P
A
Generator relay testing by secondary injection & CT/PT resistance checking. :: TESTII
HT Switch gear Relays testing(Unit Board/Station Board/Comp. Board/AHP Board) ::
TEST-II
Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TESTII
IAC / SAC and Bottom ash panels cleaning, connection tightening & checking ::
TEST-II
P-Proposed, A-Actual
Prepared by
MPD
1 30 P
A
1 13 P
A
1
5 P
A
1
3 P
A
1 35 P
A
1 30 P
A
1 15 P
A
1 30 P
A
1 20 P
A
1
3 P
Page No. 1
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Unit No. 5
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
P/M & Capacity Test of Station Battery set for battery set 1 and 2 & UPS :: EM-II
SECTION
Electrical supply to various Agencies woking for capital O/H of the unit :: EM-II
SECTION
Removal of all corner solenoid/C/M HAG & reject gate solenoid along with tubing &
leak isolating valve checking/ replacement. :: I&C-II
Removal & Servicing of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches
and Ignitor Transformer :: I&C-II
P-Proposed, A-Actual
Prepared by
MPD
Unit No. 5
A
1 14 P
A
1
5 P
A
1 35 P
A
1 16 P
A
1 18 P
A
1 15 P
A
1 15 P
A
1 20 P
A
1
5 P
A
1 19 P
A
1 14 P
Page No. 2
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
1 20
PM, blow down v/v servicing & oil repl. of all CT fans gear box (Total 11 CT Fans) ::
ODP-II
Unit No. 5
P
A
1 25
Work of both side nozzle replacement which are missing & nozzle cleaning of tower
5A & 5B :: ODP-II
P
A
1 25
Overhauling of CCW 5C & BFV seal ring repl :: ODP-II
P
A
1 25
Work of CT fan cells approach way railing & gear box protection cage railing
repairing work :: ODP-II
P
A
1 30
Drift eliminator cleaning & repl :: ODP-II
P
A
1 20
ct Fan foundation frame replacement/ reconditioning CT Fan :: ODP-II
P
A
P-Proposed, A-Actual
Prepared by
MPD
Page No. 3
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
1 30
Hot water asbestos cement (broken) pipe replacement :: ODP-II
Unit No. 5
P
A
1 30
Work of separation of ACW return line from CCW hot water outlet line (4nos.) :: ODPII
P
A
25
P
A
25
P
A
1 30 P
A
2
P
A
P-Proposed, A-Actual
Prepared by
MPD
2 32 P
Page No. 4
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Unit No. 5
2 11 P
A
2 11 P
A
3
P
A
3 23
HP valve works :: BM-II PP
P
A
3 28
Servicing of APH including basket replacement (HE, HIE, CE of pri. & sec.) :: BM-II PP
P
A
3 28
Servicing of Burner Tilt including coal compartment assemblies replacement :: BMII PP
P
A
P/M of Gen & UAT bus duct and painting of duct :: EM-II AGENCY
P-Proposed, A-Actual
Prepared by
MPD
3 30 P
A
3 30 P
Page No. 5
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
P/M of Gen & UAT bus duct and painting of duct :: EM-II AGENCY
P-Proposed, A-Actual
Prepared by
MPD
8 P
A
3
4 P
A
3 24 P
A
3 24 P
A
3 23 P
A
3 18 P
A
3
5 P
A
3 31 P
A
3 31 P
A
3 31 P
A
3 30 P
Page No. 6
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
A
3
:: I&C-II
Disconnection, removal, servicing & normalisation of HPBP1, HPBP2, FOD-1 & 2,
BPE1, BPE2, BD valve servo & Blocking element, both tank & suction filter
Removal, Cleaning, Calibration & normalisation of all Press. Switches, Press.
cleaning. :: I&C-II
Gauges,Temp. switches temp. gauges, RTDs of
i) Lub. Oil & Turbine drain oil system.
ii) Control Fluid system iii) Governing racks
iv) LP bypass system v) HP bypass system
vi) Primary water system vii) Gas system
viii) Seal Oil system inclusive of new ckt.
