12
the following consolidation test data were
obtained from undisturb San Fransisco Bay
Mud. For this clay, LL= 88, pl=43,s= 2.7
Mg/m3 , and Wn = 105.7%. Initally, the
specimen height was 2.54 cm and its
volume was 75.14 cm3. Plot the data as
percent consolidation versus log pressure.
Evaluate the preconsolidation pressure
and the modified virgin compression
index.
Stress
(kPa)
0
5
10
20
40
80
160
320
640
160
40
5
SOLUTIO
N
_1
Stress (kPa)
_1vertical
= Strain
_/
/
precent consolidation
_2=/
1+ _
_=(_1+_2)/2
0
5
10
20
40
80
160
320
640
160
40
5
Dial
Reading
_v
(mm)
12.7 0.00%
12.352 1.37%
12.294 1.60%
12.131 2.24%
11.224 5.81%
9.053 14.36%
6.665 23.76%
4.272 33.18%
2.548 39.97%
2.951 38.38%
3.533 36.09%
4.35 32.87%
_1= _/_ =
((12.712.294))/25.4
= 0.0161 = 1.61
stress 10 kPa :
%
_2=/ 1+ _ =
((2.8552.793))/
(1+2.855)=0.016=1.6%
_=(1.61%+1.6 %)/2
= 1.6 %
3
2.8
2.6
Void2.4
Ratio (e)
2.2
Dial Reading
(mm)
12.7
12.352
12.294
12.131
11.224
9.053
6.665
4.272
2.548
2.951
3.533
4.35
e
2.855
2.802
2.793
2.769
2.631
2.301
1.939
1.576
1.314
1.375
1.464
1.589
_2 _
0.00%
1.37%
1.61%
2.23%
5.81%
14.37%
23.76%
33.18%
39.97%
38.39%
36.08%
32.84%
0.00%
1.37%
1.60%
2.24%
5.81%
14.36%
23.76%
33.18%
39.97%
38.39%
36.09%
32.86%
3
2.8
2.6
Void2.4
Ratio (e)
2.2
2
1.8
1.6
1.4
1.2
1
10
pressure (kPa)
100
1000
200
100
1000
0%
5%
7.5%
10%
15%
20%
Vertical
25% Strain v
22%
30%
35%
40%
45%
0
10
pressure (kPa)
34
50
e
2.855
2.802
2.793
2.769
2.631
2.301
1.939
1.576
1.314
1.375
1.464
1.589
1000
1000
Problem 8.20
Plot the following void ratio versus pressure
data. and Evaluate the compression index
and recompression index. Determine the
preconsolidation stress.
Pressure
(kPa)
1.079
1.059
1.049
1.029
1.001
0.959
0.94
0.881
0.821
0.69
0.53
0.57
0.62
0.717
0
10
20
40
80
160
200
300
400
800
2000
500
160
20
1.1
1 1.09
0.9
0.8
Void ratio
(e)
0.75
0.7
0.65
0.6
0.54
0.5
0.4
10
p 100
215
1000
pressure (kPa)
_=(1.090.65)/
(log( 1000/100)) = 0.44
_=(0.750.54)/
(log( 1000/10)) = 0.105
10000
00
10000
Problem 9.14
Elapsed
Time
(minute)
0
0.25
1
2.25
4
6.25
9
12.25
16
20.25
25
30.25
36
42.25
60
100
200
400
1440
after taylor 1948
1/4 to 1/2
47
63
75
82
92
101
108
114
119
123
126
128
130
133
134
137
141
144
149
Solution
(a). Use a spreadsheet to plot the e versus log and/or the e versus log curve for th
Determine the preconsolidation stress and the appropriate compression index
step 1 determine initial void ratio (e o)
_=( )/( )=
/
10 ^(4)
^3 =
7.87 ^3
=
=area
x height=93,31
cm^2 x 1.254 in =14.46 in^2 x 1.254 in
=18.133 in^3
==18.133 7.87=10.263 in^3
_= / = 10.263/7.87
= 1.304
step 2 determine strain
= _/ = (
)/( ) x100%
(* *
1+in
_)4
(* *calculation will be describe in the following table
step
(* *
(*** : initial height minus deformation under1/2 kg/cm2 = 1.254 in - 149x10-4 in = 1.238 in
Loading Increment
(kg/cm2)
1/8
1/4
1/2
1
2
4
8
16
kPa
12.26
24.52
49.04
98.08
196.16
392.32
784.64
1569.28
Strain () %
Void Ratio
(e)
0
47
149
385
1343
2201
2902
3534
0.00%
0.37%
1.19%
3.07%
10.71%
17.55%
23.14%
28.18%
1.304
1.295
1.277
1.233
1.057
0.900
0.771
0.655
step 5 determine curve e versus ' , plot preconsolidation curve and index compression
1.34
1.400
1.300
1.200
1.04
Void Ratio (e)
1.100
1.000
0.900
0.800
0.700
0.600
10
70 105
200
100
1000
(b) Use a spreadsheet to plot dial reading versus (t)1/2 for each increment and determi
Plot cv versus log .
