Anda di halaman 1dari 3

RINGKASAN ANALISA SATUAN PEKERJAAN

KODE

NO.

ANALISA

I.

URAIAN PEKERJAAN

HARGA
MATERIAL + ALAT

(Rp.)
UPAH

JUMLAH
(Rp.)

ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN


1

II.

I.4

1 M' Penguk. dan Pemasangan Bouwplank

33,000.00

15,090.00

48,090.00

72,000.00
144,000.00
120,425.00
158,525.00
436,500.00

26,800.00
12,848.00
16,750.00
18,500.00
5,688.00
5,688.00
15,750.00
118,220.00

26,800.00
12,848.00
88,750.00
162,500.00
126,113.00
164,213.00
15,750.00
554,720.00

385,200.00
204,000.00

147,240.00
83,421.00

532,440.00
287,421.00

123,790.00
102,588.00
58,423.00
48,835.20
27,017.60

58,330.00
58,330.00
28,870.00
28,870.00
17,112.00

182,120.00
160,918.00
87,293.00
77,705.20
44,129.60

12,092.80
8,004.80
10,047.20
83,310.00
473.10

25,785.00
25,785.00
30,180.00
36,480.00
15,490.00

37,877.80
33,789.80
40,227.20
119,790.00
15,963.10

11,100,000.00
422,000.00
369,250.00
263,750.00
344,700.00
60,752.00
122,700.00
10,570,000.00
133,250.00
26,000.00
64,550.00
92,230.00
52,380.00
30,590.00

3,671,000.00
565,500.00
452,400.00
188,100.00
376,200.00
27,650.00
42,780.00
1,306,800.00
15,090.00
55,850.00
23,800.00
36,825.00
28,035.00
18,690.00

14,771,000.00
987,500.00
821,650.00
451,850.00
720,900.00
88,402.00
165,480.00
11,876,800.00
148,340.00
81,850.00
88,350.00
129,055.00
80,415.00
49,280.00

544,920.00
14,625.00
91,500.00
102,000.00
190,550.00
196,850.00
286,000.00
699,070.00

125,725.00
1,052.30
40,954.00
40,954.00
47,187.00
48,367.00
48,367.00
465,900.00

670,645.00
15,677.30
132,454.00
142,954.00
237,737.00
245,217.00
334,367.00
1,164,970.00

109,040.00
66,200.00

20,670.00
28,975.00

129,710.00
95,175.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH


1
2
3
4
5
6
7
8

III.

II.1
II.9
II.15
II.11
BM.321
BM.322
BM.330
BM.7103

1 M3 Galian Tanah biasa sedalam 1 meter


1 M3 Urugan Tanah Kembali
1 M3 Urugan tanah
1 M3 Urugan Pasir
1 M3 Urugan Tanah (Mekanis)
1 M3 Urugan Sirtu (Mekanis)
1 M2 Pembentukan Badan Jalan
1 M3 Pekerjaan Gabions (Bronjong)

ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI


1
2

IV.

III.6
III.14

1 M3 Pasang Pondasi Batu Gunung 1 PC : 5 Ps


1 M3 Pasang Pondasi Batu Kosong

ANALISA BIAYA KONSTRUKSI PEKERJAAN PAS. BATA MERAH


1
2
3
4
5

V.

IV.2
IV.5
IV.9
IV.12
IV.12a

1 M2 Pasangan Bata Merah Tebal 1 Bata 1 PC : 2 Ps


1 M2 Pasangan Bata Merah Tebal 1 Bata 1 PC : 5 Ps
1 M2 Pasangan Bata Merah Tebal Bata 1 PC : 2 Ps
1 M2 Pasangan Bata Merah Tebal Bata 1 PC : 5 Ps
1 M2 Pasangan Bata Merah Penebalan Dinding 1 PC : 5 Ps

ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN


1
2
3
4
5

VI.

