Anda di halaman 1dari 56

Cooling and Water washing of Boiler :: BM-II PP

P
A

Generator relay testing by secondary injection & CT/PT resistance checking. :: TESTII
HT Switch gear Relays testing(Unit Board/Station Board/Comp. Board/AHP Board) ::
TEST-II
Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TESTII
IAC / SAC and Bottom ash panels cleaning, connection tightening & checking ::
TEST-II

CCW switchgear relay,X"er test,Reguler ODP works :: TEST-II

Capital Overhaul of Generator, Excitor, brushless assembly :: EM-II AGENCY

Oil filteration of GTR-5R,UAT-5A,5C :: EM-II AGENCY

Replacement of Black metal of GTR-R,Y,B ;UAT-A,B,C,D SAT-A,B; STN-3 :: EM-II


AGENCY

P/M of all LT Motors except O/H plan motor :: EM-II SECTION

Maintenance of ESP A Pass :: EM-II SECTION

P-Proposed, A-Actual
Prepared by
MPD

1 30 P

A
1 13 P

A
1

5 P

A
1

3 P

A
1 35 P

A
1 30 P

A
1 15 P

A
1 30 P

A
1 20 P

A
1

3 P

Page No. 1

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Unit No. 5

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Maintenance of ESP A Pass :: EM-II SECTION

P/M & Capacity Test of Station Battery set for battery set 1 and 2 & UPS :: EM-II
SECTION

P/M of all HT motors except above motors :: EM-II SECTION

Electrical supply to various Agencies woking for capital O/H of the unit :: EM-II
SECTION

Removal, servicing, calibration & restoration of SADC Power Cylinder :: I&C-II

Removal of all corner solenoid/C/M HAG & reject gate solenoid along with tubing &
leak isolating valve checking/ replacement. :: I&C-II
Removal & Servicing of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches
and Ignitor Transformer :: I&C-II

Removal & Servicing and of 28 nos. Flame Scanners :: I&C-II

Removal & Normali-sation of Boiler side Instruments as per B/M II , E/M II


requirement :: I&C-II

All Turbine side JB connections tightening work :: I&C-II


All pneumatic valves of CPU - Solenoid checking, servicing/replacement , power
cylinder checking/servicing if necessary.
:: I&C-II
CPU instrument air valves checking & replacement if necessary. :: I&C-II

P-Proposed, A-Actual
Prepared by
MPD

Unit No. 5

A
1 14 P

A
1

5 P

A
1 35 P

A
1 16 P

A
1 18 P

A
1 15 P

A
1 15 P

A
1 20 P

A
1

5 P

A
1 19 P

A
1 14 P

Page No. 2

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

1 20
PM, blow down v/v servicing & oil repl. of all CT fans gear box (Total 11 CT Fans) ::
ODP-II

Unit No. 5

P
A

1 25
Work of both side nozzle replacement which are missing & nozzle cleaning of tower
5A & 5B :: ODP-II

P
A

1 25
Overhauling of CCW 5C & BFV seal ring repl :: ODP-II

P
A

1 25
Work of CT fan cells approach way railing & gear box protection cage railing
repairing work :: ODP-II

P
A

1 30
Drift eliminator cleaning & repl :: ODP-II

P
A

1 20
ct Fan foundation frame replacement/ reconditioning CT Fan :: ODP-II

P
A

P-Proposed, A-Actual
Prepared by
MPD

Page No. 3

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

1 30
Hot water asbestos cement (broken) pipe replacement :: ODP-II

Unit No. 5

P
A

1 30
Work of separation of ACW return line from CCW hot water outlet line (4nos.) :: ODPII

P
A

25

CT Fan O/H (5nos.) :: ODP-II

P
A

25

Overhauling of CCW 5D & BFV seal ring repl :: ODP-II

P
A

GENERATOR & EXCITER OVRHAUL :: TM-II

1 30 P

A
2

Pre Furnace pressurisation test & CAVT :: BM-II PP

P
A

VARIOUS COOLERS CLEANING & HYD. TEST :: TM-II

P-Proposed, A-Actual
Prepared by
MPD

2 32 P

Page No. 4

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

HP HEATERS INTERNAL INSPECTION & PARTING PLANE LEAKAGES ATTENDING ::


TM-II

LP HEATERS INTERNAL INSP. & AIR LEAK TEST. :: TM-II

Unit No. 5

2 11 P

A
2 11 P

A
3

Erection of cuplock scaffolding up to 50 mtr Elev. :: BM-II PP

P
A

3 23
HP valve works :: BM-II PP

P
A

3 28
Servicing of APH including basket replacement (HE, HIE, CE of pri. & sec.) :: BM-II PP

P
A

3 28
Servicing of Burner Tilt including coal compartment assemblies replacement :: BMII PP

P
A

Internal inspection of GTR-5Y, UAT-5B,5D :: EM-II AGENCY

P/M of Gen & UAT bus duct and painting of duct :: EM-II AGENCY

P-Proposed, A-Actual
Prepared by
MPD

3 30 P

A
3 30 P

Page No. 5

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

P/M of Gen & UAT bus duct and painting of duct :: EM-II AGENCY

HOPPER CLEANING :: BM-II BA

Seal trough cleaning:: BM-II BA

Flushing of impulse lines - 200 no.s :: I&C-II


Servicing of Bottom Ash / Burner Tilt / PA Fan guide vane power cylinder

TURBINE SIDE PUMP SERVICING :: TM-II

SERVICING OF TURBINE ,SIDE VALVES :: TM-II

ATTENDING DEFECTS AS PER DEFECT LIST :: TM-II

Overhaul of HT motor PA-5A,FD-5B,ID-5A,ID-5D;C/M-5A,5B,5F :: EM-II AGENCY

P-Proposed, A-Actual
Prepared by
MPD

8 P

A
3

4 P

A
3 24 P

A
3 24 P

A
3 23 P

A
3 18 P

A
3

5 P

A
3 31 P

A
3 31 P

A
3 31 P

A
3 30 P

Page No. 6

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

A
3

:: I&C-II
Disconnection, removal, servicing & normalisation of HPBP1, HPBP2, FOD-1 & 2,
BPE1, BPE2, BD valve servo & Blocking element, both tank & suction filter
Removal, Cleaning, Calibration & normalisation of all Press. Switches, Press.
cleaning. :: I&C-II
Gauges,Temp. switches temp. gauges, RTDs of
i) Lub. Oil & Turbine drain oil system.
ii) Control Fluid system iii) Governing racks
iv) LP bypass system v) HP bypass system
vi) Primary water system vii) Gas system
viii) Seal Oil system inclusive of new ckt.
:: I&C-II
INSULATION REMOVAL :: TM-II

Unit No. 5

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

4 25
Servicing of Fans :: BM-II PP

Unit No. 5

P
A

Maintenance of ESP B Pass :: EM-II SECTION

ERECTION OF FABRIC EXPANSION JOINT SIZE- 12000 X 5000 X 300 MM :: BM-II BA

Services to operation and other sections, Misc works :: TEST-II

ERECTION OF METALLIC EXPANSION JOINT SIZE- 8255 X 5715 X 782 MM :: BM-II


BA

SERVICING OF WATER VALVES & REPLACEMENT :: BM-II BA

PIPELINE REPLACEMENT Coarse ash :: BM-II BA

PIPE LINE REPLACEMENT :Ash gate : BM-II BA

SERVICING OF ASH & CHAIN VALVES :: BM-II FA ESP A&C PASS

SERVICING OF FEEDER EJECTOR:: BM-II FA

WATER WASHING OF FIELDS :: BM-II ESP A&C PASS

P-Proposed, A-Actual
Prepared by
MPD

6 P

A
4

8 P

A
4 23 P

A
4 11 P

A
4 25 P

A
4 29 P

A
4 28 P

A
4 10 P

A
4 16 P

A
4

9 P

Page No. 7

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

WATER WASHING OF FIELDS :: BM-II ESP A&C PASS


i) Removal & normalisation of ESP / Coarse Ash / FGDH / Economiser A/V & W/V
Solenoid after B/M II clearence
ii). Removal & Servicing of ESP/Coarsh ash power cylinder.
:: I&C-II

Unit No. 5

A
4 22 P

A
4 33

Pipes Replacement :: ODP-II

P
A

Work of cleaning of CT pond area & outlet strainer of CT Pond cleaning & Repairing
(5A & 5B)
:: ODP-II

4 20

P
A

4 25
ACW/CCW pumps suction strainer repairing & fitting work :: ODP-II

P
A

4 25
Work of ACW recirculation / outlet line's valves, discharge line valves, vent valve
checking ,repairing/replacement, sum make up valve :: ODP-II

P
A

4 30
Work of repairing /replacement of riser valves of cooling tower 5A & 5B :: ODP-II

P
A

P-Proposed, A-Actual
Prepared by
MPD

Page No. 8

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

4 23
Algae removal & splash bar cleaning :: ODP-II

Unit No. 5

P
A

4 13
ACW line leakage attending near cooling tower 5B :: ODP-II

P
A

4 20
ACW/CCW expanion bellow checking :: ODP-II

P
A

25

ACW/CCW SUMP CLEANING WORK and hydro cone checking :: ODP-II

P
A

23

Hot water basin cleaning 5A & 5B :: ODP-II

P
A

4
ACW return line checking & repairing :: ODP-II

20

P
A

P-Proposed, A-Actual
Prepared by
MPD

Page No. 9

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

REVISIONING OF TURBINE VALVES & STRAINER :: TM-II

ACW SIDE VALVES SERVICING :: TM-II

Preventive Maintenance of Rectiformers :: EM-II AGENCY

Unit No. 5

4 31 P

A
4 31 P

A
4 21 P

A
5 25

Thickness survey & replacements of tubes in second pass :: BM-II PP

P
A

O/H of critical LT motors :: EM-II AGENCY

O/H of coal feeder motors :: EM-II AGENCY

Retrofitting of HT Breaker with HT contactor :: EM-II AGENCY

P/M of Dry Type 5XA, OXA1, LXA1, 5XB , OXA2, LXA2, including NGRs :: EM-II
SECTION

