DRAWING TITLE
STRESSES :
SEVERE CONTROL
GENERAL PLANS
000
001
002
011
012
013
ADMIXTURES :
SETTING RETARDERS (CONSTRUCTION JOINTS).
WATERPROOFING ADMIXTURE (TO IMPROVE WATERPROOFNESS OF WALLS, FLOOR SLAB AND RESERVOIR COVER SLAB).
014
ARCHITECTURAL DETAILS
100
101
102
103
104
WHERE SPLICE BARS ARE USED, THEIR LENGTH SHALL NOT BE LESS THAN 2x50 . ( =BAR NOMINAL DIAMETER).
LAPS SHALL BE STAGGERED FROM ONE HOOP TO THE OTHER AND/OR ONE BAR TO THE OTHER IN ORDER TO REDUCE THE NUMBER OF
LAPS IN THE SAME SECTION. PINS
BENDING :
> 12mm MECHANICAL.
HOLES MADE BY TIE-RODS SHALL BE FILLED WITH A NON SHRINK GROUT BY MEANS OF SPECIAL INJECTION METHODS.
TOPOGRAPHICAL PLANS
THE CONTRACTOR SHALL PERFORM COMPLEMENTARY AND DETAILED SURVEY OF THE PROJECT SITE AREA.
WATERPROOFING :
SURFACE WATERPROOFING TREATMENT OF RESERVOIR FLOOR SLAB, WALLS AND COVER SLAB FROM THE INTERIOR SIDE.
REMARKS :
- ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED.
- ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED.
- SCALING FROM THESE DRAWINGS IS NOT ALLOWED.
THIS SURVEY SHALL START DIRECTLY AFTER THE NOTICE OF COMMENCE OF THE PROJECT IS DECLARED AND SHALL BE SUBMITTED TO
EXCAVATION WORKS
THE EXCAVATION SHOWN IN RELATED DRAWINGS IS DEFINED ACCORDING TO THE CURRENT TOPOGRAPHICAL AND GEOLOGICAL
THE CONTRACTOR SHALL PERFORM TEST PITS TO PRECISE EXACT LOCATION AND DEPTH PRIOR TO EXCAVATION WORKS FOR
DATA. EXCAVATION LEVELS CAN BE ADJUSTED IF NECESSARY DURING THE EXECUTION WORKS.
MECHANICAL DRAWINGS
THE MECHANICAL DRAWINGS OF RESERVOIRS AND VALVES CHAMBERS EQUIPMENTS, INCLUDED IN THIS SET ARE PRELIMINARY
DRAWINGS.
31/05/2015
Rev.
Date
Description
UNITED NATIONS
INTERNATIONAL
CHILDREN'S
EMERGENCY FUND
THE CONTRACTOR SHALL PERFORM DETAILED ENGINEERING DRAWINGS FOR THESE WORKS ACCORDING TO SPECIFICATIONS AND
THE DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
First Issue
BEIRUT
AND MOUNT
LEBANON WATER
ESTABLISHMENT
Designed by:
Project Title:
THE CONTRACTOR SHALL PERFORM THE ELECTRICAL LIGHTING DRAWINGS TO MEET WITH THE REQUIRED TECHNICAL SPECIFICATIONS
REINFORCEMENT :
Drawing Title:
: SYMBOL
LIGHTING INSTALLATION AND EQUIPEMENTS SHOULD BE LIMITED TO THE QUANTITIES INDICATED IN THE BILLS OF QUANTITIES.
Drawn by:
B.E.H.T.
Date:
31/05/2015
Checked by:
Z. MAKHOUL
Scale:
Approved by:
G. ABDELNOUR
Format:
A0
Drawing Nb.:
001
Revision: