DAFTAR ANALISA DAN HARGA SATUAN

NO
I

URAIAN UPAH DAN BAHAN

SATUAN

HARGA
SATUAN
(Rp)

KUANTITAS

PEKERJAAN PERSIAPAN
1M1 Pas. Bowplank
Papan klas II jenis jambu air
Usuk klas II jenis jambu air
Paku > 5 Cm
Pekerja
Mandor

M3
M3
Kg
Org/Hari
Org/hari

###
###
8,500.00
18,000.00
25,000.00

0.005
0.004
0.010
0.056
0.003

5,828.00
6,262.40
85.00
1,008.00
70.00
13,253.40

0.750
0.025

13,500.00
625.00
14,125.00

0.600
0.060

10,800.00
1,500.00
12,300.00

1.200
0.300
0.015

107,760.00
5,400.00
375.00
113,535.00

1.000
0.330
0.010

25,000.00
5,940.00
250.00
31,190.00

1.200
2.100
0.210

80,160.00
37,800.00
5,250.00
123,210.00

1.200
3.580
0.710
1.200
0.120
3.600
0.360
Jumlah

80,160.00
82,340.00
75,473.00
24,000.00
3,600.00
64,800.00
9,000.00
339,373.00

125.000
2.980
0.510
1.200
0.120
3.600
0.180
Jumlah

225,000.00
68,540.00
54,213.00
24,000.00
3,600.00
64,800.00
4,500.00
444,653.00

Jumlah
II

PEKERJAAN GALIAN
1 M3 Galian Tanah
Pekerja
Mandor

Org / Hari
Org / Hari

18,000.00
25,000.00
Jumlah

III

PEKERJAAN URUGAN
1 1 M3 Urugan Tanah Kembali
Pekerja
Mandor

Org / Hari
Org / Hari

18,000.00
25,000.00
Jumlah

2 1 M3 Urugan Pasir
Pasir Urug
Pekerja
Mandor

M3
Org / Hari
Org / Hari

3 1 M3 Urg.Tanah Peninggian lantai


Tanah urug
Pekerja
Mandor

M
Org / Hari
Org / Hari

89,800.00
18,000.00
25,000.00
Jumlah

25,000.00
18,000.00
25,000.00
Jumlah

IV

BIAYA
SATUAN
(Rp)

PEKERJAAN PASANGAN
1 1 M3 Pasangan Aanstamping
Batu Karang
Pekerja
Mandor

M3
Org / Hari
Org / Hari

2 1 M3 Pas. Pondasi 1Pc : 5 Psr


Batu Karang
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

M
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

66,800.00
18,000.00
25,000.00
Jumlah

3 1 M3 Pas.Tbk. Biasa 1Pc : 5Psr


Batu Bataco
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Bh
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

66,800.00
23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00

1,800.00
23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00

V
A

4 1 M3 Pas.Tembok trasram 1Pc : 2Psr


Batu Batako
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Bh
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

1,800.00
23,000.00
65,000.00
20,000.00
30,000.00
18,000.00
25,000.00

125.000
4.280
0.220
1.500
0.150
4.400
0.220
Jumlah

225,000.00
98,440.00
14,300.00
30,000.00
4,500.00
79,200.00
5,500.00
456,940.00

PEKERJAAN BETON
1 M3 BETON BERTULANG
1 Beton K-175 (1Pc : 2Psr : 3Krl )
Semen
Pasir cor
Batu Pecah 1/2 Cm
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Zak
M3
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

23,000.00
106,300.00
160,000.00
20,000.00
30,000.00
18,000.00
25,000.00

8.750
0.680
1.000
0.700
0.070
0.400
0.020
Jumlah 1

201,250.00
72,284.00
160,000.00
14,000.00
2,100.00
7,200.00
500.00
457,334.00

110.000
2.000
0.675
0.068
6.750
0.338
Jumlah 2

715,000.00
22,000.00
13,500.00
2,025.00
121,500.00
8,437.50
882,462.50

0.400
2.000
4.000
0.400
2.000
0.100

466,240.00
17,000.00
80,000.00
12,000.00
36,000.00
2,500.00
613,740.00
1,953,536.50

2 Besi Tulangan
Besi Beton
Kawat Ikat (Bendrat)
Tukang Besi
Kepala Tukang Besi
Pekerja
Mandor

Kg
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

6,500.00
11,000.00
20,000.00
30,000.00
18,000.00
25,000.00

3 Begisting (Cetakan)
Papan Kayu Kls.II jenus jambu air
Paku > 5 Cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

M3
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

###
8,500.00
20,000.00
30,000.00
18,000.00
25,000.00

1 M3 Beton Bertulang K - 175


1 M3 Lantai Beton 1Pc : 3Psr : 5Krl
Semen
Pasir cor
Batu Pecah 2/3 Cm
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Jumlah 3
Total 1+2+3
Zak
M3
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

23,000.00
106,300.00
125,000.00
20,000.00
30,000.00
18,000.00
25,000.00

5.730
0.680
1.040
0.350
0.035
4.060
0.203

131,790.00
72,284.00
130,000.00
7,000.00
1,050.00
73,080.00
5,075.00
420,279.00

0.233
0.019
0.200
0.020
0.400
0.020

5,359.00
2,019.70
4,000.00
600.00
7,200.00
500.00
19,678.70

Jumlah
VI

PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1Pc : 2 Psr
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