ASH FEED GATE 1B SERVICING :: BM-II BA

HYJECTOR 1B SERVICING :: BM-II BA

Hopper cleaning & scaffolding erection:: BM-II BA

P-Proposed, A-Actual
Prepared by
MPD

5 32 P

A
5 28 P

A
5 18 P

A
5 28 P

A
5

9 P

A
5

9 P

A
5

9 P

Page No. 10

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Hopper cleaning & scaffolding erection:: BM-II BA


Removal / Calibration & Re-mounting of
(a) PA Hdr Press. Switches
(b) Furnance Press. Switches.
(c). C/M instruments :: I&C-II
Servicing/ Calibration of Boiler and Turbine side control valves- 75 nos :: I&C-II

Calibration of critical and Non-critical Instruments as per List / Schedules 200


nos. :: I&C-II

Unit No. 5

A
5 15 P

A
5 21 P

A
5 24 P

A
5 33

Valve Replacement/Servicing :: ODP-II

P
A

CONDENSER TUBE CLEANING :: TM-II

5 14 P

A
6 21

Cleaning of Pent house, Repair of pent house, dog house & cat house :: BM-II PP

P
A

6 25
RLA Study of the Boiler :: BM-II PP

P
A

Cooler Cleaning of PA-5A,5B;MDBFP-5C,5D :: EM-II AGENCY

P-Proposed, A-Actual
Prepared by
MPD

6 21 P

Page No. 11

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

P/M of 5C, 5PA Sec-1 , 5MA Sec-1, 5MB, 5MC, 5EMPA Sec-1, 5ME Sec-1, 5MG, Soot
blower Boards,5E Sec-I :: EM-II SECTION
P/M of 5D, SE-12/2, 5PA Sec-2, 5MA Sec-2, 5MD, 5ME Sec-2, 5EMPA sec-2, 5MF, 5MG
Board,5E Sec-II :: EM-II SECTION
GTR / UAT Transf testing, OTI/WTI calibration,and . Protection trials,cw flow switch
servising,GTR Bushing Tan Delta measurement,Oil pump trial :: TEST-II

Replacement of pipeline of size 150/200/250/300 NB:: BM-II BA

Removal and Normalisation of Turbine side instru-ments as per :: TM-II & EMII
requirement :: I&C-II
Disconnection / Checking of HP/IP stop & Control valves Limit switches , PFTS &
Thermocouples. :: I&C-II

Removal of main turbine turbovisory instruments :: I&C-II

Removal, Cleaning, testing & restoration of LPT exhaust Hood T/CS & RTD. :: I&C-II

Unit No. 5

6 28 P

A
6 28 P

A
6 23 P

A
6 30 P

A
6 20 P

A
6 11 P

A
6

7 P

7 P

A
A
6 10

ACW Pumps Thrust bearing oil replacement 5A,B,C :: ODP-II

P
A

6 10
ACW Pumps gland replacement 5A,B,C :: ODP-II

P-Proposed, A-Actual
Prepared by
MPD

Page No. 12

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Unit No. 5

ACW Pumps gland replacement 5A,B,C :: ODP-II

A
ALIGNMENT CHECKING, DECOUPLING & REMOVAL OF HP MODULE :: TM-II

IP TURBINE DISMANTLING & CHECKS :: TM-II

H2 & EXCITER COOLERS ACID CLEANING & HYDRAULIC TESTING :: TM-II

Maintenance of ESP C Pass :: EM-II SECTION

INSPECTION OF FIELDS :: BM-II ESP

RECTIFICATION OF DEFECTS :: BM-II ESP

Calibration of Bottom ash/PAHH/SAHH/FGDH/Economiser/ESP/AHP all instrument ::


I&C-II

Checking of all DAS workstations & controllers . :: I&C-II

8 P

A
6 12 P

A
6 20 P

A
7

9 P

A
7 13 P

A
7 18 P

A
7 24 P

A
7 16 P

A
8 11

Hydrojetting of WW, DIV. PANNELS, PL SH, RH :: BM-II PP

P
A

P-Proposed, A-Actual
Prepared by
MPD

Page No. 13

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

8 25
Radiography of weld joints :: BM-II PP

Unit No. 5

P
A

Disconnection & removal of HP/IP ATT valves motors. :: I&C-II

BEARINGS UT & CHECKS :: TM-II

ERECTION OF FABRIC EXPANSION JOINT SIZE- 3950 X 3450 X 300 MM :: BM-II BA

SERVICING OF ASH & CHAIN VALVE :: BM-II BA

SERVICING OF FEEDER EJECTOR :: BM-II BA

Attending of all S/D defects /Modifications. :: I&C-II


Replacement of JBs alongwith TBs
:: I&C-II
Disconnection & removal of LPBP 1 & 2 stop control & water Injection Limit switches
& PFTS :: I&C-II

DISMANTLING OF HP MODULE :: TM-II

LP TURBINE DISMANTALING & CHECKS :: TM-II

P-Proposed, A-Actual
Prepared by
MPD

9 P

A
8 14 P

A
9 13 P

A
9 17 P

A
9 17 P

A
9 19 P

A
9 16 P

A
9 10 P

A
9 13 P

A
9 20 P

Page No. 14

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

LP TURBINE DISMANTALING & CHECKS :: TM-II

Maintenance of ESP D Pass:: EM-II SECTION

ASH FEED GATE 2B SERVICING :: BM-II BA

HYJECTOR 2B SERVICING :: BM-II BA

Repairs of BAH plate / seal trough :: BM-II BA

Refractory cooling water pipeline & flushing nozzle repair:: BM-II BA

Damaged refractory removal & anchor welding:: BM-II BA

Calibration of ID/FD/PA/BCWP/ CWBP instruments. :: I&C-II


Removal, Cleaning, Calibration & normalisation as per :: TM-II schedule of i) HOT &
Cold gas, Primary water RTDS /Temp. Switches & ACW I/L,O/L RTDS
ii) Generator seal oil TE & EE RTDS, Pre-chamber Level Probe Gas Cooler I/L & O/L
RTDS
iii) Main Exciter Hot/Cold air instruments
:: I&C-II
CONDENSER TUBE CLEANING BY JETTING & BULLET SHOT METHOD :: TM-II

SERVICING OF WATER VALVES:: BM-II FA ESP A&C PASS

WATER WASHING OF FIELDS :: BM-II ESP B&D PASS

P-Proposed, A-Actual
Prepared by
MPD

Unit No. 5

A
10 12 P

A
10 14 P

A
10 14 P

A
10 19 P

A
10 16 P

A
10 19 P

A
10 19 P

A
10 27 P

A
10 19 P

A
11 18 P

A
11 18 P

Page No. 15

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Removal / Servicing & Remounting of AHP Ash water make up valves, series sump
make valves, ETP valves, RC valves, suction valves solenoids as per ODP II
schedules. :: I&C-II
Calibration MOT& FRF tank Level switches with Amplifiers :: I&C-II

Unit No. 5

11 17 P

A
11 13 P

A
11 30

Cleaning work :: ODP-II

P
A

11 20
Flushing Nozzle Replacement :: ODP-II

P
A

12 25
Insp., thk.survey of WW & Replacement of tubes in first pass including DP, RH & PSH
:: BM-II PP

P
A

ERECTION OF METALLIC EXPANSION JOINT SIZE- 7355 X 4267 X 782 MM :: BM-II BA

Checking/calibration of primary water, Lube oil, Cold gas and FRF Temp. control
valves. :: I&C-II

Preventive Maintenance of 5EPX A/B/C/D, 5AHX A/B :: EM-II SECTION

P/M & Capacity Test of +/- 24V G1/G2 Battery sets :: EM-II SECTION

P-Proposed, A-Actual
Prepared by
MPD

12 19 P

A
12 15 P

A
13 18 P

A
13 18 P

Page No. 16

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

P/M & Capacity Test of +/- 24V G1/G2 Battery sets :: EM-II SECTION
Calibration of
i) C/MS CAD/HAD 16nos.
ii) Burner tilt.
iii) PA Fan vane
:: I&C-II

Unit No. 5

A
13 28 P

A
13 22

Strainer and NRV servicing :: ODP-II

P
A

IP TURBINE REPAIR & CHECKS :: TM-II

ERECTION OFFABRIC EXPANSION JOINT SIZE- 7700 X 6050 X 300 MM :: BM-II BA

Sample isolating valves & blowdown needle valves(Whitey make) replacement ::


I&C-II

13 19 P

A
14 18 P

A
14 26 P

A
14 20

CCW Pumps Thrust bearing oil & power pack oil replacement 5A,B,C,D :: ODP-II

P
A

14 20
CCW Pumps gland replacement 5A,B,C,D :: ODP-II

P
A

CHECKS, REVIOSINING & MINOR REPAIRS OF HP MODULE :: TM-II

P-Proposed, A-Actual
Prepared by
MPD

14 18 P

Page No. 17

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

FEED STORAGE TANK & DEA. INSPECTION :: TM-II

HT Circuit Breaker operation time & contact resistance measurement and


Connection tightening of all HT breakers (All Unit Board breakers) :: TEST-II

ASH FEED GATE 1A SERVICING :: BM-II BA

HYJECTOR 1A SERVICING :: BM-II BA

Servicing of C/Ms HAG/ all corner solenoid, Limit Switches & air line, oil filter
cleaning and oil top up. :: I&C-II
Seal /leak off steam valve sump, Filter & Servo-unit Cleaning, Calibration, and
Normalisation. :: I&C-II
Replacement of Thermocouple, Thermowell & guide pipe provision for PAH & SAH
flue gas side & air side thermocouples. :: I&C-II

