DAFTAR HARGA SATUAN BAHAN DAN UPAH

BULAN JANUARI 2015


A. Harga Satuan Bahan
NO

NAMA BARANG

SATUA
N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

FINISHING
Amplas
Cat besi
Cat dasar
Cat emco
Cat menie besi kanzai
Cat menie kayu
Cat tembok Decolith
Cat tembok Dulux
Cat tembok Emco
Cat tembok Paragon
Cat tembok Toyopaint
Cat tembok Vinilex
Cat tembok Vinippaint
Dempul sanpolac
Kuas star 4"
Mild
Minyak cat
Plamir kayu
Plamir tembok
Politur ultra
Politur vernis
Thiner A Bonanza
Thiner B Spesial

lbr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
bh
zak
ltr
kg
kg
ltr
ltr
ltr
ltr

24
25
26
27
28
29
30
31
32
33
34
35
36

PENUTUP ATAP
Alang-alang panjang 2,4 meter
Alluminium foil solartek 1,2x25x4mm
Asbes Bubungan
Asbes Gelombang 1,80 m x 0,80 m x 5 mm
Asbes Gelombang 2,4 m x 1,05 m x 4 mm
Asbes Rata 2 m x 1 m x 4 mm
Atap metal Toratora 1 x 4 Extra
Atap metal Toratora 1 x 4 Premium
Atap metal Toratora 2 x 4 Extra
Atap metal Toratora 2 x 4 Premium
Atap metal Toratora 3 x 4 Extra
Atap metal Toratora 3 x 4 Premium
Atap metal Toratora 4 x 4 Extra

lbr
m2
lbr
lbr
lbr
lbr
m2
m2
m2
m2
m2
m2
m2

Harga Barang dan Upah

Hal. 1

NO

NAMA BARANG

SATUA
N

37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

Atap metal Toratora 4 x 4 Premium


Bentala paras
Bentala tanah liat
Besi profil WF P.6m
Besi profil WF P.12m
Bubungan Biasa
Bubungan Karang Pilang (glazur) isi 3,5/m
Bubungan Karang Pilang isi 3,5/m
Bubungan Ngalayur isi 3,5/m
Bubungan Plentong
Bubungan Utama isi 3,5/m
Genteng Kanmuri (glazur) isi 14/m2
Genteng Kodok Karang Pilang (Bambe) isi 20/m2
Genteng Kodok Karang Pilang (Bisma) isi 20/m2
Genteng Kodok Karang Pilang (Good Year) isi 20/m2
Genteng Morando Abadi isi 18/m2
Genteng Morando Jatiwangi isi 18/m2
Genteng Morando Ngalayur isi 20/m2
Genteng Plentong
Genteng plentong dicat
Genteng Plentong Jatiwangi isi 24/m2
Ijuk
Ikut celedu paras
Ikut celedu tanah liat
Murda paras
Murda tanah liat
Seng BJLS 0,20 gelombang
Seng BJLS 0,25 gelombang
Seng BJLS 0,28 gelombang
Seng BJLS 0,32 gelombang
Seng Plat 3" x 6" BJLS 28
Sirap Jati
Tali Ijuk
Tali pengikat alang-alang

m2
bh
bh
kg
kg
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
kg
bh
bh
bh
bh
lbr
lbr
lbr
lbr
lbr
bh
kg
ikat

71
72
73
74
75
76
77
78

PENGGANTUNG DAN KACA


Engsel kupu-kupu
Engsel nylon
Espagnoleth
Grendel biasa
Grendel hararo
Kaca 3 mm bening
Kaca 5 mm bening
Kaca 6 mm bening

ps
ps
set
bh
bh
m2
m2
m2

Harga Barang dan Upah

Hal. 2

NO

NAMA BARANG

1
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95

2
Kaca 8 mm bening
Kaca 10 mm bening
Kaca 12 mm bening
Kaca Es/Kapur 3 mm
Kaca Es/Kapur 5 mm
Kaca nako
Kaca nako teralis bening
Kaca ryben 3 mm
Kaca ryben 5 mm
Kait angin biasa
Kunci pintu TOP
Kunci pintu Union
Kunci pintu Vanesa
Kunci pintu Yale
Kunci pintu YURI
Kunci slot
Kunci tanam 2 slag

96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120

KAYU DAN PLAFOND


Bambu besar Ukuran 4 m
Bambu sedang Ukuran 4 m
Bambu kecil Ukuran 4 m
Celling teak (0,62 x 2,40) m2
Eternit
Formika
Gedeg kulit kelas I
Gypsum Old
Hard board MDF
Kalsiboard 4,5 mm
Kayu bekesting 4/6 Meranti
Kayu bingkirai balok
Kayu bingkirai papan
Kayu dolken (pekerjaan sementara)
Kayu jati
Kayu jati papan
Kayu kamper balok
Kayu kamper usuk/reng
Kayu kamper papan
Kayu kruing balok
Kayu kruing usuk/reng
Kayu kruing papan
Kayu meranti balok
Kayu meranti usuk/reng
Kayu meranti papan
Harga Barang dan Upah

SATUA
N
3
m2
m2
m2
m2
m2
daun
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh

btg
btg
btg
lbr
lbr
lbr
m2
lbr
lbr
lbr
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Hal. 3

NO

NAMA BARANG

SATUA
N

121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

Kayu merbau balok


Kayu merbau papan
Kayu profil usuk
Kayu seseh balok
Kayu seseh dolken
Lem Aibond
Lem Kayu
List Gypsum standar
Minyak bekisting
Multiplek 12 mm
Multiplek 18 mm
Multiplek 6 mm
Multiplek 9 mm
Plywood 12 mm
Plywood 3 mm
Plywood 4 mm
Plywood 6 mm
Plywood 9 mm
Plywood aluminium
Teak wood (0,9x2,20) m2
Teak wood (1,20x2,40) m2

m3
m3
m1
m3
m3
kg
ltr
m'
ltr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

142
143
144
145
146
147
148
149
150
151

KERAMIK
IKAD
Ikad (Keramik) Kw. I 10 x 20 cm
Ikad (Keramik) Kw. I 20 x 20 cm
Ikad (Keramik) Kw. I 20 x 30 cm
Ikad (Keramik) Kw. I 30 x 30 cm
Ikad (Keramik) Kw. I 40 x 40 cm
Ikad (Keramik) Kw. II 10 x 20 cm
Ikad (Keramik) Kw. II 20 x 20 cm
Ikad (Keramik) Kw. II 20 x 30 cm
Ikad (Keramik) Kw. II 30 x 30 cm
Ikad (Keramik) Kw. II 40 x 40 cm

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

152
153
154
155
156
157

INESA
Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P)
Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP)
Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P)
Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP)
Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R)
Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P)

m2
m2
m2
m2
m2
m2

Harga Barang dan Upah

Hal. 4

NO

NAMA BARANG

SATUA
N

158
159
160
161
162

Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P)


Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP)
Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P)
Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP)
Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P)

m2
m2
m2
m2
m2

163
164
165
166
167
168
169
170
171
172
173

ESSENZA
Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P)
Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP)
Keramik 30 x 30 Kelas I (Pepper G Price Rubert Silver star, P)
Keramik 30 x 30 Kelas I (Pepper G Price Rubert Silver star,UP)
Keramik 40 x 40 Kelas I (Pepper G Price Rubert Silver star, P)
Keramik 40 x 40 Kelas I (Pepper G Price Rubert Silver star,UP)
Keramik 60 x 60 Kelas I (Pepper G Price Rubert Silver star, P)
Keramik Kelas I Domus
Keramik Kelas I Granity Imperiali
Keramik Kelas I Lavagna
Keramik Kelas I Mountain Peak

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

174
175
176
177
178
179
180
181
182
183
184

ROMAN
Keramik 20 x 20 tekstur kasar
Keramik 25 x 33 kelas I
Keramik 25 x 45 motif halus kelas I
Keramik 30 x 30 standard
Keramik 30 x 30 kelas I T. 1cm
Keramik 20 x 60 kelas I T. 1cm
Keramik 20 x 40 kelas I Motif standard
Keramik 30 x 60 kelas I Motif Dasar Muda
Keramik 40 x 40 kelas I krem
Keramik 40 x 40 kelas I white
Keramik 50 x 50 kelas I warna muda

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

185
186
187
188

PLATINUM
Keramik 25 x 33 kelas I
Keramik 25 x 40 kelas II
Keramik 30 x 60 kelas II bulgari
Keramik 40 x 40 kelas I brown

m2
m2
m2
m2

GRANIT
189 Granit star white L.60
190 Granit BGYD red L.60
191 Granit crystal pink L. 60

Harga Barang dan Upah

m2
m2
m2

Hal. 5

NO

NAMA BARANG

SATUA
N

192 Granit mongol black L. 60


193 Granit gold black L. 60

194
195
196
197
198
199

GRANITO
Granito Castello Tera 60 x 60
Granito Monalisa TD6602 60 x 60
Granito Monalisa TD6602 80 x 80
Granito Niro FR660IY 60 x 60
Granito Essenza Grey 60 x 60
Granito Indogress Cristallo 80 x 80

m2
m2

m2
m2
m2
m2
m2
m2

MARMER
200 Marmer cream BA 60 x 60
201 Marmer cream BA 40 x 40
202 Marmer cream BA 30 x 30

m2
m2
m2

MOZAIK
203 Mozaik keramik zehn crystal glass 30 x 30
204 Mozaik batu alam 30 x 30

biji
biji

205
206
207
208
209
210
211
212
213

ASIA
Keramik 20 x 30 kelas I warna muda
Keramik 30 x 30 kelas I warna muda
Keramik 30 x 30 kelas I warna tua
Keramik 40 x 40 kelas I warna muda
Keramik 10 x 20 kelas II
Keramik 20 x 20 kelas II
Keramik 20 x 30 kelas II
Keramik 30 x 30 kelas II
Keramik 40 x 40 kelas II

m2
m2
m2
m2
m2
m2
m2
m2
m2

214
215
216
217
218
219
220
221
222
223

MULIA
Keramik 10 x 20 cm kelas I
Keramik 20 x 20 cm kelas I
Keramik 20 x 30 cm kelas I
Keramik 30 x 30 cm kelas I
Keramik 40 x 40 cm kelas I
Keramik 10 x 20 cm kelas II
Keramik 20 x 20 cm kelas II
Keramik 20 x 30 cm kelas II
Keramik 30 x 30 cm kelas II
Keramik 40 x 40 cm kelas II

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Harga Barang dan Upah

Hal. 6

NO

NAMA BARANG

SATUA
N

224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264

SANITAIR
Bak mandi fibre glass 70x70x66 cm
Bak mandi keramik 50x50
Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange "
Floor drain plastik
Floor drain stainless
Kloset duduk INA Komplit
Kloset duduk Amerika Standar
Kloset duduk "TOTO Type AVANTECW 821 PJ/SW 821JP COMPLIT
Kloset duduk "TOTO Type AVANTE CW 821J"/SW 821JP COMPLIT
Kloset duduk " TOTO Type AVANTE CW 823 J
Kloset duduk " TOTO Type CW 660J
Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT
Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA
Kloset duduk " TOTO Type CW 660J WARNA COMPLIT
Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT
Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT
Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT
Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT
Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT
Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT
Kloset jongkok " TOTO Type CE 6 COMPLIT
Kloset jongkok " TOTO Type CE 7 COMPLIT
Kloset porselin jongkok Kia (standar)
Kloset porselin jongkok Ina (standar)
Kran biasa
Kran SunEi
Kran TOTO T 205 LCSC
Kran TOTO T 205 MC
Kran TOTO T 23 B13
Kran TOTO T 23 B13V7N
Kran TOTO T 26 - 13
Kran TOTO TX 109 LH
Penyekat Urinoir " TOTO " Type A 100 "
Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory )
Soap holder " TOTO " Type S 6 N "
Seal tape
Urinoir " TOTO U 57 M
Urinoir " TOTO U 57 M BODI
Wastagel KIA Standard
Wastagel KIA Warna
Wastafel Komplit " TOTO Tx " Type L 521V1A "
Harga Barang dan Upah

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Hal. 7

NO

NAMA BARANG

SATUA
N

265
266
267
268
269
270
271
272
273
274
275
276
277
278

Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 "
Wastafel Toto komplit LW631JW/F segi 4
Wastafel Toto LW352JW/F bulat
Wastafel Toto komplit LW645+T6JV5 kotak
Wastafel Toto LW248JR
Shower TOTO Tx 401SBZ
Shower TOTO Tx 471SOBR
Shower TOTO Tx 471SKBR
Shower TOTO Tx 449SMBR
Kloset American Standart komplit
Kloset American Famous
Kloset Toto komplit
Elite cuci piring E-176
Elite cuci piring dobel E-118

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

279
280
281
282
283
284
285
286
287
288
289
290

PAKU
Paku 10 cm
Paku kalsiboard
Paku list SQ
Paku pancing 60 x 230
Paku reng/usuk SQ
Paku seng
Paku seng import
Paku skrup 1/2"
Paku skrup 2"
Paku skrup 3.5"
Paku sumbat 1/2"

kg
kg
kg
kg
kg
kg
bj
kg
kg
kg
kg

291
292
293
294
295
296
297
298
299
300
301
302
303
304

PASIR, BATU, KERIKIL, BATA DAN PARAS


Bata gosok ex Tulikup
Bata Merah tebal 5cm
Bata Merah tebal 7cm
Batako kelas I
Batu kali /batu bulat 15/20 cm
Batu karang
Batu lahar Singaraja
Batu pecah 5-7 cm (manual)
Batu pipih Singaraja
Bata riyan ( abble )
Roster Keramik
Koral Beton
Limestone
Paras Batik

bj
bj
bj
bj
m3
m3
m3
m3
m3
bj
bh
m3
m3
bh

Harga Barang dan Upah

Hal. 8

NO

NAMA BARANG

SATUA
N

305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347

Paras Buahan
Paras Karang Bukit
Paras Kerobokan Tebal 5
Paras Malem
Paras Putih Bukit
Paras Silakarang tebal
Paras Silakarang tipis
Paras untuk pondasi
Batu alam RTM hijau 10 x 20 halus
Batu alam RTM hijau 20 x 20 halus
Batu alam RTS hijau 10 x 20 kasar
Batu pilah Jember 30 x 30
Batu pilah Jember 20 x 30
Batu pilah Jember 40 x 40
Batu pilah Singaraja 30 x 30
Batu pilah Singaraja 20 x 20
Batu hitam Jember 5 x 20 halus
Batu hitam Jember 20 x 40 halus
Batu hitam Jember 15 x 30 halus
Batu hitam Singaraja 15 x 30 halus
Batu hitam Singaraja 20 x 40 halus
Batu AND 60 x 60 abu
Batu AND 50 x 50 hitam
Batu AND 40 x 40 hitam bkr
Batu AND 30 x 60 hitam bkr
Batu AND 40 x 60 hitam kilap
Batu AND 30 x 40 abu SS
Batu marmer kuning 10 x 20
Batu marmer kuning PB1 10 x 20
Batu marmer kuning PB2 10 x 20
Batu marmer kuning 15 x 30
Batu kuning serat 30 x 30
Batu kuning serat 20 x 30
Batu palimanan cirebon 20 x 30
Batu palimanan cirebon 20 x 40
Batu paras Jogja 60 x 60
Batu candi hitam 60 x 60
Batu candi hitam 20 x 20
Batu candi hitam 30 x 30
Batu candi hitam 40 x 40 T.5cm
Batu candi hitam 20 x 30
Batu Bali green gelombang 20 x 40
Batu Bali green kombinasi 20 x 40
Harga Barang dan Upah

bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Hal. 9

NO

NAMA BARANG

SATUA
N

348
349
350
351
352
353
354

Batu serayu 20 x 60
Pasir halus ( diayak )
Pasir beton / cor
Pasir pasang
Pasir urug
Sirtu
Tanah urug

m2
m3
m3
m3
m3
m3
m3

355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388

PIPA
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 1"
Pipa Galvanis 1,5 BSA
Pipa Galvanis 2"
Pipa Galvanis 3"
Pipa Maspion AW 1
Pipa Maspion AW 1/2
Pipa Maspion AW 10
Pipa Maspion AW 1-1/2
Pipa Maspion AW 1-1/4
Pipa Maspion AW 12
Pipa Maspion AW 14
Pipa Maspion AW 16
Pipa Maspion AW 2
Pipa Maspion AW 2-1/2
Pipa Maspion AW 3
Pipa Maspion AW 3/4
Pipa Maspion AW 4
Pipa Maspion AW 5
Pipa Maspion AW 6
Pipa Maspion AW 8
Pipa Maspion C 1
Pipa Maspion C 1-1/2
Pipa Maspion C 1-1/4
Pipa Maspion C 2
Pipa Maspion C 2-1/2
Pipa Maspion C 3
Pipa Maspion C 3/4
Pipa Maspion C 4
Pipa Maspion C 5/8
Pipa Maspion D 10

m1
m1
m1
m1
m1
m1
m1
m1
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr

Harga Barang dan Upah

Hal. 10

NO

NAMA BARANG

SATUA
N

389
390
391
392
393
394
395
396
397
398
399
400

Pipa Maspion D 1-1/2


Pipa Maspion D 1-1/4
Pipa Maspion D 12
Pipa Maspion D 14
Pipa Maspion D 16
Pipa Maspion D 2
Pipa Maspion D 2-1/2
Pipa Maspion D 3
Pipa Maspion D 4
Pipa Maspion D 5
Pipa Maspion D 6
Pipa Maspion D 8

ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr

401
402
403
404
405

KRAN AIR
TOTO T.30AR13V7N
TOTO T.60N
TOTO TX-116 LI
TOTO TX-116 LEBR
TOTO TX 101 LB

bh
bh
bh
bh
bh

406
407
408
409
410
411

HANDEL PINTU
Gradino Handel Luar HP.6106
Gradino Handel Luar HP.99.01
Solid HRE 99.14
ELT handle pintu dobel P99.62
ELT handle pintu dobel PR 511.05
ELT bulat PHB 308SS

bh
bh
bh
set
set
bh

412
413
414
415
416
417
418

SEMEN & AIR CAMPURAN BETON


Semen Bosowa 50 kg
Semen Gresik 40 kg
Semen Gresik 50 kg
Semen Tiga Roga 40 kg
Semen Tonasa 40 kg
Semen warna/semen grouting
Air Campuran Beton

zak
zak
zak
zak
zak
kg
ltr

419
420
421
422

BESI BETON DAN PAGAR


Besi beton
Besi beton 6 polos
Besi beton 8 polos
Besi beton 10 polos

kg
btg
btg
btg

Harga Barang dan Upah

Hal. 11

NO

NAMA BARANG

SATUA
N

423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

Besi beton 12 polos


Besi beton 16 polos
Besi beton 10 ulir
Besi beton 13 ulir
Besi beton 16 ulir
Besi beton 19 ulir
Besi beton 22 ulir
Kawat berduri
Kawat beton RRT
Pagar BRC asli T.120 diameter 6mm
Pagar BRC asli T.150 diameter 6mm
Pagar BRC asli T.175 diameter 7mm
Pagar BRC asli T.190 diameter 7mm
Pagar BRC asli T.90 diameter 6mm
Pagar HotDip Galvanized T.120 diameter 6mm
Pagar HotDip Galvanized T.150 diameter 7mm
Pagar HotDip Galvanized T.175 diameter 7mm
Pagar HotDip Galvanized T.190 diameter 7mm
Pagar HotDip Galvanized T.90 diameter 6mm
Tiang BRC asli T. 120 diameter 1 1/2"
Tiang BRC asli T. 150 diameter 2"
Tiang BRC asli T. 175 diameter 2"
Tiang BRC asli T. 190 diameter 2"
Tiang BRC asli T. 90 diameter 1 1/2"
Tiang HotDip Galvanized T. 120 diameter 1 1/2"
Tiang HotDip Galvanized T. 150 diameter 2"
Tiang HotDip Galvanized T. 175 diameter 2"
Tiang HotDip Galvanized T. 190 diameter 2"
Tiang HotDip Galvanized T. 90 diameter 1 1/2"

btg
btg
btg
btg
btg
btg
btg
roll
kg
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

452
453
454
455
456
457
458
459
460
461
462

BAHAN LISTRIK
Saklar (Broco)
Stop Kontak
Fitting
Steker
Coaxial cable 5C - 75 ohm commscof
Kabel NYM 3 x 2.5 mm ex. Supreme
Kabel NYM 4 mm
Kabel telephone
Lampu pijar 10 Watt (Philip)
Lampu pijar 15 Watt (Philip)
Lampu pijar 25 Watt (Philip)

bh
bh
bh
bh
m1
m1
m1
m1
bh
bh
bh

Harga Barang dan Upah

Hal. 12

NO

NAMA BARANG

SATUA
N

463
464
465
466
467
468
469
470
471

Lampu TL 10 Watt (10 Watt)


Lampu TL 20 Watt (10 Watt)
Lampu TL 25 Watt (10 Watt)
Pipa clipsal 20 mm
Pipa flexible clipsal 20 mm
Sock clipsal 20 mm
Tee dos clipsal 20 mm
Klem clipsal 20 mm
Inbow dos plastik clipsal E 157 P

bh
bh
bh
bt
m1
bj
bh
bj
bj

472
473
474
475
476
477

BUIS BETON
Buis beton 10 x 75
Buis beton 15 x 75
Buis beton 20 x 75
Buis beton 25 x 75
Buis beton 30 x 75
Buis beton 50 x 75

bh
bh
bh
bh
bh
bh

478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496

PAVING
Paving 10 x 20 cm tebal 6 cm K225
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225
Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225)
Kanstein Jumbo (P:50,L:15,T:30 cm K225)
Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
Grass Block 36 X 54 cm tebal 9 cm K 225
Koral Sikat (10 Kg)

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
m2
zak

LAIN-LAIN
497 Wall papper 30,5 x 30,5
498 Wall papper 70 x 100
499 Wall papper 50 x 70
Harga Barang dan Upah

lembar
lembar
lembar
Hal. 13

NO

NAMA BARANG

SATUA
N

500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516

Wall papper 30 x 60
Glass block
Dugul batu hitam 50 x 50 x 200 tempel
Dugul batu hitam 60 x 70 x 250 tempel
Dugul batu hitam 70 x 70 x 250 tempel
Padmasari batu hitam 50 x 50 x 200 tempel
Padmasari batu hitam 65 x 75 x 255 tempel
Padmasari batu hitam 70 x 70 x 250 tempel
Dugul batu hitam 50 x 50 x 200 masive
Dugul batu hitam 60 x 70 x 250 masive
Dugul batu hitam 70 x 70 x 300 masive
Padmasari batu hitam 50 x 50 x 200 masive
Padmasari batu hitam 65 x 75 x 255 masive
Padmasari batu hitam 70 x 70 x 250 masive
Padmasari paras taro 50 x 70 x 250
Padmasari paras taro 65 x 65 x 250
Padmasari paras taro 65 x 85 x 300

lembar
bj
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
Mangupura, 8 Januari 2015
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M


Pembina Tk.I
NIP. 196110101994032001

Harga Barang dan Upah

Hal. 14

PAH

HARGA SATUAN
4
4,100.00
70,500.00
43,600.00
55,000.00
47,500.00
30,000.00
33,000.00
38,800.00
38,000.00
10,000.00
18,500.00
30,000.00
17,000.00
42,100.00
16,800.00
18,000.00
26,000.00
42,000.00
12,000.00
47,000.00
59,000.00
22,000.00
20,000.00

12,500.00
60,000.00
24,000.00
30,000.00
36,000.00
50,000.00
84,000.00
125,000.00
74,000.00
108,500.00
72,000.00
105,000.00
70,000.00
Harga Barang dan Upah

