Rab Rumah Type 36-100
Rab Rumah Type 36-100
NO
URAIAN
PEKERJAAN PERSIAPAN
1 1m2 Membersihkan Lapangan dan Peralatan
0.1000 Pekerja
0.0500 Mandor
Jumlah Harga per Satuan Pekejaan
2 1M Pengukruan dan pemasangan Bouw Plank
0.0120 Kayu Usuk 5/7
0.0200 Paku Biasa 2"-5"
0.0070 Kayu Papan 3/20
0.1000 Pekerja
0.1000 Tukang Kayu
0.0100 Kepala Tukang
0.0050 Mandor
Jumlah Harga per Satuan Pekejaan
II PEKERJAAN TANAH
1 1M2 Galian Tanah Biasa Sedalam 1 m
0.7500 Pekerja
0.0250 Mandor
Jumlah Harga per Satuan Pekejaan
2 Mengurug Kembali 1 m3 Galian
Mengurug kembali 1 m3 Galian Dihitung dari 1/3 kali indeks Pekerjaan Galian
Jumlah Harga per Satuan Pekejaan
3 1 m3 Urugan Pasir
1.2000 Pasir Urug
0.3000 Pekerja
0.0100 Mandor
Jumlah Harga per Satuan Pekejaan
III PEKERJAAN PONDASI DAN BETON
1 Membuat 1M3 lantai kerja beton
SAT
218.000
0.520
0.870
1.150
0.200
0.025
0.006
PC
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Kepala Tukang
Mandor
oh
oh
m3
kg
m3
oh
oh
oh
oh
oh
oh
m3
oh
oh
kg
M3
M3
OH
OH
OH
OH
kg
m3
m3
oh
oh
oh
oh
m3
kg
ltr
oh
oh
oh
oh
m3
kg
ltr
oh
oh
oh
oh
m3
kg
ltr
m3
lbr
oh
oh
oh
oh
m3
kg
ltr
m3
lbr
oh
oh
oh
oh
m3
kg
ltr
m3
lbr
oh
oh
oh
oh
Kg
Kg
oh
oh
oh
oh
Bh
Kg
M3
oh
oh
oh
oh
kg
m3
oh
oh
oh
oh
kg
oh
oh
oh
oh
m3
kg
kg
oh
oh
oh
oh
m3
kg
oh
oh
oh
oh
m3
kg
oh
oh
oh
oh
m3
kg
oh
oh
oh
oh
m3
kg
oh
oh
oh
oh
Lbr
kg
oh
oh
oh
oh
m3
kg
oh
oh
oh
oh
lbr
m3
kg
oh
oh
oh
oh
m
kg
oh
oh
oh
oh
m3
kg
oh
oh
oh
oh
bh
kg
m3
oh
oh
oh
oh
bh
kg
m3
oh
oh
oh
oh
bh
kg
m3
oh
oh
oh
oh
bh
kg
m3
oh
oh
oh
oh
bh
oh
oh
oh
oh
bh
oh
oh
oh
oh
bh
oh
oh
oh
oh
bh
oh
oh
oh
oh
m2
oh
oh
oh
oh
bh
oh
oh
oh
oh
Bh
oh
oh
oh
oh
bh
kg
m3
m3
m3
m3
oh
oh
oh
oh
m
oh
oh
oh
oh
m
oh
oh
oh
oh
m
oh
oh
oh
oh
bh
bh
oh
oh
oh
oh
bh
oh
oh
oh
oh
bh
stel
oh
oh
oh
oh
bh
stel
oh
oh
oh
oh
kg
kg
kg
oh
oh
oh
oh
oh
oh
UAN PEKERJAAN
HARGA SAT.
HARGA
BAHAN
60,000
95,000
2,700,000
30,000
4,000,000
60,000
65,000
85,000
95,000
UPAH
6,000
4,750
10,750
JUMLAH
Hal 991
Hal 991
10,750
32,400
600
28,000
61,000
60,000
95,000
6,000
6,500
850
475
13,825
45,000
2,375
47,375
KET
Hal 992
Hal 996
Hal 992
Hal 991
Hal 991
Hal 991
Hal 991
74,825
Hal 991
Hal 991
47,375
15,792
15,792
111,000
60,000
95,000
133,200
133,200
1,410
125,000
279,000
60,000
65,000
85,000
95,000
152,150
307,380
65,000
242,730
615,110
1,410
125,000
279,000
18,000
950
18,950
Hal 961
Hal 991
Hal 991
327,120
97,500
145,080
69,000
13,000
2,125
570
84,695
Hal 961
Hal 961
Hal 961
Hal 991
Hal 991
Hal 991
Hal 991
699,805
Hal 961
Hal 961
Hal 961
65,000
85,000
60,000
95,000
569,700
3,300,000
30,000
27,500
60,000
65,000
85,000
95,000
16,250
2,125
99,000
7,600
124,975
Hal 991
Hal 991
Hal 991
Hal 991
694,675
132,000
9,000
2,750
143,750
Hal 992
Hal 996
Hal 995
18,000
16,900
2,210
475
37,585
181,335
3,300,000
30,000
27,500
60,000
65,000
85,000
95,000
148,500
9,000
2,750
160,250
3,300,000
30,000
27,500
2,500,000
115,000
60,000
65,000
85,000
95,000
39,600
21,450
2,805
3,135
66,990
294,240
39,600
21,450
2,805
3,135
66,990
294,240
39,600
21,450
2,805
3,135
66,990
311,890
132,000
12,000
5,500
45,000
50,400
244,900
15,300
15,800
60,000
Hal 994
132,000
12,000
5,500
37,500
40,250
227,250
3,300,000
30,000
27,500
2,500,000
144,000
60,000
65,000
85,000
95,000
213,030
132,000
12,000
5,500
37,500
40,250
227,250
3,300,000
30,000
27,500
2,500,000
115,000
60,000
65,000
85,000
95,000
31,200
16,900
2,210
2,470
52,780
16,065
237
hal 993
hal 993
420
65,000
85,000
95,000
16,302
2,500
1,410
125,000
60,000
65,000
85,000
95,000
455
60
29
963
17,265
175,000
13,649
5,625
194,274
Sorong
18,000
6,500
850
1,425
26,775
221,049
1,410
125,000
9,745.92
4,375.00
14,120.92
1,410
14,121
4,583
4,583
5,500,000
30,000
21,000
60,000
65,000
85,000
95,000
6,600,000
37,500
21,000
6,658,500
5,500,000
21,000
60,000
65,000
85,000
95,000
8,370,000
60,000
162,500
21,250
4,750
248,500
469,550
240,000
19,000
780,000
102,000
1,141,000
4,795,000
3,630,000
24,000
3,654,000
3,300,000
30,000
60,000
65,000
360,000
1,170,000
153,000
28,500
1,711,500
220,000
1,050
221,050
3,300,000
30,000
60,000
95,000
65,000
85,000
4,583
3,630,000
90,000
144,000
468,000
239,752
85,000
95,000
3,720,000
3,300,000
30,000
60,000
95,000
65,000
85,000
61,200
11,400
684,600
4,404,600
6,000
475
6,500
850
13,825
64,525
46,200
4,500
50,700
39,000
30,000
60,000
95,000
65,000
85,000
27,300
600
27,900
3,300,000
30,000
60,000
65,000
85,000
95,000
60,240
Hal 988
Hal 996
6,000
3,250
425
475
10,150
91,698
3,600
3,900
510
285
8,295
37,395
12,000
19,500
2,550
950
35,000
94,790
53,790
6,000
59,790
9,166
1,410
6,000
13,000
2,125
475
21,600
28,875
225
29,100
3,300,000
30,000
60,000
65,000
85,000
95,000
40,080
24,898
53,790
2,860
81,548
27,500
1,500
60,000
65,000
85,000
95,000
7,200
570
3,900
510
12,180
35,640
3,000
38,640
68,400
3,300,000
26,000
60,000
65,000
85,000
95,000
Hal 992
60,771
13,818
993
125,000
60,000
65,000
85,000
95,000
5,625
80,214
5,000
1,410
125,000
60,000
65,000
85,000
95,000
15,000
7,800
1,020
1,235
25,055
105,269
59,350
14,100
5,625
79,075
993
37,200
22,750
2,975
2,850
65,775
144,850
2,240
1,410
125,000
60,000
65,000
85,000
95,000
59,360
14,664
5,625
79,649
9,166
1,410
125,000
60,000
65,000
85,000
95,000
15,000
7,800
1,020
1,188
25,008
53,137
Hal 995
900
9,750
1,275
76
12,001
22,001
Hal 995
600
6,500
850
48
7,998
16,998
10,000
10,000
34,500
60,000
65,000
85,000
95,000
993
9,000
9,000
10,000
60,000
65,000
85,000
95,000
145,424
10,000
10,000
9,000
60,000
65,000
85,000
95,000
37,200
22,750
2,975
2,850
65,775
13,749
11,506
2,875
28,130
10,000
60,000
65,000
85,000
95,000
993
Hal 995
900
9,750
1,275
76
12,001
34,500
22,001
Hal 995
1,200
13,000
1,700
95
34,500
105,000
60,000
65,000
85,000
95,000
15,995
50,495
115,500
115,500
Hal 994
900
9,750
1,275
76
12,001
127,501
850,000
