(1)
BARANGAY
MUNICIPALITY/
CITY
PROVINCE
(2)
(3)
(4)
DESCRIPTION OF THE
EXTENT OF DAMAGE
(5)
NOTE:
To be submitted within twelve (12) hours after calamity. Cost of priority I group should be thoser that can be funded by the immediate Resp
Prepared by:
DANILO O. MESINA
Chief Maintenenance Section
End. "6"
BOM-SDMCD Form 2015-05
Length/Area/
Volme of
Damage
Type/No. of
Equipment
Needed
ESTIMATED COST OF
RESTORATION
ESTIMATED
DURATION
OF REPAIR
WORKS
(6)
(7)
(8)
(9)
REMARKS
(10)
Submitted by:
DAVID A. BULIYAT
District Engineer
( DRRM TEAM)
Day/Date
Day 1/
Incident Commander
Contact No.
Contact No.
Day 2/
Name of Person
a.
b.
c.
a.
b.
c.
a.
b.
Day3/
Public Information Officer
Contact No.
c.
a.
b.
Day4/
Safety Officer
Contact No.
c.
a.
b.
Day5/
Liason Officer
Contact No.
c.
a.
b.
Day6/
Operations Chief
Contact No.
c.
a.
b.
Day7/
Planning Chief
Contact No.
c.
a.
b.
Day8/
Logistics Chief
Contact No.
c.
a.
b.
Day9/
c.
Admin./Finance Chief
Contact No.
a.
b.
Day 10/
c.
Prepared By:
c of the Phillippines
Contact Numbers
Submitted By:
REGION: CAR
District Engineering Office: ABRA
NAME OF PERSON MANNING THE OPERATION CENTER
(DRRM TEAM)
Day/
Date
Day 1/
LORETO B. DACOROON
Incident Commander
0917-512-2753
Contact No.
EDWIN T. BRINGAS
Deputy Incident Commander
0917-581-1928
Contact No.
PACIENCIA P. BELLO
Public Information Officer
0927-456-9894
Contact No.
AGNES B. BERNARDEZ
Safety Officer
0917-799-4238
Contact No.
ERNESTO P. BAYOAN
Liaison Officer
0926-404-3721
Contact No.
0917-799-4270
Contact No.
0917-799-0304
Contact No.
ARNEL N. BRILLANTES
Logistics Chief
0915-574-3124
Contact No.
Day 2/
Day 3/
Day 4/
Day 5/
Day 6/
Day 7/
Day 8/
Day 9/
Day 9/
NERIO P. PLURAD
Admin./Finance Chief
0906-239-8151
Contact No.
Day 10/
Designation
Contact Numbers
Engineer II
Const. & Maint Foreman
Electrician II
Engineer II
Admin. Officer II
Const. & Maint. Man
Engineer II
Painter II
Engineering Assistant
0915-750-0166
0917-922-8595
0916-277-4587
0917-799-4270
0927-581-1920
0927-265-7188
0917-514-7097
0917-793-1739
6:00AM6:00PM
6:00PM6:00AM
b.
c.
a.
b.
c.
Prepared by:
Submitted by:
REGION :
CAR
District Engineering Office:
Ineng
August 20, 2015 (6:00 am)
ABRA
:
:
TYPE
2
NUMBER
3
LOCATION
4
1. Abra-Kalinga Road
Payloader
Road Grader
Dumptruck
Chainsaw
1
1
1
1
K0409+000
K0469+000
K0441+000
K0441+000
Road Grader
Chainsaw
1
1
K0435+000
K0412+000
Dumptruck
Chainsaw
Backhoe
1
1
1
K0399+000
K0399+000
K0394+000
4. Abra-Cervantes Road
Mini-Dumptruck
Chainsaw
1
1
K0432+000
K0435+000
Philippines
NG OF ASSETS
15 (6:00 am)
MANPOWER
REMARKS
21
14
12
Submitted by:
(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g.K0434+400; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang, Abra
Abra-Kalinga Road
a. K0436+200; San Isidro, Lagangilang, Abra
b.K0436+500; San Isidro, Lagangilang, Abra
c. K0436+700; San Isidro, Lagangilang, Abra
d. K0438+850; Nagtipulan, Lagangilang, Abra
e. K0439+500; Nagtipulan, Lagangilang, Abra
DATE
REPORTED
TO CENTRAL
OFFICE
2
SITUATION
DURING
CALAMITY
ACTION TAKEN
DESCRIPTION OF DAMAGE
( Equipment used/deployed)
5
Punch-thru
Punch-thru
Punch-thru
Punch-thru
Punch-thru
Not Passable
Not Passable
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Road cut
Not Passable
Soil
Soil
Soil
Soil
Soil
Not Passable
Soil Collapse
Soil
Soil
Soil
Soil
Soil
Not Passable
Not Passable
Not Passable
Landslide
Landslide
Landslide
Further
Further
Further
Further
Further
clearing
clearing
clearing
clearing
clearing
is
is
is
is
is
on-going
on-going
on-going
on-going
on-going
EDWIN T. BRINGAS
Chief, Maintenance Section
Encl. "4"
BOM-SDMCD Form 2015-03
D HIGHWAYS
AND BRIDGES
N TAKEN
used/deployed)
5
PREL.EST.