:: I&C-II
INSULATION REMOVAL :: TM-II
Unit No. 5
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
4 25
Servicing of Fans :: BM-II PP
Unit No. 5
P
A
P-Proposed, A-Actual
Prepared by
MPD
6 P
A
4
8 P
A
4 23 P
A
4 11 P
A
4 25 P
A
4 29 P
A
4 28 P
A
4 10 P
A
4 16 P
A
4
9 P
Page No. 7
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Unit No. 5
A
4 22 P
A
4 33
P
A
Work of cleaning of CT pond area & outlet strainer of CT Pond cleaning & Repairing
(5A & 5B)
:: ODP-II
4 20
P
A
4 25
ACW/CCW pumps suction strainer repairing & fitting work :: ODP-II
P
A
4 25
Work of ACW recirculation / outlet line's valves, discharge line valves, vent valve
checking ,repairing/replacement, sum make up valve :: ODP-II
P
A
4 30
Work of repairing /replacement of riser valves of cooling tower 5A & 5B :: ODP-II
P
A
P-Proposed, A-Actual
Prepared by
MPD
Page No. 8
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
4 23
Algae removal & splash bar cleaning :: ODP-II
Unit No. 5
P
A
4 13
ACW line leakage attending near cooling tower 5B :: ODP-II
P
A
4 20
ACW/CCW expanion bellow checking :: ODP-II
P
A
25
P
A
23
P
A
4
ACW return line checking & repairing :: ODP-II
20
P
A
P-Proposed, A-Actual
Prepared by
MPD
Page No. 9
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Unit No. 5
4 31 P
A
4 31 P
A
4 21 P
A
5 25
P
A
P/M of Dry Type 5XA, OXA1, LXA1, 5XB , OXA2, LXA2, including NGRs :: EM-II
SECTION
P-Proposed, A-Actual
Prepared by
MPD
5 32 P
A
5 28 P
A
5 18 P
A
5 28 P
A
5
9 P
A
5
9 P
A
5
9 P
Page No. 10
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Unit No. 5
A
5 15 P
A
5 21 P
A
5 24 P
A
5 33
P
A
5 14 P
A
6 21
Cleaning of Pent house, Repair of pent house, dog house & cat house :: BM-II PP
P
A
6 25
RLA Study of the Boiler :: BM-II PP
P
A
P-Proposed, A-Actual
Prepared by
MPD
6 21 P
Page No. 11
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
P/M of 5C, 5PA Sec-1 , 5MA Sec-1, 5MB, 5MC, 5EMPA Sec-1, 5ME Sec-1, 5MG, Soot
blower Boards,5E Sec-I :: EM-II SECTION
P/M of 5D, SE-12/2, 5PA Sec-2, 5MA Sec-2, 5MD, 5ME Sec-2, 5EMPA sec-2, 5MF, 5MG
Board,5E Sec-II :: EM-II SECTION
GTR / UAT Transf testing, OTI/WTI calibration,and . Protection trials,cw flow switch
servising,GTR Bushing Tan Delta measurement,Oil pump trial :: TEST-II
Removal and Normalisation of Turbine side instru-ments as per :: TM-II & EMII
requirement :: I&C-II
Disconnection / Checking of HP/IP stop & Control valves Limit switches , PFTS &
Thermocouples. :: I&C-II
Removal, Cleaning, testing & restoration of LPT exhaust Hood T/CS & RTD. :: I&C-II
Unit No. 5
6 28 P
A
6 28 P
A
6 23 P
A
6 30 P
A
6 20 P
A
6 11 P
A
6
7 P
7 P
A
A
6 10
P
A
6 10
ACW Pumps gland replacement 5A,B,C :: ODP-II
P-Proposed, A-Actual
Prepared by
MPD
Page No. 12
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Unit No. 5
A
ALIGNMENT CHECKING, DECOUPLING & REMOVAL OF HP MODULE :: TM-II
