ADMINISTRACIN NACIONAL DE ELECTRICIDAD

Direccin de Planificacin General y Poltica Empresarial (DP)


Divisin de Estudios Energticos (DEE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

PLAN MAESTRO

DE

GENERACIN

PERIODO: 2014 2023


ENERO 2014

TRANSMISIN

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

PLAN MAESTRO DE GENERACIN Y TRANSMISIN (2014 - 2023)


TABLA DE CONTENIDOS

1.

RESUMEN EJECUTIVO .................................................................................................................................. 4


1.1
1.2
1.3
1.4
1.5
1.6

OBRAS DE GENERACIN................................................................................................................................. 6
OBRAS DE TRANSMISIN................................................................................................................................ 6
OBRAS DE AMPLIACIN Y CONSTRUCCIN DE SUBESTACIONES ..................................................................... 9
OBRAS DE COMPENSACIN .......................................................................................................................... 11
RESUMEN DE CAPACIDAD INSTALADA Y EXTENSIN DE LNEAS PREVISTAS ................................................. 11
INVERSIONES REQUERIDAS .......................................................................................................................... 12

2.

INTRODUCCIN ............................................................................................................................................ 14

3.

CRITERIOS TCNICOS ................................................................................................................................ 15


3.1
3.2
3.3
3.4
3.5

4.

PREMISAS BSICAS ..................................................................................................................................... 19


4.1
4.2
4.3
4.4

5.

MARGEN DE RESERVA DE GENERACIN DE ENERGA ELCTRICA ................................................................. 15


PERFIL DE TENSIONES .................................................................................................................................. 16
CARGA EN LNEAS DE TRANSMISIN ............................................................................................................ 16
CARGA EN TRANSFORMADORES................................................................................................................... 17
MARGEN DE CARGA Y ESTABILIDAD DE TENSIN......................................................................................... 17

GENERACIN ............................................................................................................................................... 19
DEMANDA NACIONAL .................................................................................................................................. 19
PROYECCIN DE CARGAS Y FACTOR DE POTENCIA POR SUBESTACIONES ..................................................... 21
EXPORTACIN ............................................................................................................................................. 21

CONFIGURACIONES TOPOLGICAS ...................................................................................................... 23


5.1
5.2

CONFIGURACIN DE CORTO PLAZO ............................................................................................................. 23


CONFIGURACIN DE MEDIO PLAZO ............................................................................................................. 23

6.

CRONOGRAMA DE OBRAS DE GENERACIN Y TRANSMISIN..................................................... 24

7.

ANLISIS GENERAL DEL PERIODO ........................................................................................................ 25


7.1
7.2
7.3
7.4

8.

ANLISIS POR SISTEMAS ........................................................................................................................... 42


8.1
8.2
8.3
8.4
8.5
8.6

9.

ANLISIS DEL SIN EN CONDICIONES NORMALES ......................................................................................... 25


ANLISIS DE CONTINGENCIAS DEL SIN ....................................................................................................... 34
EVALUACIN DE PRDIDAS DE TRANSMISIN .............................................................................................. 39
INTERCONEXIN CON LAS CENTRALES HIDROELCTRICAS BINACIONALES ................................................. 40

SISTEMA CENTRAL ...................................................................................................................................... 42


SISTEMA SUR ............................................................................................................................................... 44
SISTEMA ESTE ............................................................................................................................................. 46
SISTEMA METROPOLITANO .......................................................................................................................... 49
SISTEMA NORTE .......................................................................................................................................... 52
SISTEMA OESTE ........................................................................................................................................... 54

OTROS PLANES DE EXPANSIN DEL SISTEMA ELCTRICO .......................................................... 56


9.1
9.2

PLANES DE GENERACIN ............................................................................................................................. 56


PLAN DE INVERSIN EN REDES DE TRANSMISIN DE 500KV ....................................................................... 58

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 2

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

10.
A.1
A.2
A.3
A.4
A.5
A.6
A.7
A.8

ANEXOS ........................................................................................................................................................ 61
INTERCONEXIONES INTERNACIONALES Y SISTEMAS REGIONALES DEL SISTEMA INTERCONECTADO NACIONAL
LISTADO DE OBRAS SUBSISTEMAS DEL SISTEMA INTERCONECTADO NACIONAL
MAPAS ELCTRICOS
PROYECCIN DE CARGAS POR BARRA PARA EL PERIODO 2012 2021
BALANCE DE GENERACIN Y DEMANDA DEL SISTEMA
LONGITUD DE LNEA Y CAPACIDAD INSTALADA EN SUBESTACIONES
DIAGRAMAS DE FLUJOS DE POTENCIA Y TENSIONES DE BARRAS POR AO
DIAGRAMAS UNIFILARES DEL SIN

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 3

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

1.

