Anda di halaman 1dari 22

Position Title

Areas of Expertise

Senior Engineering Manager / Project Manager / Senior Project Manager / Project Director
Instrumentation , Electrical , Control Systems , Safety Instrumented Systems , Forensic Engineering ,
Construction , Commissioning , Engineering Management , Project Management ( Brownfield & Greenfield)

Name of Expert
Contact Details // linkedin
Date of Birth
Mobile Number
Country of Residence // Citizenship
Linkedin // Personal Website
MSc Project Management (Thesis)

Stephanus ROUX
sroux53@yahoo.com or stephenroux@mweb.co.za
18th May 1952 // still very active , effective both body & mind
+27721166050
South Africa / South African
http://www.linkedin.com/in/stephanusroux/fr // http://sroux53.wix.com/consulting-engineers
In Depth Look at Complex Projects and the Potential Implication on Project Management (basis of discussion is
around engineering and construction projects in the ammonia /fertilizer industries)

1. Education:
Institution

Dates Attended/
Issue Date

Degree/Diploma

COU (Open University ), Spain/UK

2015 - 2016 (expected Dec )

Masters Degree in Management of Projects

CEI (UK)/European Council , UK

1999 - 2001

Diploma as Professional Engineer

Executive Business School , RSA

1989

Diploma in Project Management

MTC , Maitland , RSA

1984 - 1988

National Diploma (Electrical & Control Systems)

ICS , USA

1981 - 1982

Diploma in Computer Engineering

2.

Employment record relevant to potential assignments:

Period

Employing organization and


your title /position.

2016

SMEC_ILF JV (my services to the JV , was done via XRS Consulting Engineers )

April 2016 to
July 2016

Engineering Manager
Technical Team Leader
BEP ( Basic Engineering Package )

2016
Jan 2016 to
March 2016

XRS Consulting Engineers (owner )

2015

FERTIAL Spa

Feb 2015 ~
May 2015

Project Manager / Director

Algeria

NH3 Revamp Project ( BEP )


(executed by the licence holder KBR)

(Oran, Arzew
& Annaba)

Project Value : 350 million USD


Compressor Value : 55 million USD
DCS/ESD : 25 Million Euros
DCS/ESD
Compressors
Gas Turbines
Air Compressors
Steam Turbines
Electric Motors
Flare
CCR
Piping
Vessels

Country

Summary of activities performed relevant to the Assignment

/ Bangladesh/
Pakistan

Gas Compressor Project for BGFCL ( in BrahmanBaria )


Manage a team of 55 engineers & designers ( located in Pakistan &
Bangladesh)

Middle East

Training Consultant // Technical Consultant // Mentor


Technical Consulting // PMC roles

Coming from BEP /EPC contractor Was riddled with technical problems / lack the deta
certain areas

Complexity of the project (problem areas)

Integration of cultures ; technical capabilities ; lack of project experience ;


authority /regulations ; construction execution plan / philosophy with EPC a
ARH approval ; suitability of EPC contractors in terms of NH3
experience/exposure ; customs , excise / logistics around construction ( be
Algeria) ; construction contract ; execution of construction under signed co
with EPC ; integration of safety systems with ARH approval ; commissionin
while integrate testing of safety systems ; procurement (LLI) ; understandin
the SoS/SoW ; languages ( French, Arabic, Spanish, English) ; , poor con
were negotiated ; Small team ; lack of certain knowledge /experience ; stru
to maintain team cohesion ; EPC had indicated lack of confidence in the B

Risks: (potential) ( initial)

Insufficient front end loading ; highly schedule driven ; inappropriate contra


strategy ; company politics ; ignoring best practices ; understanding
infrastructure

My initial task was to look at both the complexity / management strategy & risks as was
identified by me

Review of PDB , Specifications & DC of both plant equipment ( mechanical , piping ,


electrical , DCS , Instrumentation , Process )
Develop of a project charter ; execution plan / strategy for project execution ; Develop a WB
Communication Plan ; team strategy , team battery limits definition , roles of responsi
steer com agenda preparation ; review ITB ; review contracts of EPC FEED ; Interfa
with sub consultants ( DNV-GL (france) & IDOM (spain)) ; developed checklist for EPC
evaluation on FEED bid ; evaluated HSE & ARH requirements as set by statuary
law/requirements ; developed communication plan ; develop a project execution plan
at cost control strategies ; preliminary construction execution plan ; developed a detai
RASCI matrix ; look at EWP & CWP concepts for implementation ; contracts managem

Develop a detailed communication plan , a project management plan, a procure


philosophy plan.

Page 1 of 22

2014

XRS Consulting Engineers (owner ) ;


Haward / Petrolab ; ICTD ; NARA Eng.

Jan 2014 ~
Dec 2014

Training Consultant / Technical Consultant /


/Mentor
( process operators/
technicians/technologists/engineers )

Algeria

Develop a TQL ( technical query list ) / issues log


Develop & manage change management procedures , manage contractual issu
amendments , contractual letters etc
Issue progress / traffic light reporting ( weekly/monthly)

Done technical training in the field of instrumentation


Covering

Course set at a fairly advance level

Advance Control ; Safety Instrumented Systems ; Compressor Controls &


Protection ; Custody Flowmeters ; Project Engineering ; Developing & App
Standard Instrumentation and Control Documentation ; Advanced Operati
Digital (Smart) Transmitters ; DCS design& configuration , etc

Done technical training in the field of instrumentation


Covering:

2013

Kentz ( part of the SNC Lavalin Group )

May 2013 ~
Oct 2013

Project Manager
Project: NMPP: Project Value: + > 2.5 Billion
ZAR
Client: Transnet Capital Projects Ltd

2013

Hatch Africa

April 2013 ~
June 2011

Engineer Manager & Project Manager


Project: ATC: - FEL: 1 & 2: Mafube: Project
Value: 3.5 Billion ZAR
SASOL Mining: - FEL: 1 & 2: Limpopo West:
Project Value: Phase 1 mine (600 million ZAR)
& Phase 2 mine: 5.5 Billion ZAR

UAE/
Bahrain/
KSA/
Kuwait/
Oman

RSA

Troubleshooting & Maintenance of Electrical Equipment ; Generator Excita


Systems ; Electrical Demand-Side Management (EDSM) ; Electrical Equip
& Control Systems ; Start-up, Commissioning & Testing of Electrical Syste
ARC Flash Hazard Analysis ; Modern Power System Protective Relaying ,

Done training in the field of project management ;contracts management ; project


engineering ; leadership

Core Accountability & Execution:


Fully responsible to provide the required leadership , direction and management of the
engineers for TM1 & TM2 packages and provide overall guidance in terms of sc
priorities , technical expediting , progress meetings with Vendors, coordination of te
inspections , final Vendor handover requirements , training and site support requirem
overall status reporting , MOC (management of change) and schedule managem
vendor to enable both Vendor and Consultant engineering scope and site requiremen
priorities in terms of completions and turnover

Issue progress / traffic light reporting ( weekly/monthly)

Core Accountability & Execution:


Coordinated all contracts with the clients and maintained an available working relations
all levels throughout the period of the project
Demonstrated an overriding commitment to health, safety, environmental responsibility
Assumed responsibility for the performance of all tasks needed for the successful com
of the project and as leader of the project team, plans, organizes, directs, manages sta
controls, motivates and stimulates the team to work as an integral / cohesive unit
Defined project scope and objectives
Establishes the basic work plans for engineering, procurement, project control, constru
planning, commissioning, and quality assurance in line with the client and others outsid
Represented Hatch in project execution and maintained official communication with the
and others outside of Hatch
Conducted periodical meetings with the client to review progress, discuss major chang
the work and resolve problems raised between the client and Hatch, (this included the
com meeting / Agenda that was drafted by myself)
Managed key project personnel so that the work can be executed correctly, effectively,
smoothly in accordance with the clients specifications, and all contractual terms and
conditions
Conducted the project for execution in line with the project policy, procedures, instructi
and guidelines
Managed all project personnel matters and settled all problems concerning the organiz
functions necessary to the corporate officers concerned
Reviewed and approved all major change orders and periodically reviewed change ord
controls to determine their adequacy and whether change orders are executed in a tim
manner
Reviewed and approved all major purchases and subcontracts to assure their conform
with the project
Reviewed and approved the work procedures, and schedules prepared for project
administration, engineering, procurement, project control, construction planning and qu
assurance

