PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/PUSTU DAN JARINGANNYA.
PEMBANGUNAN PUSKESMAS SENGKOL
: DESA SENGKOL KEC. PUJUT
2016
NO.
I.
URAIAN
JUMLAH
HARGA
(Rp)
PEKERJAAN
Rp.
18.528.437,50
II.
2.1
2.2
2.3
2.4
Rp.
Rp.
Rp.
Rp.
Rp.
1.323.550.013,78
44.991.215,81
85.092.527,44
884.445.346,55
309.020.923,98
III.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
PEKERJAAN ARSITEKTURAL
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN KAYU
PEKERJAAN PENUTUP LANTAI DAN DINDING
PEKERJAAN PENGECATAN
PEKERJAAN BESI DAN ALUMUNIUM
PEKERJAAN KUNCI, ALAT PENGGANTUNG DAN KACA
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.057.706.803,01
173.849.671,28
158.732.212,83
239.800,00
437.873.637,20
77.825.352,84
141.576.189,42
67.609.939,43
IV
4.1
4.2
4.3
4.4
Rp.
Rp.
Rp.
Rp.
Rp.
92.260.144,95
38.744.222,50
6.293.871,47
38.740.323,88
8.481.727,10
V
5.1
5.2
PEKERJAAN ELEKTRIKAL
PEK. INSTALASI LISTRIK DAN PENERANGAN
PEK. FIRE EXTINGUISER DAN PENANGKAL PETIR
Rp.
Rp.
Rp.
40.065.000,00
32.065.000,00
8.000.000,00
VI
6.1
6.2
6.3
Rp.
Rp.
Rp.
Rp.
187.234.525,00
20.227.612,76
85.738.721,94
81.268.190,30
Rp.
2.719.344.924,25
BAMBANG ANCASONO, BE
Direktur
NO.
I.
:
:
:
:
PENGADAAN, PENINGKATAN DAN PERBAIKAN SARANA DAN PRASARANA PUSKESMAS/PUSTU DAN JARINGANNYA.
PEMBANGUNAN PUSKESMAS SENGKOL
: DESA SENGKOL KEC. PUJUT
2016
URAIAN PEKERJAAN
SAT.
KODE
ANAL
KUAN
TITAS
II.
2.1
PEKERJAAN TANAH
2.2
2.2.1
2.2.2
2.3
2.3.1
2.3.1(1)
2.3.1(2)
2.3.1(3)
2.3.1(4)
2.3.1(5)
2.3.1(6)
2.3.1(7)
2.3.1(8)
2.3.1(9)
2.3.1(10)
2.3.1(11)
2.3.1(12)
2.3.1(13)
2.3.1(14)
2.3.1(15)
2.3.1(16)
2.3.1(17)
2.3.1(18)
2.3.1(19)
2.3.1(20)
2.3.1(21)
2.3.1(22)
2.3.1(23)
2.3.1(24)
2.3.1(25)
2.3.1(26)
2.3.1(27)
JUMLAH
HARGA
(Rp.)
1,1
1,2
1,3
1,4
2,5
2,6
2.1.1
2.1.2
2.1.3
2.1.4
HARGA
SATUAN
(Rp.)
Ls
Ls
Ls
Ls
Ls
Ls
250.000,00 Rp.
1.500.000,00 Rp.
1.000.000,00 Rp.
7.500,00 Rp.
5.000.000,00 Rp.
4.200.000,00 Rp.
Rp.
250.000,00
1.500.000,00
1.000.000,00
6.578.437,50
5.000.000,00
4.200.000,00
18.528.437,50
43.587,50
14.529,17
98.587,50
99.935,00
Rp.
Rp.
Rp.
Rp.
Rp.
17.921.371,12
1.991.222,29
18.618.249,38
6.460.373,03
44.991.215,81
262.713,00
571.329,00
Rp.
Rp.
Rp.
15.300.405,12
69.792.122,32
85.092.527,44
677.248,32 Rp.
2.992.835,68 Rp.
3.589.410,12 Rp.
2.628.122,07 Rp.
4.712.686,64 Rp.
91.019,50 Rp.
5.462.676,70 Rp.
7.210.790,89 Rp.
