1,676.01

010139 BASE CONCRETO POBRE

6035

0.05

ESTRUCTURA MAMPOSTERIA ESTRUCTU.

M2

010149

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010139

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

010515

#N/A #N/A

0.04

#N/A

#N/A

#N/A

#N/A

010249

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010514

#N/A #N/A

0.01

#N/A

#N/A

#N/A

#N/A

010319

#N/A #N/A

0.84

#N/A

#N/A

#N/A

#N/A

010276

#N/A #N/A

0.01

#N/A

#N/A

#N/A

010531 REFUEZO MALLA

KG

3.77 $

1,073.32

4,046.42

010234 CONCRETO FLUIDO 3000 PSI

M3

0.01 $

285,000.00

2,850.00

66

Preparado Por LEONARDO ROJO HENAO

647.43

#N/A
$

4,693.84

2,850.00

66

CODIGO
6036

ACTIVIDAD

UND

ENSAY. CONCRETOS CILINDRO

UND

010244 ENSAY. CONCRETOS CILINDRO

UND

6037

ANDEN EN CONCRETO E = 0.1

010233 CONCRETO 1 : 3 : 5

VR. UNIT.

1 $

M3

0.1

ALBAIL.

HH

0.5 $

CONCRETO CICLOPEO

14,500.00

VR. PARCIAL
$

14,500.00

9,908.54

4,954.27

IVA 16%

SUBTOTAL
$

14,500.00

4,954.27
27,492.00

M2

( 2,000 PSI)

080102 HORA CUADRILLA AA


6038

CANT

#N/A

#N/A

#N/A

#N/A

M3

010108 AGUA

LT

158 $

150.00

23,700.00

3,792.00

010118 ARENA MEDIANA

M3

0.3 $

26,950.00

8,085.00

1,293.60

9,378.60

010177 CEMENTO GRIS CONQUISTADOR

KG

180 $

521.68

93,902.40

15,024.38

108,926.78

010121 ASFALTO

M3

0.57 $

161,472.00

92,039.04

14,726.25

106,765.29

010366 PIEDRA DE RIO

M3

0.42 $

24,221.00

10,172.82

1,627.65

11,800.47

HH

4.7 $

9,908.54

46,570.15

46,570.15

080102 HORA CUADRILLA AA


6039

ALBAIL.

COLUMNA CIRCULAR 0.30

ML

070101 ANDAMIO TUBULAR

SM

5 $

3,500.00

17,500.00

2,800.00

20,300.00

010234 CONCRETO FLUIDO 3000 PSI

M3

0.08 $

285,000.00

22,800.00

3,648.00

26,448.00

070122 PARAL METALICO

SM

6.4 $

2,070.00

13,248.00

2,119.68

15,367.68

050216 PUNTILLA 2" C.C / 13010200

LB

0.57 $

2,000.00

1,140.00

182.40

1,322.40

070118 VIBRADOR

DD

0.01 $

2,250.00

22.50

3.60

26.10

HH

4.7 $

9,908.54

46,570.15

46,570.15

HR

3 $

17,250.00

51,750.00

8,280.00

60,030.00

M3

0.5 $

72,000.00

36,000.00

5,760.00

41,760.00

HH

6 $

9,908.54

59,451.26

59,451.26

1,950.00

975.00

156.00

1,131.00

0.80

5.80

9,908.54

080102 HORA CUADRILLA AA


6040

ALBAIL.

DEMOLICION CIMIENTOS ENTERRADOS

070107 COMPRESOR

MARTILLOS

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
6041

ALBAIL.

REPARACION DE GRIETAS

ML

010108

#N/A #N/A

010520 WAIPE
010275 HERRAMIENTA MENOR
080102 HORA CUADRILLA AA
6042

M3

ALBAIL.

MENSULA EN CONCRETO

0.2

#N/A

#N/A

KG

0.5 $

0.1 $

50.00

5.00

HH

1 $

9,908.54

9,908.54

#N/A

#N/A

UND

010279 HIERRO CHIPA 3/8"

KG

6 $

1,800.00

10,800.00

1,728.00

12,528.00

M3

0.04 $

292,421.37

11,696.85

1,871.50

13,568.35

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

1 $

3,500.00

3,500.00

560.00

4,060.00

080102 HORA CUADRILLA AA

HH

1.3 $

9,908.54

12,881.11

12,881.11

010229 CONCRETO 1 : 2 : 3

6043

(3,100 PSI)
ALBAIL.

LADRILLO ESTRUCTURAL STA FE.

M2

010108

#N/A #N/A

5.25

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.02

#N/A

#N/A

#N/A

#N/A

010408

#N/A #N/A

0.5

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

9.53

#N/A

#N/A

#N/A

010297 LADRILLO PRENSADO

#N/A

UND

38.8 $

250.00

9,700.00

1,552.00

11,252.00

010418 SIKA 1 IMPERMEABLIZANTE INTEGRAL

KG

0.3 $

1,950.00

585.00

93.60

678.60

080102 HORA CUADRILLA AA

HH

0.97 $

9,908.54

9,611.29

9,611.29

9000

ALBAIL.

PISOS (BASE)

9001 EXCAVACION MANUAL

M3

070121

#N/A #N/A

080102 HORA CUADRILLA AA


9002

RELLENOS DE EXCAVACION

080102 HORA CUADRILLA AA


9003

ALBAIL.
ALBAIL.