2 1 M2 Plesteran 1Pc : 3Psr


Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00

0.136
0.016
0.200
0.020
0.400
0.020

3,128.00
1,700.80
4,000.00
600.00
7,200.00
500.00
17,128.80

0.119
0.014
0.200
0.020
0.400
0.020

2,737.00
1,488.20
4,000.00
600.00
7,200.00
500.00
16,525.20

0.140
0.120
0.012

3,220.00
2,400.00
360.00
5,980.00

Jumlah
3 1 M2 Plesteran 1Pc : 5Psr
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

4 1 M2 Acian semen
Semen
Tukang Batu
Kepala Tukang Batu

Zak
Org / Hari
Org / Hari

23,000.00
20,000.00
30,000.00
Jumlah

VII PEK. PINTU & JENDELA/UNIT


1 Pasangan P1
Kayu Klas I jenis jati
Papan klas I jenis Jati
Kunci tanam merk yalle warna kuning
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Kait angin magnet
Biaya fabrikasi (diluar finishing)

M3
M3
Bh
Bh
Bh
Bh
Ls

0.05
0.07
1.00
8.00
3.00
1.00
1.00

2,565,600.000
2,565,600.000
80,000.000
4,500.000
10,000.000
35,000.000
200,000.000
Jumlah

128,280.00
179,592.00
80,000.00
36,000.00
30,000.00
35,000.00
200,000.00
688,872.00

2 Pasangan P2
Kayu Klas I jenis jati
Papan klas I jenis Jati
Seng licin 0.20
Teacwood 2,8 mm
Kunci tanam merk yalle warna kuning
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Grendel
Kait angin magnet
Biaya fabrikasi (diluar finishing)

M3
M3
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Ls

0.05
0.03
1.52
3.04
1.00
8.00
3.00
1.00
1.00
1.00

2,565,600.000
2,565,600.000
13,000.000
75,000.000
80,000.000
4,500.000
10,000.000
10,000.000
35,000.000
200,000.000
Jumlah

128,280.00
76,968.00
19,760.00
228,000.00
80,000.00
36,000.00
30,000.00
10,000.00
35,000.00
200,000.00
844,008.00

3 Pasangan pintu garasi


Kayu Klas I jenis jati
Papan klas I jenis Jati
Kunci tanam merk yalle warna kuning
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Grendel
Kait angin biasa
Handle besar
Biaya fabrikasi (diluar finishing)

M3
M3
Bh
Bh
Bh
Bh
Bh
Bh
Ls

0.12
0.30
1.00
8.00
18.00
12.00
2.00
2.00
1.00

2,565,600.000
2,565,600.000
80,000.000
4,500.000
10,000.000
10,000.000
10,000.000
100,000.000
200,000.000
Jumlah

307,872.00
769,680.00
80,000.00
36,000.00
180,000.00
120,000.00
20,000.00
200,000.00
200,000.00
1,913,552.00

4 Pasangan PJ1
Kayu Klas I jenis jati
Papan klas I jenis Jati
Kaca 5 mm
Espagnolet
Kunci tanam merk yalle warna kuning
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Grendel
Kait angin biasa
Handle besar
Handle kecil
Biaya fabrikasi (diluar finishing)

M3
M3
M2
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ls

0.13
0.13
1.25
1.00
1.00
8.00
10.00
6.00
4.00
2.00
2.00
1.00

2,565,600.000
2,565,600.000
60,000.000
27,500.000
80,000.000
4,500.000
10,000.000
10,000.000
10,000.000
100,000.000
5,000.000
200,000.000
Jumlah

333,528.00
333,528.00
75,000.00
27,500.00
80,000.00
36,000.00
100,000.00
60,000.00
40,000.00
200,000.00
10,000.00
200,000.00
1,495,556.00

5 Pasangan PJ2
Kayu Klas I jenis jati
Papan klas I jenis Jati
Kaca 5 mm
Handle kecil
Kunci tanam merk yalle warna kuning
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Grendel
Kait angin biasa
Kait angin magnet
Biaya fabrikasi (diluar finishing)

M3
M3
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ls

0.14
0.15
1.47
3.00
1.00
8.00
9.00
3.00
6.00
1.00
1.00

2,565,600.000
2,565,600.000
60,000.000
5,000.000
80,000.000
4,500.000
10,000.000
10,000.000
10,000.000
35,000.000
200,000.000
Jumlah

359,184.00
384,840.00
88,200.00
15,000.00
80,000.00
36,000.00
90,000.00
30,000.00
60,000.00
35,000.00
200,000.00
1,378,224.00

6 Pasangan PJ3
Kayu Klas I jenis jati
Papan klas I jenis Jati
Kaca 5 mm
Handle kecil
Kunci tanam merk yalle warna kuning
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Grendel
Kait angin biasa
Kait angin magnet
Biaya fabrikasi (diluar finishing)

M3
M3
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ls

0.11
0.12
0.88
2.00
1.00
8.00
8.00
2.00
4.00
1.00
1.00

2,565,600.000
2,565,600.000
60,000.000
5,000.000
80,000.000
4,500.000
10,000.000
10,000.000
10,000.000
35,000.000
200,000.000
Jumlah

282,216.00
307,872.00
52,800.00
10,000.00
80,000.00
36,000.00
80,000.00
20,000.00
40,000.00
35,000.00
200,000.00
1,143,888.00

7 Pasangan J2
Kayu Klas I jenis jati
Papan klas I jenis Jati
Kaca 5 mm
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Grendel
Handle kecil
Kait angin biasa
Biaya fabrikasi (diluar finishing)

