Anda di halaman 1dari 4

Homework -8

1.
a)

z / 2 = 2.81 which implies that ( /2 =1(2.81)


Therefore,

=0.005

And Confidence Level = 100*(1- =99.5


b)

z / 2=1.44 which implies that ( /2 =1(1.44)


Therefore,

=0.15

And Confidence level = 100*(1- =85


c) 99.7 % implies that
Therefore,

( 2 )=0.0015

z 0.0015= 2.96

d) 75 % implies that
Therefore,

=0.003 which leads

=0.25 which leads

( 2 )=0.125

z 0.125=1.15

2.
a) 4.85

( 1.96 ) ( 0.75 )
=4.85 0.3287 = (4.521, 5.179)
20

b) 4.56

(2.33)( 0.75)
=4.56 0.4368=( 4.123, 4.997)
16

c) 2(1.96)

0.75
=0.4= Therefore ,n=54.0225
n

In order to have the width of the 95% confidence interval n must be at least 55.

d) n =

[2 ( 2.58 ) ( 0.75 ) ]
0.2

=93.61

Therefore, n= 94

7.
Degree of freedom: n-1=22-1=21
chisq(0.005,21)=8.033653
chisq(0.995,21)=41.40106
The variance s2 =25.36799
Then the CI for 2 is (21*25.368/41.401,21*25.368/8.034) = (12.868, 66.309)
CI for is (3.6, 8.1)

6.
Variable
Q3

N
20

Mean
0.9255

Median TrMean StDev


0.9300

0.9261

SEMean Min

0.0809

0.0181

0.8525 0.96

95% CI = 0.9255 2.093(0.0181) = 0.9255 0.0379 = (.8876,.9634)

5.
Sample mean = 25
Standard deviation = 3.5
Standard error of mean = s / n
Standard error of mean = 3.5 / 15
SE = 3.5/3.873

Max Q1
0.78

1.06

Standard error of mean 0.9036


Confidence interval 25-(0.9036)(2.145) and 25+(0.9036)(2.145)

(23.06, 26.93)

4.
a) Box plot

Outlier is present( > Q3+1.5IQR)

b) n=48 , mean=54.70, std dev=5.23

=0.05
z =2.009

(2 )

5.2

95 % CI is = 54.7 2.009 ( 48 )

= 54.7 1.652

= (53.04,56.35)

Interpretation: We are 95 percent sure that true average breakdown voltage lies in
this range .

has not been precisely determined as we are givenarange which it lies .

3.

=0.01
Therefore, ( /2 =0.005

and

z =

(2)

2.576

N=2003

^p=0.25

99 % CI for p is: 0.25 2.576

( 0.25 ) (.75)
2003

= 0.25 0.0249

= (0.2251,0.2749)

Anda mungkin juga menyukai