RETIRO SOBRANTES TIERRA

070121 VOLQUETA 6 M3
080102 HORA CUADRILLA AA
9004

ALBAIL.

RELLENOS ROCA MUERTA

HH

0.37

#N/A

#N/A

#N/A

#N/A

1.05

9,908.54

10,403.97

10,403.97

0.6

9,908.54

5,945.13

5,945.13

M3

0.37

72,000.00

26,640.00

30,902.40

HH

0.4

9,908.54

3,963.42

3,963.42

M3
HH
M3
$

4,262.40

M3

070119 VIBROCOMPACT. A GASOLINA

DD

0.04

89,900.00

3,596.00

575.36

4,171.36

070121 VOLQUETA 6 M3

M3

1.3

72,000.00

93,600.00

14,976.00

108,576.00

HH

0.8

9,908.54

7,926.83

7,926.83

080102 HORA CUADRILLA AA

67

ALBAIL.

Preparado Por LEONARDO ROJO HENAO

67

CODIGO
9005

ACTIVIDAD
POLISEC

UND

CANT

VR. UNIT.

VR. PARCIAL

010406 PLATINA DE HIERRO 2 x 1/2" x 1/4"

ML

1.13

3,667.00

4,143.71

080102 HORA CUADRILLA AA

HH

0.15

9,908.54

1,486.28

9006

IVA 16%

SUBTOTAL

M2
ALBAIL.

PLACA BASE CONCRETO 0.08

662.99

4,806.70

1,486.28

M2

050246

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010230

#N/A #N/A

0.09

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.73

#N/A

#N/A

9007

PLACA BASE CONCRETO 0.1

#N/A

M2

050246

#N/A #N/A

0.51

#N/A

#N/A

#N/A

#N/A

010230

#N/A #N/A

0.11

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.73

#N/A

#N/A

9008

PLACA BASE CONCRETO 0.15

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

1.02

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

M3

0.16

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.82

9,908.54

8,125.00

3,500.00

3,570.00

9009

CONCRETO BASE GRADAS

3,500.00

#N/A

3,570.00

571.20

4,141.20

8,125.00

4,141.20

89,176.88

#N/A

#N/A

M2
ML

1.02

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

M3

0.1

080102 HORA CUADRILLA AA

ALBAIL.

HH

9,908.54

89,176.88

CONCRETO SARDINELES 0.4

#N/A

050246 TABLA COMUN SAJO 1"x10"X3mt

9010

#N/A

M2

#N/A

#N/A

571.20
#N/A

#N/A

ML

070118 VIBRADOR

DD

0.03

2,250.00

67.50

10.80

78.30

010264 FORMALETA SARDINEL

DD

8.00

16.00

2.56

18.56

7,233.24

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

M3

0.05

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.73

9011

CONCRETO ANDENES

0.1

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

050112 BASTIDOR OTOBO 2"x2"x2.9mts

#N/A
$

9,908.54

#N/A
$

7,233.24

#N/A

#N/A

M2
M3

1.02

ML

0.11

1,624.00

#N/A
$

178.64

#N/A
$

28.58

#N/A
$

207.22

#N/A

050216 PUNTILLA 2" C.C / 13010200

LB

2,000.00

2,000.00

320.00

2,320.00

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

1.02

3,500.00

3,570.00

571.20

4,141.20

080102 HORA CUADRILLA AA

HH

0.82

9,908.54

8,125.00

8,125.00

9012

ALBAIL.

CONCRETO ESTRIADO RAMPAS

M2

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

1.02

3,500.00

3,570.00

571.20

4,141.20

010229 CONCRETO 1 : 2 : 3

(3,100 PSI)

M3

0.16

292,421.37

46,787.42

7,485.99

54,273.41

080102 HORA CUADRILLA AA

ALBAIL.

HH

0.9

9,908.54

8,917.69

8,917.69

2.37

5,280.00

12,513.60

14,515.78

6,539.64

9013

IMPERMEA. PERMA PLY- 2 CAPAS

010363 PERGOLA

VLU 20

ML

010120

#N/A #N/A

080102 HORA CUADRILLA AA


9014

HH

ALBAIL.

ALISTADO ENDURECIDO

HH

1.56

#N/A

#N/A

2,002.18
#N/A

9,908.54

6,539.64

UND

3.09

325,634.40

1,006,210.30

160,993.65

1,167,203.94

KG

18.67

521.68

9,739.77

1,558.36

11,298.13

M2

010415 SUBCONTRATO REVISION PUNTOS DE GAS


010177 CEMENTO GRIS CONQUISTADOR
010118

#N/A #N/A

0.05

#N/A

#N/A

#N/A

010108

#N/A #N/A

7.95

#N/A

#N/A

#N/A

080102 HORA CUADRILLA AA


9015

ALISTADO DE PISOS

#N/A

0.66

ALBAIL.
0.04

010177 CEMENTO GRIS CONQUISTADOR

HH

0.7

9,908.54

6,935.98

20.3

521.68

10,590.10

#N/A
#N/A
$

6,935.98

12,284.52

M2
KG

1,694.42

010118

#N/A #N/A

0.065

#N/A

#N/A

#N/A

#N/A

010108

#N/A #N/A

7.42

#N/A

#N/A

#N/A

#N/A

080102

#N/A #N/A

0.55

#N/A

#N/A

9016

ALISTADO IMPER. PISOS 0.04

#N/A

M2

010418

#N/A #N/A

0.56

#N/A

#N/A

#N/A

#N/A

010177

#N/A #N/A

18.7

#N/A

#N/A

#N/A

#N/A

010118

#N/A #N/A

0.04

#N/A

#N/A

#N/A

010108 AGUA
080102 HORA CUADRILLA AA
9017

ALBAIL.