Hal. 15

HARGA SATUAN
4
105,000.00
150,000.00
80,000.00
9,500.00
10,066.00
5,000.00
7,200.00
7,200.00
8,800.00
8,800.00
4,400.00
11,000.00
4,500.00
4,180.00
4,180.00
3,190.00
3,190.00
3,080.00
1,540.00
1,980.00
1,350.00
2,750.00
68,200.00
53,900.00
82,500.00
67,100.00
47,850.00
46,200.00
46,750.00
51,700.00
51,150.00
9,350.00
37,400.00
10,450.00

53,900.00
29,700.00
110,000.00
17,050.00
24,200.00
75,000.00
105,000.00
165,000.00
Harga Barang dan Upah

Hal. 16

HARGA SATUAN
4
265,000.00
350,000.00
400,000.00
95,700.00
128,700.00
16,500.00
128,700.00
100,000.00
130,000.00
24,200.00
66,000.00
79,200.00
119,900.00
126,500.00
145,200.00
110,000.00
115,500.00

17,000.00
13,000.00
10,000.00
77,000.00
51,700.00
88,000.00
40,000.00
69,850.00
117,700.00
79,200.00
1,150,000.00
10,500,000.00
13,000,000.00
102,000.00
22,000,000.00
30,000,000.00
7,500,000.00
6,000,000.00
8,500,000.00
5,000,000.00
5,000,000.00
6,000,000.00
2,500,000.00
2,300,000.00
3,200,000.00
Harga Barang dan Upah

Hal. 17

HARGA SATUAN
4
15,000,000.00
15,500,000.00
24,500.00
2,491,225.00
3,025,000.00
36,300.00
13,750.00
18,700.00
16,500.00
148,500.00
220,000.00
72,000.00
108,570.00
139,700.00
50,000.00
60,000.00
73,700.00
116,050.00
82,500.00
65,000.00
68,200.00

51,500.00
42,000.00
52,000.00
42,500.00
48,000.00
38,000.00
40,000.00
47,000.00
40,000.00
52,000.00

191,000.00
154,000.00
180,000.00
143,000.00
165,000.00
209,000.00

Harga Barang dan Upah

Hal. 18

HARGA SATUAN
4
209,000.00
160,000.00
197,000.00
149,000.00
248,500.00

210,000.00
189,500.00
150,700.00
107,800.00
222,900.00
194,900.00
273,500.00
286,500.00
262,500.00
249,900.00
337,000.00

76,100.00
70,500.00
108,900.00
114,500.00
123,800.00
124,000.00
87,500.00
175,900.00
84,500.00
84,500.00
101,500.00

63,900.00
40,000.00
58,000.00
59,500.00

315,000.00
425,000.00
320,000.00

Harga Barang dan Upah

Hal. 19

HARGA SATUAN
4
825,000.00
825,000.00

271,700.00
244,000.00
242,000.00
244,000.00
258,000.00
247,000.00

335,000.00
260,000.00
215,000.00

41,000.00
21,500.00

55,500.00
46,900.00
45,000.00
52,000.00
45,000.00
35,000.00
37,000.00
37,000.00
40,000.00

55,500.00
46,900.00
45,000.00
52,000.00
45,000.00
35,000.00
37,000.00
37,000.00
40,000.00
46,000.00
Harga Barang dan Upah

Hal. 20

HARGA SATUAN
4

230,000.00
225,000.00
200,000.00
15,000.00
45,000.00
1,300,000.00
955,000.00
1,500,000.00
5,610,000.00
5,600,000.00
610,000.00
1,674,900.00
1,491,000.00
670,000.00
2,800,000.00
2,200,000.00
1,800,000.00
2,800,000.00
2,200,000.00
1,800,000.00
392,900.00
232,500.00
145,000.00
135,000.00
25,000.00
149,400.00
319,500.00
228,100.00
140,000.00
142,000.00
187,000.00
410,000.00
835,000.00
317,900.00
78,400.00
2,700.00
1,052,000.00
849,000.00
185,000.00
235,000.00
1,135,000.00
Harga Barang dan Upah

Hal. 21

HARGA SATUAN
4
735,000.00
1,021,000.00
746,000.00
1,535,000.00
382,000.00
1,185,000.00
2,100,000.00
2,900,000.00
3,787,000.00
4,446,000.00
1,325,000.00
5,040,000.00
686,000.00
1,284,500.00

15,400.00
26,400.00
18,700.00
22,000.00
14,300.00
23,100.00
49,500.00
19,800.00
19,800.00
29,150.00
16,500.00

1,980.00
1,300.00
2,500.00
197,000.00
145,000.00
190,000.00
195,000.00
155,000.00
2,500.00
50,000.00
192,000.00
85,000.00
17,000.00
10,000.00
Harga Barang dan Upah

Hal. 22

HARGA SATUAN
4
8,500.00
9,500.00
13,000.00
4,000.00
14,500.00
12,000.00
12,500.00
90,000.00
75,000.00
90,000.00
70,000.00
55,000.00
55,000.00
65,000.00
65,000.00
60,000.00
55,000.00
55,000.00
55,000.00
60,000.00
65,000.00
190,000.00
190,000.00
140,000.00
140,000.00
160,000.00
100,000.00
75,000.00
90,000.00
70,000.00
100,000.00
70,000.00
70,000.00
80,000.00
80,000.00
120,000.00
75,000.00
70,000.00
75,000.00
185,000.00
75,000.00
105,000.00
100,000.00
Harga Barang dan Upah

Hal. 23

HARGA SATUAN
4
90,000.00
155,000.00
160,000.00
140,000.00
130,000.00
80,000.00
85,700.00

27,125.00
35,000.00
70,625.00
81,125.00
38,000.00
58,000.00
77,500.00
175,000.00
35,000.00
23,000.00
112,000.00
65,000.00
50,000.00
1,550,000.00
1,900,000.00
2,400,000.00
95,000.00
125,000.00
175,000.00
30,000.00
250,000.00
373,000.00
494,000.00
768,000.00
14,700.00
19,500.00
16,500.00
35,000.00
45,000.00
50,000.00
10,000.00
63,000.00
5,500.00
784,000.00
Harga Barang dan Upah

Hal. 24

HARGA SATUAN
4
35,000.00
30,000.00
1,270,000.00
1,650,000.00
1,877,568.00
45,000.00
65,000.00
95,000.00
130,000.00
209,000.00
254,000.00
449,000.00

290,900.00
854,000.00
2,580,000.00
2,230,000.00
844,700.00

135,000.00
304,000.00
243,000.00
196,000.00
446,000.00
220,000.00

64,000.00
57,000.00
67,000.00
55,000.00
52,000.00
17,000.00
150.00

8,765.00
24,100.00
40,300.00
62,900.00

Harga Barang dan Upah

Hal. 25

HARGA SATUAN
4
90,600.00
161,200.00
65,200.00
109,900.00
166,900.00
235,500.00
314,700.00
93,500.00
17,600.00
187,000.00
195,800.00
276,100.00
294,800.00
150,700.00
154,000.00
210,100.00
225,500.00
242,000.00
132,200.00
183,700.00
236,500.00
269,500.00
275,000.00
154,000.00
161,700.00
189,200.00
209,000.00
220,000.00
139,700.00

42,200.00
32,900.00
7,700.00
7,700.00
6,600.00
15,600.00
24,600.00
4,400.00
6,600.00
7,700.00
8,800.00
Harga Barang dan Upah

Hal. 26

HARGA SATUAN
4
30,250.00
38,500.00
37,400.00
13,200.00
11,550.00
2,200.00
7,700.00
825.00
11,000.00

37,000.00
45,900.00
55,000.00
58,000.00
63,000.00
85,000.00

63,000.00
70,000.00
73,000.00
78,000.00
84,000.00
60,000.00
70,000.00
73,000.00
79,000.00
85,000.00
89,000.00
99,000.00
105,000.00
60,000.00
31,000.00
32,000.00
36,000.00
75,000.00
45,000.00

34,800.00
84,000.00
67,800.00
Harga Barang dan Upah

Hal. 27

HARGA SATUAN
4
36,750.00
35,000.00
3,990,000.00
4,305,000.00
4,515,000.00
3,990,000.00
4,305,000.00
4,515,000.00
4,500,000.00
5,800,000.00
6,200,000.00
4,500,000.00
5,700,000.00
6,000,000.00
700,000.00
750,000.00
900,000.00

8 Januari 2015
as Cipta Karya
en Badung

sy Dharmayanty, M.T
ina Tk.I
101994032001

Harga Barang dan Upah

Hal. 28

DAFTAR HARGA SATUAN UPAH


BULAN JANUARI 2015
NO

NAMA BARANG

SPESIFIKASI

SATUAN

HARGA
(Rp.)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Mandor
Kepala Tukang
Tukang Politur
Tukang Batu
Tukang kayu
Tukang Besi
Tukang cat
Tukang gali
Tukang Listrik
Tukang Pipa/ Tukang Ledeng
Tukang Aspal
Tukang masak Aspal
Pekerja
Tukang Ukir
Operator
Pembantu Operator
Mekanik
Pembantu Mekanik
Pasang Atap Alang-Alang
Pasang Bata Gosok Dua Muka
Pasang Bata Gosok Satu Muka
Pasang Batu Paras Diukir
Pasang Patu Paras Siap Diukir
Tukang Bongkar Begesting

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
M2
M2
M2
M2
Hari

125,000.00
100,000.00
60,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
95,000.00
80,000.00
100,000.00
75,000.00
68,000.00
75,000.00
55,000.00
70,000.00
350,000.00
200,000.00
375,000.00
300,000.00
55,000.00

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).
Mangupura, 8 Januari 2015
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001

DAFTAR ANALISA PEKERJAAN


NO

URAIAN

HARGA
SATUAN
(Rp)

PEKERJAAN PERSIAPAN
1

HARGA
UPAH
(Rp)
4

(SNI 03-2835-2002)

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2


METER
1.2500 btg Bambu Sedang
2.5000 kg Semen Portland
1.2000 lbr Seng gelombang 3" - 5"
0.0050 m3 Pasir Beton
0.0090 m3 Koral beton
0.0720 m3 Kayu Meranti Usuk 5/7
0.0600 kg Paku biasa 2" - 5"
0.4500 kg Meni Besi
0.2000 oh Tukang Kayu
0.4000 oh Pekerja
0.0200 oh Kepala Tukang
0.0200 oh Mandor

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7
0.0200 kg Paku Biasa 2" - 5"
0.0070 m3 Kayu Papan Meranti 3/20
0.1000 oh Tukang Kayu
0.1000 oh Pekerja
0.0100 oh Kepala Tukang
0.0050 oh Mandor
1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI
PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m
0.1800 m3 Kayu Meranti
0.8500 kg Paku Biasa 2" - 5"
1.1000 kg Besi Strip
35.0000 kg Semen Portland
0.1500 m3 Pasir Pasang
0.1000 m3 Pasir Beton
0.1500 m3 Koral Beton
30.0000 bh Bata Merah
0.2500 lbr Seng Plat
2.0000 bh Jendela Nako
0.0800 m2 Kaca Polos
0.1500 bh Kunci Tanam
0.0600 lbr Plywood 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Tukang Batu
2.0000 oh Pekerja
0.3000 oh Kepala Tukang
0.0500 oh Mandor
1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
1.7000 btg Bambu Sedang
0.2100 m3 Kayu Meranti
0.3000 kg Paku Biasa 2" - 5"
10.5000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 28
2.0000 oh Tukang Kayu
1.0000 oh Pekerja

13,000.00
1,425.00
47,850.00
160,000.00
85,000.00
2,300,000.00
14,300.00
47,500.00
95,000.00
80,000.00
100,000.00
125,000.00
Total :

19,000.00
32,000.00
2,000.00
2,500.00
55,500.00

2,300,000.00
14,300.00
3,200,000.00
95,000.00
80,000.00
100,000.00
125,000.00
Total :

9,500.00
8,000.00
1,000.00
625.00
19,125.00

102,000.00
2,500,000.00
14,300.00
10,066.00
1,425.00
140,000.00
160,000.00
85,000.00
1,300.00
51,150.00
16,500.00
105,000.00
115,500.00
60,000.00
95,000.00
95,000.00
80,000.00
100,000.00
125,000.00
Total :

190,000.00
95,000.00
160,000.00
30,000.00
6,250.00
481,250.00

13,000.00
2,500,000.00
14,300.00
1,425.00
160,000.00
85,000.00
46,750.00
95,000.00
80,000.00

190,000.00
80,000.00

NO

URAIAN

0.2000
0.0500
5

oh Kepala Tukang
oh Mandor

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang
0.2760 m3 Kayu Meranti
0.7000 kg Paku biasa 2" - 5"
1.5000 lbr Seng gelombang BJLS 28
1.5000 oh Tukang Kayu
1.0000 oh Pekerja
0.1500 oh Kepala Tukang
0.0500 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

100,000.00
125,000.00
Total :

20,000.00
6,250.00
296,250.00

13,000.00
2,500,000.00
14,300.00
46,750.00
95,000.00
80,000.00
100,000.00
125,000.00
Total :

142,500.00
80,000.00
15,000.00
6,250.00
243,750.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja
0.0500 oh Mandor

1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang
0.1860 m3 Kayu Meranti
0.3000 kg Paku Biasa 2" - 5"
18.0000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 28
1.3500 lbr Plywood 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Pekerja
0.2000 oh Kepala Tukang
0.0500 oh Mandor

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang
0.0800 kg Paku Biasa 2" - 5"
1.0000 btg Kaso 5/7
0.3000 oh Tukang kayu
0.0015 oh Mandor

1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu
0.2500 kg Tali Ijuk
0.0170 oh Tukang Kayu
0.0020 oh Pekerja
0.2500 oh Kepala Tukang
0.0130 oh Mandor

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20
0.0900 m3 Batu Pecah 5 - 7
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
0.0500 oh Mandor

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja
0.3330 oh Mandor

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja
0.0330 oh Mandor

II

PEKERJAAN TANAH
1

HARGA
UPAH
(Rp)
4

80,000.00
125,000.00
Total :

8,000.00
6,250.00
14,250.00

13,000.00
2,500,000.00
14,300.00
1,425.00
160,000.00
85,000.00
46,750.00
60,000.00
95,000.00
80,000.00
100,000.00
125,000.00
Total :

190,000.00
80,000.00
20,000.00
6,250.00
296,250.00

2,500,000.00
14,300.00
44,800.00
95,000.00
125,000.00
Total :

28,500.00
187.50
28,687.50

10,000.00
37,400.00
95,000.00
80,000.00
100,000.00
125,000.00

1,615.00
160.00
25,000.00
1,625.00
28,400.00

145,000.00
155,000.00
140,000.00
80,000.00
125,000.00
Total :

80,000.00
6,250.00
86,250.00

80,000.00
125,000.00
Total :

533,360.00
41,625.00
574,985.00

80,000.00
125,000.00
Total :

533,360.00
4,125.00
537,485.00

80,000.00
125,000.00
Total :

60,000.00
3,125.00
63,125.00

(SNI 2835 : 2008)

1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja
0.0250 oh Mandor
1 M3 GALIAN TANAH BIASA DALAM 2 METER

NO

URAIAN

0.9000
0.0450

oh Pekerja
oh Mandor

1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja
0.0670 oh Mandor

1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja
0.0320 oh Mandor

1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja
0.0600 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

80,000.00
125,000.00
Total :

72,000.00
5,625.00
77,625.00

80,000.00
125,000.00
Total :

84,000.00
8,375.00
92,375.00

80,000.00
125,000.00
Total :

80,000.00
4,000.00
84,000.00

80,000.00
125,000.00
Total :

120,000.00
7,500.00
127,500.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja
0.0450 oh Mandor

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja
0.0050 oh Mandor

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja
0.0100 oh Mandor

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug
0.3000 oh Pekerja
0.0100 oh Mandor

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk
0.1500 oh Pekerja
0.0150 oh Mandor

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu
0.2500 oh Pekerja
0.0250 oh Mandor

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug
0.5000 oh Pekerja
0.0500 oh Mandor
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone
0.2500 oh Pekerja
0.0250 oh Mandor

80,000.00
125,000.00
Total :

96,000.00
5,625.00
101,625.00

80,000.00
125,000.00
Total :

4,000.00
625.00
4,625.00

80,000.00
125,000.00
Total :

26,400.00
1,250.00
27,650.00

1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja
0.0500 oh Mandor

III

HARGA
UPAH
(Rp)

PEKERJAAN PONDASI

80,000.00
125,000.00
Total :

40,000.00
6,250.00
46,250.00

130,000.00
80,000.00
125,000.00
Total :

24,000.00
1,250.00
25,250.00

2,750.00
80,000.00
125,000.00
Total :

12,000.00
1,875.00
13,875.00

80,000.00
80,000.00
125,000.00
Total :

20,000.00
3,125.00
23,125.00

85,700.00
80,000.00
125,000.00
Total :

40,000.00
6,250.00
46,250.00

17,000.00
80,000.00
125,000.00
Total :

20,000.00
3,125.00
23,125.00

145,000.00
1,425.00
140,000.00
80,000.00
95,000.00

120,000.00
71,250.00

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
202.0000 kg Semen Portland
0.4850 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu

NO

URAIAN

0.0750
0.0750

oh Kepala Tukang
oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
163.0000 kg Semen Portland
0.5200 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

100,000.00
125,000.00
Total :

7,500.00
9,375.00
208,125.00

145,000.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

120,000.00
71,250.00
7,500.00
9,375.00
208,125.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
136.0000 kg Semen Portland
0.5440 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
117.0000 kg Semen Portland
0.5610 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
91.0000 kg Semen Portland
0.5840 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
126.0000 kg Besi Beton
1.8000 kg Kawat Beton
3.4000 oh Pekerja
0.8500 oh Tukang Batu
0.0850 oh Kepala Tukang
0.1700 oh Mandor

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
2.4000 oh Pekerja
0.8000 oh Tukang Batu
0.0800 oh Kepala Tukang
0.1190 oh Mandor

1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20
0.4320 m3 Pasir Urug
0.7800 oh Pekerja
0.3900 oh Tukang Batu
0.0390 oh Kepala Tukang
0.0390 oh Mandor

SNI 03-2836-2002

HARGA
UPAH
(Rp)
4

145,000.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

120,000.00
71,250.00
7,500.00
9,375.00
208,125.00

145,000.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

120,000.00
71,250.00
7,500.00
9,375.00
208,125.00

145,000.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

120,000.00
71,250.00
7,500.00
9,375.00
208,125.00

145,000.00
1,425.00
160,000.00
85,000.00
8,765.00
17,600.00
80,000.00
95,000.00
100,000.00
125,000.00

272,000.00
80,750.00
8,500.00
21,250.00
382,500.00

145,000.00
1,425.00
160,000.00
85,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

192,000.00
76,000.00
8,000.00
14,875.00
290,875.00

145,000.00
130,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

62,400.00
37,050.00
3,900.00
4,875.00
108,225.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang


0.0160 m3 Pasir Urug
0.0800 m3 Pasir Beton
0.1250 m3 Koral Beton
49.0000 kg Semen Portland
34.5000 kg Besi Beton
0.7000 kg Kawat beton
0.0270 m3 Kayu Bekesting
0.1200 kg Paku Reng SQ
0.2000 kg Plamir Tembok
0.0900
lt Minyak Bekisting
0.8000 oh Pekerja
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
0.0400 oh Mandor

10 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang


0.0190 m3 Pasir Urug
0.0940 m3 Pasir Beton
0.1500 m3 Koral Beton
60.5000 kg Semen Portland
45.0000 kg Besi Beton
0.9000 kg Kawat beton
0.0320 m3 Kayu Bekesting
0.1200 kg Paku Reng SQ
0.2400 kg Plamir Tembok
0.0900
lt Minyak Bekisting
1.0000 oh Pekerja
0.6700 oh Tukang Batu
0.0670 oh Kepala Tukang
0.0500 oh Mandor

IV

PEKERJAAN DINDING

130,000.00
160,000.00
85,000.00
1,425.00
8,765.00
17,600.00
1,150,000.00
14,300.00
12,000.00
16,500.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

64,000.00
47,500.00
5,000.00
5,000.00
121,500.00

130,000.00
160,000.00
85,000.00
1,425.00
8,765.00
17,600.00
1,150,000.00
14,300.00
12,000.00
16,500.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

80,000.00
63,650.00
6,700.00
6,250.00
156,600.00

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00

48,000.00
19,000.00
2,000.00
3,750.00

(SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm
43.5000 kg Semen Portland
0.0800 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

72,750.00
2

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
32.9500 kg Semen Portland
0.0910 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
26.5500 kg Semen Portland
0.0930 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00

48,000.00
19,000.00
2,000.00
3,750.00
72,750.00

48,000.00
19,000.00
2,000.00

NO

URAIAN

0.0300

oh Mandor

HARGA
SATUAN
(Rp)
3

125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
22.2000 kg Semen Portland
0.1020 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
18.5000 kg Semen Portland
0.1220 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
18.9500 kg Semen Portland
0.0380 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00

HARGA
UPAH
(Rp)
4

3,750.00
72,750.00

48,000.00
19,000.00
2,000.00
3,750.00
72,750.00

48,000.00
19,000.00
2,000.00
3,750.00
72,750.00

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
14.3700 kg Semen Portland
0.0400 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

NO

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
11.5000 kg Semen Portland
0.0430 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
9.6800 kg Semen Portland
0.0450 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
8.3200 kg Semen Portland
0.0490 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
6.5000 kg Semen Portland
0.0500 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) / BATAKO


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
1.9500 kg Besi Beton 8 mm
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

1,300.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

197,000.00
1,425.00
140,000.00
8,765.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

25,600.00
9,500.00
1,000.00
1,875.00
37,975.00

197,000.00
1,425.00
140,000.00

NO

URAIAN

0.3200
0.1000
0.0100
0.0150

oh
oh
oh
oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik
11.0000 kg Semen Portland
0.0350 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I
0.0140 m3 Kayu kamper usuk/reng
0.0120 kg Paku Biasa

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

80,000.00
95,000.00
100,000.00
125,000.00
Total :

25,600.00
9,500.00
1,000.00
1,875.00
37,975.00

192,000.00
1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

40,000.00
6,000,000.00
14,300.00

NO

URAIAN

0.0030
0.1000
0.0500
0.0050
0.0020

m3
oh
oh
oh
oh

List Kayu 2/4


Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PLESTERAN
1

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

6,000,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

8,000.00
4,750.00
500.00
250.00
13,500.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

(SNI 2837 : 2008)

1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland
0.0160 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor
1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland
0.0200 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland
0.0230 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland
0.0240 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland
0.0260 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland
0.0270 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland

1,425.00

NO

URAIAN

0.0290
0.3000
0.1500
0.0150
0.0150

m3
oh
oh
oh
oh

Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland
0.0270 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland
0.0310 m3 Pasir Pasang
0.4000 oh Pekerja

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

32,000.00
19,000.00
2,000.00
2,750.00
55,750.00

1,425.00
140,000.00
80,000.00

32,000.00

NO

URAIAN

0.2000
0.0200
0.0220

oh Tukang Batu
oh Kepala Tukang
oh Mandor

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland
0.0350 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland
0.0360 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland
0.0130 m3 Pasir Pasang
0.0800 oh Pekerja
0.4000 oh Tukang Batu
0.0400 oh Kepala Tukang
0.0040 oh Mandor

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland
0.0060 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

95,000.00
100,000.00
125,000.00
Total :

19,000.00
2,000.00
2,750.00
55,750.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

32,000.00
19,000.00
2,000.00
2,750.00
55,750.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

32,000.00
19,000.00
2,000.00
2,750.00
55,750.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

