Activity ID
Activity Name
ATA-16 ActivitiesAc
Electrical Section
Motor Maintenance
Ma
29-Aug-16
1d 15-Aug-16
16-Aug-16
1d 15-Aug-16
16-Aug-16
A030
Servicing/ Bearing replacement of De-butanizer Condenser fan motor (EC-602), 11KW, 380V
1d 16-Aug-16
17-Aug-16
A040
Servicing/ Bearing replacement of NGL fractionator pump motor (GA-601 A/B), 2.2KW, 380V
1d 16-Aug-16
17-Aug-16
A050
Servicing/ Bearing replacement of crude transfer pump motor (100-GA-01A/B), 45KW, 380V
1d 17-Aug-16
18-Aug-16
A060
Servicing/ Bearing replacement of Flare K.O. drum pump motor (902-GA-01A/B), 4KW, 380V
1d 17-Aug-16
18-Aug-16
A070
1d 17-Aug-16
18-Aug-16
A080
Servicing/ Bearing replacement of Steam condenser fan motor (E-01A/B), 11KW, 380V
1d 18-Aug-16
19-Aug-16
A090
Servicing/ Bearing replacement of Boiler feed water pump motor (P-01A/B), 37KW, 380V
1d 19-Aug-16
20-Aug-16
A100
Servicing/ Bearing replacement of Aux. boiler blower motor (700-PA-3), 5.5KW, 380V
1d 19-Aug-16
20-Aug-16
A110
Servicing/ Bearing replacement of Aux. lube oil pump motor (GA-403 AX/BX), 1.5KW, 380V
1d 19-Aug-16
20-Aug-16
A120
Servicing/ Bearing replacement of Amine reg. reflux pump motor (GA-401 A/B), 6KW, 380V
1d 20-Aug-16
21-Aug-16
A130
Servicing/ Bearing replacement of Amine transfer pump motor (GA-404), 3KW, 380V
1d 20-Aug-16
21-Aug-16
A140
Servicing/ Bearing replacement of Amine regen. condenser Fam motor (EC-402 A/B), 28KW, 380
1d 21-Aug-16
22-Aug-16
A150
Servicing/ Bearing replacement of Hot oil cir. pump motor (830-GA-02 A/B), 112KW, 380V
1d 22-Aug-16
23-Aug-16
A160
Servicing/ Bearing replacement of Hot oil makeup pump motor (830-GA-03), 112KW, 380V
1d 22-Aug-16
23-Aug-16
A170
Servicing/ Bearing replacement of Cooling water pump motor (830-GA-01 A/B), 112KW, 380V
1d 22-Aug-16
23-Aug-16
A180
Servicing/ Bearing replacement of Cooling tower fan motor (801-CT-01 A/B/C/D/E/F), 9.5KW, 380
1d 23-Aug-16
24-Aug-16
A190
Servicing/ Bearing replacement of Raw water pump motor (802-GA-01 A/B), 19KW, 380V
1d 23-Aug-16
24-Aug-16
A200
Servicing/ Bearing replacement of Potable water pump motor (802-GA-02 A/B), 3KW, 380V
1d 24-Aug-16
25-Aug-16
A210
Servicing/ Bearing replacement of Demin water pump motor (912-GA-01 A/B), 2.5KW, 380V
1d 24-Aug-16
25-Aug-16
A220
Servicing/ Bearing replacement of LPG loading pump motor (911-GA-01 A/B), 11.9KW, 380V
1d 24-Aug-16
25-Aug-16
A230
Servicing/ Bearing replacement of Crude loading pump motor (910-GA-01 A/B), 11.9KW, 380V
1d 25-Aug-16
26-Aug-16
A240
1d 25-Aug-16
26-Aug-16
A250
Servicing/ Cleaning of Lean Amine feed pump motor (GA-403 A/B), 755KW, 6KV
1d 26-Aug-16
27-Aug-16
A260
1d 26-Aug-16
27-Aug-16
A270
Servicing/ Cleaning of Fire water pump motor (901-GA-01 A), 220KW, 6KV