ALISTADO PISO LISTON

050111 BASTIDOR EN AMARILLO 2"X2"

68

LT

7.42

150.00

1,113.00

HH

0.46

9,908.54

4,557.93

3,000.00

3,000.00

178.08

#N/A
$

1,291.08

4,557.93

3,480.00

M2
UND

Preparado Por LEONARDO ROJO HENAO

480.00

68

CODIGO

ACTIVIDAD

UND

CANT

UND

0.2

3,162.00

632.40

101.18

733.58

010177 CEMENTO GRIS CONQUISTADOR

KG

1.22

521.68

636.45

101.83

738.28

010118 ARENA MEDIANA

M3

0.01

26,950.00

269.50

43.12

312.62

010108 AGUA

LT

0.55

150.00

82.50

13.20

95.70

HH

0.55

9,908.54

5,449.70

5,449.70

010325 MALLA CON VENA 2x0.6

080102 HORA CUADRILLA AA


9018

ALBAIL.

ALISTADO TERRAZAS 0.08

VR. UNIT.

VR. PARCIAL

IVA 16%

SUBTOTAL

M2

010177 CEMENTO GRIS CONQUISTADOR

KG

24.88

521.68

12,979.40

2,076.70

15,056.10

010118 ARENA MEDIANA

M3

0.1

26,950.00

2,695.00

431.20

3,126.20

6,935.98

010108

#N/A #N/A

080102 HORA CUADRILLA AA


9019

ALBAIL.

PEGANTE MORTERO CONCRETO

010286 IGASOL

UNDx16 KG

010177 CEMENTO GRIS CONQUISTADOR


010108
ALBAIL.

CAUELA CONCRETO 0.2x0.12

010233 CONCRETO 1 : 3 : 5

#N/A

#N/A

#N/A

9,908.54

6,935.98

KG

6,010.00

12,020.00

1,923.20

13,943.20

KG

521.68

521.68

83.47

605.15

4,954.27

M2

HH

0.5
0.5

#N/A
$

9,908.54

#N/A
$

4,954.27

#N/A

#N/A

ML
M3

0.02

050246 TABLA COMUN SAJO 1"x10"X3mt

ML

0.33

3,500.00

1,155.00

184.80

1,339.80

010461 TABLON SAJO 2"x10"x 3mts

ML

0.33

13,425.00

4,430.25

708.84

5,139.09

050216 PUNTILLA 2" C.C / 13010200

LB

2.06

2,000.00

4,120.00

659.20

4,779.20

080102 HORA CUADRILLA AA

HH

0.8

9,908.54

7,926.83

7,926.83

9021

( 2,000 PSI)

#N/A

0.7

#N/A #N/A

080102 HORA CUADRILLA AA


9020

HH

14.83

ALBAIL.

TRITURADO FINO

#N/A

#N/A

#N/A

#N/A

M3

070119 VIBROCOMPACT. A GASOLINA

DD

0.04

89,900.00

3,596.00

575.36

4,171.36

010504 TRITURADO FINO

M3

1.03

35,844.00

36,919.32

5,907.09

42,826.41

HH

0.7

9,908.54

6,935.98

6,935.98

080102 HORA CUADRILLA AA


9022

ALBAIL.

TRITURADO GRUESO

M3

070119 VIBROCOMPACT. A GASOLINA

DD

0.04

89,900.00

3,596.00

575.36

4,171.36

010503 TRITURADO 3/4"

M3

0.88

32,000.00

28,160.00

4,505.60

32,665.60

HH

0.7

9,908.54

6,935.98

6,935.98

1.05

800.00

840.00

974.40

080102 HORA CUADRILLA AA


9023

ALBAIL.

ACERO TRANSFERENCIA

KG

010101 ACERO FIGURADO DE 60.000 PSI

KG

050236

#N/A #N/A

0.03

#N/A

#N/A

080102

#N/A #N/A

0.03

#N/A

#N/A

10000
10001

134.40
#N/A

#N/A
#N/A

VIAS
ANDEN EN CONCRETO H= 0.1

010414 ROCA MUERTA

M2
M3

0.3

M3

0.1

M3

0.4

6,996.00

2,798.40

HH

0.01

9,908.54

99.09

UND

0.04

950.00

38.00

MS

0.05

14,375.00

718.75

HH

0.7

9,908.54

6,935.98

HH

0.03

750.00

22.50

3.60

26.10

070113 MOTONIVELADORA CAT 12-F

HRS

0.03

104,000.00

3,120.00

499.20

3,619.20

01414

UND

1.3

45,500.00

59,150.00

9,464.00

68,614.00

HH

0.03

265,000.00

7,950.00

1,272.00

9,222.00

HH

1.2

9,908.54

11,890.25

11,890.25

HH

0.03

750.00

22.50

3.60

26.10

070113 MOTONIVELADORA CAT 12-F

HRS

0.03

104,000.00

3,120.00

499.20

3,619.20

01414

UND

1.3

45,500.00

59,150.00

9,464.00

68,614.00

HH

0.03

265,000.00

7,950.00

1,272.00

9,222.00

HH

1.2

9,908.54

11,890.25

11,890.25

0.07

14,219.00

995.33

1,154.58

010230 CONCRETO 1 : 2 : 4

(2,850 PSI)

010257 EXCAVACION MANUAL


080102 HORA CUADRILLA AA
10002

ALBAIL.