32,000.00
19,000.00
2,000.00
2,750.00
55,750.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

6,400.00
38,000.00
4,000.00
500.00
48,900.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
9,500.00
1,000.00
1,875.00
36,375.00

1,425.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

12,000.00
7,125.00
800.00
1,000.00
20,925.00

1,425.00
80,000.00
95,000.00
100,000.00

5,600.00
3,325.00
400.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland
0.1500 oh Pekerja
0.0750 oh Tukang Batu
0.0080 oh Kepala Tukang
0.0080 oh Mandor

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE


(= 8 M')
1.6000 kg Semen Portland
0.0700 oh Pekerja
0.0350 oh Tukang Batu
0.0040 oh Kepala Tukang

NO

URAIAN

0.0040

oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

125,000.00
Total :

500.00
9,825.00

1,425.00
140,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

24,000.00
14,250.00
1,500.00
1,875.00
41,625.00

1,425.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

16,000.00
9,500.00
1,000.00
1,250.00
27,750.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland
0.0120 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg
0.2000 oh Pekerja
0.1000 oh Tukang Labur/Cat
0.0100 oh Kepala Tukang
0.0100 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

VI
1

PEKERJAAN KAYU

HARGA
UPAH
(Rp)
4

(SNI 3434 : 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
7.0000 oh Pekerja
21.0000 oh Tukang Kayu
2.1000 oh Kepala Tukang
0.3500 oh Mandor

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
6.0000 oh Pekerja
18.0000 oh Tukang Kayu
1.8000 oh Kepala Tukang
0.3000 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA


KACA, KAYU KLS I/II
0.0240 m3 Papan Kayu Kamper
1.0000 m2 Kaca Bening 3 mm
0.3000 Kg Lem Kayu
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

7,500,000.00
15,400.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

560,000.00
1,995,000.00
210,000.00
43,750.00
2,808,750.00

5,000,000.00
15,400.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

480,000.00
1,710,000.00
180,000.00
37,500.00
2,407,500.00

8,500,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

28,000.00
99,750.00
10,500.00
2,250.00
140,500.00

6,000,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

28,000.00
99,750.00
10,500.00
2,250.00
140,500.00

8,500,000.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

80,000.00
285,000.00
30,000.00
6,250.00
401,250.00

8,500,000.00
75,000.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00

64,000.00
228,000.00
24,000.00
5,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA
TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood 4 mm
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

HARGA
UPAH
(Rp)
4

Total :

321,000.00

8,500,000.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

80,000.00
285,000.00
30,000.00
6,250.00
401,250.00

8,500,000.00
15,400.00
13,750.00
60,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

80,000.00
285,000.00
30,000.00
6,250.00
401,250.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood 4 mm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

HARGA
UPAH
(Rp)
4

8,500,000.00
15,400.00
13,750.00
60,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

64,000.00
228,000.00
24,000.00
5,000.00
321,000.00

8,500,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

53,600.00
190,000.00
20,000.00
41,875.00
305,475.00

8,500,000.00
15,400.00
13,750.00
65,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

64,000.00
228,000.00
24,000.00
5,000.00
321,000.00

8,500,000.00
15,400.00
13,750.00
65,000.00
88,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

64,000.00
228,000.00
24,000.00
5,000.00
321,000.00

7,500,000.00
10,066.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

320,000.00
1,140,000.00
120,000.00
25,000.00
1,605,000.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600
0.1500
0.6700
2.0000
0.2000
0.3350

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 1-2,5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.8000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.5000 Lbr Formika
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000
15.0000
5.6000
4.0000
12.0000
1.2000
0.2000

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000
15.0000

m3 Balok Kayu Kamper


Kg Besi Strip Tebal 5 cm

7,500,000.00
10,066.00

NO

URAIAN

5.6000
6.7000
20.1000
2.0100
0.3350

Kg
oh
oh
oh
oh

Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

536,000.00
1,909,500.00
201,000.00
41,875.00
2,688,375.00

7,500,000.00
10,066.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

192,000.00
684,000.00
72,000.00
15,000.00
963,000.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

16 PAS 1 M2 RANGKA ATAP USUK RENG GENTENG KERAMIK, KAYU


KLS II KAMPER
0.0140
0.0060
0.0036
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Usuk (4 x 6 ) cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2,300,000.00
6,000,000.00
6,000,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

8,000.00
9,500.00
1,000.00
625.00
19,125.00

2,300,000.00
6,000,000.00
6,000,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

8,000.00
9,500.00
1,000.00
625.00
19,125.00

7,500,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

9,600.00
11,400.00
1,200.00
750.00
22,950.00

2,300,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

12,000.00
28,500.00
3,000.00
9,375.00
52,875.00

2,300,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

16,000.00
28,500.00
3,000.00
1,250.00
48,750.00

8,500,000.00
15,400.00
80,000.00
95,000.00

8,000.00
19,000.00

17 PAS 1 M2 RANGKA ATAP USUK RENG GENTENG BETON, KAYU


KLS II KAMPER
0.0140
0.0105
0.0072
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Usuk ( 5 x 7 ) Cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II


0.1650
0.2000
0.1200
0.1200
0.0120
0.0060

m3
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154
0.2000
0.1500
0.3000
0.0300
0.0750

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163
0.2500
0.2000
0.3000
0.0300
0.0100

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II


0.0108
0.1000
0.1000
0.2000

m3
Kg
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu

NO

URAIAN

0.0200
0.0050

oh Kepala Tukang
oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

100,000.00
125,000.00
Total :

2,000.00
625.00
29,625.00

8,500,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

8,000.00
19,000.00
2,000.00
625.00
29,625.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II


0.0110
0.0500
0.1000
0.2000
0.0200
0.0050

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280
0.1500
0.1500
0.4500
0.0450
0.0080

m3
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

7,500,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

12,000.00
42,750.00
4,500.00
1,000.00
60,250.00

7,500,000.00
15,400.00
65,000.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

12,000.00
42,750.00
4,500.00
1,000.00
60,250.00

7,500,000.00
15,400.00
60,000.00
13,750.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

16,000.00
57,000.00
6,000.00
1,250.00
80,250.00

8,500,000.00
15,400.00
19,800.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

48,000.00
171,000.00
18,000.00
3,750.00
240,750.00

60,000.00
15,400.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

2,000.00
7,125.00
800.00
125.00
10,050.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.1500
0.4500
0.0450
0.0080

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Teakwood 4 mm uk 90x220 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.2000
0.6000
0.0600
0.0100

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Plywood tebal 4 mm uk 120 x 240 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


0.0070
0.1000
0.1500
0.6000
1.8000
0.1800
0.0300

m3
Kg
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 10 Cm
Paku Skrup 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X


240) CM
0.4000
0.0500
0.0250
0.0750
0.0080
0.0010

Lbr
Kg
oh
oh
oh
oh

Plywood tebal 4 mm uk 120 x 240 cm


Paku 1 Cm dan 2.5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VII PEKERJAAN BETON ( SNI 7394:2008)


1

MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87
247.0000 kg Semen Portland
1,425.00
869.0000 kg Pasir Beton
100.71
999.0000 kg Koral Beton
92.59

NO
1

215.0000
1.6500
0.2750
0.0280
0.0830

lt
oh
oh
oh
oh

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

25.00
80,000.00
95,000.00
100,000.00
125,000.00

MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
276.0000 kg Semen Portland
1,425.00
828.0000 kg Pasir Beton
100.71
92.59
1,012.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
80,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

132,000.00
26,125.00
2,800.00
10,375.00
171,300.00

132,000.00
26,125.00
2,800.00
10,375.00
171,300.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72
299.0000 kg Semen Portland
1,425.00
799.0000 kg Pasir Beton
100.71
92.59
1,017.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66
326.0000 kg Semen Portland
1,425.00
760.0000 kg Pasir Beton
100.71
92.59
1,029.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61
352.0000 kg Semen Portland
1,425.00
731.0000 kg Pasir Beton
100.71
92.59
1,031.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58
371.0000 kg Semen Portland
1,425.00
698.0000 kg Pasir Beton
100.71
92.59
1,047.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56
384.0000 kg Semen Portland
1,425.00
692.0000 kg Pasir Beton
100.71
92.59
1,039.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53
406.0000 kg Semen Portland
1,425.00
684.0000 kg Pasir Beton
100.71
92.59
1,026.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

NO
1

413.0000
681.0000

kg
kg
kg
lt
oh
oh
oh
oh

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

Semen Portland
Pasir Beton
Koral Beton
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1,425.00
100.71
92.59
1,021.0000
215.0000
25.00
1.6500
55,000.00
0.2750
95,000.00
0.0280
100,000.00
0.0830
125,000.00
Total :
MEMBUAT
1
M
BETON
MUTU
f'
=
28,8
Mpa
(K325),
Slump
(12

2)cm,
w/c
=0,49
10
C
439.0000 kg Semen Portland
1,425.00
670.0000 kg Pasir Beton
100.71
92.59
1,006.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

NO

URAIAN

HARGA
SATUAN
(Rp)

11 MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48
448.0000 kg Semen Portland
1,425.00
667.0000 kg Pasir Beton
100.71
92.59
1,000.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
95,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
10.5000 kg Besi Beton (Polos/ Ulir)
0.1500 kg Kawat Beton
0.0700 oh Pekerja
0.0700 oh Tukang Besi
0.0070 oh Kepala Tukang
0.0040 oh Mandor

13 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

15 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4 m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0180 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

HARGA
UPAH
(Rp)
4

90,750.00
26,125.00
2,800.00
10,375.00
130,050.00

8,765.00
17,600.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

5,600.00
6,650.00
700.00
500.00
13,450.00

2,500,000.00
14,300.00
16,500.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

41,600.00
24,700.00
2,600.00
3,250.00
72,150.00

2,500,000.00
14,300.00
16,500.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

41,600.00
24,700.00
2,600.00
3,250.00
72,150.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

52,800.00
31,350.00
3,300.00
4,125.00
91,575.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
80,000.00
95,000.00
100,000.00
125,000.00

52,800.00
31,350.00
3,300.00
4,125.00

NO

URAIAN

HARGA
SATUAN
(Rp)

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
6.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

HARGA
UPAH
(Rp)
4

Total :

91,575.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

52,800.00
31,350.00
3,300.00
4,125.00
91,575.00

NO

URAIAN

HARGA
SATUAN
(Rp)

18 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III
0.4000 Kg Paku Biasa 5' - 12'
0.2000 Ltr Minyak Bekisting
0.0200 M3 Kayu Usuk 4/6
0.3500 Lbr Plywood 9 mm
3.0000 Btng Dolken Kayu 8" - 10"/4m
4.0000 Bh Formite/penjaga jarak bekisting/spacer
0.6600 Oh Pekerja
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.1500 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
2,000.00
80,000.00
95,000.00
100,000.00
125,000.00

HARGA
UPAH
(Rp)
4

52,800.00
31,350.00
3,300.00
4,125.00
91,575.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

52,800.00
31,350.00
3,300.00
4,125.00
91,575.00

2,500,000.00
14,300.00
102,000.00
80,000.00
95,000.00
100,000.00
125,000.00
Total :

12,000.00
4,750.00
500.00
1,000.00
18,250.00

21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III
2,500,000.00
1.5000 kg Paku Biasa 5' - 12'
14,300.00
0.4000 ltr Minyak Bekisting
16,500.00
157.0000 kg Besi Beton
8,765.00
2.2500 kg Kawat Beton
17,600.00
336.0000 kg Semen Portland
1,425.00
0.5400 m3 Pasir Beton
160,000.00
0.8100 m3 Koral Beton
85,000.00
5.3000 oh Pekerja
80,000.00
0.2750 oh Tukang Batu
95,000.00
1.3000 oh Tukang Kayu
95,000.00
1.0500 oh Tukang Besi
95,000.00
0.2620 oh Kepala Tukang
100,000.00
0.2650 oh Mandor
125,000.00
Total :

424,000.00
26,125.00
123,500.00
99,750.00
26,200.00
33,125.00
732,700.00

20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan)
0.6000 kg Paku Biasa 5' - 12'
0.5000 btg Dolken Kayu 8" - 10"/4m
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III
2.0000 kg Paku Biasa 5' - 12'
0.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00

NO

URAIAN

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

oh
oh
oh
oh
oh
oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

80,000.00
95,000.00
95,000.00
95,000.00
100,000.00
125,000.00
Total :

HARGA
UPAH
(Rp)
4

452,000.00
26,125.00
148,200.00
133,000.00
32,300.00
35,375.00
827,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III
4.0000 kg Paku Biasa 5' - 12'
2.0000 ltr Minyak Bekisting
315.0000 kg Besi Beton
4.5000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1500 m3 Kayu Kelas II balok
3.5000 lbr Plywood 9 mm
20.0000 btg Dolken Kayu 8" /4 m
7.0500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
2.1000 oh Tukang Besi
0.4030 oh Kepala Tukang
0.3530 oh Mandor

24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1400 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
16.0000 btg Dolken Kayu 8" /4 m
6.3500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3330 oh Kepala Tukang
0.3180 oh Mandor
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000 ltr Minyak Bekisting
157.5000 kg Besi Beton
2.2500 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1200 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
32.0000 btg Dolken Kayu 8" /4 m
5.3000 oh Pekerja
0.2750 oh Tukang Batu
1.3000 oh Tukang Kayu
1.0500 oh Tukang Besi
0.2650 oh Kepala Tukang
0.2650 oh Mandor
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)

HARGA
UPAH
(Rp)
4

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

528,750.00
24,750.00
148,500.00
189,000.00
40,300.00
44,125.00
975,425.00

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

476,250.00
24,750.00
148,500.00
126,000.00
33,300.00
39,750.00
848,550.00

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00

397,500.00
24,750.00
117,000.00
94,500.00
26,500.00
33,125.00
693,375.00

NO

URAIAN

0.2400
3.2000
1.6000
157.0000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00

397,500.00
24,750.00
117,000.00
94,500.00
26,200.00
33,125.00
693,075.00

NO

URAIAN

HARGA
SATUAN
(Rp)

27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +


BEKISTING)
0.2500 m3 Kayu Kelas III
3.0000 kg Paku Biasa 5' - 12'
1.2000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1050 m3 Kayu Kelas II balok
2.5000 lbr Plywood 9 mm
14.0000 btg Dolken Kayu 8" /4 m
5.6500 oh Pekerja
0.2750 oh Tukang Batu
1.5600 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3230 oh Kepala Tukang
0.2830 oh Mandor

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00

HARGA
UPAH
(Rp)
4

423,750.00
24,750.00
140,400.00
126,000.00
32,300.00
35,375.00
782,575.00

28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

m3
kg
kg
kg
kg
m3
m3
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2,500,000.00
14,300.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

13,500.00
1,800.00
1,800.00
1,800.00
600.00
1,125.00
20,625.00

2,500,000.00
14,300.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

22,275.00
2,970.00
2,970.00
2,970.00
1,000.00
1,875.00
34,060.00

1,540.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
5,400.00
600.00
1,000.00
18,250.00

29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15


CM)
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

m3
kg
kg
kg
kg
m3
m3
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1

1 M2 PEKERJAAN ATAP GENTENG PLENTONG


25.0000 bh Genteng Plentong
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong
8.0000 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Kayu
0.0200 oh Kepala Tukang
0.0020 oh Mandor

1,980.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
5,400.00
600.00
1,000.00
18,250.00

8,800.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

30,000.00
18,000.00
2,000.00
250.00
50,250.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM


0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm
30,000.00
0.1200 kg Paku Pancing 60 x 230
22,000.00
0.1400 oh Pekerja
75,000.00
0.0700 oh Tukang Kayu
90,000.00
0.0070 oh Kepala Tukang Kayu
100,000.00
0.0070 oh Mandor
125,000.00
Total :
1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
2.4000 lbr Bubungan Stel Gelombang
6.0000 kg Paku Skrup 3,5"
0.0840 oh Pekerja
0.1250 oh Tukang Kayu
0.0130 oh Kepala Tukang
0.0040 oh Mandor
1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap
0.2000 kg Paku Biasa 1/2" - 1"
0.1660 oh Pekerja
0.2500 oh Tukang Kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28
0.0600 kg Paku biasa 1/2" - 1"
0.0500 kg Paku biasa 2" - 5"
0.0040 m3 Kayu papan 3 cm
0.1250 oh Pekerja
0.2500 oh Tukang kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang
0.5000 glg Tali pengikat
0.2000 oh Pekerja
0.0100 oh Mandor

1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28
0.0200 kg Paku Biasa 1/2" - 1"
0.1200 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0060 oh Mandor

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28
0.0400 kg Paku biasa 1/2" - 1"

10,500.00
6,300.00
700.00
875.00
18,375.00

24,000.00
29,150.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,300.00
11,250.00
1,300.00
500.00
19,350.00

9,350.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

12,450.00
22,500.00
2,500.00
1,000.00
38,450.00

51,150.00
15,400.00
14,300.00
8,500,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,375.00
22,500.00
2,500.00
1,000.00
35,375.00

12,500.00
10,450.00
75,000.00
125,000.00
Total :

15,000.00
1,250.00
16,250.00

46,750.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,000.00
5,400.00
600.00
750.00
15,750.00

60,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
4,500.00
500.00
1,000.00
17,250.00

51,150.00
15,400.00

NO

URAIAN

0.1500
0.0700
0.0080
0.0060

IX
1

oh
oh
oh
oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
6,300.00
800.00
750.00
19,100.00

51,700.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

2,250.00
6,300.00
700.00
500.00
9,750.00

PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5
MM DAN 6 MM
1.1000 lbr Asbes semen
0.0100 kg Paku Biasa 1/2" - 1"
0.0300 oh Pekerja
0.0700 oh Tukang Kayu
0.0070 oh Kepala Tukang
0.0040 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS
0.0300 kg Paku Biasa 1/2" - 1"
0.1000 oh Pekerja
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan
0.0100 kg Paku Biasa 1/2" - 1"
0.8000 oh Pekerja
0.8000 oh Tukang Kayu
0.0800 oh Kepala Tukang
0.0400 oh Mandor

HARGA
UPAH
(Rp)
4

60,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
9,000.00
1,000.00
625.00
18,125.00

8,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00

60,000.00
72,000.00
8,000.00
5,000.00

Total : 145,000.00
4

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil
0.1000 kg Paku list SQ
0.0500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0030 oh Mandor

24,500.00
15,840.00
75,000.00
90,000.00
100,000.00
125,000.00

3,750.00
4,500.00
500.00
375.00

Total :

9,125.00

8,500,000.00
15,840.00
51,700.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

13,500.00
28,800.00
3,200.00
1,125.00
46,625.00

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup
19,800.00
0.3640 lbr Gypsum Board (120x240x9)
69,850.00
0.1000 oh Pekerja
75,000.00
0.0500 oh Tukang Kayu
90,000.00
0.0050 oh Kepala Tukang
100,000.00
0.0050 oh Mandor
125,000.00
Total :

7,500.00
4,500.00
500.00
625.00
13,125.00

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm
0.0600 kg Paku Biasa 2" - 5"
1.1000 lbr Asbes
0.1800 oh Pekerja
0.3200 oh Tukang Kayu
0.0320 oh Kepala Tukang
0.0090 oh Mandor

1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup
0.3640 lbr Kalsiboard 4.5 mm
0.1000 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0050 oh Mandor

19,800.00
79,200.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
4,500.00
500.00
625.00
13,125.00

PEKERJAAN SANITASI ( SNI 2002 )

X
1

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


1.0000 bh Kloset duduk/ monoblok
Perlengkapan
6% x harga kloset
3.3000 oh Pekerja
1.1000 oh Tukang batu
0.0010 oh Kepala Tukang

1,674,900.00
75,000.00
90,000.00
100,000.00

247,500.00
99,000.00
100.00

NO

URAIAN

0.1600

oh Mandor

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.5000 oh Tukang batu
1.5000 oh Kepala Tukang
0.1600 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

125,000.00
Total :

20,000.00
366,600.00

135,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
135,000.00
150,000.00
20,000.00
380,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir
Perlengkapan
6% x harga Urin
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.0000 oh Tukang batu
0.1000 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel
Perlengkapan
12% x harga wast
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.2000 oh Pekerja
1.4500 oh Tukang batu
0.1500 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass
Perlengkapan
18% x harga wast
1.8000 oh Pekerja
2.7000 oh Tukang batu
0.5400 oh Kepala Tukang
0.1100 oh Mandor

MEMASANG 1 M1 PIPA GALVANIS 0,5" - 1 "


1.2000 m1 Pipa galvanis
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0270 oh Mandor

MEMASANG 1 M1 PIPA GALVANIS 1,5" - 3"


1.2000 M' Pipa galvanis
Perlengkapan
35% x harga pipa
0.1080 Oh Pekerja
0.1800 Oh Tukang Pipa
0.0180 Oh Kepala Tukang
0.0054 Oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW 0,5" - 1,5"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang Pipa
0.0060 oh Kepala Tukang
0.0018 oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW 2"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa

HARGA
UPAH
(Rp)
4

1,052,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
90,000.00
10,000.00
12,500.00
187,500.00

185,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

90,000.00
130,500.00
15,000.00
12,500.00
248,000.00

230,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

135,000.00
243,000.00
54,000.00
13,750.00
445,750.00

38,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

4,050.00
8,100.00
900.00
3,375.00
16,425.00

175,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

8,100.00
16,200.00
1,800.00
675.00
26,775.00

16,250.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

2,700.00
5,400.00
600.00
225.00
8,925.00

23,750.00
75,000.00
90,000.00

4,050.00
8,100.00

NO

URAIAN

0.0090
0.0027

oh Kepala Tukang
oh Mandor

10 MEMASANG 1 M1 PIPA PVC TYPE AW 3" - 4"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0810 oh Pekerja
0.1350 oh Tukang Pipa
0.0135 oh Kepala Tukang
0.0041 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

100,000.00
125,000.00
Total :

900.00
337.50
13,387.50

62,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,075.00
12,150.00
1,350.00
512.50
20,087.50

NO

URAIAN

HARGA
SATUAN
(Rp)

11 MEMASANG 1 BUAH KRAN 0,75" ATAU 0,5"


1.0000 bh Kran air
0.0250 bh Seal tape
0.0100 oh Pekerja
0.1000 oh Tukang Pipa
0.0100 oh Kepala Tukang
0.0050 oh Mandor

XI
1

PEKERJAAN BESI DAN ALUMINIUM


7393:2008)
1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF
0.0060 oh Pekerja
0.0600 oh Tukang besi
0.0060 oh Kepala Tukang
0.0003 oh Mandor

1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako
10.0000 bh Paku biasa 1 cm - 2,5 cm
7.0000 m' Besi strip
0.2000 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat
0.0150 kg Paku biasa 0,5" - 1"
0.0190 m3 Kayu papan kelas II/III
0.1500 oh Pekerja
0.4000 oh Tukang besi
0.0250 oh Kepala Tukang
0.0013 oh Mandor

HARGA
UPAH
(Rp)
4

25,000.00
2,700.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

750.00
9,000.00
1,000.00
625.00
11,375.00

9,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

450.00
5,400.00
600.00
37.50
6,487.50

128,700.00
19,800.00
10,066.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

15,000.00
18,000.00
2,000.00
125.00
35,125.00

51,150.00
19,800.00
8,500,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
36,000.00
2,500.00
162.50
49,912.50

115,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

750.00
45,000.00
1,000.00
625.00
47,375.00

29,700.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,125.00
13,500.00
1,500.00
100.00
16,225.00

53,900.00
75,000.00
90,000.00
100,000.00

750.00
9,000.00
1,000.00

(SNI

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1

1 BH PASANG KUNCI TANAM BIASA


1.0000 bh Kunci tanam biasa
0.0100 oh Pekerja
0.5000 oh Tukang besi
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela
0.0100 oh Pekerja
0.1000 oh Tukang besi
0.0100 oh Kepala Tukang