51,000
60,000
65,000
85,000
95,000
850,000
51,000
901,000
195,000
35,100
60,000
65,000
85,000
95,000
Hal 962
108,000
175,500
45,900
10,450
339,850
569,950
192,000
65,975
128
1,520
259,623
410,123
7,500
2,188
9,688
28,750
10,063
60,000
65,000
85,000
95,000
1,185,785
57,600
47,940
8,750
19,530
9,180
7,500
150,500
6,250
2,188
60,000
65,000
85,000
95,000
198,000
71,500
85
15,200
284,785
195,000
35,100
230,100
1,200
1,410
125,000
279,000
15,300
125,000
60,000
65,000
85,000
95,000
Hal 995
Hal 997
2,160
3,900
510
171
6,741
16,429
34,500
10,063
44,563
Hal 997
3,240
5,850
765
257
10,112
54,674
14,625
5,119
60,000
65,000
85,000
95,000
17,550
5,119
22,669
336,000
446,000
60,000
65,000
85,000
95,000
Hal 997
4,860
8,775
1,190
390
15,215
37,883
336,000
446,000
782,000
Hal 995
1,800
19,500
2,550
143
23,993
805,993
62,500
60,000
65,000
85,000
95,000
62,500
62,500
25,000
3,200
60,000
65,000
85,000
95,000
33,505
600
6,500
850
475
8,425
45,505
1,200
4,095
536
238
6,068
21,928
6,000
475
6,475
6,475
1,950
1,950
11,960
15,860
60,000
95,000
600
6,500
850
475
8,425
37,000
80
37,080
19,500
19,500
46,000
60,000
65,000
85,000
95,000
70,925
25,000
80
25,080
37,000
3,200
60,000
65,000
85,000
95,000
600
6,500
850
475
8,425
=
=
=
=
=
12.5
8
p
12.5
100
=
=
=
x
x
l
8
(p
12.5
45
+
+
m
2)
2
=
=
=
=
9
1
1
1.2
=
=
(p
1
x
x
10.8
m3
1.2
II
PEKERJAAN AWAL
Pembersihan Lahan
Pembersihan Lahan
Panjang
Lebar
V
Pemasangan Bouwplank
V
Volume 1
bh
m
m
m
l
1
=
=
(p
x
3.675
l
3
2.2
=
=
=
V. Galian Tanah
14.475
8.078
m3
5.56
2.3
Urugan Pasir
Urugan pasir dibawah pondasi
Panjang
Lebar
Tinggi
Volume 1
=
=
=
=
=
(p
1
x
x
0.9
m3
1m
1m
0.1 m
=
=
=
=
=
=
l
1
49 m
0.15 m
0.1 m
(p
49
0.735
x
x
m3
Vol. lantai 1
5.25
4.5
Vol. lantai 2
2.75
3.5
Vol. lantai 3
2.75
1.2
Vol. lantai 4
2.25
1.2
( Vol. lantai
0.1 m
=
=
3.925
0.1
III
3.1
PEKERJAAN PONDASI
Pekerjaan Lantai Kerja , tinggi 0.05 m
Jumlah Pondasi
Panjang
Lebar
Tinggi
Volume 1
3.2
A
1
Pekerjaan Pondasi
BETON
Pondasi Tapak 80 x 80 ( K3)
Volume 1
Panjang
Lebar
Tinggi
Volume 1
=
=
=
=
=
=
(p
1
x
x
0.45
m3
=
=
=
=
=
=
=
=
=
=
=
l
1
0.8 m
0.8 m
0.15 m
p
0.8 x
=
Volume 2
Panjang
Lebar
Tinggi
Volume 2
9
1
1
0.05
0.096
0.8
m
0.4 m
0.15 m
0.55 m
p
x
0.4 x
0.033
l
0.15
m3
V. Total 1
=
=
( V1
0.096
0.387
=
=
=
=
=
0.8 m
0.475 m
0.15 m
p
=
=
=
=
=
=
=
p
0.033
l
0.15
m3
+
( V1
V2 )
0.057
0.36
=
=
=
=
=
0.8 m
0.8 m
0.15 m
p
0.033
m3
0.8 x
0.096
=
=
=
=
=
=
=
0.475
3
0.4 x
0.8
m3
0.3 m
0.15 m
0.55 m
p
0.3 x
=
V. Total 3
0.4 m
0.15 m
0.55 m
=
Volume 2
Panjang
Lebar
Tinggi
Volume 2
x
0.057
=
V. Total 2
0.033
3
0.8 x
=
Volume 2
Panjang
Lebar
Tinggi
Volume 2
V2 )
0.02
0.15
m3
+
( V1
0.096
0.12
V2 )
0.02475
=
=
=
=
=
0.8 m
0.475 m
0.15 m
p
0.057
=
=
=
=
=
Volume 2
Panjang
Lebar
Tinggi
Volume 2
=
=
p
0.02
l
0.15
( V1
V2 )
0.057
0.08
=
=
=
=
=
0.8 m
0.8 m
0.15 m
p
0.02475
m
0.8 x
0.10
=
=
=
=
=
0.15 m
0.15 m
0.55 m
=
6
=
=
0.3 x
0.8
m
0.15 x
=
V. Total 5
0.475
3
0.3 m
0.15 m
0.55 m
=
V. Total 4
0.8 x
=
Volume 2
Panjang
Lebar
Tinggi
Volume 2
0.01
0.15
m
( V1
0.096
0.11
V2 )
0.012375
m3
Volume 1
Panjang
Lebar
Tinggi
Volume 1
Volume 2
Panjang
Lebar
Tinggi
Volume 2
=
=
=
=
=
0.6 m
0.375 m
0.15 m
p
0.03
=
=
=
=
=
0.15 m
0.15 m
0.55 m
p
Volume 2
Panjang
Lebar
Tinggi
Volume 2
V. Total 7
V. Total beton
=
=
l
0.375
m3
0.15 x
=
V. Total 6
x
0.6 x
0.01
0.15
m3
+
( V1
0.03375
0.09
=
=
=
=
=
0.375 m
0.375 m
0.15 m
p
0.012375
m
0.375 x
0.02
=
=
=
=
=
0.3 m
0.15 m
0.55 m
p
0.375
m
0.3 x
0.15
0.02
=
=
( V1
0.02109375
0.09
m3
0.39
+
+
1.24
=
=
=
V2 )
V.Total 1
V2 )
0.02475
V.Total 2
0.36
B
1
PEMBESIAN
Pondasi Tapak 80 x 80 ( K3)
Pembesian 8-200
panjang
jmlh besi
berat besi
Volume 1
Pembesian 810
panjang
jmlh besi
berat besi
Volume 2
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 3
=
=
=
=
=
=
2
20
0.395
jmlh besi
20
47.4
=
=
=
=
=
=
1.2
8
0.617
jmlh besi
8
17.7696
=
=
=
=
=
=
Pembesian 8-200
panjang
jmlh besi
berat besi
Volume 2
Pembesian 810
panjang
2
m
bh
kg/m
x
x
kg
panjang
1.2
kg/m
x
x
kg
panjang
1.2
1.2 m
4 bh
0.222
jmlh besi
4
3.1968
=
=
=
V. total 1
m
bh
kg/m
x
x
kg
V1
47.4
68.3664 kg
=
=
=
=
=
=
2
6
0.395
jmlh besi
6
18.96
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
1.35
10
0.395
jmlh besi
10
21.33
m
bh
kg/m
x
x
kg
+
+
panjang
2
panjang
1.35
panjang
jmlh besi
berat besi
Volume 3
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 4
V. total 2
Pembesian 610
panjang
jmlh besi
berat besi
Volume 2
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 3
V. total 3
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.2
8
0.617
jmlh besi
8
23.6928
0.222
jmlh besi
4
4.2624
V1
18.96
68.2452 kg
2
20
0.395
jmlh besi
20
15.8
=
=
=
=
=
=
1.2
6
0.617
jmlh besi
6
4.4424
=
=
=
kg/m
x
x
kg
panjang
1.2
kg/m
x
x
kg
panjang
1.2
1.2 m
4 bh
=
=
=
=
=
=
=
=
=
=
=
=
m
bh
+
+
m
bh
kg/m
x
x
kg
V2
21.33
panjang
2
m
bh
kg/m
x
x
kg
panjang
1.2
kg/m
x
x
kg
panjang
0.9
0.9 m
4 bh
0.222
jmlh besi
4
0.7992
V1
15.8
21.0416 kg
+
+
V2
4.4424
Pembesian 8-200
panjang
jmlh besi
berat besi
Volume 2
Pembesian 610
panjang
jmlh besi
berat besi
Volume 3
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 4
V. total 4
Pembesian 410
panjang
=
=
=
=
=
=
2
6
0.395
jmlh besi
6
4.74
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
1.35
10
0.395
jmlh besi
10
5.3325
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
1.2
6
0.617
jmlh besi
6
4.4424
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
panjang
2
panjang
1.35
m
bh
kg/m
x
x
kg
panjang
1.2
kg/m
x
x
kg
panjang
0.9
0.9 m
4 bh
0.222
jmlh besi
4
0.7992
V1
4.74
15.3141 kg
2
20
0.395
jmlh besi
20
15.8
1.2
+
+
m
bh
kg/m
x
x
kg
V2
5.3325
panjang
2
jmlh besi
berat besi
Volume 2
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 3
V. total 5
Pembesian 8-185
panjang