RESUMEN EJECUTIVO

El Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo para el periodo 2014-2023
presenta una sntesis de los estudios tcnicos de planificacin realizados con vistas a determinarel
conjunto de obras necesarias en el Sistema Interconectado Nacional (SIN), de forma a acompaar el
crecimiento de la demanda, para proveer un servicio en condiciones tcnicamente aceptables de acuerdo a
los criterios y premisas de planificacin adoptados.
Como resultado de los estudios tcnicos, se obtiene el Plan de Obras de Generacin y Transmisin para la
prxima dcada, en el cual se plasman las necesidades del sistema. Debido a la coyuntura nacional, el
Plan se centra fundamentalmente en las obras de refuerzo que permiten atender el crecimiento de la
demanda, quedando en un segundo plano aquellas obras que apunten exclusivamente a un aumento en la
confiabilidad del suministro de la energa elctrica.
Si bien la definicin de un Plan de Obras se ve influenciado por diversos factores, como ser:
configuraciones topolgicas consideradas, requerimientos de confiabilidad, calidad y disponibilidad de
fuentes de generacin, entre otros, el factor de mayor preponderancia es el escenario de crecimiento de la
demanda. En este sentido, el Plan Maestro de Corto y Medio Plazo es desarrollado en base a la adopcin
de un escenario de mercado de energa elctrica con una tasa de crecimiento promedio de 9,1 % en el
periodo, conforme a la recomendacin del ESTUDIO DE MERCADO ELCTRICO NACIONAL,
PROYECCIN 2013-2023, elaborado por el Departamento de Estudios de Tarifas y Mercado, y
aprobado por Resolucin P/N 33.429 de la ANDE, en fecha 01/08/2013.
Cabe acotar que dicha tasa o porcentaje de crecimiento, se refiere al asociado nicamente al mercado
nacional sin considerar la insercin al SIN de futuras nuevas industrias electrointensivas (IEI). Con la
inclusin de las mismas, dicho porcentaje de crecimiento corresponde al 9,84 %, el cual fue finalmente
utilizado para el dimensionamiento del SIN.
Dichos escenarios han sido adoptados considerando el crecimiento tendencial de 9,4% de los ltimos 5
aos y 7,1 % en los ltimos 10 aos, la influencia de las altas temperaturas de los ltimos aos en los
hbitos de consumo de los clientes, la demanda insatisfecha por restricciones de transformacin,
transmisin y distribucin de la energa elctrica, as como la necesidad de planificar con ciertos
mrgenes de seguridad.
En el escenario seleccionado PIB Alto I (con alto crecimiento industrial) se considera que el pas ha
iniciado un proceso de industrializacin, y que despus de muchas dcadas de estancamiento del sector,
habra una ruptura del modelo tradicional. El Gobierno nacional ha anunciado el procesamiento del 50%
de la soja producida en el Pas a partir del 2013.
Asimismo, al crecimiento sostenido de la inversin bruta de capital en los ltimos aos se debe sumar el
impacto econmico de la incorporacin de pequeas industrias electrointensivas (en total alrededor de
250 MW; 2.200 GWh, conforme al Decreto N 7406) que se estn instalando en el pas.
La recuperacin de las expectativas del sector privado, el crecimiento de la clase media alrededor del 50%
en los ltimos 10 aos, la inversin pblica en infraestructura, la construccin masiva de grandes
shoppings y hoteles, asimismo, el continuo crecimiento del sector financiero nacional (alrededor del 12%
anual en los ltimos 5 aos), constituyen factores significativos para plantear un elevado crecimiento del
producto interno bruto en la prxima dcada.
A los factores mencionados, debemos agregar los diversos proyectos de parques industriales que se
planean instalar en el pas en determinadas regiones como: Hernandarias, Villa Hayes, Villeta, Itapa,
Pedro Juan Caballero, Concepcin, entre otros.
Es tambin importante resaltar nuevamente, que el Plan de Obras presentado constituye un conjunto de
obras requeridas para atender al mercado elctrico nacional as como tambin a algunas industrias
electrointensivas (IEI), las cuales ya poseen contrato firmado con ANDE y con plazos de aumentos
graduales en sus potencias contratadas, conforme al Decreto 7406. En la tabla a seguir se presentan y el
cronograma de implementacin de la demanda total de las industrias Electrointensivas, conforme al
Decreto 7406.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 4

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Demanda de IEI
Demanda de potencia (MW)
Energia (GWh)

2014
0
0

2015
122
1.120

2016
174
1.603

2017
213
1.961

2018
239
2.202

2019
263
2.414

2020
263
2.414

2021
263
2.414

2022
263
2.414

2023
263
2.414

Observaciones:
El cronograma de potencia demandada por las industrias fue realizado en base a informaciones suministradas por las mismas, y los valores
mximos indicados corresponden a las demandas anuales finales de las Industrias. As mismo las cinco IEI modularn su potencia contratada en
todas las fases al 25%, es decir desconectarn su potencia contratada en un 75% en el horario de punta del SIN. Se ha incluido en la demanda de
IEI las prdidas de transmisin ocasionadas, que promedian un 5%.

La posibilidad de aumentos considerables en los intercambios energticos con otros pases de la regin
deber ser analizada en estudios especficos, para cada caso.
El estudio presentado se basa en un anlisis de rgimen permanente, es decir, en simulaciones de flujo de
potencia, tomndose como premisa principal de planificacin el suministro de la demanda total
proyectada sin violaciones a los criterios de tensin y de cargas en lneas de transmisin y equipos de
transformacin ante condiciones normales de operacin del Sistema (Red Completa).
Se evalan tambin condiciones de emergencia, considerndose el Criterio N 1 o contingencia simple,
en el que se supone la prdida de un solo elemento del sistema por vez (Red Incompleta o Alterada). Las
contingencias son analizadas principalmente en los corredores de transmisin en 220 y 500 kV, de forma
a estimar el desempeo del Sistema ante las mismas, y dependiendo de la severidad de estas, evaluar la
necesidad de introduccin de obras de refuerzo. Dicho anlisis es limitado al tronco principal de
transmisin del SIN, donde se tiene algn tipo de redundancia, y la magnitud de carga potencialmente
afectada es mayor.
Para el periodo 2014-2023 se requeriran un total de 236 obras, discriminadas en la tabla abajo de la
siguiente manera:
Obras de Generacin
Repotenciacin de generacin
existente
Construccin de nuevas centrales

Obras en Subestaciones
Ampliaciones de capacidad de
transformacin existentes
Nuevas subestaciones:
500 kV
220 kV
66 kV

4
1

Obras en Lneas de Transmisin


Recapacitacin de lneas
27
existentes
Nuevas lneas de transmisin:
500 kV
6
220 kV
26
66 kV
15

Obras de Compensacin Reactiva

118
3
26
9

Plan Maestro de Generacin y Transmisin (2014 2023)

Compensacin en 220 kV

Compensacin en 23 kV

113

Pg. 5

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

1.1

Obras de generacin

Las obras de generacin contempladas incluyen la finalizacin de los trabajos de adecuacin,


modernizacin y repotenciacin de los Grupos 3 y 4 de la Central Hidroelctrica de Acaray para el ao
2014. Para el ao 2015, se prev la culminacin de trabajos similares en los Grupos 1 y 2 de dicha
Central.
La obra de generacin ms importante contemplada en el periodo es la maquinizacin de la presa Yguaz,
con puesta en servicio prevista para el ao 2018, con dos unidades generadoras de 100 MW cada una,
para la generacin en horario de punta, con una energa anual de 184 GWh.
Los trabajos previstos en ambas centrales son de suma importancia ya que los mismos permiten optimizar
la contratacin de energa de las Centrales Binacionales y los costos de generacin de la ANDE,
asegurando el Margen de Reserva de Generacin hasta el ao 2023.
No obstante a partir del ao 2025 se estara teniendo dficit en el Margen de Reserva de Generacin, por
lo que las construcciones de obras adicionales de Generacin deberan ser iniciadas durante el periodo del
Plan Maestro actual, esto se puede apreciar en el siguiente grfico.