1d 26-Aug-16
27-Aug-16
A280
Servicing/ Bearing replacement of RGT A/B vent fan motor (A/B), 22KW, 380V
1d 27-Aug-16
28-Aug-16
A290
Servicing/ Bearing replacement of RGT Gen. cooling fan motor (A/B), 2.2KW, 380V
1d 27-Aug-16
28-Aug-16
Sep 11 18
14d 15-Aug-16
Servicing/ Bearing replacement of Reco Condenser fan motor (PA-501X-A/B), 11KW, 380V
Summary
Sep 04
08-Sep-16, ATA
Milestone
2016
Aug 28
08-Sep-16
A020
Remaining Work
Aug 21
24d 15-Aug-16
A010
Actual Work
Aug 14
Activity Name
A300
Servicing/ Bearing replacement of Boiler Feed Water Pump Motor SRU-II (A/B), 37KW, 380V
1d 27-Aug-16
28-Aug-16
A310
Servicing/ Bearing replacement of Sulfur Feed Pump Motor SRU-II (A/B), 14.92KW, 380V
1d 28-Aug-16
29-Aug-16
A320
Servicing/ Bearing replacement of Sulfur Loading Pump Motor SRU-II (A/B), 14.92KW, 380V
1d 28-Aug-16
29-Aug-16
A330
Servicing/ Bearing replacement of Condensate Transfer Pump Motor SRU-II (A/B), 2.2KW, 380V
1d 28-Aug-16
29-Aug-16
A131
Servicing/ Bearing replacement of Amine cooler fan motor (EC-401 A/B/C/D), 28KW, 380V
1d 21-Aug-16
22-Aug-16
A231
Servicing/ Cleaning of Hot oil cir.pump motor (830-GA-01 A/B/C), 187KW, 6KV
Electric Heat
H
Tracing
1d 25-Aug-16
26-Aug-16
23d 16-Aug-16
08-Sep-16
B010
4d 16-Aug-16
20-Aug-16
B020
5d 03-Sep-16
08-Sep-16
4d 16-Aug-16
20-Aug-16
Plant Lightenng
Lig
Circuit
C040
1d 16-Aug-16
17-Aug-16
C050
Cleaning / servicing of all Road Lights (250W) & Replacement of parts if required.
1d 17-Aug-16
18-Aug-16
C060
Cleaning / servicing of all Flood Lights ( 400W ) & Replacement of parts if required.
1d 18-Aug-16
19-Aug-16
C080
1d 19-Aug-16
20-Aug-16
6d 15-Aug-16
21-Aug-16
Plant Earthing
Ear
D010
3d 15-Aug-16
18-Aug-16
D020
3d 18-Aug-16
21-Aug-16
7d 22-Aug-16
29-Aug-16
Cable Laying
La
E010
1d 22-Aug-16
23-Aug-16
E020
1d 23-Aug-16
24-Aug-16
E030
1d 24-Aug-16
25-Aug-16
E040
Power cable for Old SRU Air Blower motor 25 sqmm HT Cable (Req . 1.5'X3.5' running 150 mete
4d 25-Aug-16
29-Aug-16
6d 16-Aug-16
22-Aug-16
Installation/Modification
Installatio
F010
1d 16-Aug-16
17-Aug-16
F020
1d 17-Aug-16
18-Aug-16
F030
Modification job of LV Busbar and coupller Drop downs for 3200 Amp Air Circuit Breakers
1d 18-Aug-16
19-Aug-16
F040
Inst of AMF panel ,Sync of EDG circuit breaker with transformer breaker,
1d 19-Aug-16
20-Aug-16
F050
1d 20-Aug-16
21-Aug-16
F060
1d 21-Aug-16
22-Aug-16
5d 21-Aug-16
26-Aug-16
5d 21-Aug-16
26-Aug-16
Relay Testing
Tes
G010
Relay testing of all relay installed with( MV )medium voltage sytem.CTM 09 NOS ,CDG 04 NOS
Actual Work
Milestone
Remaining Work
Summary
Aug 14
Aug 21
2016
Aug 28
Sep 04
Sep 11 18
08-Sep-16, Elec
22-Aug-16, Installation/Modification