May, 2016
Contents
Generation Mix ............................................................................................................................................ 3
Monthly Dispatch from all Generation Units (May, 2016) .......................................................................... 4
Generation of Power Plants During last 12 months .................................................................................... 5
Share of Cost Vs Share of Energy for May 2016 ........................................................................................ 19
Reservoir Storage Levels - May 2016 ......................................................................................................... 20
Comparison with past years- Total Reservoir Storage Levels from 1st January ........................................ 21
System Inflow - May 2016.......................................................................................................................... 22
Demand Variation - May 2016 ................................................................................................................... 23
Load Curve for 05th May 2016 (Highest Night Peak Recorded during the month) .................................... 24
Comparison of Cumulative Generation Mix from 1st January to 31st May ................................................ 25
Comparison of Cumulative Generation from 1st January to 31st May ....................................................... 26
Generation Capacity Variation - May 2016................................................................................................ 27
Daily Variation of Generation Mix May, 2016 ........................................................................................... 28
Variation of Generation Mix - last 12 months ........................................................................................... 29
Generation Mix
May, 2016 in GWh
28.6
3%
126.5
12%
347.4
33%
CEB Hydro
CEB Thermal Oil
376.3
36%
160.8
16%
CEB Coal
IPP Thermal
SPP Wind
953.8
17%
1,633.5
29%
CEB Hydro
CEB Thermal Oil
CEB Coal
885.0
15%
1,918.8
34%
IPP Thermal
NCRE
Excluding contribution from Mini-hydro, solar and Bio-mass plants during April and May
Capacity (MW)
50
53.5
60
116
75
Generation (MWh)
Plant factor (%)
8,067
21.7%
26,688
67.0%
4,680
10.5%
33,341
38.6%
31,509
56.5%
Kotmale
Victoria
Randenigala
Rantambe
Ukuwela
Bowatenna
Upper Kotmale
201
210
122
49
40
40
150
29,130
37,934
30,815
14,757
9,974
6,500
45,534
19.5%
24.3%
33.9%
40.5%
33.5%
21.8%
40.8%
Samanalawewa
Kukule
Inginiyagala
Udawalawe
Nilambe
120
70
11.25
6
3.2
22,213
37,496
5,649
2,860
299
24.9%
72.0%
67.5%
64.1%
12.5%
Puttalam Coal I
Puttalam Coal II
Puttalam Coal III
285
285
285
186,499
189,809
0.0%
88.0%
89.5%
Uthura Janani
Sapugaskanda B
Sapugaskanda A
Barge CEB
KCCP
KPS GT 7
KPS Small GTs
26.01
69.6
69.6
60
161
113