M3
M3
M2
Bh
Bh
Bh
Bh
Bh
Ls

0.08
0.05
0.88
4.00
4.00
2.00
2.00
4.00
1.00

2,565,600.000
2,565,600.000
60,000.000
4,500.000
10,000.000
10,000.000
5,000.000
10,000.000
200,000.000
Jumlah

205,248.00
128,280.00
52,800.00
18,000.00
40,000.00
20,000.00
10,000.00
40,000.00
200,000.00
714,328.00

8 Pasangan BV1
Kayu Klas I jenis jati
Papan klas I jenis Jati
Angker dia. 12 mm
Biaya fabrikasi (diluar finishing)

M3
M3
Bh
Ls

0.05
0.04
2.00
1.00

2,565,600.000
2,565,600.000
4,500.000
100,000.000
Jumlah

128,280.00
102,624.00
9,000.00
100,000.00
339,904.00

9 Pasangan BV2
Kayu Klas I jenis jati
Papan klas I jenis Jati
Angker dia. 12 mm
Biaya fabrikasi (diluar finishing)

M3
M3
Bh
Ls

0.04
0.02
2.00
1.00

2,565,600.000
2,565,600.000
4,500.000
100,000.000
Jumlah

102,624.00
51,312.00
9,000.00
100,000.00
262,936.00

10 Pas. Pintu lemari tanam u/ meja beton


Kayu Klas I jenis jati
Papan klas I jenis Jati
Angker dia. 12 mm
Engsel merk ARCH warna kuning
Handle kecil
Biaya fabrikasi (diluar finishing)

M3
M3
Bh
Bh
Bh
Ls

0.03
0.04
8.00
8.00
4.00
1.00

2,565,600.000
2,565,600.000
4,500.000
10,000.000
5,000.000
200,000.000
Jumlah

76,968.00
102,624.00
36,000.00
80,000.00
20,000.00
200,000.00
515,592.00

11 Pas. ventilasi gewel


Kayu Klas I jenis jati
Kaca 5 mm
Angker dia. 12 mm
Biaya fabrikasi (diluar finishing)

M3
M2
Bh
Ls

0.02
0.35
2.00
1.00

2,565,600.000
60,000.000
4,500.000
100,000.000
Jumlah

51,312.00
21,000.00
9,000.00
100,000.00
181,312.00

1,500.00
23,000.00
65,000.00
20,000.00
30,000.00
18,000.00
25,000.00

3.300
0.015
0.012
0.250
0.050
0.250
0.050

4,950.00
345.00
780.00
5,000.00
1,500.00
4,500.00
1,250.00
18,325.00

11.110
0.223
0.018
0.276
0.028
0.274
0.014

49,995.00
5,129.00
1,913.40
5,520.00
840.00
4,932.00
350.00
68,679.40

25.000
0.225
0.030
0.250
0.025
0.500
0.025

45,000.00
5,175.00
3,189.00
5,000.00
750.00
9,000.00
625.00
68,739.00

83.000
0.225
0.030
0.250
0.025
0.500
0.025

103,750.00
5,175.00
3,189.00
5,000.00
750.00
9,000.00
625.00
127,489.00

VIII PEKERJAAN LANTAI


1 1 M1 Pasangan Plint Keramik uk.10/30
Ubin Keramik 10/30 Cm
bh.
Semen
Zak
Pasir Pasang
M3
Tukang Batu
Org / Hari
Kepala Tukang Batu
Org / Hari
Pekerja
Org / Hari
Mandor
Org / Hari

Jumlah
2 1 M2 Pasangan Keramik Uk.30/30
Keramik 30/30 warna putih
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

bh.
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

4,500.00
23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

3 1 M2 Pasangan Tegel Wafel 20/20


Tegel wafel warna abu-abu 20/20 Cm
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Bh
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

1,800.00
23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

4 1 M2 Pasangan Tegel keramik 11/11


Tegel keramik 11/11 Cm
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Bh
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

1,250.00
23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

5 1 M2 Pasangan keramik 20/20


Keramik 20/20 Cm warna putih
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

Bh
Zak
M3
Org / Hari
Org / Hari
Org / Hari
Org / Hari

1,800.00
23,000.00
106,300.00
20,000.00
30,000.00
18,000.00
25,000.00

25.000
0.225
0.030
0.250
0.025
0.500
0.025

45,000.00
5,175.00
3,189.00
5,000.00
750.00
9,000.00
625.00
68,739.00

0.300
0.110
0.050
0.050
0.200
0.020
0.120
0.012

6,750.00
660.00
150.00
750.00
3,600.00
500.00
2,400.00
360.00
15,170.00

0.350
0.080
0.100
0.110
0.075
0.100
0.120
0.012
0.200
0.020

13,125.00
1,200.00
300.00
660.00
1,312.50
500.00
2,400.00
360.00
3,600.00
500.00
23,957.50

0.098
0.050
0.500
0.140
0.014
0.168
0.017

1,960.00
750.00
2,500.00
2,800.00
420.00
3,024.00
420.00
11,874.00

0.305
0.057
0.120
0.012
0.200
0.020

6,100.00
855.00
2,400.00
360.00
3,600.00
500.00
13,815.00

0.250
0.010
0.100
0.010
0.050
0.003

6,250.00
50.00
2,000.00
300.00
900.00
62.50
9,562.50

Jumlah
IX PEKERJAAN FINISHING
1 1 M2 Cat Tembok + Plapond + Atap
Cat
Plamur
Amplas
Kwas roll
Pekerja
Mandor
Tukang cat
Kepala Tukang Cat