1.2

Obras de transmisin

1.2.1

Red de 500 kV

El Plan de Obras incluye conjunto de obras de 500 kV de gran envergadura, necesarias para satisfacer la
demanda analizada, atendiendo fundamentalmente el mercado local. As, en el periodo se requiere la
construccin de las siguientes obras:

LT 500 kV Yacyret Ayolas, segunda lnea (16 km), con una capacidad de 2000 MVA, (ao
2016).

LT 500 kV Ayolas Villa Hayes (347 km) con una capacidad de 2000 MVA, y ampliacin de la
Subestacin Villa Hayes con la instalacin de un banco de transformadores de 500/220 kV - 600
MVA adicional (ao 2016).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 6

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

LT 500 kV Margen Derecha Los Cedrales (25 km) con una capacidad de 2000 MVA, y
Subestacin Los Cedrales 500 kV con una capacidad de transformacin 500/220 kV inicial de 2 x
600MVA, totalizando 1200 MVA (ao 2017).

LT 500 kV Ayolas Trinidad II (129 km) con una capacidad de 2000 MVA, y la Subestacin
Trinidad II 500 kV con una capacidad de transformacin 500/220 kV inicial de 600 MVA (ao
2017)

Seccionamiento de la LT 500 kV Ayolas Villa Hayes y construccin de la Subestacin Eusebio


Ayala 500 kV con una capacidad de transformacin 500/220 kV inicial de 600 MVA (ao 2018).
Seccionamiento de la LT 220 kV doble terna Coronel Oviedo Guarambar.

LT 500 kV Margen Derecha Villa Hayes, segunda lnea (348 km) con una capacidad de 2000
MVA. (ao 2019).

Subestacin Villa Hayes, montaje del cuarto banco de autotransformadores 500/220 kV - 600 MVA
adicional (ao 2020).

Subestacin Eusebio Ayala, montaje del segundo banco de autotransformadores 500/220 kV - 600
MVA adicional (ao 2020).

Subestacin Ayolas, montaje del tercer banco de autotransformadores 500/220 kV - 375 MVA (ao
2020).

LT 500 kV Ayolas Eusebio Ayala, segunda lnea (225 km) con una capacidad de 2000 MVA. (ao
2022).

Subestacin Carayao, construccin de patio en 500 kV y montaje de dos bancos de


autotransformadores con una capacidad de transformacin 500/220 kV inicial de (2 x 600) MVA,
totalizando 1200 MVA (ao 2023).

Lnea 500 kV Margen Derecha Carayao (210 km), con una capacidad de 2000 MVA, y posicin
correspondiente. Adems, seccionamiento de la segunda lnea de 500 kV Margen Derecha - Villa
Hayes en la Subestacin Carayao (ao 2023).

1.2.2

Red de 220 kV

El Plan de Obras incluye conjunto de nuevas lneas de 220 kV, que pueden ser consideradas estructurales,
ya que modifican sustancialmente la operacin del sistema de transmisin, proveyendo un aumento
importante en la confiabilidad y flexibilidad del sistema. En este sentido se pueden mencionar como
necesarias las siguientes obras de construccin y repotenciacin:

Construccin
Sistema Central

LT 220 kV doble terna Caraya San Estanislao (47 km) (ao 2022).

Sistema Sur

LT 220 kV alimentacin a Cambyret doble terna a partir del seccionamiento de la LT 220 kV


Coronel Bogado Trinidad (25 km) (ao 2014).

LT 220 kV simple terna Ayolas Coronel Bogado (65 km) (ao 2015).

LT 220 kV simple terna Coronel Bogado Trinidad (53 km) (ao 2015).

LT 220 kV simple terna Santa Rita Mara Auxiliadora (110 km) (ao 2017).

LT 220 kV simple terna Villalbn Villeta II (200 km) (ao 2020).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 7

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Sistema Este

LT 220 kV simple terna Itakyry Catuet Salto del Guair (145 km) (ao 2014).

LT 220 kV Acaray Microcentro (5,4 km doble terna (area) y 1,3 km simple terna subterrnea)
(ao 2015).

LT 220 kV doble terna Acaray Pte. Franco (10 km) (ao 2015).

LT 220 kV simple terna Kilmetro 30 Santa Rita (45 km) (ao 2016).

LT 220 kV doble terna Margen Derecha Itakyry (71 km) (ao 2017).

LT 220 kV doble terna Los Cedrales Pte. Franco (10 km) (ao 2017).

LT 220 kV doble terna Pte. Franco Paranamb (39 km) (ao 2017).

Sistema Metropolitano

LT 220 kV doble terna Villa Hayes Puerto Sajonia (25 km) (ao 2014).

LT 220 kV simple terna San Lorenzo Barrio Molino (10 km) (ao 2015).

LT 220 kV doble terna Limpio Luque San Lorenzo (25 km) (ao 2016).

LT 220 kV doble terna Villa Hayes Puerto Botnico (18 km) e instalacin de conductores desde la
subestacin Puerto Botnico hasta la subestacin Parque Caballero (7,5km) (ao 2016).

LT 220 kV simple terna Guarambar Villeta II (12 km) (ao 2017).

LT 220 kV simple terna San Lorenzo Villa Aurelia (8,5 km) tramo areo y (2,3 km) tramo
subterrneo (ao 2017).

Sistema Norte

LT 220 kV simple terna Itakyry Curuguaty Capitn Bado Cerro Cor (330 km) (ao 2014).

LT 220 kV simple terna Horqueta Concepcin II (45 km) (ao 2016).

LT 220 kV simple terna Cruce Bella Vista Bella Vista Norte (80 km) (ao 2016)

LT 220 kV simple terna Villa Hayes Concepcin II (200 km) (ao 2019).

Sistema Oeste

LT 220 kV simple terna Concepcin II Pozo Colorado Loma Plata (280 km) (ao 2021).

LT 220 kV simple terna Vallem II Toro Pampa (130 km) (ao 2021).

Repotenciacin
Sistema Central

LT 220 kV Caraya - San Estanislao repotenciacin de 47 km de 210 para 270 MVA. (ao 2014).

LT 220 kV San Estanislao Santa Rosa repotenciacin de 96 km de 210 para 270 MVA. (ao 2014).