Dial reading (in)
Elapsed
Time
()
1/8 to 1/4
(minute)
0
0
1.254
0.25
0.5
1.2531
1
1
1.2526
2.25
1.5
1.2521
4
2
1.2517
6.25
2.5
1.2514
9
3
1.251
12.25
3.5
1.2508
16
4
1.2506
20.25
4.5
1.2505
25
5
1.2504
30.25
5.5
1.2503
36
6
1.2502
42.25
6.5
1.2501
60
7.745967
1.25
100
10
1.2499
200
14.14214
1.2498
400
20
1.2496
1440
37.94733
1.2493
1/4 to 1/2
1.2493
1.2477
1.2465
1.2458
1.2448
1.2439
1.2432
1.2426
1.2421
1.2417
1.2414
1.2412
1.241
1.2407
1.2406
1.2403
1.2399
1.2396
1.2391
t50
1.254
1.253
1.252
U 90
1.251
1.249
1.248
1.247
1.246
t900
1
10
( )
15
20
25
30
35
Calculation Cv
=_90=0.848
_^2 , we need average height of specimen
during load incremen
H=1.254
_in
_90(1 )=1min
_=(
_^2)/_90
_=(0.848 0.622 ^2
)/(1 )
_=0.328 ^2/
t50
1.25
=_90=0.848
_^2 , we need average height of specimen during
load incremen
H=1.254 0.0047=1.249
_in
_90(3.9 )=15.21min
1.248
1.246
1.244
U 90
1.24
1.238
1.236
1.234
t90
5
3.9
10
( )
15
20
25
30
35
30
35
t50
1.24
1.235
1.23
1.225
dial reading
(in)
1.22
U90
1.215
1.21
1.205
1.2
t90
4.1
10
15
20
25
( )
t50
1.22
1.2
1.18
1.16
U90
1.22
1.2
1.18
1.16
U90
1.12
1.1
1.08
1.06
10
t90
8.5 ( )
15
20
25
30
35
30
35
30
35
t50
1.12
1.1
1.08
1.06
dial reading
(in)
1.04
U 90
1.02
1
0.98
t90
10
( )
7.8
15
20
25
t50
1.24
1.22
1.2
dial reading
(in)
1.18
U90
1.16
1.14
5
10
t90
( )
6
15
20
25
t50
1.26
t50
1.24
1.22
1.2
dial reading
(in)
1.18
U90
1.16
1.14
t90 5
4.9
10
15
( )
t90
min
Loading increment
kg/cm2
0.125
0.25
0.5
1
2
4
8
20
H
in
1
15.21
16.81
72.25
60.84
36
24.01
25
Hdr
in
1.254
1.2493
1.2391
1.2155
1.1197
1.254
1.2542
0.627
0.62465
0.61955
0.60775
0.55985
0.627
0.6271
30
35
Cv
in2/min
0.333373
0.021754
0.019363
0.004335
0.004369
0.00926
0.013889
0.4
0.35
0.3
0.25
Cv
0.2
0.15
0.1
0.05
0
)
4 to 8
0
53
101
154
204
259
309
357
399
440
470
498
525
575
604
629
654
701
8 to 16
-2
60
115
169
227
278
332
372
410
442
464
498
532
563
582
601
632
dex compression
10000
)
4 to 8
1.254
1.2487
1.2439
1.2386
1.2336
1.2281
1.2231
1.2183
1.2141
1.21
1.207
1.2042
1.2015
1.199
1.1965
1.1936
1.1911
1.1886
1.1839
35
8 to 16
1.2542
1.248
1.2425
1.2371
1.2313
1.2262
1.2208
1.2168
1.213
1.2098
1.2076
1.2059
1.2042
1.2025
1.2008
1.1977
1.1958
1.1939
1.1908
40
of specimen
imen during
35
40
35
40
35
40
35
40
35
40
35
40
Problem 9.15