8 P
A
6 12 P
A
6 20 P
A
7
9 P
A
7 13 P
A
7 18 P
A
7 24 P
A
7 16 P
A
8 11
P
A
P-Proposed, A-Actual
Prepared by
MPD
Page No. 13
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
8 25
Radiography of weld joints :: BM-II PP
Unit No. 5
P
A
P-Proposed, A-Actual
Prepared by
MPD
9 P
A
8 14 P
A
9 13 P
A
9 17 P
A
9 17 P
A
9 19 P
A
9 16 P
A
9 10 P
A
9 13 P
A
9 20 P
Page No. 14
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
P-Proposed, A-Actual
Prepared by
MPD
Unit No. 5
A
10 12 P
A
10 14 P
A
10 14 P
A
10 19 P
A
10 16 P
A
10 19 P
A
10 19 P
A
10 27 P
A
10 19 P
A
11 18 P
A
11 18 P
Page No. 15
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Removal / Servicing & Remounting of AHP Ash water make up valves, series sump
make valves, ETP valves, RC valves, suction valves solenoids as per ODP II
schedules. :: I&C-II
Calibration MOT& FRF tank Level switches with Amplifiers :: I&C-II
Unit No. 5
11 17 P
A
11 13 P
A
11 30
P
A
11 20
Flushing Nozzle Replacement :: ODP-II
P
A
12 25
Insp., thk.survey of WW & Replacement of tubes in first pass including DP, RH & PSH
:: BM-II PP
P
A
Checking/calibration of primary water, Lube oil, Cold gas and FRF Temp. control
valves. :: I&C-II
P/M & Capacity Test of +/- 24V G1/G2 Battery sets :: EM-II SECTION
P-Proposed, A-Actual
Prepared by
MPD
12 19 P
A
12 15 P
A
13 18 P
A
13 18 P
Page No. 16
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
P/M & Capacity Test of +/- 24V G1/G2 Battery sets :: EM-II SECTION
Calibration of
i) C/MS CAD/HAD 16nos.
ii) Burner tilt.
iii) PA Fan vane
:: I&C-II
Unit No. 5
A
13 28 P
A
13 22
P
A
13 19 P
A
14 18 P
A
14 26 P
A
14 20
CCW Pumps Thrust bearing oil & power pack oil replacement 5A,B,C,D :: ODP-II
P
A
14 20
CCW Pumps gland replacement 5A,B,C,D :: ODP-II
P
A
P-Proposed, A-Actual
Prepared by
MPD
14 18 P
Page No. 17
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Servicing of C/Ms HAG/ all corner solenoid, Limit Switches & air line, oil filter
cleaning and oil top up. :: I&C-II
Seal /leak off steam valve sump, Filter & Servo-unit Cleaning, Calibration, and
Normalisation. :: I&C-II
Replacement of Thermocouple, Thermowell & guide pipe provision for PAH & SAH
flue gas side & air side thermocouples. :: I&C-II
Removal, mounting, laying, dressing & checking of SH/RH metal temp thermocouples as per BM-II schedule. :: I&C-II
P-Proposed, A-Actual
Prepared by
MPD
Unit No. 5
14 24 P
A
14 19 P
A
15 19 P
A
15 19 P
A
15 19 P
A
16 19 P
A
16 28 P
A
17 24 P
A
17 29 P
A
17 24 P
A
17 22 P
A
18 26 P
Page No. 18
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
P
A
18 20 P
A
19 20 P
A
19 23 P
A
19 20 P
A
19 25 P
A
19 29 P
LPH -1/2/3 Level switches functional testing with Protocol with operation and TM-II :: 19 20 P
I&C-II
P-Proposed, A-Actual
Prepared by
MPD
A
19 20 P
A
19 22 P
Page No. 19