jmlh besi
berat besi
Volume 2
Pembesian 410
panjang
jmlh besi
berat besi
Volume 3
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 4
=
=
=
=
=
=
=
=
=
=
=
=
=
=
4
0.617
jmlh besi
4
2.9616
bh
kg/m
x
x
kg
panjang
1.2
kg/m
x
x
kg
panjang
0.5
0.5 m
4 bh
0.222
jmlh besi
4
0.444
V1
15.8
19.2056 kg
+
+
=
=
=
=
=
=
1.15
8
0.395
jmlh besi
8
7.268
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
1.6
6
0.395
jmlh besi
6
7.584
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
1.2
4
0.617
jmlh besi
4
5.9232
=
=
=
=
V2
2.9616
panjang
1.15
panjang
1.6
m
bh
kg/m
x
x
kg
panjang
1.2
0.5 m
4 bh
0.222
jmlh besi
kg/m
x
panjang
V. total 6
Pembesian 610
panjang
jmlh besi
berat besi
Volume 3
Pembesian 6-200
panjang
jmlh besi
berat besi
Volume 4
=
=
4
0.888
x
kg
0.5
=
=
=
V1
+
+
V2
7.584
7.268
21.6632 kg
=
=
=
=
=
=
1.15
12
0.395
jmlh besi
12
10.902
=
=
=
=
=
=
1.2
6
0.617
jmlh besi
6
8.8848
=
=
=
=
=
=
V. total 7
=
=
=
V. Total Besi
=
=
BEKESTING
Pondasi Tapak 80 x 80 ( K3)
Volume 1
Lebar
Tinggi
Jmlh sisi
Volume 1
=
=
=
=
=
panjang
1.15
m
bh
kg/m
x
x
kg
panjang
1.2
kg/m
x
x
kg
panjang
0.9
0.9 m
4 bh
0.222
jmlh besi
4
1.5984
+
+
V3
8.8848
68.37
+
+
V.Total 2
68.2452
235.22
m3
V1
10.902
21.3852 kg
V.Total 1
m
bh
kg/m
x
x
kg
0.8 m
0.15 m
4 bh
l
x
0.8 x
t
0.15
0.48
m2
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
=
=
=
=
=
=
=
=
0.4 m
0.15 m
0.55 m
2 bh
2 bh
( l1
=
V. Total 1
=
=
=
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
0.605
m2
0.48
+
+
3.255
m2
( V1
=
=
=
=
=
=
=
=
0.8 m
0.475 m
0.15 m
2 bh
2 bh
( l1
0.8
0.24
x
x
+
0.3825
m2
=
=
=
=
=
=
=
=
( l1
0.4
0.44
x
x
+
0.605
m2
=
=
( V1
0.3825
+
+
2.1975
m2
=
=
=
=
t
0.55
0.165
V2 )
0.605
t
0.15
0.1425
0.4 m
0.15 m
0.55 m
2 bh
2 bh
=
V. Total 2
0.4
0.44
x
x
+
t
0.55
0.165
V2 )
0.605
0.8 m
0.15 m
4 bh
l
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
0.8 x
0.48
=
=
=
=
=
=
=
=
0.3 m
0.15 m
0.55 m
2 bh
2 bh
( l1
=
V. Total 3
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
=
=
0.3
0.33
x
x
+
0.495
m2
0.48
+
+
1.95
m2
=
=
=
=
=
=
=
=
0.8 m
0.475 m
0.15 m
2 bh
2 bh
( l1
0.8
0.24
x
x
+
0.3825
m2
=
=
=
=
=
=
=
=
=
V. Total 4
0.15
2
( V1
0.55
0.165
V2 )
0.495
t
0.15
0.1425
0.3 m
0.15 m
0.55 m
2 bh
2 bh
( l1
0.3
0.33
x
x
+
0.495
m2
=
=
( V1
0.3825
+
+
0.8775
m2
0.8 m
t
0.55
0.165
V2 )
0.495
Tinggi
Jmlh sisi
Volume 1
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
=
=
=
=
0.15 m
4 bh
l
x
0.8 x
0.48
=
=
=
=
=
=
=
=
0.15 m
0.15 m
0.55 m
2 bh
2 bh
( l1
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
=
=
0.15
0.165
0.33
m2
0.48
+
+
0.81
m2
=
=
=
=
=
=
=
=
0.6 m
0.375 m
0.15 m
2 bh
2 bh
( l1
0.6
0.18
x
x
+
0.2925
m2
=
=
=
=
=
=
=
=
=
V. Total 6
0.15
2
x
x
+
=
V. Total 5
( V1
t
0.55
0.165
V2 )
0.33
t
0.15
0.1125
0.15 m
0.15 m
0.55 m
2 bh
2 bh
( l1
0.15
0.165
x
x
+
0.33
m2
=
=
( V1
0.2925
+
+
1.245
m2
t
0.55
0.165
V2 )
0.33
=
=
=
=
=
0.375 m
0.15 m
4 bh
l
0.225
=
=
=
=
=
=
=
=
=
=
=
V. Total Bekisting
=
=
B
1
PEKERJAAN BETON
Pekerjaan Sloof (15/30)
Beton
Panjang
Lebar
Tinggi
Volume
0.3
0.33
x
x
+
0.495
m2
0.225
+
+
1.44
m2
( V1
3.26
+
+
11.78
m2
V.Total 1
=
=
=
=
=
p
49
x
x
2.205
m3
t
0.55
0.165
V2 )
0.495
V.Total 2
2.1975
49 m
0.15 m
0.3 m
Pembesian
Sloof 1 15/30 ( panjang 8m )
210
Tul. Atas
310
Tul. Bawah
8-180
Sengkang
Pembesian 510
panjang
( l1
=
IV
4.1
0.15
2
0.3 m
0.15 m
0.55 m
2 bh
2 bh
=
V. Total 7
0.375 x
=
Volume 2
Lebar 1
Lebar 2
Tinggi
Jmlh sisi 1
Jmlh sisi 2
Volume 2
Tul. Atas
Tul. Bawah
Sengkang
l
0.15
jmlh besi
berat besi
Volume 1
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
=
=
=
=
=
5
0.617
jmlh besi
5
24.68
=
=
=
=
=
=
=
0.40
0.18
(p. sloof
4
8.78
=
=
=
=
=
=
=
1
4
0.395
0.2
(p. sloof
4
7.9
1
4
bh
kg/m
x
x
kg
m
m
kg/m
m
:
:
kg
kg/m
m
:
:
kg
=
=
=
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
=
=
=
=
=
=
=
=
=
=
=
jrk.cincin)
0.18
m
m
panjang
8
jrk.cincin)
0.2
V1
24.68
41.36
Tul. Atas
Tul. Bawah
Sengkang
8
5
0.617
jmlh besi
5
24.68
1
4
0.395
0.18
(p. sloof
m
bh
kg/m
x
x
kg
panjang
8
m
m
kg/m
m
:
jrk.cincin)
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
=
=
=
=
=
=
=
=
=
1
4
:
kg
8.78
m
m
0.395
0.2
(p. sloof
4
7.9
kg/m
m
:
:
kg
=
=
=
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
0.18
jrk.cincin)
0.2
V1
24.68
41.36
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
3
5
0.617
jmlh besi
5
9.255
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
=
1
m
1.5
m
0.395
0.2
(p. sloof
1.5
2.96
kg/m
m
:
:
kg
=
=
=
=
=
=
=
1
m
1.5
m
0.395
0.18
(p. sloof
1.5
3.29
kg/m
m
:
:
kg
panjang
3
jrk.cincin)
0.2
jrk.cincin)
0.18
=
=
=
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
2.75
5
0.617
jmlh besi
5
8.48375
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
=
1
m
1.375
m
0.395
0.18
(p. sloof
1.375
3.02
kg/m
m
:
:
kg
=
=
=
=
=
=
=
1
m
1.375
m
0.395
0.2
(p. sloof
1.375
2.715625
kg/m
m
:
:
kg
=
=
=
=
=
V1
9.255
15.51
Tul. Atas
Tul. Bawah
Sengkang
5.25
5
m
bh
panjang
2.75
jrk.cincin)
0.18
jrk.cincin)
0.2
V1
8.48375
14.22
berat besi
Volume 1
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
=
=
=
=
0.617
jmlh besi
5
16.19625
kg/m
x
x
kg
=
=
=
=
=
=
=
1
m
2.625
m
0.395
0.18
(p. sloof
2.625
5.76
kg/m
m
:
:
kg
=
=
=
=
=
=
=
1
m
2.625
m
0.395
0.2
(p. sloof
2.625
5.184375
kg/m
m
:
:
kg
=
=
=
=
=
Pembesian 8-200
pjng. cincin
pjng. Sloof
=
=
=
=
=
=
=
=
panjang
5.25
jrk.cincin)
0.18
jrk.cincin)
0.2
V1
16.19625
27.14
Tul. Atas
Tul. Bawah
Sengkang
1.5
5
0.617
jmlh besi
5
4.6275
1
1.5
m
bh
kg/m
x
x
kg
m
bh
panjang
1.5
berat besi
jarak cincin
Volume 2
=
=
=
=
=
0.395
0.2
(p. sloof
1.5
2.96
kg/m
m
:
:
kg
=
=
=
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
4.5
5
0.617
jmlh besi
5
13.8825
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
=
1
m
2.25
m