OF DAMAGE
( P'M)
a. POINTMAN
b.CONTACT NUMBER
REMARKS
; ; ; ; ; / Abra/Nagaparan/Danglas
ng is on-going
ng is on-going
ng is on-going
ng is on-going
ng is on-going
ation on going
c advisory
ng is on-going
ation on going
ng is on-going
ng is on-going
ith private
the clearing
ith private
the clearing
ng is on-going
ng is on-going
ng is on-going
Not Passable
a.
567
ng
ng
ng
ng
ng
is
is
is
is
is
on-going
on-going
on-going
on-going
on-going
b. 0927-265-7188
ith the
the clearing
ection
Submitted by:
LORETO B. DACOROON
Caretaker
aparan/Danglas
(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
DATE
REPORTED
TO CENTRAL
OFFICE
SITUATION
DURING
CALAMITY
ACTION TAKEN
DESCRIPTION OF DAMAGE
( Equipment used/deployed)
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Soil
Soil
Soil
Soil
Soil
Soil
Soil
Not Passable
Road Cut
Not Passable
Abra-Kalinga Road
a. K0436+200; San Isidro, Lagangilang, Abra
b.K0436+500; San Isidro, Lagangilang, Abra
c. K0436+700; San Isidro, Lagangilang, Abra
d. K0438+850; Nagtipulan, Lagangilang, Abra
e. K0439+500; Nagtipulan, Lagangilang, Abra
f. K0448+000; Lenneng, Baay-Licuan, Abra
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse and fallen trees
Collapse and fallen trees
5
Soil
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
cleared
cleared
cleared
cleared
cleared
cleared
cleared
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Not Passable
Not Passable
Not Passable
Landslide
Landslide
Landslide
Further
Further
Further
Further
Further
Further
clearing
clearing
clearing
clearing
clearing
clearing
is
is
is
is
is
is
on-going
on-going
on-going
on-going
on-going
on-going
Encl. "4"
BOM-SDMCD Form 2015-03
D HIGHWAYS
AND BRIDGES
N TAKEN
used/deployed)
5
PREL.EST.
OF DAMAGE
( P'M)
6
a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097
leared
REMARKS
8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August 22, 2015
Not Passable; Needs immediate
restoration
c advisory
a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595
ng is on-going
ng is on-going
ng is on-going
ng is on-going
ng is on-going
leared
ng is on-going
ng is on-going
ng
ng
ng
ng
ng
ng
is
is
is
is
is
is
on-going
on-going
on-going
on-going
on-going
on-going
ith the
the clearing
ection
Submitted by:
LORETO B. DACOROON
Caretaker
(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
h.K0434+400; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang
b. K0434+800; Bangbangcag, Bucay
c. K0450+050; Bilabila, Sallapadan,
d. K0452+000; Bilabila, Sallapadan,
e. K0452+750; Bilabila, Sallapadan,
Abra-Kalinga Road
DATE
REPORTED
TO CENTRAL
OFFICE
SITUATION
DURING
CALAMITY
ACTION TAKEN
DESCRIPTION OF DAMAGE
( Equipment used/deployed)
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Soil
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse and fallen trees
Collapse and fallen trees
Not Passable
Not Passable
Passable
Passable
Passable
Not Passable
5
Soil
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
cleared
cleared
cleared
cleared
cleared
cleared
cleared
Passable
One lane passable
One lane passable
passable
One lane passable
Punch-thru
Passable
Road Slip
Soil Collapse and fallen trees
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Collapsed Stone Masonry
Soil Collapse
Not Passable
Soil Collapse
One
One
One
One
Soil
Soil
Soil
Soil
Not Passable
Soil Collapse
Punch-thru
Not Passable
Not Passable
Not Passable
Landslide
Cut Road Section
Not Passable
Landslide
lane
lane
lane
lane
passable
passable
passable
passable
operation
Not Passable
Landslide
Passable
Passable
One lane passable
Passable
Passable
Not passable
Not passable
passable
passable
Passable
Soil Collapsed
Soil Collapsed/Debris flow
Damaged pavement
Punched-thru by private
equipment. Closely monitored
for possible recurrent. Closely
monitored for possible
recurrent.