LT 220 kV Cnel. Oviedo Cnel. Oviedo II repotenciacin de 48 km de 210 para 350 MVA. (ao
2022).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 8

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Sistema Sur

LT 220 kV San Patricio - Cnel. Bogado repotenciacin de 64 km de 165 para 250 MVA. (ao 2014)

LT 220 kV Ayolas - San Patricio repotenciacin de 43 km de 250 para 375 MVA. (ao 2017)

LT 220 kV Ayolas - Villalbn repotenciacin de 121 km de 210 para 350 MVA. (ao 2020)
1.3

Obras de ampliacin y construccin de subestaciones

El Plan de Obras incluye importante nmero de nuevos centros de distribucin, los cuales se resumen a
continuacin:
Sistema Central

Barrio San Pedro: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2015).

Vaquera: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2015).

Coronel Oviedo II: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2019).

Sistema Sur

Cambyret: subestacin 220/66/23 kV, con capacidades de transformacin 220/66 kV- 60 MVA y
220/23 kV - 41,67 MVA (ao 2014).

Fram: subestacin 66/23 kV, con una capacidad de 30 MVA (ao 2016).

Mara Auxiliadora: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2017).

Costanera: subestacin 66/23 kV, con una capacidad de 60 MVA (ao 2019).

Yuty: subestacin 66/23 kV, con una capacidad de 30 MVA (ao 2020).

Pilar II: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2021).

Sistema Este

Ciudad del Este: subestacin 66/23 kV, con una capacidad de 60 MVA (ao 2014).

Catuet: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2014).

Salto del Guair: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2014).

Curuguaty: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2014).

Parque Industrial: subestacin 220/66/23 kV, con una capacidad de transformacin 220/66 kV
60 MVA y 220/23 kV de 41,67 MVA (ao 2014).

Microcentro: subestacin 220/66/23 kV, con una capacidad de transformacin 220/66 kV 60 MVA y
220/23 kV de 80 MVA (ao 2015).

Mallorqun: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2015).

Santa Rita: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2016).

Kilmetro 7: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2017).

Sistema Metropolitano

Fernando de la Mora: subestacin 66/23 kV, con una capacidad de 90 MVA (ao 2014).

Barrio Mburucuy: subestacin 66/23 kV, con una capacidad de 90 MVA (ao 2014).

Mariano Roque Alonso: subestacin 66/23 kV, con una capacidad de 100 MVA (ao 2014).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 9

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

La Colmena: subestacin 66/23 kV, con una capacidad de 20 MVA (ao 2015).

Barrio Molino: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2015).

Instituto de Previsin Social: subestacin 66/23 kV, con una capacidad de 60 MVA (ao 2017).

Villa Aurelia: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2017).

Villeta II: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2017).

Villa Elisa: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2016).

Altos: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2022).

Sistema Norte

Capitn Bado: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2014).

Concepcin II: subestacin 220/66 kV, con una capacidad de 60 MVA (ao 2016).

Bella Vista Norte: subestacin 220/23 kV, con una capacidad de 20 MVA (ao 2016).

Sistema Oeste

Acueducto: subestacin 220/23 kV, con una capacidad de 10 MVA (ao 2016).

Toro Pampa: subestacin 220/23 kV, con una capacidad de 10 MVA (ao 2021).

Pozo Colorado: subestacin 220/23 kV, con una capacidad de 10 MVA (ao 2023).

De igual forma, se puede destacar la necesidad de ampliacin de capacidad de transformacin en


prcticamente todas las subestaciones existentes en el SIN. En este sentido, se resalta la paulatina
introduccin del nuevo mdulo de transformacin 220/23 kV de 80 MVA en sustitucin al mdulo actual
de 41,67 MVA. As mismo, se puede resaltar la necesidad de duplicacin de la capacidad de
transformacin en subestaciones de gran porte del Sistema Metropolitano, como son las subestaciones
Puerto Botnico, Lambar, Parque Caballero y Puerto Sajonia.
Los siguientes grficos resumen el estado de carga de los transformadores de potencia que alimentan a la
red de distribucin del SIN. Los mismos indican la capacidad total instalada en MVA en el nivel de
23 kV, en subestaciones del Sistema, agrupndose la capacidad instalada conforme sus factores de
utilizacin previstos en los siguientes grupos: hasta 80%, hasta 90%, hasta 100%, y mayor a la capacidad
nominal (mayor a 100%). Los grficos llevan en cuenta las ampliaciones de las capacidades de
transformacin, de acuerdo a las obras propuestas para los aos del periodo 2014-2023.
Estado de Carga de los Transformadores del SIN, Periodo 2014 2023

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 10

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Puede observarse que de 3.456 MVA instalados en 23 kV en subestaciones en el 2013, se requerir contar
con una capacidad instalada de 6.434 MVA para el 2018 y de 8.542 MVA para el 2023, lo cual implica
un 147% de aumento en la capacidad instalada para todo el periodo. Puede apreciarse tambin, que para
el 2013 se tendra aproximadamente el 38% de la capacidad instalada operando con un factor de
utilizacin de 80% o menor.
La capacidad instalada para el 2018 permite mejorar ligeramente el estado de carga de los
transformadores, tenindose estimativamente un 55% del parque de transformadores operando con un
factor de utilizacin de 80% o menor. Sin embargo, considerando que la incertidumbre con relacin al
crecimiento de la demanda es mayor en el Medio Plazo, y con el objetivo de optimizar econmicamente
el Plan de Inversiones, en dicho periodo se tiene una reduccin en el ritmo de aumento de capacidad
instalada, lo cual produce una reduccin del margen de carga, obtenindose as que para el 2023 el 52%
del parque de transformadores estara con una carga entre 90 y 100% de su capacidad nominal.
1.4