0.395
0.18
(p. sloof
2.25
4.94
kg/m
m
:
:
kg
=
=
=
=
=
=
=
1
m
2.25
m
0.395
0.2
(p. sloof
2.25
4.44375
kg/m
m
:
:
kg
V1
4.6275
7.59
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
jrk.cincin)
0.2
=
=
=
Tul. Atas
panjang
4.5
jrk.cincin)
0.18
jrk.cincin)
0.2
V1
13.8825
23.26
Tul. Bawah
Sengkang
Pembesian 510
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
310
8-200
=
=
=
=
=
=
=
=
=
=
=
=
=
Tul. Bawah
Sengkang
1
5
0.617
jmlh besi
5
3.085
1
1
m
bh
kg/m
x
x
kg
m
bh
0.395
0.2
(p. sloof
1
1.98
kg/m
m
:
:
kg
=
=
=
10
Pembesian 8-180
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 2
Pembesian 8-200
panjang
1
jrk.cincin)
0.2
V1
3.085
5.06
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
7
5
0.617
jmlh besi
5
21.595
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
=
1
m
3.5
m
0.395
0.18
(p. sloof
3.5
7.68
kg/m
m
:
:
kg
panjang
7
jrk.cincin)
0.18
pjng. cincin
pjng. Sloof
berat besi
jarak cincin
Volume 3
=
=
=
=
=
=
=
1
m
3.5
m
0.395
0.2
(p. sloof
3.5
6.9125
=
=
=
V.Total 1
41.36
253.04
kg/m
m
:
:
kg
jrk.cincin)
0.2
=
=
=
V1
21.595
36.19
+
+
kg
V.Total 2
41.36
BEKISTING
Volume 1
Panjang
Tinggi
Jmlh sisi
Volume 1
Volume 2
Panjang
Lebar
Jmlh sisi
Volume 2
=
=
=
=
=
49 m
0.3 m
2 bh
l
4.2
A
1
Pekerjaan Kolom
BETON
Kolom 12/40 (K3)
Panjang
Lebar
Tinggi
jmlh kolom
Volume
Kolom 12/30
Panjang
Lebar
Tinggi
jmlh kolom
Volume
Kolom 12/12
Panjang
Lebar
Tinggi
jmlh kolom
Volume
29.4
=
=
=
=
=
49 m
0.15 m
1 bh
(l
49
7.35
0.3
m2
x
x
l
0.15
m2
=
=
( V1
29.4
+
+
36.75
m2
=
=
=
=
=
=
(p
0.4
x
x
1.344
m3
V2 )
7.35
0.4 m
0.12 m
4m
7 bh
=
=
=
=
=
=
(p
0.3
x
x
0.72
m3
=
=
=
=
=
49 x
=
V. Total
l
0.12
0.3 m
0.12 m
4m
5 bh
l
0.12
0.12 m
0.12 m
4m
7 bh
(p
0.12
0.288
=
=
V1
1.344
+
+
1.632
m3
B
1
PEMBESIAN
Kolom 12/40
Tul. Atas
Sengkang
88
8-200
0.12
3
Pembesian 88
panjang
jmlh besi
berat besi
jmlh kolom
Volume 1
Pembesian 8-200
pjng. cincin
tinggi kolom
berat besi
jarak cincin
Volume 2
Volume Besi 1
Kolom 12/30
Tul. Atas
Sengkang
Pembesian 68
panjang
jmlh besi
berat besi
jmlh kolom
Volume 1
Pembesian 8-200
pjng. cincin
tinggi kolom
berat besi
jarak cincin
Volume 2
Volume Besi 2
=
=
=
=
=
=
=
4
8
0.395
7
jmlh besi
8
88.48
=
=
=
=
=
=
=
1.1
4
0.395
0.2
(t. kolom
4
60.83
=
=
V1
88.48
+
+
149.31
m3
m
bh
kg/m
bh
x
x
kg
panjang
4
m
m
kg/m
m
:
x
kg
jrk.cincin)
0.2
V2
60.83
68
8-200
=
=
=
=
=
=
=
4
6
0.395
5
jmlh besi
6
47.4
=
=
=
=
=
=
=
0.9
4
0.395
0.2
(t. kolom
4
35.55
=
=
V1
47.4
+
+
82.95
m3
m
bh
kg/m
bh
x
x
kg
panjang
4
m
m
kg/m
m
:
x
kg
jrk.cincin)
0.2
V2
35.55
Kolom 12/12
Tul. Atas
Sengkang
Pembesian 48
panjang
jmlh besi
berat besi
jmlh kolom
Volume 1
Pembesian 8-200
pjng. cincin
tinggi kolom
berat besi
jarak cincin
48
8-200
=
=
=
=
=
=
=
4
4
0.395
5
jmlh besi
4
31.6
=
=
=
=
0.5
4
0.395
0.2
m
bh
kg/m
bh
x
x
kg
m
m
kg/m
m
panjang
4
Volume 2
=
=
=
(t. kolom
4
19.75
:
x
kg
jrk.cincin)
0.2
Volume Besi 3
=
=
V1
31.6
+
+
V2
19.75
51.35
m3
C
1
BEKISTING
Kolom 12/40
Volume 1
Panjang
Tinggi
Jmlh sisi
jmlh kolom
Volume 1
Volume 2
=
=
=
V1
149.31
283.61
t
4
=
=
=
=
=
=
(p
0.4
x
x
22.4
m2
0.4 m
4m
2 bh
7 bh
Panjang
tinggi
Jmlh sisi
Volume 2
=
=
=
=
=
0.12 m
4m
2 bh
(p
=
Volume Total1
Kolom 12/30
Volume 1
Panjang
Tinggi
Jmlh sisi
jmlh kolom
Volume 1
Volume 2
Panjang
Tinggi
Jmlh sisi
jmlh kolom
Volume 2
Volume Total2
Kolom 12/12
Volume 1
Panjang
Tinggi
Jmlh sisi
jmlh kolom
Volume 1
Volume Total3
0.12
x
x
6.72
l
4
2
=
=
V1
22.4
+
+
29.12
m3
=
=
=
=
=
=
(p
0.3
x
x
12
m2
V2
6.72
0.3 m
4m
2 bh
5 bh
=
=
=
=
=
=
(p
0.12
x
x
4.8
m2
=
=
V1
12
+
+
16.8
m3
t
4
0.12 m
4m
2 bh
5 bh
=
=
=
=
=
=
(p
0.12
x
x
9.6
m2
V1
9.6
t
4
V2
4.8
0.12 m
4m
4 bh
5 bh
m2
t
4
=
=
V1
29.12
55.52
=
=
=
=
=
=
=
=
=
p
34
8
19
4.5
15
34
0.15
0.2
x
x
+
m
+
m
m
m
m
l
0.15
1.02
m3
=
=
=
=
=
=
=
=
=
p
15
8
8
3.5
7
15
0.15
0.2
x
x
0.45
m3
=
=
=
=
=
=
=
p
2.4
1.2
2.4
2.4
0.15
0.2
x
x
0.072
m3
=
=
=
=
p
2.25
2.25
0.12
0.2
x
4.3
A
1
m
+
m
m
m
m
l
0.15
+
m
m
m
m
l
0.15
m
m
m
l
V. Total
2.25
0.054
=
=
=
=
=
=
p
13.75
3
13.75
0.12
0.15
x
x
0.2475
m3
=
=
V1
1.02
+
+
1.8435
m2
0.12
3
PEMBESIAN
Balok Ring 15/20 ( Structural )
Tul. Atas
Tul. Bawah
Sengkang
210
210
8-180
Tul. Atas
Tul. Bawah
Sengkang
+
m
m
m
l
0.12
V2
0.45
Pembesian 410
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Pembesian 8-180
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Volume besi I
34
4
0.617
jmlh besi
4
83.912
=
=
=
=
=
=
=
0.8
17
0.395
0.2
(p. sloof
17
26.86
=
=
=
=
=
=
=
0.8
m
17
m
0.395
0.18
(p. sloof
17
29.84
=
=
=
m
bh
kg/m
x
x
kg
panjang
34
m
bh
kg/m
m
:
x
kg
V1
26.86
83.56 kg
kg/m
m
:
:
kg
+
+
jrk.cincin)
0.2
jrk.cincin)
0.18
V2
26.86
=
=
=
=
=
=
Pembesian 410
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
28
28
8-180
=
=
=
=
=
=
=
=
=
Tul. Atas
Tul. Bawah
Sengkang
15
4
0.395
jmlh besi
4
23.7
m
bh
kg/m
x
x
kg
0.8
m
7.5
bh
0.395
kg/m
panjang
15
jarak cincin
Volume 2
Pembesian 8-180
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
0.8
m
7.5
m
0.395
0.18
(p. sloof
7.5
13.17
V1
23.7
48.72 kg
310
310
8-180
Pembesian 610
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-180
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
kg/m
m
:
:
kg
+
+
jrk.cincin)
0.2
jrk.cincin)
0.18
V2
11.85
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
2.4
6
0.617
jmlh besi
6
8.8848
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
=
0.8
m
2.4
m
0.395
0.18
(p. sloof
2.4
4.21
kg/m
m
:
:
kg
=
=
=
=
=
=
=
=
=
=
m
:
x
kg
0.2
(p. sloof
7.5
11.85
=
=
=
Volume besi II
=
=
=
=
V1
8.8848
13.10 kg
+
+
28
Tul. Atas
panjang
2.4
jrk.cincin)
0.18
V2
4.21
Tul. Bawah
Sengkang
Pembesian 48
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
28
8-200
Tul. Bawah
Sengkang
=
=
=
=
=
=
2.25
4
0.395
jmlh besi
4
3.555
=
=
=
=
=
=
=
0.64
2.25
0.395
0.2