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
A
18 25
Unit No. 5
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Removal & Servicing of CRH NRVs Limit switches assemblies LHS & RHS :: I&C-II
Mill O/L Temp. T/Cs checking, Well checking , replacement if found faulty and both
point availability/checking. :: I&C-II
AHP A/B/C Series & HP Ash water tank Level controller testing after Sensor Cable &
bolt replacement :: I&C-II
CPU bypass valve & DP transmitter calibration & interlock checking . :: I&C-II
P-Proposed, A-Actual
Prepared by
MPD
Unit No. 5
19 24 P
A
20 27 P
A
20 23 P
A
20 23 P
A
20 23 P
A
20 24 P
A
20 25 P
A
20 25 P
A
20 23 P
A
20 21 P
A
20 21 P
A
20 23 P
Page No. 20
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Internal Inspection of O2 Probe & Replacement of guide pipes & V guards. :: I&C-II
TDBFP A/B, MDBFP C/D , CEP A/B/C instruments checking, calibration and
protection trials :: I&C-II
Normalisation of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches and
Ignitor Transformer :: I&C-II
P-Proposed, A-Actual
Prepared by
MPD
Unit No. 5
A
21 23 P
A
21 24 P
A
21 23 P
A
21 26 P
A
21 22 P
A
21 28 P
A
21 24 P
A
22 26 P
A
22 25 P
A
23 24 P
A
24 27 P
Page No. 21
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TESTII
Motorised valves limit switch setting after clearance from T/M , B/M :: TEST-II
A
24 26 P
A
24 35 P
A
24 35 P
A
25 31 P
A
25 27 P
A
P
A
Restoration of all corner solenoid/C/M HAG & reject gate solenoid. :: I&C-II
Provision of PVC tubes for condenser hydraulic test & Hot-well level switches
functional checking. :: I&C-II
P-Proposed, A-Actual
Prepared by
MPD
26 33 P
A
26 27 P
A
26 27 P
A
26 26 P
Page No. 22
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
24 35 P
26 26
Dept. Hydrulic Test :: BM-II PP
Unit No. 5
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Provision of PVC tubes for condenser hydraulic test & Hot-well level switches
functional checking. :: I&C-II
Unit No. 5
A
27 27
P
A
LP bypass stop & CVs with water injection valves remote trials. :: I&C-II
27 31 P
A
27 30 P
A
27 31 P
A
27 28 P
A
27 28 P
A
27 28 P
A
28 28
P
A
P/M of Generator PT cubical & NGR Shaft Grounding brushes checking :: EM-II
SECTION
P-Proposed, A-Actual
Prepared by
MPD
28 30 P
Page No. 23
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
A
P
A
Main turbine & LP Bypass Governing characteristics through EHC & Hydraulic with
TM-II & operation :: I&C-II
P-Proposed, A-Actual
Prepared by
MPD
29 31 P
A
29 30 P
A
29 29 P
A
29 29 P
A
29 30 P
A
29 30 P
Page No. 24
29/Jan
28/Jan
27/Jan
26/Jan
25/Jan
24/Jan
23/Jan
22/Jan
21/Jan
20/Jan
19/Jan
18/Jan
17/Jan
16/Jan
15/Jan
14/Jan
13/Jan
11/Jan
12/Jan
10/Jan
09/Jan
08/Jan
07/Jan
06/Jan
05/Jan
04/Jan
03/Jan
02/Jan
01/Jan
31/Dec
30/Dec
29/Dec
28/Dec
28 28 P
29 31
Removal of scaffolding. :: BM-II PP