NO

URAIAN

0.0005

oh Mandor

1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot
0.0200 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

125,000.00
Total :

62.50
10,812.50

24,200.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,125.00
13,500.00
1,500.00
100.00
16,225.00

110,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,500.00
18,000.00
2,000.00
125.00
21,625.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

XIII PEK. PENUTUP LANTAI DAN DINDING


7395:2008)
1

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ex: Mulia


11.8700 bh Keramik 30 x 30 cm Asia
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ex: Mulia


26.5000 bh Keramik 20 x 20 cm
10.4000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.6200 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm
1.1400 kg Semen Portland
0.0030 m3 Pasir Pasang
0.1000 kg Semen warna/semen grouting
0.0900 oh Pekerja
0.0900 oh Tukang batu
0.0090 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG DINDING KERAMIK 20 X 20 CM ex : Mulia


26.5000 bh Keramik 20 x 20 cm
9.3000 kg Semen Portland
0.0180 m3 Pasir Pasang
1.9400 kg Semen warna/semen grouting
0.9000 oh Pekerja
0.4500 oh Tukang batu
0.0450 oh Kepala Tukang
0.0450 oh Mandor

1 M2 PASANG BATU ALAM 30 X 30 CM


11.8700 bh Batu alam 30 x 30 cm
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu

HARGA
UPAH
(Rp)
4

105,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,125.00
13,500.00
1,500.00
100.00
16,225.00

3,974.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

52,500.00
31,500.00
3,500.00
4,375.00
91,875.00

1,876.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

52,500.00
31,500.00
3,500.00
4,375.00
91,875.00

3,974.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,750.00
8,100.00
900.00
625.00
16,375.00

1,876.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

67,500.00
40,500.00
4,500.00
5,625.00
118,125.00

6,318.44
176.00
125,000.00
37,400.00
75,000.00
90,000.00

52,500.00
31,500.00

(SNI

NO

URAIAN

0.0350
0.0350

oh Kepala Tukang
oh Mandor

1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II
0.0500 kg Paku sekrup 3,5'
0.1200 oh Pekerja
0.1200 oh Tukang kayu
0.0120 oh Kepala Tukang
0.0060 oh Mandor

HARGA
SATUAN
(Rp)
3

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni
0.1500 kg Dempul
0.1700 kg Cat dasar
0.2600 kg Cat Penutup 2x

100,000.00
125,000.00
Total :

3,500.00
4,375.00
91,875.00

8,500,000.00
29,150.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,000.00
10,800.00
1,200.00
750.00
21,750.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

HARGA
UPAH
(Rp)

30,000.00
42,100.00
43,600.00
55,000.00

NO

URAIAN

0.0700
0.0090
0.0060
0.0025

oh
oh
oh
oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
90,000.00
100,000.00
125,000.00
Total :

5,250.00
810.00
600.00
312.50
6,972.50

59,000.00
42,100.00
4,100.00
16,800.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

12,000.00
14,400.00
1,600.00
312.50
28,312.50

12,000.00
43,600.00
30,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,500.00
5,670.00
630.00
312.50
8,112.50

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar
43,600.00
0.1800 kg Cat Penutup 2x
30,000.00
0.0280 oh Pekerja
75,000.00
0.0420 oh Tukang cat
90,000.00
0.0042 oh Kepala Tukang
100,000.00
0.0025 oh Mandor
125,000.00
Total :

2,100.00
3,780.00
420.00
312.50
6,612.50

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis
0.0500 kg Dempul
0.1000 lbr Amplas
0.0100 bh Kuas
0.1600 oh Pekerja
0.1600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat Penutup 2x
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala Tukang
0.0025 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi
0.0100 lbr Kuas
0.0200 oh Pekerja
0.2000 oh Tukang cat
0.0200 oh Kepala Tukang
0.0100 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi
0.0060 oh Pekerja
0.0600 oh Tukang cat
0.0120 oh Kepala Tukang
0.0060 oh Mandor

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur
2.0000 lbr Amplas
0.0600 oh Pekerja
0.0600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor

47,500.00
16,800.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,500.00
18,000.00
2,000.00
1,250.00
22,750.00

70,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

450.00
5,400.00
1,200.00
750.00
7,800.00

47,000.00
4,100.00
75,000.00
90,000.00
100,000.00
125,000.00

4,500.00
5,400.00
1,600.00
312.50

Total :

11,812.50

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok
8.4000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan
8.4000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1,980.00
1,240.00
350,000.00
Total :

350,000.00
350,000.00

10,000.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

1,980.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

HARGA
UPAH
(Rp)
4

12,500.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

1,980.00
12,500.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

1,980.00
1,240.00
355,000.00
Total :

355,000.00
355,000.00

12,500.00
1,240.00
355,000.00
Total :

355,000.00
355,000.00

1,980.00
12,500.00
1,240.00
280,000.00
Total :

280,000.00
280,000.00

60,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :
70,000.00
73,000.00
78,000.00
84,000.00
60,000.00
70,000.00
73,000.00
79,000.00
85,000.00
89,000.00
99,000.00
105,000.00
60,000.00

22,500.00
2,500.00
37,500.00
3,125.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00

75,000.00
130,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :

45,000.00
5,000.00
75,000.00
6,250.00
131,250.00

XVI PEKERJAAN LANDSCAPE


1

2
4
5
5
7
8
10
11
12
14
15
16
18

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.5000 oh Pekerja
0.0250 oh Mandor
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225

19 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block
0.0690 m3 Pasir Urug
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
1.0000 oh Pekerja
0.0500 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

20 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat
9.2800 zak Semen
0.2000 m3 Pasir pasang
0.2500 oh Tukang Batu
0.0100 oh Kepala Tukang
0.6250 oh Pekerja
0.0310 oh Mandor
21 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225
0.4500 zak Semen 50 Kg
0.0023 m3 Pasir Pasang
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang
0.9500 oh Pekerja
0.0950 oh Mandor
22 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
23 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

HARGA
UPAH
(Rp)
4

45,000.00
1,240.00
140,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :

22,500.00
1,000.00
46,875.00
3,875.00
74,250.00

62,000.00
1,240.00
140,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :
64,000.00
72,000.00

31,500.00
3,500.00
71,250.00
11,875.00
118,125.00
118,125.00
118,125.00

NO

URAIAN

HARGA
SATUAN
(Rp)

24 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat
0.0710 kg Thiner
0.0300 oh Tukang Cat
0.0030 oh Kep. Tukang
0.1500 oh Pekerja
0.0150 oh Mandor

HARGA
UPAH
(Rp)
4

70,500.00
20,000.00
95,000.00
100,000.00
75,000.00
125,000.00
Total :

2,850.00
300.00
11,250.00
1,875.00
16,275.00

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
15,600.00
3.0000 bt Pipa Clipsal 20 mm hitam
13,200.00
2.0000 bh Tee dos clipsal 20 mm hitam
7,700.00
15.0000 bj Klem clipsal 20 mm hitam
825.00
3.0000 bj Sock clipsal 20 mm hitam
2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P
11,000.00
1.0000 ttk Biaya pasang
25,000.00
Total :

25,000.00
25,000.00

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
3.0000 bt Pipa Clipsal 20 mm hitam
1.0000 bh Tee dos clipsal 20 mm hitam
15.0000 bj Klem clipsal 20 mm hitam
4.0000 bj Sock clipsal 20 mm hitam
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 m1 Pipa flexible clipsal 20 mm hitam
1.0000 ttk Biaya pasang

1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone
8.0000 bt Pipa Clipsal 20 mm putih
1.0000 bh Tee dos clipsal 20 mm putih
25.0000 bj Klem clipsal 20 mm putih
5.0000 bj Sock clipsal 20 mm putih
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof
6.0000 bt Pipa Clipsal 20 mm putih
2.0000 bh Tee dos clipsal 20 mm putih
20.0000 bj Klem clipsal 20 mm putih
6.0000 bj Sock clipsal 20 mm putih
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

15,600.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
11,550.00
25,000.00
Total :

25,000.00
25,000.00

4,400.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
25,000.00
Total :

25,000.00
25,000.00

6,600.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
25,000.00
Total :

25,000.00
25,000.00

Mangupura, 8 Jan

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

JAAN
HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

16,250.00
3,562.50
57,420.00
800.00
765.00
165,600.00
858.00
21,375.00

44,400.00

266,630.50

366,530.50

27,600.00
286.00
22,400.00

15,300.00

50,286.00

84,711.00

127,500.00
450,000.00
12,155.00
11,072.60
49,875.00
21,000.00
16,000.00
12,750.00
39,000.00
12,787.50
33,000.00
8,400.00
17,325.00
3,600.00

385,000.00

814,465.10
22,100.00
525,000.00
4,290.00
14,962.50
4,800.00
4,250.00
70,125.00

1,680,715.10

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

237,000.00

645,527.50

1,178,777.50

39,000.00
690,000.00
10,010.00
70,125.00

195,000.00

809,135.00

1,247,885.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

11,400.00

25,650.00

16,250.00
465,000.00
4,290.00
25,650.00
4,800.00
4,250.00
70,125.00
81,000.00

237,000.00

671,365.00

1,204,615.00

90,000.00
1,144.00
44,800.00

22,950.00

135,944.00

187,581.50

10,000.00
9,350.00

22,720.00

19,350.00

70,470.00

21,750.00
13,950.00
1,400.00

69,000.00

37,100.00

192,350.00

459,988.00

1,034,973.00

429,988.00

967,473.00

50,500.00

113,625.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

62,100.00

139,725.00

73,900.00

166,275.00

67,200.00

151,200.00

102,000.00

229,500.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

81,300.00

182,925.00

3,700.00

8,325.00

22,120.00

49,770.00

37,000.00

83,250.00

156,000.00

20,200.00

156,000.00

201,450.00

16,500.00

11,100.00

16,500.00

41,475.00

96,000.00

18,500.00

96,000.00

137,625.00

102,840.00

37,000.00

102,840.00

186,090.00

20,400.00

18,500.00

20,400.00

174,000.00
287,850.00
67,900.00

62,025.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

166,500.00

529,750.00

904,375.00

174,000.00
232,275.00
72,800.00

166,500.00

479,075.00

853,700.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

174,000.00
193,800.00
76,160.00

166,500.00

443,960.00

818,585.00

174,000.00
166,725.00
78,540.00

166,500.00

419,265.00

793,890.00

174,000.00
129,675.00
81,760.00

166,500.00

385,435.00

760,060.00

69,600.00
276,450.00
49,920.00
39,780.00
1,104,390.00
31,680.00

306,000.00

1,571,820.00

2,260,320.00

65,250.00
276,450.00
49,920.00
39,780.00

232,700.00

431,400.00

954,975.00

174,000.00
56,160.00

86,580.00

230,160.00

424,965.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

2,080.00
12,800.00
10,625.00
69,825.00
302,392.50
12,320.00
31,050.00
1,716.00
2,400.00
1,485.00

97,200.00

446,693.50

665,393.50

2,470.00
15,040.00
12,750.00
86,212.50
394,425.00
15,840.00
36,800.00
1,716.00
2,880.00
1,485.00

125,280.00

569,618.50

851,498.50

182,000.00
61,987.50
11,200.00

58,200.00

255,187.50

386,137.50

182,000.00
46,953.75
12,740.00

58,200.00

241,693.75

182,000.00
37,833.75
13,020.00

372,643.75

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

58,200.00

232,853.75

363,803.75

182,000.00
31,635.00
14,280.00

58,200.00

227,915.00

358,865.00

182,000.00
26,362.50
17,080.00

58,200.00

225,442.50

356,392.50

91,000.00
27,003.75
5,320.00

29,100.00

123,323.75

188,798.75

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

91,000.00
20,477.25
5,600.00

29,100.00

117,077.25

182,552.25

91,000.00
16,387.50
6,020.00

29,100.00

113,407.50

178,882.50

91,000.00
13,794.00
6,300.00

29,100.00

111,094.00

176,569.00

91,000.00
11,856.00
6,860.00

29,100.00

109,716.00

175,191.00

91,000.00
9,262.50
7,000.00

29,100.00

107,262.50

172,737.50

2,462,500.00
10,687.50
3,780.00
17,091.75

30,380.00

2,494,059.25

2,462,500.00
10,687.50
3,780.00

2,562,414.25

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

30,380.00

2,476,967.50

2,545,322.50

5,760,000.00
15,675.00
4,900.00

29,100.00

5,780,575.00

60,000.00
84,000.00
171.60

5,846,050.00

HARGA
UPAH
(Rp)
4

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

18,000.00

10,800.00

162,171.60

186,471.60

22,093.20
2,240.00

33,300.00

24,333.20

99,258.20

14,569.20
2,800.00

33,300.00

17,369.20

92,294.20

11,080.80
3,220.00

33,300.00

14,300.80

89,225.80

8,892.00
3,360.00

33,300.00

12,252.00

87,177.00

7,387.20
3,640.00

33,300.00

11,027.20

85,952.20

6,292.80
3,780.00

33,300.00

10,072.80

4,924.80

84,997.80

HARGA
UPAH
(Rp)
4

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

4,060.00

33,300.00

8,984.80

83,909.80

19,425.60
3,780.00

44,600.00

23,205.60

14,774.40
4,340.00

123,555.60

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

44,600.00

19,114.40

119,464.40

11,856.00
4,480.00

44,600.00

16,336.00

116,686.00

9,849.60
4,900.00

44,600.00

14,749.60

115,099.60

8,390.40
5,040.00

44,600.00

13,430.40

113,780.40

712.50
1,820.00

39,120.00

2,532.50

90,552.50

6,156.00
840.00

29,100.00

6,996.00

72,471.00

4,428.90

16,740.00

4,428.90

2,280.00

42,093.90

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

7,860.00

2,280.00

19,965.00

9,034.50
1,680.00

33,300.00

10,714.50

85,639.50

4,631.25

22,200.00

4,631.25

54,581.25

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

8,250,000.00
19,250.00
13,750.00

2,247,000.00

8,283,000.00

13,338,750.00

6,000,000.00
19,250.00
13,750.00

1,926,000.00

6,033,000.00

10,366,500.00

340,000.00
770.00

112,400.00

340,770.00

593,670.00

240,000.00
770.00

112,400.00

240,770.00

493,670.00

340,000.00
6,875.00

321,000.00

346,875.00

204,000.00
75,000.00
4,125.00

1,069,125.00

HARGA
UPAH
(Rp)
4

256,800.00

HARGA
BAHAN
(Rp)
5

283,125.00

HARGA
JUMLAH
(Rp)
6

860,925.00

544,000.00
6,875.00

321,000.00

550,875.00

1,273,125.00

212,500.00
462.00
6,875.00
60,000.00

321,000.00

279,837.00

1,002,087.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

217,600.00
462.00
6,875.00
60,000.00

256,800.00

284,937.00

862,737.00

510,000.00
2,310.00

244,380.00

512,310.00

1,062,165.00

217,600.00
462.00
6,875.00
65,000.00

256,800.00

289,937.00

867,737.00

212,500.00
462.00
11,000.00
65,000.00
44,000.00

256,800.00

332,962.00

910,762.00

8,250,000.00
150,990.00
86,240.00

1,284,000.00

8,487,230.00

9,000,000.00
150,990.00

11,376,230.00

HARGA
UPAH
(Rp)
4

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

86,240.00

2,150,700.00

9,237,230.00

14,076,305.00

8,250,000.00
150,990.00
46,200.00

770,400.00

8,447,190.00

10,180,590.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

32,200.00
36,000.00
21,600.00
3,850.00

15,300.00

93,650.00

128,075.00

32,200.00
63,000.00
43,200.00
3,850.00

15,300.00

142,250.00

176,675.00

1,237,500.00
3,080.00

18,360.00

1,240,580.00

1,281,890.00

35,420.00
3,080.00

42,300.00

38,500.00

133,675.00

37,490.00
3,850.00

39,000.00

41,340.00

91,800.00
1,540.00

129,090.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

23,700.00

93,340.00

146,665.00

93,500.00
770.00

23,700.00

94,270.00

147,595.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

210,000.00
2,310.00

48,200.00

212,310.00

320,760.00

210,000.00
2,310.00
55,900.00
7,700.00

48,200.00

275,910.00

384,360.00

210,000.00
2,310.00
51,600.00
7,700.00

64,200.00

271,610.00

416,060.00

59,500.00
1,540.00
2,970.00

192,600.00

64,010.00

497,360.00

24,000.00
770.00

8,040.00

24,770.00

351,975.00
87,516.99
92,497.41

42,860.00

HARGA
UPAH
(Rp)
4

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

5,375.00

137,040.00

537,364.40

845,704.40

393,300.00
83,387.88
93,701.08
5,375.00

137,040.00

575,763.96

884,103.96

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

426,075.00
80,467.29
94,164.03
5,375.00

104,040.00

606,081.32

840,171.32

464,550.00
76,539.60
95,275.11
5,375.00

104,040.00

641,739.71

875,829.71

501,600.00
73,619.01
95,460.29
5,375.00

104,040.00

676,054.30

910,144.30

528,675.00
70,295.58
96,941.73
5,375.00

104,040.00

701,287.31

935,377.31

547,200.00
69,691.32
96,201.01
5,375.00

104,040.00

718,467.33

952,557.33

578,550.00
68,885.64
94,997.34
5,375.00

104,040.00

747,807.98

981,897.98

HARGA
UPAH
(Rp)
4

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

588,525.00
68,583.51
94,534.39
5,375.00

104,040.00

757,017.90

991,107.90

625,575.00
67,475.70
93,145.54
5,375.00

104,040.00

791,571.24

1,025,661.24

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

638,400.00
67,173.57
92,590.00
5,375.00

104,040.00

803,538.57

1,037,628.57

92,032.50
2,640.00

10,760.00

94,672.50

118,882.50

100,000.00
4,290.00
1,650.00

57,720.00

105,940.00

235,810.00

100,000.00
4,290.00
1,650.00

57,720.00

105,940.00

235,810.00

100,000.00
5,720.00
3,300.00
75,000.00
40,617.50
204,000.00

73,260.00

428,637.50

100,000.00
5,720.00
3,300.00
90,000.00
40,617.50
204,000.00

593,472.50

HARGA
UPAH
(Rp)
4

73,260.00

HARGA
BAHAN
(Rp)
5

443,637.50

HARGA
JUMLAH
(Rp)
6

608,472.50

100,000.00
5,720.00
3,300.00
75,000.00
40,617.50
612,000.00

73,260.00

836,637.50

1,001,472.50

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

75,000.00
5,720.00
3,300.00
100,000.00
40,617.50
306,000.00
8,000.00

73,260.00

538,637.50

703,472.50

75,000.00
5,720.00
2,475.00
75,000.00
40,617.50
204,000.00

73,260.00

402,812.50

567,647.50

66,000.00
8,580.00
51,000.00

14,600.00

125,580.00

158,430.00

500,000.00
21,450.00
6,600.00
1,376,105.00
39,600.00
478,800.00
86,400.00
68,850.00

586,160.00

2,577,805.00

675,000.00
28,600.00
9,900.00
1,840,650.00
52,800.00
478,800.00
86,400.00
68,850.00

3,896,665.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

661,600.00

3,241,000.00

4,729,600.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

1,000,000.00
57,200.00
33,000.00
2,760,975.00
79,200.00
478,800.00
86,400.00
68,850.00
750,000.00
406,175.00
2,040,000.00

35,300.00
780,340.00

7,760,600.00

9,516,365.00

800,000.00
45,760.00
26,400.00
1,840,650.00
52,800.00
478,800.00
86,400.00
68,850.00
700,000.00
324,940.00
1,632,000.00

678,840.00

6,056,600.00

7,583,990.00

800,000.00
45,760.00
26,400.00
1,380,487.50
39,600.00
478,800.00
86,400.00
68,850.00
600,000.00
324,940.00
3,264,000.00

554,700.00

7,115,237.50

8,363,312.50

HARGA
UPAH
(Rp)
4

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

600,000.00
45,760.00
26,400.00
1,376,105.00
39,600.00
478,800.00
86,400.00
68,850.00
800,000.00
324,940.00
2,448,000.00

554,460.00

6,294,855.00

7,542,390.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

625,000.00
42,900.00
19,800.00
1,840,650.00
52,800.00
478,800.00
86,400.00
68,850.00
525,000.00
290,125.00
1,428,000.00

626,060.00

5,458,325.00

6,866,960.00

5,000.00
143.00
26,295.00
792.00
5,700.00
960.00
765.00

16,500.00

39,655.00

76,780.00

7,500.00
286.00
31,554.00
880.00
7,837.50
1,440.00
1,275.00

27,248.00

50,772.50

112,080.50

38,500.00

14,600.00

38,500.00

71,350.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

49,500.00

14,600.00

49,500.00

82,350.00

44,000.00
11,400.00
4,480.00

40,200.00

59,880.00

150,330.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

22,500.00
2,640.00

14,700.00

25,140.00

58,215.00

57,600.00
174,900.00

15,480.00

232,500.00

267,330.00

561,000.00
3,080.00

30,760.00

564,080.00

633,290.00

20,460.00
924.00
715.00
34,000.00

28,300.00

56,099.00

119,774.00

81,250.00
5,225.00

13,000.00

86,475.00

115,725.00

32,725.00
308.00

12,600.00

33,033.00

61,383.00

63,000.00

13,800.00

63,000.00

15,345.00
616.00

94,050.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

15,280.00

15,961.00

50,341.00

56,870.00
154.00

7,800.00

57,024.00

74,574.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

22,500.00
462.00

14,500.00

22,962.00

55,587.00

127,500.00
154.00

116,000.00 127,654.00

388,654.00

25,725.00
1,584.00

7,300.00

27,309.00

43,734.00

102,000.00
950.40
56,870.00

37,300.00

159,820.40

243,745.40

2,178.00
25,425.40

10,500.00

27,603.40

51,228.40

2,178.00
28,828.80

10,500.00

31,006.80

1,674,900.00
100,494.00

54,631.80

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

293,280.00

1,775,394.00

2,435,274.00

135,000.00
8,550.00
1,400.00

304,000.00

144,950.00

828,950.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

1,052,000.00
63,120.00
8,550.00
1,400.00

150,000.00

1,125,070.00

1,462,570.00

185,000.00
22,200.00
8,550.00
1,400.00

198,400.00

217,150.00

663,550.00

230,000.00
41,400.00

356,600.00

271,400.00

1,073,750.00

45,600.00
13,300.00

13,140.00

58,900.00

88,465.00

210,000.00
61,250.00

21,420.00

271,250.00

319,445.00

19,500.00
5,687.50

7,140.00

25,187.50

28,500.00
8,312.50

41,252.50

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

10,710.00

36,812.50

60,910.00

75,000.00
21,875.00

16,070.00

96,875.00

133,032.50

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

25,000.00
67.50

9,100.00

25,067.50

45,542.50

10,925.00

5,190.00

10,925.00

22,602.50

141,570.00
198,000.00
70,462.00

28,100.00

410,032.00

473,257.00

53,707.50
297.00
161,500.00

39,930.00

215,504.50

305,347.00

115,500.00

37,900.00

115,500.00

200,775.00

29,700.00

12,980.00

29,700.00

53,900.00

58,905.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

8,650.00

53,900.00

73,362.50

24,200.00

12,980.00

24,200.00

53,405.00

110,000.00

17,300.00

110,000.00

148,925.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

115,500.00

12,980.00

115,500.00

144,705.00

47,171.38
13,400.00
6,300.00
25,500.00

73,500.00

92,371.38

257,746.38

49,714.00
13,936.00
6,300.00
27,540.00

73,500.00

97,490.00

262,865.00

13,233.42
1,527.60
420.00
1,700.00

13,100.00

16,881.02

46,356.02

49,714.00
12,462.00
2,520.00
32,980.00

94,500.00

97,676.00

74,999.88
1,760.00
5,625.00
56,100.00

310,301.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

73,500.00

138,484.88

303,859.88

25,500.00
1,457.50

17,400.00

26,957.50

6,000.00
6,315.00
7,412.00
14,300.00

66,107.50

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

5,578.00

34,027.00

46,577.50

8,850.00
2,105.00
410.00
168.00

22,650.00

11,533.00

62,495.50

1,200.00
4,360.00
7,800.00

6,490.00

13,360.00

27,962.50

5,232.00
5,400.00

5,290.00

10,632.00

22,534.50

4,750.00
168.00

18,200.00

4,918.00

45,868.00

21,150.00

6,240.00

21,150.00

35,190.00

24,534.00
8,200.00

9,450.00

32,734.00

53,996.50

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

217,800.00
10,416.00
280,000.00

228,216.00

858,216.00

137,500.00
10,416.00
160,000.00

147,916.00

507,916.00

108,900.00
5,208.00
160,000.00

114,108.00

474,108.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

229,166.67
5,208.00
160,000.00

234,374.67

594,374.67

108,900.00
56,145.83
6,510.00
160,000.00

171,555.83

531,555.83

108,900.00
5,208.00
284,000.00

114,108.00

753,108.00

229,166.67
5,208.00
284,000.00

234,374.67

873,374.67

108,900.00
56,145.83
6,510.00
224,000.00

171,555.83

675,555.83

60,000.00

52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00
52,500.00

60,000.00
70,000.00
73,000.00
78,000.00
84,000.00
60,000.00
70,000.00
73,000.00
79,000.00
85,000.00
89,000.00
99,000.00
105,000.00
60,000.00