BASE ASFALTO 1350

010141 BENITIN DE 500 P - 750


10003

ALBAIL.

BASE B 200

ESTRACTOR DE OLORES

070116 TANQUE AGUA FORD 600


10004

ALBAIL.

BASE B 600

ESTRACTOR DE OLORES

070116 TANQUE AGUA FORD 600


10005

ALBAIL.

CALZADA V0 A V2- ASFALTO

010134 BASE ASFALTICA B 1350

69

4,440.00

#N/A

710.40

5,150.40

3,246.14

99.09

6.08

44.08

115.00

833.75

6,935.98

#N/A
$

447.74

#N/A

M3

070105 CILINDRO GALION

080102 HORA CUADRILLA AA

#N/A

M3

070105 CILINDRO GALION

080102 HORA CUADRILLA AA

14,800.00

M2

010133 BARRA CORRUGADA No 2


080102 HORA CUADRILLA AA

M2
M3

Preparado Por LEONARDO ROJO HENAO

159.25

69

CODIGO

UND

CANT

010416 RODADURA ASFALTICA B- 1350

ACTIVIDAD

M3

0.03

7,100.00

213.00

34.08

247.08

010135 BASE B 200

M3

0.4

9,878.00

3,951.20

632.19

4,583.39

010138 BASE B 600

M3

0.2

8,787.00

1,757.40

281.18

2,038.58

010258 EXCAVACION MECANICA

M3

0.7

5,222.00

3,655.40

3,655.40

10006

M2
$

292,421.37

29,242.14

33,920.88

CALZADA V0 A V2- CONCRETO

010102

#N/A #N/A

010135 BASE B 200

M3

VR. UNIT.

1
0.1

VR. PARCIAL

#N/A

IVA 16%

#N/A

SUBTOTAL

#N/A
$

4,678.74

#N/A

010258

#N/A #N/A

0.28

#N/A

#N/A

#N/A

#N/A

010294

#N/A #N/A

#N/A

#N/A

#N/A

#N/A

010356

#N/A #N/A

#N/A

#N/A

10007

CALZADA V3 A V4- ASFALTO

010134 BASE ASFALTICA B 1350

M3

0.05

010416 RODADURA ASFALTICA B- 1350

M3

0.03

010135 BASE B 200

M3

0.4

010138 BASE B 600

M3

010258 EXCAVACION MECANICA

M3

10008

M2

CALZADA V3 A V8- CONCRETO

010102

#N/A #N/A

010135 BASE B 200

#N/A

M2

M3

#N/A
$

29,050.00

0.2

68

871.50

292,421.37

58,484.27

6,600.00

448,800.00

9,878.00

987.80

#N/A

1
0.1

#N/A
$

#N/A
$

139.44

9,357.48

#N/A

#N/A

#N/A

158.05

#N/A #N/A

0.28

#N/A

#N/A

#N/A

#N/A #N/A

#N/A

#N/A

#N/A

10009

M2

CALZADA V5 A V8- ASFALTO

35,400.00

35,400.00

67,841.76

448,800.00

1,145.85

#N/A

#N/A
$

010294

M2

1,010.94

#N/A

010258
010356 PORCELANATO 0,5x0,5 TRAF. PESADO

#N/A
$

#N/A
#N/A
#N/A
$

35,400.00
824.70

010134 BASE ASFALTICA B 1350

M3

0.05

14,219.00

710.95

113.75

010416 RODADURA ASFALTICA B- 1350

M3

0.03

7,100.00

213.00

34.08

247.08

010135 BASE B 200

M3

0.4

9,878.00

3,951.20

632.19

4,583.39

010138 BASE B 600

M3

0.15

8,787.00

1,318.05

210.89

1,528.94

010258 EXCAVACION MECANICA

M3

0.63

5,222.00

3,289.86

3,289.86

10010

M3

EXCAVACION MECANICA

070114 RETROEXCAVADORA J.D. 510

HR

0.04

12,000.00

480.00

070121 VOLQUETA 6 M3

M3

0.5

72,000.00

36,000.00

M3

1.2

161,472.00

193,766.40

HH

0.01

9,908.54

99.09

10011

JUNTAS DILATACION ASFALTO

010120 ASFALTO
080102 HORA CUADRILLA AA
10012

ALBAIL.