Kg
Kg
Lbr
Bh
Org / Hari
Org / Hari
Org / Hari
Org / Hari

22,500.00
6,000.00
3,000.00
15,000.00
18,000.00
25,000.00
20,000.00
30,000.00
Jumlah

2 1 M2 Cat Kayu
Cat Kilap
Minyak Cat
Kertas amplas
Plamur
Dempul
Kwas biasa
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

Kg
Ltr
Lbr
Kg
Kg
Bh
Org / Hari
Org / Hari
Org / Hari
Org / Hari

37,500.00
15,000.00
3,000.00
6,000.00
17,500.00
5,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

3 1 M2 Pek. Menie seng + kayu


Menie
Minyak Cat
Kwas Biasa
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

Kg
Ltr
Bh
Org / Hari
Org / Hari
Org / Hari
Org / Hari

20,000.00
15,000.00
5,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

4 1 M2 Cat besi
Cat besi
Minyak Cat
Tukang cat
Kepala tukang cat
Pekerja
Mandor

Kg
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

20,000.00
15,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

5 1 M2 Teac Oil
Teac Oil
Kwas Biasa
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor

Ltr
Bh
Org / Hari
Org / Hari
Org / Hari
Org / Hari

25,000.00
5,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

PEKERJAAN LISPLANK KAYU


1 M2 Lisplank 2 x 2,5/20
Papan Kayu Klas II jenis Jambu air
Paku < 5 Cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

M3
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

###
10,000.00
20,000.00
30,000.00
18,000.00
25,000.00

0.025
0.100
0.800
0.080
0.280
0.014

29,140.00
1,000.00
16,000.00
2,400.00
5,040.00
350.00
53,930.00

1.100
1.000
24.000
0.400
8.000
0.400

825,000.00
8,500.00
480,000.00
12,000.00
144,000.00
10,000.00
1,479,500.00

0.860
0.047
0.200
0.020
0.100
0.010

44,704.40
705.00
4,000.00
600.00
1,800.00
250.00
52,059.40

1.100
0.020
0.100
0.010
0.040
0.004

46,200.00
300.00
2,000.00
300.00
720.00
100.00
49,620.00

0.347
0.012
0.030
0.020
0.600
0.060
0.210
0.021

11,798.00
18,787.20
255.00
200.00
12,000.00
1,800.00
3,780.00
525.00
49,145.20

1.100
0.050
0.200
0.030

2,750.00
500.00
4,000.00
900.00
8,150.00
815.00

Jumlah
XI

PEKERJAAN ATAP
1 1 M3 Kuda-Kuda / Rangka Atap
Kayu Balok Kls. II jenis jambu air
Paku > 5 Cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

M3
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

750,000.00
8,500.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

2 1 M2 Penutup Atap BJLS 0.30


Seng Gelombang BJLS 0.30
Paku Seng
Tukang Atap
Kepala Tukang Atap
Pekerja
Mandor

Lbr.
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

52,000.00
15,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

3 1 M' Penutup Bubungan Atap BJLS 0.30


Seng licin BJLS 0.30
M1
Paku seng
Bh
Tukang Atap
Org / Hari
Kepala Tukang Atap
Org / Hari
Pekerja
Org / Hari
Mandor
Org / Hari

42,000.00
15,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

XII PEKERJAAN PLAPOND


1 1 M2 Plafon Triplex
Triplex 2,8 mm
Kayu Usuk Kls. II jenis jambu air
Paku > 5 Cm
Paku < 5 Cm
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor

Lbr.
M3
Kg
Kg
Org / Hari
Org / Hari
Org / Hari
Org / Hari

34,000.00
###
8,500.00
10,000.00
20,000.00
30,000.00
18,000.00
25,000.00
Jumlah

2 10 M' Pas. List Plafon dari tripleks


List Plafon dari tripleks
Paku < 5 Cm
Tukang Kayu
Kepala Tukang Kayu

M1
Kg
Org / Hari
Org / Hari

2,500.00
10,000.00
20,000.00
30,000.00
Jumlah
1M'

3 1M1 Pasangan Talang Kil (Jurai Dalam)


Papan Kayu klas II jenis jambu air
M3
Paku > 5 Cm
Kg
Paku < 5 Cm
Kg
Seng Licin BJLS 0.30
M1
Tukang Kayu
Org / Hari
Kepala Tukang Kayu
Org / Hari
Pekerja
Org / Hari
Mandor
Org / Hari

###
8,500.00
10,000.00
42,000.00
20,000.00
30,000.00
18,000.00
25,000.00

=
0.025
0.100
0.500
0.500
0.125
0.075
0.100
0.010

Jumlah

29,140.00
850.00
5,000.00
21,000.00
2,500.00
2,250.00
1,800.00
250.00
62,790.00

DAFTAR HARGA SATUAN MATERIAL, UPAH, DLL


NO.