178,125.00
188,125.00
191,125.00
196,125.00
202,125.00
178,125.00
188,125.00
191,125.00
197,125.00
203,125.00
207,125.00
217,125.00
223,125.00
178,125.00

75,000.00
8,970.00

105,000.00

83,970.00

320,220.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

54,000.00
11,507.20
28,000.00

59,400.00

93,507.20

227,157.20

62,000.00
558.00
322.00

94,500.00
94,500.00
94,500.00

62,880.00
103,507.20
111,507.20

275,505.00
316,132.20
324,132.20

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

20,022.00
1,420.00

13,020.00

21,442.00

50,737.00

124,800.00
39,600.00
15,400.00
12,375.00
6,600.00
11,000.00
20,000.00

209,775.00

254,775.00

20,000.00

156,000.00
39,600.00
7,700.00
12,375.00
8,800.00
11,000.00
11,550.00
25,000.00
272,025.00

317,025.00

110,000.00
105,600.00
7,700.00
20,625.00
11,000.00
11,000.00
20,000.00

265,925.00

310,925.00

132,000.00
79,200.00
15,400.00
16,500.00
13,200.00
11,000.00
20,000.00

267,300.00

Mangupura, 8 Januari 2015

312,300.00

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN


BULAN JANUARI 2015
NO

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK

1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN

1 M2 PEMBUATAN BEDENG BURUH

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM

1 M2 PEMBUATAN STEGGER DARI BAMBU

10

1 M2 PEMBUATAN JALAN SEMENTARA

11

1 M3 BONGKARAN BETON BERTULANG

12

1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

II

PEKERJAAN TANAH

1 M3 GALIAN TANAH BIASA DALAM 1 METER

1 M3 GALIAN TANAH BIASA DALAM 2 METER

1 M3 GALIAN TANAH BIASA DALAM 3 METER

1 M3 GALIAN TANAH KERAS DALAM 1METER

1 M3 GALIAN TANAH CADAS DALAM 1 METER

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER

1 M3 URUGAN KEMBALI

10

1 M3 PEMADATAN TANAH ( Per 20 Cm )

11

1 M3 URUGAN PASIR

12

1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM

13

1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan

14

1 M3 URUGAN TANAH PILIHAN DIPADATKAN

15

1 M3 URUGAN LIMESTONE PADAT

III PEKERJAAN PONDASI

(SNI 03-2835-2002)

(SNI 2835 : 2008)

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS

1 M3 BATU KALI CAMP. 1 PC : 4 PS

1 M3 BATU KALI CAMP. 1 PC : 5 PS

Hal. 128

NO

URAIAN PEKERJAAN

1 M3 BATU KALI CAMP. 1 PC : 6 PS

1 M3 BATU KALI CAMP. 1 PC : 8 PS

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M

1 M3 PASANGAN BATU KOSONG

IV PEKERJAAN DINDING

(SNI 6897 : 2008)

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS

10

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS

11

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS

12

1 M2 PASAANGAN BATU ALAM 30 X 30 CAMP 1PC : 2PS

13

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) / BATAKO

14

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI

15

1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM

16

1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

PEKERJAAN PLESTERAN

1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM

10

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM

11

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM

12

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM

13

1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM

(SNI 2837 : 2008)

Hal. 129

NO

URAIAN PEKERJAAN

14

1 M2 PLESTERAN CIPRAT 1 PC : 2 PS

15

1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')

16

1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')

17

1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS

18

1 M2 PEKERJAAN ACIAN

VI PEKERJAAN KAYU

(SNI 3434 : 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA KACA, KAYU KLS I/II

7
8

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II

9
10

MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II

11

MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I


MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU
KELAS II

12
13

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III


Bentang 6 M'

14

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

15

MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

16

PAS 1 M2 RANGKA ATAP USUK RENG GENTENG KERAMIK, KAYU KLS II KAMPER

17

PAS 1 M2 RANGKA ATAP USUK RENG GENTENG BETON, KAYU KLS II KAMPER

18

MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

19

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III

20

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III

21

MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

22

MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

23

MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III

24

MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA


KAYU KELAS II

25

MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA


KAYU KELAS II

26

MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

27

MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

Hal. 130

NO

URAIAN PEKERJAAN

VII PEKERJAAN BETON ( SNI 7394:2008)


1

MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87

MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78

MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72

MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66

MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61

MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58

MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56

MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53

MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52

10

MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49

11

MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48

12

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR

13

1 M2 PASANG BEKISTING UNTUK PONDASI

14

1 M2 PASANG BEKISTING UNTUK SLOOF

15

1 M2 PASANG BEKISTING UNTUK KOLOM

16

1 M2 PASANG BEKISTING UNTUK BALOK

17

1 M2 PASANG BEKISTING UNTUK LANTAI

18

1 M2 PASANG BEKISTING UNTUK DINDING

19

1 M2 PASANG BEKISTING UNTUK TANGGA

20

1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON

21

1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)

22

1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)

23

1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)

24

1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)

25

1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING

26

1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

27

1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)

28

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)

29

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

30

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI

31

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M

32

1 M3 PASANGAN BATU KOSONG

33

1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang

34

1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1

1 M2 PEKERJAAN ATAP GENTENG PLENTONG


Hal. 131

NO

URAIAN PEKERJAAN

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT

1 M1 PASANG BUBUNGAN GENTENG PLENTONG

1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM

1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M

1 M2 PEKERJAAN ATAP SIRAP

1 M2 PEKERJAAN ATAP NOK SIRAP

1 M2 PASANG ATAP ALANG-ALANG 3 M1

1 M2 PEKERJAAN ATAP SENG GELOMBANG

10

1 M2 PASANGAN LAPISANG ALUMINIUM FOIL

11

1 M1 PASANG NOK SENG GELOMBANG

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1

MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM

1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

PEKERJAAN SANITASI ( SNI 2002 )

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN

MEMASANG 1 BUAH URINOIR

MEMASANG 1 BUAH WASHTAFEL KIA

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3

MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "

MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"

MEMASANG 1 M1 PIPA PVC TYPE AW f 2"

10

MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"

11

MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

XI PEKERJAAN BESI DAN ALUMINIUM


1

1 KG PASANG RANGKA ATAP BAJA

1 M2 PASANG JENDELA NAKO

1 M1 PASANG TALANG DATAR, SENG BJLS 28


Hal. 132

(SNI 7393:2008)

NO

URAIAN PEKERJAAN

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1

1 BH PASANG KUNCI TANAM BIASA

1 PS PASANG ENGSEL PINTU

1 PS PASANG ENGSEL JENDELA KUPU-KUPU

1 BH PASANG KAIT ANGIN

1 BH PASANG KUNCI SLOT

1 M2 PASANG KACA, TEBAL 3 - 5 MM

XIII PEK. PENUTUP LANTAI DAN DINDING


1

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ex: Mulia

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ex: Mulia

1 M1 PASANG PLIN KERAMIK 10 X 30 CM

1 M2 PASANG DINDING KERAMIK 20 X 20 CM ex : Mulia

1 M1 PASANG PLIN KAYU 2 X 10 CM

(SNI 7395:2008)

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA

1 M2 PASANGAN BATA GOSOK 1 MUKA

1 M2 PASANGAN PARAS 1 MUKA

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA

1 M2 PASANGAN BATA GOSOK DIUKIR

1 M2 PASANGAN PARAS DIUKIR

Hal. 133

NO

URAIAN PEKERJAAN

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

XVI PEKERJAAN LANDSCAPE


1

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225

Paving 10 x 20 cm tebal 6 cm K350

Paving 10 x 20 cm tebal 8 cm K225

Paving 10 x 20 cm tebal 8 cm K350

Paving 20 x 20 cm tebal 6 cm K225

Paving 20 x 20 cm tebal 6 cm K350

Paving 20 x 20 cm tebal 8 cm K225

Paving 20 x 20 cm tebal 8 cm K350

Paving 20 x 20 cm tebal 8 cm K425

10

Paving 20 x 20 cm tebal 10 cm K225

11

Paving 20 x 20 cm tebal 10 cm K350

12

Paving 20 x 20 cm tebal 10 cm K425

13

Paving Tiga Berlian tebal 6 cm K225

14

1 M2 PASANGAN GRASS BLOCK

15

1 M2 PASANGAN KORAL SIKAT

16

1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225

17

Kanstein Jumbo (P:50,L:15,T:30 cm K225)

18

Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

19

1 M2 PENGECATAN KANSTEIN

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN

1 TITIK INSTALASI AC

1 TITIK INSTALASI TELEPHONE

1 TITIK INSTALASI MATV


Mangupura,

8 Januari 2016

Kepala Dinas Cipta Karya


Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001

Hal. 134

ERJAAN

HARGA
3

Rp.

366,530.50

Rp.

84,711.00

Rp.

1,680,715.10

Rp.

1,178,777.50

Rp.

1,247,885.00

Rp.

25,650.00

Rp.

1,204,615.00

Rp.

187,581.50

Rp.

70,470.00

Rp.

192,350.00

Rp.

1,034,973.00

Rp.

967,473.00

Rp.

113,625.00

Rp.

139,725.00

Rp.

166,275.00

Rp.

151,200.00

Rp.

229,500.00

Rp.

182,925.00

Rp.

8,325.00

Rp.

49,770.00

Rp.

Rp.

83,250.00

Rp.

201,450.00

Rp.

41,475.00

Rp.

137,625.00

Rp.

186,090.00

Rp.

62,025.00

Rp.

904,375.00

Rp.

853,700.00

Rp.

818,585.00

Hal. 135

HARGA
3

Rp.

793,890.00

Rp.

760,060.00

Rp.

2,260,320.00

Rp.

954,975.00

Rp.

424,965.00

Rp.

386,137.50

Rp.

372,643.75

Rp.

363,803.75

Rp.

358,865.00

Rp.

356,392.50

Rp.

188,798.75

Rp.

182,552.25

Rp.

178,882.50

Rp.

176,569.00

Rp.

175,191.00

Rp.

172,737.50

Rp.

150,081.38

Rp.

2,562,414.25

Rp.

2,545,322.50

Rp.

5,846,050.00

Rp.

186,471.60

Rp.

99,258.20

Rp.

92,294.20

Rp.

89,225.80

Rp.

87,177.00

Rp.

85,952.20

Rp.

84,997.80

Rp.

83,909.80

Rp.

123,555.60

Rp.

119,464.40

Rp.

116,686.00

Rp.

115,099.60

Rp.

113,780.40

Rp.

90,552.50
Hal. 136

HARGA
3

Rp.

72,471.00

Rp.

42,093.90

Rp.

19,965.00

Rp.

85,639.50

Rp.

54,581.25

Rp.

13,338,750.00

Rp.

10,366,500.00

Rp.

593,670.00

Rp.

493,670.00

Rp.

1,069,125.00

Rp.

860,925.00

Rp.

1,273,125.00

Rp.

1,002,087.00

Rp.

862,737.00

Rp.

1,062,165.00

Rp.

867,737.00

Rp.

910,762.00

Rp.

11,376,230.00

Rp.

14,076,305.00

Rp.

10,180,590.00

Rp.

128,075.00

Rp.

176,675.00

Rp.

1,281,890.00

Rp.

133,675.00

Rp.

129,090.00

Rp.

146,665.00

Rp.

147,595.00

Rp.

320,760.00

Rp.

384,360.00

Rp.

416,060.00

Rp.

497,360.00

Rp.

42,860.00

Hal. 137

HARGA
3

Rp.

845,704.40

Rp.

884,103.96

Rp.

840,171.32

Rp.

875,829.71

Rp.

910,144.30

Rp.

935,377.31

Rp.

952,557.33

Rp.

981,897.98

Rp.

991,107.90

Rp.

1,025,661.24

Rp.

1,037,628.57

Rp.

118,882.50

Rp.

235,810.00

Rp.

235,810.00

Rp.

593,472.50

Rp.

608,472.50

Rp.

1,001,472.50

Rp.

703,472.50

Rp.

567,647.50

Rp.

158,430.00

Rp.

3,896,665.00

Rp.

4,729,600.00

Rp.

9,516,365.00

Rp.

7,583,990.00

Rp.

8,363,312.50

Rp.

7,542,390.00

Rp.

6,866,960.00

Rp.

76,780.00

Rp.

112,080.50

Rp.

2,260,320.00

Rp.

954,975.00

Rp.

424,965.00

Rp.

665,393.50

Rp.

851,498.50

Rp.

71,350.00
Hal. 138

HARGA
3

Rp.

82,350.00

Rp.

150,330.00

Rp.

58,215.00

Rp.

267,330.00

Rp.

633,290.00

Rp.

119,774.00

Rp.

115,725.00

Rp.

61,383.00

Rp.

94,050.00

Rp.

50,341.00

Rp.

74,574.00

Rp.

55,587.00

Rp.

388,654.00

Rp.

43,734.00

Rp.

243,745.40

Rp.

51,228.40

Rp.

54,631.80

Rp.

2,435,274.00

Rp.

828,950.00

Rp.

1,462,570.00

Rp.

663,550.00

Rp.

1,073,750.00

Rp.

88,465.00

Rp.

319,445.00

Rp.

41,252.50

Rp.

60,910.00

Rp.

133,032.50

Rp.

45,542.50

Rp.

22,602.50

Rp.

473,257.00

Rp.

305,347.00
Hal. 139

HARGA
3

Rp.

200,775.00

Rp.

58,905.00

Rp.

73,362.50

Rp.

53,405.00

Rp.

148,925.00

Rp.

144,705.00

Rp.

257,746.38

Rp.

262,865.00

Rp.

46,356.02

Rp.

310,301.00

Rp.

66,107.50

Rp.

46,577.50

Rp.

62,495.50

Rp.

27,962.50

Rp.

22,534.50

Rp.

45,868.00

Rp.

35,190.00

Rp.

53,996.50

Rp.

858,216.00

Rp.

507,916.00

Rp.

474,108.00

Rp.

594,374.67

Rp.

531,555.83

Rp.

753,108.00

Rp.

873,374.67

Hal. 140

HARGA
3

Rp.

675,555.83

Rp.

178,125.00

Rp.

188,125.00

Rp.

191,125.00

Rp.

196,125.00

Rp.

178,125.00

Rp.

188,125.00

Rp.

191,125.00

Rp.

197,125.00

Rp.

203,125.00

Rp.

207,125.00

Rp.

217,125.00

Rp.

223,125.00

Rp.

178,125.00

Rp.

320,220.00

Rp.

227,157.20

Rp.

275,505.00

Rp.

316,132.20

Rp.

324,132.20

Rp.

50,737.00

Rp.

254,775.00

Rp.

317,025.00

Rp.

310,925.00

Rp.

312,300.00

nuari 2016

pta Karya

adung

harmayanty, M.T

Tk. I

94032001

Hal. 141

DAFTAR HARGA SATUAN BAHAN TAMBAHAN


BULAN JULI TAHUN 2013
A. Harga Satuan Bahan
NO

NAMA BARANG

SATUAN

BATU
Batu Candi
1 20x20x2
2 15x30x2
3 20x30x2
4 20x40x2
5 30x30x2
6 40x40x2
7 30x60x2
8 20x40x3
9 30x30x3
10 30x30x5
11 40x40x5

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

1
2
3
4
5

Palimanan putih
20x20x2
20x30x2
20x40x2
20x40x3
30x30x3

m2
m2
m2
m2
m2

1
2
3

Palimanan Serat Kuning


20x30
20x40
15x30

m2
m2
m2

1
2
3
4

Palimanan Cirebon
15x30x2
20x30x2
20x40x2
30x30x2

m2
m2
m2
m2

1
2

Alur Bali Green Lurus


20x30
20x40

m2
m2

1
2
3

Alur Bali Green Cukil


20x30
20x40
20x20

m2
m2
m2

1
2
3

Batu Bali Green


15x30
20x30
20x40

m2
m2
m2

Harga Barang dan Upah

Hal. 142

NO

NAMA BARANG

SATUAN

40x40

m2

1
2

PARAS
Paras Kerobokan
20x40x3
20x40x5

Bj
Bj

1
2

Paras Kelating
20x40x3
20x40x5

Bj
Bj

1
2

Alur Andesit Lurus


20x40
30x60

m3
m3

1
2

Alur and cukil


20x40
15x30

m2
m2

Alur And Gelombang


Alur And Gelombang lurus

m2
m2

Random Singaraja
Random Cirebon
Random Jember

m2
m2
m2

Harga Barang dan Upah

Hal. 143

NO

NAMA BARANG

SATUAN

Harga Barang dan Upah

Hal. 144

AMBAHAN

HARGA SATUAN
4

78,000.00
78,000.00
78,000.00
80,000.00
80,000.00
105,000.00
115,000.00
135,000.00
135,000.00
165,000.00
185,000.00

65,000.00
67,000.00
68,000.00
110,000.00
110,000.00

75,000.00
75,000.00
75,000.00

72,000.00
73,000.00
75,000.00
80,000.00

105,000.00
105,000.00

105,000.00
105,000.00
105,000.00

75,000.00
75,000.00
75,000.00
Harga Barang dan Upah

Hal. 145

HARGA SATUAN
4

80,000.00

6,000.00
8,000.00

6,000.00
8,000.00

135,000.00
140,000.00

135,000.00
135,000.00
140,000.00
140,000.00
25,000.00
65,000.00
45,000.00

Harga Barang dan Upah

Hal. 146

HARGA SATUAN
4

Harga Barang dan Upah

Hal. 147

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7
0.0200 kg Paku Biasa 2" - 5"
0.0070 m3 Kayu Papan Meranti 3/20
0.1000 oh Tukang Kayu
0.1000 oh Pekerja
0.0100 oh Kepala Tukang
0.0050 oh Mandor

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja
0.3330 oh Mandor

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja
0.0330 oh Mandor
1

1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja
0.0250 oh Mandor
1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja
0.0450 oh Mandor

1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja
0.0670 oh Mandor

1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja
0.0320 oh Mandor

1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja
0.0600 oh Mandor

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja
0.0450 oh Mandor

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )

2,300,000.00
14,300.00
3,200,000.00
75,000.00
55,000.00
75,000.00
81,000.00
Total :

11,324.00

55,000.00
81,000.00
Total :

314,926.40

55,000.00
81,000.00
Total :

295,486.40

55,000.00
81,000.00
Total :

34,620.00

55,000.00
81,000.00
Total :

42,516.00

55,000.00
81,000.00
Total :

50,541.60

55,000.00
81,000.00
Total :

46,073.60

55,000.00
81,000.00
Total :

69,888.00

55,000.00
81,000.00
Total :

55,716.00

0.5000
0.0500

oh Pekerja
oh Mandor

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug
0.3000 oh Pekerja
0.0100 oh Mandor
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
1.2000 m3 Tanah Urug
0.5000 oh Pekerja
0.0500 oh Mandor
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone
0.2500 oh Pekerja
0.0250 oh Mandor

III
1

PEKERJAAN PONDASI

55,000.00
81,000.00
Total :

25,240.00

130,000.00
55,000.00
81,000.00
Total :

13,848.00

85,700.00
55,000.00
81,000.00
Total :

25,240.00

17,000.00
55,000.00
81,000.00
Total :

12,620.00

145,000.00
1,425.00
140,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

120,360.00

145,000.00
1,425.00
140,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

120,360.00

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
202.0000 kg Semen Portland
0.4850 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
163.0000 kg Semen Portland
0.5200 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
136.0000 kg Semen Portland
0.5440 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu

145,000.00
1,425.00
140,000.00
55,000.00
75,000.00

0.0750
0.0750

oh Kepala Tukang
oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
117.0000 kg Semen Portland
0.5610 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
91.0000 kg Semen Portland
0.5840 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) / BATAKO


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
1.9500 kg Besi Beton 8 mm
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor
17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland
0.0120 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu

75,000.00
81,000.00
Total :

120,360.00

145,000.00
1,425.00
140,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

120,360.00

145,000.00
1,425.00
140,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

120,360.00

197,000.00
1,425.00
140,000.00
8,765.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

21,652.00

197,000.00
1,425.00
140,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

21,652.00

1,425.00
140,000.00
55,000.00
75,000.00

0.0150
0.0150

oh Kepala Tukang
oh Mandor

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg
0.2000 oh Pekerja
0.1000 oh Tukang Labur/Cat
0.0100 oh Kepala Tukang
0.0100 oh Mandor

75,000.00
81,000.00
Total :

24,072.00

1,425.00
55,000.00
68,000.00
75,000.00
81,000.00
Total :

15,488.00

VII PEKERJAAN BETON ( SNI 7394:2008)


1

MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87
247.0000 kg Semen Portland
1,425.00
869.0000 kg Pasir Beton
100.71
999.0000 kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
96,158.40

MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
276.0000 kg Semen Portland
1,425.00
828.0000 kg Pasir Beton
100.71
92.59
1,012.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :

96,158.40

MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72
299.0000 kg Semen Portland
1,425.00
799.0000 kg Pasir Beton
100.71
92.59
1,017.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :

96,158.40

MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66
326.0000 kg Semen Portland
1,425.00

760.0000
1,029.0000

215.0000
1.6500
0.2750
0.0280
0.0830

kg
kg
lt
oh
oh
oh
oh

Pasir Beton
Koral Beton
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

100.71
92.59
25.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61
352.0000 kg Semen Portland
1,425.00
731.0000 kg Pasir Beton
100.71
kg
Koral
Beton
92.59
1,031.0000
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58
371.0000 kg Semen Portland
1,425.00
698.0000 kg Pasir Beton
100.71
92.59
1,047.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56
384.0000 kg Semen Portland
1,425.00
692.0000 kg Pasir Beton
100.71
92.59
1,039.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53
406.0000 kg Semen Portland
1,425.00
684.0000 kg Pasir Beton
100.71
92.59
1,026.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00