Obras de compensacin

Dado el continuo crecimiento de la demanda, la compensacin reactiva se convierte en una herramienta


de optimizacin de la operacin del sistema de transmisin.
En este sentido, el Plan de Obras prev la instalacin de un Sistema Esttico de Compensacin Reactiva
(SVS por sus siglas en ingls) en el nivel de tensin de 220 kV en la Subestacin Guarambar. Dicho
sistema de compensacin estara compuesto por una rama dinmica (compensador esttico de reactivo del
tipo TCR/TSC) con una capacidad de -120/+140 MVAr, y dos ramas estticas (bancos de capacitores
maniobrados mecnicamente) de +80 MVAr cada una. Con esto, el rango total de compensacin del SVS
sera de -120/+300 MVAr, el cual estara operativo para el ao 2015.
Se puede destacar la importancia que tienen los compensadores estticos de reactivos instalados en el SIN
en el control del perfil de tensiones. As, el aporte del compensador de la Subestacin San Lorenzo
(-80/+150 MVAr en 66 kV), de la Subestacin Limpio (-150/+250 MVAr en 220 kV), y el reciente de la
Subestacin Horqueta (-80/+150 MVAr en 220 kV), permiten no solamente obtener un control en el nivel
de tensin, sino que tambin proveen un soporte reactivo para aumento de la capacidad de transmisin y
de la estabilidad del sistema.
Con relacin al compensador actual de San Lorenzo (-80/+150 MVAr en 66 kV), cuya vida til se
encuentra muy prxima a su culminacin, en el presente plan se encuentra previsto un retrofit del mismo
(cambio de los equipos existentes y obsoletos por otros nuevos y modernos), con la misma potencia que
la actual.
Finalmente, el Plan prev la instalacin de 633 MVAr en bancos de capacitores en 23 kV, con el fin de
acompaar el crecimiento de la demanda reactiva del sistema, y optimizar la utilizacin de la capacidad
de transformacin en las subestaciones del SIN.
1.5

Resumen de capacidad instalada y extensin de lneas previstas

La Tabla a continuacin resume la evolucin del SIN en el Corto Plazo (2014-2018), y Medio Plazo
(2019-2023), respectivamente, indicndose la capacidad instalada en generacin, longitudes de las lneas
de transmisin por nivel de tensin, capacidad instalada por niveles de transformacin y tensin,
compensacin reactiva por nivel de tensin, y el nmero de subestaciones del Sistema en los
mencionados periodos.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 11

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Resumen de la evolucin de los equipos del SIN, Periodo 2014 2023


Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Interconectado Nacional
Concepto

Unid.

Existente
2013

2014

2015

2016

2017

Aumento Previsto
2018
2019
2020

2021

2022

2023

Total

Previsto
2023

Generacin

MW

200

52

200

252

452

Lneas en 500 kV

km

363

154

348

225

210

1.300

1.662

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

575
258

32
0

379
0

143
165

110
0

200
0

200
121

410
0

47
48

0
188

2.095
780

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

363
0
3.877
0
0
0
1.181
0
0
0
0
3.445
2.005
1.812
1.768

55
87

40
4

12
17

3
5

0
8

10
72

26
38

0
0

0
0

0
24

145
230

850
743
771
596

0
120
410
66

600
240
258
120

1.800
120
282
108

600
107
410
140

0
143
80
158

1.575
60
275
80

0
40
778
60

0
120
320
75

1.200
120
87
80

6.625
1.812
3.671
1.483

10.070
3.816
5.484
3.250

-120/140

-350/540
-80/150
0
280
340
1.782

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

Subestaciones

Un.

-230/400
-80/150
0
240
180
816
0
70

5.972

1.326

-120/140
0
0
0
300
0
10

0
40
0
117
0
6

0
0
0
18
0
3

0
0
0
102
0
5

0
0
160
57
0
3

0
0
0
36
0
2

0
0
0
99
0
1

0
0
0
132
0
2

0
0
0
99
0
1

0
0
0
6
0
2

0
40
160
966
0
35

105

El listado de obras que componen el Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo
puede ser encontrado en el Anexo 1.
1.6

Inversiones requeridas

Las inversiones que seran requeridas para llevar adelante dichas obras se resumen en la siguiente tabla,
discriminada por montos en moneda local (obras) , moneda extranjera (materiales y equipos) y los totales,
tanto para las obras de transmisin, como para las de generacin.
Los costos indicados corresponden a costos directos, calculados a partir de valores tpicos referenciales
(costos modulares), propios de un nivel de planificacin, incluyndose los impuestos.
Inversiones de Corto Plazo 2014 2023 (En Millones de USD)
Ao
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Totales

ML

Generacin
ME
Total
5
12
17
7
35
42
52
426
479
64
473
537

Plan Maestro de Generacin y Transmisin (2014 2023)

Transmisin
ML
ME
Total
159
295
454
83
131
214
102
335
437
153
260
413
39
83
122
115
184
299
71
120
190
81
137
218
79
131
210
97
162
259
979
1.838
2.816

Pg. 12

ML
159
88
102
160
91
115
71
81
79
97
1.043

Total Anual
ME
Total
295
454
143
231
335
437
295
455
509
600
184
299
120
190
137
218
131
210
162
259
2.311
3.354

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

A continuacin se presentan unos grficos ilustrativos de la composicin de las inversiones requeridasen


generacin y transmisin, as como la composicin de las mismas en moneda local y extranjera y la
cobertura del financiamiento obtenido para las mismas.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 13

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

2.

INTRODUCCIN

Este trabajo presenta una sntesis de los estudios tcnicos relacionados con la planificacin del Sistema de
Generacin y Transmisin de la ANDE de Corto y Medio Plazo para el periodo comprendido entre los
aos 2014 y 2023.
Primeramente, se exponen los criterios tcnicos utilizados, y las premisas bsicas adoptadas en la
elaboracin del trabajo. Posteriormente, se presenta el plan de obras requeridas a partir de una evaluacin
del desempeo del sistema.
Los principales componentes del Plan Maestro de Generacin y Transmisin son:
Anlisis general del sistema
Para el periodo considerado, y para distintos periodos de carga (punta, media y leve), se analiza el
desempeo de las configuraciones topolgicas de la red elctrica adoptadas para la operacin del
Sistema, comprendiendo bsicamente:
Anlisis en rgimen normal. Es el anlisis en estado permanente de las configuraciones adoptadas
para el sistema con la red completa, de forma a evaluar las condiciones de cargas presentes en los
transformadores y lneas de transmisin, as como el perfil de tensin de las barras del sistema y las
condiciones operativas de los compensadores estticos de reactivos.
Anlisis en rgimen de emergencia (contingencia simple). Anlisis similar al anterior pero con la
presencia de una contingencia simple severa, como la prdida de uncircuito de transmisin en 500 kV,
resultando as la operacin con una red alterada o incompleta.
Anlisis por sistemas
Es la descripcin concisa de los problemas detectados en los distintos sistemas regionales de
transmisin y transformacin. Se presentan los principales refuerzos requeridos y que se encuentran
contenidos en el Plan de Obras, incluyndose las justificaciones tcnicas y sus efectos.
Cabe resaltar, que el anlisis realizado est basado fundamentalmente en estudios de flujo de potencia
(rgimen permanente). Los estudios en rgimen transitorio y dinmico del Sistema se omiten del
presente informe, debido a las caractersticas particulares del Sistema ANDE.
Queda fuera del alcance de este estudio el anlisis de estabilidad dinmica del sistema ante una
operacin interconectada de la Centrales de Itaip y Yacyret en un nico sistema elctrico, lo cual
requerir de un estudio complementario dado la especificidad tcnica involucrada.
Anexos
En los anexos se presentan:

Interconexiones internacionales y sistemas regionales del Sistema Interconectado Nacional


(SIN);

Listado de Obras;

Mapas elctricos;

Proyeccin de cargas por barra para el periodo 2014 2023;

Balance de generacin y demanda del sistema;

Datos de longitudes de lneas de transmisin y capacidad instalada en subestaciones;

Diagramas de flujos de potencia y tensiones de barras por ao;

Diagramas unifilares del SIN.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 14

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

3.

