Testing and
Commissioning of MV/LV
Cables and 11KV
Package Unit
Substations - Session 1
Date: 28.04.2016
Page 2
Page 4
I Date I Name
Page 8
Capacitance measurement on MV
cables FAT/SAT
Capacitance measurement shall made with a
calibrated LCR meter at a frequency of 1 kHz.
The measurement shall be done between each
core against copper screen. The measured
value shall be converted to micro Farad/km.
The measurement shall be made at ambient
temperature
Page 9
Page 10
Page 17
Page 21
Isolate T-Off from 'OFF' position Firmly lift the operating handle up
Insert the operating handle
from the 'SERVICE' to the'ISOLATE'
Page 22
Page 23
Page 24
Page 25
Presentation Title
Page 29
I Date I Name
Presentation Title
Page 30
Test RH Ring
Switch
1
Closed/On
2
Closed/On
LH Ring
Switch
Selector
Switch
a
b
c
Circuit Breaker
Selector
on
eart
h
LHS Ring
Switch
RHS Ring
Switch
on
off
CB Switch
on
off
earth
earth
Apply Test
Voltage to:
A
B
C
Earth
Closed/On Closed/On
Closed/On
A,C
Frame, b
Closed/On Closed/On
Closed/On
Frame, a, c
Closed/On
Closed/On Closed/On
Open/Off
Open/Off
Open/Off
Closed/On A,B,C,A,B,C
Closed/On
A,B,C
a, b, c
a, b, c