PAVIMENTO CONCRE. E = 0.17

76.80

556.80

36,000.00

224,769.02

99.09
8,944.20

ML
$

31,002.62

M2

010235 CONCRETO PAVIMENTO 41KG / M2

M3

0.17

45,356.00

7,710.52

1,233.68

010264 FORMALETA SARDINEL

DD

82

8.00

656.00

104.96

760.96

070119 VIBROCOMPACT. A GASOLINA

DD

0.1

89,900.00

8,990.00

1,438.40

10,428.40

080102 HORA CUADRILLA AA

HH

9,908.54

9,908.54

9,908.54

45,356.00

8,164.08

1,306.25

9,470.33

10013

ALBAIL.

PAVIMENTO CONCRE. E = 0.18

M2

010235 CONCRETO PAVIMENTO 41KG / M2

M3

0.18

010264 FORMALETA SARDINEL

DD

0.82

8.00

6.56

1.05

7.61

070119 VIBROCOMPACT. A GASOLINA

DD

0.1

89,900.00

8,990.00

1,438.40

10,428.40

080102 HORA CUADRILLA AA

HH

9,908.54

9,908.54

9,908.54

10014

ALBAIL.

SARDINEL EN CONCRETO

010230 CONCRETO 1 : 2 : 4

ML
M3

0.06

010264 FORMALETA SARDINEL

DD

0.82

8.00

6.56

1.05

7.61

070118 VIBRADOR

DD

0.03

2,250.00

67.50

10.80

78.30

HH

0.66

9,908.54

6,539.64

6,539.64

080102 HORA CUADRILLA AA


10015

(2,850 PSI)

ALBAIL.

SEPARADOR

#N/A

#N/A

#N/A

#N/A

M2

010269 GRAMA SEMILLA

M2

1,850.00

1,850.00

296.00

2,146.00

010257 EXCAVACION MANUAL

M3

0.3

6,996.00

2,098.80

335.81

2,434.61

010501 TIERRA NEGRA

M3

0.33

8,250.00

2,722.50

435.60

3,158.10

HH

9,908.54

9,908.54

9,908.54

080102 HORA CUADRILLA AA


10016

ZONA VERDE

ALBAIL.

M2

010269 GRAMA SEMILLA

M2

1,850.00

1,850.00

296.00

2,146.00

010257 EXCAVACION MANUAL

M3

0.3

6,996.00

2,098.80

335.81

2,434.61

70

Preparado Por LEONARDO ROJO HENAO

70

CODIGO

ACTIVIDAD

010501 TIERRA NEGRA


080102 HORA CUADRILLA AA
21018

ALBAIL.

