Anda di halaman 1dari 5

CENTRALLY SPONSORED SCHEME OF INFORMATION & COMMUNICATION

TECHNOLOGY IN SCHOOL
ANNUAL PROGRESS REPORT FOR
Name of the State /UT:
1.

Secondary Stage:

1.1
Sl. No.

School covered
Name of Name
the District Block

of No. of Secondary school


Govt.

(1)

(2)

(3)

(4)

Govt.
Aided
(5)

Grand
Total
Total
(6)

(7)

Note: Please shade/mark in * such blocks which fall in the category of Educationally
Backward Blocks.
1.2
Sl. No.

(1)

Students covered
Name of Name
the District Block
(2)

of No. of students covered


Govt.
Govt.
Total
Aided
(3)
(4)
(5)
(6)

Note: Please shade/mark in * such blocks which fall in the category of Educationally
Backward Blocks.

2.

Higher Secondary PUC Colleges/Intermediate college

2.1

Higher Secondary schools PUC Colleges /Intermediate college

Sl. No.

Name of Name
the District Block

of No. of Secondary school


Govt.

(1)

(2)

(3)

(4)

Govt.
Aided
(5)

Grand
Total
Total
(6)

(7)

Note: Please shade/mark in * such blocks which fall in the category of Educationally
Backward Blocks.
2.2

Students covered

Sl. No.

(1)

Name of Name
the District Block
(2)

of No. of Secondary school


Govt.
Govt.
Total
Aided
(3)
(4)
(5)
(6)

Note: Please shade/mark in * such blocks which fall in the category of Educationally
Backward Blocks.
3.

Total
no.
of
schools
colleges/Intermediate)

Sl. No.
(1)

Secondary
Schools
(2)

covered

(Secondary/Higher

secondary/PUC

Higher
Secondary
Schools/PUC Total
colleges/Intermediate colleges
(3)
(4)

4.

Total no. of students covered

Sl. No.

Secondary
Schools
(2)

(1)

5.

Hardware/Equipment installed in each school

Sl. No.
(1)
1.
2.
3.
4.
5.
6.
7.

6.

Higher
Secondary
Schools/PUC Total
colleges/Intermediate colleges
(3)
(4)

Hardware / Equipments
(2)
Computers
UPS
Scanner
Web Camera
Printer
Projector
Any other equipment
(List the same)

No.
(3)

Total no. of hardware/equipment procured during the year

Sl. No.
(1)
1.
2.
3.
4.
5.
6.
7.

Hardware / Equipments
(2)
Computers
UPS
Scanner
Web Camera
Printer
Projector
Any other equipment
(List the same)

Total No.
(3)

7.
Please give details of the operating and application software used for the
programme
8.

Please give details of educational software used for the programme

9.

Provision of Internet connectivity

i)
ii)
iii)

No. of schools having internet connectivity:


No. of schools covered through broadband:
No. of schools having ordinary internet connectivity:

10.
The list of agencies along-with the no. of schools allotted for implementation of
ICT in schools scheme.
Name of the agency along-with No. of schools allotted
complete address

11.
Teacher Training
Sl. No.
Activity
(1)
(2)
1.
Institutions(s) responsible for training
teachers
2.
Nature of Training
i) ICT literacy,
ii) Computer Aided Learning
3.
Duration
4.
Brief Details of Modules Developed
5.
Training on content development

12.

13.

Details
(3)
of

Whether web portal is created?

i)

If so the address of the web portal:

ii)

If not, reason s therefor and time by which it will be created:

Whether Third Party Evaluation of the Scheme was done?


I)

If so, forward a Report of the same

II)

If not, reasons therefor and time by which it will be done

File No.
Dated:
Signature_______________
Designation

Department
(with seal)

S No

Heading

1.

Budget provision by the State/ UT Govt.


during the current financial year

2.

Funds released/ sanctioned as central


share after adjustment of unspent balance

3.

Funds released by the State/ UT Govt.


against central share

4.

Funds utilized by the State/ UT Govt.

5.

Number of schools covered

6.

Number of Schools provided with Internet


connectivity

7.

Physical progress of the scheme

Remarks of State/ UT
Govt.

Anda mungkin juga menyukai