SERVICING OF ASH & CHAIN VALVES:: BM-II FA ESP B&D PASS

SERVICING OF FEEDER EJECTOR:: BM-II FA ESP B&D PASS

Removal, mounting, laying, dressing & checking of SH/RH metal temp thermocouples as per BM-II schedule. :: I&C-II

Performance package validation work. :: I&C-II

SERVICING OF WATER VALVE :: BM-II BA

P-Proposed, A-Actual
Prepared by
MPD

Unit No. 5

14 24 P

A
14 19 P

A
15 19 P

A
15 19 P

A
15 19 P

A
16 19 P

A
16 28 P

A
17 24 P

A
17 29 P

A
17 24 P

A
17 22 P

A
18 26 P

Page No. 18

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

SERVICING OF WATER VALVE :: BM-II BA

P
A

HP/IP/LP ROLL CHECK & CORRECTION :: TM-II

P/M of 5AHS 3.3 KV BOARD :: EM-II SECTION

ERECTION OF FABRIC EXPANSION JOINT SIZE- 8900 X 3800 X 300 MM :: BM-II BA

PASS BOX UP :: BM-II ESP

INSPECTION OF FIELDS :: BM-II ESP A&C PASS

RECTIFICATION OF DEFECTS :: BM-II ESP B&D PASS

18 20 P

A
19 20 P

A
19 23 P

A
19 20 P

A
19 25 P

A
19 29 P

LPH -1/2/3 Level switches functional testing with Protocol with operation and TM-II :: 19 20 P
I&C-II

HP MODULE ASSEMBLY :: TM-II

LP TURBINE REPAIR & CHECKS ( MPI & NFT ) :: TM-II

P-Proposed, A-Actual
Prepared by
MPD

A
19 20 P

A
19 22 P

Page No. 19

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

A
18 25

Grating and Support replacement :: ODP-II

Unit No. 5

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Removal & Servicing of CRH NRVs Limit switches assemblies LHS & RHS :: I&C-II

ERECTION OF METALLIC EXPANSION JOINT SIZE- 3950 X 3450 X 300 MM :: BM-II BA

ASH FEED GATE 2A SERVICING :: BM-II BA

HYJECTOR 2A SERVICING :: BM-II BA

Mill O/L Temp. T/Cs checking, Well checking , replacement if found faulty and both
point availability/checking. :: I&C-II
AHP A/B/C Series & HP Ash water tank Level controller testing after Sensor Cable &
bolt replacement :: I&C-II

CPU bypass valve & DP transmitter calibration & interlock checking . :: I&C-II

IP TURBINE BOXUP :: TM-II

ALIGNMENT OF ALL ROTOR CHECKS & COUPLING OF ROTOR :: TM-II

P/M of BB1 / BB2 batteries of DG set :: EM-II SECTION

Preventive Maintenance of DG set :: EM-II SECTION

BTS A/B/C/D Trial :: TEST-II

P-Proposed, A-Actual
Prepared by
MPD

Unit No. 5

19 24 P

A
20 27 P

A
20 23 P

A
20 23 P

A
20 23 P

A
20 24 P

A
20 25 P

A
20 25 P

A
20 23 P

A
20 21 P

A
20 21 P

A
20 23 P

Page No. 20

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

BTS A/B/C/D Trial :: TEST-II

P/M of X'mers M. B.s & NGRs of UAT-5A /5B/5C/5D :: EM-II SECTION

P/M of 5AHPA 415 VOLTS BOARD :: EM-II SECTION

TEST CHARGE & GATE OPENING :: BM-II ESP

Refractory filling :: BM-II BA

Internal Inspection of O2 Probe & Replacement of guide pipes & V guards. :: I&C-II

TDBFP A/B, MDBFP C/D , CEP A/B/C instruments checking, calibration and
protection trials :: I&C-II

GRAVITY TEST :: TM-II

P/M of DCDBs & Chargers :: EM-II SECTION

LP TURBINE BOXUP WORK :: TM-II

Calibration of Boiler drum press. Gauges. :: I&C-II

Normalisation of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches and
Ignitor Transformer :: I&C-II

P-Proposed, A-Actual
Prepared by
MPD

Unit No. 5

A
21 23 P

A
21 24 P

A
21 23 P

A
21 26 P

A
21 22 P

A
21 28 P

A
21 24 P

A
22 26 P

A
22 25 P

A
23 24 P

A
24 27 P

Page No. 21

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

LT switch gear (PA,EMPA,MA,ME,MD, DGDB,AHP,ESP)Relay testing and Control


connection tightening :: TEST-II

BEARING BOXUP ,INSULATION WORK :: TM-II

Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TESTII

Motorised valves limit switch setting after clearance from T/M , B/M :: TEST-II

SERVICING OF WATER VALVES:: BM-II FA ESP B&D PASS

Normalisation of 28 nos. Flame Scanners :: I&C-II

A
24 26 P

A
24 35 P

A
24 35 P

A
25 31 P

A
25 27 P

A
P
A

ERECTION OF METALLIC EXPANSION JOINT SIZE- 3450 X 3550 X 300 MM :: BM-II BA

Restoration of all corner solenoid/C/M HAG & reject gate solenoid. :: I&C-II

ID/FD/PA/BCWP protection trial. :: I&C-II

Provision of PVC tubes for condenser hydraulic test & Hot-well level switches
functional checking. :: I&C-II

P-Proposed, A-Actual
Prepared by
MPD

26 33 P

A
26 27 P

A
26 27 P

A
26 26 P

Page No. 22

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

24 35 P

26 26
Dept. Hydrulic Test :: BM-II PP

Unit No. 5

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Provision of PVC tubes for condenser hydraulic test & Hot-well level switches
functional checking. :: I&C-II

Unit No. 5

A
27 27

Repair if any observed in departmental hydraulic test :: BM-II PP

P
A

CLEANING OF BA DRAIN PIT & OTP TANK :: BM-II BA

Refractory curing:: BM-II BA

SS seal plate / Wire mesh Repairing & replacements:: BM-II BA

LP bypass stop & CVs with water injection valves remote trials. :: I&C-II

Calibration & Normalization of main turbine turbovisory instruments :: I&C-II

BEARING OIL FLUSHING :: TM-II

27 31 P

A
27 30 P

A
27 31 P

A
27 28 P

A
27 28 P

A
27 28 P

A
28 28

IBR Hydrulic Test :: BM-II PP

P
A

P/M of Generator PT cubical & NGR Shaft Grounding brushes checking :: EM-II
SECTION

P-Proposed, A-Actual
Prepared by
MPD

28 30 P

Page No. 23

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Boiler protection Trial. :: I&C-II

A
P
A

COARSE ASH TANK CLEANING :: BM-II BA

Light up and post light up activities :: I&C-II

Main turbine & LP Bypass Governing characteristics through EHC & Hydraulic with
TM-II & operation :: I&C-II

Turbine Protection trial :: I&C-II

HP,IP, TURBINE INSULATION WORK :: TM-II

TURBINE BARRING ,GEN,AIR LEAK TEST :: TM-II

P-Proposed, A-Actual
Prepared by
MPD

29 31 P

A
29 30 P

A
29 29 P

A
29 29 P

A
29 30 P

A
29 30 P

Page No. 24

Signed by Incharge DyCE-II

29/Jan

28/Jan

27/Jan

26/Jan

25/Jan

24/Jan

23/Jan

22/Jan

21/Jan

20/Jan

19/Jan

18/Jan

17/Jan

16/Jan

15/Jan

14/Jan

13/Jan

11/Jan

12/Jan

10/Jan

09/Jan

08/Jan

07/Jan

06/Jan

05/Jan

04/Jan

03/Jan

02/Jan

01/Jan

31/Dec

30/Dec

29/Dec

28/Dec

28 28 P

29 31
Removal of scaffolding. :: BM-II PP

Unit No. 5

Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec

Activity Description

End Day

Section: DyCE-II

Start Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

Activity Description
1

Cooling and Water washing of Boiler--BM-II PP

Maintenance of ESP

3
4
5
6
7
8

A pass--ESP/AHP--EM-II

IAC / SAC and Bottom ash panels cleaning,


connection tightening & checking--TEST-II
Preventive Maintenance of
SF-11/1, 6A, SF-13, SF-14, Sec-II Of 6E.--HT/LT
Preventive Maintenance of
SWITCHGEARS--EM-II
SF-11/2, Sec-I of 6PA , 6MA, 6MC,6MD,
Sec-II of 6EMPA ,6ME, 6MG, Soot blower--HT/LT
Preventive Maintenance of 6XA, OXB1, LXB1,6XB ,
SWITCHGEARS--EM-II
OXB2, LXB2--LT TRANSFORMER--EM-II
P/M & Capacity Test of Station battery set no 3,4 &
5--BATTARIES/DGSET--EM-II
HT Switch gear Relays testing(Unit Board/Station
Board/Comp. Board/AHP Board)--TEST-II

11

FRP blade replacement of CT Fan 6A,B--ODP-II


GTR / UAT Transf testing, OTI/WTI calibration,and .
Protection trials,cw flow switch servising,GTR Bushing
Tan Delta measurement,Oil pump trial--TEST-II
Work of overhauling of CCW Pump 6B--ODP-II

12

Prev.Maint.of 6AHXA 3.3KV board--ESP/AHP--EM-II

9
10

13
14

Generator relay testing by secondary injection &


CT/PT resistance checking.--TEST-II
Preventive Maintenance of LT Motors : --LT MOTORS-EM-II

19

CT Fan O/H--ODP-II
Electrical supply to various Agencies woking for
capital O/H of the unit --LIGHTING / WELDING
SUPPLY--EM-II
CCW switchgear relay,X"er testing, control panel
connection tightening, Reguler ODP works--TEST-II
GTR 6R, 6Y & 6B P/M of transformer with attendence
of minor leakages,Oil level top ups--HT
TRANSFORMERS--EM-II
Pre Furnace pressurisation test & CAVT--BM-II PP