URAIAN

I.
1
2
3
4
5

UPAH PEKERJA
Pekerja
Mandor
Tukang Batu, Besi, Cat, Atap
Tukang Kayu/Kaca
Kepala Tukang

II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

HARGA BAHAN
Aspal
Amplas
Alumunium
Angker
Angker dia.12 mm
Arde tanam
Bataco 10 . 20 . 40
Batu Karang gunung/gladag
Batu Kali
Batu Pecah 3/5 Cm
Batu Pecah 5/7 Cm
Batu Pecah 1/2 Cm (split)
Batu Pecah Kali 2/3 Cm
Bat tub fyber
Besi dia.19 mm
Besi dia.16 mm
Besi dia.12 mm
Besi dia.10 mm
Besi dia. 8 mm
Besi dia. 6 mm
Bak air type fiber
Baut mur dia. 12
Beugel U dia. 16 mm
Bak cuci dari stainlisteel
Besi siku 70 . 70 . 7
Besi man hall t=3mm
Besi Canal 125.50.1.2
Cat kayu/besi
Cat Kilap
Cat Tembok
Dempul kayu
Engsel Jendela ARCH
Engsel Pintu ARCH
Espagnolet
Floor Drain besi
Grendel tekan
Handle besar
Handle kecil
Kaca Bening 3 mm.
Kaca Bening 5 mm.
Kwas roll
Kwas biasa
Kursi sofa sudut + meja
Kapur
Kawat harmonika 3.3 Cm
Kawat duri
Kawat ikat
Kait Angin Pintu (Magnet)
Kait angin biasa
Kayu balok Klas I/bayam
Kayu klas II jenis jambu air
Kayu bulat u/ begesting
Kayu Jati/ Kls I
Kran air vernekel
Kunci gembok
Kunci tanam yalle warna kuning
Kloset jongkok merk INA
Kloset duduk merk INA

SATUAN

Org/Hr
Org/Hr
Org/Hr
Org/Hr
Org/Hr
Kg
Lbr
M2
Buah
Buah
Unit
Buah
M3
M3
M3
M3
M3
M3
Unit
Kg
Kg
Kg
Kg
Kg
Kg
Unit
Bh
Bh
Unit
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Psg
Psg
Buah
Buah
Buah
Buah
Buah
M2
M2
Bh
Bh
Unit
M3
M2
M1
Kg
Buah
Bh
M3
M3
Btg
M3
Buah
Bh
Bh
Bh
Unit

HARGA DASAR
(Rp)

HARGA SAT.
(Rp)

18,000.00
25,000.00
20,000.00
20,000.00
30,000.00

###
###
###
###
###

7,500.00
3,000.00
25,000.00
4,500.00
6,000.00
100,000.00
1,800.00
45,000.00
65,000.00
100,000.00
80,000.00
125,000.00
90,000.00
750,000.00
6,500.00
6,500.00
6,500.00
6,500.00
6,500.00
6,500.00
500,000.00
2,500.00
5,000.00
500,000.00
7,000.00
7,500.00
6,500.00
20,000.00
37,500.00
22,500.00
17,500.00
10,000.00
10,000.00
27,500.00
25,000.00
10,000.00
100,000.00
5,000.00
50,000.00
60,000.00
15,000.00
5,000.00
1,000,000.00
30,000.00
12,500.00
2,000.00
11,000.00
35,000.00
10,000.00
3,500,000.00
750,000.00
2,000.00
2,500,000.00
25,000.00
25,000.00
80,000.00
125,000.00
1,050,000.00

###
###
###
###
###
###
###
66,800.00
75,000.00
112,500.00
100,000.00
160,000.00
125,000.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
2,565,600.00
###
###
###
###
###

59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109

Lampu Pijar 25 Watt


Lampu TL type balk 20 watt
Lampu TL 40 Watt
List Plafon tripleks
List Plafon Profil
Les kaca
Lem aica aibon
Lem webber
Mur + baut dia. 12 mm
Gordin pintu + jendela
Minyak Cat
Paku < 5 Cm
Paku > 5 Cm
Paku Seng
Papan kayu bayam
Papan kayu meranti
Papan kayu jati
Papan Klas II (jambu air)
Pasir pasang/cor
Pasir urug
Pasir split
Plat srteep 4.40 mm
Pipa Galvanis dia 3/4 "
Pipa GIP dia 1 1/2 "
Pipa PVC dia 2"
Plamur Tembok
Panel kontrol
Residu
Reng kayu uk. 2/3 Cm
Saklar Ganda
Saklar Tunggal
Saklar Triple
Sekering Box 2 Group
Semen Portland (kupang)
Seng Bubungan BJLS 0.20
Seng Gelombang BJLS 0.20
Seng Bubungan BJLS 0.30
Seng Gelombang BJLS 0.30
Septik Tank & Peresapan
Shocket dia. 1/2"
Shower lengkap
Stop Kontak
Stop Kran
Tralis naco
Tanah Humus
Tanah Urug
Teac Oil
Tripleks 3,8 mm
Teacwood 2,8 mm
Tegel Abu-abu 20/20 Cm
Tegel Porselin 11/11 Cm

Buah
Buah
Buah
M'
M'
M'
Kg
Kg
Buah
Unit
Kg
Kg
Kg
Kg
M3
M3
M3
M3
M3
M3
M3
Buah
Staff
Staff
Staff
Kg
Unit
Liter
M3
Buah
Buah
Buah
Unit
Zak
M'
Lbr
Lbr
Lbr
Unit
Buah
Unit
Buah
Buah
Buah
M3
M3
Ltr
Lbr
Lbr
Buah
Buah

5,000.00
25,000.00
45,000.00
2,500.00
75,000.00
2,500.00
30,000.00
25,000.00
6,000.00
2,000,000.00
15,000.00
10,000.00
8,500.00
15,000.00
4,000,000.00
1,500,000.00
2,500,000.00
1,100,000.00
65,000.00
50,000.00
80,000.00
15,000.00
55,000.00
40,000.00
35,000.00
6,000.00
100,000.00
3,500.00
1,500,000.00
15,000.00
12,500.00
20,000.00
150,000.00
23,000.00
13,000.00
38,000.00
42,000.00
52,000.00
3,500,000.00
2,500.00
350,000.00
12,500.00
17,500.00
3,000.00
65,000.00
25,000.00
25,000.00
40,000.00
75,000.00
1,500.00
1,250.00