Unit No. 5
Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
27/Dec
Activity Description
End Day
Section: DyCE-II
Start Day
Activity Description
1
Maintenance of ESP
3
4
5
6
7
8
A pass--ESP/AHP--EM-II
11
12
9
10
13
14
19
CT Fan O/H--ODP-II
Electrical supply to various Agencies woking for
capital O/H of the unit --LIGHTING / WELDING
SUPPLY--EM-II
CCW switchgear relay,X"er testing, control panel
connection tightening, Reguler ODP works--TEST-II
GTR 6R, 6Y & 6B P/M of transformer with attendence
of minor leakages,Oil level top ups--HT
TRANSFORMERS--EM-II
Pre Furnace pressurisation test & CAVT--BM-II PP
20
21
22
23
15
16
17
18
P-Proposed, A-Actual
Prepared by
MPD
Page No. 25
Unit No. 6
End
Day
SN
Start
Day
Section: DyCE-II
14
15
15
20
25
26
27
30
30
30
34
35
35
28
34
SN
Activity Description
23
24
25
26
27
28
29
30
31
32
33
34
35
Servicing of Fans--BM-II PP
36
37
38
39
40
41
42
43
44
45
46
P-Proposed, A-Actual
Prepared by
MPD
Page No. 26
Unit No. 6
End
Day
Section: DyCE-II
Start
Day
23
28
28
28
28
28
28
13
15
25
25
25
28
30
33
10
11
12
14
24
24
25
Activity Description
Unit No. 6
End
Day
SN
Start
Day
Section: DyCE-II
31
10
10
15
19
16
21
21
54
25
55
PM of all CT Fans--ODP-II
25
56
25
57
25
58
27
59
28
60
28
61
Valve Replacement/Servicing--ODP-II
28
62
30
63
30
64
30
30
30
31
12
15
47
Prev.Maint.of 5APPA/5APPA--ESP/AHP--EM-II
48
49
50
51
52
53
65
66
67
68
69
P-Proposed, A-Actual
Prepared by
MPD
Page No. 27
Activity Description
69
70
71
72
73
74
75
76
77
78
79
81
82
83
85
86
87
11
15
24
25
27
27
15
16
26
28
10
13
10
33
11
16
11
16
11
25
11
25
11
25
12
16
12
17
12
25
12
25
13
19
13
22
HT MOTORS--EM-II
80
84
Unit No. 6
End
Day
SN
Start
Day
Section: DyCE-II
88
89
90
91
92
P-Proposed, A-Actual
Prepared by
MPD
Page No. 28
Activity Description
92
93
94
95
96
97
98
99
102
103
IP Turbine Boxup-TM-II
104
105
106
107
108
109
Gravity Test-TM-II
110
111
112
100
101
113
114
115
P-Proposed, A-Actual
Prepared by
MPD
Page No. 29
Unit No. 6
End
Day
SN
Start
Day
Section: DyCE-II
14
19
14
24
15
22
16
19
16
20
16
24
16
30
17
34
17
34
18
24
19
24
20
35
20
23
21
25
22
27
22
27
23
24
23
27
24
30
26
26
26
28
26
35
26
35
Activity Description
115
116
117
118
119
120
Removal of scaffolding.--BM-II PP
121
122
124
125
126
127
123
P-Proposed, A-Actual
Prepared by
MPD
Page No. 30
Unit No. 6
End
Day
SN
Start
Day
Section: DyCE-II
27
27
28
28
29
29
29
29
29
31
30
30
30
31
30
34
31
35
32
32
33
35
34
37
HELP
Program is basically designed for designed bar chart based on different activity. Each activity first plan called schedule activity and
then based on user work a actual days required for activity is different so each activity is divided into two category on program first
is defined by "S-Schedule Activities-Start Day and End Day" and "A-Actual Activities-Start Day and End Day". Please follow the