(p. sloof
2.25
2.844
m
bh
kg/m
x
x
kg
panjang
2.25
m
bh
kg/m
m
:
x
kg
jrk.cincin)
0.2
Volume besi IV
=
=
=
Pembesian 48
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Volume besi V
28
28
8-200
V2
2.84
BEKISTING
Balok Ring 15/20
Volume 1
Panjang
Tinggi
Jmlh sisi
Volume 1
13.75
4
0.395
jmlh besi
4
21.725
=
=
=
=
=
=
=
0.54
13.75
0.395
0.2
(p. sloof
13.75
14.664375
=
=
=
=
=
=
=
=
=
Volume 2
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
3.555
6.40 kg
+
+
V1
m
bh
kg/m
x
x
kg
panjang
13.75
m
bh
kg/m
m
:
x
kg
jrk.cincin)
0.2
V1
21.725
36.39 kg
+
+
V2
14.66
=
=
=
VI
83.56
188.17
+
+
kg
51.4 m
0.2 m
2 bh
p
51.4 x
20.56
0.2
m
=
=
=
=
=
Panjang
Lebar
Jmlh sisi
Volume 2
Volume 2
Panjang
Lebar
Jmlh sisi
Volume 4
51.4 m
0.15 m
1 bh
(l
51.4
x
x
7.71
=
=
=
=
=
16 m
0.15 m
2 bh
p
l
0.15
2
16 x
4.8
=
=
=
=
=
16 m
0.1 m
1 bh
(l
0.15
m
16
x
x
1.6
l
0.1
2
=
=
V1
20.56
+
+
34.67
m2
Volume 1
1.5
0.5
Volume 2
1.5
0.5
Volume 3
0.8
2.25
Volume 4
2.65
0.5
Volume 5
0.5
Volume 6
2.75
1.2
Volume 7
1.5
0.5
Volume 8
0.8
0.5
V. Total
Total Volume
V2
7.71
Pembesian
Canopy di atas jendela 1.5 m x 0.5 m (3bh)
Pembesian 36
=
panjang
1.5
=
jmlh besi
3
=
berat besi
0.222
=
Volume 1
jmlh besi
=
3
=
0.999
Pembesian 8-200
=
panjang canopy
1.5
=
panjang besi
0.68
=
jarak besi
0.2
=
berat besi
0.395
=
Volume 2
(p. canopy
=
1.5
=
2.0145
VOLUME I
=
=
=
V1
0.999
9.0405
m
bh
kg/m
x
x
kg
m
m
bh
kg/m
:
:
kg
+
+
kg
2.25
5
0.222
jmlh besi
5
2.4975
m
bh
kg/m
x
x
kg
2.25
0.98
0.2
0.395
(p. canopy
2.25
4.354875
m
m
bh
kg/m
:
:
kg
=
=
=
V1
2.4975
6.852375
+
+
kg
=
=
5
6
m
bh
panjang
1.5
jrk.besi)
0.2
V2
2.0145
panjang
2.25
jrk.besi)
0.2
V2
4.354875
berat besi
Volume 1
Pembesian 8-200
panjang list
panjang cincin
jarak cincin
berat besi
Volume 2
Volume III
=
=
=
=
0.617
jmlh besi
6
18.51
kg/m
x
x
kg
=
=
=
=
=
=
=
5
1.3
0.2
0.395
(p. list
5
12.8375
m
m
bh
kg/m
:
:
kg
=
=
=
V1
18.51
31.3475
+
+
kg
panjang
5
jrk.cincin)
0.2
V2
12.8375
Pembesian 6-200
tinggi tiang
panjang cincin
jarak cincin
berat besi
Volume 6
Volume IV
2.65
6
0.395
jmlh besi
6
9.8103
m
bh
kg/m
x
x
kg
=
=
=
=
=
=
=
2.66
1.3
0.2
0.222
(t. tiang
2.66
3.83838
m
bh
m
kg/m
:
:
kg
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
V1
9.8103
13.64868
+
+
kg
2.75
7
0.222
jmlh besi
7
4.2735
m
bh
kg/m
x
x
kg
2.75
1.38
0.2
0.395
(p. canopy
2.75
7.495125
m
m
bh
kg/m
:
:
kg
V1
4.2735
11.768625
0.8
3
0.222
jmlh besi
+
+
kg
m
bh
kg/m
x
panjang
2.65
jrk.cincin)
0.2
V2
3.83838
panjang
2.75
jrk.besi)
0.2
V2
7.495125
panjang
Pembesian 8-200
panjang canopy
panjang besi
jarak besi
berat besi
Volume 2
=
=
3
0.5328
=
=
=
=
=
=
=
0.8
0.68
0.2
0.395
(p. canopy
0.8
1.0744
x
kg
m
m
bh
kg/m
:
:
kg
0.8
jrk.besi)
0.2
VOLUME VI
=
=
=
V1
0.5328
1.6072
+
+
kg
V2
1.0744
=
=
=
VI
9.0405
74.26488
+
+
kg
VII
6.852375
+
799.0845828
PEKERJAAN DINDING
5.1 Pekerjaan Dinding Bata
Volume
Luas Dinding Bata
Dinding samping kanan
Luas
=
=
Luas 1
=
=
=
47.71
m2
m2
2
-
=
=
=
=
=
69.4
m2
m2
Luas 5
29.0625
m2
T. LUAS DINDING
=
=
L1
47.71
+
+
216.0725
m2
=
=
=
=
=
=
=
=
=
=
p
2.15
2.15
p
1.8
1.782
p
2.3
0.46
LP
x
x
l
1
x
x
l
0.99
x
x
l
0.2
LJ
Luas Jendela
Luas PJ1
L2
40.9
P1
Luas Pintu
P2
Luas Pintu
J1
Luas Jendela
Luas PJ1
2.15
4.392
=
=
p
2.15
x
x
3.87
m2
=
=
p
2.15
x
x
1.72
m2
=
=
p
1.8
x
x
l
1.55
=
=
=
=
=
=
=
2.79
p
1.55
0.31
LJ
m2
x
x
l
0.2
BV
Luas BV
T. LUAS PJ
Volume Dinding Bt
l
0.9
l
0.8
2.79
3.1
+
+
x
9.3
1.782
p
0.6
x
x
0.24
m2
=
=
LPJ
4.392
+
+
19.522
m2
0.31
3
=
=
=
=
LLA
l
0.4
P1
3.87
19.522
m2
=
=
=
=
=
=
Volume Dinding
196.5505
196.5505
107.9405
107.9405
304.491
+
+
m2
47.71
88.61
Volume dinding
196.5505
2.8
1.8
6.6
p
6.6
18.48
18.48
16.52
Volume Plesteran
+
m
x
x
t
2.8
(LP2
1.72
=
=
=
=
=
1.6
1.3
2.5
p
2.5
+
m
x
x
m2
=
=
1.8
1.2
t
1.6
Luas Dinding KM
16.52
=
Volume
=
=
VI
Volume Plesteran
304.491
283.971
2.1
10.2
20.52
20.52
2
+
m
2.1
x
x
l
0.05
0.05
0.12
p
10.2
0.0612
m3
=
=
=
0.8
2.6
0.075
+
x
0.8
2
Tebal
Volume 2
=
=
=
=
=
=
=
=
=
=
=
Volume Kusen
Luas Kaca
Panjang 1
Panjang 2
Lebar 1
Lebar 2
Volume 1
0.0117
1.85
3.9
P1 (2 Unit)
Luas Kusen Pintu
Panjang
m3
1.85
p
3.9
x
x
l
0.05
0.0234
m3
V1
0.0612
+
+
0.0963
m2
=
=
=
=
V2
0.0117
2.1
0.9
x
x
p
2.1
1.89
m2
=
=
=
=
=
=
0.65
0.8
0.5
0.3
m
m
m
m
x
x
=
=
l
0.075
0.05
0.12
p1
0.65
0.325
0.24
l
0.9
l1
0.5
m2
x
x
p2
0.8
=
Volume Kaca
x
x
p
5.2
=
=
=
Volume 2
0.03
l2
0.3
m2
=
=
V1
0.325
+
+
0.565
m2
=
=
2.1
5.1
+
m
V2
0.24
0.9
Lebar
Tebal
Jumlah
Volume 1
=
=
=
=
=
0.05
0.12
2
0.0612
=
=
=
=
=
2.1
0.8
2
P2 (1 Unit)
J1 (3 Unit)
Luas Kusen Jendela
Panjang
Lebar
Tebal
Jumlah
Volume 1
=
=
=
=
=
=
=
=
Lebar
Tebal
Volume 2
=
=
=
=
=
=
=
=
3.36
=
=
=
=
=
=
=
l
0.05
m3
x
x
p
2.1
x
x
p
5.1
l
0.8
m2
1 buah
1.7
8.2
+
m
1.7
x
x
l
0.05
0.05
0.12
3 Unit
p
8.2
0.1476
1.7
4.5
9
m3
+
x
1.7
2
x
x
l
0.07
0.07
0.03
p
9
0.0567
1.4
3.1
m3
+
m
1.4
x
x
l
0.05
0.05
0.12
3 Unit
p
3.1
=
Volume Kusen
Luas Kaca
Panjang
Lebar
Jlmh kaca
Jlmh Jendela
Volume 1
BV (1 Unit)
Luas Kusen BV
Panjang
Lebar
Tebal
Jumlah
Volume 1
Luas Kaca
Panjang
Lebar
Volume 1
m3
=
=
V1
0.1476
+
+
0.2601
m2
=
=
=
=
=
=
=
0.0558
=
=
=
=
=
=
=
1.56
0.55
2
3
p
1.56
5.148
0.7
2.2
m
m
bh
bh
x
x
l
0.55
m2
+
m
0.7
x
x
l
0.05
0.05
0.12
1 Unit
p
2.2
0.0132
m3
=
=
=
=
0.6
0.4
m
m
x
x
p
0.6
=
PEKERJAAN ATAP
7.1 Pekerjaan Sopi - Sopi
Sopi - Sopi 1
A
BETON
1
Balok Ring 15/15
Panjang balok ring (x)
V2
0.0567
0.24
l
0.4
m2
VII
=
=
=
=
=
=
=
=
=
p
5.02
0
5.02
5.02
5.02
0.15
0.15
x
x
m
m
m
m
m
l
0.15
=
2
Volume Beton
B
1
m3
=
=
=
=
=
=
p
0.12
x
x
0.06768
m3
=
=
V1
0.11295
+
+
0.2259
m2
0.12 m
0.12 m
1.78
4.7 m
2.92
l
0.12
V2
0.11295
PEMBESIAN
Balok Ring 15/15
Tul. Atas
Tul. Bawah
Sengkang
0.11295
Pembesian 48
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Pembesian 8-180
