pv magazine feed-in tariff table

Country

State/Region

1 - 5 MW
capacity

Algeria

> 5 MW capacity

Size

Rooftop
Incentive
Hours of operation
(kWh/kW/year)
1615 - 1674
1675 - 1749
1750 - 1824
1825 - 1899
1900 - 1974
1975 - 2049
2050 - 2124
2125 - 2184
> 2184
Hours of operation
(kWh/kW/year)
1615 - 1674
1675 - 1749
1750 - 1824
1825 - 1899
1900 - 1974
1975 - 2049
2050 - 2124
2125 - 2184
> 2184

BIPV
Incentive
Guaranteed purchase price
Phase I (first 5 years)

Size

DZD 13.10

Guaranteed purchase price


Phase I (first 5 years)

DZD 10.48

The Algerian feed-in tariff is only available for ground-mounted solar PV p


for a limited number of hours per year, outside of which the electricity mu
prices.

EGP0.848/kW
EGP0.848/kW
Residential
h
h
NonNonEGP0.901/kW
EGP0.901/kW
residential
residential
h
h
< 200 kW
< 200 kW
EGP0.973/kW
EGP0.973/kW
200 - 500 kW
200 - 500 kW
h
h
US$0.136/kW
US$0.136/kW
500 kW - 20
500 kW - 20
h* (equiv. to
h* (equiv. to
MW
MW
EGP0.973)
EGP0.973)
US$0.1434/k
US$0.1434/k
20 - 50 MW
Wh* (equiv. 20 - 50 MW
Wh* (equiv.
to EGP1.025)
to EGP1.025)
*Projects above 500 kW will have price guarantees in U.S. dollars to mitigate investors' conc
fluctuation.
India has the Jawaharlal Nehru National Solar Mission (JNNSM), which is a
reference article for the details on the last bidding round (Phase II Batch I
Residential

Egypt

India

Indonesia

Indonesia has a bidding system similar to that in India. The maximum fee
or US$0.30/kWh for projects that utilize local components of 40% or more
minimum 40% local content requirement will have their bid adjusted down
during the competitive selection process, but will then be paid according t
entities cannot take part in the bidding process as bidders must submit an
number, although they can partner with local firms to take part.

Iran

Kenya

Peak/Med
Load (20
hours)

Peak/Med
IRR4,628/kW
Load (20
h
hours)

500 kW 1
MW Off-grid

US$0.20/kWh

500 kW 1
MW Off-grid

US$0.20/kWh

500 kW 10
MW On-grid

US$0.12/kWh

500 kW 10
MW On-grid

US$0.12/kWh

10 40 MW
On-grid

US$0.12/kWh

10 40 MW
On-grid

US$0.12/kWh

IRR4,628/kW
h

1.0888
1.2544
<4kW
MYR/kWh
MYR/kWh
1.0664
1.2320
4-24kW
4-24kW
MYR/kWh
MYR/kWh
0.8944
1.0600
24-72kW
24-72kW
MYR/kWh
MYR/kWh
0.8699
1.0355
72kW-1MW
72kW-1MW
MYR/kWh
MYR/kWh
0.7194
0.8850
1-10MW
1-10MW
MYR/kWh
MYR/kWh
0.6618
0.8274
10-30MW
10-30MW
MYR/kWh
MYR/kWh
Bonus for local modules: 0.0500MYR/kWh
Bonus for local inverters: 0.0500MYR/kWh
FITs for plants below 24 kW degress 8% per year and those above 24 kW
March 2013. The bonuses for local modules and inverters do not have yea
Mauritius has closed its FIT program with no indication of whether it will establish a new ince
<4kW

Malaysia

Mauritius

Transmission
connected
Mongolia

Morocco
Philippines

Any size

US$0.150.18/kWh

Any size

US$0.150.18/kWh

Distribution
US$0.20US$0.20connected &
Any size
Any size
0.30/kWh
0.30/kWh
Ulan Bator
Morocco has no feed-in tariffs, but the government supports large-scale projects by experien
project-to-project basis.
Any size
9.68/kWh
Any size
9.68/kWh
There is an incentive scheme for renewable energy generation in the Philippines, however a
only have 40% foreign equity, making the market very hard to penetrate for foreign investor

