Content:
Case Study
Conclusion
t= ?
t= ?
Gd t b G , Stb
Ad w hw t G ,W
Ad Gd
hw
G
t= ?
A
t w G ,W hw / b b w G ,W
w 10kN / m
G ,W 1.0
b 24kN / m
b 0.9
hw
G
A
t= ?
t= 0.86 * hw
Ad Gd
t 10 / 11.6 h w
t 0.86 h w
6
w 10kN / m
G ,W 1.0
hw
b 24kN / m
b 0.9
G
1
A
G
t= 0.86
hw
Ad Gd
t 10 / 11.6 h w
t 0.86 h w
A
7
w 10kN / m
G ,W 1.0
hw
b 24kN / m
b 0.9
G
1
t= 1.00 m
A
G
2
Ad Gd
Content:
Case study
Conclusion
10
11
GEWI-Piles
Robust thread
13
GEWI-Piles
14
Available types
BSt500S, GEWI, 20 50 mm
S670/800, GEWI-Plus, 18 75 mm
15
Available types
Ultimate Load [kN]
4000
3,535
GEWI
3500
GEWI Plus
3000
2,540
2500
2,080
2,217
2000
1500
1,170
1,080
770
1000
628
500
0
18
22 25 28
32 35
40 43
50
57.5
63.5
75
Installation of GEWI-Piles
17
Installation of GEWI-Piles
1)
2)
3)
4)
1) Drilling
2) Installation
3) Pulling of casing
& Grouting
4) Post-grouting
(if required)
18
Content:
Case Study
Conclusion
19
20
Case Study
City Tunnel Leipzig - Station Bayerischer Bahnhof
General:
21
Case Study
Stage 1: Construction of Diaphragm Wall (North)
22
Case Study
Stage 2: Sliding of Portico, Excavation, Anchors + Piles
23
Case Study
Stage 3: 2nd Stage of Excavation and Anchors
24
Case Study
Stage 4: Final Excavation and piles (under water)
25
26
27
Case Study
Arge Citytunnel Leipzig
28
Case Study
Stage 5: Underwater concreting of bottom slab
29
Case Study
Stage 6: Dewatering of excavation pit, levelling concrete
30
31
32
Content:
Case Study
Conclusion
33
34
corrugated sheathing
cement grout
spacer
coupler
GEWI bar
35
Protection layer I:
36
plastic cord,
guarantees grout cover
37
38
39
Content:
Case Study
Conclusion
40
Conclusion:
41
Conclusion:
Conclusion:
Various:
No prestressing required
43
DYWIDAG-SYSTEMS INTERNATIONAL
GEWI-Piles
The sustainable solution for uplift problem!