following steps to designed a bar chart
STEPs
1. Enter Organisation Name
2. Enter Total activities user want to scheduled.
3. Enter Starting Date of BarChart
Activity Description
Generator relay testing by secondary injection & CT/PT resistance checking. :: TEST-II
Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TEST-II
IAC / SAC and Bottom ash panels cleaning, connection tightening & checking :: TEST-II
10
11
12
P/M & Capacity Test of Station Battery set for battery set 1 and 2 & UPS :: EM-II
SECTION
13
14
Electrical supply to various Agencies woking for capital O/H of the unit :: EM-II
SECTION
15
16
Removal of all corner solenoid/C/M HAG & reject gate solenoid along with tubing & leak
isolating valve checking/ replacement. :: I&C-II
17
Removal & Servicing of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches and
Ignitor Transformer :: I&C-II
18
19
20
21
22
End
Day
SN
Start
Day
30
13
35
30
15
30
20
14
35
16
18
15
15
20
19
14
22
23
PM, blow down v/v servicing & oil repl. of all CT fans gear box (Total 11 CT Fans) ::
ODP-II
24
Work of both side nozzle replacement which are missing & nozzle cleaning of tower 5A
& 5B :: ODP-II
25
26
Work of CT fan cells approach way railing & gear box protection cage railing repairing
work :: ODP-II
27
28
29
30
Work of separation of ACW return line from CCW hot water outlet line (4nos.) :: ODP-II
31
32
34
35
36
37
38
39
40
41
Servicing of APH including basket replacement (HE, HIE, CE of pri. & sec.) :: BM-II PP
42
43
44
P/M of Gen & UAT bus duct and painting of duct :: EM-II AGENCY
45
End
Day
Activity Description
Start
Day
SN
20
25
25
25
30
20
30
30
25
25
30
32
11
11
23
28
28
30
30
47
48
Servicing of Bottom Ash / Burner Tilt / PA Fan guide vane power cylinder
:: I&C-II
49
Disconnection, removal, servicing & normalisation of HPBP1, HPBP2, FOD-1 & 2, BPE1,
BPE2, BD valve servo & Blocking element, both tank & suction filter cleaning. :: I&C-II
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
End
Day
46
Activity Description
Start
Day
SN
24
24
23
18
31
31
31
30
25
23
11
25
29
28
10
16
66
67
i) Removal & normalisation of ESP / Coarse Ash / FGDH / Economiser A/V & W/V
Solenoid after B/M II clearence
ii). Removal & Servicing of ESP/Coarsh ash power cylinder.
:: I&C-II
68
69
Work of cleaning of CT pond area & outlet strainer of CT Pond cleaning & Repairing (5A
& 5B)
:: ODP-II
70
71
Work of ACW recirculation / outlet line's valves, discharge line valves, vent valve
checking ,repairing/replacement, sum make up valve :: ODP-II
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
P/M of Dry Type 5XA, OXA1, LXA1, 5XB , OXA2, LXA2, including NGRs :: EM-II SECTION
87
88
End
Day
Activity Description
Start
Day
SN
22
33
20
25
25
30
23
13
20
25
23
20
31
31
21
25
32
28
18
28
88
89
90
91
Servicing/ Calibration of Boiler and Turbine side control valves- 75 nos :: I&C-II
92
Calibration of critical and Non-critical Instruments as per List / Schedules 200 nos. ::
I&C-II
93
94
95
Cleaning of Pent house, Repair of pent house, dog house & cat house :: BM-II PP
96
97
98
P/M of 5C, 5PA Sec-1 , 5MA Sec-1, 5MB, 5MC, 5EMPA Sec-1, 5ME Sec-1, 5MG, Soot
blower Boards,5E Sec-I :: EM-II SECTION
99
P/M of 5D, SE-12/2, 5PA Sec-2, 5MA Sec-2, 5MD, 5ME Sec-2, 5EMPA sec-2, 5MF, 5MG
Board,5E Sec-II :: EM-II SECTION
100
GTR / UAT Transf testing, OTI/WTI calibration,and . Protection trials,cw flow switch
servising,GTR Bushing Tan Delta measurement,Oil pump trial :: TEST-II
101
102
Removal and Normalisation of Turbine side instru-ments as per :: TM-II & EMII
requirement :: I&C-II
103
Disconnection / Checking of HP/IP stop & Control valves Limit switches , PFTS &
Thermocouples. :: I&C-II
104
105
Removal, Cleaning, testing & restoration of LPT exhaust Hood T/CS & RTD. :: I&C-II
106
107
108
109
110
End
Day
Activity Description
Start
Day
SN
15
21
24
33
14
21
25
21
28
28
23
30
20
11
10
10
12
20
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
End
Day
Activity Description
Start
Day
SN
13
18
24
16
11
25
14
13
17
17
19
16
10
13
20
10
12
10
14
10
14
10
19
10
16
:: I&C-II
125
Disconnection & removal of LPBP 1 & 2 stop control & water Injection Limit switches &
PFTS :: I&C-II
126
127
128
129
130
131
132
133
134
135
Removal, Cleaning, Calibration & normalisation as per :: TM-II schedule of i) HOT &
Cold gas, Primary water RTDS /Temp. Switches & ACW I/L,O/L RTDS
ii) Generator seal oil TE & EE RTDS, Pre-chamber Level Probe Gas Cooler I/L & O/L
RTDS
iii) Main Exciter Hot/Cold air instruments
:: I&C-II
136
137
138
139
Removal / Servicing & Remounting of AHP Ash water make up valves, series sump
make valves, ETP valves, RC valves, suction valves solenoids as per ODP II
schedules. :: I&C-II
140
141
142
143
Insp., thk.survey of WW & Replacement of tubes in first pass including DP, RH & PSH ::
BM-II PP
144
145
Checking/calibration of primary water, Lube oil, Cold gas and FRF Temp. control valves.