5.691.986,22 Rp.
4.761.918,48 Rp.
7.019.789,91 Rp.
5.911.593,81 Rp.
6.436.465,45 Rp.
91.019,50 Rp.
4.333.933,46 Rp.
5.022.889,13 Rp.
5.256.749,67 Rp.
5.917.399,39 Rp.
4.009.949,26 Rp.
4.009.949,26 Rp.
3.435.339,76 Rp.
4.502.321,65 Rp.
4.502.321,65 Rp.
4.502.321,65 Rp.
729.051,71 Rp.
76.340,00 Rp.
729.051,71 Rp.
8.072.461,35
62.684.943,23
2.541.302,37
902.759,93
51.886.679,86
14.576.772,93
112.094.125,94
24.228.257,39
2.766.305,30
514.287,20
18.795.487,49
3.591.293,24
17.233.636,25
1.319.782,75
78.335.847,31
27.688.676,32
6.150.397,11
208.916.744,03
1.876.656,25
5.933.120,92
10.357.549,38
4.142.135,92
5.745.412,66
10.249.085,01
17.210.177,03
12.519.760,00
5.540.793,03
PEKERJAAN FONDASI
Pasangan Batu Kosong (aanstamping)
M3
58,24
SNI 2836:2008 (6.9)
Pasangan Fondasi Batu Kali 1 Pc : 5 Ps
M3
122,16
SNI 2836:2008 (6.3)
Jumlah Harga Pekerjaan FONDASI (Masuk Pada Rekapitulasi Daftar Kuantitas)
PEKERJAAN BETON
Lantai 1 (Ground Floor)
Beton Lantai Kerja
Foot Plate Tipe FP1,(175 x 175 x 35)
Foot Plate Tipe FP2,(60 x 60 x 30)
Foot Plate Tangga Tipe FT (150 x 80 x 35)
Balok Sloof Tipe S1 20/25 cm
Balok Sloof Tipe Sp 15/20 cm
Kolom Tipe K1 30/40 cm
Kolom Tipe K3 15/20 cm
Kolom Tipe KG 25/25 cm
Balok Tipe BB (20/30) cm - Elev. +2.20
Balok Tipe BL/Latei (13/20) cm - Elev. +2.75
Balok Tipe BR1a (15/25) cm - Elev. +3.25
Balok Tipe BR2a (15/20) cm - Elev. +4.00
Balok Tipe Rp (10/15) cm - Elev. +4.00
Balok Tipe BL1 (30/50) cm - Elev. +4.00
Balok Tipe BL2 (25/35) cm - Elev. +4.00
Balok Tipe BL3 (20/30) cm - Elev. +4.00
Pelat Lantai t = 12 cm - Elev. +4.00
Pelat Bordes t = 12 cm - Elev. +2.00
Pelat Tangga t = 12 cm Inc. Pendestal
Pelat Atap Canopy t = 10 cm - Elev. 3.15
Pelat Lisplang beton tegak t = 7 cm
Pelat Sunshding t = 7 cm
Pelat Meja Beton t = 7 cm
Rabat beton t = 5 cm camp 1 Pc ; 2 psr ; 5 krl
Kolom Praktis KP 10/10 cm
Rabat Entrance dan Penghubung R. Inap t = 10 cm
M3
M3
M3
M3
M3
M
M3
M3
M3
M3
M3
M3
M3
M
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M
M3
11,92
20,95
0,71
0,34
11,01
160,15
20,52
3,36
0,49
0,11
2,68
0,61
2,68
14,50
18,08
5,51
1,17
35,31
0,47
1,48
3,02
0,92
1,28
2,28
23,61
164,00
7,60
NO.
2.3.2
2.3.2(1)
2.3.2(2)
2.3.2(4)
2.3.2(5)
2.3.2(6)
2.3.2(7)
2.3.2(8)
2.3.2(9)
2.3.2(10)
2.3.2(11)
2.3.2(12)
2.4
2.4.1
2.4.2
2.4.3
2.4.4
2.4.5
2.4.6
2.4.7
URAIAN PEKERJAAN
SAT.
KUAN
TITAS
KODE
ANAL
JUMLAH
HARGA
(Rp.)