UND

CANT

M3

0.33

VR. UNIT.
8,250.00

VR. PARCIAL
2,722.50

HH

9,908.54

9,908.54

IVA 16%
$

435.60

SUBTOTAL
$

3,158.10

9,908.54

PAV.CONCR MR=36 E=0.15,INC.JUNTA

M2

ANTISOL

KL

0.2

11,500.00

2,300.00

368.00

2,668.00

SELLADOR ELASTICO POLIURET

UND

0.15

18,000.00

2,700.00

432.00

3,132.00

BAKE-ROD (ESPUMA DE POLIET

UND

0.3

800.00

240.00

38.40

278.40

MEZCLA CONCRETO 1:2:3 3100 PSI 21 MPA

M3

0.15

300,000.00

45,000.00

7,200.00

52,200.00

MANO OBRA ALBANILERIA 1 AYUDANTE

HC

0.16

6,500.00

1,040.00

1,040.00

MANO OBRA ALBANILERIA 5 AYUDANTE-1 OFI

HC

0.16

15,000.00

2,400.00

2,400.00

REGLA VIBRATORIA DE 4MTS

DIA

0.07

34,900.00

2,443.00

390.88

2,833.88

CORTADORA DE PAVIMENTO DE 4 A 7 CM

NL

0.25

4,500.00

1,125.00

180.00

1,305.00

EQUIPO DE ACABADO SUPERFICIAL

DIA

0.01

22,000.00

220.00

35.20

255.20

EQUIPO DE ACABADO SUPERFICIAL

GLB

0.1

1,500.00

150.00

24.00

174.00

FORMALETA MET.PAVIMENTO 0.15X0.20X3MTS

DIA

0.5

1,300.00

650.00

104.00

754.00

71

Preparado Por LEONARDO ROJO HENAO

71

VR. TOTAL

5,537.99

100108

3,520.00

10203

17,718.40

10202

4,825.60

10215

25,862.20

10,656.20

10206

1,137.85

10114

825,989.37

100102

1,511,053.32

72

Preparado Por LEONARDO ROJO HENAO

72

VR. TOTAL

#N/A

3,619,500.00

$ 18,315,140.00

#N/A

18,621.93

14,840.33

164,898.77

561,768.28

73

Preparado Por LEONARDO ROJO HENAO

73

VR. TOTAL

183,385.31

1,438,942.13

649,531.14

10,854.48

18,260.54

39,962.00

10,121.13

9,130.27

6,202.56

8,663.31

22,262.54

74

Preparado Por LEONARDO ROJO HENAO

74

VR. TOTAL
$

64,278.81

36,634.94

61,265.78

202,808.34

3,824.91

260,358.45

1,379.92

3,811.03

1,135.72

2,894.53

2,481.02

3,000.28

6,099.18

21,708.96

75

Preparado Por LEONARDO ROJO HENAO

75

VR. TOTAL
$

3,952.00

6,719.44

7,029.57

2,584.40

21,708.96

3,618.16

4,651.92

40,040.00

3,640.00

3,641.04

31,707.34

19,817.09

1,486.28

475.60

17,892.31

#N/A

76

Preparado Por LEONARDO ROJO HENAO

76

VR. TOTAL
$

171,246.26

151,332.71

17,263.79

20,667.42

25,102.40

#N/A

#N/A

813,569.12

33,597.20

77

Preparado Por LEONARDO ROJO HENAO

77

VR. TOTAL

523,208.16

612,421.70

546,123.14

525,701.34

42,487.54

2,774,789.30

2,774.79

67,711.71

78

Preparado Por LEONARDO ROJO HENAO

78

VR. TOTAL

780,000.00

818,116.02

62,335.73

14,592.52

79

Preparado Por LEONARDO ROJO HENAO

79

VR. TOTAL

41,660.53

55,327.96

71,188.73

71,240.00

19,760.00

#N/A

175,680.95

5,375.55

80

Preparado Por LEONARDO ROJO HENAO

80

VR. TOTAL

6,822.82

10,920.00

12,688.00

29,826.10

5,375.55

7,959.95

81,472.40

34,527.58

40,626.77

22,843.38

81

Preparado Por LEONARDO ROJO HENAO

81

VR. TOTAL
$

23,548.80

23,428.11

63,240.78

105,203.52

#N/A

#N/A

1,152,745.71

455,184.32

273,043.85

42,328.88

58,166.36

73,572.32

76,839.00

82

Preparado Por LEONARDO ROJO HENAO

82

VR. TOTAL
$

12,715.25

46,880.74

226,731.26

1,043,069.16

16,640.07

93,615.50

40,696.30

1,231,342.00

27,449.10

154,440.00

65,126.88

83

Preparado Por LEONARDO ROJO HENAO

83

VR. TOTAL

65,126.88

6,440.55

5,945.13

34,865.82

16,333.41

44,011.01

38,863.00

19,716.78

10,480.32

3,111.12

59,892.62

84

Preparado Por LEONARDO ROJO HENAO

84

VR. TOTAL
#N/A

4,094.92

26,464.26

#N/A

#N/A

#N/A

#N/A

65,216.49

#N/A

269,850.71

85

Preparado Por LEONARDO ROJO HENAO

85

VR. TOTAL

351,738.49

120,847.46

54,391.49

120,847.46

#N/A

48,327.14

10,664.97

10,664.97

472,072.67

292,767.58

86

Preparado Por LEONARDO ROJO HENAO

86

VR. TOTAL

595,846.58

534,565.12

38,766.00

5,272.18

7,236.32

5,168.80

14,989.52

34,527.58

64,341.52

124,594.21

36,530.55

87

Preparado Por LEONARDO ROJO HENAO

87

VR. TOTAL
$

118,508.87

#N/A

50,436.91

59,580.03

59,858.43

41,929.47

80,979.71

362,014.14

7,158.67

25,047.97

9,545.63

11,694.99

88

Preparado Por LEONARDO ROJO HENAO

88

VR. TOTAL
$

78,507.17

66,566.39

69,158.54

69,610.36

68,347.11

41,836.27

89

Preparado Por LEONARDO ROJO HENAO

89

VR. TOTAL

362,149.70

85,512.71

46,725.95

389,439.99

364,314.39

83,243.76

996,320.00

490,004.52

47,966.46

90

Preparado Por LEONARDO ROJO HENAO

90

VR. TOTAL

314,204.23

8,372.72

8,395.79

47,925.11

8,715.51

98,128.40

983,994.38

336,282.13

91

Preparado Por LEONARDO ROJO HENAO

91

VR. TOTAL
$

44,658.43

47,925.11

35,551.01

79,175.68

827,008.00

92

Preparado Por LEONARDO ROJO HENAO

92

VR. TOTAL
$

325,634.40

147,310.80

375,000.00

#N/A

#N/A

#N/A

#N/A

17,972.79

19,098.16

30,326.44

#N/A

31,795.90

5,595.39

93

Preparado Por LEONARDO ROJO HENAO

93

VR. TOTAL

30,661.44

24,703.65

22,179.25

20,917.06

21,056.36

18,234.42

22,179.25

40,921.36

36,714.04

34,759.77

30,006.51

94

Preparado Por LEONARDO ROJO HENAO

94

VR. TOTAL

#N/A

29,670.27

#N/A

#N/A

30,723.00

8,426.00

178,649.64

20,260.17

31,501.72

29,402.67

27,830.01

208,049.26

17,113.99

95

Preparado Por LEONARDO ROJO HENAO

95

VR. TOTAL
$

22,450.41

27,433.58

14,975.65

14,975.65

244,348.25

13,036.36

#N/A

17,050.38

13,036.36

9,880.00

7,702.58

7200
37880
96

7632
40152.8
Preparado Por LEONARDO ROJO HENAO

96

VR. TOTAL

5,995.81

19,344.86

37,628.86

24,629.44

33,659.42

28,380.69

97

2350
2900
18500

2491
3074
19610

20100
18100
30000
1500
28200
1500

21306
19186
31800
1590
29892
1590

Preparado Por LEONARDO ROJO HENAO

97

VR. TOTAL

28,596.74

32,631.25

6,687.40

7,651.71

#N/A

#N/A

17,229.60

23,623.89

98

Preparado Por LEONARDO ROJO HENAO

98

VR. TOTAL
$

67,277.14

19,011.78

183,951.41

254,073.62

208,127.59

194,005.05

196,909.78

171,914.22

129,147.44

53,787.58

11,360.58

15,869.50

26,380.26

27,525.25

29,290.00

27,286.68

40,399.38

4200
20
99

36.4
4368
20.8

273

4095
19.5

Preparado Por LEONARDO ROJO HENAO

99

VR. TOTAL

5200
3000
20
1000
5100
3750
25500
13500
9900
650
47500
16328
17349
1400
3200
$

46,423.50

25,298.85

5408
3120
20.8
1040
5304
3900
26520
14040
10296
676
49400
16981.12
18042.96
1456
3328

5070
2925
19.5
975
4972.5
3656.25
24862.5
13162.5
9652.5
633.75
46312.5
15919.8
16915.275
1365
3120