:: I&C-II
146
147
P/M & Capacity Test of +/- 24V G1/G2 Battery sets :: EM-II SECTION
148
Calibration of
i) C/MS CAD/HAD 16nos.
ii) Burner tilt.
iii) PA Fan vane
:: I&C-II
149
150
151
152
Sample isolating valves & blowdown needle valves(Whitey make) replacement :: I&C-II
153
CCW Pumps Thrust bearing oil & power pack oil replacement 5A,B,C,D :: ODP-II
End
Day
Activity Description
Start
Day
SN
10
19
10
19
10
27
10
19
11
18
11
18
11
17
11
13
11
30
11
20
12
25
12
19
12
15
13
18
13
18
13
28
13
22
13
19
14
18
14
26
14
20
153
CCW Pumps Thrust bearing oil & power pack oil replacement 5A,B,C,D :: ODP-II
154
155
156
157
HT Circuit Breaker operation time & contact resistance measurement and Connection
tightening of all HT breakers (All Unit Board breakers) :: TEST-II
158
159
160
Servicing of C/Ms HAG/ all corner solenoid, Limit Switches & air line, oil filter cleaning
and oil top up. :: I&C-II
161
Seal /leak off steam valve sump, Filter & Servo-unit Cleaning, Calibration, and
Normalisation. :: I&C-II
162
Replacement of Thermocouple, Thermowell & guide pipe provision for PAH & SAH flue
gas side & air side thermocouples. :: I&C-II
163
164
165
Removal, mounting, laying, dressing & checking of SH/RH metal temp thermo-couples
as per BM-II schedule. :: I&C-II
166
167
168
169
170
171
172
173
174
175
LPH -1/2/3 Level switches functional testing with Protocol with operation and TM-II ::
I&C-II
176
End
Day
Activity Description
Start
Day
SN
14
20
14
18
14
24
14
19
15
19
15
19
15
19
16
19
16
28
17
24
17
29
17
24
17
22
18
26
18
25
18
20
19
20
19
23
19
20
19
25
19
29
19
20
19
20
176
177
178
Removal & Servicing of CRH NRVs Limit switches assemblies LHS & RHS :: I&C-II
179
180
181
182
Mill O/L Temp. T/Cs checking, Well checking , replacement if found faulty and both
point availability/checking. :: I&C-II
183
AHP A/B/C Series & HP Ash water tank Level controller testing after Sensor Cable & bolt
replacement :: I&C-II
184
CPU bypass valve & DP transmitter calibration & interlock checking . :: I&C-II
185
186
187
188
189
190
191
192
193
194
Internal Inspection of O2 Probe & Replacement of guide pipes & V guards. :: I&C-II
195
TDBFP A/B, MDBFP C/D , CEP A/B/C instruments checking, calibration and protection
trials :: I&C-II
197
198
199
End
Day
Activity Description
Start
Day
SN
19
22
19
24
20
27
20
23
20
23
20
23
20
24
20
25
20
25
20
23
20
21
20
21
20
23
21
23
21
24
21
23
21
26
21
22
21
28
21
24
22
26
22
25
200
201
Normalisation of 16 Nos. of HEA Ignitors with Power Cylinder, Limit Switches and
Ignitor Transformer :: I&C-II
202
203
204
Checking of Battery Chargers,UPS filter cleaning and UPS change over trial :: TEST-II
205
Motorised valves limit switch setting after clearance from T/M , B/M :: TEST-II
206
207
208
209
210