5.462.676,70
7.172.147,41
7.210.790,89
7.019.789,91
7.019.789,91
5.758.000,72
7.256.344,90
6.452.234,82
4.502.321,65
3.435.339,76
76.340,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
24.254.284,56
30.252.117,77
2.401.193,37
13.433.069,97
13.491.158,74
9.673.441,21
12.190.659,42
38.229.491,34
9.243.266,35
5.630.693,63
9.771.520,00
884.445.346,55
165.000,00
Rp.
121.565.226,74
214.637,50 Rp.
121.319,00 Rp.
45.000,00 Rp.
95.000,00 Rp.
500.000,00 Rp.
100.000,00 Rp.
Rp.
158.136.099,12
7.189.548,12
6.426.450,00
2.363.600,00
12.440.000,00
900.000,00
309.020.923,98
99.226,60 Rp.
93.124,90 Rp.
205.804,50 Rp.
142.279,50 Rp.
30.000,00 Rp.
177.375,00 Rp.
18.844.867,81
50.879.720,36
864.378,90
866.482,16
120.000,00
57.646.875,00
III
PEKERJAAN ARSITEKTURAL
3.1
PEKERJAAN DINDING
3.1.1
3.1.1(1)
3.1.1(2)
3.1.1(3)
3.1.1(4)
3.1.1(5)
3.1.1(6)
3.1.2
3.1.2(1)
3.1.2(2)
3.2
HARGA
SATUAN
(Rp.)
M2
M2
M2
M2
BH
M2
189,92
546,36
4,20
6,09
4,00
325,00
99.226,60
93.124,90
Rp.
Rp.
Rp.
2.786.282,93
41.841.064,13
173.849.671,28
PEKERJAAN PLESTERAN
3.2.1
3.2.1(1)
3.2.1(2)
3.2.1(3)
3.2.1(4)
3.2.1(5)
3.2.1(6)
46.407,68
43.064,12
46.407,68
26.317,50
26.317,50
26.317,50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.564.866,97
47.057.025,21
6.304.019,25
29.645.084,70
3.574.969,20
1.220.605,65
3.2.2
3.2.2(1)
3.2.2(2)
3.2.2(3)
3.2.2(4)
3.2.2(5)
46.407,68
43.064,12
46.407,68
26.317,50
26.317,50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.125.618,28
38.697.461,30
3.353.465,36
24.287.368,05
1.901.728,87
158.732.212,83
74.937,50 Rp.
239.800,00
Rp.
239.800,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
91.934.699,54
4.933.863,21
27.837.010,74
15.026.735,16
1.093.258,90
1.394.432,82
31.185.000,00
11.193.750,00
16.774.645,14
30.143.860,90
11.196.000,00
69.335.280,00
3.3
3.3.1
M2
M2
M2
M2
M2
M2
33,72
1.092,7
135,84
1.126,44
135,84
46,38
PEKERJAAN KAYU
Papan Loket Kayu 3/30 Klas II
3,20
M2
M2
M2
M2
M2
M2
M2
M2
M
M
M2
M2
465,54
20,85
129,36
69,83
4,62
6,48
346,50
124,38
421,32
391,42
24,88
86,67
197.479,70
236.636,13
215.190,25
215.190,25
236.636,13
215.190,25
90.000,00
90.000,00
39.814,50
77.011,55
450.000,00
800.000,00
NO.
3.4.2
3.4.2(1)
3.4.2(2)
3.4.2(3)
3.4.2(4)
3.4.2(5)
3.4.2(6)
3.4.2(7)
3.4.2(8)
3.4.2(9)
3.5
URAIAN PEKERJAAN
SAT.
KUAN
TITAS
KODE
ANAL
JUMLAH
HARGA
(Rp.)
197.479,70 Rp.
197.479,70 Rp.
197.479,70 Rp.
236.636,13 Rp.
215.190,25 Rp.
90.000,00 Rp.
90.000,00 Rp.
39.814,50 Rp.
77.011,55 Rp.
Rp.