South Africa launched its Renewable Energy Independent Power Producer


(REIPPPP) on August 3, 2011. It is a bidding system with a maximum pric
191) for solar photovoltaic systems. It has a non-refundable application
1,007) and is designed to stimulate large-scale projects (>5 MW). It also
that require 45% of the goods and services of a project to be supplied fro
service providers.
The dates for Fourth Bid Round Submissions are as follows:
Bid registration date
South Africa

Fourth Bid Submission Date

Announcement of Preferred Bidders in respect of Fourth Bid Submission D

Signing and effective date of PPAs, Direct Agreements, Implementation Ag


Connection Agreements and Financial Close not later than

The Department of Energy also introduced a Small Projects Independent P


Programme on August 21, 2013 in relation to renewable energy generatio
capacity of 1-5 MW.
Mini-grid
Tanzania

National grid

Any time
Dry season
Wet season

Tanzania

National grid
Average
Ground-mounted (200
MW quota by December
2015)

Thailand

Uganda

< 10 kW
BHT6.85/kWh
10 - 250 kW BHT6.40/kWh
250 kW - 1
BHT6.01/kWh
MW
Uganda cancelled its FIT in November 2012. It is unclear if support for PV will be renewed in

tariff table

Last updated:
20th March 2015

Ground-mounted
Term
Size
Incentive
uaranteed purchase price
Phase II (last 15 years)
DZD 16.66
DZD 15.86
DZD 15.01
DZD 14.09 20 years
DZD 13.10
DZD 12.11
DZD 11.19
DZD 10.34
DZD 9.55
uaranteed purchase price
Phase II (last 15 years)
DZD 13.33
DZD 12.69
DZD 12.01
DZD 11.27 20 years
DZD 10.48
DZD 9.69
DZD 8.95
DZD 8.27
DZD 7.64

Sources

http://www.joradp.dz/FTP/jo-francais/2014/F2014023.pdf
http://www.pv-magazine.com/news/details/beitrag/algeria-laun

ound-mounted solar PV projects. It is only available


f which the electricity must be sold at conventional
Residential

EGP0.848/kW
h

Nonresidential
< 200 kW

EGP0.901/kW
h

http://www.eversheds.com/documents/sectors/energy/RFQ-FEE
http://egyptera.org/en/kwa3d%20tanzmia.aspx

EGP0.973/kW
h
25 years
US$0.136/kW
500 kW - 20
h* (equiv. to
MW
EGP0.973)
US$0.1434/k
20 - 50 MW
Wh* (equiv.
to EGP1.025)
o mitigate investors' concerns about exchange rate

http://www.pv-magazine.com/news/details/beitrag/egypt-anno

ssion (JNNSM), which is an auction system. See the


g round (Phase II Batch I).

http://www.pv-magazine.com/opinion-analysis/blogdetails/beitr

200 - 500 kW

India. The maximum feed-in tariff is US$0.25/kWh,


mponents of 40% or more. Bidders that fulfil the
ve their bid adjusted downward by US$0.05/kWh
then be paid according to their initial bid. Foreign
s bidders must submit an Indonesian tax registration
ms to take part.

http://www.hhp.co.id/files/Uploads/Documents/Type%202/HHP

http://www.hhp.co.id/files/Uploads/Documents/Type%202/HHP

Sorena Solar Green Energy Co.

Peak/Med
Load (20
hours)

IRR4,628/kW
5 years
h

500 kW 1
MW Off-grid

US$0.20/kWh

500 kW 10
MW On-grid

US$0.12/kWh 20 years

10 40 MW
On-grid

US$0.12/kWh

http://www.energyvortex.com/energydictionary/firm_capacity_

0.9166
MYR/kWh
0.8942
MYR/kWh
0.7222
MYR/kWh
0.6977
MYR/kWh
0.5472
MYR/kWh
0.4896
MYR/kWh

http://www.pv-magazine.com/news/details/beitrag/malaysia--s

<4kW
4-24kW
24-72kW
72kW-1MW
1-10MW
10-30MW

http://www.pv-magazine.com/fileadmin/uploads/bilder/firmenlo

http://seda.gov.my/

http://seda.gov.my/go-home.php?omaneg=0001010000000101
21 years

r and those above 24 kW degress 20% per year as of


nverters do not have yearly degressions.
t will establish a new incentive scheme.
Any size