#N/A

5,747.80

53,708.63

0.75
3
5618.75

100

Preparado Por LEONARDO ROJO HENAO

100

VR. TOTAL
$

25,701.30

#N/A

#N/A

70,649.88

54,727.14

54,727.14

55,435.32

254,800.00

101

Preparado Por LEONARDO ROJO HENAO

101

VR. TOTAL

188,906.27

122,905.79

112,273.97

173,274.87

45,725.85

14,278.50

17,227.05

21,568.74

102

Preparado Por LEONARDO ROJO HENAO

102

VR. TOTAL

196,414.40

183,251.66

183,251.66

183,437.84

47,314.17

41,736.83

103

Preparado Por LEONARDO ROJO HENAO

103

VR. TOTAL

39,282.88

53,057.91

175,105.44

54,873.15

20,438.33

22,717.62

28,663.30

104

Preparado Por LEONARDO ROJO HENAO

104

VR. TOTAL
$

34,978.00

121,104.00

121,104.00

121,104.00

121,104.00

150,800.00

61,215.88

61,215.88

20,675.20

49,103.60

171,862.60

105

Preparado Por LEONARDO ROJO HENAO

105

VR. TOTAL

222,258.40

248,788.11

83,136.43

1,669,522.40

106

Preparado Por LEONARDO ROJO HENAO

106

VR. TOTAL

191,578.00

22,742.72

448,809.86

86,323.69

107

Preparado Por LEONARDO ROJO HENAO

107

VR. TOTAL

#N/A

30,751.26

#N/A

#N/A

19,332.74

965,885.62

54,487.27

13,414.38

108

Preparado Por LEONARDO ROJO HENAO

108

VR. TOTAL

42,229.10

45,783.20

40,828.93

#N/A

162,007.49

#N/A

#N/A

38,467.43

1,242.36

2,896.40
#N/A

109

Preparado Por LEONARDO ROJO HENAO

109

VR. TOTAL

100,178.56

93,050.82

11,262.05

9,521.75

14,962.80

5,168.80

5,938.00

12,386.30

#N/A

#N/A

5,356.70

8,372.70

110

Preparado Por LEONARDO ROJO HENAO

110

VR. TOTAL

#N/A

9,712.17

3,659.68

230,528.48

171,862.60

70,192.30

195,000.00

62,025.60

98,027.92

408,335.20

111

Preparado Por LEONARDO ROJO HENAO

111

VR. TOTAL

180,908.00

854,908.00

#N/A

#N/A

46,623.15

#N/A

209,367.56

112

Preparado Por LEONARDO ROJO HENAO

112

VR. TOTAL
#N/A

#N/A

#N/A

155,880.83

155,880.83

#N/A

#N/A

16,761.26

#N/A

113

Preparado Por LEONARDO ROJO HENAO

113

VR. TOTAL

22,524.48

#N/A

45,584.12

#N/A

#N/A

38,056.88

#N/A

114

Preparado Por LEONARDO ROJO HENAO

114

VR. TOTAL

#N/A

#N/A

38,270.07

#N/A

#N/A

44,200.00

#N/A

#N/A

#N/A

115

Preparado Por LEONARDO ROJO HENAO

115

VR. TOTAL

#N/A

21,423.75

26,070.02

20,034.27

18,548.69

#N/A

1,545.00

53,884.74

41,083.24

116

Preparado Por LEONARDO ROJO HENAO

116

VR. TOTAL
#N/A

36,462.00

3,351.45

114,839.18

80,000.00

34,500.00

34,500.00

81,740.00

22,997.03

#N/A

15,965.00

20,600.00

15,895.02

18,282.95

9,355.53

117

Preparado Por LEONARDO ROJO HENAO

117

VR. TOTAL
$

21,134.27

26,235.66

47,945.74

6,095.80

2,193.80

8,343.18

8,807.50

118

Preparado Por LEONARDO ROJO HENAO

118

VR. TOTAL

#N/A

4,377.99

#N/A

1,653.09

6,566.17

6,257.76

11,445.59

2,734.86

9,037.08

2,474.88

119

Preparado Por LEONARDO ROJO HENAO

119

VR. TOTAL

40,651.93

45,784.88

32,430.35

15,327.76

15,539.36

11,600.00

1,898.92

9,087.44

4,454.45

8,546.38

19,919.83

9,380.55

4,335.68

3,668.56

#N/A

120

Preparado Por LEONARDO ROJO HENAO

120

VR. TOTAL

#N/A

4,725.91

3,438.10

4,194.86

28,722.25

3,101.28

7,397.81

12,612.21

20
1

12,331.96

10,407.18

18,363.42

121

97800
4890

Preparado Por LEONARDO ROJO HENAO

121

VR. TOTAL

#N/A

#N/A

1,186,567.71