20

Various coolers cleaning &Hyd test -TM-II

21

Preventive Maintenance of HT Motors --HT MOTORS-EM-II

22

Insulation Removal -TM-II

23

Erection of cuplock scaffolding up to 50 mtr Elev.-BM-II PP

15
16
17
18

P-Proposed, A-Actual
Prepared by
MPD

Page No. 25

Unit No. 6

End
Day

SN

Start
Day

Section: DyCE-II

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

14

15

15

20

25

26

27

30

30

30

34

35

35

28

34

Signed by Incharge DyCE-II

SN

Activity Description
23
24

Erection of cuplock scaffolding up to 50 mtr Elev.-BM-II PP


HP valve works--BM-II PP

25

ACW side valves servicing, feed line/steam line


valves servicing -TM-II

26

Turbine side boiler feed pump servicing -TM-II

27
28

Servicing of APH including basket replacement (HE,


HIE, CE of pri. & sec.)--BM-II PP
Servicing of Burner Tilt including coal compartment
assemblies replacement--BM-II PP

29

Overhauling of turbine side BFP-TM-II

30

Attending defects as per defect list -TM-II

31
32
33

HP Heaters internal inspection & parting plane


leakages attending-TM-II
Condenser tube cleaning by NCC blow away technic
-TM-II
Replacement of economiser middle & lower coil-BM-II PP

34

Replacement of LTSH Vertical coil--BM-II PP

35

Servicing of Fans--BM-II PP

36

Pipes Replacement --ODP-II

37

Internal inspections ESP/AHP X'mers--ESP/AHP--EM-II

38

tank & sump Cleaning work--ODP-II

39
40

Preventive Maintenance of PT cubicle & NGT-GENERATOR--EM-II


UAT-6B Consevator modification for replacement of
diaphram with air cell--HT TRANSFORMERS--EM-II

41

LP Turbine Dismentaling & Checks-TM-II

42

IP Turbine Dismentling & Checks-TM-II

43
44

Preventive Maintenance of UAT-6A /6B/6C/6D --HT


TRANSFORMERS--EM-II
Generator & Excitor Overhaul & Gen, Air Leak TestTM-II

45

RLA of I P LP & Valves-TM-II

46

Thickness survey & replacements of tubes in second


pass--BM-II PP

P-Proposed, A-Actual
Prepared by
MPD

Page No. 26

Unit No. 6

End
Day

Section: DyCE-II

Start
Day

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

23

28

28

28

28

28

28

13

15

25

25

25

28

30

33

10

11

12

14

24

24

25

Signed by Incharge DyCE-II

Activity Description

Unit No. 6

End
Day

SN

Start
Day

Section: DyCE-II

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

31

10

10

15

19

Replacement of HP Module with Repaired module


-TM-II
Cleaning of Pent house, Repair of pent house, dog
house & cat house--BM-II PP

16

21

21

54

Work of fitting of shalitex board 25mm thick into


expansion joint of cooling tower 6A & 6B --ODP-II

25

55

PM of all CT Fans--ODP-II

25

56

RLA Study of the Boiler--BM-II PP

25

57

Work of checking,repairing/replacement of Blow


down valves of CT 6A & 6B--ODP-II

25

58

Work of CT fan cells approach way railing & gear box


protection cage railing repairing work--ODP-II

27

59

Grating and Support replacement --ODP-II

28

60

Revision of turbine valves & strainer-TM-II

28

61

Valve Replacement/Servicing--ODP-II

28

62

CT Fan foundation frame replacement/


reconditioning--ODP-II

30

63

Splash bar cleaning--ODP-II

30

64

Drift eliminator cleaning--ODP-II

30

30

30

31

12

15

47

Prev.Maint.of 5APPA/5APPA--ESP/AHP--EM-II

48

Alinement Checking, Decoupling & Removal of HP


module-TM-II

49
50
51
52
53

65
66
67
68
69

Maintenance of ESP B pass--ESP/AHP--EM-II


Work of ACW recirculation / outlet line's valves,
discharge line valves, vent valve checking , sump
make up v/v, repairing/replacement --ODP-II
Services to operation and other sections.--TEST-II

i) ACW line leakage attending work near U#6


chimney & U#6 ESP area--ODP-II
Work of repairing /replacement of flow control valves
of cooling tower 6A & 6B--ODP-II
Preventive maintenance of DC coal feeder motors--LT
MOTORS--EM-II
ACW Pumps Thrust bearing oil replacement 6B,C-ODP-II
Retrofitting of 6D board--HT/LT SWITCHGEARS--EM-II

P-Proposed, A-Actual
Prepared by
MPD

Page No. 27

Signed by Incharge DyCE-II

Activity Description
69
70
71

Retrofitting of 6D board--HT/LT SWITCHGEARS--EM-II


Hydrojetting of WW, DIV. PANNELS, PL SH, RH --BM-II
PP
H2 & Excitor Coolers Acid Cleaning & Hydraulic
Testing-TM-II

72

Strainer and NRV servicing & replacement --ODP-II

73

Radiography of weld joints--BM-II PP

74

Work of both side nozzle replacement which are


missing & nozzle cleaning of tower 6A & 6B--ODP-II

75
76
77
78
79

Work of overhauling of ACW Pump 6A--ODP-II


Preventive Maintenance of
SF-12/1, 6A,
SF-15, SF-16 , Sec-II Of 6E--HT/LT
SWITCHGEARS--EM-II
Overhauling of BCW spare motor--HT MOTORS--EM-II
Preventive Maintenance of
SF-12/2, Sec-II of 6PA , 6MA,6MD, 6ME
Sec-I of6EMPA ,6MF, 6MG--HT/LT SWITCHGEARS--EMII
Cooler cleaning of MDBFP-6D, PA Fan 6A & 6B motor-CCW pump butterfly valve servicing--ODP-II

81

Checkng of Rotor E/F Holders--GENERATOR--EM-II

82

Feed Storage Tank & Dea. Inspection-TM-II

83

Maintenance of ESP C pass--ESP/AHP--EM-II


Work of cleaning of CT pond area, outlet strainer of
CT Pond Repairing.
--ODP-II
ACW/CCW pumps suction strainer repairing & fitting
work --ODP-II
ACW/CCW SUMP CLEANING WORK and hydro cone
checking--ODP-II
UAT 6A Faulty Air cell replacement replacement--HT
TRANSFORMERS--EM-II

85
86
87

11

15

24

25

27

27

15

16

26

28

10

13

10

33

11

16

11

16

11

25

11

25

11

25

12

16

12

17

12

25

12

25

13

19

13

22

HT MOTORS--EM-II

80

84

Unit No. 6

End
Day

SN

Start
Day

Section: DyCE-II

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

88

LP Turbine Repair & Checks ( MPI & NFT )-TM-II

89

LFET for Boiler water wall tubes--BM-II PP

90

Insp., thk.survey of WW & Replacement of tubes in


first pass including DP, RH & PSH--BM-II PP

91

IP Tirbine Repair & Checks-TM-II

92

Condenser tube cleaning by JETTING & BULLET Shot


method-TM-II

P-Proposed, A-Actual
Prepared by
MPD

Page No. 28

Signed by Incharge DyCE-II

Activity Description
92
93
94
95
96
97

Condenser tube cleaning by JETTING & BULLET Shot


method-TM-II
d)CCW Pumps Thrust bearing oil replacement
6A,C,D--ODP-II
LP Heaters internal insp. & air leak test .-TM-II
CCW Pump Butterfly valve Hydraulic system's power
pack oil replacement 6A,B,C,D--ODP-II
HT Circuit Breaker operation time & contact
resistance measurement and Connection tightening
of all HT breakers (All Unit Board breakers)--TEST-II
P/M & Capacity Test of 220 V UPS battery set-BATTARIES/DGSET--EM-II

98

Bearings UT & Checks-TM-II

99

Maintenance of ESP D pass--ESP/AHP--EM-II

102

Preventive Maintenance of DCDBs--HT/LT


SWITCHGEARS--EM-II
Preventive Maintenance of
SF-12/2, Sec-II of 6PA , 6MA,6MD, 6ME
Sec-I of6EMPA ,6MF, 6MG--HT/LT SWITCHGEARS--EMII
LP Turbine Boxup Work-TM-II

103

IP Turbine Boxup-TM-II

104

Motorised valves limit switch setting after clearance


from T/M , B/M--TEST-II

105

BTS A/B/C/D Trial--TEST-II

106

P/M & Capacity Test of +/- 24V G1/G2 Battery sets 1


& 2--BATTARIES/DGSET--EM-II

107

e) CCW Pumps gland replacement 6A,6C,6D--ODP-II

108

f)ACW Pumps gland replacement 6B,C--ODP-II

109

Gravity Test-TM-II

110

HP/IP/LP Roll Check & Correction-TM-II

111

Flushing Nozzle Replacement --ODP-II

112

Dept. Hydrulic Test --BM-II PP

100
101

113
114
115

Alinement of All Rotor Checks & Coupling of RotorTM-II


Checking of Battery Chargers,UPS filter cleaning and
UPS change over trial--TEST-II
WSB L/S Setting after B/M work--TEST-II

P-Proposed, A-Actual
Prepared by
MPD

Page No. 29

Unit No. 6

End
Day

SN

Start
Day

Section: DyCE-II

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

14

19

14

24

15

22

16

19

16

20

16

24

16

30

17

34

17

34

18

24

19

24

20

35

20

23

21

25

22

27

22

27

23

24

23

27

24

30

26

26

26

28

26

35

26

35

Signed by Incharge DyCE-II

Activity Description

115

WSB L/S Setting after B/M work--TEST-II

116

Repair if any observed in departmental hydraulic


test--BM-II PP

117

IBR Hydrulic Test--BM-II PP

118

Bearing Boxup work-TM-II

119

Turbine Protection trial

120

Removal of scaffolding.--BM-II PP

121

Bearing oil flushing -TM-II

122

124

HP,IP, Turbine insulation work-TM-II


Preventive Maintenance of F/F batteries & BB1 / BB2
batteries of Main & Standby DG set
--BATTARIES/DGSET--EM-II
Generator Testing, GCB trial--TEST-II