Encl. "4"
BOM-SDMCD Form 2015-03
D HIGHWAYS
AND BRIDGES
N TAKEN
used/deployed)
5
PREL.EST.
OF DAMAGE
( P'M)
6
a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097
leared
c advisory
ith the
the clearing
REMARKS
8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August 22, 2015
Not Passable; Needs immediate
restoration
a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595
ith the
the clearing
was
was
was
was
was
was
was
passable
passable
passable
passable
passable
passable
passable
ith the
the clearing
ith the
the clearing
Section
Section
Section
Section
Section
Section
Section
and DPWH
e on stand-by for
rent of soil
Section
Section
Section
Section
with the
the clearing
was
was
was
was
passable
passable
passable
passable
was
was
was
was
was
passable
passable
cleared 9:00 AM
passable
passable
hru by private
losely monitored
ecurrent. Closely
d for possible
urrent.
Warning Signs
ection
Section
Section
Section
Section
Section
Submitted by:
LORETO B. DACOROON
Caretaker
(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
h.K0434+400; Nagaparan, Danglas, Abra
Abra-Cervantes Road
a. K0432+185; Baay Bridge; San Isidro,
Lagangilang
b. K0434+800; Bangbangcag, Bucay
c. K0450+050; Bilabila, Sallapadan
d. K0452+000; Bilabila, Sallapadan
e. K0452+750; Bilabila, Sallapadan
DATE
REPORTED
TO CENTRAL
OFFICE
SITUATION
DURING
CALAMITY
ACTION TAKEN
DESCRIPTION OF DAMAGE
( Equipment used/deployed)
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Soil
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse and fallen trees
Collapse and fallen trees
Not Passable
Not Passable
Passable
Passable
Passable
Not Passable
5
Soil
Soil
Soil
Soil
Soil
Soil
Soil
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
Collapse
cleared
cleared
cleared
cleared
cleared
cleared
cleared
Not Passable
Soil Collapse
Passable
One lane passable
One lane passable
passable
One lane passable
Punch-thru
Passable
Road Slip
Soil Collapse and fallen trees
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Collapsed Stone Masonry
Soil Collapse
Not Passable
Soil Collapse
One
One
One
One
Soil
Soil
Soil
Soil
Not Passable
Soil Collapse
Punch-thru
Not Passable
Abra-Kalinga Road
a. K0414+450; Deet, Tayum, Abra
b. K0436+200; San Isidro, Lagangilang, Abra
c.K0436+500; San Isidro, Lagangilang, Abra
d. K0436+700; San Isidro, Lagangilang, Abra
e. K0438+850; Nagtipulan, Lagangilang, Abra
f. K0439+500; Nagtipulan, Lagangilang, Abra
g. K0441+260/K0444+100; Bonglo, Baay-Licuan,
Abra
lane
lane
lane
lane
passable
passable
passable
passable
Not Passable
Not Passable
Landslide
Cut Road Section
Not Passable
Not Passable
Landslide
Landslide
Passable
Passable
One lane passable
Passable
Passable
Not passable
Not passable
passable
passable
Passable
Soil Collapsed
Soil Collapsed/Debris flow
Damaged pavement
Punched-thru by private
equipment. Closely monitored
for possible recurrent. Closely
monitored for possible
recurrent.
Encl. "4"
BOM-SDMCD Form 2015-03
D HIGHWAYS
AND BRIDGES
N TAKEN
used/deployed)
5
PREL.EST.
OF DAMAGE
( P'M)
6
a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097
leared
c advisory
ith the
the clearing
REMARKS
8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August 22, 2015
Not Passable; Needs immediate
restoration
a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595
ith the
the clearing
ith the
the clearing
was
was
was
was
was
was
was
passable
passable
passable
passable
passable
passable
passable
ith the
the clearing
ith the
the clearing
Section
Section
Section
Section
Section
Section
Section
and DPWH
e on stand-by for
rent of soil
Section
Section
Section
Section
with the
the clearing
was
was
was
was
passable
passable
passable
passable
was
was
was
was
was
passable
passable
cleared 9:00 AM
passable
passable
hru by private
losely monitored
ecurrent. Closely
d for possible
urrent.