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
28
28
8-180
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
5.02
4
0.395
jmlh besi
4
7.9316
=
=
=
=
=
=
=
0.8
m
2.51
bh
0.395
kg/m
0.2
m
(p. sloof
:
2.51
x
3.9658
kg
=
=
=
=
=
=
=
0.8
m
2.51
m
0.395
0.18
(p. sloof
2.51
4.41
m
bh
kg/m
x
x
kg
kg/m
m
:
:
kg
panjang
5.02
jrk.cincin)
0.2
jrk.cincin)
0.18
Volume besi I
Kolom 12/12
Tul. Atas
Sengkang
Pembesian 48
panjang
jmlh besi
berat besi
jmlh kolom
Volume 1
V1
3.9658
12.34 kg
4.7
4
0.395
1
jmlh besi
4
7.426
=
=
=
=
=
=
=
0.5
4.7
0.395
0.2
(t. kolom
4.7
4.64125
Volume Besi II
=
=
=
V1
7.426
12.06725
Volume Besi
=
=
=
Sopi - Sopi 2
BETON
Balok Ring 15/15
Panjang balok ring (x)
VI
12.34
24.41
m
bh
kg/m
bh
x
x
kg
V2
3.97
panjang
4.7
m
m
kg/m
m
:
x
kg
jrk.cincin)
0.2
+
+
kg
V2
4.64125
+
+
kg
VII
12.06725
=
=
=
=
=
=
=
=
=
p
10.04
0
0
5.02
10.04
10.04
0.15
0.15
x
x
0.2259
m3
+
+
48
8-200
=
=
=
=
=
=
=
Pembesian 8-200
pjng. cincin
tinggi kolom
berat besi
jarak cincin
Volume 2
=
=
=
m
+
m
m
m
m
l
0.15
Volume Beton
B
1
0.12 m
0.12 m
2.84
5.74 m
2.4
p
0.12
x
x
l
0.12
0.082656
m3
=
=
V1
0.2259
+
+
0.4518
m2
V2
0.2259
PEMBESIAN
Balok Ring 15/15
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
Pembesian 48
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Pembesian 8-180
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
28
28
8-180
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
10.04
4
0.395
jmlh besi
4
15.8632
=
=
=
=
=
=
=
0.8
m
5.02
bh
0.395
kg/m
0.2
m
(p. sloof
:
5.02
x
7.9316
kg
=
=
=
=
=
=
=
0.8
m
5.02
m
0.395
0.18
(p. sloof
5.02
8.81
m
bh
kg/m
x
x
kg
kg/m
m
:
:
kg
panjang
10.04
jrk.cincin)
0.2
jrk.cincin)
0.18
Volume besi II
Kolom 12/12
Tul. Atas
Sengkang
Pembesian 48
Tinggi kolom
jmlh besi
berat besi
jmlh kolom
Volume 1
V1
7.9316
24.68 kg
+
+
5.74
4
0.395
1
jmlh besi
4
9.0692
=
=
=
=
=
=
=
0.5
5.74
0.395
0.2
(t. kolom
5.74
5.66825
Volume Besi II
=
=
=
V1
9.0692
14.73745
Volume Besi
=
=
=
VI
24.68
39.41
=
=
=
=
=
=
=
=
=
p
4.2
0
0
4.2
4.2
4.2
0.15
0.15
x
x
0.0945
m3
Sopi - Sopi 3
BETON
Balok Ring 15/15
Panjang balok ring (x)
Panjang balok ring(y)
Jumlah panjang sloof
Lebar
Tinggi
Volume 1
V2
7.93
48
8-200
=
=
=
=
=
=
=
Pembesian 8-200
Tinggi kolom
tinggi kolom
berat besi
jarak cincin
Volume 2
=
=
=
m
bh
kg/m
bh
x
x
kg
panjang
5.74
m
m
kg/m
m
:
x
kg
jrk.cincin)
0.2
+
+
kg
V2
5.66825
+
+
kg
VII
14.73745
m
m
m
m
m
l
0.15
Volume Beton
B
1
p
0.12
x
x
0.0432
m3
=
=
V1
0.0945
+
+
0.1377
m2
0.12 m
0.12 m
2.44
3m
0.56
l
0.12
V2
0.0432
PEMBESIAN
Balok Ring 15/15
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
Pembesian 48
panjang
jmlh besi
berat besi
Volume 1
Pembesian 8-200
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Pembesian 8-180
pjng. cincin
pjng. Balok
berat besi
jarak cincin
Volume 2
Volume besi II
28
28
8-180
Tul. Atas
Tul. Bawah
Sengkang
=
=
=
=
=
=
4.2
4
0.395
jmlh besi
4
6.636
=
=
=
=
=
=
=
0.8
m
1.925
bh
0.395
kg/m
0.2
m
(p. sloof
:
1.925
x
3.0415
kg
=
=
=
=
=
=
=
0.8
m
1.925
m
0.395
0.18
(p. sloof
1.925
3.38
V1
m
bh
kg/m
x
x
kg
kg/m
m
:
:
kg
+
panjang
4.2
jrk.cincin)
0.2
jrk.cincin)
0.18
V2
=
=
2
Kolom 12/12
Tul. Atas
Sengkang
3.04
48
8-200
Pembesian 48
tinggi kolom
jmlh besi
berat besi
jmlh kolom
Volume 1
=
=
=
=
=
=
=
1
jmlh besi
4
4.74
=
=
=
=
=
=
=
0.5
3
0.395
0.2
(t. kolom
3
2.9625
=
=
=
V1
4.74
7.7025
+
+
kg
V2
2.9625
Volume Besi
=
=
=
VI
+
+
kg
VII
7.7025
=
=
=
=
=
=
4.55
18.54
+
m
2.22
Panjang
18.54
18.54
x
x
m
Jmlh
1
0.86
2.86
+
m
0.86
x
x
Jmlh
4
Pembesian 8-200
pjng. cincin
tinggi kolom
berat besi
jarak cincin
Volume 2
3.0415
9.46 kg
Kuda - kuda 2
Panjang
Jumlah kuda - kuda
Panjang 2
=
=
=
=
=
3
4
m
bh
kg/m
bh
x
x
kg
0.395
panjang
3
m
m
kg/m
m
:
x
kg
9.46
17.16
jrk.cincin)
0.2
1 bh
4 bh
Panjang
2.86
Lebar
Tebal
Volume Kuda - kuda
Gording 2
Panjang
Jmlh gording
Panjang 2
Gording 3
Panjang
Jmlh gording
Panjang 3
Panjang Gording
Lebar
Tebal
Volume Gording
11.44
=
=
=
=
=
=
=
V1
18.54
29.98
0.08
0.12
p
29.98
+
+
m
V2
11.44
x
x
l
0.08
0.287808
m3
=
=
=
=
=
5.58
4
panjang
5.58
22.32 m
=
=
=
=
=
2.92
5
panjang
2.92
14.6 m
=
=
=
=
=
2.67
2
panjang
2.67
5.34 m
=
=
=
=
=
=
=
V1
22.32
42.26
0.08
0.12
p
42.26
+
+
m
V2
14.6
x
x
l
0.08
0.405696
m3
=
=
=
=
5
16
panjang
5
x
x
jmlh gording
4
x
x
jmlh gording
5
x
x
jmlh gording
2
x
x
jmlh kaso
16
Kaso2
Panjang
Jmlh kaso
Panjang 2
Panjang Kaso
Lebar
Tebal
Volume Kaso
Volume Kaso
80 m
=
=
=
=
=
1.05
17
panjang
1.05
17.85 m
=
=
=
=
=
=
=
=
=
=
V1
80
97.85
0.05
0.08
p
97.85
+
+
m
V2
17.85
x
x
l
0.05
0.3914
m3
48
=
=
=
=
=
8
0.08
0.12
p
8
x
x
0.0768
m2
=
=
=
=
48
=
7.8 Pekerjaan List Plank
Vol. List Plank
jmlh kaso
17
=
7.7 Pekerjaan Genteng
Vol. Genteng
x
x
48
=
=
Luas Ruangan
m2
l
0.08
x
m
x
m
+
21.5 m
IX
48
=
Luas KM + Teras
=
=
=
33.25
=
=
2.7
8.7
24.55
m2
=
=
p
5
x
x
m2
=
=
p
1.8
x
x
2.7
m2
16.52
Luas dinding KM
=
=
=
=
=
2.8
1.8
6.6
p
6.6
18.48
18.48
Luas Teras
( 5 x 1.2 )
m2
+
+
+
Luas KM
( 1.5 x 1.8)
=
Volume Lantai 40 x 40
6
2
1.6
1.3
2.5
p
2.5
+
m
x
x
l
1.2
l
1.5
1.8
t
2.8
(LP2
1.72
m2
+
m
x
x
1.2
t
1.6
m2
=
=
Luas Dinding KM
16.52
=
9.5 Pekerjaan Keramik
Volume = Panjang
=
=
X
PEKERJAAN INSTALASI LISTRIK
10.1 Instalasi Air Bersih
=
Panjang
=
10.2 Instalasi Air Kantor
PVC 4 "
Panjang
XIII
PEKERJAAN PENGECATAN
Volume
=
=
20.52
4.2
17.675
+
m
4.75
=
=
=
=
Volume Plesteran
304.491
283.971
20.52
2
x
x
2)
2
+
+
(l
8
x
x
t)
1.2
x
x
jmlh pondasi
9
t)
=
=
V1
10.8
+
+
14.475
m3
( V. Urugan Pasir
+
0.45
+
+
3
4.5
x
x
2)
2
5.25
+
1
V2
3.675
V. Lantai Kerja
0.387
V. Beton )
2.75
7
x
x
t)
0.1
x
x
x
x
t)
0.15
jmlh pondasi
9
0.1
t)
=
23.625
m2
9.625
m2
3.3
m2
2.7
m2
39.25
m2
t)
=
=
V1
0.9
+
+
5.56
m3
x
x
t)
0.05
x
x
V2
0.735
bh
m
m
m
0.15
x
x
t
0.55
jmlh pondasi
9
+
+
V3
3.925
Jlmh pondasi
3
0.15
0.55
Jlmh pondasi