51.616.256,59
3.436.146,78
918.280,61
2.395.940,77
6.865.644,93
25.650.000,00
6.795.000,00
11.752.842,26
16.394.988,88
437.873.637,20
PEKERJAAN PENGECATAN
3.5.1
3.5.1(1)
3.5.1(2)
3.5.1(3)
3.5.2
3.5.2(1)
3.5.2(2)
3.5.2(3)
3.6
HARGA
SATUAN
(Rp.)
M2
M2
M2
1.274,9
221,94
19,28
Pt T-38-2000-C (6)
Pt T-38-2000-C (7)
Pt T-38-2000-C (10)
28.129,75
20.649,75
128.382,65
Rp.
Rp.
Rp.
35.863.462,17
4.583.005,52
2.475.345,87
28.129,75 Rp.
20.649,75 Rp.
128.382,65 Rp.
Rp.
28.110.874,94
5.885.178,75
907.485,60
77.825.352,84
3.6.1
3.6.1(1)
3.6.1(2)
3.6.1(3)
3.6.1(4)
114.217,40
472.604,00
800.000,00
400.000,00
Rp.
Rp.
Rp.
Rp.
39.568.333,88
24.556.503,84
23.200.000,00
3.200.000,00
3.6.2
3.6.2(1)
3.6.2(2)
3.6.2(3)
3.6.2(4)
3.6.2(5)
114.217,40
472.604,00
800.000,00
700.000,00
400.000,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
21.156.489,00
12.724.862,70
9.600.000,00
6.370.000,00
1.200.000,00
141.576.189,42
153.175,00 Rp.
100.000,00 Rp.
1.500.000,00 Rp.
80.000,00 Rp.
20.465,50 Rp.
15.235,00 Rp.
28.985,00 Rp.
20.735,00 Rp.
182.424,00 Rp.
284.669,00 Rp.
7.000.000,00 Rp.
2.757.150,00
2.900.000,00
3.000.000,00
800.000,00
1.739.567,50
3.717.340,00
3.536.170,00
5.059.340,00
6.358.862,82
1.574.219,57
14.000.000,00
3.7
M
M2
UNIT
UNIT
346,43
51,96
29,00
8,00
3.7.1
3.7.1(1)
3.7.1(2)
3.7.1(3)
3.7.1(4)
3.7.1(5)
3.7.1(6)
3.7.1(7)
3.7.1(8)
3.7.1(9)
3.7.1(10)
3.7.1(11)
3.7.2
3.7.2(1)
3.7.2(2)
3.7.2(3)
3.7.2(4)
3.7.2(5)
3.7.2(6)
3.7.2(7)
3.7.2(8)
3.7.2(9)
BH
PSG
PSG
PSG
BH
BH
BH
BH
M2
M2
Unit
18,00
29,00
2,00
10,00
85,00
244,00
122,00
244,00
34,86
5,53
2,00
Pt T-30-2000-C (2)
Ls
Ls
Ls
Pt T-30-2000-C (5)
Pt T-30-2000-C (6)
Pt T-30-2000-C (12)
Pt T-30-2000-C (7)
Pt T-30-2000-C (13)
Pt T-30-2000-C (14)
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
919.050,00
1.000.000,00
573.034,00
1.980.550,00
1.884.025,00
2.695.550,00
3.005.252,98
922.327,56
9.187.500,00
67.609.939,43
NO.
URAIAN PEKERJAAN
IV
4.1
PEKERJAAN SANITAIR
SAT.
KUAN
TITAS
KODE
ANAL
4.1.1
4.1.1(1)
4.1.1(3)
4.1.1(6)
4.1.1(7)
4.1.1(8)
4.1.1(9)
4.1.1(10)
4.1.1(11)
4.1.2
4.1.2(1)
4.1.2(2)
4.1.2(3)
4.1.2(4)
4.1.2(5)
4.1.2(6)
4.1.2(7)
4.2
4.2.1
4.2.1(1)
4.2.1(2)
4.2.1(3)
4.2.1(4)
4.2.1(5)
4.2.1(6)
4.2.2
4.2.2(1)
4.2.2(2)
4.3
4.3.1
4.3.1(1)
4.3.1(2)
4.3.1(3)
4.3.1(4)
4.3.1(5)
4.3.2
4.3.2(1)
4.3.2(2)
4.4
4.4.1
4.4.2
BH
BH
BH
Unit
Unit
Unit
Unit
Unit
8,00
22,00
5,00
3,00
3,00
3,00
11,00
3,00
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
114.235,00 Rp.