Warning Signs
ection
Section
Section
Section
Section
Section
Submitted by:
LORETO B. DACOROON
Caretaker
(Province/City/ Municipality/
Barangay/Sta. Limits)
1
Abra-Ilocos Norte Road
a. K0424+300; Abaquid, Danglas, Abra
b. K0424+450 ; Abaquid, Danglas, Abra
c. K0424+600; Abaquid, Danglas, Abra
d. K0424+800; Abaquid, Danglas, Abra
e. K0425+400; Abaquid, Danglas, Abra
f. K0430+600; Nagaparan, Danglas, Abra
g. K0432+600; Nagaparan, Danglas, Abra
h.K0434+400; Nagaparan, Danglas, Abra
DATE
REPORTED
TO CENTRAL
OFFICE
SITUATION
DURING
CALAMITY
ACTION TAKEN
DESCRIPTION OF DAMAGE
( Equipment used/deployed)
5
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Not Passable
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse and fallen trees
Soil Collapse and fallen trees
Cut Road Section
Passable
Road Slip
Passable
Road Slip
"
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Passable
Road Slip
Road Slip
Road Slip
Soil Collapse
Soil Collapse
Road Slip
Road Slip
Road Slip
Road Slip
"
"
"
"
"
"
"
"
"
Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Not Passable
Road Slip
Soil Collapse/Road Slip
Soil Collapse
Road Slip
Soil Collapse
Road Slip
Soil Collapse
Soil Collapse
Soil Collapse
Not Passable
Passable
Passable
Passable
Not Passable
Road Slip
Soil Collapse
Road Slip
Road Slip
Soil Collapse
Road Slip
Road Slip
Soil Collapse
Road Slip
Road Slip
Road Slip
Soil Collapse
Road Slip
Soil Collapse
Road Slip
Soil Collapse
Road Slip
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Installed traffic advisory
Not Passable
Soil Collapse
Passable
One lane passable
One lane passable
passable
One lane passable
Punch-thru
Passable
Road Slip
Soil Collapse and fallen trees
Soil Collapse
Soil Collapse
Soil Collapse
Soil Collapse
Collapsed Stone Masonry
Soil Collapse
Not Passable
Soil Collapse
One
One
One
One
Soil
Soil
Soil
Soil
Not Passable
Soil Collapse
Punch-thru
Not Passable
Abra-Kalinga Road
a. K0414+450; Deet, Tayum, Abra
b. K0436+200; San Isidro, Lagangilang, Abra
c.K0436+500; San Isidro, Lagangilang, Abra
d. K0436+700; San Isidro, Lagangilang, Abra
e. K0438+850; Nagtipulan, Lagangilang, Abra
f. K0439+500; Nagtipulan, Lagangilang, Abra
g. K0441+260/K0444+100; Bonglo, Baay-Licuan,
Abra
lane
lane
lane
lane
passable
passable
passable
passable
Not Passable
Not Passable
Landslide
Cut Road Section
Not Passable
Not Passable
Landslide
Landslide
Passable
Passable
One lane passable
Passable
Passable
Not passable
Not passable
passable
passable
Passable
Soil Collapsed
Soil Collapsed/Debris flow
Damaged pavement
Punched-thru by private
equipment. Closely monitored
for possible recurrent. Closely
monitored for possible
recurrent.
Encl. "4"
BOM-SDMCD Form 2015-03
ND HIGHWAYS
S AND BRIDGES
ON TAKEN
t used/deployed)
5
PREL.EST.
OF DAMAGE
( P'M)
6
a. POINTMAN
b.CONTACT NUMBER
7
a. LORETO E. CASTILLO, JR.
b. 0917-514-7097
leared
with the contractor
aring operation
with the contractor
aring operation
REMARKS
8
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Both lanes are passable
Section was opened 3:00 PM,
August
22, 2015
Not Passable;
Needs immediate
restoration
Section is under contract. One
lane is Passable;
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
c advisory
"
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
Both
a. XERXES N. ASTUDILLO,JR.
b. 0917-922-8595
was
was
was
was
was
was
was
passable
passable
passable
passable
passable
passable
passable
Section
Section
Section
Section
Section
Section
Section
and DPWH
e on stand-by for
rent of soil
Section
Section
Section
Section
was
was
was
was
passable
passable
passable
passable
was
was
was
was
was
passable
passable
cleared 9:00 AM
passable
passable
hru by private
Closely monitored
ecurrent. Closely
d for possible
current.
