Analisa Pengadaan Konst
Analisa Pengadaan Konst
Uraian
Sat
Volume
Jumlah Harga (R
A.
BAHAN Plamir
Kg
0,1000
Cat Dasar
Kg
0,1000
A.
1
2
3
4
5
BAHAN Plamir
Cat Dasar
Cat Penutup 2x lapis
Ampelas
Kuas
Kg Kg Kg
Lmbr
Bh
0,1000
0,1000
0,3700
0,5000
0,0100
A.
1
2
3
4
5
BAHAN Plamir
Cat Dasar
Cat Penutup 2x lapis
Ampelas
Kuas
Kg Kg Kg
Lmbr
Bh
0,1000
0,1000
0,3700
0,5000
0,0100
OH OH OH 0,0030
OH
0,0040
0,0400
0,0600
Sub Total A
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Cat Pekerja
Sub Total B
C.
No.
Uraian
Sat
A.
1
2
3
4
BAHAN
Semen @50 Kg Pasir Pasang Batu Kerikil
Air
Kg Kg Kg 230,0000
893,0000
Ltr
Sub Total A
Volume
1.027,0000
200,0000
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0600
OH
0,0200
0,2000
1,2000
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
2
3
BAHAN
Batu Bata Semen @50 Kg Pasir Pasang
Bh Kg M3
70,0000
14,3700
0,0400
Jumlah Harga (R
Sub Total A
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0150
OH
0,0100
0,1000
0,3000
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
2
3
BAHAN
Batu Bata Semen @50 Kg Pasir Pasang
Bh Kg M3
70,0000
9,6800
0,0450
B.
1
2
3
4
UPAH Mandor
Kepala Tukang
Tukang Batu
Pekerja
Jumlah Harga (R
Sub Total A
OH OH OH 0,0150
OH
0,0100
0,1000
0,3000
Sub Total B
C.
No.
Sat
Volume
Jumlah Harga (R
A.
1
2
BAHAN
Semen @50 Kg
Pasir Pasang
Kg
M3
7,7760
0,0230
OH OH OH 0,0150
OH
0,0150
0,1500
0,3000
Sub Total A
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
Sub Total B
C.
No.
Uraian
Sat
Volume
Jumlah Harga (R
A.
1
2
BAHAN
Semen @50 Kg
Pasir Pasang
Kg
M3
5,1840
0,0260
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0150
OH
0,0150
0,1500
0,3000
Sub Total A
Sub Total B
C.
No.
Uraian
Sat
Volume
Jumlah Harga (R
A.
1
BAHAN
Semen @50 Kg
Kg
3,2500
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0100
OH
0,0100
0,1000
0,2000
Sub Total A
Sub Total B
C.
No.
Uraian
Sat
Volume
Jumlah Harga (R
A.
1
2
BAHAN
Semen @50 Kg
Pasir Pasang
Zak
M3
0,0662
0,0180
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0100
OH
0,0380
0,4600
0,3200
Sub Total A
Sub Total B
C.
No.
Uraian
Sat
A.
BAHAN
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
Volume
Jumlah Harga (R
Sub Total A
OH OH OH 0,0020
OH
0,0020
0,0200
0,1360
Sub Total B
C.
No.
Uraian
Sat
Volume
Jumlah Harga (R
A.
1
2
BAHAN
Semen @50 Kg
Pasir Pasang
Kg
M3
4,3000
0,0060
B.
1
2
3
4
UPAH Mandor
Kepala Tukang
Tukang Batu
Pekerja
OH OH OH 0,0150
OH
0,0100
0,1000
0,3000
Sub Total A
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
2
3
4
BAHAN
Semen @50 Kg
Pasir Pasang
Kerikil (Maks. 30 mm) Air
Kg Kg Kg 326,0000
760,0000
Liter
OH OH OH 0,0830
OH
0,0280
0,2750
1,6500
1.029,0000
215,0000
Sub Total A
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
2
3
4
BAHAN
Semen @50 Kg Pasir Pasang Batu Kerikil
Air
Kg Kg Kg 352,0000
731,0000
Liter
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0830
OH
0,0280
0,2750
1,6500
1.031,0000
215,0000
Sub Total A
Sub Total B
C.
No.
Uraian
Sat
A.
1
2
3
4
BAHAN
Semen @50 Kg Pasir Pasang Batu Kerikil
Air
Kg Kg Kg 384,0000
692,0000
Liter
Sub Total A
Volume
1.039,0000
215,0000
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0830
OH
0,0280
0,2750
1,6500
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
2
BAHAN
Besi Beton
Kawat Beton
Kg
Kg
10,5000
0,1500
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Besi Pekerja
Sub Total A
OH OH OH 0,0040
OH
0,0070
0,0700
0,0700
Sub Total B
C.
Harga/10Kg
Harga/1Kg
No.
Uraian
Sat
Volume
A.
1
2
3
BAHAN
Kayu Kls III Paku
Minyak Bekisting
M3
Kg
Lt
0,0400
0,3000
0,1000
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Kayu Pekerja
OH OH OH 0,0260
OH
0,0260
0,2600
0,5200
Sub Total A
Sub Total B
C.