65.2
7,158
32,266
17,615
28,902
63,722
9,980
1,183
37.0%
62.3%
34.0%
64.7%
53.2%
11.9%
2.4%
50.8
30
270
163
100
11,369
39,302
50,655
27,162
30.1%
0.0%
19.6%
41.8%
36.5%
Asia Power
Northern Power
Westcoast
SOJITZ - Kelanitissa
ACE Embilipitiya
GWh
24.33
25
20
16.05
15
11.84
10.42
10
7.05
7.39
7.38
6.96
8.067
6.82
4.50
5
2.19
0
GWh
40
37.17
36.44
35
29.031
30
27.03
26.69
25
20.82
20.24
15
18.43
18.127
20
13.90
10
5
0
17.68
16.58
GWh
20
17.68
18
16
14.62
14
12
14.62
12.83
10
9.00
8.29
7.31
7.279
11.36
10.80
10.22
4.68
4
2
0
GWh
60
54.19
47.16
50
40
49.14
44.25
38.06
36.58
32.11
31.38
34.07
32.26
30
20
10
0
36.54
33.34
GWh
42.96
45
40
42.59
36.49
33.45
35
30
27.42
23.33
25
25.22
25.93
32.16
31.51
25.43
22.65
20
15
10
5
0
90
80
70
65.59
59.97
60
50
39.56
40
30
33.84
29.13
28.45
22.92
22.21
21.18
20
15.6
10
1.58
0
GWh
160
143.38
140
120
102.01
100.65
100
80
71.30
62.47
60
51.24
49.47
40.09
34.12 37.93
40
16.67 17.88
20
0
GWh
100
87.09
90
80
66.32
70
60
50
40
30
37.37
30.32 30.14
22.86
30.82
18.66
20
10
32.48
5.10
10.05
23.15
GWh
40
37.95
35
30.48
30
23.67
25
20
15
13.20
15.15
12.12
10.59
14.76
10.31
8.09
10
9.12
3.89
5
0
GWh
25
20
19.27
15
13.24
10
12.90
13.65
9.97
9.17
8.39
6.29
4.68
4.54
GWh
18
15.09
15
11.37
12
9
6.50
5.35
4.79
4.01
2.30
2.29
1.35
0.52
0.73
0.00
GWh
87.40
90
76.35
80
70
60
53.33
45.53
50
40.28
40
30
33.93
27.75
26.40
24.64
20
10.84
10
0
10
8.77
10.07
GWh
70
59.65
60
52.68
49.38
50
40
38.18
35.2
33.77
29.87
29.11
30
22.21
16.51
20
17.75
10.71
10
0
GWh
50
46.62
45
38.11
40
40.19
37.5
35
29.92
30
25
28.34
27.31
22.76
20
13.75
15
10
13.32
6.62
5
0
11
5.33
GWh
6.58
5.96
5.96
5.65
5.23
5
4.18
4
3.02
3
2.05
2
1.35
1.50
1.07
0.86
1
0
GWh
2.86
2.77
2.86
2.86
2.56
2.19
2
1.91
1.71
1
0.52
0.39
0.00
0.02
12
GWh
2.5
2.08
2.16
2.0
1.5
1.25
0.99
1.0
0.58
0.5
0.47
0.28
0.22
0.11
0.30
0.30
0.16
0.0
GWh
7.00
6.38
6.00
5.00
4.00
3.00
1.88
2.00
1.71
1.18
1.00
0.09
0.00
0.00
0.15
0.02
0.25
0.00
13
0.39
0.10
GWh
60
56.62
50
40
34.56
30
21.39
20
11.02
10
9.98
6.16
0.08
1.55
0.49
0.26
1.47
2.07
GWh
100
90.42
99.25
95.11
90
80
72.86
72.12
70
63.72
60
50
40
30
20
10
0.55
14
0.00
0.00
0.00
GWh
40
36.45
33.33
35
30
25.696
25
20
22.73
23.49
23.58
19.97
18.41
17.62
16.34
13.13
15
10
6.35
5
0
GWh
39.23
40
39.38
38.04
33.05
35
29.35
30
25.39
25
19.69
20
15
10.85
10
5
0.02
0
15
32.27
GWh
14
12
12.23
11.69
10.94
11.49
11.26
10.81
10
7.33
8
6
7.16
4.79
4.14
4
1.42
1.39
GWh
45
41.58
39.32
40
35
32.04
28.90
30
25
20
17.49
19.66
15.41
15
10
5
0
Note: The Power plant was operated as an IPP power plant (Colombo Power) until end of the Power Purchase
Agreement in June 2015. The same is operated by CEB since December 2015
16
GWh
450
400
294.79
376.31
342.73
329.78
350
300
405.07 399.53
395.12
380.34 374.21
282.95
256.54
251.35
250
200
150
100
50
0
GWh
30
24.17
25
20
18.35
18.18
16.70
15
14.49
14.30
13.02
10.97
10
5
3.03
1.76
17
1.96
11.37
GWh
120.00
103.14
100.00
88.75
84.89
77.82
80.00
88.71
79.76
60.00
50.66
40.00
32.60
22.24
20.00
10.60
0.00
1.73
0.00
GWh
160
159.23
144.53
140
120
110.43
100
83.19
79.25
80
60
84.83
57.14
39.3
40
21.88
20
0.37
0
18
GWh
31.00
30.38
30.00
29.00
28.00
27.16
27.00
26.00
25.00
Northern Power
Power plant is not available from February 2015 due to a court order
100%, 100%
97%, 93%
90%
92%, 81%
80%
70%
60%
50%
80%, 45%
40%
30%
71%, 25%
77%, 38%
75%, 34%
72%, 26%
20%
53%, 12%
10%
0%
0%
34%, 0%
20%
34%, 0%
40%
60%
80%
100%
Note: excluding generation and cost of Wind, Mini Hydro, Solar and Biomass power plants
19
120%
1200
GWh
1000
800
Samanalawewa
Randenigala
Victoria
600
Kotmale
Maussakelle
Castlereigh
400
200
0
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
20
Comparison with past years- Total Reservoir Storage Levels from 1st January
GWh
1200
1000
800
2012
2013
2014
600
2015
2016
400
200
21
100.0
92.9 93.8
80.0
60.0
59.7
54.4
49.2
40.0
33.1
30.7
22.5 24.1
20.0
6.0 6.8 5.9 6.1 5.8
10.6 11.4
15.0
11.8
26.0
20.5
29.3
25.4
28.4
19.8
16.5
15.9
11.8
0.0
1
10
11
12
13
14
15
16
22
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Nigh Peak
1000
Day Peak
800
Minimum
Demand
600
400
200
th
23
31-May
30-May
29-May
28-May
27-May
26-May
25-May
24-May
23-May
22-May
21-May
20-May
19-May
18-May
17-May
16-May
15-May
14-May
13-May
12-May
11-May
10-May
9-May
8-May
7-May
6-May
5-May
4-May
3-May
2-May
1-May
Load Curve for 05th May 2016 (Highest Night Peak Recorded during the month)
MW
2400
2100
1800
1500
CEB Hydro
IPP Thermal
1200
CEB
Thermal Oil
CEB Coal
900
600
300
Time of Day
Note: Contribution from Wind, Mini Hydro, Solar and Biomass is not included
24
4,000
65.14
953.82
262.70
1799.22
2287.20
1918.77
SPP Wind
IPP
3,000
CEB Coal
1109.36
235.10
2,000
885.02
CEB Oil
CEB Hydro
963.18
2036.63
1,000
1633.49
911.17
0
2014
2015
2016
Year
6000
5000
4000
2014
3000
2015
2016
2000
1000
Note: Generation from SPP Mini Hydro, Solar and Biomass is not included
26
3500
Reserve Margin
MW
100%
95.3%
90%
88.3%
3000
80%
76.0%
74.9%
72.3%
2500
67.2%
71.9%
67.9%
1500
46.0%
41.6%
41.9%
40.7%
34.0%
50.1% 50%
47.0%
Available
Capacity at
Night Peak
40%
Night Peak
39.4%
36.6%
32.6%
30.5%
30%
20%
500
10%
0
0%
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
27
Installed
Capacity
60%
59.4%
56.9%
51.4%
47.2%
45.3%
46.5%
31.7%
1000
66.0%
62.3%
63.1%
59.3%
2000
47.6%
70%
Reserve Margin
at Night Peak
(%)
28
31-May
30-May
29-May
28-May
27-May
26-May
25-May
24-May
23-May
22-May
21-May
20-May
19-May
18-May
17-May
16-May
15-May
14-May
13-May
12-May
11-May
10-May
9-May
8-May
7-May
6-May
5-May
4-May
3-May
2-May
1-May
GWh
45
40
35
SPP Wind
30
IPP Thermal
25
20
CEB Coal
15
CEB
Thermal Oil
10
CEB Hydro
600
500
400
CEB Hydro
CEB Thermal Oil
300
CEB Coal
IPP Thermal
Renewable
200
100
Note: Generation from Mini Hydro, Solar and Biomass power plants are not included in Renewable generation figures of April, 2016 and May, 2016.
29