96,158.40

96,158.40

96,158.40

96,158.40

Total :
MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52
413.0000 kg Semen Portland
1,425.00
681.0000 kg Pasir Beton
100.71
92.59
1,021.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :
10 MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49
439.0000 kg Semen Portland
1,425.00
670.0000 kg Pasir Beton
100.71
92.59
1,006.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :
11 MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48
448.0000 kg Semen Portland
1,425.00
667.0000 kg Pasir Beton
100.71
92.59
1,000.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
55,000.00
0.2750 oh Tukang Batu
75,000.00
0.0280 oh Kepala Tukang
75,000.00
0.0830 oh Mandor
81,000.00
Total :

96,158.40

12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir)
0.1500 kg Kawat Beton
0.0700 oh Pekerja
0.0700 oh Tukang Besi
0.0070 oh Kepala Tukang
0.0040 oh Mandor

13 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang

8,765.00
17,600.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

2,500,000.00
14,300.00
16,500.00
55,000.00
75,000.00
75,000.00

96,158.40

96,158.40

96,158.40

7,959.20

0.0260

oh Mandor

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

15 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4 m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0180 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
6.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu

81,000.00
Total :

41,724.80

2,500,000.00
14,300.00
16,500.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

41,724.80

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

52,958.40

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

52,958.40

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00

0.0330
0.0330

oh Kepala Tukang
oh Mandor

18 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III
0.4000 Kg Paku Biasa 5' - 12'
0.2000 Ltr Minyak Bekisting
0.0200 M3 Kayu Usuk 4/6
0.3500 Lbr Plywood 9 mm
3.0000 Btng Dolken Kayu 8" - 10"/4m
4.0000 Bh Formite/penjaga jarak bekisting/spacer
0.6600 Oh Pekerja
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

75,000.00
81,000.00
Total :

52,958.40

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
2,000.00
55,000.00
75,000.00
75,000.00
81,000.00
52,958.40

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.1500 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan)
0.6000 kg Paku Biasa 5' - 12'
0.5000 btg Dolken Kayu 8" - 10"/4m
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

52,958.40

2,500,000.00
14,300.00
102,000.00
55,000.00
75,000.00
75,000.00
81,000.00
Total :

10,418.40

21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III
2,500,000.00
1.5000 kg Paku Biasa 5' - 12'
14,300.00
0.4000 ltr Minyak Bekisting
16,500.00
157.0000 kg Besi Beton
8,765.00
2.2500 kg Kawat Beton
17,600.00
336.0000 kg Semen Portland
1,425.00

0.5400
0.8100
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

m3
m3
oh
oh
oh
oh
oh
oh

Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III
2.0000 kg Paku Biasa 5' - 12'
0.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
5.6500 oh Pekerja
0.2750 oh Tukang Batu
1.5600 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3230 oh Kepala Tukang
0.2830 oh Mandor
1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +
23 BEKISTING)
0.4000 m3 Kayu Kelas III
4.0000 kg Paku Biasa 5' - 12'
2.0000 ltr Minyak Bekisting
315.0000 kg Besi Beton
4.5000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1500 m3 Kayu Kelas II balok
3.5000 lbr Plywood 9 mm
20.0000 btg Dolken Kayu 8" /4 m
7.0500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
2.1000 oh Tukang Besi
0.4030 oh Kepala Tukang
0.3530 oh Mandor

24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)

160,000.00
85,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
Total :

423,592.00

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
Total :

480,418.40

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
Total :

22,874.40
598,754.40

0.3200
3.2000
1.6000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1400
2.8000
16.0000
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +


BEKISTING
0.3200 m3 Kayu Kelas III
3.2000
1.6000
157.5000
2.2500
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Paku Biasa 5' - 12'


Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
Total :

519,486.40

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
423,772.00

26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +


BEKISTING)
0.2400 m3 Kayu Kelas III
3.2000
1.6000
157.0000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000

kg
ltr
kg
kg
kg
m3
m3
m3
lbr

Paku Biasa 5' - 12'


Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00

24.0000
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

btg
oh
oh
oh
oh
oh
oh

Dolken Kayu 8" /4 m


Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

102,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
423,592.00

27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +


BEKISTING)
0.2500 m3 Kayu Kelas III
3.0000
1.2000
210.0000
3.0000
336.0000
0.5400
0.8100
0.1050
2.5000
14.0000
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Paku Biasa 5' - 12'


Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
480,418.40

28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

kg
kg
kg
kg
m3
m3
oh
oh
oh
oh
oh
oh

Paku Biasa 5' - 12'


Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15


CM)
0.0030 m3 Kayu Kelas III
0.0200
3.6000
0.0500

kg Paku Biasa 5' - 12'


kg Besi Beton
kg Kawat Beton

2,500,000.00
14,300.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
Total :
2,500,000.00
14,300.00
8,765.00
17,600.00

12,463.20

5.5000
0.0090
0.0150
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
8

kg
m3
m3
oh
oh
oh
oh
oh
oh

Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang Pipa
0.0060 oh Kepala Tukang
0.0018 oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0027 oh Mandor

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0810 oh Pekerja
0.1350 oh Tukang Pipa
0.0135 oh Kepala Tukang
0.0041 oh Mandor

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air
0.0250 bh Seal tape
0.0100 oh Pekerja
0.1000 oh Tukang Pipa
0.0100 oh Kepala Tukang
0.0050 oh Mandor

XVI PEKERJAAN LANDSCAPE

1,425.00
160,000.00
85,000.00
55,000.00
75,000.00
75,000.00
75,000.00
75,000.00
81,000.00
Total :

20,580.00

16,250.00
55,000.00
62,500.00
75,000.00
81,000.00
Total :

5,060.64

23,750.00
55,000.00
62,500.00
75,000.00
81,000.00
Total :

7,590.96

62,500.00
55,000.00
62,500.00
75,000.00
81,000.00
Total :

11,389.68

25,000.00
2,700.00
55,000.00
62,500.00
75,000.00
81,000.00
Total :

6,364.00

2
4
5
5
7
8
10
11
12
14
15
16
18

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.5000 oh Pekerja
0.0250 oh Mandor
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225

19 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block
0.0690 m3 Pasir Urug
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
1.0000 oh Pekerja
0.0500 oh Mandor

20 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat
9.2800 zak Semen
0.2000 m3 Pasir pasang
0.2500 oh Tukang Batu
0.0100 oh Kepala Tukang
0.6250 oh Pekerja
0.0310 oh Mandor
21 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225
0.4500 zak Semen 50 Kg
0.0023 m3 Pasir Pasang
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang
0.9500 oh Pekerja
0.0950 oh Mandor

60,000.00
75,000.00
75,000.00
55,000.00
81,250.00
Total :
70,000.00
73,000.00
78,000.00
84,000.00
60,000.00
70,000.00
73,000.00
79,000.00
85,000.00
89,000.00
99,000.00
105,000.00
60,000.00

40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00
40,125.00

75,000.00
130,000.00
75,000.00
75,000.00
55,000.00
81,250.00
Total :

80,250.00

45,000.00
1,240.00
140,000.00
75,000.00
75,000.00
55,000.00
81,250.00
Total :

45,115.00

62,000.00
1,240.00
140,000.00
75,000.00
75,000.00
55,000.00
81,250.00
Total :

71,075.00

22 Kanstein Jumbo (P:50,L:15,T:30 cm K225)


23 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

64,000.00
72,000.00

71,075.00
71,075.00

70,500.00
20,000.00
68,000.00
75,000.00
55,000.00
81,250.00
Total :

9,387.00

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
15,600.00
3.0000 bt Pipa Clipsal 20 mm hitam
13,200.00
2.0000 bh Tee dos clipsal 20 mm hitam
7,700.00
15.0000 bj Klem clipsal 20 mm hitam
825.00
3.0000 bj Sock clipsal 20 mm hitam
2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P
11,000.00
1.0000 ttk Biaya pasang
25,000.00
Total :

20,000.00

24 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat
0.0710 kg Thiner
0.0300 oh Tukang Cat
0.0030 oh Kep. Tukang
0.1500 oh Pekerja
0.0150 oh Mandor

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
3.0000 bt Pipa Clipsal 20 mm hitam
1.0000 bh Tee dos clipsal 20 mm hitam
15.0000 bj Klem clipsal 20 mm hitam
4.0000 bj Sock clipsal 20 mm hitam
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 m1 Pipa flexible clipsal 20 mm hitam
1.0000 ttk Biaya pasang

15,600.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
11,550.00
25,000.00
Total :

20,000.00

DAFTAR ANALISA PEKERJAAN


NO

URAIAN

HARGA
SATUAN
(Rp)

PEKERJAAN PERSIAPAN
1

HARGA
UPAH
(Rp)
4

(SNI 03-2835-2002)

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2


METER
1.2500 btg Bambu Sedang
2.5000 kg Semen Portland
1.2000 lbr Seng gelombang 3" - 5"
0.0050 m3 Pasir Beton
0.0090 m3 Koral beton
0.0720 m3 Kayu Meranti Usuk 5/7
0.0600 kg Paku biasa 2" - 5"
0.4500 kg Meni Besi
0.2000 oh Tukang Kayu
0.4000 oh Pekerja
0.0200 oh Kepala Tukang
0.0200 oh Mandor

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7
0.0200 kg Paku Biasa 2" - 5"
0.0070 m3 Kayu Papan Meranti 3/20
0.1000 oh Tukang Kayu
0.1000 oh Pekerja
0.0100 oh Kepala Tukang
0.0050 oh Mandor
1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI
PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m
0.1800 m3 Kayu Meranti
0.8500 kg Paku Biasa 2" - 5"
1.1000 kg Besi Strip
35.0000 kg Semen Portland
0.1500 m3 Pasir Pasang
0.1000 m3 Pasir Beton
0.1500 m3 Koral Beton
30.0000 bh Bata Merah
0.2500 lbr Seng Plat
2.0000 bh Jendela Nako
0.0800 m2 Kaca Polos
0.1500 bh Kunci Tanam
0.0600 lbr Plywood 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Tukang Batu
2.0000 oh Pekerja
0.3000 oh Kepala Tukang
0.0500 oh Mandor
1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
1.7000 btg Bambu Sedang
0.2100 m3 Kayu Meranti
0.3000 kg Paku Biasa 2" - 5"
10.5000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 28
2.0000 oh Tukang Kayu
1.0000 oh Pekerja

13,000.00
1,425.00
47,850.00
160,000.00
85,000.00
2,300,000.00
14,300.00
47,500.00
90,000.00
75,000.00
100,000.00
125,000.00
Total :

18,000.00
30,000.00
2,000.00
2,500.00
52,500.00

2,300,000.00
14,300.00
3,200,000.00
90,000.00
75,000.00
100,000.00
125,000.00
Total :

9,000.00
7,500.00
1,000.00
625.00
18,125.00

102,000.00
2,500,000.00
14,300.00
10,066.00
1,425.00
140,000.00
160,000.00
85,000.00
1,300.00
51,150.00
16,500.00
105,000.00
115,500.00
60,000.00
90,000.00
90,000.00
75,000.00
100,000.00
125,000.00
Total :

180,000.00
90,000.00
150,000.00
30,000.00
6,250.00
456,250.00

13,000.00
2,500,000.00
14,300.00
1,425.00
160,000.00
85,000.00
46,750.00
90,000.00
75,000.00

180,000.00
75,000.00

NO

URAIAN

0.2000
0.0500
5

oh Kepala Tukang
oh Mandor

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang
0.2760 m3 Kayu Meranti
0.7000 kg Paku biasa 2" - 5"
1.5000 lbr Seng gelombang BJLS 28
1.5000 oh Tukang Kayu
1.0000 oh Pekerja
0.1500 oh Kepala Tukang
0.0500 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

100,000.00
125,000.00
Total :

20,000.00
6,250.00
281,250.00

13,000.00
2,500,000.00
14,300.00
46,750.00
90,000.00
75,000.00
100,000.00
125,000.00
Total :

135,000.00
75,000.00
15,000.00
6,250.00
231,250.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja
0.0500 oh Mandor

1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang
0.1860 m3 Kayu Meranti
0.3000 kg Paku Biasa 2" - 5"
18.0000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 28
1.3500 lbr Plywood 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Pekerja
0.2000 oh Kepala Tukang
0.0500 oh Mandor

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang
0.0800 kg Paku Biasa 2" - 5"
1.0000 btg Kaso 5/7
0.3000 oh Tukang kayu
0.0015 oh Mandor

1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu
0.2500 kg Tali Ijuk
0.0170 oh Tukang Kayu
0.0020 oh Pekerja
0.2500 oh Kepala Tukang
0.0130 oh Mandor

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20
0.0900 m3 Batu Pecah 5 - 7
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
0.0500 oh Mandor

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja
0.3330 oh Mandor

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja
0.0330 oh Mandor

II

PEKERJAAN TANAH
1

HARGA
UPAH
(Rp)
4

75,000.00
125,000.00
Total :

7,500.00
6,250.00
13,750.00

13,000.00
2,500,000.00
14,300.00
1,425.00
160,000.00
85,000.00
46,750.00
60,000.00
90,000.00
75,000.00
100,000.00
125,000.00
Total :

180,000.00
75,000.00
20,000.00
6,250.00
281,250.00

2,500,000.00
14,300.00
44,800.00
90,000.00
125,000.00
Total :

27,000.00
187.50
27,187.50

10,000.00
37,400.00
90,000.00
75,000.00
100,000.00
125,000.00

1,530.00
150.00
25,000.00
1,625.00
28,305.00

145,000.00
155,000.00
140,000.00
75,000.00
125,000.00
Total :

75,000.00
6,250.00
81,250.00

75,000.00
125,000.00
Total :

500,025.00
41,625.00
541,650.00

75,000.00
125,000.00
Total :

500,025.00
4,125.00
504,150.00

75,000.00
125,000.00
Total :

56,250.00
3,125.00
59,375.00

(SNI 2835 : 2008)

1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja
0.0250 oh Mandor
1 M3 GALIAN TANAH BIASA DALAM 2 METER

NO

URAIAN

0.9000
0.0450

oh Pekerja
oh Mandor

1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja
0.0670 oh Mandor

1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja
0.0320 oh Mandor

1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja
0.0600 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
125,000.00
Total :

67,500.00
5,625.00
73,125.00

75,000.00
125,000.00
Total :

78,750.00
8,375.00
87,125.00

75,000.00
125,000.00
Total :

75,000.00
4,000.00
79,000.00

75,000.00
125,000.00
Total :

112,500.00
7,500.00
120,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja
0.0450 oh Mandor

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja
0.0050 oh Mandor

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja
0.0100 oh Mandor

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug
0.3000 oh Pekerja
0.0100 oh Mandor

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk
0.1500 oh Pekerja
0.0150 oh Mandor

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu
0.2500 oh Pekerja
0.0250 oh Mandor

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug
0.5000 oh Pekerja
0.0500 oh Mandor
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone
0.2500 oh Pekerja
0.0250 oh Mandor

75,000.00
125,000.00
Total :

90,000.00
5,625.00
95,625.00

75,000.00
125,000.00
Total :

3,750.00
625.00
4,375.00

75,000.00
125,000.00
Total :

24,750.00
1,250.00
26,000.00

1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja
0.0500 oh Mandor

III

HARGA
UPAH
(Rp)

PEKERJAAN PONDASI

75,000.00
125,000.00
Total :

37,500.00
6,250.00
43,750.00

130,000.00
75,000.00
125,000.00
Total :

22,500.00
1,250.00
23,750.00

2,750.00
75,000.00
125,000.00
Total :

11,250.00
1,875.00
13,125.00

80,000.00
75,000.00
125,000.00
Total :

18,750.00
3,125.00
21,875.00

85,700.00
75,000.00
125,000.00
Total :

37,500.00
6,250.00
43,750.00

17,000.00
75,000.00
125,000.00
Total :

18,750.00
3,125.00
21,875.00

145,000.00
1,425.00
140,000.00
75,000.00
90,000.00

112,500.00
67,500.00

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
202.0000 kg Semen Portland
0.4850 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu

NO

URAIAN

0.0750
0.0750

oh Kepala Tukang
oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
163.0000 kg Semen Portland
0.5200 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

100,000.00
125,000.00
Total :

7,500.00
9,375.00
196,875.00

145,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

112,500.00
67,500.00
7,500.00
9,375.00
196,875.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
136.0000 kg Semen Portland
0.5440 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
117.0000 kg Semen Portland
0.5610 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
91.0000 kg Semen Portland
0.5840 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
126.0000 kg Besi Beton
1.8000 kg Kawat Beton
3.4000 oh Pekerja
0.8500 oh Tukang Batu
0.0850 oh Kepala Tukang
0.1700 oh Mandor

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
2.4000 oh Pekerja
0.8000 oh Tukang Batu
0.0800 oh Kepala Tukang
0.1190 oh Mandor

1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20
0.4320 m3 Pasir Urug
0.7800 oh Pekerja
0.3900 oh Tukang Batu
0.0390 oh Kepala Tukang
0.0390 oh Mandor

SNI 03-2836-2002

HARGA
UPAH
(Rp)
4

145,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

112,500.00
67,500.00
7,500.00
9,375.00
196,875.00

145,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

112,500.00
67,500.00
7,500.00
9,375.00
196,875.00

145,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

112,500.00
67,500.00
7,500.00
9,375.00
196,875.00

145,000.00
1,425.00
160,000.00
85,000.00
8,765.00
17,600.00
75,000.00
90,000.00
100,000.00
125,000.00

255,000.00
76,500.00
8,500.00
21,250.00
361,250.00

145,000.00
1,425.00
160,000.00
85,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

180,000.00
72,000.00
8,000.00
14,875.00
274,875.00

145,000.00
130,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

58,500.00
35,100.00
3,900.00
4,875.00
102,375.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang


0.0160 m3 Pasir Urug
0.0800 m3 Pasir Beton
0.1250 m3 Koral Beton
49.0000 kg Semen Portland
34.5000 kg Besi Beton
0.7000 kg Kawat beton
0.0270 m3 Kayu Bekesting
0.1200 kg Paku Reng SQ
0.2000 kg Plamir Tembok
0.0900
lt Minyak Bekisting
0.8000 oh Pekerja
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
0.0400 oh Mandor

10 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang


0.0190 m3 Pasir Urug
0.0940 m3 Pasir Beton
0.1500 m3 Koral Beton
60.5000 kg Semen Portland
45.0000 kg Besi Beton
0.9000 kg Kawat beton
0.0320 m3 Kayu Bekesting
0.1200 kg Paku Reng SQ
0.2400 kg Plamir Tembok
0.0900
lt Minyak Bekisting
1.0000 oh Pekerja
0.6700 oh Tukang Batu
0.0670 oh Kepala Tukang
0.0500 oh Mandor

IV

PEKERJAAN DINDING

130,000.00
160,000.00
85,000.00
1,425.00
8,765.00
17,600.00
1,150,000.00
14,300.00
12,000.00
16,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

60,000.00
45,000.00
5,000.00
5,000.00
115,000.00

130,000.00
160,000.00
85,000.00
1,425.00
8,765.00
17,600.00
1,150,000.00
14,300.00
12,000.00
16,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
60,300.00
6,700.00
6,250.00
148,250.00

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00

45,000.00
18,000.00
2,000.00
3,750.00

(SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm
43.5000 kg Semen Portland
0.0800 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

68,750.00
2

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
32.9500 kg Semen Portland
0.0910 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
26.5500 kg Semen Portland
0.0930 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00

45,000.00
18,000.00
2,000.00
3,750.00
68,750.00

45,000.00
18,000.00
2,000.00

NO

URAIAN

0.0300

oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
22.2000 kg Semen Portland
0.1020 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
18.5000 kg Semen Portland
0.1220 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
18.9500 kg Semen Portland
0.0380 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00

3,750.00
68,750.00

45,000.00
18,000.00
2,000.00
3,750.00
68,750.00

45,000.00
18,000.00
2,000.00
3,750.00
68,750.00

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
14.3700 kg Semen Portland
0.0400 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

NO

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
11.5000 kg Semen Portland
0.0430 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
9.6800 kg Semen Portland
0.0450 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
8.3200 kg Semen Portland
0.0490 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
6.5000 kg Semen Portland
0.0500 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) / BATAKO


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
1.9500 kg Besi Beton 8 mm
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

1,300.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

197,000.00
1,425.00
140,000.00
8,765.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

24,000.00
9,000.00
1,000.00
1,875.00
35,875.00

197,000.00
1,425.00
140,000.00

NO

URAIAN

0.3200
0.1000
0.0100
0.0150

oh
oh
oh
oh

Pekerja
Tukang Batu
Kepala Tukang
Mandor

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik
11.0000 kg Semen Portland
0.0350 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I
0.0140 m3 Kayu kamper usuk/reng
0.0120 kg Paku Biasa

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
90,000.00
100,000.00
125,000.00
Total :

24,000.00
9,000.00
1,000.00
1,875.00
35,875.00

192,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

40,000.00
6,000,000.00
14,300.00

NO

URAIAN

0.0030
0.1000
0.0500
0.0050
0.0020

m3
oh
oh
oh
oh

List Kayu 2/4


Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PLESTERAN
1

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

6,000,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
4,500.00
500.00
250.00
12,750.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

(SNI 2837 : 2008)

1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland
0.0160 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor
1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland
0.0200 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland
0.0230 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland
0.0240 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland
0.0260 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland
0.0270 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland

1,425.00

NO

URAIAN

0.0290
0.3000
0.1500
0.0150
0.0150

m3
oh
oh
oh
oh

Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland
0.0270 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland
0.0310 m3 Pasir Pasang
0.4000 oh Pekerja

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

30,000.00
18,000.00
2,000.00
2,750.00
52,750.00

1,425.00
140,000.00
75,000.00

30,000.00

NO

URAIAN

0.2000
0.0200
0.0220

oh Tukang Batu
oh Kepala Tukang
oh Mandor

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland
0.0350 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland
0.0360 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0220 oh Mandor

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland
0.0130 m3 Pasir Pasang
0.0800 oh Pekerja
0.4000 oh Tukang Batu
0.0400 oh Kepala Tukang
0.0040 oh Mandor

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland
0.0060 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

90,000.00
100,000.00
125,000.00
Total :

18,000.00
2,000.00
2,750.00
52,750.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

30,000.00
18,000.00
2,000.00
2,750.00
52,750.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

30,000.00
18,000.00
2,000.00
2,750.00
52,750.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

30,000.00
18,000.00
2,000.00
2,750.00
52,750.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,000.00
36,000.00
4,000.00
500.00
46,500.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
9,000.00
1,000.00
1,875.00
34,375.00

1,425.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
6,750.00
800.00
1,000.00
19,800.00

1,425.00
75,000.00
90,000.00
100,000.00

5,250.00
3,150.00
400.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland
0.1500 oh Pekerja
0.0750 oh Tukang Batu
0.0080 oh Kepala Tukang
0.0080 oh Mandor

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE


(= 8 M')
1.6000 kg Semen Portland
0.0700 oh Pekerja
0.0350 oh Tukang Batu
0.0040 oh Kepala Tukang

NO

URAIAN

0.0040

oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

125,000.00
Total :

500.00
9,300.00

1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

22,500.00
13,500.00
1,500.00
1,875.00
39,375.00

1,425.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

15,000.00
9,000.00
1,000.00
1,250.00
26,250.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland
0.0120 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg
0.2000 oh Pekerja
0.1000 oh Tukang Labur/Cat
0.0100 oh Kepala Tukang
0.0100 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

VI
1

PEKERJAAN KAYU

HARGA
UPAH
(Rp)
4

(SNI 3434 : 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
7.0000 oh Pekerja
21.0000 oh Tukang Kayu
2.1000 oh Kepala Tukang
0.3500 oh Mandor

