Anda di halaman 1dari 5

COMPUTATION

OF DEAD LOAD

Second Floor:
FRAME 1:

Slab: 11.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.42/m

Along 5 length (2B-2)


Slab: 4.35KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 17 KN/m

FRAME 3:

Along 6.3m length (2B-2)


Slab: 12.9KN/m
CHB Wall: 4.2(2.6) =8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 25.55 KN/m

Along 5 length (2B-2)


Slab: 21.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 34.42 KN/m

Along 5m length (2B-2)


Slab: 10.88KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 23.53KN/m
Along 2.7m length (2B-2)
Slab: 5.88KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 18.53KN/m
FRAME 2:
Along 5 length (2B-2)
Slab: 18.36KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 21.18KN/m
Along 6.3m length (2B-2)
Slab: 22.04KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.86 KN/m
Along 5m length (2B-2)
Slab: 21.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 34.41KN/m
Along 2.7m length (2B-2)

Total Load: 24.86 KN/m


Along 5m length (2B-2)
Slab: 21.76KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.59 KN/m
Along 2.7m length (2B-2)
Slab: 11.76KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 14.59KN/m

Total Load: 14. 58KN/m


FRAME 14:
Along 5 length (2B-2)
Slab: 21.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 34.42 KN/m

FRAME 7:= FRAME 9:

Along 6.3m length (2B-2)


Slab: 22.04KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.86 KN/m

Along 6.3m length (2B-2)


Slab: 18.68KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 21.5 KN/m

Along 5 length (2B-2)


Slab: 21.76KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 24.58 KN/m

Along 5m length (2B-2)


Slab: 18.36KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 21.18KN/m

Along 5m length (2B-2)


Slab: 21.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 34.42KN/m

Along 6.3m length (2B-2)


Slab: 12.9KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 15.72 KN/m

Along 2.7m length (2B-2)


Slab: 11.76KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 14.58KN/m

Along 5m length (2B-2)


Slab: 21.76KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.58KN/m

FRAME 15:

Along 2.7m length (2B-2)


Slab: 11.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.41KN/m
NOTE:
FRAME 3= FRAME 4= FRAME 5=
FRAME 11=FRAME 12= FRAME 13
FRAME 6:= FRAME 10:
Along 5 length (2B-2)
Slab: 21.76KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 34.42 KN/m
Along 6.3m length (2B-2)
Slab: 22.04KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m

Along 2.7m length (2B-2)


Slab: 11.76KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 14. 58KN/m
FRAME 8:
Along 5 length (2B-2)
Slab: 21.76KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 24.58 KN/m
Along 5m length (2B-2)
Slab: 21.76KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 24.58KN/m
Along 2.7m length (2B-2)
Slab: 11.76KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m

Along 5 length (2B-2)


Slab: 10.88KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 23.53 KN/m
Along 6.3m length (2B-2)
Slab: 12.9KN/m
CHB Wall: 4.2(2.6) =8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 25.55 KN/m
Along 5m length (2B-2)
Slab: 4.35KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 17KN/m
Along 2.7m length (2B-2)
Slab: 5.88KN/m

CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m


Plastering (2 faces): 0.5(2.6) = 1.3 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 18.53KN/m
FRAME A:

*Between (6 7) and (9-10): Along 5m length


(2B-1)
Slab: 21.76KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 24.58 KN/m

*Between 1 2: Along 5m length (2B-1)


Slab: 10.58KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Plastering (2 faces): 0.9(1) = 1.3KN/m
Beam: 23.54(.35) (.30) = 2.82 KN/m
Total Load: 23.23KN/m

*Between (7-8) and (8-9): Along 5m length


Slab: 10.88 KN/m
Total Load : 10.88 KN/m
*Between 1415: Along 5m length (2B-1)
Slab: 21.76KN/m
Beam: 23.54(.35)(.30) = 2.82 KN/m
Total Load: 24.58KN/m

*Between (2 3) to (14-15) Along 5m length


(2B-1)
Slab: 10.88KN/m
CHB Wall: 8.53KN/m
Plastering (2 faces): 0.9(1) = 1.3KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 23.54 KN/m
*Between (6 7) and (9-10): Along 5m length
(2B-1)
Slab: 10.88KN/m
CHB Wall: 4.2 KN/m2 (1.7m) = 7.14 KN/m
Area: ((2.6) 2.1) = 10.1m2
H =

10.9
5

= 2.18m

4.2(2.18) = 5.23
Plastering (2 faces): 0.5(2.18) = 1.09 KN/m
Beam: 23.54(.4)(.30) = 2.82 KN/m
Total Load: 20.02 KN/m
FRAME B:
*Between 1 2: Along 5m length (2B-1)
Slab: 10.58KN/m
Beam: 23.54(.35)(.30) = 2.82 KN/m
Total Load: 13.7KN/m
*Between (2 3) to (5-6) and bet. (10-11) to
(13-14) Along 5m length (2B-1)
Slab: 17. 33KN/m
Glass (serve as Wall):
0.4KN/m2 (2.6) = 1.04 KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 21.19KN/m