125

Post CAVT and furnace pressurisation test--BM-II PP

126

Shaft Grounding brushes cheking.--GENERATOR--EM-II

127

Turbine Barring -TM-II

123

P-Proposed, A-Actual
Prepared by
MPD

Page No. 30

Unit No. 6

End
Day

SN

Start
Day

Section: DyCE-II

CHANDRAPUR SUPER THERMAL POWER STATION


Consolidated ANNUAL Overhaul Bar Chart, Unit-5 BAR CHART

27

27

28

28

29

29

29

29

29

31

30

30

30

31

30

34

31

35

32

32

33

35

34

37

Signed by Incharge DyCE-II

HELP
Program is basically designed for designed bar chart based on different activity. Each activity first plan called schedule activity and
then based on user work a actual days required for activity is different so each activity is divided into two category on program first
is defined by "S-Schedule Activities-Start Day and End Day" and "A-Actual Activities-Start Day and End Day". Please follow the
following steps to designed a bar chart
STEPs
1. Enter Organisation Name
2. Enter Total activities user want to scheduled.
3. Enter Starting Date of BarChart

4. Enter Maximum days required.


5. Enter Unit No for which bar chart user want design
6. Enter Section who plan a activity and design a barchart for UnitMaximum days required.
7. Enter Chart Title such as Annual Overhaul/Capital Overhaul etc
8. Enter Prepared by Name or Designation etc
9. After completing all above details enter each activities details as follows
a. Enter activity description
b. Each activity consists of two rows, 1st Row "S-Schedule" and 2nd Row "A-Actual" Activity.
c. Enter schedule start day and end day infront each activity 1st row.
d. Press "Design BarChart Buttion" for designing barchart shows schedule days
e. After completing actual work
f. Enter Actual start day and end day infront each activity 2nd row.
d. Press "Design BarChart Buttion" for designing barchart show schedule days-Actual days

Activity Description

Cooling and Water washing of Boiler :: BM-II PP

Generator relay testing by secondary injection & CT/PT resistance checking. :: TEST-II

HT Switch gear Relays testing(Unit Board/Station Board/Comp. Board/AHP Board) ::


TEST-II

Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TEST-II

IAC / SAC and Bottom ash panels cleaning, connection tightening & checking :: TEST-II

CCW switchgear relay,X"er test,Reguler ODP works :: TEST-II

Capital Overhaul of Generator, Excitor, brushless assembly :: EM-II AGENCY

Oil filteration of GTR-5R,UAT-5A,5C :: EM-II AGENCY

Replacement of Black metal of GTR-R,Y,B ;UAT-A,B,C,D SAT-A,B; STN-3 :: EM-II


AGENCY

10

P/M of all LT Motors except O/H plan motor :: EM-II SECTION

11

Maintenance of ESP A Pass :: EM-II SECTION

12

P/M & Capacity Test of Station Battery set for battery set 1 and 2 & UPS :: EM-II
SECTION

13

P/M of all HT motors except above motors :: EM-II SECTION

14

Electrical supply to various Agencies woking for capital O/H of the unit :: EM-II
SECTION

15

Removal, servicing, calibration & restoration of SADC Power Cylinder :: I&C-II

16

Removal of all corner solenoid/C/M HAG & reject gate solenoid along with tubing & leak
isolating valve checking/ replacement. :: I&C-II

17

Removal & Servicing of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches and
Ignitor Transformer :: I&C-II

18

Removal & Servicing and of 28 nos. Flame Scanners :: I&C-II

19

Removal & Normali-sation of Boiler side Instruments as per B/M II , E/M II


requirement :: I&C-II

20

All Turbine side JB connections tightening work :: I&C-II

21

All pneumatic valves of CPU - Solenoid checking, servicing/replacement , power


cylinder checking/servicing if necessary.
:: I&C-II

22

CPU instrument air valves checking & replacement if necessary. :: I&C-II

End
Day

SN

Start
Day

UNIT 5 BARCHART ACTIVITIES

30

13

35

30

15

30

20

14

35

16

18

15

15

20

19

14

22

CPU instrument air valves checking & replacement if necessary. :: I&C-II

23

PM, blow down v/v servicing & oil repl. of all CT fans gear box (Total 11 CT Fans) ::
ODP-II

24

Work of both side nozzle replacement which are missing & nozzle cleaning of tower 5A
& 5B :: ODP-II

25

Overhauling of CCW 5C & BFV seal ring repl :: ODP-II

26

Work of CT fan cells approach way railing & gear box protection cage railing repairing
work :: ODP-II

27

Drift eliminator cleaning & repl :: ODP-II

28

ct Fan foundation frame replacement/ reconditioning CT Fan :: ODP-II

29

Hot water asbestos cement (broken) pipe replacement :: ODP-II

30

Work of separation of ACW return line from CCW hot water outlet line (4nos.) :: ODP-II

31

CT Fan O/H (5nos.) :: ODP-II

32

Overhauling of CCW 5D & BFV seal ring repl :: ODP-II

34

GENERATOR & EXCITER OVRHAUL :: TM-II

35

Pre Furnace pressurisation test & CAVT :: BM-II PP

36

VARIOUS COOLERS CLEANING & HYD. TEST :: TM-II

37

HP HEATERS INTERNAL INSPECTION & PARTING PLANE LEAKAGES ATTENDING ::


TM-II

38

LP HEATERS INTERNAL INSP. & AIR LEAK TEST. :: TM-II

39

Erection of cuplock scaffolding up to 50 mtr Elev. :: BM-II PP

40

HP valve works :: BM-II PP

41

Servicing of APH including basket replacement (HE, HIE, CE of pri. & sec.) :: BM-II PP

42

Servicing of Burner Tilt including coal compartment assemblies replacement :: BM-II


PP

43

Internal inspection of GTR-5Y, UAT-5B,5D :: EM-II AGENCY

44

P/M of Gen & UAT bus duct and painting of duct :: EM-II AGENCY

45

HOPPER CLEANING :: BM-II BA

End
Day

Activity Description

Start
Day

SN

20

25

25

25

30

20

30

30

25

25

30

32

11

11

23

28

28

30

30

Seal trough cleaning:: BM-II BA

47

Flushing of impulse lines - 200 no.s :: I&C-II

48

Servicing of Bottom Ash / Burner Tilt / PA Fan guide vane power cylinder
:: I&C-II

49

Disconnection, removal, servicing & normalisation of HPBP1, HPBP2, FOD-1 & 2, BPE1,
BPE2, BD valve servo & Blocking element, both tank & suction filter cleaning. :: I&C-II

50

Removal, Cleaning, Calibration & normalisation of all Press. Switches, Press.


Gauges,Temp. switches temp. gauges, RTDs of
i) Lub. Oil & Turbine drain oil system.
ii) Control Fluid system iii) Governing racks
iv) LP bypass system v) HP bypass system
vi) Primary water system vii) Gas system
viii) Seal Oil system inclusive of new ckt.
:: I&C-II

51

INSULATION REMOVAL :: TM-II

52

TURBINE SIDE PUMP SERVICING :: TM-II

53

SERVICING OF TURBINE ,SIDE VALVES :: TM-II

54

ATTENDING DEFECTS AS PER DEFECT LIST :: TM-II

55

Overhaul of HT motor PA-5A,FD-5B,ID-5A,ID-5D;C/M-5A,5B,5F :: EM-II AGENCY

56

Servicing of Fans :: BM-II PP

57

Maintenance of ESP B Pass :: EM-II SECTION

58

ERECTION OF FABRIC EXPANSION JOINT SIZE- 12000 X 5000 X 300 MM :: BM-II BA

59

Services to operation and other sections, Misc works :: TEST-II

60

ERECTION OF METALLIC EXPANSION JOINT SIZE- 8255 X 5715 X 782 MM :: BM-II BA

61

SERVICING OF WATER VALVES & REPLACEMENT :: BM-II BA

62

PIPELINE REPLACEMENT Coarse ash :: BM-II BA

63

PIPE LINE REPLACEMENT :Ash gate : BM-II BA

64

SERVICING OF ASH & CHAIN VALVES :: BM-II FA ESP A&C PASS

65

SERVICING OF FEEDER EJECTOR:: BM-II FA

End
Day

46

Activity Description

Start
Day

SN

24

24

23

18

31

31

31

30

25

23

11

25

29

28

10

16

66

WATER WASHING OF FIELDS :: BM-II ESP A&C PASS

67

i) Removal & normalisation of ESP / Coarse Ash / FGDH / Economiser A/V & W/V
Solenoid after B/M II clearence
ii). Removal & Servicing of ESP/Coarsh ash power cylinder.
:: I&C-II

68

Pipes Replacement :: ODP-II

69

Work of cleaning of CT pond area & outlet strainer of CT Pond cleaning & Repairing (5A
& 5B)
:: ODP-II

70

ACW/CCW pumps suction strainer repairing & fitting work :: ODP-II

71

Work of ACW recirculation / outlet line's valves, discharge line valves, vent valve
checking ,repairing/replacement, sum make up valve :: ODP-II

72

Work of repairing /replacement of riser valves of cooling tower 5A & 5B :: ODP-II