85.635,00 Rp.
390.775,00 Rp.
150.000,00 Rp.
2.509.361,25 Rp.
75.000,00 Rp.
1.312.685,00 Rp.
482.955,00 Rp.
913.880,00
1.883.970,00
1.953.875,00
450.000,00
7.528.083,75
225.000,00
14.439.535,00
1.448.865,00
114.235,00
85.635,00
2.509.361,25
2.509.361,25
75.000,00
1.312.685,00
150.000,00
Rp.
Rp.
Rp
Rp.
Rp.
Rp.
Rp.
Rp.
342.705,00
342.540,00
7.528.083,75
225.000,00
1.312.685,00
150.000,00
38.744.222,50
58.359,95 Rp.
419.122,00 Rp.
45.000,00 Rp.
1.167.199,00
419.122,00
45.000,00
M
BH
BH
20,00
1,00
1,00
BH
M
M
2,00
92,90
49,00
Ls
RSNI T-15-2002 (6.23)
RSNI T-15-2002 (6.21)
25.000,00
27.085,30
22.174,90
Rp.
Rp.
Rp.
50.000,00
2.516.224,37
1.086.570,10
27.085,30 Rp.
22.174,90 Rp.
Rp.
677.132,50
332.623,50
6.293.871,47
M
M
BH
Unit
Unit
34,80
91,00
4,00
2,00
6,00
285.090,85
68.005,30
419.122,00
4.000.000,00
1.500.000,00
Rp.
Rp.
Rp.
Rp.
Rp.
9.921.161,58
6.188.482,30
1.676.488,00
8.000.000,00
9.000.000,00
Pipa Air Kotor Padat "PVC Kls AW" 4" Inc. Support
M
10,00
RSNI T-15-2002 (6.28)
Pipa Air Bekas "PVC Klas AW" 3" Inc. Support
M
10,00
RSNI T-15-2002 (6.27)
Jumlah Harga Pekerjaan INSTALASI AIR BEKAS (Masuk Pada Rekapitulasi Daftar Kuantitas)
285.090,85
110.328,35
Rp.
Rp.
Rp.
2.850.908,50
1.103.283,50
38.740.323,88
68.005,30
641.316,50
Rp.
Rp.
5.916.461,10
2.565.266,00
Rp.
8.481.727,10
M
BH
87,00
4,00
Jumlah Harga Pekerjaan INSTALASI AIR HUJAN (Masuk Pada Rekapitulasi Daftar Kuantitas)
NO.
V
5.1
URAIAN PEKERJAAN
SAT.
KUAN
TITAS
KODE
ANAL
5.1.2
5.1.2(1)
5.1.2(2)
5.1.2(2)
5.1.2(3)
5.1.2(4)
5.1.2(5)
3.7.2(6)
3.7.2(7)
3.7.2(8)
3.7.2(9)
3.7.2(10)
3.7.2(11)
5.2.1
Unit
BH
BH
BH
BH
BH
BH
TTK
BH
BH
TTK
TTK
TTK
UNIT
UNIT
UNIT
1,000
21,000
21,00
12,00
12,00
14,00
14,00
14,00
8,00
17,00
72,00
14,00
1,00
8,00
1,00
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
Ls
5.500.000,00
150.000,00
60.000,00
35.000,00
45.000,00
65.000,00
50.000,00
37.000,00
25.000,00
45.000,00
95.000,00
95.000,00
95.000,00
50.000,00
50.000,00
350.000,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp
Rp.
Rp.
Rp.
5.500.000,00
3.150.000,00
1.260.000,00
420.000,00
540.000,00
910.000,00
700.000,00
518.000,00
200.000,00
765.000,00
6.840.000,00
1.330.000,00
50.000,00
400.000,00
350.000,00
150.000,00
60.000,00
35.000,00
45.000,00
65.000,00
50.000,00
37.000,00
25.000,00
45.000,00
95.000,00
95.000,00
95.000,00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.800.000,00
720.000,00
140.000,00
180.000,00
390.000,00
300.000,00
592.000,00
175.000,00
180.000,00
3.135.000,00
950.000,00
570.000,00
32.065.000,00
4.000.000,00
Rp.