4
0.15
x
x
t
0.55
Jlmh pondasi
1
0.15
0.55
Jlmh pondasi
1
0.15
x
x
t
0.55
Jlmh pondasi
1
0.15
0.55
Jlmh pondasi
2
0.15
0.55
Jlmh pondasi
2
+
+
V.Total 3
0.12
+
+
V.Total 4
0.08
+
+
V.Total 5
0.11
+
+
x
x
berat besi
0.395
x
x
berat besi
0.617
x
x
berat besi
0.222
V2
17.7696
+
+
jmlh pondasi
3
jmlh pondasi
3
x
x
jmlh pondasi
3
V3
3.1968
x
x
berat besi
0.395
x
x
x
x
berat besi
0.395
jmlh pondasi
4
jmlh pondasi
4
x
x
berat besi
0.617
x
x
berat besi
0.222
+
+
V3
23.6928
x
x
berat besi
0.395
x
x
berat besi
0.617
x
x
berat besi
0.222
+
+
V3
0.7992
x
x
jmlh pondasi
4
jmlh pondasi
+
+
V4
4.2624
x
x
jmlh pondasi
1
x
x
jmlh pondasi
1
x
x
jmlh pondasi
1
x
x
berat besi
0.395
x
x
berat besi
0.395
x
x
berat besi
0.617
x
x
berat besi
0.222
+
+
x
x
V3
4.4424
berat besi
0.395
x
x
jmlh pondasi
1
x
x
jmlh pondasi
1
x
x
jmlh pondasi
1
jmlh pondasi
+
+
V4
0.7992
x
x
jmlh pondasi
1
x
x
berat besi
0.617
x
x
berat besi
0.222
+
+
x
x
jmlh pondasi
1
x
x
jmlh pondasi
1
V3
0.444
x
x
berat besi
0.395
x
x
berat besi
0.395
x
x
berat besi
0.617
berat besi
x
x
jmlh pondasi
2
x
x
jmlh pondasi
2
x
x
jmlh pondasi
2
jmlh pondasi
+
+
V3
5.9232
+
+
V4
0.888
x
x
berat besi
0.395
x
x
berat besi
0.617
x
x
berat besi
0.222
+
+
0.222
jmlh pondasi
2
jmlh pondasi
2
jmlh pondasi
+
+
V.Total 4
15.31
V4
1.5984
+
+
V.Total 3
jmlh sisi
21.04
+
+
V.Total 5
19.2056
+
+
+
+
( l2
jmlah sisi )
2
x
x
jmlah sisi )
2
x
x
Jlmh pondasi
3
jmlh sisi
x
x
jmlah sisi )
2
x
x
Jlmh pondasi
3
x
x
0.15
x
x
+
+
( l2
0.475
x
x
+
+
( l2
x
x
0.15
0.55
x
x
jmlah sisi )
2
0.15
x
x
jmlah sisi )
2
0.55
x
x
jmlah sisi )
2
+
+
( l2
x
x
0.15
jmlah sisi )
2
+
+
( l2
0.475
x
x
x
x
jmlah sisi )
2
+
+
( l2
x
x
x
x
Jlmh pondasi
1
x
x
jmlah sisi )
2
x
x
Jlmh pondasi
2
x
x
0.15
0.55
x
x
jmlah sisi )
2
0.15
x
x
jmlah sisi )
2
0.55
x
x
jmlah sisi )
2
jmlh sisi
+
+
( l2
jmlah sisi )
2
x
x
jmlah sisi )
2
x
x
Jlmh pondasi
2
x
x
jmlah sisi )
2
x
x
Jlmh pondasi
1
x
x
0.15
x
x
+
+
( l2
0.375
x
x
+
+
( l2
x
x
0.15
0.55
x
x
jmlah sisi )
2
0.15
x
x
jmlah sisi )
2
0.55
x
x
jmlah sisi )
2
jmlh sisi
x
x
jmlah sisi )
2
x
x
Jlmh pondasi
2
+
+
V.Total 3
x
x
t
0.3
310
210
8-200
1.95
+
+
( l2
+
+
Tul. Atas
Tul. Bawah
Sengkang
0.15
x
x
V.Total 4
0.88
+
+
V.Total 5
0.81
210
310
8-180
0.55
x
x
jmlah sisi )
2
+
+
x
x
berat besi
0.617
x
x
pjng. cincin
1
x
x
berat besi
0.395
x
x
pjng. cincin
1
x
x
berat besi
0.395
+
+
V3
+
+
V2
8.78
7.9
kg
310
210
8-200
210
310
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.617
pjng. cincin
berat besi
x
x
+
+
pjng. cincin
1
V2
8.78
0.395
x
x
berat besi
0.395
+
+
V3
7.9
kg
310
210
8-200
210
310
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.617
x
x
pjng. cincin
1
x
x
berat besi
0.395
x
x
pjng. cincin
1
x
x
berat besi
0.395
+
+
V2
2.96
+
+
V3
3.29
kg
310
210
8-200
210
310
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.617
x
x
pjng. cincin
1
x
x
berat besi
0.395
x
x
pjng. cincin
1
x
x
berat besi
0.395
+
+
V3
2.715625
+
+
V2
3.02
kg
310
210
8-200
Tul. Atas
Tul. Bawah
Sengkang
210
310
8-180
x
x
berat besi
0.617
x
x
pjng. cincin
1
x
x
berat besi
0.395
x
x
pjng. cincin
1
x
x
berat besi
0.395
+
+
V3
5.184375
+
+
V2
5.76
kg
310
210
8-200
x
x
Tul. Atas
Tul. Bawah
Sengkang
berat besi
0.617
210
310
8-200
x
x
+
+
pjng. cincin
1
x
x
berat besi
0.395
V2
2.96
kg
310
210
8-200
210
310
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.617
x
x
pjng. cincin
1
x
x
berat besi
0.395
x
x
pjng. cincin
1
x
x
berat besi
0.395
+
+
V3
4.44375
+
+
V2
4.94
kg
310
Tul. Atas
210
210
8-200
x
x
berat besi
0.617
x
x
pjng. cincin
1
+
+
310
8-200
Tul. Bawah
Sengkang
x
x
berat besi
0.395
V2
1.98
kg
310
210
8-200
210
310
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.617
x
x
pjng. cincin
1
x
x
berat besi
0.395
x
x
pjng. cincin
1
+
+
V2
+
+
V.Total 3
x
x
berat besi
0.395
7.68
+
+
V3
6.9125
15.51
+
+
V.Total 4
14.22
kg
+
+
V.Total 5
27.14
+
+
jmlh sisi
x
x
jmlah sisi )
1
x
x
t)
4
x
x
jmlh kolom
7
x
x
t)
4
x
x
jmlh kolom
5
t)
jmlh kolom
V2
0.288
x
x
berat besi
0.395
x
x
jmlh kolom
x
x
pjng. cincin
1.1
x
x
berat besi
0.395
x
x
berat besi
0.395
x
x
jmlh kolom
x
x
pjng. cincin
0.9
x
x
berat besi
0.395
x
x
jmlh kolom
7
x
x
jmlh kolom
5
x
x
berat besi
0.395
x
x
jmlh kolom
5
x
x
pjng. cincin
0.5
x
x
+
+
kg
V2
82.95
+
+
x
x
jmlh sisi )
2
x
x
berat besi
0.395
V3
51.35
jmlh kolom
7
x
x
jmlh kolom
5
x
x
jmlah sisi )
2
x
x
jmlh kolom
7
x
x
jmlh sisi )
2
x
x
jmlh kolom
5
x
x
jmlh sisi )
2
x
x
jmlh kolom
5
x
x
jmlh sisi )
4
x
x
jmlh kolom
5
+
+
V2
16.8
+
+
1.5
4.5
x
x
t
0.2
V3
9.6
m2
3.5
x
x
t
0.2
1.2
x
x
t
0.2
3.5
0.2
2.75
x
x
t
0.15
+
+
V3
0.072
210
210
8-180
+
+
Tul. Atas
Tul. Bawah
Sengkang
V4
0.054
+
+
210
210
8-180
V5
0.2475
x
x
berat besi
0.617
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
+
+
V3
29.84
28
28
8-200
x
x
Tul. Atas
Tul. Bawah
Sengkang
berat besi
0.395
28
28
8-180
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
+
+
V3
13.17
310
310
8-200
28
310
310
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.617
x
x
pjng. cincin
0.8
x
x
Tul. Atas
berat besi
0.395
28
28
8-200
28
8-200
Tul. Bawah
Sengkang
x
x
berat besi
0.395
x
x
pjng. cincin
0.64
x
x
berat besi
0.395
28
28
8-200
x
x
berat besi
0.395
x
x
pjng. cincin
0.54
VII
48.72
x
x
28
28
8-200
Tul. Atas
Tul. Bawah
Sengkang
x
x
+
+
VIII
13.10
jmlh sisi
2
berat besi
0.395
+
+
VIV
6.40
+
+
VV
36.39
x
x
jmlah sisi )
jmlh sisi
x
x
jmlah sisi )
1
+
+
V3
4.8
+
+
0.1
0.075
m3
0.1
0.075
m3
0.1
0.18
m3
0.1
0.1325
m3
0.1
0.25
m3
0.1
0.33
m3
0.1
0.075
m3
0.1
0.04
m3
1.1575
m3
V4
1.6
x
x
berat besi
0.222
x
x
pjng. Besi
0.68
x
x
jmlh canopy
3
x
x
berat besi
0.222
x
x
pjng. Besi
0.98
x
x
berat besi
0.395
x
x
berat besi
0.395
x
x
berat besi
0.617
x
x
pjng. cincin
1.3
x
x
berat besi
0.395
x