Page 2 of 22

2011

Worley Parsons

May 2011 ~
June 2009

Project Engineering Manager


(multi discipline)

RSA

Project: CAN: Sasol Nitro: Project Value: 1.25


Billion ZAR
PMC Role: Owner Engineer
Managed Sub Contractors: BE Morgan &
Associates and SNC Lavalin (Belgium)
Managed Engineering Team: Worley Parsons
Air Compressors
Conveyors , Steam Turbines
Vessels
DCS System
SIS / ESD System
Steel Structures
Granulator

2008

RSV ( Read , Swatman & Vogt)

April 2008 ~
Feb 2009

Senior Project Manager & Program Manager


Client : Total Coal RSA

RSA

Reviewed project status of engineering, procurement , and directs the respective group
managers to take necessary measures so as to ensure compatibility with the overall
schedule
Reviewed and approved all project forecast, schedules, cost estimates and approved a
major expenditures
Reviewed and approved quality assurance programs and reports
Coordinated all contracts with the clients and maintained an available working relations
all levels throughout the period of the project
Obtained all necessary client approvals with focus on enhancing client relations
Obtained the clients acceptance of the plant and coordinated completion of final projec
document ; Executed project within timeframe and budget, in the case of SASOL the b
constraint was tight and we delivered on target

Issue progress / traffic light reporting ( weekly/monthly)


Issue Cash flow reports

Core Accountability & Execution:

Responsible for the day to day management and performance of the Engineering
Department (multi discipline)

Management and development of all engineering staff (project related)

Recruitment of engineering personnel in conjunction with HOD of respective engineer


departments

Management of the coordination between ED and other various departments and


disciplines within the ED to ensure compliance with the project scope of work , HSE a
requirements

Responsible for project management of engineering work (basic engineering & detail
& implementation)

Acted as the main interface with the Client for all engineering and technical related ac

Responsible for the finalization of the engineering document deliverables register and
schedule to ensure a timely issue of all deliverables inline with the project schedule

Reviewed and approved all engineering deliverables

Participated in driving all engineering meetings within WP team and that of the Sub
Contractors

At all times maintained a good client relationship

Implementation of good, sound engineering practices to ensure efficient constructabil


value engineering opportunities

Developed and standardized procedures and methods to that improved the efficiency
effectiveness of engineering services, projects, and activities; assesses and monitors
workload, administrative and support systems, and internal reporting relationships;
identified opportunities for improvement

Contributed to the commercial management of the project

Developed /updated a detailed plan / schedule to ensure optimization of resources fo


project completion

Responsible for the document control personnel

Review of Piping ISOs , 3D Model Review

Participate in HAZOPS/HAZAM , SIL assignment reviews

Participate in FAT & SAT


Mange Subcontractors ( International : SNC Lavalin ( Belgium ) & BE Morgan ( RSA) ;
progress & design review meetings at Sub contractors offices in Belgium

Approval of all disciple work ( Electrical , Instrumentation , Civil , Process, Mechanica


,Piping
Piping , ISOs , Piping Layout , Piping Classes ,Design Breaks , Piping Supports ,
Analysis
Manage tank re rating exercise , new VUP regualtions
Managed tank storage instrumentation & tank gauging systems , design , specificatio
design
Develop & design SIS for Nitro plant

Issue progress / traffic light reporting ( weekly/monthly)

Issue & develop project charter


Conducted a pre kick off & kick off meetings with well structured agendas
Develop formal project plan ( ie WBS , scope statement , scope change & verification
control ) , Managing schedule baseline , Cost management ( estimate & manage bud
Procurement management , Risk management , Quality management ( develop & de

Coal Mine : Dorstfotein

Page 3 of 22

RSV Scope : Infrastructure & Rail & Material


Handling
DRA Scope
Beneficiation Plant

2007

FLUOR ( Greenville ) ( USA)

July 2007 ~
Feb 2008

SIPChem Project: Al Jubail, KSA; (DED,


Implementation Phase):
Manager Projects /
Engineering Manager ( Construction)
(Acting as Construction Director
during leave cycles)
Project Value: 1.2 Billion USD

Gas Turbines ,
Compressors & Boilers
Piping
Pumps
Vessels

standards & ensure adherence ) , Communication management ( develop & deploy O


communication matrix & documentation matrix) , Integration management

Manage project by earned value

Manage project scope by a formal change management procedure

Manage variation schedule / register & relevant scope changes

Manages the assigned budget ( EPCM & CAPEX & Sub Consultants)

Responsible for commercial relationship with respect to the project objective & target

Mitigates team conflicts & communication problems

Ultimately responsible for ensuring successful execution of project activities

Act as primary interface to ensure that Clients expectations & to approved basis of d

Setting clear objectives to the engineering & design teams , including of achieving
productivity

Developed a risk register , issues log , decision register etc

Technical responsibility including designing, installation, commissioning and handove

Contract approval & responsibility

Equipment specification / selection

Implementation of HSE & QS programs (including placing of QA engineer)

Responsible for insurance issues

Planning & scheduling

Financial responsibility for aspects of the contract including project budget

Providing sound technical, contractual & commercial advice to the project team

Arranging management reviews at key stages of the project


Implementing suitable management controls / systems & procedures
Adequate reporting throughout the project life to all relevant parties
Developed POP (procurements)
Develop & manage change management procedures , manage contractual issues/
amendments , contractual letters etc

RSA

Construction Side:

Management of Department Managers

Project controls including cost engineering, materials & logistics, contracts and quant
surveyors, engineering, construction, quality assurance, turnover/commissioning, fina
human resources & administration

Setting & managing by objectives ( i.e. CEP construction execution plan) / reevalua
an ongoing basis construction sequence

Setting of short term strategy (overcome the issue of available work fronts)

Continuous interface with the client (SIPCHEM) to address potential issues

Strong interface & management by small informal & formal dialogues / meetings , em
via teleconferencing

Driving of staff meetings (global & individual basis)

Participating in all contractor & subcontractor meetings

Dealing with ongoing safety issues (looking at long term training plans for workforce)

Dealing with contractual issues on an ongoing basis

Interfacing with contractor & subcontractor on both an informal & formal basis
Engineering Side:

Developing relationships with all stake holders

Ensuring that good & clear communications & reporting is achieved

Determining, setting & achieving objectives & goals

Providing ongoing technical support

Understanding, analyzing and solving execution problems

Implementing mechanisms to make methods & system standards consistent

Finding solutions for ensuring and the performance of work

Interfacing with management & vendor management

Ensuring that the project conforms to the appropriate safety standards

Contributing to the commercial management of the project

Safe & efficient delivery of projects to both client and company

Ensuring compliance with company operating and financial procedures within the pro

Providing input to both technical and commercial aspects of the tendering process

Managing design & engineering requirements of the project

Conducting PIER (post implementation evaluation report/interview)

Managing multi million rand projects by the development and implementation of welldeveloped execution plans

Page 4 of 22

2006

Foster Wheeler (UK)

Oct 2006 ~
May 2007

Principal Project Engineer /


Engineering Manager: (PMC)

KSA
( Saudi)

HGCE Project (Habshan) ,UAE


(DED / Implementation Phase
Project Value: 1.0 Billion USD
Gas Turbines ,
Gas Compressors
Boilers
BMS
SIS/ESD
DCS

2006

GLTA / E+PC

June 2004 ~
June 2006

Project Manager ( African Products)


Engineering Manager ( Lagos , Nigeria)
Project Engineer ( Sasol)
Lead Engineer ( Mufiliria , Zambia )

UAE

Implementing QA processes/procedures in line with engineering/design requirement


Broad experience in technology assessment, planning and deployment, budgeting, co
negotiations, recruiting & retention, business planning and cost accounting
Developing /updating a detailed plan / schedule to ensure optimization of resources fo
project completion

