Anda di halaman 1dari 10

Fit- Up Inspection Report

Report No.:
Location :
Equipment Description :
ISO Drawing No./Rev.No:
No.

Comments:

Drawing No.

System :
Weld Type
Date :
P & ID No./Rev :

Rev No.

SP. No. Joint No.

NPS
(Inch)

THK
(mm)

Welder
Stamp

Weld
Type

Material Spec
WPS No.

Member 1

Member 2

Print Name
Signature
Date

TANK ROOF PLATE INSTALLATION CHECK LIST

on Report

Product Form
Member 1

Member 2

Heat Number
Member 1

Member 2

Result
(ACC/AWC/REJ)

Weld Visual Inspection


Report No.:
Location :
Date :
No.

comments:

Signature

System:

Drawing No.

Pipe Size/Thk

Spool No.

Weld No. Weld Type

Material
Heat No.

Material
Heat No.

Fit-up
Inspection

Welding
Date

Welder ID
Root / Hot
Subsequent Pass
Pass

Name
Date

Welder ID
Subsequent Pass

WPS No.

Visual Inspection
Result

Anda mungkin juga menyukai