Warning Signs
ection
Section
Section
Section
Section
Section
Submitted by:
LORETO B. DACOROON
Caretaker
ASSETS DEPLOYMENT
TYPHOON :
Ineng
As of : August 20, 2015 (6:00 am)
REGION :
CAR
DEPLOYED ASSESTS
DISTRICT OFFICE
(1)
EQUIPMENTS
MANPOWER
(2)
(3)
ABRA
1
1
1
1
unit Payloader
unit Road Grader
unit Dumptruck
unit Chainsaw
21
ABRA
14
ABRA
1 unit Dumptruck
1 unit Chainsaw
1 unit Backhoe
12
ABRA
1 unit Mini-Dumptruck
1 unit Chainsaw
e Phillippines
C WORKS AND HIGHWAYS
PLOYMENT
DESTINATION
(Name of Road Section/Barangay/
Municipality/Province
REMARKS
(4)
(5)
Abra-Kalinga
Abra-Kalinga
Abra-Kalinga
Abra-Kalinga
Road/Zone 7/Bangued/Abra
Road/Baquero/Baay-Licuan/Abra
Road/Quersodan/Lagangilang/Abra
Road/Quersodan/Lagangilang/Abra
Abra-Ilocos Norte/Nagaparan/Danglas/Abra
Abra-Ilocos Norte/Mudeng/La Paz/Abra
Abra-Ilocos Sur/Pangtud/Pidigan/Abra
Abra-Ilocos Sur/Pangtud/Pidigan/Abra
Abra-Ilocos Sur/Sulbec/Pidigan/Abra
Abra-Cervantes Road/Nagbalitangan/Bucay
Abra-Cervantes Road/Nagbalitangan/Bucay
O S. BENEDITO
Submitted by:
ABRA
LOCATION
NAME OF ROAD/BRIDGES/
FC STRUCTURE
BARANGAY
( STATION Limits)
MUNICIPALITY/
CITY
PROVINCE
(1)
Abra-Ilocos Norte Road; K0424+300
to K0432+600 @ various sections
(2)
Abaquid/ Nagaparan Danglas
(4)
Nagaparan
San iSidro/
Lagangilang/ Baay-Licuan Abra
Nagtipulan/ Lenneng/
Tumalip/ Nalbuan
Deet
Tayum
Abra
Road Slip
Bonglo
Baay-Licuan
Abra
BilaBila
Sallapadan
Abra
BilaBila
Sallapadan
Abra
Bangbangcag
Bucay
Abra
San Isidro
Lagangilang
Abra
Sulvec
Pidigan
Abra
Garreta
Pidigan
Abra
(3)
Danglas
(5)
Abra
Soil Collapse
Abra
Monggoc
Pidigan
Abra
Monggoc
Pidigan
Abra
Ubbog Lipcan
Bangued
Abra
NOTE: To be submitted within twelve (12) hours after calamity. Cost of priority I group should be those that can be funded by the immediate Resp
Prepared by:
EDWIN T. BRINGAS
Chief Maintenenance Section
End. "6"
BOM-SDMCD Form 2015-05
he Phillippines
UBLIC WORKS AND HIGHWAYS
Length/Area/
Volume of
Damage
(6)
4,072 cu.m.
Type/No. of
Equipment
Needed
Estimated Cost of
Restoration
(7)
(8)
Payloader/ Backhoe 1,000,000.00
Estimated
Duration of
Repair Works
(9)
14 C.D.
K0436+200;
K0436+500;
K0424+300;
K0436+700;
K0424+450;
K0438+850;
K0424+600;
(10)
K0439+500;
K0424+800;
Immediate rehabilitation to quickly restore mobility and K0448+000;
K0425+400;
ensure safety of the affected areas.
K0448+250;
K0430+600;
K0448+950;
K0432+600
Immediate rehabilitation to quickly restore mobility and K0453+450;
K0462+750;
ensure safety of the affected areas.
K0463+150;
Immediate rehabilitation to quickly restore mobility and K0463+200;
ensure safety of the affected areas.
K0463+300;
K0468+450
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
REMARKS
5,000,000.00
45 C.D.
21 C.D.
30 l.m.
1,000,000.00
30 C.D.
60 l.m.
5,000,000.00
64 C.D.
40 l.m.
850,000.00
24 C.D.
40 l.m.
1,100,000.00
26 C.D.
15 l.m.
750,000.00
22 C.D.
5,000,000.00
30 C.D.
100,000.00
14 C.D.
100,000.00
16 C.D.
6000 cu.m.