8.000.000,00
Rp.
8.000.000,00
UNIT
2,00
Ls
Jumlah Harga Pekerjaan FIRE EXTINGUISER DAN PENANGKAL PETIR (Masuk Pada Rekapitulasi Daftar Kuantitas)
VI
6.1
6.1.1
6.1.1(1)
6.1.1(2)
6.1.1(3)
Pekerjaan Tanah
Pengukuran dan Bouwplank
Galian Tanah Fondasi
Urugan Kembali Fondasi
6.1.2
6.1.2(1)
6.1.2(2)
6.1.2(3)
6.1.2(4)
Pekerjaan Beton
Beton Lantai Kerja
M3
0,76
SNI 7394:2008 (6.4)
Foot Plate Tipe FP6 (150 x 150 x 35)
M3
3,14
SNI 7394:2008 (6.28d)
Kolom Tipe K2 30/30 cm
M3
0,65
SNI 7394:2008 (6.30c)
Balok Sloof Tipe S1 20/25 cm
M3
0,54
SNI 7394:2008 (6.29a)
Jumlah Harga Pekerjaan TANAH DAN BETON (Masuk Pada Rekapitulasi Daftar Kuantitas)
6.2
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.2.6
6.2.7
6.2.8
6.2.9
6.2.10
6.2.11
JUMLAH
HARGA
(Rp.)
PEKERJAAN ELEKTRIKAL
5.1.1
5.1.1(1)
3.7.2(2)
3.7.2(3)
3.7.2(4)
3.7.2(5)
3.7.2(6)
3.7.2(7)
3.7.2(8)
3.7.2(9)
3.7.2(10)
3.7.2(11)
3.7.2(12)
3.7.2(13)
3.7.2(14)
3.7.2(15)
3.7.2(16)
5.2
HARGA
SATUAN
(Rp.)
M
M3
M3
22,00
26,62
26,62
95.892,50
43.587,50
14.529,17
2.109.635,000
1.160.190,281
386.730,094
677.248,32
2.811.964,48
7.210.790,89
4.712.686,64
Rp.
515.047,347
8.838.566,761
4.672.592,496
2.544.850,784
20.227.612,76
Rp.
400.000,000
842.181,912
31.711.898,574
8.507.002,870
19.650.911,280
13.858.000,000
3.472.000,000
260.450,960
3.476.863,283
787.610,813
2.771.802,246
85.738.721,94
25.000,00
37.251,50
37.251,50
37.251,50
37.251,50
20.500,00
15.500,00
2.325,46
2.133,32
13.854,50
48.757,50
NO.
6.3
URAIAN PEKERJAAN
SAT.
KUAN
TITAS
KODE
ANAL
JUMLAH
HARGA
(Rp.)
6.3.1
6.3.1(1)
6.3.1(2)
6.3.1(3)
6.3.1(4)
6.3.2
6.3.2(1)
6.3.2(2)
6.3.2(3)
6.3.2(4)
6.3.2(5)
6.3.2(6)
6.3.2(7)
6.3.2(8)
6.3.2(9)
3.7.2(10)
HARGA
SATUAN
(Rp.)
M
Unit
M
BH
60,00
1,00
67,50
1,00
Ls
Ls
RSNI T-15-2002 (6.23)
Ls
750.000,00
45.000,00
27.085,30
22.500,00
Rp.
Rp.
Rp.
Rp.
45.000.000,00
45.000,00
1.828.257,75
22.500,00
18.500.000,00
Rp.
18.500.000,00
27.085,30 Rp.
27.085,30 Rp.
7.500.000,00 Rp.
50.000,00 Rp.
27.085,30 Rp.
58.359,95 Rp.
45.000,00 Rp.
45.000,00 Rp.
25.000,00 Rp.
Rp.
338.566,25
27.085,30
15.000.000,00
50.000,00
108.341,20
233.439,80
45.000,00
45.000,00
25.000,00
81.268.190,30