CRITERIOS TCNICOS

Diariamente, la generacin de electricidad oferta la potencia necesaria al sistema elctrico, la que se


destina a cubrir la demanda de las residencias, comercios, industrias, instituciones, etc.
La premisa de los responsables del suministro de energa elctrica es que se atienda esta demanda con
seguridad, calidad, confiabilidad y economa. El asegurar esas condiciones implica que se desarrollen
procesos adecuados de planificacin del sector elctrico, asegurando las inversiones necesarias,
aparejadas a las previsiones de crecimiento de la demanda.
Los criterios tcnicos utilizados para la planificacin establecen condiciones mnimas que se deben
cumplir durante la simulacin del desempeo esttico del SIN (Rgimen Permanente). Bsicamente,
estos criterios establecen valores de tensin y carga admisible en lneas de transmisin, equipos de
transformacin, compensacin esttica de reactivos y generadores en condiciones de operacin normal y
de emergencia.
A fin de determinar las necesidades del sistema, tales como nuevas obras, ampliacin de la capacidad de
generacin, repotenciacin de equipos, ampliacin de la capacidad de transformacin de las
subestaciones, etc., se analiza el desempeo del SIN principalmente en el periodo de demanda mxima
simultnea y en condiciones normales, es decir, con todos sus elementos en servicio (red completa). En
estas condiciones todos los equipos deben estar operando dentro de sus capacidades nominales y las
tensiones dentro de los rangos aceptados.
De igual forma, se analizan los periodos de demanda de carga media y leve, a fin de especificar y
verificar los equipos utilizados en el control de la tensin del sistema.
En cuanto a los equipos de transformacin, la carga de los mismos es evaluada considerando las
demandas mximas en los respectivos locales, la cual no necesariamente coincide con la carga mxima
simultnea del SIN. Con esto, se determinan los refuerzos de transformacin requeridos en los distintos
centros de distribucin.
Se evalan tambin las condiciones de emergencia, considerndose el Criterio N 1, en el que se supone
la prdida de un solo elemento del sistema por vez. Dicho criterio es normalmente aceptado en
planificacin de sistemas elctricos. Las contingencias son analizadas principalmente en el tronco de
transmisin en 220 y 500 kV, de forma a estimar el desempeo del sistema ante las mismas, y
dependiendo de la severidad de las mismas, evaluar la necesidad de obras de refuerzo adicionales.

3.1

Margen de reserva de generacin de energa elctrica

La Divisin de Operacin de la ANDE, como responsable de la operacin del Sistema Interconectado


Nacional (SIN), cuenta con un sistema de control e informacin en tiempo real, de vital importancia para
atender la demanda diaria de potencia y energa elctrica, pues a diferencia de otros sectores, la energa
elctrica no puede almacenarse, sino que debe consumirse al mismo tiempo que se la genera; por tanto la
coordinacin entre demanda (consumo) y generacin es dinmica y permanente.
Oferta Bruta

P. Sincronizada
P. Max. Generada

Potencia Indisponible
Reserva Fra
Res. Rotante

El significado de estos conceptos, de manera simplificada, se encuentrareflejado en el grfico.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 15

Reserva
Total

Oferta Neta

Potencia

Como la demanda vara diariamente, adems de


estacionalmente, y va incrementndose producto del
desarrollo econmico y el crecimiento poblacional, el sistema
elctrico debe tener un margen de reserva de generacin para
atender esas variaciones y ese crecimiento. As, el margen de
reserva de generacin de energa elctrica se define como la
diferencia que existe entre la demanda mxima que se puede
alcanzar, producto de la simultaneidad de consumos que se
den y, la capacidad de generacin que an tiene el parque
generador. Un valor razonable es que este margen sea del
10% de la demanda mxima para la reserva rotante y del 20%
para la reserva total (fra y rotante).

Tiempo

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

La Oferta Bruta, es la capacidad instalada de generacin a la temperatura horaria (en el caso de la


generacin trmica la temperatura tiene un efecto importante sobre la produccin de energa, por el
rendimiento de los motores, a mayor temperatura ambiente, menor rendimiento). Actualmente, esta oferta
bruta para el SIN se encuentra alrededor de los 8.908 MW. Sin embargo no toda ella es aprovechable.
La Oferta Neta, es el resultado de descontar de la Oferta Bruta, la Potencia Indisponible y la Potencia no
Disponible por hidrologa. Es decir se resta la potencia de generadores que por diferentes razones no
pueden entregar energa en ese momento (generadores en mantenimiento, o fallas mecnicas) y tambin
las reducciones de la generacin hidroelctrica debido a los regmenes hidrolgicos.

Entonces, la Oferta Neta representa la capacidad realmente disponible de generacin que tiene el sistema.