V.2
V.5
V.30
V.36
BOW-1

1 M2 Plesteran 1 PC : 2 Ps, Tebal 15 mm


1 M2 Plesteran 1 PC : 5 Ps, Tebal 15 mm
1 M2 Plesteran 1 PC : 3 Ps, Beton Tebal 15 mm
1 M2 Plesteran Waterproof
10 M2 Acian Tembok

ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU & DINDING PARTISI

1
2
3
4
5
6
7
8
9
10
11
12
13
14

VII.

VI.1
VI.7
VI.9
VI.12
VI.19b
VI.19c
VI.19d
VI.27
VI.33
VI.47a
VI.49
VI.52
VI.52a
VI.52b

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas I


1 M2 Pasang Pintu Panil Kayu Kelas I - Bayam
1 M2 Pasang Pintu & Jendela Kaca Kayu Kelas I
1 M2 Pasang Pintu & Jendela Jalusi Kayu Kelas I Lokal
1 M2 Pasang Pintu Multipleks Rangkap Lapis HPL
1 M2 Dinding Double Gypsum, tebal 9 mm
1 M2 Rangka Hollow (DINDING PARTISI)
1 M3 Pasang Konstruksi Kuda-kuda Kayu Kelas I
1 M2 Pasang Kaso + Reng Genteng Beton Kayu Kelas I
1 M' Pasang Plint Multipleks 9 mm + HPL
1 M' Pasang Lisplang Uk. (2 x 25) cm, Kayu Kelas I
1 M' Pasang Lisplang Uk. 2x (2 x 20) cm, Kayu Kelas I
1 M' Pasang Lisplang Uk. 2x (1.8 x 20) cm, Woodplank Motif
1 M' Pasang Lisplang Uk. 1.8 x 30 cm, Woodplank Motif

ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON


1
2
3
4
5
6
7
8

VIII.
1
2

VII.1
VII.25a
VII.28
VII.29
VII.30
VII.31
VII.32
VII.35

1 M3 Membuat beton tumbuk 1 PC : 3 Ps : 5 Kr


1 Kg Pembesian dengan besi polos
1 M2 Pasang bekisting untuk pondasi
1 M2 Pasang bekisting untuk sloof
1 M2 Pasang bekisting untuk kolom
1 M2 Pasang bekisting untuk balok
1 M2 Pasang bekisting untuk lantai
1 M3 Membuat beton dengan Mutu K. 225

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP


VIII.32
VIII.36

1 M2 Pasang atap genteng metal


1 M' Pasang nok genteng metal

KODE

NO.

ANALISA
3
4
5
6
7

IX.

VIII.38
VIII.39
XI.19

URAIAN PEKERJAAN

HARGA
MATERIAL + ALAT

1 M2 Pasang atap seng gelombang


1 M' Pasang atap nok seng
1 M' Pasang atap Spandek
1 M' Pasang atap nok Spandek
1 M2 Pasang talang miring, seng bjls 28

(Rp.)
UPAH

JUMLAH
(Rp.)

500.00
14,800.00
72,170.00
51,220.00
96,125.00

12,834.00
15,572.00
29,780.00
22,835.00
35,840.00

13,334.00
30,372.00
101,950.00
74,055.00
131,965.00

9,050.00
16,020.00
76,500.00
93,670.00
30,376.00
25,512.00
35,972.40

7,585.00
12,072.00
39,468.00
52,170.00
29,135.00
29,135.00
64,170.00

16,635.00
28,092.00
115,968.00
145,840.00
59,511.00
54,647.00
100,142.40

2,226,000.00
358,240.00
792,240.00
108,500.00
8,525.00
43,400.00
58,900.00
173,600.00
426,250.00
1,162,500.00
95,065.00
125,000.00

106,950.00
323,800.00
206,700.00
22,626.00
7,542.00
11,313.00
16,973.50
16,973.50
25,495.00
33,931.00
9,780.00
9,780.00

2,332,950.00
682,040.00
998,940.00
131,126.00
16,067.00
54,713.00
75,873.50
190,573.50
451,745.00
1,196,431.00
104,845.00
134,780.00