Restoration of all corner solenoid/C/M HAG & reject gate solenoid. :: I&C-II
211
212
Provision of PVC tubes for condenser hydraulic test & Hot-well level switches
functional checking. :: I&C-II
213
214
215
216
217
LP bypass stop & CVs with water injection valves remote trials. :: I&C-II
218
219
220
221
P/M of Generator PT cubical & NGR Shaft Grounding brushes checking :: EM-II
SECTION
222
End
Day
Activity Description
Start
Day
SN
23
24
24
27
24
35
24
26
24
35
24
35
25
31
25
27
26
26
26
33
26
27
26
27
26
26
27
27
27
31
27
30
27
31
27
28
27
28
27
28
28
28
28
30
28
28
222
223
224
225
226
Main turbine & LP Bypass Governing characteristics through EHC & Hydraulic with TMII & operation :: I&C-II
227
228
229
230
231
232
233
234
235
236
237
238
End
Day
Activity Description
Start
Day
SN
29
31
29
31
29
30
29
29
29
29
29
30
29
30
29
33
30
31
31
33
31
35
32
32
32
33
32
34
32
33
33
33
Activity Description
Star
t
Day
End
Day
S.
N.
30
13
35
30
15
30
10
20
11
12
P/M & Capacity Test of Station Battery set for battery set 1
and 2 & UPS :: EM-II SECTION
14
13
14
35
16
18
15
15
20
15
16
17
18
19
20
20
21
19
22
14
23
PM, blow down v/v servicing & oil repl. of all CT fans gear box
(Total 11 CT Fans) :: ODP-II
20
24
25
25
25
26
25
27
30
28
20
29
30
30
30
31
25
32
25
34
30
35
36
32
37
11
38
11
39
40
23
41
28
42
28
43
44
P/M of Gen & UAT bus duct and painting of duct :: EM-II
AGENCY
45
46
47
48
49
50
Disconnection,
removal, servicing & normalisation of HPBP1,
:: I&C-II
HPBP2, FOD-1 & 2, BPE1, BPE2, BD valve servo & Blocking
element, both tank & suction filter cleaning. :: I&C-II
i) Lub. Oil & Turbine drain oil system.
ii) Control Fluid system iii) Governing racks
iv) LP bypass system v) HP bypass system
30
30
24
24
23
18
31
31
31
30
25
51
52
53
54
55
56
57
58
59
23
60
11
61
25
62
29
63
28
64
10
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
16
22
33
20
25
25
30
23
13
20
25
23
20
31
31
21
25
32
28
18
86
87
88
89
90
91
92
93
94
95
96
97
P/M of 5C, 5PA Sec-1 , 5MA Sec-1, 5MB, 5MC, 5EMPA Sec-1,
5ME Sec-1, 5MG, Soot blower Boards,5E Sec-I :: EM-II
SECTION
P/M of 5D, SE-12/2, 5PA Sec-2, 5MA Sec-2, 5MD, 5ME Sec-2,
99
5EMPA sec-2, 5MF, 5MG Board,5E Sec-II :: EM-II SECTION
GTR / UAT Transf testing, OTI/WTI calibration,and . Protection
100 trials,cw flow switch servising,GTR Bushing Tan Delta
measurement,Oil pump trial :: TEST-II
Replacement of pipeline of size 150/200/250/300 NB:: BM-II
101
BA
98
28
15
21
24
33
14
21
25
21
28
28
23
30
102
20
103
11
10
10
111
112
113
114
Calibration of Bottom
ash/PAHH/SAHH/FGDH/Economiser/ESP/AHP all instrument ::
I&C-II
115
116
117
118
119
120
12
20
13
18
24
16
11
25
14
13
17
17
19
16
10
13
20
10
12
10
14
10
14
10
19
10
16
10
19
10
19
10
27
10
19
Delay if any
As per schedule
As per schedule. 34
leakages pointed out