SECTION 01109
SPECIAL NOTES, PRIORITY OF DOCUMENTS ETC.
1.
For any works not covered by this Particular Specifications, The General Specifications
alongwith Laws, Bye-Laws, Rules and Regulations issued by the various
Ministries and Statutory Authorities having jurisdictions shall apply.
It will be the Contractors responsibility to ascertain the names of all the
Ministries and Authorities having jurisdictions, the details of their applicable
statutes, and the methods to ensure compliance with them in consonance with other
Tender/Contract Documents.
2.
If an ambiguity or discrepancy is found in the documents the Engineer shall issue any
necessary clarification or instruction. In this regard the Engineers decision shall be considered
as final.
Also, if any ambiguity or discrepancy is found inside the above prioritized documents; For
example say in Document III-3 : Drawing : Ambiguities found between plans/sections/detail
drawings and Finishing Schedule; in this case, the Engineer has the right to insist on the
costliest interpretation to which a reading of the Contract Document can lead. The same
principle will be followed for all documents having any confusing terms.
3.
K07078-TD-SPC-PMC-01 REV 2
III-2/01109 - 1
4.
The Contractor shall take approvals from all the Concerned Authorities having
jurisdication prior to commencing their construction/execution works.
5.
END OF SECTION