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
6.0000 oh Pekerja
18.0000 oh Tukang Kayu
1.8000 oh Kepala Tukang
0.3000 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA


KACA, KAYU KLS I/II
0.0240 m3 Papan Kayu Kamper
1.0000 m2 Kaca Bening 3 mm
0.3000 Kg Lem Kayu
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

7,500,000.00
15,400.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

525,000.00
1,890,000.00
210,000.00
43,750.00
2,668,750.00

5,000,000.00
15,400.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

450,000.00
1,620,000.00
180,000.00
37,500.00
2,287,500.00

8,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

26,250.00
94,500.00
10,500.00
2,250.00
133,500.00

6,000,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

26,250.00
94,500.00
10,500.00
2,250.00
133,500.00

8,500,000.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
270,000.00
30,000.00
6,250.00
381,250.00

8,500,000.00
75,000.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00

60,000.00
216,000.00
24,000.00
5,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA
TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood 4 mm
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

HARGA
UPAH
(Rp)
4

Total :

305,000.00

8,500,000.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
270,000.00
30,000.00
6,250.00
381,250.00

8,500,000.00
15,400.00
13,750.00
60,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
270,000.00
30,000.00
6,250.00
381,250.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood 4 mm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

HARGA
UPAH
(Rp)
4

8,500,000.00
15,400.00
13,750.00
60,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

60,000.00
216,000.00
24,000.00
5,000.00
305,000.00

8,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

50,250.00
180,000.00
20,000.00
41,875.00
292,125.00

8,500,000.00
15,400.00
13,750.00
65,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

60,000.00
216,000.00
24,000.00
5,000.00
305,000.00

8,500,000.00
15,400.00
13,750.00
65,000.00
88,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

60,000.00
216,000.00
24,000.00
5,000.00
305,000.00

7,500,000.00
10,066.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

300,000.00
1,080,000.00
120,000.00
25,000.00
1,525,000.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600
0.1500
0.6700
2.0000
0.2000
0.3350

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 1-2,5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.8000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.5000 Lbr Formika
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000
15.0000
5.6000
4.0000
12.0000
1.2000
0.2000

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000
15.0000

m3 Balok Kayu Kamper


Kg Besi Strip Tebal 5 cm

7,500,000.00
10,066.00

NO

URAIAN

5.6000
6.7000
20.1000
2.0100
0.3350

Kg
oh
oh
oh
oh

Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

502,500.00
1,809,000.00
201,000.00
41,875.00
2,554,375.00

7,500,000.00
10,066.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

180,000.00
648,000.00
72,000.00
15,000.00
915,000.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

16 PAS 1 M2 RANGKA ATAP USUK RENG GENTENG KERAMIK, KAYU


KLS II KAMPER
0.0140
0.0060
0.0036
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Usuk (4 x 6 ) cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

2,300,000.00
6,000,000.00
6,000,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
9,000.00
1,000.00
625.00
18,125.00

2,300,000.00
6,000,000.00
6,000,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
9,000.00
1,000.00
625.00
18,125.00

7,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,000.00
10,800.00
1,200.00
750.00
21,750.00

2,300,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
27,000.00
3,000.00
9,375.00
50,625.00

2,300,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

15,000.00
27,000.00
3,000.00
1,250.00
46,250.00

8,500,000.00
15,400.00
75,000.00
90,000.00

7,500.00
18,000.00

17 PAS 1 M2 RANGKA ATAP USUK RENG GENTENG BETON, KAYU


KLS II KAMPER
0.0140
0.0105
0.0072
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Usuk ( 5 x 7 ) Cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II


0.1650
0.2000
0.1200
0.1200
0.0120
0.0060

m3
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154
0.2000
0.1500
0.3000
0.0300
0.0750

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163
0.2500
0.2000
0.3000
0.0300
0.0100

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II


0.0108
0.1000
0.1000
0.2000

m3
Kg
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu

NO

URAIAN

0.0200
0.0050

oh Kepala Tukang
oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

100,000.00
125,000.00
Total :

2,000.00
625.00
28,125.00

8,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
18,000.00
2,000.00
625.00
28,125.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II


0.0110
0.0500
0.1000
0.2000
0.0200
0.0050

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280
0.1500
0.1500
0.4500
0.0450
0.0080

m3
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

7,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
40,500.00
4,500.00
1,000.00
57,250.00

7,500,000.00
15,400.00
65,000.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
40,500.00
4,500.00
1,000.00
57,250.00

7,500,000.00
15,400.00
60,000.00
13,750.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

15,000.00
54,000.00
6,000.00
1,250.00
76,250.00

8,500,000.00
15,400.00
19,800.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

45,000.00
162,000.00
18,000.00
3,750.00
228,750.00

60,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,875.00
6,750.00
800.00
125.00
9,550.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.1500
0.4500
0.0450
0.0080

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Teakwood 4 mm uk 90x220 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.2000
0.6000
0.0600
0.0100

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Plywood tebal 4 mm uk 120 x 240 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


0.0070
0.1000
0.1500
0.6000
1.8000
0.1800
0.0300

m3
Kg
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 10 Cm
Paku Skrup 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X


240) CM
0.4000
0.0500
0.0250
0.0750
0.0080
0.0010

Lbr
Kg
oh
oh
oh
oh

Plywood tebal 4 mm uk 120 x 240 cm


Paku 1 Cm dan 2.5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VII PEKERJAAN BETON ( SNI 7394:2008)


1

MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87
247.0000 kg Semen Portland
1,425.00
869.0000 kg Pasir Beton
100.71
999.0000 kg Koral Beton
92.59

NO
1

215.0000
1.6500
0.2750
0.0280
0.0830

lt
oh
oh
oh
oh

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

25.00
75,000.00
90,000.00
100,000.00
125,000.00

MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
276.0000 kg Semen Portland
1,425.00
828.0000 kg Pasir Beton
100.71
92.59
1,012.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72
299.0000 kg Semen Portland
1,425.00
799.0000 kg Pasir Beton
100.71
92.59
1,017.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66
326.0000 kg Semen Portland
1,425.00
760.0000 kg Pasir Beton
100.71
92.59
1,029.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61
352.0000 kg Semen Portland
1,425.00
731.0000 kg Pasir Beton
100.71
92.59
1,031.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58
371.0000 kg Semen Portland
1,425.00
698.0000 kg Pasir Beton
100.71
92.59
1,047.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56
384.0000 kg Semen Portland
1,425.00
692.0000 kg Pasir Beton
100.71
92.59
1,039.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53
406.0000 kg Semen Portland
1,425.00
684.0000 kg Pasir Beton
100.71
92.59
1,026.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

NO
1

413.0000
681.0000

kg
kg
kg
lt
oh
oh
oh
oh

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

Semen Portland
Pasir Beton
Koral Beton
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1,425.00
100.71
92.59
1,021.0000
215.0000
25.00
1.6500
75,000.00
0.2750
90,000.00
0.0280
100,000.00
0.0830
125,000.00
Total :
MEMBUAT
1
M
BETON
MUTU
f'
=
28,8
Mpa
(K325),
Slump
(12

2)cm,
w/c
=0,49
10
C
439.0000 kg Semen Portland
1,425.00
670.0000 kg Pasir Beton
100.71
92.59
1,006.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

NO

URAIAN

HARGA
SATUAN
(Rp)

11 MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48
448.0000 kg Semen Portland
1,425.00
667.0000 kg Pasir Beton
100.71
92.59
1,000.0000 kg Koral Beton
215.0000
lt Air
25.00
1.6500 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
0.0280 oh Kepala Tukang
100,000.00
0.0830 oh Mandor
125,000.00
Total :
12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
10.5000 kg Besi Beton (Polos/ Ulir)
0.1500 kg Kawat Beton
0.0700 oh Pekerja
0.0700 oh Tukang Besi
0.0070 oh Kepala Tukang
0.0040 oh Mandor

13 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000 ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

15 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4 m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0180 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

HARGA
UPAH
(Rp)
4

123,750.00
24,750.00
2,800.00
10,375.00
161,675.00

8,765.00
17,600.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

5,250.00
6,300.00
700.00
500.00
12,750.00

2,500,000.00
14,300.00
16,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

39,000.00
23,400.00
2,600.00
3,250.00
68,250.00

2,500,000.00
14,300.00
16,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

39,000.00
23,400.00
2,600.00
3,250.00
68,250.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

49,500.00
29,700.00
3,300.00
4,125.00
86,625.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
100,000.00
125,000.00

49,500.00
29,700.00
3,300.00
4,125.00

NO

URAIAN

HARGA
SATUAN
(Rp)

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
6.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

HARGA
UPAH
(Rp)
4

Total :

86,625.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

49,500.00
29,700.00
3,300.00
4,125.00
86,625.00

NO

URAIAN

HARGA
SATUAN
(Rp)

18 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III
0.4000 Kg Paku Biasa 5' - 12'
0.2000 Ltr Minyak Bekisting
0.0200 M3 Kayu Usuk 4/6
0.3500 Lbr Plywood 9 mm
3.0000 Btng Dolken Kayu 8" - 10"/4m
4.0000 Bh Formite/penjaga jarak bekisting/spacer
0.6600 Oh Pekerja
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.1500 ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
2,000.00
75,000.00
90,000.00
100,000.00
125,000.00

HARGA
UPAH
(Rp)
4

49,500.00
29,700.00
3,300.00
4,125.00
86,625.00

2,500,000.00
14,300.00
16,500.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

49,500.00
29,700.00
3,300.00
4,125.00
86,625.00

2,500,000.00
14,300.00
102,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
4,500.00
500.00
1,000.00
17,250.00

21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III
2,500,000.00
1.5000 kg Paku Biasa 5' - 12'
14,300.00
0.4000 ltr Minyak Bekisting
16,500.00
157.0000 kg Besi Beton
8,765.00
2.2500 kg Kawat Beton
17,600.00
336.0000 kg Semen Portland
1,425.00
0.5400 m3 Pasir Beton
160,000.00
0.8100 m3 Koral Beton
85,000.00
5.3000 oh Pekerja
75,000.00
0.2750 oh Tukang Batu
90,000.00
1.3000 oh Tukang Kayu
90,000.00
1.0500 oh Tukang Besi
90,000.00
0.2620 oh Kepala Tukang
100,000.00
0.2650 oh Mandor
125,000.00
Total :

397,500.00
24,750.00
117,000.00
94,500.00
26,200.00
33,125.00
693,075.00

20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan)
0.6000 kg Paku Biasa 5' - 12'
0.5000 btg Dolken Kayu 8" - 10"/4m
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III
2.0000 kg Paku Biasa 5' - 12'
0.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00

NO

URAIAN

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

oh
oh
oh
oh
oh
oh

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

HARGA
UPAH
(Rp)
4

423,750.00
24,750.00
140,400.00
126,000.00
32,300.00
35,375.00
782,575.00

NO

URAIAN

HARGA
SATUAN
(Rp)

23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III
4.0000 kg Paku Biasa 5' - 12'
2.0000 ltr Minyak Bekisting
315.0000 kg Besi Beton
4.5000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1500 m3 Kayu Kelas II balok
3.5000 lbr Plywood 9 mm
20.0000 btg Dolken Kayu 8" /4 m
7.0500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
2.1000 oh Tukang Besi
0.4030 oh Kepala Tukang
0.3530 oh Mandor

24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1400 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
16.0000 btg Dolken Kayu 8" /4 m
6.3500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3330 oh Kepala Tukang
0.3180 oh Mandor
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000 ltr Minyak Bekisting
157.5000 kg Besi Beton
2.2500 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1200 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
32.0000 btg Dolken Kayu 8" /4 m
5.3000 oh Pekerja
0.2750 oh Tukang Batu
1.3000 oh Tukang Kayu
1.0500 oh Tukang Besi
0.2650 oh Kepala Tukang
0.2650 oh Mandor
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)

HARGA
UPAH
(Rp)
4

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

528,750.00
24,750.00
148,500.00
189,000.00
40,300.00
44,125.00
975,425.00

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

476,250.00
24,750.00
148,500.00
126,000.00
33,300.00
39,750.00
848,550.00

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00

397,500.00
24,750.00
117,000.00
94,500.00
26,500.00
33,125.00
693,375.00

NO

URAIAN

0.2400
3.2000
1.6000
157.0000
2.2500
336.0000
0.5400
0.8100
0.1600
2.8000
24.0000
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

m3
kg
ltr
kg
kg
kg
m3
m3
m3
lbr
btg
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Minyak Bekisting
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Kelas II balok
Plywood 9 mm
Dolken Kayu 8" /4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00

397,500.00
24,750.00
117,000.00
94,500.00
26,200.00
33,125.00
693,075.00

NO

URAIAN

HARGA
SATUAN
(Rp)

27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +


BEKISTING)
0.2500 m3 Kayu Kelas III
3.0000 kg Paku Biasa 5' - 12'
1.2000 ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1050 m3 Kayu Kelas II balok
2.5000 lbr Plywood 9 mm
14.0000 btg Dolken Kayu 8" /4 m
5.6500 oh Pekerja
0.2750 oh Tukang Batu
1.5600 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3230 oh Kepala Tukang
0.2830 oh Mandor

2,500,000.00
14,300.00
16,500.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
5,000,000.00
116,050.00
102,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00

HARGA
UPAH
(Rp)
4

423,750.00
24,750.00
140,400.00
126,000.00
32,300.00
35,375.00
782,575.00

28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

m3
kg
kg
kg
kg
m3
m3
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2,500,000.00
14,300.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

13,500.00
1,800.00
1,800.00
1,800.00
600.00
1,125.00
20,625.00

2,500,000.00
14,300.00
8,765.00
17,600.00
1,425.00
160,000.00
85,000.00
75,000.00
90,000.00
90,000.00
90,000.00
100,000.00
125,000.00
Total :

22,275.00
2,970.00
2,970.00
2,970.00
1,000.00
1,875.00
34,060.00

1,540.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
5,400.00
600.00
1,000.00
18,250.00

29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15


CM)
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

m3
kg
kg
kg
kg
m3
m3
oh
oh
oh
oh
oh
oh

Kayu Kelas III


Paku Biasa 5' - 12'
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1

1 M2 PEKERJAAN ATAP GENTENG PLENTONG


25.0000 bh Genteng Plentong
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong
8.0000 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Kayu
0.0200 oh Kepala Tukang
0.0020 oh Mandor

1,980.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
5,400.00
600.00
1,000.00
18,250.00

8,800.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

30,000.00
18,000.00
2,000.00
250.00
50,250.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM


0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm
30,000.00
0.1200 kg Paku Pancing 60 x 230
22,000.00
0.1400 oh Pekerja
75,000.00
0.0700 oh Tukang Kayu
90,000.00
0.0070 oh Kepala Tukang Kayu
100,000.00
0.0070 oh Mandor
125,000.00
Total :
1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
2.4000 lbr Bubungan Stel Gelombang
6.0000 kg Paku Skrup 3,5"
0.0840 oh Pekerja
0.1250 oh Tukang Kayu
0.0130 oh Kepala Tukang
0.0040 oh Mandor
1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap
0.2000 kg Paku Biasa 1/2" - 1"
0.1660 oh Pekerja
0.2500 oh Tukang Kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28
0.0600 kg Paku biasa 1/2" - 1"
0.0500 kg Paku biasa 2" - 5"
0.0040 m3 Kayu papan 3 cm
0.1250 oh Pekerja
0.2500 oh Tukang kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang
0.5000 glg Tali pengikat
0.2000 oh Pekerja
0.0100 oh Mandor

1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28
0.0200 kg Paku Biasa 1/2" - 1"
0.1200 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0060 oh Mandor

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28
0.0400 kg Paku biasa 1/2" - 1"

10,500.00
6,300.00
700.00
875.00
18,375.00

24,000.00
29,150.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,300.00
11,250.00
1,300.00
500.00
19,350.00

9,350.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

12,450.00
22,500.00
2,500.00
1,000.00
38,450.00

51,150.00
15,400.00
14,300.00
8,500,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,375.00
22,500.00
2,500.00
1,000.00
35,375.00

12,500.00
10,450.00
75,000.00
125,000.00
Total :

15,000.00
1,250.00
16,250.00

46,750.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,000.00
5,400.00
600.00
750.00
15,750.00

60,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
4,500.00
500.00
1,000.00
17,250.00

51,150.00
15,400.00

NO

URAIAN

0.1500
0.0700
0.0080
0.0060

IX
1

oh
oh
oh
oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
6,300.00
800.00
750.00
19,100.00

51,700.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

2,250.00
6,300.00
700.00
500.00
9,750.00

PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5
MM DAN 6 MM
1.1000 lbr Asbes semen
0.0100 kg Paku Biasa 1/2" - 1"
0.0300 oh Pekerja
0.0700 oh Tukang Kayu
0.0070 oh Kepala Tukang
0.0040 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS
0.0300 kg Paku Biasa 1/2" - 1"
0.1000 oh Pekerja
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan
0.0100 kg Paku Biasa 1/2" - 1"
0.8000 oh Pekerja
0.8000 oh Tukang Kayu
0.0800 oh Kepala Tukang
0.0400 oh Mandor

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil
0.1000 kg Paku list SQ
0.0500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0030 oh Mandor

HARGA
UPAH
(Rp)
4

60,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
9,000.00
1,000.00
625.00
18,125.00

8,500,000.00
15,400.00
75,000.00
90,000.00
100,000.00
125,000.00

60,000.00
72,000.00
8,000.00
5,000.00

Total :

145,000.00

24,500.00
15,840.00
75,000.00
90,000.00
100,000.00
125,000.00

3,750.00
4,500.00
500.00
375.00

Total :

9,125.00

8,500,000.00
15,840.00
51,700.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

13,500.00
28,800.00
3,200.00
1,125.00
46,625.00

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup
19,800.00
0.3640 lbr Gypsum Board (120x240x9)
69,850.00
0.1000 oh Pekerja
75,000.00
0.0500 oh Tukang Kayu
90,000.00
0.0050 oh Kepala Tukang
100,000.00
0.0050 oh Mandor
125,000.00
Total :

7,500.00
4,500.00
500.00
625.00
13,125.00

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm
0.0600 kg Paku Biasa 2" - 5"
1.1000 lbr Asbes
0.1800 oh Pekerja
0.3200 oh Tukang Kayu
0.0320 oh Kepala Tukang
0.0090 oh Mandor

1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup
0.3640 lbr Kalsiboard 4.5 mm
0.1000 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0050 oh Mandor

19,800.00
79,200.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

7,500.00
4,500.00
500.00
625.00
13,125.00

PEKERJAAN SANITASI ( SNI 2002 )

X
1

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


1.0000 bh Kloset duduk/ monoblok
Perlengkapan
6% x harga kloset
3.3000 oh Pekerja
1.1000 oh Tukang batu
0.0010 oh Kepala Tukang

1,674,900.00
75,000.00
90,000.00
100,000.00

247,500.00
99,000.00
100.00

NO

URAIAN

0.1600

oh Mandor

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.5000 oh Tukang batu
1.5000 oh Kepala Tukang
0.1600 oh Mandor

HARGA
SATUAN
(Rp)
3

HARGA
UPAH
(Rp)
4

125,000.00
Total :

20,000.00
366,600.00

135,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
135,000.00
150,000.00
20,000.00
380,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir
Perlengkapan
6% x harga Urin
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.0000 oh Tukang batu
0.1000 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel
Perlengkapan
12% x harga wast
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.2000 oh Pekerja
1.4500 oh Tukang batu
0.1500 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass
Perlengkapan
18% x harga wast
1.8000 oh Pekerja
2.7000 oh Tukang batu
0.5400 oh Kepala Tukang
0.1100 oh Mandor

MEMASANG 1 M1 PIPA GALVANIS 0,5" - 1 "


1.2000 m1 Pipa galvanis
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0270 oh Mandor

MEMASANG 1 M1 PIPA GALVANIS 1,5" - 3"


1.2000 M' Pipa galvanis
Perlengkapan
35% x harga pipa
0.1080 Oh Pekerja
0.1800 Oh Tukang Pipa
0.0180 Oh Kepala Tukang
0.0054 Oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW 0,5" - 1,5"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0360 oh Pekerja
0.0600 oh Tukang Pipa
0.0060 oh Kepala Tukang
0.0018 oh Mandor

MEMASANG 1 M1 PIPA PVC TYPE AW 2"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0540 oh Pekerja
0.0900 oh Tukang Pipa

HARGA
UPAH
(Rp)
4

1,052,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

75,000.00
90,000.00
10,000.00
12,500.00
187,500.00

185,000.00
1,425.00
140,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

90,000.00
130,500.00
15,000.00
12,500.00
248,000.00

230,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

135,000.00
243,000.00
54,000.00
13,750.00
445,750.00

38,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

4,050.00
8,100.00
900.00
3,375.00
16,425.00

175,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

8,100.00
16,200.00
1,800.00
675.00
26,775.00

16,250.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

2,700.00
5,400.00
600.00
225.00
8,925.00

23,750.00
75,000.00
90,000.00

4,050.00
8,100.00

NO

URAIAN

0.0090
0.0027

oh Kepala Tukang
oh Mandor

10 MEMASANG 1 M1 PIPA PVC TYPE AW 3" - 4"


1.2000 m1 Pipa PVC
Perlengkapan
35% x harga pipa
0.0810 oh Pekerja
0.1350 oh Tukang Pipa
0.0135 oh Kepala Tukang
0.0041 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

100,000.00
125,000.00
Total :

900.00
337.50
13,387.50

62,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,075.00
12,150.00
1,350.00
512.50
20,087.50

NO

URAIAN

HARGA
SATUAN
(Rp)

11 MEMASANG 1 BUAH KRAN 0,75" ATAU 0,5"


1.0000 bh Kran air
0.0250 bh Seal tape
0.0100 oh Pekerja
0.1000 oh Tukang Pipa
0.0100 oh Kepala Tukang
0.0050 oh Mandor

XI
1

PEKERJAAN BESI DAN ALUMINIUM


7393:2008)
1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF
0.0060 oh Pekerja
0.0600 oh Tukang besi
0.0060 oh Kepala Tukang
0.0003 oh Mandor

1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako
10.0000 bh Paku biasa 1 cm - 2,5 cm
7.0000 m' Besi strip
0.2000 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat
0.0150 kg Paku biasa 0,5" - 1"
0.0190 m3 Kayu papan kelas II/III
0.1500 oh Pekerja
0.4000 oh Tukang besi
0.0250 oh Kepala Tukang
0.0013 oh Mandor

HARGA
UPAH
(Rp)
4

25,000.00
2,700.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

750.00
9,000.00
1,000.00
625.00
11,375.00

9,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

450.00
5,400.00
600.00
37.50
6,487.50

128,700.00
19,800.00
10,066.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

15,000.00
18,000.00
2,000.00
125.00
35,125.00

51,150.00
19,800.00
8,500,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

11,250.00
36,000.00
2,500.00
162.50
49,912.50

115,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

750.00
45,000.00
1,000.00
625.00
47,375.00

29,700.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,125.00
13,500.00
1,500.00
100.00
16,225.00

53,900.00
75,000.00
90,000.00
100,000.00

750.00
9,000.00
1,000.00

(SNI

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1

1 BH PASANG KUNCI TANAM BIASA


1.0000 bh Kunci tanam biasa
0.0100 oh Pekerja
0.5000 oh Tukang besi
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela
0.0100 oh Pekerja
0.1000 oh Tukang besi
0.0100 oh Kepala Tukang

NO

URAIAN

0.0005

oh Mandor

1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot
0.0200 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

125,000.00
Total :

62.50
10,812.50

24,200.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,125.00
13,500.00
1,500.00
100.00
16,225.00