3.2

Perfil de tensiones

Los rangos de tensin admisibles en el sistema, ante condiciones normales y de emergencia se indican en
la Tabla 1.
Tabla 1. Rango de Tensin Admisible en los Criterios de Planificacin
Rango de Tensin Admisible [pu]

Estado del
Sistema

3.3

23 kV

66, 220 y 500 kV

Barras cercanas a la Generacin

Condiciones
Normales

1,05

0,95 1,05

0,95 1,10

Contingencia
(N1)

1,00 1,05

0,90 1,10

0,90 1,10

Carga en lneas de transmisin

En condiciones normales de operacin todas las lneas de transmisin deben operar dentro de los lmites
de su capacidad nominal. Ante condiciones de emergencia, se tolera una sobrecarga de hasta 20% de su
capacidad nominal.
En lo que se refiere a la capacidad para las lneas de transmisin de 66 kV la Tabla 2siguiente muestra los
valores de las capacidades adoptadas conformes las especificaciones de Proyecto.
Tabla 2. Capacidad de Lneas de Transmisin en 66 kV
Capacidad de Lneas (MVA)
Condiciones del Sistema

Tipos de Lneas

Normales

Contingencia (N-1)

Subterrnea (Nuevas)

100

120

Subterrneas (Viejas)

60

72

Area Metropolitana

50

60

Area Interior

40

50

Area Nueva

72

80

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 16

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

En lo que se refiere a la capacidad para las lneas de transmisin de 220 kV, y de 500 kV la Tabla 3
siguiente muestra los valores de las capacidades adoptadas conforme a Instrucciones Operativas vigentes
en la ANDE.
Tabla 3. Capacidad de Lneas de Transmisin 500 y 220 kV
Capacidad de LTs (MVA)

Tipos de Lneas

Condiciones Normales

Subterrnea 220 kV

250

General 220 kV (Tpico)

210

GUA LAM 220 kV

195

ACY COV 220 kV (Ctos. II y III)

191
200 / 550*
(*a partir del 2015)

ACY PFO

3.4

ACY K30 (Ctos. I y II)

550

K30 COV (Cto. I)

191

K30 COV (Ctos. VIII y IX)

300

MD CYO 220 kV (Ctos. IV y V)

259

COV SLO 220 kV (Cto. I)


COV GUA 220 kV (Ctos. II y III)

272

CYO LIM 220 kV (Ctos. IV y V)

230

AYO SPA- 220 kV

253

SPA GUA- 220 kV (Ctos. VI y VII)

240

MD ACY (Ctos. I y II)

667

MD LCD 500 kV

2000

AYO ESA 500 kV

2000

YAC AYO 500 kV

2000

AYO VHA 500 kV

2000

MD VHA 500 kV

2000

Especificadas a 1 pu de tensin

Carga en transformadores

Para los transformadores que componen el sistema de transmisin y subtransmisin (220 kV y 66 kV), en
condiciones normales de operacin todos deben operar dentro de los lmites de su capacidad nominal.
Ante condiciones de emergencia, se tolera una sobrecarga de hasta 20% de su capacidad nominal.
Para los transformadores que alimentan la red de distribucin en 23 kV, se consider una ampliacin o
cambio de los mismos una vez alcanzada su capacidad nominal en condiciones de carga mxima de la
subestacin, y generalmente no coincidente con la punta del sistema.
3.5

Margen de carga y estabilidad de tensin

En lo que se refiere a mrgenes de carga y estabilidad de tensin, an no se han adoptado mrgenes


mnimos requeridos, tanto en potencia activa como reactiva (MW y MVAr). Dichos mrgenes son

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 17

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

calculados de manera a tener una nocin cualitativa del desempeo del sistema en lo que se refiere a
estabilidad de tensin.
Los mrgenes de potencia activa son calculados mediante el trazado de curvas PV del sistema, las cuales
se obtienen mediante aumentos sucesivos y simultneos en la carga de todas las barras del sistema
ANDE. Dichos aumentos son realizados manteniendo constantes los factores de potencia de las barras de
carga del sistema. La curva PV muestra la evolucin de
V (pu)
la tensin de una o varias barras conforme aumenta la
b) Factor de potencia en adelanto
carga. El punto crtico de estabilidad sera el punto de
1.0
mxima carga posible (punta de la nariz de la curva). A
a) Factor de potencia
medida que el punto operativo se acerca a dicho punto
en atraso
Punto Crtico
crtico, las posibilidades de inestabilidad aumentan. En
Parte no trazada
el grfico se muestra tambin el efecto de la
compensacin reactiva, por medio de la cual se puede
aumentar la capacidad de carga pero obtenindose
P (% de crecimiento de carga)
puntos crticos con tensiones cada vez ms elevadas.
El margen de carga de potencia reactiva se evala mediante el trazado de curvas QV. Dichas curvas
grafican la tensin de una barra y la generacin de potencia reactiva (positiva o negativa) requerida por el
sistema para mantener dicho valor deseado de tensin.
En la siguiente figura se esquematizan varias curvas QV donde se resaltan los mnimos que representan
los puntos crticos de las mismas (para tensiones inferiores se tendra una operacin inestable). Por
cuestiones prcticas, dichas curvas son trazadas
exclusivamente para la ventana de inters de 0,90 a 1,10 p.u.
de tensin que se encuadra dentro de los rangos de tensin
Q
(MVAr)
especificados en la seccin 3.1. A modo ilustrativo se
esquematizan 3 curvas QV. La curva C1 muestra la
C2
existencia de un punto operativo sin requerimientos de
Deficiencia de
compensacin (punto A) y con margen adecuado de
A
reactivo
1.1
0.9
estabilidad. La curva C2 representara un sistema con mayor
V (pu)
C3
C1
carga que la del C1, y la falta de interseccin con el eje V de Margen
estabilidad
denotara la deficiencia de reactivo en el sistema y la
Ventana de monitoreo
Punto Crtico
necesidad de compensacin reactiva de forma a obtener un
punto operativo seguro. La curva C3 denotara un sistema
donde se tendra un punto operativo sin requerimiento de compensacin adicional en la barra, pero con
reducido margen de estabilidad, adems de tenerse un punto crtico dentro del rango de tensiones en
emergencia. Este hecho, indicara que el sistema ya se encuentra con alta compensacin reactiva (ver
efecto de compensacin en grfico Curva PV), lo cual implicara la necesidad de aumento de capacidad
de transmisin.
Ambas metodologas son complementarias y sirven para identificar los problemas del Sistema y
determinar la eficacia de las soluciones propuestas.
En general, se buscar que las obras sugeridas en el Plan Maestro produzcan un aumento en el margen de
carga, tanto activa como reactiva, y en consecuencia mejorar el margen de estabilidad de tensin del
Sistema.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 18

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

4.

PREMISAS BSICAS

En esta seccin se definen los escenarios bsicos bajo los cuales se realiza el anlisis del desempeo del
sistema elctrico de potencia y en funcin a ellos se especifican las necesidades del SIN para su operacin
dentro de los criterios tcnicos preestablecidos.
4.1

Generacin

Las fuentes de generacin del SIN consideradas para el periodo de anlisis son 100% de origen
hidroelctrico, siendo las caractersticas de las mismas, las siguientes:

Central Hidroelctrica de Acaray. Las cuatro unidades de la CH de Acaray operan inicialmente


con potencias nominales de 56 MVA (Grupos 1 y 2) y 60 MVA (Grupos 3 y 4).