20,460.00

6,128.00

26,588.00

95,000.00
160,000.00
18,000.00
14,000.00
22,000.00
236,500.00
181,500.00
495,000.00
137,540.00
152,125.00

41,380.00
14,130.00
14,130.00
9,420.00
14,130.00
18,920.00
18,920.00
31,262.00
21,390.00
42,780.00

136,380.00
174,130.00
32,130.00
23,420.00
36,130.00
255,420.00
200,420.00
526,262.00
158,930.00
194,905.00

70,066.00
114,323.40
179,926.60
228,886.60
12,338.25
10,870.00
99,672.40
111,007.20
114,022.00
130,243.33

32,325.00
69,745.00
69,745.00
69,745.00
10,695.00
10,695.00
69,745.00
69,745.00
77,355.00
77,355.00

102,391.00
184,068.40
249,671.60
298,631.60
23,033.25
21,565.00
169,417.40
180,752.20
191,377.00
207,598.33

17,509.00

15,560.00

33,069.00

9,550.00

15,090.00

24,640.00

32,620.00

15,090.00

47,710.00

10,525.00

15,348.00

25,873.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT


1
2
3
4
5
6
7

X.

IX.19
IX.19a
IX.20
IX.21
IX.24
IX.24a
IX.24b

1 M2 List langit-langit kayu profil, ukuran 4 x 5 cm


1 M2 List langit-langit Gypsum kayu profil
1 M2 Langit-langit eternit/asbes (1 x 1) m, tbl 3,2 mm
1 M2 Langit-langit Multipleks 4 mm + rangka kayu kelas II
1 M2 Langit-langit gypsum board, tebal 9 mm
1 M2 Langit-langit kalsi board, tebal 3.5 mm
1 M2 Rangka Hollow (PLAFOND)

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

1
2
3
4
5
6
7
8
9
10
11
12

XI.

X.1
X.2
X.5
X.22
X.26
X.29
X.31
X.32
X.33
X.34
X.35
X.36

Memasang 1 Bh kloset duduk Warna


Memasang 1 Bh kloset jongkok
Memasang 1 Bh wastafel
Memasang 1 m' pipa galvanis diameter 1 "
Memasang 1 m' pipa PVC type AW diameter "
Memasang 1 m' pipa PVC type AW diameter 2 "
Memasang 1 m' pipa PVC type AW diameter 3 "
Memasang 1 m' pipa PVC type AW diameter 4 "
Memasang 1 m' pipa PVC type AW diameter 6"
Memasang 1 m' pipa PVC type AW diameter 8"
Memasang 1 bh kran air diameter " atau "
Memasang 1 bh Floor drain

ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM


1

XII.

XI.3b

1 Kg Mengerjakan Besi Profile C/L

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1
2
3
4
5
6
7
8
9
10

XIII.
1
2
3
4
5
6
7
8
9
10

XIV.

XII.1
XII.2
XII.5
XII.6
XII.9
XII.17
XII.17
XII.18
XII.Spl-1
XII.Spl-2

1 Buah Pasang kunci bundar


1 Buah Pasang kunci tanam biasa 2x putar
1 Buah Pasang engsel pintu biasa
1 Buah Pasang engsel jendela
1 Buah Pasang kait angin
1 M2 Pasang kaca, tebal 5 mm
Riben
1 M2 Pasang kaca, tebal 5 mm
Polos
1 M2 Pasang kaca, tebal 8 mm
1 M' Pasang Rangka Kusen Aluminium
1 M' Pasang Daun Pintu Aluminium

