Buttery Valve
Ball Valves and Buttery Production, assembly, Sale.
Whenever you start reading a piping drawing or document, you can see many
abbreviations on these drawings/documents.
Many abbreviations are common and are regularly used in the drawings but few of the
abbreviation are new and unique for a particular drawing.
Gosto
Tweet
AO
DEGREES
OR DEG
NPT
DEGREE CENTIGRADE
DEGREE FAHRENHEIT
API
DETAILS
DET
ASTM
DIAMETER
DIA
AMERICAN SOCIETY OF
MECHANICALENGINEERS
ASME
DIMENSION
DIM
ASA
DISCHARGE
DISCH
XXS
AND
&
DRAIN
DR
APPROXIMATE
APPROX
DRAWING
DRG
tosearchtypeandhitenter
FOLLOW US ON GOOGLE+
Piping
engineering
Follow
BATTERY LIMIT
B/L
ECCENTRIC
ECC
BEVELLED
BE
ELBOW
EL
BBE
ELEVATION
EL
BOE
EXTENDED SPINDLE
EX.SPINDLE
BLE
EXTRA STRONG
XS
http://www.pipingengineering.com/pipingabbreviationslayoutdrawings.html
+1
+ 605
Subscribe
Popular
Recent
Comments
1/5
13/08/2016
Pipingabbreviation:Layoutdrawingsabbreviationsandlegends
BSE
EYE WASH
EW
BLIND FLANGE
BF
BOTTOM
BOT
FABRICATED
FAB
BOTTOM OF PIPE
BOP
FACE OF FLANGE
FOF
BRITISH STANDARD
BS
BSPT
FEET
OR FT
BUTT WELD
BW
FLANGE
FLG
BUTTERFLY
BUTFY
FLAT FACE
FF
FIELD WELD
FW
CSC
FFL
CSO
CARBON STEEL
CS
CENTIMETER
cm
GASKET
GSKT
CENTRE TO CENTRE
C TO C
GEAR OPERATED
GO
CENTRE LINE
GRADE
GR
Piping-engineering
10,866likes
LikePage
CERTIFICATE
CERT
CHAIN OPERATED
CH.OP
HAND HOLE
HH
CHANNEL
CHAN
HEIGHT
HT
CHECK
CHK
HPP
Or reach me on aj@piping-
CLEAN OUT
CO
HORIZONTAL
HOR
engineering.com
COLUMN
COL
HOSE CONNECTION
HC
CONCENTRIC
CONC
HYDRAULIC
HYD
CONNECTION
CONN
CONTACT FACE
CF
CONTINUED
CONT
CONTINUED ON DRAWING
COD
CONTROL VALVE
CV
CORROSION
CORR
COUPLING
CPLG
INCH
OR IN
RADIUS
RAD
INSIDE DIAMETER
ID
RAISED FACE
RF
INSULATION
INSUL
REDUCER OR REDUCING
RED
IH
REFERENCE
REF
IP
RSP
INTERNAL
INT
REQUIRED
REQD
INVERT ELEVATION
INV.EL
RTJ
ISOMETRIC
ISO
ROUND
RND
KILOGRAMME
Share
Bethefirstofyourfriendstolikethis
Google+
kg
SS. NO
SC
LOCKED CLOSED
LC
SAMPLE POINT
SP
LOCKED OPEN
LO
SCHEDLE
SCH
LONG
LG
SCREWED
SCD
LRWE
SEAMLESS
SMLS
SOP
MACHINE
MACH
SRWE
MANHOLE
MH
SLIP ON
SO
MATCHLINE
ML
SOCKET WELD
SW
MATERIAL
MATL
SPECIFICATION
SPEC
MAXIMUM
max
SQUARE
SQ
http://www.pipingengineering.com/pipingabbreviationslayoutdrawings.html
2/5
13/08/2016
Pipingabbreviation:Layoutdrawingsabbreviationsandlegends
MSL
STAINLESS STEEL
SS
METER
STANDARD
STD
MILLIMETRE
mm
STEAM
STM
MINIMUM
MIN
STEAM OUT
STM.OUT
STEAM TRACED
ST.TR
NIPPLE
NIP
STRAIGHT
STR
NOMINAL
NOM
SUCTION
SUCT
NOMINAL BORE
NB
SUPPORT
SUPPT
NORMALLY CLOSED
NC
SURFACE
SURF
NORMALLY OPEN
NO
SWAGE
SWG
NOZZLE
NOZZ
SWAGED NIPPLE
SN
NUMBER