1,172,999.66

1,165,393.34

1,160,148.69

1,159,627.02

1,159,058.49

#N/A

122

Preparado Por LEONARDO ROJO HENAO

122

VR. TOTAL

#N/A

1,165,364.39

1,479,788.51

53,360.00

83,520.00

104,400.00

74,240.00

69,600.00

45,975.64
#N/A

5,608,370.14

#N/A

#N/A

307,450.46

123

Preparado Por LEONARDO ROJO HENAO

123

VR. TOTAL

267,946.47

#N/A

#N/A

339,208.38

#N/A

#N/A

270,515.38

124

Preparado Por LEONARDO ROJO HENAO

124

VR. TOTAL

#N/A

#N/A

#N/A
$

291,577.64

#N/A

#N/A

#N/A

#N/A

#N/A

125

Preparado Por LEONARDO ROJO HENAO

125

VR. TOTAL

13,260.80

15,474.40

28,280.80

41,306.37

28,681.60

290.00

25,862.20

#N/A

#N/A

3,351.45

36,946.30

6,896.35

37,074.16

453,969.29

456,268.07

126

Preparado Por LEONARDO ROJO HENAO

126

VR. TOTAL

35,670.00
#N/A

54,671.65

52,978.27

#N/A

#N/A

56,525.00

#N/A

#N/A

57,617.62

60,424.37

127

Preparado Por LEONARDO ROJO HENAO

127

VR. TOTAL

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

19,470.93

#N/A

#N/A

128

Preparado Por LEONARDO ROJO HENAO

128

VR. TOTAL

16,874.53

#N/A

#N/A

206,943.68

#N/A

#N/A

20,757.80

129

Preparado Por LEONARDO ROJO HENAO

129

VR. TOTAL
#N/A

#N/A

40,840.95

10,899.40
#N/A

#N/A

#N/A

#N/A

130

Preparado Por LEONARDO ROJO HENAO

130

VR. TOTAL
$

11,589.82

24,496.76

25,024.71

24,987.16

18,327.63

#N/A

55,446.02

55,446.02

51,630.74

61,497.62

#N/A

#N/A

#N/A

19,236.97

131

Preparado Por LEONARDO ROJO HENAO

131

VR. TOTAL

#N/A

#N/A

#N/A

#N/A

14,252.47

12,555.79

#N/A

#N/A

20,214.02

16,759.99

#N/A

132

Preparado Por LEONARDO ROJO HENAO

132

VR. TOTAL

#N/A

#N/A

#N/A

20,206.95

1,465.87

15,424.51

#N/A

#N/A

#N/A

37,342.95

5,945.13

36,847.53

133

Preparado Por LEONARDO ROJO HENAO

133

VR. TOTAL
$

151,332.71

#N/A

475,248.60

561,070.78

648,343.26

603,329.37

#N/A

521,788.38

#N/A

134

Preparado Por LEONARDO ROJO HENAO

134

VR. TOTAL

625,628.41

700,337.39

64,500.97

75,445.76

87,897.64

55,286.37

43,455.10

43,455.10

135

Preparado Por LEONARDO ROJO HENAO

135

VR. TOTAL
#N/A

76,633.59

#N/A

110,783.92

54,799.05

58,673.35

136

Preparado Por LEONARDO ROJO HENAO

136

VR. TOTAL
$

58,319.09

73,548.72

191,906.19

1,307.29

439,603.43

170,147.19

162,376.75

#N/A

137

Preparado Por LEONARDO ROJO HENAO

137

VR. TOTAL
$

14,500.00
#N/A

310,933.29

110,034.33

161,241.26

#N/A

43,037.46

#N/A

#N/A

5,945.13

34,865.82

120,674.19

138

Preparado Por LEONARDO ROJO HENAO

138

VR. TOTAL
$

6,292.98

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

67,332.29

#N/A

#N/A

#N/A

#N/A

10,809.88

139

Preparado Por LEONARDO ROJO HENAO

139

VR. TOTAL

#N/A

#N/A

#N/A

53,933.75

43,772.94

#N/A

#N/A

7,813.81

93,371.55

93,371.55

11,679.04

140

Preparado Por LEONARDO ROJO HENAO

140

VR. TOTAL

#N/A

#N/A

#N/A

10,473.97

36,556.80

224,868.11

30,042.11

29,814.88

#N/A

17,647.25

17,647.25

141

Preparado Por LEONARDO ROJO HENAO

141

VR. TOTAL

67,040.48

10500
16900
560
236431
6124
40825
34500
4872
21000
1400
1300

142

1680
2704
89.6
37828.96
979.84
6532
5520
779.52
3360
224
208

Preparado Por LEONARDO ROJO HENAO

142

Anda mungkin juga menyukai