Managing FLUOR , MC
Part of the PMT ( Client) (GASCO)
Attending Design reviews (Compressors/SIS/Gas Turbines/Boilers etc.)
Providing ongoing technical support
Understanding, analyzing and solving execution problems
Implementing mechanisms to make methods & system standards consistent
Finding solutions for ensuring and the performance of work
Interfacing with management & vendor management
Ensuring that the project conforms to the appropriate safety standards
Contributing to the commercial management of the project
Safe & efficient delivery of projects to both client and company
Ensuring compliance with company operating and financial procedures within the pro
Providing input to both technical and commercial aspects of the tendering process
Managing design & engineering requirements of the project ( all disciplines)
Conducting PIER (post implementation evaluation report/interview)
Part of the team to evaluate & development and implementation execution plans
Implementing QA processes/procedures in line with engineering/design requirements
Broad experience in technology assessment, planning and deployment, budgeting, co
negotiations, recruiting & retention, business planning and cost accounting
Developing /updating a detailed plan / schedule to ensure optimization of resources fo
project completion

Only skills are reflected here for Lead Engineer / Senior Engineer ( EICS) , the engineering
management & project management requirements would be similar in delivery require
as set above

Page 5 of 22

Engineering & Design (As lead engineer)


Managing the team , Interface on a regular basis to eliminate
issues/concerns
Conceptual phase / feasibility & BED (basic engineering design)
o Conducting feasibility studies, control budget estimates (
scope), manpower forecast schedules, risk & criticality
analysis, preparation and evaluation of proposed project
execution plans, RASCI matrix, technical enquiries &
technical evaluation of various equipment (mechanical,
electrical & control)
Implementation & development
o Performing/preparing design evaluations & calculations,
concept proposals clarification and defining design
requirements, preparation of supporting design
documentation and maintaining integrity of design
identification documentation, estimate of end of job cost
capital application (instrumentation, electrical & control
systems)
o Managing cost control covering change orders,
implementation of authorized modifications to and to issu
variation order - reports
o Managing / leading engineering staff by means of planni
directing and controlling tasks
o Performing relevant engineering calculations- flow, contr
valve, power requirements, intrinsic safety
o Reviewing & approving design documentation /drawings
through the various stages of the project
o Instituting changes in methods, design or equipment as
appropriate
Preparing design documentation i.e. FLD, marshalling cabinet / JB de
termination & wiring detail, control /functional block diagrams, I/O listin
loading of PLC / DCS equipment, piping hook up detail, cable tray layo

design, cable selection AG/UG, application of earthing philosophy / de


Developing instrument index (in line with equip tag & numbering
philosophy), cable schedules, termination detail for junction
boxes/marshalling cabinets, BOM/Q schedules

Liaison with client to ascertain control system requirements and to res


process problems

Supervising and controlling all contractor activities

Development of design strategy, design criteria, technical specification


scope of work, define/develop engineering interface
requirements/specifications
(Design criteria / specification covers instrumentation, control system
protection systems, instrumented protective systems, MIS, OA etc.)

Conducting / attending PHA/PHI (around instrumentation & control


systems)

Attending HAZOP/HAZAN meetings (total plant design)

Ordering equipment, technical review, bid clarification, contract award

Functional / working knowledge of local/international standards,


specifications and statuary requirements i.e. IEC, SABS, BSI, Shell DE
ASI, ANSI, GOSS, OSHACT, MHS, etc.

Instrument control systems:

Discrete through to multiple control systems, distributed control


systems upgrades & installations, control room upgrades and
installations, supervisory systems and interface to control system
process control system optimization, and RIO systems

Instrument protective systems

Discrete through to multiple emergency shutdown and protective


systems, pneumatic and hydraulic systems, alarm systems, and
compressor surge protection

Instrument fire and gas systems

Fire and gas detection system installations and upgrades, catalyti


infrared line of sight and point gas detection, fusible loop, electron
and infrared fire detection, oil mist detection, very early smoke
detection and conventional smoke detection, and deluge systems

Instrument field systems

Hazardous area installations, hazardous area surveys, electronic,


pneumatic and hydraulic systems, local control systems & RTUs,
level, pressure, temperature, vibration and other field instruments

System integration

Liquid leak detection facilities, SCADA systems, custody transfer mete


tankage systems, blending systems, personnel entry systems (mining
Fire & Gas : (overview)

Fire and gas detection system installations and upgrades, catalytic, infrared line
sight and point gas detection, fusible loop, electronic and infrared fire detection,
mist detection, very early smoke detection and conventional smoke detection, a
deluge systems
Stayed intact with new developments in Fire & Safety Engineering Procedures.
(Knowledge of NFPA, OSHA and other relevant International Fire & Safety
Standards).
Safety Instrumented Systems: ( overview )
Experience gained in design and implementation of process control and safety
instrumented systems for chemical, petrochemical, natural gas
Experience gained in working directly with SIS and Emergency Shutdown Syste
(ESD) on petrochemical projects
Established knowledge of PHA and risk assessment processes
Have a working knowledge of OSH ACT , IEC and ISA safety standards /
requirements
Demonstrated ability to perform analysis of safety instrumented functions using
tree analysis and spurious trip analysis
Provide engineering services and lead a team of Safety Instrumented System
engineers in developing information for the creation of design documentation
including: Safety Requirement Specifications applying ISA S84/IEC62511 stand
Safety Integrity Level Calculations, Develop Cause and Effect Matrices for Safe
Instrumented Functions
Lead engineers in the design / selection of both electrical & instrumentation equip
o Control Valve size selection/calculation , Intrinsic loop calculation / de
Orifice Calculations ,ESD designs ,Create I/O list , system integration
schedule / reports

Page 6 of 22


2004

FLUOR ( Sunninghill, RSA)

Oct 2003 ~
May 2004

Senior Engineer (EPCM)


SASOL Turbo Project
(FEED / DED phase):

Nigeria,
Zambia
RSA

Develop a TQL ( technical query list ) / issues log

Gained extensive experience in brown field projects : in planning , managing


& performing/executing work in operating process plants around process automation systems
integration , boiler management systems, software validation & system checkouts and
successful commissioned respective plants
Main Attributes :

Understanding of and having worked with owner plant operating companies ;


Knowing their mentality, priorities, organization (Loss Prevention, operations,
maintenance, technical or engineering etc.); Ability to interact without notice and
think out of the box ; Complete trust and transparency ; Ingrained sense to su
problems immediately and completely ; Execution mentality ; Proactive ; Flexibil
Performance
Involved in terms of execution : Hot cut over ( whole petrochemical refinery
Pneumatics to DCS ) , Boiler management systems , Emergency shutdown syst
Piping tie ins
Managed fairly large teams : + 20 > : technical personnel ( technicians ,
technologists , operation , process engineers )
For the Turbo Project

Discrete through to multiple control systems, distributed control systems upgrades &
installations, control room upgrades and installations, supervisory systems and interfa
control systems, process control system optimization, and RIO systems

Conducting feasibility studies, control budget estimates (total scope), manpower forec
schedules, risk & criticality analysis, preparation and evaluation of proposed project
execution plans, RASCI matrix, technical enquiries & technical evaluation of various
equipment (mechanical, electrical & control)

Performing/preparing design evaluations & calculations, concept proposals clarificatio


defining design requirements, preparation of supporting design documentation and
maintaining integrity of design identification documentation, estimate of end of job cos
capital application (instrumentation, electrical & control systems)

Liaison with client to ascertain control system requirements and to resolve process
problems

Configuring and faults diagnosis of DCS, PLC, SCADA, RTU, Profibus Communicatio
Analyzers and Control Loops.