FRAME C:
*Between 1 2: Along 5m length (2B-1)
Slab: 21.76KN/m
Glass (serve as Wall):
0.4KN/m2 (2.6) = 1.04 KN/m
Beam: 23.54(.35) (.30) = 2.82 KN/m
Total Load: 25.62KN/m
*Between (2 3) to (5-6) and bet. (10-11) to
(13-14) Along 5m length (2B-1)
Slab: 17. 33KN/m
Glass (serve as Wall):
0.4KN/m2 (2.6) = 1.04 KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 21.19KN/m
*Between (7-8) and (8-9): Along 5m length
Slab: 10.88 KN/m
Total Load : 10.88 KN/m
*Between (6 7) and (9-10): Along 5m length
(2B-1)
Slab: 21.76KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 24.58 KN/m
*Between 1415: Along 5m length (2B-1)
Slab: 16.42KN/m
Beam: 23.54(.35)(.30) = 2.82 KN/m
Total Load: 19.14KN/m
FRAME D:
*Between (1 2) to (13-14)

Along 5m length (2B-1)


Slab: 18.84KN/m
Beam: 23.54(.35) (.30) = 2.82 KN/m
Total Load: 21.66KN/m
*Between (14 15) Along 5m length (2B-1)
Slab: 16.32KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 19.14KN/m
FRAME E:
*Between (1 2) to (14-15)
Along 5m length (2B-1)
Slab: 7.96KN/m
Beam: 23.54(.35) (.30) = 2.82 KN/m
Total Load: 21.08KN/m

Roof Deck
FRAME 1:
Along 5m length (RB-2)
Slab: 3.41 KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 19.46 KN/m

Slab17.08 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 19.9KN/m
Along 2.7m length (RB-2)
Slab: 9.22KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m Total
Load: 12.04KN/m
FRAME3: to FRAME 13

Along 6.3m length (RB-2)


Slab: 10.11 KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 17.63 KN/m
Along 5m length (RB-2)
Slab: 8.54 KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 16.06 KN/m
Along 2.7m length (RB-2)
Slab: 4.6 KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 12.13 KN/m

Along 5m length (RB-2)


Slab: 17.08KN/m
Beam: 2.82KN/m
Total Load: 19.9 KN/m
Along 6.3m length (RB-2)
Slab: 20.22KN/m
Beam: 23.54(.40)(.30) = 2.82 KN/m
Total Load: 23.04 KN/m
Along 5m length (RB-2)
Slab: 17.08KN/m
Beam: 23.54(.40) (.30) = 2.82KN/m
Total Load: 19.9 KN/m
Along 2.7m length (RB-2)
Slab: 9.22KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m Total
Load: 12.04KN/m
FRAME14:

FRAME 2:
Along 5m length (RB-2)
Slab: 14.14KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load:25.76 KN/m
Along 6.3m length (RB-2)
Slab: 20.22KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 23.04KN/m
Along 5m length (RB-2)

Along 5m length (RB-2)


Slab: 17.08KN/m
Beam: 2.82KN/m
Total Load: 19.9 KN/m
Along 6.3m length (RB-2)
Slab: 20.22KN/m
Beam: 23.54(.40)(.30) = 2.82 KN/m
Total Load: 23.04 KN/m
Along 5m length (RB-2)
Slab: 14.41KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m

Beam: 23.54(.40) (.30) = 2.82KN/m


Total Load: 25.76KN/m
Along 2.7m length (RB-2)
Slab: 9.28KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 12.04KN/m
FRAME 15:
Along 5m length (RB-2)
Slab: 8.54KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 2.82KN/m
Total Load: 18.36 KN/m
Along 6.3m length (RB-2)
Slab: 10.11 KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 17.63 KN/m
Along 5m length (RB-2)
Slab: 3.41KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 19.46KN/m
Along 2.7m length (RB-2)
Slab: 4.61KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.40) (.30) = 2.82 KN/m
Total Load: 12.1KN/m
FRAME A:
*Between 1 2: Along 5m length (RB-1)
Slab: 8.31KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m
Beam: 23.54(.35) (.30) = 2.82 KN/m

Total Load: 24.01KN/m


*Between (2 3) to (14-15) Along 5m length
(2B-1)
Slab: 8.54KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 16.06KN/m
FRAME B:
*Between 1 2: Along 5m length (RB-1)
Slab: 12.82KN/m
CHB Wall: 4.2(2.18) = 5.23
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 20.87KN/m

*Between (2 3) to (14-15) Along 5m length


(2B-1)
Slab: 17.08KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 19.9KN/m
FRAME C:
*Between (1 2): to (13- 14) Along 5m length
(RB-1)
Slab: 12.82KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 15.64KN/m
*Between (14 15) Along 5m length (2B-1)
Slab: 4.28KN/m
CHB Wall: 4.2(2.18) = 5.23
Beam: 23.54(.4) (.30) = 2.82 KN/m
Total Load: 12.33KN/m
FRAME D:
*Between (1 2): to (13- 14) Along 5m length
(RB-1)
Slab: 14.78KN/m

Beam: 23.54(.4) (.30) = 2.82 KN/m


Total Load: 17.6KN/m
*Between (14 15) along 5m length (2B-1)
Slab: 14.55KN/m
CHB Wall: 4.2 KN/m2 (2.6m) = 8.53 KN/m

Beam: 23.54(.4) (.30) = 2.82 KN/m


Total Load: 25.9KN/m
FRAME E:

*Between (1 2): to (14- 15) along 5m length


(RB-1)
Slab: 6.24KN/m
Parapet: 4.2 KN/m2 (1.0m) = 4.2 KN/m
Plastering (2 faces): 0.5(1.0) = 0.5 KN/m
Beam: 23.54(.4) (.30) = 2.82 KN/m

Total Load: 13.76KN/m