TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................................... 2
2.0 COMPANY BACKGROUND ................................................................................................. 2
3.0 CURRENT STATE ................................................................................................................ 3
4.0 FUTURE VISION AND SCOPE ............................................................................................ 5
5.0 PROJECT SCHEDULE ......................................................................................................... 7
6.0 PROJECT METHODOLOGY ................................................................................................ 7
7.0 CLIENT X PROJECT TEAM ............................................................................................. 7
8.0 WORK SITE(S) ..................................................................................................................... 7
9.0 BIDDER'S EMPLOYEE REQUIREMENTS .......................................................................... 8
10.0 IMPLEMENTATION STANDARDS ....................................................................................... 8
11.0 PROPOSAL CONTENT ........................................................................................................ 8
12.0 CONSULTING PARTNER SELECTION PROCESS ..........................................................10
13.0 CRITERIA FOR EVALUATION ...........................................................................................10
14.0 LEGAL CONSIDERATIONS ...............................................................................................11
15.0 PROPOSAL SCHEDULE ....................................................................................................12
16.0 PROPOSAL SUBMISSION .................................................................................................12
1.0 INTRODUCTION
This document is a Request for Proposal (RFP) issued to vendors who may be able to assist CLIENT X
Incorporated (CLIENT X) with a strategic assessment as preparation for the possible implementation of the
JDA Supply Chain planning solution(s). CLIENT X requires written responses to this RFP to be received by
5pm Central October 14th, 2015.
CLIENT X is seeking a vendor to lead a global planning phase of current state supply chain processes with
an emphasis on future state process improvements and specific software recommendations in the areas of
Sales and Operations Planning (S&OP), Demand planning, Supply Planning, Inventory
Optimization.
CLIENT X is seeking a vendor with specialized expertise in supply chain process improvements and supply
chain software implementations. The vendor shall have deep experience in implementing supply chain tools
in the area of S&OP, demand planning, supply planning, inventory optimization and detailed scheduling.
The vendor should also have expertise in manufacturing processes and related integration points with
supply chain processes, including transportation planning and optimization.
The vendor shall have global experience in leading a global supply chain project preparation planning phase
and strategic assessments resulting in a set of recommendations in the area of software tool selection
which will include hardware costs, software costs, resource needs. The vendor should advise and
recommend on process alignment improvements, project plan / road map vision, system architecture
design, data alignment recommendation and interface assessment requirements related to implementing
advanced supply chain software. The planning phase should follow a structured approach and a proven
methodology. Leadership capability is crucial. Extensive supply chain process knowledge is also required.
Expert knowledge in the area of process manufacturing and package industry are required.
CLIENT X will review the responses to this RFP. Finalists will be selected to make a formal presentation at
CLIENT Xs CLIENT CITY, CLIENT STATE headquarters. The vendors core competencies, experience,
knowledge of supply chain, cultural fit with CLIENT X, and the ability to effectively manage costs and
schedules will be deciding factors in who CLIENT X will invite to present their proposals.
Supply chain processes are generally the same across regions however some regions have greater
complexity within the supply chain. The vendor needs to consider a roadmap that accommodates for
several options within preferably a limited set of software recommendations. The roadmap needs to be
executable and should not be overly complex.
SCOPE
Below are the high level business processes currently considered as part of the overall assessment, other
related processes may need to be incorporated and should be suggested by supplier:
Regional Demand Planning
Regional Supply Planning
Global Demand Planning
Global Supply Planning
Sales and Operations Planning
Inventory Optimization
Transportation optimization
Project Preparation Planning Phase Deliverables
At a minimum, deliverables must include the following:
Current state Global Supply Chain applications and capabilities (people, process and technology)
leveraging existing CLIENT X documentation
Supply Chain business needs evaluation future state business objectives/gap assessment
Recommendation of appropriate JDA modules and solutions with cost justifications, benefits and
high level business case
High Level Project Plan including timeline for implementing recommended modules and
functionality
Resource requirements required from Supply Chain business and IT to complete implementation
Cost estimate for the recommended Supply Chain solution including hardware, software,
interfaces to other systems (SAP), and services
Future state architecture recommendation including hardware needs with hosted and on premise
options
Stakeholder Interview questions & results summary
Issue logs, key risks, key success factors, key challenges, key findings, etc
Supply Chain vision, strategy, solution and implementation roadmap recommendations which
must include a functional / business process roadmap, technology roadmap, data assessment
roadmap all with clear timelines, costs, benefits.