Installation, calibration and loop checking of the field instruments , Maintenance and
calibration of the control valves , Designing, Implementing and Commissioning of new
control loops as per site requirements , experienced in flow meters configuring
(electromagnetic, orifice plate, ultrasonic, turbine, variable area ) , Review of control
philosophy, P&I diagrams, cause & effect diagrams, instruments list, flow chart , Fami
with engineering standards ISA, IEEE, ASTM, NAMUR, ASMI , ANSI , NEMA , IEC , T
selection, installation and troubleshooting of machine monitoring equipment and prot
systems
Fire & Gas : (overview)

Fire and gas detection system installations and upgrades, catalytic, infrared line
sight and point gas detection, fusible loop, electronic and infrared fire detection,
mist detection, very early smoke detection and conventional smoke detection, a
deluge systems
Stayed intact with new developments in Fire & Safety Engineering Procedures.
(Knowledge of NFPA, OSHA and other relevant International Fire & Safety
Standards).
Safety Instrumented Systems: ( overview )
Experience gained in design and implementation of process control and safety
instrumented systems for chemical, petrochemical, natural gas
Experience gained in working directly with SIS and Emergency Shutdown Syste
(ESD) on petrochemical projects
Established knowledge of PHA and risk assessment processes
Have a working knowledge of OSH ACT , IEC and ISA safety standards /
requirements
Demonstrated ability to perform analysis of safety instrumented functions using
tree analysis and spurious trip analysis
Provide engineering services and lead a team of Safety Instrumented System
engineers in developing information for the creation of design documentation
including: Safety Requirement Specifications applying ISA S84/IEC62511 stand
Safety Integrity Level Calculations, Develop Cause and Effect Matrices for Safe
Instrumented Functions
Lead engineers in the design / selection of both electrical & instrumentation equip

Page 7 of 22

Control Valve size selection/calculation , Intrinsic loop calculation / de


Orifice Calculations , ESD designs , Create I/O list , system integratio
schedule / reports
Develop a TQL ( technical query list ) / issues log
o

2003

KBR

Feb 2003 ~
Sept 2003

Senior Engineer: (EPCM) : SASOL Polish


Water Upgrade Project

RSA

(BED / DED phase): Feb, 03 ~ Sept, 03

2003

EHL

Dec 2002 ~
Jan 2003

Project Engineer: (As consultant): EHL


Consulting Engineers:
Anglo Platinum Mines :Concentrator Upgrade
Project: (DED phase)

RSA

Developed Sequential Control Narrative


Developed RFQ packages for various equipment like analyzers etc.
Developed DC & Specification for PRV
Developed Cause & Effect Diagrams , this plant was highly interlocked both in contro
permissive to start
Discrete through to multiple control systems, distributed control systems upgrades &
installations, control room upgrades and installations, supervisory systems and interfa
control systems, process control system optimization, and RIO systems
Conducting feasibility studies, control budget estimates (total scope), manpower forec
schedules, risk & criticality analysis, preparation and evaluation of proposed project
execution plans, RASCI matrix, technical enquiries & technical evaluation of various
equipment (mechanical, electrical & control)
Performing/preparing design evaluations & calculations, concept proposals clarificatio
defining design requirements, preparation of supporting design documentation and
maintaining integrity of design identification documentation, estimate of end of job cos
capital application (instrumentation, electrical & control systems)
Liaison with client to ascertain control system requirements and to resolve process
problems

Short term assignment

to look a functional control & substation interlocking requirement for a design basis
project ) on the concentrator and ancillary requirement

Interfacing with other disciplines

Writing of SoS/SoW

Preparing of RFQ to Control Vendors


Technical Adjudication & selection

2001

Bateman

Feb 2001 ~
Sept 2002

Lead Engineer / Project Engineer:


BATEMAN: Alrosa & Norlisk (Russia) & PMR
(RSA)
(BEP / FEED / DED phases): Feb, 01 ~ Sept,
02

RSA

My team consisted 6 ( senior engineers & Designers ) / this excludes the CAD operat

Discrete through to multiple control systems, distributed control systems upgrades &
installations, control room upgrades and installations, supervisory systems and interfa
control systems, process control system optimization, and RIO systems
Conducting feasibility studies, control budget estimates (total scope), manpower forec
schedules, risk & criticality analysis, preparation and evaluation of proposed project
execution plans, RASCI matrix, technical enquiries & technical evaluation of various
equipment (mechanical, electrical & control)
Performing/preparing design evaluations & calculations, concept proposals clarificatio
defining design requirements, preparation of supporting design documentation and
maintaining integrity of design identification documentation, estimate of end of job cos
capital application (instrumentation, electrical & control systems)
Liaison with client to ascertain control system requirements and to resolve process
problems
Configuring and faults diagnosis of DCS, PLC, SCADA, RTU, Profibus Communicatio
Analyzers and Control Loops.
Installation, calibration and loop checking of the field instruments , Maintenance and
calibration of the control valves , Designing, Implementing and Commissioning of new
control loops as per site requirements , experienced in flow meters configuring
(electromagnetic, orifice plate, ultrasonic, turbine, variable area ) , Review of control
philosophy, P&I diagrams, cause & effect diagrams, instruments list, flow chart , Fami
with engineering standards ISA, IEEE, ASTM, NAMUR, ASMI , ANSI , NEMA , IEC , T
selection, installation and troubleshooting of machine monitoring equipment and prot
systems
Participate in HAZOPS /HAZANS. , COM , studies
Participate in FAT & SAT
Lead engineers in the design / selection of both electrical & instrumentation equipmen

Project Value: 1.0 Billion ZAR


For RUSSIA we used GOSS standards

Page 8 of 22

o
1999

Software Development

Feb 1999 ~
Jan 2001

Gensec & Debeers Marine

1997

Foxboro Malaysia / Petronas

Jan 97 ~ Jan Lead Engineer / Project Engineer /


1999
Construction Manager

Control Valve size selection/calculation , Intrinsic loop calculation / design


Orifice Calculations , ESD designs ,Create I/O list , system integration sch
reports , devlop an doc register for both Electrical & Instrumentation

Russia
& RSA

Development

RSA

Lead /Project Engineer

Driving the engineering team

Development of Design Criterias & Specifications

Development of Design Basis

Development of Commissioning Philosophies

Attending Design reviews (Compressors/SIS/Gas Turbines/Boilers etc.)

Providing ongoing technical support

Understanding, analyzing and solving execution problems

Implementing mechanisms to make methods & system standards consistent

Finding solutions for ensuring and the performance of work

Interfacing with management & vendor management

Ensuring that the project conforms to the appropriate safety standards

Contributing to the commercial management of the project

Safe & efficient delivery of projects to both client and company

Ensuring compliance with company operating and financial procedures within th


project

Providing input to both technical and commercial aspects of the tendering proce

Managing design & engineering requirements of the project

Conducting PIER (post implementation evaluation report/interview)

Part of the team to evaluate & development and implementation execution plans

Implementing QA processes/procedures in line with engineering/design requirem

Broad experience in technology assessment, planning and deployment, budgeti


contract negotiations, recruiting & retention, business planning and cost accoun

Developing /updating a detailed plan / schedule to ensure optimization of resour


for project completion

MLNG Upgrade Project: (FEED/BED/DED


phase)

New compressors
Upgrade on Boilers
Upgrade on some Compressors
Revised ESD system upgrade
New ADAS system
New LIMS system
New/ updated BMS
New Anti-Surge controllers

development of distributed databases ( MS Access , SQL Server & oracle),


SQL data definition , retrieval & manipulation

Construction/Site Management (As engineer / construction manager)

Installation/erection

Developing / implementing construction execution plans, incorporating qu


assurance programs, site supervision, safety programs, site administratio
installation tasks ( WBS/method statements/work instruction) managemen
site task force, monitor, audit and analyse project schedules, monitor con
conduct progress meetings, client interface / liaison, solve/ manage site
problems (and any other issues not project related), AFC drawings (final
review) prior to implementation

Commissioning

System integration testing, system checkouts, site acceptance testing, loo


function checks DCS/ESD/PLC configuration verification, loop tuning, boil
management systems, compressor control systems, machine monitoring
protection systems
Management / team leader of commissioning teams, hot cut over for com
refinery (covering DCS/ PLC /ESD/ BMS & Field Instr) ; Documentation co

Electrical

Writing specifications for electrical equipment: preparing calculations for load, sh


circuit current and motor starting

Preparing designs for low voltage switchgear, motor controls, power/light distribu
boards and speed control
Requisition, installation, checkout and commissioning , Substation layout design
cable routing layout designs
1996

Star Petroleum / CSTL and Yokogawa

Jan 1996 to
Dec 1996

Technical Specialist (DCS systems)


/Lead Engineer : CSTL: SPRC Project: &
Yokogawa , Philippines
(DED & implementation phase

Borneo
& Malaysia

Manage DCS Parts Inventories.

Develops and organizes training programs for CSEs, Inspectors and Maintenance

Page 9 of 22

DCS system was CS Centum ( Yokogawa)


Technicians.

1995

Eni / MACS ( my consultancy business at that time)

Jan 1995 ~
Dec 1995

Project Engineer: MACS / EnI: Saldanha:


Stacker & Reclaimer - Upgrade Project
(DED phase): Jan, 95 ~ Dec, 95
Scope:
PLC Systems
Switch gear
Communication Protocols
Operating & Handling Procedure ( revised)

Review DCS PMs and create/modify new ones as needed.