73

Algae removal & splash bar cleaning :: ODP-II

74

ACW line leakage attending near cooling tower 5B :: ODP-II

75

ACW/CCW expanion bellow checking :: ODP-II

76

ACW/CCW SUMP CLEANING WORK and hydro cone checking :: ODP-II

77

Hot water basin cleaning 5A & 5B :: ODP-II

78

ACW return line checking & repairing :: ODP-II

79

REVISIONING OF TURBINE VALVES & STRAINER :: TM-II

80

ACW SIDE VALVES SERVICING :: TM-II

81

Preventive Maintenance of Rectiformers :: EM-II AGENCY

82

Thickness survey & replacements of tubes in second pass :: BM-II PP

83

O/H of critical LT motors :: EM-II AGENCY

84

O/H of coal feeder motors :: EM-II AGENCY

85

Retrofitting of HT Breaker with HT contactor :: EM-II AGENCY

86

P/M of Dry Type 5XA, OXA1, LXA1, 5XB , OXA2, LXA2, including NGRs :: EM-II SECTION

87

ASH FEED GATE 1B SERVICING :: BM-II BA

88

HYJECTOR 1B SERVICING :: BM-II BA

End
Day

Activity Description

Start
Day

SN

22

33

20

25

25

30

23

13

20

25

23

20

31

31

21

25

32

28

18

28

88

HYJECTOR 1B SERVICING :: BM-II BA

89

Hopper cleaning & scaffolding erection:: BM-II BA

90

Removal / Calibration & Re-mounting of


(a) PA Hdr Press. Switches
(b) Furnance Press. Switches.
(c). C/M instruments :: I&C-II

91

Servicing/ Calibration of Boiler and Turbine side control valves- 75 nos :: I&C-II

92

Calibration of critical and Non-critical Instruments as per List / Schedules 200 nos. ::
I&C-II

93

Valve Replacement/Servicing :: ODP-II

94

CONDENSER TUBE CLEANING BY SULPHAMIC ACID :: TM-II

95

Cleaning of Pent house, Repair of pent house, dog house & cat house :: BM-II PP

96

RLA Study of the Boiler :: BM-II PP

97

Cooler Cleaning of PA-5A,5B;MDBFP-5C,5D :: EM-II AGENCY

98

P/M of 5C, 5PA Sec-1 , 5MA Sec-1, 5MB, 5MC, 5EMPA Sec-1, 5ME Sec-1, 5MG, Soot
blower Boards,5E Sec-I :: EM-II SECTION

99

P/M of 5D, SE-12/2, 5PA Sec-2, 5MA Sec-2, 5MD, 5ME Sec-2, 5EMPA sec-2, 5MF, 5MG
Board,5E Sec-II :: EM-II SECTION

100

GTR / UAT Transf testing, OTI/WTI calibration,and . Protection trials,cw flow switch
servising,GTR Bushing Tan Delta measurement,Oil pump trial :: TEST-II

101

Replacement of pipeline of size 150/200/250/300 NB:: BM-II BA

102

Removal and Normalisation of Turbine side instru-ments as per :: TM-II & EMII
requirement :: I&C-II

103

Disconnection / Checking of HP/IP stop & Control valves Limit switches , PFTS &
Thermocouples. :: I&C-II

104

Removal of main turbine turbovisory instruments :: I&C-II

105

Removal, Cleaning, testing & restoration of LPT exhaust Hood T/CS & RTD. :: I&C-II

106

ACW Pumps Thrust bearing oil replacement 5A,B,C :: ODP-II

107

ACW Pumps gland replacement 5A,B,C :: ODP-II

108

ALIGNMENT CHECKING, DECOUPLING & REMOVAL OF HP MODULE :: TM-II

109

IP TURBINE DISMANTLING & CHECKS :: TM-II

110

H2 & EXCITER COOLERS ACID CLEANING & HYDRAULIC TESTING :: TM-II

End
Day

Activity Description

Start
Day

SN

15

21

24

33

14

21

25

21

28

28

23

30

20

11

10

10

12

20

110

H2 & EXCITER COOLERS ACID CLEANING & HYDRAULIC TESTING :: TM-II

111

Maintenance of ESP C Pass :: EM-II SECTION

112

INSPECTION OF FIELDS :: BM-II ESP

113

RECTIFICATION OF DEFECTS :: BM-II ESP

114

Calibration of Bottom ash/PAHH/SAHH/FGDH/Economiser/ESP/AHP all instrument ::


I&C-II

115

Checking of all DAS workstations & controllers . :: I&C-II

116

Hydrojetting of WW, DIV. PANNELS, PL SH, RH :: BM-II PP

117

Radiography of weld joints :: BM-II PP

118

Disconnection & removal of HP/IP ATT valves motors. :: I&C-II

119

BEARINGS UT & CHECKS :: TM-II

120

ERECTION OF FABRIC EXPANSION JOINT SIZE- 3950 X 3450 X 300 MM :: BM-II BA

121

SERVICING OF ASH & CHAIN VALVE :: BM-II BA

122

SERVICING OF FEEDER EJECTOR :: BM-II BA

123

Attending of all S/D defects /Modifications. :: I&C-II

124

Replacement of JBs alongwith TBs

End
Day

Activity Description

Start
Day

SN

13

18

24

16

11

25

14

13

17

17

19

16

10

13

20

10

12

10

14

10

14

10

19

10

16

:: I&C-II

125

Disconnection & removal of LPBP 1 & 2 stop control & water Injection Limit switches &
PFTS :: I&C-II

126

DISMANTLING OF HP MODULE :: TM-II

127

LP TURBINE DISMANTALING & CHECKS :: TM-II

128

Maintenance of ESP D Pass:: EM-II SECTION

129

ASH FEED GATE 2B SERVICING :: BM-II BA

130

HYJECTOR 2B SERVICING :: BM-II BA

131

Repairs of BAH plate / seal trough :: BM-II BA

132

Refractory cooling water pipeline & flushing nozzle repair:: BM-II BA

133

Damaged refractory removal & anchor welding:: BM-II BA

134

Calibration of ID/FD/PA/BCWP/ CWBP instruments. :: I&C-II

135

Removal, Cleaning, Calibration & normalisation as per :: TM-II schedule of i) HOT &
Cold gas, Primary water RTDS /Temp. Switches & ACW I/L,O/L RTDS
ii) Generator seal oil TE & EE RTDS, Pre-chamber Level Probe Gas Cooler I/L & O/L
RTDS
iii) Main Exciter Hot/Cold air instruments
:: I&C-II

136

CONDENSER TUBE CLEANING BY JETTING & BULLE SHOT METHOD :: TM-II

137

SERVICING OF WATER VALVES:: BM-II FA ESP A&C PASS

138

WATER WASHING OF FIELDS :: BM-II ESP B&D PASS

139

Removal / Servicing & Remounting of AHP Ash water make up valves, series sump
make valves, ETP valves, RC valves, suction valves solenoids as per ODP II
schedules. :: I&C-II

140

Calibration MOT& FRF tank Level switches with Amplifiers :: I&C-II

141

Cleaning work :: ODP-II

142

Flushing Nozzle Replacement :: ODP-II

143

Insp., thk.survey of WW & Replacement of tubes in first pass including DP, RH & PSH ::
BM-II PP

144

ERECTION OF METALLIC EXPANSION JOINT SIZE- 7355 X 4267 X 782 MM :: BM-II BA

145

Checking/calibration of primary water, Lube oil, Cold gas and FRF Temp. control valves.
:: I&C-II

146

Preventive Maintenance of 5EPX A/B/C/D, 5AHX A/B :: EM-II SECTION

147

P/M & Capacity Test of +/- 24V G1/G2 Battery sets :: EM-II SECTION

148

Calibration of
i) C/MS CAD/HAD 16nos.
ii) Burner tilt.
iii) PA Fan vane
:: I&C-II

149

Strainer and NRV servicing :: ODP-II

150

IP TURBINE REPAIR & CHECKS :: TM-II

151

ERECTION OFFABRIC EXPANSION JOINT SIZE- 7700 X 6050 X 300 MM :: BM-II BA

152

Sample isolating valves & blowdown needle valves(Whitey make) replacement :: I&C-II

153

CCW Pumps Thrust bearing oil & power pack oil replacement 5A,B,C,D :: ODP-II

End
Day

Activity Description

Start
Day

SN

10

19

10

19

10

27

10

19

11

18

11

18

11

17

11

13

11

30

11

20

12

25

12

19

12

15

13

18

13

18

13

28

13

22

13

19

14

18

14

26

14

20

153

CCW Pumps Thrust bearing oil & power pack oil replacement 5A,B,C,D :: ODP-II

154

CCW Pumps gland replacement 5A,B,C,D :: ODP-II

155

CHECKS, REVIOSINING & MINOR REPAIRS OF HP MODULE :: TM-II

156

FEED STORAGE TANK & DEA. INSPECTION :: TM-II

157

HT Circuit Breaker operation time & contact resistance measurement and Connection
tightening of all HT breakers (All Unit Board breakers) :: TEST-II

158

ASH FEED GATE 1A SERVICING :: BM-II BA

159

HYJECTOR 1A SERVICING :: BM-II BA

160

Servicing of C/Ms HAG/ all corner solenoid, Limit Switches & air line, oil filter cleaning
and oil top up. :: I&C-II

161

Seal /leak off steam valve sump, Filter & Servo-unit Cleaning, Calibration, and
Normalisation. :: I&C-II

162

Replacement of Thermocouple, Thermowell & guide pipe provision for PAH & SAH flue
gas side & air side thermocouples. :: I&C-II

163

SERVICING OF ASH & CHAIN VALVES:: BM-II FA ESP B&D PASS

164

SERVICING OF FEEDER EJECTOR:: BM-II FA ESP B&D PASS

165

Removal, mounting, laying, dressing & checking of SH/RH metal temp thermo-couples
as per BM-II schedule. :: I&C-II

166

Performance package validation work. :: I&C-II

167

SERVICING OF WATER VALVE :: BM-II BA

168

Grating and Support replacement :: ODP-II

169

HP/IP/LP ROLL CHECK & CORRECTION :: TM-II

170

P/M of 5AHS 3.3 KV BOARD :: EM-II SECTION

171

ERECTION OF FABRIC EXPANSION JOINT SIZE- 8900 X 3800 X 300 MM :: BM-II BA

172

PASS BOX UP :: BM-II ESP

173

INSPECTION OF FIELDS :: BM-II ESP A&C PASS

174

RECTIFICATION OF DEFECTS :: BM-II ESP B&D PASS

175

LPH -1/2/3 Level switches functional testing with Protocol with operation and TM-II ::
I&C-II