No
TANGENT
TAN
OPERATING
OPER
TANGENT LINE
TAN.LINE
ORIENTATION
ORIENT
TEMPERATURE
TEMP
OUTSIDE DIAMETER
OD
TEMPORARY STRAINER
TS
TEE
PIPE SUPPORT
PS
THICKNESS OR THICK
THK
PBE
THREADED
THRD
P0E
TBE
PLE
TOE
PSE
TLE
PALTE
PL
THREADEDSMALL END
TSE
PALTEFORM
PLAT
T& G
PRESSURE
PRESS
TOP LEVEL
TL
TOS
TYPICAL
TYP
UNDER
UND
UNDERSIDE
US
UNC
UNF
VACUUM
VAC
VALVE
VA
VENT
VERTICAL
VERT
WALL THICKNESS
WT
WELD
WELD CAP
WC
WELD NECK
WN
WEIGHT
WP.EL
WORKING PRESSURE
WP
SharethisonWhatsApp
MORE READ
PDMS Example of
Stretch/Trim Functions
Equipment Modeling
Using PDMS- Primitives
http://www.pipingengineering.com/pipingabbreviationslayoutdrawings.html
3/5
13/08/2016
Pipingabbreviation:Layoutdrawingsabbreviationsandlegends
Point
Modelling
And Templates
8 COMMENTS
Veera
April 17, 2015 at 9:14 am
Piping engineering
April 18, 2015 at 4:27 pm
Hi Veera,
3D models can be reviewed using dierent review softwares eg
Navisworks review
Aviva review reality
Smart plan review
Naviesworks can be used for review of 3D model created in PDS as well as
PDMS.
Aviva review reality can be used for reviewing PDMS generated model.
Smart plan review can be used for reviewing 3D model generated using
PDS and Smart plan 3D.
Reply
Piping engineering
April 17, 2015 at 6:00 pm
Above mentioned are the reviewing softwares to review models designed already
in PDS, PDMS etc.
Apart from internal reviews by lead and area engineers, there are 3 formal model
reviews at Stages 30%, 60% and 90% of design completion where client will
participate in the reviews.
Below checklists may help for formal reviewshttp://www.piping-engineering.com/piping-checklist-for-30
http://www.piping-engineering.com/piping-checklist-for-60
http://www.piping-engineering.com/piping-checklist-for-90
Hope this helps.
Reply
Veera
April 18, 2015 at 5:30 pm
Thank you so much sir,, for your reply. But am asking that what are the basic
things we need to check in model..??
Reply
Piping engineering
August 21, 2015 at 7:29 pm
Hi,
Which section of piping isometric are you referring for SC. Generally SC
can be Sample Cooler or Sampling Connection on the isometric drawing.
AJ
Reply
http://www.pipingengineering.com/pipingabbreviationslayoutdrawings.html
4/5
13/08/2016
Pipingabbreviation:Layoutdrawingsabbreviationsandlegends
Nimesh
May 25, 2016 at 6:23 am
it is station controller
Reply
Jorge Padilla
October 20, 2015 at 3:58 pm
LEAVE A REPLY
Your email address will not be published. Required elds are marked *
Name *
Email *
PostComment
http://www.pipingengineering.com/pipingabbreviationslayoutdrawings.html
5/5