Audit DCS maintenance reports and PM documentation.

Provide technical input and review to corporate and local projects organizations. Prov
integration between production support and project organization.

Represent location in control engineering networks.

Report DCS bad actor and supporting infrastructure performance to Local & Corporat
Management.

Review new DCS designs & implementation to verify compliance with corporate polic
industry, and local standards.

Review/Audit CSE work processes and procedures for compliance with MOC policy.
Review derogations as needed.

Implement successful practices to improve DCS reliability and minimize life cycle cos

Assists Control Systems Engineers and other technical personnel on control discipline
areas above their levels of expertise. Manage DCS budget and contracts.

Plan software and hardware upgrades

Review Honeywell patches for applicability to PAR systems.

Communicate maintenance/upgrade plans and implementation risks to Operations.

Develop & maintain DCS Asset Management Plan.

Review/Develop DCS procedures for common technical activities.

Identifies new long-range opportunities for step-change improvement in performance


DCS.

Coordinate input to DCS User Input Subcommittee for the site.

Communicates local and corporate policy requirements and changes and explains ho
comply. Pipelines.

Develop configurations for Centum XL , also PLC/SCADA for Sequential control , Utili
plants , BMS , Boiler Management Systems

Thailand &
Philippines

Upgrade of Electrical
Upgrade on Material Handling / control & Interlock
Upgrade on Stacker & Reclaimer electrical control to PLC (Siemens)
Plant Wide Control /Implementation
Asset Management
Maintenance Operating Plan produced
Small team ( 3 engineers )
Development of SCADA
Development of Graphics
Implementation of new Substation Design

Page 10 of 22

Electrical : ( low voltage & Medium Voltage ) ( condensed overview )

Writing specifications for electrical equipment: preparing calculations for load, short ci
current and motor starting

Preparing designs for low voltage switchgear, motor controls, power/light distribution
and speed control
Requisition, installation, checkout and commissioning , Substation layout designs, ca
routing layout designs
1994

CMW / MACS ( my consultancy business)

Jul 1994 ~
Dec 1994

Technologist: MACS / CMW: MCC Bokomo


Upgrade Project
(DED phase):
MV Switch Gear ( added )

1994

MACS

Jan 1994 ~
June 1994

Technical Service Manager: MACS:

1989

ARGUS Control Systems

Jan 1989 ~
Dec 1993

Construction / Commissioning Engineer


IMAC Caltex Upgrade Project: Jan89 ~ Dec,
93

1985

AECI

April 1985 ~
Dec 1988

Senior Technician:
Maintenance on EICS ( NH3 & Nitric
Acid Plants)

1984

RSA
Saldanah

, Electrical : ( low voltage & Medium Voltage ) ( condensed overview )

Writing specifications for electrical equipment: preparing calculations for load, short ci
current and motor starting

Preparing designs for low voltage switchgear, motor controls, power/light distribution
and speed control
Requisition, installation, checkout and commissioning , Substation layout designs
routing layout designs

RSA
, Electronics (As technician / manager)

Consumer
Cape Town

Technical workshop management

Fault finding on various makes of TV / VCR / CD equipment

Functional knowledge of TV/VCR/CD circuits & theory

Functional knowledge in the application of sophisticated test equipment

Power (industrial)

Fault finding on thyristor / industrial electronics equipment / circuit boards down to


component level
Functional knowledge in the application of sophisticated test equipment

RSA
, Construction/Site Management (As engineer / construction manager)
Installation/erection
Cape Town

Developing / implementing construction execution plans, incorporating quality assura


programs, site supervision, safety programs, site administration, site installation tasks
( WBS/method statements/work instruction) management of site task force, monitor, a
and analyse project schedules, monitor contracts, conduct progress meetings, client
interface / liaison, solve/ manage site problems (and any other issues not project rela
AFC drawings (final review) prior to implementation
Commissioning

System integration testing, system checkouts, site acceptance testing, loop function c
DCS/ESD/PLC configuration verification, loop tuning, boiler management systems,
compressor control systems, machine monitoring and protection systems

Management / team leader of commissioning teams, hot cut over for complete refiner
(covering DCS/ PLC /ESD/ BMS & Field Instr) ; Documentation control
Maintenance ( duringTCCC)

Industrial plants (Petrochemical/ fertilizer)

Installation, maintenance and fault finding on indicating, control, alarm recording, trip
supervisory systems

Management/supervision of maintenance crews

Gained extensive knowledge in the use of various test equipment in fault finding /
troubleshooting of pneumatic, hydraulic and electronic systems
Conducting root cause analysis, monitoring and optimizing plant performance, initiatin
implementing plant modifications, plant condition monitoring

Maintenance

Industrial plants (Petrochemical/ fertilizer)

Installation, maintenance and fault finding on indicating, control, alarm recording, trip
supervisory systems

Management/supervision of maintenance crews

Gained extensive knowledge in the use of various test equipment in fault finding /
troubleshooting of pneumatic, hydraulic and electronic systems
Conducting root cause analysis, monitoring and optimizing plant performance, initiatin
implementing plant modifications, plant condition monitoring

AAC ( Anglo American Corporation)

Page 11 of 22

April 1984 ~
Mar 1985

Engineering Technician: R&D

RSA
, Research & Development
Cape Town

Water Jetting Guns , Nozzles , Stope Cleaning , Backfill

Rock Drill Bits ( composition)


Fluidic Power Control (As engineering technician)

Hydraulic system design, load consideration, system design options, component sele
and assessment

Hydraulic failure analysis, mode identification, causation & prevention


Research Reports

Issue to Chamber of Mines

1983

FEDMIS Fertilizer

Mar 1983 ~
Mar 1984

Instrument Technician : Fedmis

1982

GBS Wang / Customer Engineering ( Johannesburg & Cape Town)

Mar 1982 ~
Feb 1983

Computer Service Engineer:

1974

CALTEX Refinery

Feb 1974 ~
Feb 1982

1969

RSA
Welkom
OFS

Process Operator
Pupil Technician
Instrument Technician / Senior
Technician:

General Plant Maintenance around instrumentation & Control

Computer Servicing ( workshop & call out)


Hard Drive repair , Hard drive alignments ,Types : Osborne & Wang Computers ,PCB (
repairs ) , Software Development ( basic )
Qualified as a process operator on the following plants / units: Vacuum, Naptha,
Merox, GCU and FCCU
Trained on Industrial Process ( Instrumentation & Electrical )

Maintenance (As technician / senior technician)


Industrial plants (Petrochemical/ fertiliser) , Installation, maintenance and fault fi
on indicating, control, alarm recording, trip and supervisory systems ,
management/supervision of maintenance crews
Gained extensive knowledge in the use of various test equipment in fault finding
troubleshooting of pneumatic, hydraulic and electronic systems , Conducting roo
cause analysis, monitoring and optimizing plant performance, initiating and
implementing plant modifications, plant condition monitoring
Network
Functional knowledge of various typical instrumentation network applications

SAR & H ( South African Railway & Harbours )

Jan 1969 ~
Shipping / Wage Clerk
Performed administrative duties
Dec 1973
3. Membership in Professional Associations and Publications:
Memberships:

Fellow: Institute of Measurement and Control (UK): # S19450

Fellow: Institute of Engineering and Technology (old IEE)(UK): # 1100179684

Senior Member : IEEE : Institute of Electronic & Electrical Engineers (USA) : # 90883894

Senior Member : ISA : International Society of Automation (USA) : # 33178502


Publications:

Over 60 extensive / detailed articles placed on Slideshare and Linkedin ( topics in the area of engineering & engineering/project management )
4.

Professional Licensing:

International Professional Engineer : IntPE(UK)(ECUK) : License No : # 20069 (2015)

European Engineer : Eur Ing (FEANI) : License No : # 29338 (2006)

Chartered Engineer : C Eng (ECUK) : License No : # 409374 (2005)

Incorporated Engineer : I Eng (ECUK) : License No : # 409374 (1992)

5.

Certification:

Certified as International Project Manager (CIPM)

Certified as Master Project Manager (MPM)

6.