TOTAL
750,000.00
23 C.D.
1,000,000.00
26 C.D.
1,000,000.00
26 C.D.
23,150,000.00
LORETO B. DACOROON
Caretaker
ABRA
LOCATION
NAME OF ROAD/BRIDGES/
FC STRUCTURE
BARANGAY
( STATION Limits)
MUNICIPALITY/
CITY
PROVINCE
(4)
(5)
(1)
Abra-Ilocos Norte Road; K0424+300
to K0432+600 @ various sections
(2)
Abaquid/ Nagaparan Danglas
Nagaparan
San iSidro/
Lagangilang/ Baay-Licuan Abra
Nagtipulan/ Lenneng/
Tumalip/ Nalbuan
Deet
Tayum
Abra
Road Slip
Bonglo
Baay-Licuan
Abra
BilaBila
Sallapadan
Abra
BilaBila
Sallapadan
Abra
BilaBila
Sallapadan
Abra
Soil Collapsed
Bangbangcag
Bucay
Abra
San Isidro
Lagangilang
Abra
(3)
Danglas
Abra
Soil Collapse
Abra
Bangued/Pidigan
Abra
Sulvec
Pidigan
Abra
Garreta
Pidigan
Abra
Monggoc
Pidigan
Abra
Monggoc
Pidigan
Abra
Ubbog Lipcan
Bangued
Abra
Damaged pavement
NOTE: To be submitted within twelve (12) hours after calamity. Cost of priority I group should be those that can be funded by the immediate Resp
Prepared by:
EDWIN T. BRINGAS
Chief Maintenenance Section
End. "6"
BOM-SDMCD Form 2015-05
he Phillippines
Length/Area/
Volume of
Damage
(6)
4,072 cu.m.
Type/No. of
Equipment
Needed
Estimated Cost of
Restoration
REMARKS
(9)
14 C.D.
(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
5,000,000.00
45 C.D.
21 C.D.
30 l.m.
1,000,000.00
30 C.D.
60 l.m.
5,000,000.00
64 C.D.
40 l.m.
850,000.00
24 C.D.
40 l.m.
1,100,000.00
26 C.D.
200,000.00
7 C.D.
750,000.00
22 C.D.
5,000,000.00
30 C.D.
6000 cu.m.
15 l.m.
(7)
(8)
Payloader/ Backhoe 1,000,000.00
Estimated
Duration of
Repair Works
TOTAL
7 C.D.
100,000.00
14 C.D.
100,000.00
16 C.D.
750,000.00
23 C.D.
1,000,000.00
26 C.D.
200,000.00
14 C.D.
23,650,000.00
LORETO B. DACOROON
Caretaker
ABRA
NAME OF ROAD/BRIDGES/
STRUCTURE
LOCATION
FC
BARANGAY
MUNICIPALITY/
CITY
PROVINCE
( STATION Limits)
(1)
Abra-Ilocos Norte Road; K0434+480;
Nagaparan, Danglas, Abra
(2)
(3)
(4)
(5)
Nagaparan
Danglas
Abra
Rockslide
Nagaparan
Danglas
Abra
Road slip
Nagaparan
Danglas
Abra
Road slip
Nagaparan
Danglas
Abra
Landslide
Nagaparan
Danglas
Abra
Landslide
Nagaparan
Danglas
Abra
Landslide
Nagaparan
Danglas
Abra
Landslide
Nagaparan
Danglas
Abra
Landslide
Bagalay
Tayum
Abra
Road slip
Balais
Lagangilang
Abra
Road slip
San Isidro
Lagangilang
Abra
Road slip
San Isidro
Lagangilang
Abra
Road slip
ABRA
NAME OF ROAD/BRIDGES/
STRUCTURE
LOCATION
FC
BARANGAY
MUNICIPALITY/
CITY
PROVINCE
(2)
(3)
(4)
(5)
San Isidro
Lagangilang
Abra
Road slip
Bongol
Baay-Licuan
Abra
Road slip
Bongol
Baay-Licuan
Abra
Road slip
Bongol
Baay-Licuan
Abra
Road slip
Bongol
Baay-Licuan
Abra
Road slip
Bongol
Baay-Licuan
Abra
Road slip
Lenneng
Baay-Licuan
Abra
Road slip
Lenneng
Baay-Licuan
Abra
Road slip
Lenneng
Baay-Licuan
Abra
Road slip
Lenneng
Baay-Licuan
Abra
Road slip
Lenneng
Baay-Licuan
Abra
Road slip
Lenneng
Baay-Licuan
Abra
Road slip
( STATION Limits)
(1)
Abra-Kalinga Road; K0441+980
Abra-Kalinga Road; K0442+010
Abra-Kalinga Road; K0443+090
Abra-Kalinga Road; K0443+580
Abra-Kalinga Road; K0444+400
Abra-Kalinga Road; K0444+550
Abra-Kalinga Road; K0448+550
Abra-Kalinga Road; K0448+580
Abra-Kalinga Road; K0450+210
Abra-Kalinga Road; K0450+720
Abra-Kalinga Road; K0451+550