x
berat besi
0.617
x
x
pjng. cincin
1.3
x
x
berat besi
0.222
x
x
pjng. Besi
1.38
berat besi
x
x
berat besi
0.222
x
x
berat besi
0.395
0.222
x
x
pjng. Besi
0.68
x
x
berat besi
0.395
+
+
VIII
31.3475
+
+
799.08
kg
VOLUME BETON
VIV
13.64868
+
+
VV
11.76863
+
+
VVI
1.6072
7.95
0.96
2.3
7.5
17.4
11
+
+
L3
69.4
+
+
LLA
9.45
L4
29
+
+
L5
29.0625
0.46
x
x
Jmlh
2
x
x
Jmlh
1
x
x
Jmlh
1
+
+
P2
1.72
+
+
ume dinding
J1
9.3
+
+
BV
0.24
+
+
1.5
BV)
0.24
+
+
as Dinding KM
1.5
m2
Luas dinidng keramik KM + Dapur
1.8
x
x
tebal
0.12
+
=
0.5
5.2
1.8
0.5
0.8
0.8
x
x
tebal
0.03
0.1
x
x
tebal
0.12
+
+
V3
0.0234
2.1
0.1
x
x
tebal
0.12
x
x
Jmlh
2
x
x
Jmlh
2
1.7
1.55
x
x
tebal
0.12
x
x
Jumlah
3
0.55
0.55
x
x
tebal
0.03
x
x
jumlah
3
0.1
0.1
x
x
tebal
0.12
x
x
Jumlah
3
1.55
0.1
+
+
V3
0.0558
x
x
Jmlh kaca
2
x
x
Jmlh jendela
3
0.4
0.4
x
x
tebal
0.12
x
x
Jumlah
1
x
x
t
0.15
x
x
t
4.7
28
28
8-200
28
28
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
+
+
V3
4.41
x
x
berat besi
0.395
x
x
jmlh kolom
x
x
pjng. cincin
0.5
x
x
berat besi
0.395
5.02
x
x
t
0.15
x
x
jmlh kolom
1
0.5
x
x
t
5.74
28
28
8-200
28
28
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
+
+
V3
8.81
x
x
berat besi
0.395
x
x
jmlh kolom
x
x
pjng. cincin
0.5
x
x
berat besi
0.395
x
x
t
0.15
x
x
jmlh kolom
1
x
x
t
3
28
28
8-200
28
28
8-180
Tul. Atas
Tul. Bawah
Sengkang
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
x
x
pjng. cincin
0.8
x
x
berat besi
0.395
V3
3.38
x
x
berat besi
0.395
x
x
jmlh kolom
x
x
pjng. cincin
0.5
x
x
berat besi
0.395
5.04
2.63
0.81
0.33
x
x
jmlh kolom
1
2.05
2.05
tebal
0.12
+
+
V3
tebal
5.34
0.12
tebal
0.08
x
x
t
0.12
5.5
uas Teras )
Luas ruangan 2
uas Teras )
+
+
1.5
BV)
0.24
1.5
+
+
as Dinding KM
m2
( 0.2 x 5 ) + (1 x 6 )
4.75
0.375
3.6
V.Total 6
0.09
+
+
V.Total 7
0.09
V.Total 6
21.66
+
+
V.Total 7
21.39
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
jmlah sisi )
V.Total 6
1.25
+
+
V.Total 7
1.44
V.Total 6
41.36
+
+
V.Total 7
7.59
+
+
V.Total 8
23.26
+
+
V.Total 9
5.06
+ V.Total 10
+
36.19
4.4
0.3
0.8
II
URAIAN PEKERJAAN
PEKERJAAN RUMAH
PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN
1 Pekerjaan persiapan lahan
2 Pekerjaan pasangan bouw plank
PEKERJAAN GALIAN DAN URUGAN
1 Pekerjaan galian tanah untuk pondasi
2 Pekerjaan Urugan tanah kembali sisi pondasi
III
VOL.
SAT.
100 m2
45 m
14.475 m3
8.078 m3
5.56 m3
PEKERJAAN PONDASI
1 Pekerjaan Lantai Kerja , t = 0.05m
0.45 m3
PEKERJAAN BETON
1 Pekerjaan Sloof
Beton
Besi
Bekisting
1.24 m3
235.22 kg
11.78 m2
2.205 m3
253.04 kg
36.75 m2
2 Pekerjaan Kolom
Beton
Besi
Bekisting
1.632 m3
283.61 kg
55.52 m2
1.8435 m3
188.17 kg
4 Pekerjaan Canopy
Beton
Besi
5 Pekerjaan Carport
V
PEKERJAAN DINDING
1 Pekerjaan Bata
1.1575 m3
74.26488 kg
1.5 m3
161.55 m2
2 Pekerjaan Plesteran
3 Pekerjaan Acian
269.49 m2
248.97 m2
VI
0.0963 m3
1.89 m2
1 psg
2 psg
4 psg
4 Psg
0.565 m2
0.0612
3.36
2
4
1
m3
bh
psg
psg
bh
0.2601
12
12
5.148
m3
psg
psg
m2
0.0132 m3
2 psg
0.24 m2
VII
Sopi - Sopi 2
Beton
Besi
Bekisting diasumsikan memakai bekisting kolom
Sopi - Sopi 3
Beton
Besi
Bekisting diasumsikan memakai bekisting kolom
2 Pekerjaan Kuda - Kuda
3 Pekerjaan Gording
0.2259 m3
24.41 kg
0.4518 m3
39.41 kg
0.1377 m3
17.16 kg
0.287808 m3
0.405696 m3
0.0768 m3
48 m2
48 m2
21.5 m
VIII
PEKERJAAN PLAFOND
1 Pekerjaan Rangka Plafond
2 Pekerjaan Plafond Gypsum + Tali lis
IX
XI
XII
XIII
48 m2
48 m2
24.55 m2
6 m2
2.7 m2
20.52 m2
28.86 m
36.44
1
m
ls
17.675
28.65
1
1
3
m2
m2
unit
unit
unit
1
1
1
2
1
2
1
bh
bh
bh
bh
bh
bh
bh
10
10
2
4
5
2
10
bh
bh
bh
bh
bh
bh
ttk
248.97 m2
48 m2
96 m2
150 m2
B.
C.
ls
D.
ls
E.
ls
F.
ls
JUMLAH TOTAL
KESIMPULAN
Biaya untuk pembangunan rumah type 36 dengan kapling 100m2 beserta fasilitas dan infrastruktur
seperti jalan, sumur + jet pump, listrik dan gorong - gorong serta pemecahan sertifikat, izin, balik nama,
KPR dan BPHTB adalah Rp. 205.000.000
JUMLAH HARGA
10,750
15,000
1,075,000
675,000
1,750,000
47,375
685,753
15,792
127,565
152,150
845,954
1,659,272
699,805
314,912
694,675
862,656
17,265
4,061,096
181,335
2,135,220
7,373,884
694,675
17,265
213,030
1,531,758
4,368,772
7,828,853
694,675
1,133,710
17,265
4,896,527
213,030
11,827,426
694,675
1,280,633
17,265
3,248,714
694,675
804,086
17,265
1,282,183
694,675
1,042,013
39,244,674
221,049
35,710,434
JUMLAH
JUMLAH
JUMLAH
JUMLAH
JUMLAH
14,121
3,805,447
4,583
1,140,905
40,656,785
8,370,000
806,031
469,550
50,495
22,001
16,998
887,450
50,495
44,002
67,990
22,001
88,004
127,501
72,038
8,370,000
469,550
50,495
22,001
550,000
512,244
1,577,688
100,990
88,004
550,000
8,370,000
16,998
22,001
127,501
2,177,037
203,970
264,012
656,375
8,370,000
110,484
16,998
33,995
127,501
30,600
8,321,409
694,675
17,265
156,927
421,357
694,675
17,265
313,854
680,475
694,675
17,265
95,657
296,353
4,795,000
1,380,039
4,404,600
1,786,929
JUMLAH
JUMLAH
4,404,600
338,273
64,525
3,097,200
40,080
60,240
1,923,840
1,295,160
11,786,064
94,790
4,549,920
91,698
4,401,485
8,951,405
105,269
2,584,344
144,850
869,100
145,424
392,645
145,424
53,137
2,984,100
1,533,537
8,363,726
16,429
1,500,000
598,655
1,500,000
54,674
37,883
1,500,000
1,000,000
410,123
966,363
1,085,355
1,500,000
1,000,000
1,230,368
7,880,740
569,950
185,000
88,500
33,505
45,505
70,925
805,993
569,950
185,000
88,500
67,010
45,505
141,850
805,993
1,903,808
20,000
25,000
21,000
32,000
27,000
200,000
450,000
200,000
250,000
42,000
128,000
135,000
400,000
4,500,000
5,655,000
21,928
5,459,414
21,928
1,052,544
6,511,958
JUMLAH
JUMLAH
JUMLAH
JUMLAH
JUMLAH
JUMLAH
6,475
621,600
JUMLAH
150,680,324
UMLAH TOTAL
100,000
15,000,000
13,800,000
13,800,000
9,000,000
9,000,000
10,000,000
10,000,000
4,000,000
4,000,000
202,480,324
196.55
35.00
161.550
304.49
35.00
269.490
283.97
35.00
248.970