Institute Involvement:

IET(UK) : Technical Professional Review./ Interviewer : ( for C Eng & I Eng Registration)

IET(UK) : Mentor ( Electrical & Power )

IET(UK) : International Professional Registration Advisor

InstMC(UK) : Mentor ( Instrumentation & Control Systems)

7.

Registration: (nothing planned)

8.

CFSE : ( Certified Functional Safety Expert ) : writing the exam in march 2017 ( been accepted as a candidate by Exida)

9.

Independent Training , Research & Development : ( private ) :

Page 12 of 22

ADAS (automated driver assisted systems) ( using 8051 MCU) / low scale / require funding
Microcontrollers 8051/8052 & PIC (8/16 bit range)
C++ programming (basic > intermediate)
Excel VBA programming (basic > intermediate)
MS Access Development ( > intermediate)
Machine Learning (basic > intermediate) : course Stanford University & University of Washington

10. Serve on Councils / Boards:

Serve of the advisory board : Life Boat Foundation ( http://lifeboat.com/ex/bios.stephanus.roux) ( areas -Engineering ; Futurists & AI )

Serve on ISA : Standards Committees (various)( for + > 4 years )( still active on some committees )
11. Hobbies:

Amateur Radio ( call sign ZS6XRS )/ Radio Amateur Astronomy


Model Trains ( N Scale)
Ancient Egypt ( middle Kingdom)
Reading : General
Reading : Technical

Language Skills (indicate only languages in which you can work):


Speaking / Understanding
English
Full professional proficiency
Full professional proficiency
Basic Proficiency
Basic Proficiency

Reading / Understanding
Full professional proficiency
Full professional proficiency
Intermediate Proficiency
Intermediate Proficiency

Writing / Understanding
Full professional proficiency
Full professional proficiency
Basic Proficiency
Basic Proficiency

12. Adequacy for the Typical Assignments: ( as manager : engineering or projects )


( note , not a mirror copy of CV , but selected areas of management , also note that with companies like GLTA , Hatch , WP , FLUOR , etc , you engage in
multiple projects in different roles over the employment period )

Mr. Stephanus ROUX , Capabilities : Expert Level ( as manager of engineering & manager of projects )
Profile:
Determined leadership style, pragmatic approach to problem solving and huge depth of technical experience. A dedicated, proactive and highly experienced
engineering practitioner, with extensive technical, project management and leadership expertise gained through senior executive positions within the
construction, oil and gas industries on an international level. A goal-oriented and organized achiever committed to maintaining high standards and generating
effective solutions facilitating the successful completion of large and complex projects within strict time and budgetary constraints. Accustomed to a global
arena and a multi-cultural workplace; open-minded and receptive to new ideas and innovative approaches. A strong and supportive leader with a record of
success who inspires by example and builds cohesive teams through motivation and the recognition and encouragement of potential. Articulate and outgoing,
an accomplished communicator with excellent interpersonal skills who commands respect and credibility through breadth of knowledge and personal integrity.
Professional Accomplishments; (acclaimed)

I managed maintenance teams on Petrochemical and Fertilizer plants

I managed commissioning teams (turnover management) of 2 complete petrochemical refineries

I managed construction teams on Petrochemical , LNG and Fertilizer plants

I managed engineering teams on Petrochemical and LNG projects as Principal Engineer and as Principal Project Engineer

I managed engineering teams as Engineering Manager on projects for Oil & Gas (tank farm), Fertilizer and Mining projects

I managed project teams as Project Manager on projects for Oil & Gas (tank farm), Food Processing , Fertilizer , Coal Mining and Coal Mining :
Infrastructure

I have experience in doing technical proposal/bidding for both mining & petrochemical projects
Programme / Project Management : ( skill set )
Knowledge:

Page 13 of 22

Produce a strategic plan and strategic goals (e.g. Balanced Scorecard approach) ; Measure benefits (e.g. earned value analysis) ; Manage
projects and programmes, including planning and organisation, management of quality, risk management, benefits management and change control

Resolve conflict ; Build relationships with stakeholders up to executive level ;Facilitate workshops with executive-level stakeholders and project
managers ; Facilitate organisational learning across projects within a programme ; Allocate budgets and skilled resources optimally ; Negotiate with
clients and suppliers ; Manage programme-level budgets, contracts and finances
Skills & Experience :

Design and plan programmes in alignment with corporate strategy ; Define roles and responsibilities, allocate and manage resources across
projects (including project management teams) ; Manage interdependencies and the resolution of conflict among projects within a programme

Measure and manage the realisation of business benefits [intermediate to advanced] ; Manage all internal and external stakeholders to the
programme [intermediate to advanced] ; Re-align projects within a programme based on a changing business requirement and corporate objectives,
including the identification of projects to be stopped ; Manage quality within a programme, while maintaining "business as usual" ; Manage
programme risks and issues ; Manage the financial and contractual aspects of a programme ; Market the programme to internal and external
stakeholders ; Manage third-party contributions to a programme (e.g. contractors) ;Coach project managers ;Lead organisational transformation
;Communicate effectively with programme stakeholders at all levels
Key Performance Areas :

Delivery of overall programme and constituent projects within budget, time, scope and resource (utilisation) constraints ; Delivery of products
according to quality criteria ; Successful management of programme risks ; Realisation of business benefits forecast in the business case

Meeting of internal and external stakeholder expectations


Job Knowledge:

Knowledge of projects organization, policies, procedures and programs including QA and Safety.; , Knowledge of industry, technology and EPC
work processes, including knowledge of customs, culture and business practices of UAE Region, where project is located.Experience with lump
sum and reimbursable projects.;

Knowledge of front-end activities including:


o

Best Practices/ Lessons Learned

Constructability

Risk Analysis/ Contingency Evaluation

Estimate/ Proposal Review Process

Ability to effectively organize and staff a project team in a matrix organization

Estimate/ Proposal Review Process

Ability to effectively organize and staff a project team in a matrix organization

Knowledge and understanding of industry standard tools, techniques and procedures including

Project Controls ; Financial management ; Records management ; Root Cause Analysis ; Scope definition

Cash flow management


Knowledge and experience in Project Execution Plan development and implementation
Knowledge of continuous improvement methodologies.
Knowledge of cross functional work processes and interface knowledge, especially Project Controls, Supply Chain management, Quality
management and the ability to manage the relationships/interfaces with management and functional groups.
Knowledge and experience in contracts/subcontracts formulation, risk analysis, negotiations, and implementation including:
o Change control and documentation management , Cost trend
program and its linkage to change control ,Oral, written and graphic
communication and presentation skills., Ability to conduct effective
meetings

Page 14 of 22

Reference to Prior Work / Assignments that Best Illustrates Capability to Handle the Assigned Tasks:
Mr. Stephanus ROUX is a senior project manager / engineering manager and construction management professional having more than 38 years experience in
the Oil & Gas, Coal Mining, Fertilizer and Petrochemical industries on projects in : RSA , UAE , KSA , Thailand , Malaysia , Russia , Zambia and Nigeria
assignments have included key project engineering and construction roles on both Greenfields and Brownfields projects.
He is best suited for roles where responsibilities involve management of all aspects of development and execution of work scopes as well as support and
supervision of site activities.
Capability : ( Development )
Scope management Engineering Plan Development Project Execution Plan EWP Project Charter WBS CWP CEP Design Criteria
( Electrical , Instrumentation , Control Systems ) Specification (Electrical , Instrumentation , Control Systems ) Design Reviews & Approval of Mullti
Discipline design deliverables SIS/SIL assignments HAZOP Change Management Integration Management POP
He has broad experience in a variety of roles:
project manager engineering manager construction manager project engineer commissioning manager maintenance engineer senior
technical advisor instrument engineer electrical engineer
He has worked on a diverse range of projects:
EPC / EPCM projects in onshore oil and gas , petrochemical , LNG , fertilizer facilities construction projects Operating terminals that stored and handled
refined oils and petrochemicals
He has worked during various project stages:
pre-feasibility & feasibility study trade-off studies concept selection studies basic design engineering FEED detailed engineering
construction management commissioning plant operation and maintenance
He has demonstrated ability to:

maintain effective relationships with in-house disciplines and project services groups liaise with contractors/ sub-contractors and service companies
foster rapport with clients

Behavioural Competencies : (Possess )