No.
Sat
Volume
A.
1
2
3
BAHAN
Kayu Kls III Paku
Minyak Bekisting
M3
Kg
Lt
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Kayu Pekerja
0,0450
0,3000
0,1000
OH OH OH 0,0260
OH
0,0260
0,2600
0,5200
Sub Total A
Sub Total B
C.
No.
A.
1
2
3
4
5
6
Sat
Volume
BAHAN
Kayu Kls III
Kayu Balok Kls II Paku
Minyak Bekisting
Multipleks Tebal 9 mm
Dolken Kayu Galam 8-10 cm/Bambu/4 m
M3
0,0400
M3
0,0150
Kg Lt Lmbr 0,4000
Ujg
0,2000
0,3500
2,0000
OH OH OH 0,0330
OH
0,0330
0,3300
0,6600
Sub Total A
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Kayu Pekerja
Sub Total B
C.
No.
Uraian
Sat
A.
1
2
3
4
5
6
BAHAN
Kayu Kls III
Kayu Balok Kls II Paku
Minyak Bekisting
Multipleks Tebal 9 mm
Dolken Kayu Galam 8-10 cm/Bambu/4 m
M3
0,0400
M3
0,0180
Kg Lt Lmbr 0,4000
Ujg
0,2000
0,3500
2,0000
Sub Total A
Volume
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Kayu Pekerja
OH OH OH 0,0330
OH
0,0330
0,3300
0,6600
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
2
3
4
5
6
BAHAN
Kayu Kls III
Kayu Balok Kls II Paku
Minyak Bekisting
Multipleks Tebal 9 mm
Dolken Kayu Galam 8-10 cm/Bambu/4 m
M3
0,0400
M3
0,0150
Kg Lt Lmbr 0,4000
Ujg
0,2000
0,3500
6,0000
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Kayu Pekerja
OH OH OH 0,0330
OH
0,0330
0,3300
0,6600
Sub Total A
Sub Total B
C.
No.
Uraian
A.
BAHAN
B.
1
UPAH Pekerja
Sat
Volume
OH
4,0000
Sat
Volume
Sub Total A
-
Sub Total B
C.
No.
A. B. C. D
E
FGHI
J
M3
M3
M3
Kg
M2
M2
M2
M2
M2
1,0000
1,0000
1,0000
1,0000
1,0000
1,0000
1,0000
1,0000
1,0000
Ls
1,0000
C.
No.
Uraian
Sat
M3
1,2000
127,00
M3
4,1667
211,00
M3
6,2500
137,00
M3
6,7708
211,00
M3
1,4800
110,00
No.
Uraian
Sat
Volume
A.
1
2
BAHAN
Batu Kali Belah (15/20 cm) Pasir Urug
M3
M3
1,2000
0,4320
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
OH OH OH 0,0390
OH
0,0390
0,3900
0,7800
Sub Total A
Sub Total B
C.
No.
Sat
Volume
A.
1
2
3
BAHAN
Semen @50 Kg
Pasir Pasang
Batu Kali Belah (15/20 cm)
Kg
M3
M3
B.
1
2
3
4
UPAH Mandor
Kepala Tukang Tukang Batu Pekerja
163,0000
0,5200
1,2000
Sub Total A
OH OH OH 0,0750
OH
0,0750
0,7500
1,5000
Sub Total B
C.
No.
Uraian
A.
BAHAN
Sat
Volume
OH OH
0,0250
0,7500
Sat
Volume
OH OH
0,0450
0,9000
Sat
Volume
Sub Total A
B.
1
2
Sub Total B
C.
Jumlah Harga ( A + B )
No.
Uraian
A.
BAHAN
Sub Total A
B.
1
2
Sub Total B
C.
No.
Jumlah Harga ( A + B )
Uraian
A.
BAHAN
Sub Total A
B.
1
2
OH OH
0,0083
0,2500
Sub Total B
C.
Jumlah Harga ( A + B )
No.
Uraian
Sat
Volume
A.
1
BAHAN
Tanah Timbunan
M3
1,2000
OH OH
0,0250
0,2500
Sub Total A
B.
1
2
Sub Total B
C.
No.
Uraian
Sat
Volume
A.
1
BAHAN
Pasir Urug
M3
1,2000
OH OH
0,0100
0,3000
Sat
Volume
Sub Total A
B.
1
2
Sub Total B
C.
No.
A.
1
BAHAN
Tanah Timbunan
M3
1,2000
OH OH
0,0250
0,2500
Sub Total A
B.
1
2
Sub Total B
C.
Satuan (Rp.)
Jumlah
Harga
(Rp.)
a Satuan (Rp.)
a Satuan (Rp.)
a Satuan (Rp.)
a Satuan (Rp.)
a Satuan (Rp.)
a Satuan (Rp.)
No.
A
:
:
:
Uraian
BAHAN
Plamir
Sat
Volume
NSTRUKSI PAGAR
Harga Satuan
Jumlah Harga