###
###
###
###
7,500.00
###
###
###
###
###
###
###
###
###
###
1,565,600.00
2,565,600.00
1,165,600.00
106,300.00
89,800.00
121,300.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149

Tegel Wafel 20/20 Cm


Tripleks 2,8 mm
Ubin Keramik 10/30 Cm
Ubin keramik 20/20 Cm
Ubin Keramik putih 30/30 Cm
Urugan Pilihan/sirtu
Urinoir
Usuk klas II jenis Jambu air
Vernis
Wastafel Komplit
Tempat sabun
Pipa galvanis dia. 1/2"
Tee stock dia. 1/2"
Cnie dia. 1/2"
Pipa galvanis dia. 1,5"
Pipa galvanis dia. 2"
Shocket turunan dia. 2" ke 1,5"
Pipa PVC dia 4"
Cnie turunan dia. 1,5" ke 1/2"
Shocket dia. 1,5"
Shocket dia. 2"
Cnie dia. 1,5"
Tee stock turunan dia. 6" ke 2"
Water mur dia. 2"
Water mur dia. 1,5"
Cnie PVC dia. 4"
Cnie PVC dia. 2"
Tee stock PVC dia. 2"
Pesawat tlp.merk panasonic
T.tdr.no.2 olympic+kasur&bantal
T.tdr.no.3 olympic+kasur&bantal
Lemari 2 pintu dari kayu jati
Meja makan kaca merk olympic
TV 21" merk polytron + rak
Dispencer aqua fresh + meja
Rice cocker merk yongma
Teflon
Kompor hock 22 sumbu
Parabol + reciever (venus)
Dandang kukus hock

Buah
Lbr
Buah
Buah
Buah
M3
Unit
M3
Kg
Buah
Unit
Staff
Bh
Bh
Staff
Staff
Bh
Staff
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

1,800.00
34,000.00
1,500.00
1,800.00
4,500.00
30,000.00
1,500,000.00
1,500,000.00
27,000.00
1,000,000.00
400,000.00
50,000.00
3,000.00
2,500.00
115,000.00
135,000.00
5,000.00
85,000.00
3,500.00
6,500.00
10,000.00
8,500.00
12,500.00
30,000.00
20,000.00
10,000.00
5,000.00
3,500.00
350,000.00
1,750,000.00
1,500,000.00
1,200,000.00
1,500,000.00
3,000,000.00
500,000.00
400,000.00
350,000.00
150,000.00
1,350,000.00
250,000.00

###
###
###
###
###
###
###
1,565,600.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

RENCANA ANGGARAN BIAYA


(EE)
KEGIATAN
PEKERJAAN

: PENGADAAN BARANG DAN JASA RSUD SoE


: A. PEMBANGUNAN RUMAH DOKTER AHLI SELUAS 137 M 2
B. PEMBUATAN JALAN DALAM KOMPLEKS & TAMAN
C. PEMBUATAN MENARA AIR SEBANYAK 1 (satu) UNIT
: KOMPLEKS RSUD SoE KABUPATEN TIMOR TENGAH SELATAN
: 2005

LOKASI
TAHUN ANGGARAN

A.
NO

URAIAN PEKERJAAN

SAT.

VOL.

Ls
M1
Ls

1.00
63.00
1.00

1
I.
1
2
3

PEKERJAAN PERSIAPAN
Pembersihan lokasi
Uitzet/pas.bowplank
Penyediaan air kerja

II.
1
2
3
4
5

PEKERJAAN TANAH & URUGAN


Galian tanah untuk pondasi
Urugan tanah kembali
Urugan pasir bawah pondasi
Urugan tanah peninggian lantai
Urugan pasir bawah lantai

III.
1
2
3
4
5
6
7
8

PEKERJAAN PASANGAN & PLESTERAN


Pas. aanstamping batu karang
Pas. pondasi batu karang
1 pc : 5 psr
Pas. tembok trasram
1 pc : 2 psr
Pas. tembok biasa
1 pc : 5 psr
Plesteran tembok trasram
1 pc : 2 psr
Plesteran tembok biasa
1 pc : 5 psr
Plesteran pondasi + beton
1 pc : 3 psr
Acian tembok seluruh

IV
1
2
3
4
5
6
7
8

PEKERJAAN BETON
Cor beton sloof 15/20
Cor beton kolom srtuktur 25/25
Cor beton kolom praktis 15/15
Cor beton ringbalk 15/20
Cor meja beton
Cor beton rabat (t=10cm)
Cor beton balok latei 15/15
Cor beton ne`ut

V
1
2
3
4
5
6
7
8
9
10
11
VI
1
2
3
4

HARGA
SATUAN
Rp.
5
250,000.00
13,253.40
500,000.00

250,000.00
834,964.20
500,000.00
1,584,964.20

14,125.00
12,300.00
113,535.00
31,190.00
113,535.00

1,043,978.75
227,304.00
604,006.20
1,012,739.30
3,368,583.45
6,256,611.70

123,210.00
339,373.00
456,940.00
444,653.00
19,678.70
16,525.20
17,128.80
5,980.00
Jumlah

1,967,663.70
17,043,312.06
2,718,793.00
10,902,891.56
1,871,247.58
8,136,347.47
330,928.42
3,463,735.60
46,434,919.39

