ENGINEERING & CONSTRUCTION PRIVATE LIMITED

OUR MILESTONES
AN OVERVIEW OF THE COMPANYS ACHIEVEMENTS SINCE ITS INCEPTION

CURRENT PROJECTS

S.no

PROJECT NAME

Transportation and Installation of FPSO

SCOPE

T&I

REIGON

Duration

Middle East

Sep 2016

Dec 2016

Design and Construction of Canal Retaining Wall

EPC

India

May 2016
TBA

Design & Construction of Conventional Centre

EPC

India

TBA

Transportation & Installation of FPSO, Middle East


The project involved transporting an FPSO from
Far-East to an Oil Field in the Middle East in the
first phase. The second phase involves installation
of this FPSO nearer to a remote Well-Head
Platform which includes mooring of the same and
installation of umbilical and flexible risers. The
project is valued around INR 133 crore (USD 20
Million) and will be completed in Q4, 2016.
Transportation & Installation of FPSO Cyrus
Scope of Work includes:
Mooring Anchor (Drag Embedded) with Chain
installation
FPSO station Keeping and Hook up with
Mooring Chains
Installation of 3 x Flexible risers and
1 x umbilical at FPSO and Existing WHP

A typical spread moored FPSO

Design & Construction of Canal Retaining wall, India


The scope of work includes the construction
of 1.12Km length of concrete retaining
wall to strengthen the existing canal road

with steel railing on top of the retaining wall.


The project is valued around INR 6 crore (USD

0.9 Million)
Civil Works Include:

Excavation

Foundation

Shuttering

Steel Works

Canal Retaining wall

Canal Retaining wall

Design & Construction of Convention center, India


The scope of work for Construction of
Convention center with PreEngineered Steel
Building System includes design, supply and

erection of Structural Works & Architectural


finishes and MEP works. The job is valued

around INR 60 Crore (USD 9 million). The


scope also includes :

Excavation

Interior Works

Foundations
Structural

MEP works

PHE

Steel Works

HVAC

Architectural
& Finishing

Top view of convention center

Front view of convention center

COMPLETED PROJECTS

Sr.no

PROJECT NAME

EPCI of WHP Topside modification

Installation Of Marine Piles & Superstructures For Umm Qasr


Jetty-3

Supply Of 120 men Accommodation Vessel For Topside


Modification

Recovery, Transport And Repairs Of SPM Buoy

Re-installation Of SPM Buoy

SCOPE

REIGON

Duration

EPCI

Middle
East

Aug 2016

Sep 2016

EPCI

Middle
East

Jan 2015

Nov 2015

Middle
East

Mar 2015

Nov 2015

India

Oct 2013

Dec 2013

India

Feb 2014

May 2014

T&I

T&I

EPCI of WHP Topside modification, Middle East


The project would see Unison for EPCI of Well
Head Platform Topside modification and
installation of riser balcony at the sub-cellar
level. The scope of work would also involve
engineering procurement, fabrication transport
& installation of topside piping, structural
modification work and pre-commissioning of the
risers. The project is valued close to INR 33 Crore
(USD 5 Million) and will be completed in Q3,
2016.
The scope of work include:
Residual engineering
Supply of structural and piping material;
Fabrication of the Deck extension and piping,
inclusive of required painting system;
Installation of riser balcony at Well Head
Platform.

Piping through Riser balcony

Fabricated Riser balcony

Installation Of Marine Piles & Superstructures For Umm Qasr Jetty-3


Unison has won the EPCIC contract for extension of the Umm Quasar Jetty No.3 at Basrah, Iraq for
HLG/Shell. The project is valued around INR 165 crore (USD 25 million). The project was mobilized in May
2015 and has completed successfully.

Loading platform & track


bridge

Breasting Dolphin Top Section


Installation

Pile installation

Transportation of piles

Jack up Barge

Completion of welding works

Umm Qasr Jetty-3 After Completion

Supply of 120 men Accommodation Vessel for Topside Modification


HLG/Shell

was

responsible

for

the

topside modification for which an 120

men

accommodation

vessel

was

required, Unison responded immediately

and was able to provide a vessel as per


the

clients

specifications

and

was

delivered to them within the stipulated


time. Unison was also responsible for the
vessel chartering, supply, maintenance,
and monitoring of the vessel during the
entire life span of the project.

Recovery, Transport & Repair Of SPM Buoy


An SPM Buoy belonging to Cairn India
Limited was damaged and had sunk-in.
The underlying flexible were also damaged
in this process. UGL salvaged the buoy

from the ocean bottom (30 meter depth)


and transported it to UAE for repair. The

project also involved salvaging/recovery of


SPM

buoy,

Under-Buoy

hoses

and

electrohydraulic umbilical. The project was


valued at around US$ 5 Million and was
completed within 2 months of the contract
award date

Recovery of SPM buoy

Lifting of SPM BUOY

Transfer SPM Buoy to a cargo barge

Damaged SPM buoy

SPM buoy Fastening to cargo Barge

SPM buoy Transported to UAE for repairs

SPM buoy Repair

Re-installation Of SPM Buoy


Another project was awarded by Cairn
India Limited which involved installation of
an SPM Buoy at Bhogat, Gujarat. The
project was valued at around US$ 4 Million
and was completed Summer, 2014. Apart
from the turret type SPM installation, the
work involved installation of 6 mooring
chains,

Under-Buoy

hoses,

electro-

hydraulic umbilical, floating hoses, mooring


hawser, onshore telemetry system at

landfall point and crude oil terminal.

Installation of SPM buoy

Under buoy hose installation

Floating hose installation

Towing SPM buoy

Installation of Mooring hawser