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING


XIII.03
XIII.04
XIII.13
XIII.13a
XIII.21
XIII.25
XIII.44
XIII.47
XIII.68
XIII.68a

1 M Pasang lantai ubin PC abu-abu uk. 20 x 20 cm


1 M2 Pasang lantai keramik warna uk. 40 x 40 cm
1 M2 Pasang keramik granit uk. 60 x 60 cm, motif
1 M2 Pasang keramik granit uk. 60 x 60 cm, hitam
1 M' Pasang plint keramik warna uk. 10 x 40 cm
1 M' Pasang plint ubin keramik uk. 10 x 30 cm
1 M2 Pasang lantai keramik 20 x 20 cm
1 M2 Pasang lantai keramik 30 x 30 cm, warna
1 M2 Pasang dinding keramik 20 x 25 cm
1 M' Pasang dinding keramik uk. 30 x 60 cm

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN

XIV.8

XIV.14

XIV.14a

XIV.14b

1 M2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat


dasar, 2 lapis cat penutup)
1 M2 Pengecatan tembok baru (dalam) (1 lapis plamir, 1 lapis
cat dasar, 2 lapis cat penutup)
1 M2 Pengecatan tembok baru (luar) (1 lapis cat dasar, 2 lapis
cat penutup)
1 M2 Pengecatan Gypsum / Kalsiboard (1 lapis cat dasar, 2
lapis cat penutup)

KODE

NO.

ANALISA
5
6

XV.

XIV.15
BOW-2

URAIAN PEKERJAAN
1 M2 Pengecatan besi (1 lapis cat dasar, 2 lapis cat penutup)
10 M2 Pengecatan Atap Seng (2x)

HARGA
MATERIAL + ALAT

(Rp.)
UPAH

JUMLAH
(Rp.)

16,580.00
9,325.00

15,560.00
15,176.00

32,140.00
24,501.00

4,916,000.00
5,087,000.00
310,000.00
390,000.00
105,500.00
124,500.00

1,200,000.00
1,200,000.00
14,440.00
20,910.00
58,800.00
73,500.00

6,116,000.00
6,287,000.00
324,440.00
410,910.00
164,300.00
198,000.00

167,000.00
145,000.00
554,192.50
144,000.00
106,650.00
83,500.00
881,750.00
703,160.00
82,800.00
98,400.00
54,000.00

37,100.00
34,150.00
41,305.00
23,250.00
18,600.00
15,500.00
232,500.00
193,750.00
20,250.00
24,300.00
13,718.00

204,100.00
179,150.00
595,497.50
167,250.00
125,250.00
99,000.00
1,114,250.00
896,910.00
103,050.00
122,700.00
67,718.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN ELEKTRIKAL


1
2
3
4
5
6

XVI.
1
2
3
4
5
6
7
8
9
10
11

EL.1
EL.2
EL.3
EL.4
EL.5
EL.6

1 Unit Panel PP
1 Unit Panel Stop Kontak/AC
1 Meter Kabel NYFGbY 4 x 50 mm
1 Meter Kabel NYFGbY 4 x 70 mm
1 Titik Memasang Instalasi Penerangan
1 Titik Memasang Instalasi Stop Kontak

ANALISA BIAYA KONSTRUKSI PEKERJAAN NON STANDAR


SPL.3
SPL.4
SPL.5
SPL.6
SPL.7
SPL.8
SPL.9
SPL.10
SPL.11
SPL.12
SPL.13

1 M2 Pekerjaan Rangka Atap Baja Ringan, Atap Genteng Metal


1 M2 Pekerjaan Rangka Atap Baja Ringan, Atap Seng/Spandek
1 M' Pekerjaan Pagar BRC 120 Lengkap dengan Tiang
1 M' Pekerjaan Pipa Besi dia. 3", tebal 0.28 mm
1 M' Pekerjaan Pipa Besi dia. 2", tebal 0.28 mm
1 M' Pekerjaan Pipa Besi dia. 1.5", tebal 0.28 mm
1 Buah Mengerjakan Pintu Kandang/Cuttle Yard Tipe P1
1 Buah Mengerjakan Pintu Kandang/Cuttle Yard Tipe P2
1 M2 Pekerjaan Paving Block t. 6 cm
1 M2 Pekerjaan Paving Block t. 8 cm
1 M2 Mengerjakan Kawat Ram Halus (Paranet)

Anda mungkin juga menyukai