110,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,500.00
18,000.00
2,000.00
125.00
21,625.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

XIII PEK. PENUTUP LANTAI DAN DINDING


7395:2008)
1

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ex: Mulia


11.8700 bh Keramik 30 x 30 cm Asia
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ex: Mulia


26.5000 bh Keramik 20 x 20 cm
10.4000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.6200 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm
1.1400 kg Semen Portland
0.0030 m3 Pasir Pasang
0.1000 kg Semen warna/semen grouting
0.0900 oh Pekerja
0.0900 oh Tukang batu
0.0090 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG DINDING KERAMIK 20 X 20 CM ex : Mulia


26.5000 bh Keramik 20 x 20 cm
9.3000 kg Semen Portland
0.0180 m3 Pasir Pasang
1.9400 kg Semen warna/semen grouting
0.9000 oh Pekerja
0.4500 oh Tukang batu
0.0450 oh Kepala Tukang
0.0450 oh Mandor

1 M2 PASANG BATU ALAM 30 X 30 CM


11.8700 bh Batu alam 30 x 30 cm
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu

HARGA
UPAH
(Rp)
4

105,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,125.00
13,500.00
1,500.00
100.00
16,225.00

3,974.00
1,340.00
140,000.00
17,000.00
75,000.00
95,000.00
100,000.00
125,000.00
Total :

52,500.00
33,250.00
3,500.00
4,375.00
93,625.00

1,876.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

52,500.00
31,500.00
3,500.00
4,375.00
91,875.00

3,974.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

6,750.00
8,100.00
900.00
625.00
16,375.00

1,876.00
1,340.00
140,000.00
17,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

67,500.00
40,500.00
4,500.00
5,625.00
118,125.00

6,318.44
176.00
125,000.00
37,400.00
75,000.00
90,000.00

52,500.00
31,500.00

(SNI

NO

URAIAN

0.0350
0.0350

oh Kepala Tukang
oh Mandor

1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II
0.0500 kg Paku sekrup 3,5'
0.1200 oh Pekerja
0.1200 oh Tukang kayu
0.0120 oh Kepala Tukang
0.0060 oh Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

100,000.00
125,000.00
Total :

3,500.00
4,375.00
91,875.00

8,500,000.00
29,150.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

9,000.00
10,800.00
1,200.00
750.00
21,750.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni
0.1500 kg Dempul
0.1700 kg Cat dasar
0.2600 kg Cat Penutup 2x

30,000.00
42,100.00
43,600.00
55,000.00

NO

URAIAN

0.0700
0.0090
0.0060
0.0025

oh
oh
oh
oh

Pekerja
Tukang cat
Kepala Tukang
Mandor

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

75,000.00
90,000.00
100,000.00
125,000.00
Total :

5,250.00
810.00
600.00
312.50
6,972.50

59,000.00
42,100.00
4,100.00
16,800.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

12,000.00
14,400.00
1,600.00
312.50
28,312.50

12,000.00
43,600.00
30,000.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,500.00
5,670.00
630.00
312.50
8,112.50

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar
43,600.00
0.1800 kg Cat Penutup 2x
30,000.00
0.0280 oh Pekerja
75,000.00
0.0420 oh Tukang cat
90,000.00
0.0042 oh Kepala Tukang
100,000.00
0.0025 oh Mandor
125,000.00
Total :

2,100.00
3,780.00
420.00
312.50
6,612.50

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis
0.0500 kg Dempul
0.1000 lbr Amplas
0.0100 bh Kuas
0.1600 oh Pekerja
0.1600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat Penutup 2x
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala Tukang
0.0025 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi
0.0100 lbr Kuas
0.0200 oh Pekerja
0.2000 oh Tukang cat
0.0200 oh Kepala Tukang
0.0100 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi
0.0060 oh Pekerja
0.0600 oh Tukang cat
0.0120 oh Kepala Tukang
0.0060 oh Mandor

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur
2.0000 lbr Amplas
0.0600 oh Pekerja
0.0600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor

47,500.00
16,800.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

1,500.00
18,000.00
2,000.00
1,250.00
22,750.00

70,500.00
75,000.00
90,000.00
100,000.00
125,000.00
Total :

450.00
5,400.00
1,200.00
750.00
7,800.00

47,000.00
4,100.00
75,000.00
90,000.00
100,000.00
125,000.00

4,500.00
5,400.00
1,600.00
312.50

Total :

11,812.50

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok
8.4000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan
8.4000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1,980.00
1,240.00
350,000.00
Total :

350,000.00
350,000.00

10,000.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

1,980.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

NO

URAIAN

HARGA
SATUAN
(Rp)

1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

HARGA
UPAH
(Rp)
4

12,500.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

1,980.00
12,500.00
1,240.00
200,000.00
Total :

200,000.00
200,000.00

1,980.00
1,240.00
355,000.00
Total :

355,000.00
355,000.00

12,500.00
1,240.00
355,000.00
Total :

355,000.00
355,000.00

1,980.00
12,500.00
1,240.00
280,000.00
Total :

280,000.00
280,000.00

60,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :
70,000.00
73,000.00
78,000.00
84,000.00
60,000.00
70,000.00
73,000.00
79,000.00
85,000.00
89,000.00
99,000.00
105,000.00
60,000.00

22,500.00
2,500.00
37,500.00
3,125.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00
65,625.00

75,000.00
130,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :

45,000.00
5,000.00
75,000.00
6,250.00
131,250.00

XVI PEKERJAAN LANDSCAPE


1

2
4
5
5
7
8
10
11
12
14
15
16
18

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.5000 oh Pekerja
0.0250 oh Mandor
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225

19 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block
0.0690 m3 Pasir Urug
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
1.0000 oh Pekerja
0.0500 oh Mandor

NO

URAIAN

HARGA
SATUAN
(Rp)

20 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat
9.2800 zak Semen
0.2000 m3 Pasir pasang
0.2500 oh Tukang Batu
0.0100 oh Kepala Tukang
0.6250 oh Pekerja
0.0310 oh Mandor
21 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225
0.4500 zak Semen 50 Kg
0.0023 m3 Pasir Pasang
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang
0.9500 oh Pekerja
0.0950 oh Mandor
22 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
23 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

HARGA
UPAH
(Rp)
4

45,000.00
1,240.00
140,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :

22,500.00
1,000.00
46,875.00
3,875.00
74,250.00

62,000.00
1,240.00
140,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :
64,000.00
72,000.00

31,500.00
3,500.00
71,250.00
11,875.00
118,125.00
118,125.00
118,125.00

NO

URAIAN

HARGA
SATUAN
(Rp)

24 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat
0.0710 kg Thiner
0.0300 oh Tukang Cat
0.0030 oh Kep. Tukang
0.1500 oh Pekerja
0.0150 oh Mandor

HARGA
UPAH
(Rp)
4

70,500.00
20,000.00
90,000.00
100,000.00
75,000.00
125,000.00
Total :

2,700.00
300.00
11,250.00
1,875.00
16,125.00

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
15,600.00
3.0000 bt Pipa Clipsal 20 mm hitam
13,200.00
2.0000 bh Tee dos clipsal 20 mm hitam
7,700.00
15.0000 bj Klem clipsal 20 mm hitam
825.00
3.0000 bj Sock clipsal 20 mm hitam
2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P
11,000.00
1.0000 ttk Biaya pasang
25,000.00
Total :

25,000.00
25,000.00

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
3.0000 bt Pipa Clipsal 20 mm hitam
1.0000 bh Tee dos clipsal 20 mm hitam
15.0000 bj Klem clipsal 20 mm hitam
4.0000 bj Sock clipsal 20 mm hitam
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 m1 Pipa flexible clipsal 20 mm hitam
1.0000 ttk Biaya pasang

1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone
8.0000 bt Pipa Clipsal 20 mm putih
1.0000 bh Tee dos clipsal 20 mm putih
25.0000 bj Klem clipsal 20 mm putih
5.0000 bj Sock clipsal 20 mm putih
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof
6.0000 bt Pipa Clipsal 20 mm putih
2.0000 bh Tee dos clipsal 20 mm putih
20.0000 bj Klem clipsal 20 mm putih
6.0000 bj Sock clipsal 20 mm putih
1.0000 bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

15,600.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
11,550.00
25,000.00
Total :

25,000.00
25,000.00

4,400.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
25,000.00
Total :

25,000.00
25,000.00

6,600.00
13,200.00
7,700.00
825.00
2,200.00
11,000.00
25,000.00
Total :

25,000.00
25,000.00

Mangupura, 8 J

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)
4

AN
HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

16,250.00
3,562.50
57,420.00
800.00
765.00
165,600.00
858.00
21,375.00

266,630.50

319,130.50

27,600.00
286.00
22,400.00

50,286.00

68,411.00

127,500.00
450,000.00
12,155.00
11,072.60
49,875.00
21,000.00
16,000.00
12,750.00
39,000.00
12,787.50
33,000.00
8,400.00
17,325.00
3,600.00

814,465.10
22,100.00
525,000.00
4,290.00
14,962.50
4,800.00
4,250.00
70,125.00

1,270,715.10

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

645,527.50

926,777.50

39,000.00
690,000.00
10,010.00
70,125.00

809,135.00

1,040,385.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

13,750.00

16,250.00
465,000.00
4,290.00
25,650.00
4,800.00
4,250.00
70,125.00
81,000.00

671,365.00

952,615.00

90,000.00
1,144.00
44,800.00

135,944.00

163,131.50

10,000.00
9,350.00

19,350.00

47,655.00

21,750.00
13,950.00
1,400.00

37,100.00

118,350.00

541,650.00

504,150.00

59,375.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

73,125.00

87,125.00

79,000.00

120,000.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

95,625.00

4,375.00

26,000.00

43,750.00

156,000.00

156,000.00

179,750.00

16,500.00

16,500.00

29,625.00

96,000.00

96,000.00

117,875.00

102,840.00

102,840.00

146,590.00

20,400.00

20,400.00

174,000.00
287,850.00
67,900.00

42,275.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

529,750.00

726,625.00

174,000.00
232,275.00
72,800.00

479,075.00

675,950.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

174,000.00
193,800.00
76,160.00

443,960.00

640,835.00

174,000.00
166,725.00
78,540.00

419,265.00

616,140.00

174,000.00
129,675.00
81,760.00

385,435.00

582,310.00

69,600.00
276,450.00
49,920.00
39,780.00
1,104,390.00
31,680.00

1,571,820.00

1,933,070.00

65,250.00
276,450.00
49,920.00
39,780.00

431,400.00

706,275.00

174,000.00
56,160.00

230,160.00

332,535.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

2,080.00
12,800.00
10,625.00
69,825.00
302,392.50
12,320.00
31,050.00
1,716.00
2,400.00
1,485.00

446,693.50

561,693.50

2,470.00
15,040.00
12,750.00
86,212.50
394,425.00
15,840.00
36,800.00
1,716.00
2,880.00
1,485.00

569,618.50

717,868.50

182,000.00
61,987.50
11,200.00

255,187.50

323,937.50

182,000.00
46,953.75
12,740.00

241,693.75

182,000.00
37,833.75
13,020.00

310,443.75

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

232,853.75

301,603.75

182,000.00
31,635.00
14,280.00

227,915.00

296,665.00

182,000.00
26,362.50
17,080.00

225,442.50

294,192.50

91,000.00
27,003.75
5,320.00

123,323.75

157,698.75

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

91,000.00
20,477.25
5,600.00

117,077.25

151,452.25

91,000.00
16,387.50
6,020.00

113,407.50

147,782.50

91,000.00
13,794.00
6,300.00

111,094.00

145,469.00

91,000.00
11,856.00
6,860.00

109,716.00

144,091.00

91,000.00
9,262.50
7,000.00

107,262.50

141,637.50

2,462,500.00
10,687.50
3,780.00
17,091.75

2,494,059.25

2,462,500.00
10,687.50
3,780.00

2,529,934.25

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

2,476,967.50

2,512,842.50

5,760,000.00
15,675.00
4,900.00

5,780,575.00

60,000.00
84,000.00
171.60

5,814,950.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

18,000.00

162,171.60

174,921.60

22,093.20
2,240.00

24,333.20

63,708.20

14,569.20
2,800.00

17,369.20

56,744.20

11,080.80
3,220.00

14,300.80

53,675.80

8,892.00
3,360.00

12,252.00

51,627.00

7,387.20
3,640.00

11,027.20

50,402.20

6,292.80
3,780.00

10,072.80

4,924.80

49,447.80

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

4,060.00

8,984.80

48,359.80

19,425.60
3,780.00

23,205.60

14,774.40
4,340.00

75,955.60

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

19,114.40

71,864.40

11,856.00
4,480.00

16,336.00

69,086.00

9,849.60
4,900.00

14,749.60

67,499.60

8,390.40
5,040.00

13,430.40

66,180.40

712.50
1,820.00

2,532.50

49,032.50

6,156.00
840.00

6,996.00

41,371.00

4,428.90

4,428.90

2,280.00

24,228.90

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

2,280.00

11,580.00

9,034.50
1,680.00

10,714.50

50,089.50

4,631.25

4,631.25

30,881.25

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

8,250,000.00
19,250.00
13,750.00

8,283,000.00

10,951,750.00

6,000,000.00
19,250.00
13,750.00

6,033,000.00

8,320,500.00

340,000.00
770.00

340,770.00

474,270.00

240,000.00
770.00

240,770.00

374,270.00

340,000.00
6,875.00

346,875.00

204,000.00
75,000.00
4,125.00

728,125.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

283,125.00

588,125.00

544,000.00
6,875.00

550,875.00

932,125.00

212,500.00
462.00
6,875.00
60,000.00

279,837.00

661,087.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

217,600.00
462.00
6,875.00
60,000.00

284,937.00

589,937.00

510,000.00
2,310.00

512,310.00

804,435.00

217,600.00
462.00
6,875.00
65,000.00

289,937.00

594,937.00

212,500.00
462.00
11,000.00
65,000.00
44,000.00

332,962.00

637,962.00

8,250,000.00
150,990.00
86,240.00

8,487,230.00

9,000,000.00
150,990.00

10,012,230.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

86,240.00

9,237,230.00

11,791,605.00

8,250,000.00
150,990.00
46,200.00

8,447,190.00

9,362,190.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

32,200.00
36,000.00
21,600.00
3,850.00

93,650.00

111,775.00

32,200.00
63,000.00
43,200.00
3,850.00

142,250.00

160,375.00

1,237,500.00
3,080.00

1,240,580.00

1,262,330.00

35,420.00
3,080.00

38,500.00

89,125.00

37,490.00
3,850.00

41,340.00

91,800.00
1,540.00

87,590.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

93,340.00

121,465.00

93,500.00
770.00

94,270.00

122,395.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

210,000.00
2,310.00

212,310.00

269,560.00

210,000.00
2,310.00
55,900.00
7,700.00

275,910.00

333,160.00

210,000.00
2,310.00
51,600.00
7,700.00

271,610.00

347,860.00

59,500.00
1,540.00
2,970.00

64,010.00

292,760.00

24,000.00
770.00

24,770.00

351,975.00
87,516.99
92,497.41

34,320.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

5,375.00

537,364.40

699,039.40

393,300.00
83,387.88
93,701.08
5,375.00

575,763.96

737,438.96

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

426,075.00
80,467.29
94,164.03
5,375.00

606,081.32

767,756.32

464,550.00
76,539.60
95,275.11
5,375.00

641,739.71

803,414.71

501,600.00
73,619.01
95,460.29
5,375.00

676,054.30

837,729.30

528,675.00
70,295.58
96,941.73
5,375.00

701,287.31

862,962.31

547,200.00
69,691.32
96,201.01
5,375.00

718,467.33

880,142.33

578,550.00
68,885.64
94,997.34
5,375.00

747,807.98

909,482.98

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

588,525.00
68,583.51
94,534.39
5,375.00

757,017.90

918,692.90

625,575.00
67,475.70
93,145.54
5,375.00

791,571.24

953,246.24

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

638,400.00
67,173.57
92,590.00
5,375.00

803,538.57

965,213.57

92,032.50
2,640.00

94,672.50

107,422.50

100,000.00
4,290.00
1,650.00

105,940.00

174,190.00

100,000.00
4,290.00
1,650.00

105,940.00

174,190.00

100,000.00
5,720.00
3,300.00
75,000.00
40,617.50
204,000.00

428,637.50

100,000.00
5,720.00
3,300.00
90,000.00
40,617.50
204,000.00

515,262.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

443,637.50

530,262.50

100,000.00
5,720.00
3,300.00
75,000.00
40,617.50
612,000.00

836,637.50

923,262.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

75,000.00
5,720.00
3,300.00
100,000.00
40,617.50
306,000.00
8,000.00

538,637.50

625,262.50

75,000.00
5,720.00
2,475.00
75,000.00
40,617.50
204,000.00

402,812.50

489,437.50

66,000.00
8,580.00
51,000.00

125,580.00

142,830.00

500,000.00
21,450.00
6,600.00
1,376,105.00
39,600.00
478,800.00
86,400.00
68,850.00

2,577,805.00

675,000.00
28,600.00
9,900.00
1,840,650.00
52,800.00
478,800.00
86,400.00
68,850.00

3,270,880.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

3,241,000.00

4,023,575.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

1,000,000.00
57,200.00
33,000.00
2,760,975.00
79,200.00
478,800.00
86,400.00
68,850.00
750,000.00
406,175.00
2,040,000.00

7,760,600.00

8,736,025.00

800,000.00
45,760.00
26,400.00
1,840,650.00
52,800.00
478,800.00
86,400.00
68,850.00
700,000.00
324,940.00
1,632,000.00

6,056,600.00

6,905,150.00

800,000.00
45,760.00
26,400.00
1,380,487.50
39,600.00
478,800.00
86,400.00
68,850.00
600,000.00
324,940.00
3,264,000.00

7,115,237.50

7,808,612.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

600,000.00
45,760.00
26,400.00
1,376,105.00
39,600.00
478,800.00
86,400.00
68,850.00
800,000.00
324,940.00
2,448,000.00

6,294,855.00

6,987,930.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

625,000.00
42,900.00
19,800.00
1,840,650.00
52,800.00
478,800.00
86,400.00
68,850.00
525,000.00
290,125.00
1,428,000.00

5,458,325.00

6,240,900.00

5,000.00
143.00
26,295.00
792.00
5,700.00
960.00
765.00

39,655.00

60,280.00

7,500.00
286.00
31,554.00
880.00
7,837.50
1,440.00
1,275.00

50,772.50

84,832.50

38,500.00

38,500.00

56,750.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

49,500.00

49,500.00

67,750.00

44,000.00
11,400.00
4,480.00

59,880.00

110,130.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

22,500.00
2,640.00

25,140.00

43,515.00

57,600.00
174,900.00

232,500.00

251,850.00

561,000.00
3,080.00

564,080.00

602,530.00

20,460.00
924.00
715.00
34,000.00

56,099.00

91,474.00

81,250.00
5,225.00

86,475.00

102,725.00

32,725.00
308.00

33,033.00

48,783.00

63,000.00

63,000.00

15,345.00
616.00

80,250.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

15,961.00

35,061.00

56,870.00
154.00

57,024.00

66,774.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

22,500.00
462.00

22,962.00

41,087.00

127,500.00
154.00

127,654.00

272,654.00

25,725.00
1,584.00

27,309.00

36,434.00

102,000.00
950.40
56,870.00

159,820.40

206,445.40

2,178.00
25,425.40

27,603.40

40,728.40

2,178.00
28,828.80

31,006.80

1,674,900.00
100,494.00

44,131.80

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

1,775,394.00

2,141,994.00

135,000.00
8,550.00
1,400.00

144,950.00

524,950.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

1,052,000.00
63,120.00
8,550.00
1,400.00

1,125,070.00

1,312,570.00

185,000.00
22,200.00
8,550.00
1,400.00

217,150.00

465,150.00

230,000.00
41,400.00

271,400.00

717,150.00

45,600.00
13,300.00

58,900.00

75,325.00

210,000.00
61,250.00

271,250.00

298,025.00

19,500.00
5,687.50

25,187.50

28,500.00
8,312.50

34,112.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

36,812.50

50,200.00

75,000.00
21,875.00

96,875.00

116,962.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

25,000.00
67.50

25,067.50

36,442.50

10,925.00

10,925.00

17,412.50

141,570.00
198,000.00
70,462.00

410,032.00

445,157.00

53,707.50
297.00
161,500.00

215,504.50

265,417.00

115,500.00

115,500.00

162,875.00

29,700.00

29,700.00

53,900.00

45,925.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

53,900.00

64,712.50

24,200.00

24,200.00

40,425.00

110,000.00

110,000.00

131,625.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

115,500.00

115,500.00

131,725.00

47,171.38
13,400.00
6,300.00
25,500.00

92,371.38

185,996.38

49,714.00
13,936.00
6,300.00
27,540.00

97,490.00

189,365.00

13,233.42
1,527.60
420.00
1,700.00

16,881.02

33,256.02

49,714.00
12,462.00
2,520.00
32,980.00

97,676.00

74,999.88
1,760.00
5,625.00
56,100.00

215,801.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

138,484.88

230,359.88

25,500.00
1,457.50

26,957.50

6,000.00
6,315.00
7,412.00
14,300.00

48,707.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

34,027.00

40,999.50

8,850.00
2,105.00
410.00
168.00

11,533.00

39,845.50

1,200.00
4,360.00
7,800.00

13,360.00

21,472.50

5,232.00
5,400.00

10,632.00

17,244.50

4,750.00
168.00

4,918.00

27,668.00

21,150.00

21,150.00

28,950.00

24,534.00
8,200.00

32,734.00

44,546.50

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

217,800.00
10,416.00
228,216.00

578,216.00

137,500.00
10,416.00
147,916.00

347,916.00

108,900.00
5,208.00
114,108.00

314,108.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

229,166.67
5,208.00
234,374.67

434,374.67

108,900.00
56,145.83
6,510.00
171,555.83

371,555.83

108,900.00
5,208.00
114,108.00

469,108.00

229,166.67
5,208.00
234,374.67

589,374.67

108,900.00
56,145.83
6,510.00
171,555.83

451,555.83

60,000.00

60,000.00
70,000.00
73,000.00
78,000.00
84,000.00
60,000.00
70,000.00
73,000.00
79,000.00
85,000.00
89,000.00
99,000.00
105,000.00
60,000.00

125,625.00
135,625.00
138,625.00
143,625.00
149,625.00
125,625.00
135,625.00
138,625.00
144,625.00
150,625.00
154,625.00
164,625.00
170,625.00
125,625.00

75,000.00
8,970.00

83,970.00

215,220.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

54,000.00
11,507.20
28,000.00

93,507.20

167,757.20

62,000.00
558.00
322.00

62,880.00
103,507.20
111,507.20

181,005.00
221,632.20
229,632.20

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

20,022.00
1,420.00

21,442.00

37,567.00

124,800.00
39,600.00
15,400.00
12,375.00
6,600.00
11,000.00
209,775.00

234,775.00

156,000.00
39,600.00
7,700.00
12,375.00
8,800.00
11,000.00
11,550.00
25,000.00
272,025.00

297,025.00

110,000.00
105,600.00
7,700.00
20,625.00
11,000.00
11,000.00
265,925.00

290,925.00

132,000.00
79,200.00
15,400.00
16,500.00
13,200.00
11,000.00
267,300.00

Mangupura, 8 Januari 2016

292,300.00

HARGA
BAHAN
(Rp)

HARGA
JUMLAH
(Rp)

ITEM PEKERJAAN

VOLUME

Pekerjaan Persiapan
Pembersihan lapangan
Bowplank

115.5 m2
57.5 m'

UPAH

JUMLAH 1

m3
m2