Abra-Kalinga Road; K0453+500
ABRA
NAME OF ROAD/BRIDGES/
STRUCTURE
LOCATION
FC
BARANGAY
MUNICIPALITY/
CITY
PROVINCE
(2)
(3)
(4)
(5)
Poblacion
Baay-Licuan
Abra
Road slip
Poblacion
Baay-Licuan
Abra
Road slip
Poblacion
Baay-Licuan
Abra
Road slip
Tumalip
Baay-Licuan
Abra
Road slip
Tumalip
Baay-Licuan
Abra
Road slip
Tumalip
Baay-Licuan
Abra
Road slip
Subagan
Baay-Licuan
Abra
Err:509
Nalbuan
Baay-Licuan
Abra
Landslide
Aguibo
Malibcong
Abra
Landslide
Aguibo
Malibcong
Abra
Landslide
Duldulao
Malibcong
Abra
Landslide
Duldulao
Malibcong
Abra
Landslide
( STATION Limits)
(1)
Abra-Kalinga Road; K0455+850
Abra-Kalinga Road; K0456+750
Abra-Kalinga Road; K0457+750
Abra-Kalinga Road; K0461+240
Abra-Kalinga Road; K0462+500
Abra-Kalinga Road; K0462+800
Err:509
Abra-Kalinga Road; K0468+150; Nalbuan,
Baay-Licuan, Abra
ABRA
NAME OF ROAD/BRIDGES/
STRUCTURE
LOCATION
FC
BARANGAY
MUNICIPALITY/
CITY
PROVINCE
( STATION Limits)
(1)
Abra-Kalinga Road; K0486+980; Gacab,
Malibcong, Abra
(2)
(3)
(4)
(5)
Gacab
Malibcong
Abra
Landslide
Gacab
Malibcong
Abra
Landslide
Gacab
Malibcong
Abra
Landslide
Gacab
Malibcong
Abra
Landslide
Gangal
Sallapadan
Abra
Collapsed Revetment
group should be those that can be funded by the immediate Response Fund and/or the Quick response Fund.
Prepared by:
EDWIN T. BRINGAS
Chief Maintenenance Section
End. "6"
BOM-SDMCD Form 2015-05
Length/Area/
Volume of
Damage
Type/No. of
Equipment
Needed
Estimated Cost of
Restoration
Estimated
Duration of
Repair Works
REMARKS
(6)
(7)
(8)
(9)
25 l.m.
Payloader/ Backhoe
200,000.00
21 D.C.
(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
20 l.m.
2,110,500.00
32 D.C.
7 l.m.
538,000.00
32 D.C.
220,000.00
21 D.C.
55 l.m.
50,000.00
7 D.C.
25 l.m.
75,000.00
7 D.C.
23 l.m.
290,000.00
21 D.C.
14 l.m.
160,000.00
21 D.C.
20 l.m.
375,000.00
14 C.D.
10 l.m.
309,000.00
14 C.D.
15 l.m.
690,000.00
17 C.D.
7 l.m.
350,000.00
14 C.D.
15 l.m.
Payloader/ Backhoe
End. "6"
BOM-SDMCD Form 2015-05
Type/No. of
Estimated Cost of
Restoration
Estimated
Duration of
Repair Works
(8)
(9)
12 l.m.
297,000.00
14 C.D.
(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
10 l.m.
555,000.00
16 C.D.
15 l.m.
500,000.00
15 C.D.
5 l.m.
133,000.00
12 C.D.
10 l.m.
998,000.00
20 C.D.
12 l.m.
260,000.00
13 C.D.
6 l.m.
285,000.00
13 C.D.
7 l.m.
275,000.00
13 C.D.
7 l.m.
177,000.00
13 C.D.
16 l.m.
365,000.00
14 C.D.
8 l.m.
162,000.00
13 C.D.
8 l.m.
196,000.00
13 C.D.
Length/Area/
Volume of
Damage
(6)
Equipment
Needed
(7)
REMARKS
End. "6"
BOM-SDMCD Form 2015-05
Type/No. of
Estimated Cost of
Restoration
Estimated
Duration of
Repair Works
(8)
(9)
17 l.m.
1,614,000.00
30 C.D.
(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
12 l.m.
270,000.00
14 C.D.
25 l.m.
841,000.00
16 C.D.
16 l.m.
508,000.00
16 C.D.
14 l.m.
348,000.00
16 C.D.
8 l.m.
293,000.00
16 C.D.
18 l.m.
Err:509
Err:509
30 l.m.
750,000.00
21 C.D.
10 l.m.
100,000.00
14 C.D.
40 l.m.
750,000.00
21 C.D.
25 l.m.
250,000.00
18 C.D.
15 l.m.
75,000.00
7 C.D.
Length/Area/
Volume of
Damage
(6)
Equipment
Needed
(7)
REMARKS
End. "6"
BOM-SDMCD Form 2015-05
Type/No. of
Estimated Cost of
Restoration
Estimated
Duration of
Repair Works
(8)
(9)
20 l.m.