Prioritized implementation matrix including quick hit recommendations
Supply Chain organizational change management recommendations
Detailed training approach and options
Cost/benefit analysis and justification for the proposed Supply Chain solution
Suggested approach with details of pros / cons / full cost models for global, regional, functional
rollouts
In summary CLIENT X expects to receive from the strategic supply chain assessment a full-scope
roadmap covering end state supply chain software functionality inclusive of all costs and benefits.
CLIENT X that the vendor is not only an expert in the JDA Plan to deliver solutions, but an expert in global
Supply Chain processes and change management of new process/technology implementations.
how bidder differentiates itself from its competitors; how bidder adds value to the services it
provides; and how bidder approaches client management.
List of bidders international offices and the number of full time Supply Chain implementation
resources per office.
List of third parties, partners or affiliates that the bidder proposes to include as part of its bid,
with description of use.
A description and analysis of bidder's Supply Chain client portfolio.
Customer list and references from bidder's Supply Chain implementations and project prep
efforts including references from recent engagements for each proposed consultant.
References shall include, but shall not be limited to: customer(s) name(s) and address(es);
customer(s) contact name(s) and telephone number(s); duration of services/contracts;
summary of services provided. At a minimum, also include the following information:
o The organization's industry and estimated size in terms of employees and 2012
revenues
o The duration of the services provided as compared to target dates
o The final cost of the project as a percentage of the original project budget
2. Proposed project management approach and methodology for conducting a global Supply Chain
Project Preparation Planning Phase effort
3. Proposed project organization structure for the project including internal staffing (business and
IT), external staffing, governance, roles & responsibilities and rate structures. Also include bidders rate
structures for other possible roles that may need to be added after the project begins. Rate structure
should clearly define all possible roles with role rates based on level of experience of the consultant.
4. Proposed testing approach and methodology.
5. Proposed data conversion approach, methodology and itemized costs.
6. Proposed quality assurance approach, methodology and itemized costs.
7. Proposed change management approach, methodology and itemized costs.
8. Proposed training approach, methodology and itemized costs.
9. Proposed transition approach as to how you would structure the go live plan(s) and post go live
support plan(s) per phase itemize internal/external resource requirements and costs.
10. Proposed scope change approach and methodology that clearly explains the definition of a scope
change, how any potential costs associated with a scope change would be estimated, the
process to confirm agreement between CLIENT X and partner, etc.
11. Proposed fees and expenses including all bidding assumptions. Provide a total price for the
proposal along with detailed cost breakdowns for training services, change management
services, quality assurance services, programming services, etc. Travel expenses and associated
assumptions and calculation methodology should be clearly defined.
12. Initial activity level project work plan that is resource loaded with CLIENT X business and IT
resources as well as bidders proposed resources.
13. Sample deliverable documents relevant to this RFP. There should be a brief description of each
sample document and its purpose included.
14. Client references and resumes for each proposed consultant.
15. A description of management qualifications and capability to staff and supervise an engagement
team.
16. Key performance indicators demonstrating performance during the past 12, 24 and 36 months
regarding timeliness, adherence to budget and customer satisfaction.
17. Bidder's previous/current relationship, if any, with CLIENT X or its affiliates.
18. Description of bidder's scope of service capabilities for a full life cycle JDA implementation.
19. Explanation as to why CLIENT X should select you as its primary partner for this engagement.
20. Draft Statement of Work for the proposed project engagement.
21. List, if any, of prerequisites that must be completed prior to project start.
7. A change management program to include the bidder's ability to conduct a skills assessment
(including executive, project team and end user), develop a customized training program, and
perform the appropriate skills development and transfer in the most efficient manner.
8. Total project cost, including all bidding assumptions. The project cost structure must ensure an
implementation on schedule and within budget. Demonstration of a proven track record in
timeliness and performance within budget.
9. Ability to provide consistent, skilled business and technical resources throughout the duration of
the project.
10. Results of key business and customer references.
11. Input from software vendor.
12. Input from research organizations and industry publications.
13. Agreement on significant contract terms contained in the implementation agreement.
14. Track record of project timeliness and performance within established budget.