Jumlah
M3
M3
M3
M3
M3

73.91
18.48
5.32
32.47
29.67
Jumlah

1 pc : 2 psr : 3 krl
1 pc : 2 psr : 3 krl
1 pc : 2 psr : 3 krl
1 pc : 2 psr : 3 krl
1 pc : 2 psr : 3 krl
1 pc : 3 psr : 5 krl
1 pc : 2 psr : 3 krl
1 pc : 2 psr : 3 krl

M3
M3
M3
M3
M2
M2
M2
M2

JUMLAH HARGA
HARGA
Rp.
6

15.97
50.22
5.95
24.52
95.09
492.36
19.32
579.22

M3
M3
M3
M3
M3
M3
M3
M3

3.52
0.25
2.14
3.01
0.35
2.80
0.07
0.34

1,953,536.50
1,953,536.50
1,953,536.50
1,953,536.50
1,953,536.50
420,279.00
1,953,536.50
1,953,536.50
Jumlah

6,876,448.48
488,384.13
4,180,568.11
5,880,144.87
683,737.78
1,176,781.20
136,747.56
664,202.41
20,087,014.52

PEK. KUSEN PINTU & JENDELA


Pasangan P1
Pasangan P2
Pasangan PJ1
Pasangan PJ2
Pasangan PJ3
Pasangan J2
Pasangan BV1
Pasangan BV2
Pasangan pintu lemari tanam u/ meja beton
Pasangan ventilasi gewel
Pasangan Pintu garasi

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

4.00
2.00
1.00
1.00
1.00
4.00
1.00
2.00
1.00
2.00
1.00

688,872.00
844,008.00
1,495,556.00
1,378,224.00
1,143,888.00
714,328.00
339,904.00
262,936.00
515,592.00
181,312.00
1,913,552.00
Jumlah

2,755,488.00
1,688,016.00
1,495,556.00
1,378,224.00
1,143,888.00
2,857,312.00
339,904.00
525,872.00
515,592.00
362,624.00
1,913,552.00
14,976,028.00

PEK. KAYU KAP + GORDING


Pas. kayu kap & gording (kayu klas II jenis jambu air)
Pas.baut dia. 12
Pas. Beugel U
Pas. Angker dia. 12

M3
Bh
Bh
Bh

9.38
300.00
18.00
18.00

1,479,500.00
2,500.00
5,000.00
6,000.00
Jumlah

13,877,710.00
750,000.00
90,000.00
108,000.00
14,825,710.00

VII
1
2
3
4
5
6

PEK. ATAP, PLAFOND


Pas. atap seng BJLS 0.30
Pas. bubungan atap seng BJLS 0.30
Pas. listplank 2 x 2,5/20 (papan klas II jenis j.air)
Pas. listplafond dari multipleks
Pas. plafond tripleks ( t = 2,80 mm )
Pas. Talang kill/jurai

VIII
1
2
3
4

PEKERJAAN LANTAI
Pas. tegel keramik 30/30 cm
Pas. plint keramik 10/30 cm
Pas. tegel keramik 20/20 cm u/ wc/km+m.beton
Pas. wafel 20/20 cm u/ lantai wc/km

IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

PEK. INSTALASI LISTRIK, AIR,TELEPON


Pas. instalasi listrik
Pas. lampu TL type balk 20 watt
Pas. Lampu pijar 25 watt
Pas. saklar tunggal
Pas. stop kontak
Pas. Saklar triple
Pas. arde tanam
Pas. Panel control
Pas. sekring box 2 (dua) group
Pas. kloset jongkok warna putih merk INA
Pas. Kloset duduk merk INA
Pas. septick tank & peresapan
Pas. instalasi air dalam bangunan
Pas. kran air type vernekel
Pas. floor drain besi
Pas. Bat tub fyber
Pas. Shower lengkap
Pas. Pipa galvanis dia. 1/2"
Pas. Tee stock dia. 1/2"
Pas. Cnie dia. 1/2"
Pas. Pipa galvanis dia. 1,5"
Pas. Pipa galvanis dia. 2"
Pas. Shocket turunan dia. 2" ke 1,5"
Pas. Tee stock dia. 1/2"
Pas. Cnie turunan dia. 1,5" ke 1/2"
Pas. Shocket dia. 1,5"
Pas. Shocket dia. 2"
Pas. Cnie dia. 1,5"
Pas. Tee stock turunan dia. 6" ke 2"
Pas. Water mur dia. 2"
Pas. Water mur dia. 1,5"
Pas. Pipa PVC dia.4"
Pas. Pipa PVC dia.2"
Pas cnie PVC dia. 4"
Pas.cnie PVC dia. 2"
Pas. T stoock PVC dia.2"
Pas. Tempat sabun di kamar mandi
Pas. Tempat cuci dari alluminium
Biaya sambungan daya listrik dari PLN
Biaya sabungan air dari PDAM
Pas. Pesawat telepon merk panasonic
Biaya sambungan telepon dari PT. Telkom

M2
M1
M2
M1
M2
M1

356.45
52.50
39.45
332.50
260.40
11.10

52,059.40
49,620.00
53,930.00
815.00
49,145.20
62,790.00

18,556,573.13
2,605,050.00
2,127,538.50
270,987.50
12,797,410.08
696,969.00
37,054,528.21