75,000.00
7 C.D.
(10)
Immediate rehabilitation to quickly restore mobility and
ensure safety of the affected areas.
15 l.m.
100,000.00
7 C.D.
55 l.m.
200,000.00
18 C.D.
10 l.m.
50,000.00
7 C.D.
90 l.m.
4,180,000.00
32 C.D.
Length/Area/
Volume of
Damage
(6)
Equipment
Needed
(7)
TOTAL
Err:509
Submitted by:
LORETO B. DACOROON
Caretaker
REMARKS
ABRA-DEO
NAME OF PROJECT/LOCATION
TYPE OF
DESCRIPTION OF EXTENT
INFRASTRUCTURE
OF DAMAGED
Stone Masonry
Stone Masonry
Rockslide
Road slip
Road slip
Landslide
Landslide
Landslide
Landslide
Landslide
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
slip
slip
slip
slip
slip
slip
slip
slip
slip
slip
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Stone
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Masonry
Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
Road
slip
slip
slip
slip
slip
slip
slip
slip
slip
slip
slip
slip
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
Landslide
GABION
Collapsed Revetment
Inspected by:
1. POW
2. BP 202
Priority
Priority
Priority
Priority
Guiude
I
II
III
3. Captioned Pictures
Engineer II
Involves iummediate rehabilitation of collapsed bridges, cut road section, breach seawalls and dikes to quickly restore mo
Involves ordinary repair works such as patching potholes,resurfacing of washed out roads and slightly destroyed flood co
Involves minor repair work and/or improvement to prevent further deterioration
End. "9"
JUSTIFICATION
to restore the road to prevent further damage and ensure road
safety within the section.
21 D.C.
32 D.C.
32 D.C.
21 D.C.
7 D.C.
7 D.C.
21 D.C.
21 D.C.
200,000.00
2,110,500.00
538,000.00
220,000.00
50,000.00
75,000.00
290,000.00
160,000.00
to restore the road to prevent further damage and ensure road
safety within the section.
14
14
17
14
14
16
15
12
20
13
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
375,000.00
309,000.00
690,000.00
350,000.00
297,000.00
555,000.00
500,000.00
133,000.00
998,000.00
260,000.00
13
13
13
14
13
13
30
14
16
16
16
16
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
C.D.
285,000.00
275,000.00
177,000.00
365,000.00
162,000.00
196,000.00
1,614,000.00
270,000.00
841,000.00
508,000.00
348,000.00
293,000.00
750,000.00
100,000.00
750,000.00
250,000.00
75,000.00
75,000.00
100,000.00
200,000.00
50,000.00
21 C.D.
14 C.D.
21 C.D.
18 C.D.
7 C.D.
7 C.D.
7 C.D.
18 C.D.
7 C.D.
4,180,000.00
19,974,500.00
Assessed by:
Submitted by:
EDWIN T. BRINGAS
LORETO B. DACOROON
Caretaker
awalls and dikes to quickly restore mobility and ensure the safety of the affected areas.
oads and slightly destroyed flood control structures.
(1)
BARANGAY
MUNICIPALITY/
CITY
PROVINCE
(2)
(3)
(4)
NOTE:
To be submitted within twelve (12) hours after calamity. Cost of priority I group should be thoser that can be fund
Prepared by:
DANILO O. MESINA
Chief Maintenenance Section
the Phillippines
WORKS AND HIGHWAYS
FRA(with Detailed Information)
DESCRIPTION OF THE
EXTENT OF DAMAGE
(5)
Length/Area/
Volme of
Damage
Type/No. of
Equipment
Needed
ESTIMATED COST OF
RESTORATION
ESTIMATED
DURATION
OF REPAIR
WORKS
(6)
(7)
(8)
(9)
be thoser that can be funded by the immediate Response Fund abd/or the Quick response Fund.
enance Section
Submitted by:
DAVID A. BULIYAT
District Engineer
End. "6"
BOM-SDMCD Form 2015-05
REMARKS
(10)
2/1/2015
(DAY 1)
1/31/2015
3 AM
4 AM
5 AM
OCCURRENCE OF CALAMITY
2 AM
6 AM
7 AM
8 AM
9 AM
10 AM
1 AM
12AM
Form
Form
Form
Form
Form
Form
2015-01
2015-02
2015-03
2015-04
2015-05
2015-06
11 AM
2/1/2015
(DAY 1)
2 PM
3 PM
4 PM
5 PM
6 PM
7 PM
8 PM
9 PM
1 PM
12 AM
End. "10"
2/2/2015
( DAY 2)
11 PM