ISSN 2229-5518
438
1. INTRODUCTION
1.1 General
IJSER
E-mail:isanurkuet@yahoo.com
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
IJSER
2. LITERATURE REVIEW
2.1 General
439
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
440
Description
IJSER
Unneeded motion
Movements of people during the production which do not add value to the
product
Work-In-Process (WIP)
Defects
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
441
Tools
Description
Value
Stream
A method to map the activities (both value adding and non-value adding) involved
Mapping(VSM)
5S
Visual Control
IJSER
A technique for organizing a job such that it can be carried out in best and safest
manner
Just-In-Time (JIT)
A strategy to produce the right part in the right place and at the right time
Kanban
Production Smoothing
Total Productive
Maintenance (TPM)
Total Quality
Management (TQM)
Single Minute Exchange of
Die (SMED)
Cellular Manufacturing
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
that
is
emerged
from
the
group
and
Group
442
IJSER
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
3.
THE
CELL
DESIGN
IMPLEMENTATION PROCESS
AND
443
Do the improvement
IJSER
CA
CA
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
444
Target
PDCA1
Target
PDCA2
PDCA3
IJSER
CADP3
CADP2
CADP1
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
445
4. DATA ANALYSIS
4.1 Cost Reduction for the Increased Efficiency
To calculate the cost reduction for increased
efficiency, the efficiency of the existing layout and
the proposed cellular layout has been calculated
first. The following equations are used to
determine the line efficiency:
Standard Pitch Time (S. P. T)
= Basic Pitch Time (B. P. T)
+ Allowances (%) (1)
Target
Total Manpower per line Total Working Minutes per Day
=
SMV
100% (2)
Line Efficiency
Total Output per day per line SMV
(3)
=
Total Manpower per line Total Working Minutes per Day
IJSER
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
446
Table 4.1 Benchmark Target and Line Efficiency of Existing Manufacturing System
1902
Total Manpower
16
Working Time
600
Min
SMV
2.26
Min
Target /hr
Line Efficiency
Pcs
425
100% Efficiency
340
80% Efficiency
170
40% Efficiency
Benchmark
45%
Table 4.2 Present Capacity of the Existing Manufacturing System
IJSER
S.N.
Operation
Man Power
SMV
(min)
0.17
Present Capacity/hr
M/C
Type
S/N
1
2
M/L
0.2
300
S/N
0.13
461
O/L
0.08
750
M/L
0.19
315
Neck Piping
F/L
0.22
272
Thread Cut/Fold
M/L
0.2
300
Side Seam
O/L
0.53
340
Shoulder Tack
S/N
0.11
1090
10
M/L
0.09
666
11
F/L
0.23
522
12
M/L
0.12
500
IJSER 2013
http://www.ijser.org
353
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
Capacity/hr
1200
1000
800
600
400
200
0
IJSER
Fig. 4.1 Variation in Each process Capacity per Hour Compare to Benchmark Target per Hour
IJSER 2013
http://www.ijser.org
447
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
448
Capacity/hr
600
500
400
300
200
100
0
IJSER
Fig. 4.3 Variation in Each Process Capacity per Hour in the Proposed Layout
Table 4.3 Capacity of Proposed Cellular Manufacturing System
S.N
.
Operation
Man
Power
0.17
Present
Capacity
/Hour
353
Balanced
capacity
/Hour
353
1
2
M/L
0.2
300
340
S/N
0.13
461
461
O/L
0.08
750
340
M/L
0.19
315
340
Neck Piping
F/L
0.22
272
545
Thread Cut/Fold
M/L
0.2
300
340
Side Seam
O/L
0.53
340
340
Shoulder Tack
S/N
0.11
1090
545
10
Thread
Fold
M/L
0.09
666
340
11
Arm
Hole
Piping
Thread Cut &
Fold
F/L
0.23
522
522
M/L
0.12
500
340
12
Cut
M/C
Type
SMV
(min)
Proposed
Man
Power
1
S/N
IJSER 2013
http://www.ijser.org
Remark
Help 5
Share
with
2 &5
Share
with 7
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
449
2378
Total Operator
16
Working Time
600 Minutes
SMV
2.26 Minutes
Line Efficiency
56%
11%
IJSER
Cost Reduction
1400000
1200000
1000000
800000
600000
400000
200000
109200
0
1%
2%
218400
3%
327600
4%
436800
5%
546000
6%
655200
7%
764400
8%
873600
982800
9%
IJSER 2013
http://www.ijser.org
10%
1201200
1092000
11%
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
5.1 Result
IJSER
450
5.2 Discussion
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
IJSER
451
IJSER 2013
http://www.ijser.org
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
7. REFERENCES
[1]
452
[9]
[10]
[11]
IJSER
[2]
[3]
[12]
[4]
[13]
Flanders, R. E., 1925, Design manufacture
and production control of a standard
machine,
Transactions of ASME, 46, 691-738.
[5]
[6]
[7]
[14]
[15]
[16]
IJSER 2013
http://www.ijser.org
Appendix: Time study sheet showing total operator with standard minute value.
APPENDIX
International Journal of Scientific & Engineering Research, Volume 4, Issue 12, December-2013
ISSN 2229-5518
IJSER
IJSER 2013
http://www.ijser.org
453