US$0.150.18/kWh

Any size

US$0.200.30/kWh

http://www.renewableenergyworld.com/rea/news/article/2012/
http://www.wind-works.org/cms/index.php?id=164&tx_ttnews%

10 years

scale projects by experienced developers on a

Any size
9.68/kWh
he Philippines, however a project can
etrate for foreign investors.

http://www.energy.go.ke/downloads/FiT%20Policy%202012.pd

20 years

http://www.invest.gov.ma/?Id=24&lang=en&RefCat=2&Ref=14

http://www.pv-magazine.com/news/details/beitrag/philippineshttp://www.bcphilippineslawyers.com/philippines-regular-foreig

http://www.worldfuturecouncil.org/fileadmin/user_upload/PDF/F
pendent Power Producer Procurement Programme
em with a maximum price of ZAR 2,850/MWh ($262;
n-refundable application fee of ZAR 15,000 ($1,379;
projects (>5 MW). It also has domestic content rules http://www.ipprenewables.co.za/
http://www.crm-ps.com/en/media-of-mines-and-windmills.php
project to be supplied from local manufacturers and

as follows:
Jul 21, 2014

Fourth Bid Submission Date

ments, Implementation Agreements and


ater than

Aug 18,
2014
Oct 28,
2014
Jul 9, 2015

all Projects Independent Power Producer Procurement


newable energy generation facilities with a limited
TZS 480.50/kWh
TZS 183.05/kWh
TZS 137.29/kWh

15 years
15 years

http://www.boell.de/sites/default/files/2013-03-powering-africa
pp.118-119 of above report (p.63 of PDF).

15 years
TZS 152.54/kWh
Community groundmounted (800 MW quota
by December 2015)

http://www.iea.org/policiesandmeasures/pams/thailand/name-4

25 years
Any size

BHT9.66/kWh

for PV will be renewed in future.

http://www.pv-magazine.com/news/details/beitrag/uganda-dro

ais/2014/F2014023.pdf
s/details/beitrag/algeria-launches-feed-in-tariff_100014932/#axzz31Pgf8Zjr

ents/sectors/energy/RFQ-FEED-IN-Tariff20-10-14.pdf

tanzmia.aspx

s/details/beitrag/egypt-announces-renewable-energy-feed-in-tariffs_100016525/

nion-analysis/blogdetails/beitrag/the-changing-dynamics-of-indias-national-solar-mission_100014586/

/Documents/Type%202/HHP/al_hhp_solarpower_jul13.pdf

/Documents/Type%202/HHP/al_hhp_indonesiasolarprojects_nov13.pdf

dmin/uploads/bilder/firmenlogos/feed_in_tariffs.pdf

ds/FiT%20Policy%202012.pdf

rgydictionary/firm_capacity__firm_energy__nonfirm_energy__firm_power.html

s/details/beitrag/malaysia--sophisticated-fit-system-adopted_100002784/

omaneg=00010100000001010101000100001000000000000000000000&y=45&s=2584

.com/rea/news/article/2012/08/mauritius-closes-expanded-feed-in-tariff-program-after-reaching-target
ndex.php?id=164&tx_ttnews%5Btt_news%5D=824&cHash=1e55ec72dbf447ffdca3c062b995dc0d

&lang=en&RefCat=2&Ref=145

s/details/beitrag/philippines-approves-fit_100007969/
om/philippines-regular-foreign-investment-negative-list-a/

/fileadmin/user_upload/PDF/Feed_in_Tariff/Powering_Africa_through_Feed-in_Tariffs.pdf

-of-mines-and-windmills.php

iles/2013-03-powering-africa_through-feed-in-tariffs.pdf

asures/pams/thailand/name-43052-en.php

s/details/beitrag/uganda-drops-pv-fit-program_100010696/

100014586/

eaching-target

Anda mungkin juga menyukai