Customer Focus

Planning & Organising

Using Initiative Achieving Goals

Decision Making & Problem Solving

Effective Communication

Team & Collaborative Working

Effective Relationships & Networking

Innovation & Creative Thinking

Change, Adaptability & Flexibility

Leadership

Continuous Development (Self & Others)

Thinking & Acting Strategically

Page 15 of 22

Some of the Roles and responsibilities of the positions Stephanus Roux has worked on in his professional career are highlighted in
the section that follows:
( note , not a mirror copy of CV , but selected areas of management , also note that with companies like GLTA , Hatch , WP , FLUOR , etc , you engage
in multiple projects in different roles over the employment period )
Year & Duration: 20151 ( 5 months)
Project : NH3 Upgrade ( Arzew & Annaba )
Contract Type : EPCM ( BEP & FEED )
Manpower : 35 ( team part : Client (Algerian) , PMC (Spanish) & EPC ( UK & Italian)
Location: Algeria
Client: FERTIAL Spa
Main Project Features:
Improve the NH3 capacity on the plant , new NH3 tankage , new Compressors ( Gas ) , new Gas turbines , new Turbines & motors , new Flare , New CCR ,
New DCS ( upgrade /change of control philosophy , new ESD / SIS system.
Positions Held: Project Manager / Director
My responsibility was intensely tied to reviewing of technical detail , as well as managing the project
Project Value : 350 million USD
Activities Performed:
As per : BEP / FEED guideline

Develop of skillset / schedule ( to establish strengths& weaknesses ) / to understand potential success of project with manpower in hand

Synchronize of technical detail , to CRS ( client requirement specification)

Review of engineering details , review of comments that was raised on detail

Chairing of meetings ( engineering )

Management of team & PMC

Raising of Contracts letters

Approval of PDB , Specification and Design Criteria of all equipment as per scope

Team motivations, one on one discussions , try to improve the skill sets

Main Focus : Mechanical equipment ( Vessels , Piping , Compressors Flare , NH3 Tanks ) , Electrical ( Substation Requirement , Switchgear ) ,
Instrumentation ( field instrumentation , DCS & ESD systems )

Discussion with ARH ( Algerian equivalent of OHS (act))/ reason we had to do plant upgrades while plant is running ( pipe rack changes , cable racking ,
cable laying , installing of new JB , relocation of CCR ( do a hot cut over , etc. )

Development of Execution Plan ( engineering , project , construction , commissioning ( start up/shutdown procedures) , some of this I developed myself

Participate in Technology Selection / in line with the set Criteria

Endorse / Implement Value Improving Practices (VIPs)

Participate in HAZOPS , HAZAN & SIL assignments

Approval of final Compressor designs


Develop a detail communication plan ( to PMC , ARH & Internal)
Year & Duration: 2011 ( 18 months)
Project : Mafube (Nooitgedacht ), LifEx
Contract Type : EPCM /NEC
Manpower : 28
Location: South Africa
Client: ATC ( Anglo Thermal Coal ) & Sasol Mining ( Small mine 600Million ZAR)
Main Project Features:
To develop a new greenfield open cast coal mine in the Lephale area , open cast mine , using IPCC , with all the infrastructure , beneficaitition plat , water
washing , infrastructure , roads , rail etc
Positions Held: Project Manager
Project Value : 5.5 Billion ZAR
Activities Performed:
As per : FEL 2 , FEL3 ( Criteria )

Setting up of team / set meetings of lead engineers to discuss scope of services / expectation

Discussion with lead engineers the required scope of services / FEL required / discipline

Coordinating the input to and review of design by the lead & discipline engineers;

Overall responsibility to develop and maintain design and drafting procedures and standards specifically for the compressor project;

Was responsible to check the integrity of engineering data received from Client

Had the overall responsibility to deliver Basic Design Package meeting project requirement;

Was responsible for design optimization and improvement during Basic Design of the compressor project;

Participate in Risk Analysis Participate in Technology Selection Participate in Cost Estimate Review Preliminary Project Schedule Block Flow
Diagrams Process Cases Identified Long Lead Equipment Identified

Assist in the Development of Overall Project Execution Strategy Permitting & Regulatory Compliance Plan Process and Utility Flow Diagrams For
Selected Option(s) Preliminary Sized Equipment List and Specifications Process Hazards Analysis Report Endorse / Implemented Value Improving
Practices (VIPs)

Develop a detailed communication plan

Page 16 of 22

Year & Duration: 2011 ( 8 months)


Project : Mafube (Nooitgedacht ), LifEx
Contract Type : EPCM /NEC
Manpower : 28
Location: South Africa
Client: ATC ( Anglo Thermal Coal )
Main Project Features:
Too develop a new greenfield coal mine in the Lephale area , open cast mine , using IPCC
Positions Held: Engineering Manager ( 1st phase , then PM for 2nd Phase)
Project Value : 5.5 Billion ZAR
Activities Performed:
As per : FEL 2 , FEL3 ( Criteria )

Setting up of team / set meetings of lead engineers to discuss scope of services / expectation

Discussion with lead engineers the required scope of services / FEL required / discipline

Coordinating the input to and review of design by the lead & discipline engineers;

Overall responsibility to develop and maintain design and drafting procedures and standards specifically for the compressor project;

Was responsible to check the integrity of engineering data received from Client

Had the overall responsibility to deliver Basic Design Package meeting project requirement;

Was responsible for design optimization and improvement during Basic Design of the compressor project;

Participate in Risk Analysis Participate in Technology Selection Participate in Cost Estimate Review Preliminary Project Schedule Block Flow
Diagrams Process Cases Identified Long Lead Equipment Identified

Assist in the Development of Overall Project Execution Strategy Permitting & Regulatory Compliance Plan Process and Utility Flow Diagrams For
Selected Option(s) Preliminary Sized Equipment List and Specifications Process Hazards Analysis Report Endorse / Implemented Value Improving
Practices (VIPs)

Page 17 of 22

Year & Duration: 2008 ( 12 months )


Project: Dorstfontein Project
Contract Type : EPCM / FIDIC
Manpower : 28
Location: South Africa
Client: Total Coal RSA
Main Project Features:
Project : coal mine ( opencast ) , beneficiation plant , material handling ( few conveyor runs +./- 12 kilo meters) & railroad , rail bridges , power plant
substation plant ,
Positions Held: Senior Project Manager / Programme Manager
Sub- Contractor : DRA ( scope was Beneficiation plan , washing pant etc)
Project Value : 1.65 Billion ZAR
Activities Performed:
As per : FEL 2 , FEL3 , FEL 4

Developed for Client approval ; project management plan ; project execution plan ; project charter ; procurement operating plan / philosophy

Develop a RASCI matrix ; issues log / needs list/Conflict Register ; Discussion Register ;

Develop a PM checklisy ,& to do list

Develop a change notice register

Develop e meeting schedule ; client & team

Arrange a risk analysis & manage risks ; advise Client of pending risks

Set for strong team cohesion & work results at the required integrity

Review of CRS ( Client Operating Procedure ) & SRS ( Safety Requirement Specification)

Start the team to develop BEP/FEED , issues designs after internal review & approval

Look at the required deliverable list per discipline / synchronize to schedule & my PEM management document

To perform adequacy checks of the existing facility;

Responsible for Institutional Development (training) relevant to his area of working;

Provide inputs for Pre-Qualification of EPC bidders and technical evaluation of EPC Bids received by BGFCL;

Supervise the detail engineering review stage of the project;

Provided engineering inputs on receipt of change orders from the contractor;

Check and review the pre-commissioning, commissioning, start-up procedures/checklist before implementation;

Check and review one year O&M Plan;

Participate in HAZOPS

Develop and maintain progress measurement systems for the engineering phase of the project;

Ensure that EPCM Contract is executed well within time and estimated cost with the satisfactory and acceptable level of quality;

Participate in Risk Assessments Technology Selection Potential Sites Identified Cost Estimate Preliminary Project Schedule Block Flow Diagrams
Process Cases Identified Long Lead Equipment Identified

Updated Strategic Business Assessment Project Schedule Level 1 Cost Estimate Overall Project Execution Strategy Permitting & Regulatory
Compliance Plan Process and Utility Flow Diagrams For Selected Option(s) Preliminary Sized Equipment List and Specifications Process Hazards
Analysis Report Endorse / Implemented Value Improving Practices (VIPs)