176

HP MODULE ASSEMBLY :: TM-II

End
Day

Activity Description

Start
Day

SN

14

20

14

18

14

24

14

19

15

19

15

19

15

19

16

19

16

28

17

24

17

29

17

24

17

22

18

26

18

25

18

20

19

20

19

23

19

20

19

25

19

29

19

20

19

20

176

HP MODULE ASSEMBLY :: TM-II

177

LP TURBINE REPAIR & CHECKS ( MPI & NFT ) :: TM-II

178

Removal & Servicing of CRH NRVs Limit switches assemblies LHS & RHS :: I&C-II

179

ERECTION OF METALLIC EXPANSION JOINT SIZE- 3950 X 3450 X 300 MM :: BM-II BA

180

ASH FEED GATE 2A SERVICING :: BM-II BA

181

HYJECTOR 2A SERVICING :: BM-II BA

182

Mill O/L Temp. T/Cs checking, Well checking , replacement if found faulty and both
point availability/checking. :: I&C-II

183

AHP A/B/C Series & HP Ash water tank Level controller testing after Sensor Cable & bolt
replacement :: I&C-II

184

CPU bypass valve & DP transmitter calibration & interlock checking . :: I&C-II

185

IP TURBINE BOXUP :: TM-II

186

ALIGNMENT OF ALL ROTOR CHECKS & COUPLING OF ROTOR :: TM-II

187

P/M of BB1 / BB2 batteries of DG set :: EM-II SECTION

188

Preventive Maintenance of DG set :: EM-II SECTION

189

BTS A/B/C/D Trial :: TEST-II

190

P/M of X'mers M. B.s & NGRs of UAT-5A /5B/5C/5D :: EM-II SECTION

191

P/M of 5AHPA 415 VOLTS BOARD :: EM-II SECTION

192

TEST CHARGE & GATE OPENING :: BM-II ESP

193

Refractory filling :: BM-II BA

194

Internal Inspection of O2 Probe & Replacement of guide pipes & V guards. :: I&C-II

195

TDBFP A/B, MDBFP C/D , CEP A/B/C instruments checking, calibration and protection
trials :: I&C-II

197

GRAVITY TEST :: TM-II

198

P/M of DCDBs & Chargers :: EM-II SECTION

199

LP TURBINE BOXUP WORK :: TM-II

End
Day

Activity Description

Start
Day

SN

19

22

19

24

20

27

20

23

20

23

20

23

20

24

20

25

20

25

20

23

20

21

20

21

20

23

21

23

21

24

21

23

21

26

21

22

21

28

21

24

22

26

22

25

200

Calibration of Boiler drum press. Gauges. :: I&C-II

201

Normalisation of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches and
Ignitor Transformer :: I&C-II

202

LT switch gear (PA,EMPA,MA,ME,MD, DGDB,AHP,ESP)Relay testing and Control


connection tightening :: TEST-II

203

BEARING BOXUP ,INSULATION WORK :: TM-II

204

Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TEST-II

205

Motorised valves limit switch setting after clearance from T/M , B/M :: TEST-II

206

SERVICING OF WATER VALVES:: BM-II FA ESP B&D PASS

207

Normalisation of 28 nos. Flame Scanners :: I&C-II

208

Dept. Hydrulic Test :: BM-II PP

209

ERECTION OF METALLIC EXPANSION JOINT SIZE- 3450 X 3550 X 300 MM :: BM-II BA

210

Restoration of all corner solenoid/C/M HAG & reject gate solenoid. :: I&C-II

211

ID/FD/PA/BCWP protection trial. :: I&C-II

212

Provision of PVC tubes for condenser hydraulic test & Hot-well level switches
functional checking. :: I&C-II

213

Repair if any observed in departmental hydraulic test :: BM-II PP

214

CLEANING OF BA DRAIN PIT & OTP TANK :: BM-II BA

215

Refractory curing:: BM-II BA

216

SS seal plate / Wire mesh Repairing & replacements:: BM-II BA

217

LP bypass stop & CVs with water injection valves remote trials. :: I&C-II

218

Calibration & Normalization of main turbine turbovisory instruments :: I&C-II

219

BEARING OIL FLUSHING :: TM-II

220

IBR Hydrulic Test :: BM-II PP

221

P/M of Generator PT cubical & NGR Shaft Grounding brushes checking :: EM-II
SECTION

222

Boiler protection Trial. :: I&C-II

End
Day

Activity Description

Start
Day

SN

23

24

24

27

24

35

24

26

24

35

24

35

25

31

25

27

26

26

26

33

26

27

26

27

26

26

27

27

27

31

27

30

27

31

27

28

27

28

27

28

28

28

28

30

28

28

222

Boiler protection Trial. :: I&C-II

223

Removal of scaffolding. :: BM-II PP

224

COARSE ASH TANK CLEANING :: BM-II BA

225

Light up and post light up activities :: I&C-II

226

Main turbine & LP Bypass Governing characteristics through EHC & Hydraulic with TMII & operation :: I&C-II

227

Turbine Protection trial :: I&C-II

228

HP,IP, TURBINE INSULATION WORK :: TM-II

229

TURBINE BARRING ,GEN,AIR LEAK TEST :: TM-II

230

P/M of all HT motors except above motors :: EM-II SECTION

231

BOX OF PASS :: BM-II ESP

232

FLUSHING NOZZLE REPLACEMENT :: BM-II BA

233

Generator Testing :: TEST-II

234

Post CAVT and furnace pressurisation test :: BM-II PP

235

NOZZLE CLEANING OF ALL PASS:: BM-II FA

236

TEST CHARGE & GATE OPENING :: BM-II ESP B&D PASS

237

Scaffolding removal:: BM-II BA

238

Boiler box up & lightup :: BM-II PP

End
Day

Activity Description

Start
Day

SN

29

31

29

31

29

30

29

29

29

29

29

30

29

30

29

33

30

31

31

33

31

35

32

32

32

33

32

34

32

33

33

33

Activity Description

Star
t
Day
End
Day

S.
N.

Generator relay testing by secondary injection & CT/PT


resistance checking. :: TEST-II

30

HT Switch gear Relays testing(Unit Board/Station


Board/Comp. Board/AHP Board) :: TEST-II

13

Checking of Battery Chargers,UPS filter cleaning and UPS


change over trial :: TEST-II

IAC / SAC and Bottom ash panels cleaning, connection


tightening & checking :: TEST-II

CCW switchgear relay,X"er test,Reguler ODP works :: TEST-II

35

Capital Overhaul of Generator, Excitor, brushless assembly ::


EM-II AGENCY

30

Oil filteration of GTR-5R,UAT-5A,5C :: EM-II AGENCY

15

Replacement of Black metal of GTR-R,Y,B ;UAT-A,B,C,D SATA,B; STN-3 :: EM-II AGENCY

30

10

P/M of all LT Motors except O/H plan motor :: EM-II SECTION

20

11

Maintenance of ESP A Pass :: EM-II SECTION

12

P/M & Capacity Test of Station Battery set for battery set 1
and 2 & UPS :: EM-II SECTION

14

13

P/M of all HT motors except above motors :: EM-II SECTION

14

Electrical supply to various Agencies woking for capital O/H


of the unit :: EM-II SECTION

35

Removal, servicing, calibration & restoration of SADC Power


Cylinder :: I&C-II
Removal of all corner solenoid/C/M HAG & reject gate
solenoid along with tubing & leak isolating valve checking/
replacement. :: I&C-II
Removal & Servicing of 16 Nos. of HEA Ignitors with Power
Cylinder, Limit Switches and Ignitor Transformer :: I&C-II

16

18

15

15

20

Cooling and Water washing of Boiler :: BM-II PP

15
16
17
18

Removal & Servicing and of 28 nos. Flame Scanners :: I&C-II

19

Removal & Normali-sation of Boiler side Instruments as per


B/M II , E/M II requirement :: I&C-II

20

All Turbine side JB connections tightening work :: I&C-II

20

All Turbine side JB connections tightening work :: I&C-II

21

servicing/replacement , power cylinder checking/servicing if


necessary.

19

22

CPU instrument air valves checking & replacement if


necessary. :: I&C-II

14

23

PM, blow down v/v servicing & oil repl. of all CT fans gear box
(Total 11 CT Fans) :: ODP-II

20

24

Work of both side nozzle replacement which are missing &


nozzle cleaning of tower 5A & 5B :: ODP-II

25

25

Overhauling of CCW 5C & BFV seal ring repl :: ODP-II

25

26

Work of CT fan cells approach way railing & gear box


protection cage railing repairing work :: ODP-II

25

27

Drift eliminator cleaning & repl :: ODP-II

30

28

ct Fan foundation frame replacement/ reconditioning CT


Fan :: ODP-II

20

29

Hot water asbestos cement (broken) pipe replacement ::