68,679.40
18,325.00
68,739.00
68,739.00
Jumlah

7,165,321.80
1,330,395.00
3,249,979.92
257,083.86
12,002,780.58

25,000.00
25,000.00
5,000.00
12,500.00
12,500.00
20,000.00
100,000.00
100,000.00
150,000.00
125,000.00
1,050,000.00
3,500,000.00
350,000.00
25,000.00
25,000.00
750,000.00
350,000.00
50,000.00
3,000.00
2,500.00
115,000.00
135,000.00
5,000.00
3,000.00
3,500.00
6,500.00
10,000.00
8,500.00
12,500.00
30,000.00
20,000.00
85,000.00
35,000.00
10,000.00
5,000.00
3,500.00
400,000.00
500,000.00
1,500,000.00
1,500,000.00
350,000.00
500,000.00
Jumlah

625,000.00
175,000.00
50,000.00
87,500.00
100,000.00
60,000.00
100,000.00
100,000.00
150,000.00
125,000.00
1,050,000.00
7,000,000.00
350,000.00
50,000.00
75,000.00
750,000.00
700,000.00
300,000.00
9,000.00
35,000.00
1,150,000.00
810,000.00
5,000.00
9,000.00
3,500.00
45,500.00
40,000.00
8,500.00
12,500.00
30,000.00
20,000.00
170,000.00
105,000.00
20,000.00
25,000.00
3,500.00
400,000.00
500,000.00
1,500,000.00
1,500,000.00
350,000.00
500,000.00
19,099,000.00

Jumlah
M2
M1
M2
M2

Ttk
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Bh
Unit
Unit
Ls
Bh
Bh
Unit
Unit
Staff
Bh
Bh
Staff
Staff
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Staff
Staff
Bh
Bh
Bh
Unit
Unit
Ls
Ls
Unit
Ls

104.33
72.60
47.28
3.74

25.00
7.00
10.00
7.00
8.00
3.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
3.00
1.00
2.00
6.00
3.00
14.00
10.00
6.00
1.00
3.00
1.00
7.00
4.00
1.00
1.00
1.00
1.00
2.00
3.00
2.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

PEKERJAAN FINISHING
Menie kayu
Cat kayu
Cat atap
Cat plafond
Cat tembok
Teac oil/plitur daun pintu & jendela
Residu kayu kap + gording
Pas. gordin pintu & jendela + rell penggantung
Pengadaan kursi sofa + meja merk olympic
Peng.T.tidur no.2 merk olympic + kasur & bantal
Peng.T.tidur no.3 merk olympic + kasur & bantal
Peng.lemari 2 pintu dari kayu jati
Peng.meja makan kaca +kursi merk olympic
Peng. TV 21" merk polytron + rak
Peng.dispencer merk aqua fresh + meja
Peng.rice cocker merk yong ma
Peng. teflon
Peng.kompor hock 22 sumbu
Peng.antena parabol + reciever merk venus
Peng dandang kukus

XI
1
2
3

PEKERJAAN LAIN - LAIN


Pembersihan kembali
Biaya administrasi ( IMB + galian C )
Biaya dokumentasi

M2
M2
M2
M2
M2
M2
Ls
Ls
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Lusin
Unit
Unit
Unit

Ls
Ls
Ls

177.71
110.00
356.45
260.40
579.22
90.00
1.00
1.00
1.00
1.00
2.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

11,874.00
23,957.50
15,170.00
15,170.00
15,170.00
9,562.50
200,000.00
2,000,000.00
1,000,000.00
1,750,000.00
1,500,000.00
1,200,000.00
1,500,000.00
3,000,000.00
500,000.00
400,000.00
350,000.00
150,000.00
1,350,000.00
250,000.00
Jumlah

2,110,128.54
2,635,325.00
5,407,346.50
3,950,268.00
8,786,767.40
860,625.00
200,000.00
2,000,000.00
1,000,000.00
1,750,000.00
3,000,000.00
3,600,000.00
1,500,000.00
3,000,000.00
500,000.00
400,000.00
350,000.00
150,000.00
1,350,000.00
250,000.00
42,800,460.44

1.00
1.00
1.00

250,000.00
350,000.00
150,000.00

250,000.00
350,000.00
150,000.00
750,000.00

Jumlah

R E K A P I T U L A S I
A
NO

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN

Rp

1,584,964.20

II

PEKERJAAN TANAH & URUGAN

Rp

6,256,611.70

III

PEKERJAAN PASANGAN & PLESTERAN

Rp

46,434,919.39

IV

PEKERJAAN BETON

Rp

20,087,014.52

PEK. KUSEN PINTU & JENDELA

Rp

14,976,028.00

VI

PEK. KAYU KAP + GORDING

Rp

14,825,710.00

VII

PEK. ATAP, PLAFOND

Rp

37,054,528.21

VIII

PEKERJAAN LANTAI

Rp

12,002,780.58

IX

PEK. INSTALASI LISTRIK, AIR,TELEPON

Rp

19,099,000.00

PEKERJAAN FINISHING

Rp

42,800,460.44

XI

PEKERJAAN LAIN - LAIN

Rp

750,000.00

J U M LAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN

Rp
Rp
Rp
Rp

215,872,017.04
21,587,201.70
237,459,218.75
237,459,000.00

TERBILANG : DUA RATUS TIGA PULUH TUJUH JUTA EMPAT RATUS LIMA PULUH SEMBILAN RIBU RUPIAH

SoE,
Meret 2005
Dibuat Oleh :
CV.MENTARI

Diperiksa/Disetujui :
Dinas Permukima Kab. TTS

Ir. ZET SELAN

VICTOR E.L LAISNIMA,ST

Nip.620008430

Direktur

Mengetahui :
Pemimpin Satuan Kerja/Direktur RSUD SoE

Dr. SOLEMAN D. POETY, M.Kes


Nip.140163519