Year & Duration: 2009 ( 25 months)


Project: CAN Project / ( Fertilizer Plant)
Contract Type : EPCM / NEC
Manpower : 14
Location: South Africa
Client: SASOL Nitro
Main Project Features:
To develop a new fertilizer plant using different granulator technology , it included conveyors , boilers , vessels , drums & steam turbines , air compressor
Positions Held: Engineering Manager
Project Value : 1.5 Billion ZAR
Activities Performed:
As per : FEL 2 , FEL3 & FEL4 ( Criteria )

Set team to review BEP ( this was done by another company other than WP)

Set for strong team cohesion & work results at the required integrity

Review of CRS ( Client Operating Procedure ) & SRS ( Safety Requirement Specification)

Start the team to eliminate errors on BEP & Update of Basic Designs

Look at the required deliverable list per discipline / synchronize to schedule & my PEM management document

To perform adequacy checks of the existing facility;

Responsible for Institutional Development (training) relevant to his area of working;

Provide inputs for Pre-Qualification of EPC bidders and technical evaluation of EPC Bids received by BGFCL;

Supervise the detail engineering review stage of the project;

Provided engineering inputs on receipt of change orders from the contractor;

Check and review the pre-commissioning, commissioning, start-up procedures/checklist before implementation;

Page 18 of 22

Check and review one year O&M Plan;


Participate in HAZOPS
Develop and maintain progress measurement systems for the engineering phase of the project;
Ensure that EPCM Contract is executed well within time and estimated cost with the satisfactory and acceptable level of quality;
Participate in Risk Assessments Technology Selection Potential Sites Identified Cost Estimate Preliminary Project Schedule Block Flow Diagrams
Process Cases Identified Long Lead Equipment Identified
Updated Strategic Business Assessment Project Schedule Level 1 Cost Estimate Overall Project Execution Strategy Permitting & Regulatory
Compliance Plan Process and Utility Flow Diagrams For Selected Option(s) Preliminary Sized Equipment List and Specifications Process Hazards
Analysis Report Endorse / Implemented Value Improving Practices (VIPs)

Year & Duration: 2007 (12 months)


Project: SIPChem Upgrade
Contract Type : EPCM /NEC
Manpower : 24 (118 when standing in as construction director)
Location: Al Jubail , Saudi Arabia
Client: SIPChem
Main Project Features: Process plant upgrade , gas compressors and turbines and DCS /ESD upgrade
Positions Held: Construction / Engineering Manager
Activities Performed:

Quality of designs ( AFD/AFC ) were far below the required mark / a 30% of rework in design was undertaken in / on Site
Some of the installation procedure / method statement were far below the required mark , I rewrote some method statements . I approved all method
statements ( original & rewritten ones)
Develop / Approve Lifting plans ( crane)
Review of Cathodic Protection designs / some rework
Reviewed DCS / ESD system designs / lot of rework
Reviewed Substation Designs / some rework
Review Compressor Designs & Installation (approval)

Year & Duration: 2006 (12 months )


Project: HGCE
Contract Type : EPCM
Manpower : 14
Location: Habshan , UAE
Client : GASCO
Main Project Features: Total Plant Upgrade , New Sections. Included New Substation (HV/MV/LV) , DCS / ESD , Gas compressors & Gas Turbines
Positions Held: Principal Project Engineer / Engineering Manager
Activities Performed:

Quality of AFD/AFC , were below the required standard


Had a team of engineers to review AFD/AFC ( & re approve & re issue)
Participate PQA & approval ( quality)
Approval of Method Statements
Review/Support of Equipment Installations
Set meetings / work loads

Year & Duration: 2004 ( 16 months)


Project: LRPF Tank Farm
Contract Type : EPC / FIDIC
Manpower : 22
Location: Lagos , Nigeria
Client: ENERGEM
Project Features: Total new tank farm ( 15 tanks ) , with the required piping , motors , control room , tank loading arms ( jetty ) , substation ,
PLC/SCADA
Positions Held: Engineering Manager
Activities Performed:
FEL 1 , FEL 2 , FEL 3 , FEL 4

Manage a fairly large team in the feasibility study to execution

Team consist of lead engineers , engineers , designers , cad operators etc

Covered all designs ( piping , mechanical , instrumentation, electrical , process )

Covered all equipment acquisitions ( RFQ)

Covered all technical & commercial adjudications

Covered all installation procedures

Covered all commissioning ( hot & cold)

Covered plant Start up , performance testing & plant handover

Page 19 of 22

Year & Duration: 2004 ( 8 months)


Project: WSA & AMS Project
Contract Type : EPCM / FIDIC
Manpower : 6
Location: Secunda , South Africa
Client: SASOL Synfuels
Project Features: new control room ( small / remote ) , new engineering work stations , new control panels , extra control cabinets ( with marshalling cabinets)
, integration to existing cabinets/units , testing of revised interlocking & sequence control
Positions Held: Project Engineer
Activities Performed:

Develop project specific specifications / standards

Development of operational requirements

Finalise contract scope

Set a deliverable list ( design )

Develop design criteria

Set / engage in meetings Client & Internal

Drive for approval & Equipment / Acquisition , Installation and Commissioning-

Year & Duration: 2001 ( 18 months )


Project: Alrosa (diamonds) & Norlisk (nickel)
Contract Type : EPCM
Manpower : 15
Location: South Africa & Russia
Client: ALROSA
Main Project Features:
Positions Held: Project Engineer
Activities Performed:
Phase : FEL 2 , FEL 3 only

Lead a team for DCS / ESD scope


Lead a team for the system integration too other equipment
Lead a team for the Gas Compressor/Turbines ( protection & anti surge control )
Lead a team that looked at expert systems
Lead a team that did BMS , Boilers
Lead a team for field instrumentation
Lead a tea for substation , switch gear selection , SLD / motor control & interlocking
Lead a team that looked PLC/SCADA
Participate in HAZOP , HAZAN , & SIL assignment studies
Participate in3D model reviews
Participate in piping details design & ISO approval
Participate in P&ID development and Instrumentation control
Final approval & design at FEL 3 ; FEL 4 was done by a company in Norway

Page 20 of 22

Year & Duration: 1997 ( 18 months )


Project: LNG Tiga
Contract Type : EPCM
Manpower : 6
Location: Bintulu , Malaysia
Client: PETRONAS
Main Project Features:
New DCS ( change over from pneumatics to DS ) ( Foxboro I/A ) , New boilers , new BMS , New Compressors , Intergartion & control philosophies , update /
change over of ESD systems
Positions Held: Senior Project Engineer
Activities Performed:

Lead a team for DCS / ESD scope


Lead a team for the system integration too other equipment
Lead a team for the Gas Compressor/Turbines ( protection & anti surge ) & integration & control DCS ,also design of local control
Lead a team that did BMS , Boilers
Lead a team for field instrumentation
Lead a tea for substation , switch gear selection , SLD / motor control & interlocking
Manage design approval
Manage team / meetings & in design reviews
Writing of Control Philosophy ./ Narratives
Manage Cause & Effect Development
Manage of design interlocking ( Instrument & Electrical ) , Motor control
Manage team in writing of work scope for RFQ & ITB

Year & Duration: 1995 ( 10 months )


Project: Stacker Reclaimer Modernisation
Contract Type : EPC
Manpower : 5
Location: Saldanha , RSA
Client: SAR&H
Main Project Features: Object was for Stacker & Reclaimers to operate via PLC / SCADA , & not solid state electronics also new conveyor system was
added
Positions Held: Project Engineer
Activities Performed:
Full : FEED & Implementation Design

Develop CRS ( client requirements specification ) / were different to original scope , gained approval

Development of interlocking philosophy

Development of PLC / SCADA configuration

Team scope management & expectations

Internal & Client meetings ( progress status / issues log / needs list

Design Criteria / Design approval internal & Client

Development of Interlock design / philosophy & Cause & Effect Diagram

Participate in HAZOP studies

Develop start up & shut down philosophy/procedures

Developed new O&M procedures

Participate in FAT / SAT

13. Certification:
I, the undersigned, certify to the best of my knowledge and belief that:
i)
this CV correctly describes my qualifications and my experience;

Date:

Page 21 of 22

__________________
Day/Month/Year

Signature of Key Expert1

Page 22 of 22

Anda mungkin juga menyukai