ODP-II

30

30

Work of separation of ACW return line from CCW hot water


outlet line (4nos.) :: ODP-II

30

31

CT Fan O/H (5nos.) :: ODP-II

25

32

Overhauling of CCW 5D & BFV seal ring repl :: ODP-II

25

34

GENERATOR & EXCITER OVRHAUL :: TM-II

30

35

Pre Furnace pressurisation test & CAVT :: BM-II PP

36

VARIOUS COOLERS CLEANING & HYD. TEST :: TM-II

32

37

HP HEATERS INTERNAL INSPECTION & PARTING PLANE


LEAKAGES ATTENDING :: TM-II

11

38

LP HEATERS INTERNAL INSP. & AIR LEAK TEST. :: TM-II

11

39

Erection of cuplock scaffolding up to 50 mtr Elev. :: BM-II PP

40

HP valve works :: BM-II PP

23

41

Servicing of APH including basket replacement (HE, HIE, CE


of pri. & sec.) :: BM-II PP

28

42

Servicing of Burner Tilt including coal compartment


assemblies replacement :: BM-II PP

28

43

Internal inspection of GTR-5Y, UAT-5B, 5D :: EM-II AGENCY

44

P/M of Gen & UAT bus duct and painting of duct :: EM-II
AGENCY

45

HOPPER CLEANING :: BM-II BA

46

Seal trough cleaning:: BM-II BA

47

Flushing of impulse lines - 200 no.s :: I&C-II


Servicing of Bottom Ash / Burner Tilt / PA Fan guide vane
power cylinder

48
49
50

Disconnection,
removal, servicing & normalisation of HPBP1,
:: I&C-II
HPBP2, FOD-1 & 2, BPE1, BPE2, BD valve servo & Blocking
element, both tank & suction filter cleaning. :: I&C-II
i) Lub. Oil & Turbine drain oil system.
ii) Control Fluid system iii) Governing racks
iv) LP bypass system v) HP bypass system

30

30

24

24

23

18

31

31

31

30

25

51

INSULATION REMOVAL :: TM-II

52

TURBINE SIDE PUMP SERVICING :: TM-II

53

SERVICING OF TURBINE ,SIDE VALVES :: TM-II

54

ATTENDING DEFECTS AS PER DEFECT LIST :: TM-II

55

Overhaul of HT motor PA-5A,FD-5B,ID-5A,ID-5D;C/M5A,5B,5F :: EM-II AGENCY

56

Servicing of Fans :: BM-II PP

57

Maintenance of ESP B Pass :: EM-II SECTION

58

ERECTION OF FABRIC EXPANSION JOINT SIZE- 12000 X 5000


X 300 MM :: BM-II BA

59

Services to operation and other sections, Misc works :: TESTII

23

60

ERECTION OF METALLIC EXPANSION JOINT SIZE- 8255 X


5715 X 782 MM :: BM-II BA

11

61

SERVICING OF WATER VALVES & REPLACEMENT :: BM-II BA

25

62

PIPELINE REPLACEMENT Coarse ash :: BM-II BA

29

63

PIPE LINE REPLACEMENT :Ash gate : BM-II BA

28

64

SERVICING OF ASH & CHAIN VALVES :: BM-II FA ESP A&C


PASS

10

65

SERVICING OF FEEDER EJECTOR:: BM-II FA

66

WATER WASHING OF FIELDS :: BM-II ESP A&C PASS

67

i) Removal & normalisation of ESP / Coarse Ash / FGDH /


Economiser A/V & W/V Solenoid after B/M II clearence
ii). Removal & Servicing of ESP/Coarsh ash power cylinder.
:: I&C-II

68

Pipes Replacement :: ODP-II

69
70
71
72

Work of cleaning of CT pond area & outlet strainer of CT


Pond cleaning & Repairing (5A & 5B)
:: ODP-II
ACW/CCW pumps suction strainer repairing & fitting work ::
ODP-II
Work of ACW recirculation / outlet line's valves, discharge
line valves, vent valve checking ,repairing/replacement, sum
make up valve :: ODP-II
Work of repairing /replacement of riser valves of cooling
tower 5A & 5B :: ODP-II

73

Algae removal & splash bar cleaning :: ODP-II

74

ACW line leakage attending near cooling tower 5B :: ODP-II

75

ACW/CCW expanion bellow checking :: ODP-II

76

ACW/CCW SUMP CLEANING WORK and hydro cone checking


:: ODP-II

77

Hot water basin cleaning 5A & 5B :: ODP-II

78

ACW return line checking & repairing :: ODP-II

79

REVISIONING OF TURBINE VALVES & STRAINER :: TM-II

80

ACW SIDE VALVES SERVICING :: TM-II

81

Preventive Maintenance of Rectiformers :: EM-II AGENCY

82

Thickness survey & replacements of tubes in second pass ::


BM-II PP

83

O/H of critical LT motors :: EM-II AGENCY

84

O/H of coal feeder motors :: EM-II AGENCY

85

Retrofitting of HT Breaker with HT contactor :: EM-II AGENCY

16

22

33

20

25

25

30

23

13

20

25

23

20

31

31

21

25

32

28

18

86

P/M of Dry Type 5XA, OXA1, LXA1, 5XB , OXA2, LXA2,


including NGRs :: EM-II SECTION

87

ASH FEED GATE 1B SERVICING :: BM-II BA

88

HYJECTOR 1B SERVICING :: BM-II BA

89

Hopper cleaning & scaffolding erection:: BM-II BA


Removal / Calibration & Re-mounting of
(a) PA Hdr Press. Switches
(b) Furnance Press. Switches.
(c). C/M instruments :: I&C-II
Servicing/ Calibration of Boiler and Turbine side control
valves- 75 nos :: I&C-II

90
91
92

Calibration of critical and Non-critical Instruments as per


List / Schedules 200 nos. :: I&C-II

93

Valve Replacement/Servicing :: ODP-II

94

CONDENSER TUBE CLEANING :: TM-II

95

Cleaning of Pent house, Repair of pent house, dog house &


cat house :: BM-II PP

96

RLA Study of the Boiler :: BM-II PP

97

Cooler Cleaning of PA-5A,5B;MDBFP-5C,5D :: EM-II AGENCY

P/M of 5C, 5PA Sec-1 , 5MA Sec-1, 5MB, 5MC, 5EMPA Sec-1,
5ME Sec-1, 5MG, Soot blower Boards,5E Sec-I :: EM-II
SECTION
P/M of 5D, SE-12/2, 5PA Sec-2, 5MA Sec-2, 5MD, 5ME Sec-2,
99
5EMPA sec-2, 5MF, 5MG Board,5E Sec-II :: EM-II SECTION
GTR / UAT Transf testing, OTI/WTI calibration,and . Protection
100 trials,cw flow switch servising,GTR Bushing Tan Delta
measurement,Oil pump trial :: TEST-II
Replacement of pipeline of size 150/200/250/300 NB:: BM-II
101
BA
98

28

15

21

24

33

14

21

25

21

28

28

23

30

102

Removal and Normalisation of Turbine side instru-ments as


per :: TM-II & EMII requirement :: I&C-II

20

103

Disconnection / Checking of HP/IP stop & Control valves


Limit switches , PFTS & Thermocouples. :: I&C-II

11

10

10

104 Removal of main turbine turbovisory instruments :: I&C-II


105

Removal, Cleaning, testing & restoration of LPT exhaust


Hood T/CS & RTD. :: I&C-II

106 ACW Pumps Thrust bearing oil replacement 5A,B,C :: ODP-II


107 ACW Pumps gland replacement 5A,B,C :: ODP-II

107 ACW Pumps gland replacement 5A,B,C :: ODP-II


108

ALIGNMENT CHECKING, DECOUPLING & REMOVAL OF HP


MODULE :: TM-II

109 IP TURBINE DISMANTLING & CHECKS :: TM-II


110

H2 & EXCITER COOLERS ACID CLEANING & HYDRAULIC


TESTING :: TM-II

111

Maintenance of ESP C Pass :: EM-II SECTION

112

INSPECTION OF FIELDS :: BM-II ESP

113

RECTIFICATION OF DEFECTS :: BM-II ESP

114

Calibration of Bottom
ash/PAHH/SAHH/FGDH/Economiser/ESP/AHP all instrument ::
I&C-II

115

Checking of all DAS workstations & controllers . :: I&C-II

116

Hydrojetting of WW, DIV. PANNELS, PL SH, RH :: BM-II PP

117

Radiography of weld joints :: BM-II PP

118

Disconnection & removal of HP/IP ATT valves motors. :: I&C-II

119

BEARINGS UT & CHECKS :: TM-II

120

ERECTION OF FABRIC EXPANSION JOINT SIZE- 3950 X 3450


X 300 MM :: BM-II BA

121 SERVICING OF ASH & CHAIN VALVE :: BM-II BA


122 SERVICING OF FEEDER EJECTOR :: BM-II BA
123 Attending of all S/D defects /Modifications. :: I&C-II
Replacement of JBs alongwith TBs
124
:: I&C-II
Disconnection & removal of LPBP 1 & 2 stop control & water
125
Injection Limit switches & PFTS :: I&C-II
126 DISMANTLING OF HP MODULE :: TM-II
127 LP TURBINE DISMANTALING & CHECKS :: TM-II
128 Maintenance of ESP D Pass:: EM-II SECTION

12

20

13

18

24

16

11

25

14

13

17

17

19

16

10

13

20

10

12

129 ASH FEED GATE 2B SERVICING :: BM-II BA


130 HYJECTOR 2B SERVICING :: BM-II BA
131 Repairs of BAH plate / seal trough :: BM-II BA
132

Refractory cooling water pipeline & flushing nozzle repair::


BM-II BA

133 Damaged refractory removal & anchor welding:: BM-II BA


134 Calibration of ID/FD/PA/BCWP/ CWBP instruments. :: I&C-II
II schedule of i) HOT & Cold gas, Primary water RTDS
/Temp. Switches & ACW I/L,O/L RTDS
135 ii) Generator seal oil TE & EE RTDS, Pre-chamber Level
Probe Gas Cooler I/L & O/L RTDS
iii) Main Exciter Hot/Cold air instruments
CONDENSER TUBE CLEANING BY JETTING & BULLET SHOT
136
METHOD :: TM-II

10

14

10

14

10

19

10

16

10

19

10

19

10

27

10

19

Delay if any
As per schedule

As per schedule. 34
leakages pointed out

Started on 3rd day as per


schedule
Agency yet to be reported.
Not started on 3rd day
Started on 3rd day as per
schedule
Started on 3rd day as per
schedule

Anda mungkin juga menyukai