Central Hidroelctrica de Itaip. La CH de Itaip despacha hasta 10 unidades generadoras de


50 Hz de 823,6 MVA cada una para atender la demanda.

Central Hidroelctrica de Yacyret. Dada la elevacin de cota en la zona de influencia,


alcanzndose el valor nominal de 83 msnm, se considera el despacho de las 20 unidades de la CH
Yacyret con una capacidad de 172,5 MVA, y operando interconectada al Sistema Argentino de
Interconexin (SADI).

El resumen del despacho de potencia de las Centrales Hidroelctricas del SIN para los diferentes periodos
de la demanda de carga (punta, media y leve), del periodo analizado se encuentran en el Anexo 4, el cual
incluye tambin un resumen de la carga de ANDE en barras de 23 kV, las ventas y las prdidas de
transmisin por cada ao.
4.2

Demanda nacional

Para la actualizacin del Plan Maestro de Corto y Medio Plazo se utiliza como base la previsin de la
demanda, aprobada por Resolucin P/N 33.429,en fecha 01/08/2013, del ESTUDIO DE MERCADO
ELCTRICO NACIONAL, PROYECCIN 2013-2023, elaborado por el Dpto. de Estudios de
Tarifas y Mercado. En dicha prospectiva, se presentan diferentes escenarios referenciales de crecimiento
de la demanda. El crecimiento econmico a nivel nacional y la evolucin de las prdidas del sistema
elctrico se constituyen en los principales factores que inciden en la evolucin de la demanda. En la
siguiente figura, se muestran los 3 escenarios referenciales indicados por el mencionado estudio de la
demanda, los cuales corresponden a:

Escenario de crecimiento econmico alto I, correspondiente a una tasa de crecimiento promedio anual
de 9,11%.

Escenario de crecimiento econmico alto II, correspondiente a una tasa de crecimiento promedio
anual de 7,04%.

Escenario de crecimiento econmico medio, correspondiente a una tasa de crecimiento promedio


anual de 5,66%.

Escenario de crecimiento econmico bajo, correspondiente a una tasa de crecimiento promedio anual
de 4,03%.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 19

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Figura 1. Demanda proyectada del SIN utilizada en el Plan Maestro.

En la elaboracin del Plan Maestro, es decir, en la determinacin de obras de refuerzos requeridas por la
red, se adopt el escenario recomendado, definido como el Escenario de Crecimiento Econmico Alto I
2013-2023, que presenta un crecimiento promedio de 9,11% en la demanda mxima del Sistema,
conforme a la figura 1.
Cabe acotar que dicha tasa o porcentaje de crecimiento, se refiere al asociado nicamente al mercado
nacional sin considerar la insercin al SIN de futuras nuevas industrias electrointensivas (IEI). Con la
inclusin de las mismas, dicho porcentaje de crecimiento corresponde al 9,84 %, el cual fue finalmente
utilizado para el dimensionamiento del SIN.
Dichos escenarios han sido adoptados considerando el crecimiento tendencial de 9,4% de los ltimos 5
aos y 7,1 % en los ltimos 10 aos, la influencia de las altas temperaturas de los ltimos aos en los
hbitos de consumo de los clientes, la demanda insatisfecha por restricciones de transformacin,
transmisin y distribucin de la energa elctrica, as como la necesidad de planificar con ciertos
mrgenes de seguridad.
En el escenario seleccionado PIB Alto I (con alto crecimiento industrial) se considera que el pas ha
iniciado un proceso de industrializacin, y que despus de muchas dcadas de estancamiento del sector,
habra una ruptura del modelo tradicional. El Gobierno nacional ha anunciado el procesamiento del 50%
de la soja producida en el Pas a partir del 2013.
Asimismo, al crecimiento sostenido de la inversin bruta de capital en los ltimos aos se debe sumar el
impacto econmico de la incorporacin de pequeas industrias electrointensivas (en total alrededor de
250 MW; 2.200 GWh, conforme al Decreto N 7406) que se estn instalando en el pas.
La recuperacin de las expectativas del sector privado, el crecimiento de la clase media alrededor del 50%
en los ltimos 10 aos, la inversin pblica en infraestructura, la construccin masiva de grandes
shoppings y hoteles, asimismo, el continuo crecimiento del sector financiero nacional (alrededor del 12%
anual en los ltimos 5 aos), constituyen factores significativos para plantear un elevado crecimiento del
producto interno bruto en la prxima dcada.
A los factores mencionados, debemos agregar los diversos proyectos de parques industriales que se
planean instalar en el pas en determinadas regiones como: Hernandarias, Villa Hayes, Villeta, Itapa,
Pedro Juan caballero, Concepcin, entre otros.
Debido a lo expuesto, el crecimiento promedio en la demanda mxima se incrementa de 9,11% a 9,84%,
tal como se puede apreciar en la figura 2.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 20

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Figura 2. Demanda del SIN agregada con la demanda de las Industrias Electrointensivas.

Se indica en latabla 4 a seguir, la demanda de todas las IEI ya instaladas y/o con las cuales la ANDE ya
ha firmado contrato para el respectivo suministro de energa elctrica, conforme al Decreto 7406.
Tabla 4. Resumen de Industria Electrointensivas instaladas en el SIN y otras en consulta previa
Demanda de IEI
Demanda de potencia (MW)
Energia (GWh)

2014
0
0

2015
122
1.120

2016
174
1.603

2017
213
1.961

2018
239
2.202

2019
263
2.414

2020
263
2.414

2021
263
2.414

2022
263
2.414

2023
263
2.414

Observaciones:
El cronograma de potencia demandada por las industrias fue realizado en base a informaciones suministradas por las mismas, y los valores
mximos indicados corresponden a las demandas anuales finales de las Industrias. As mismo las cinco IEI modularn su potencia contratada en
todas las fases al 25%, es decir desconectarn su potencia contratada en un 75% en el horario de punta del SIN. Se ha includo en la demanda de
IEI las prdidas de transmisin ocasionadas, que promedian un 5%.

4.3

Proyeccin de cargas y factor de potencia por subestaciones

Dado que los estudios de flujo de potencia requieren los valores de demanda por subestaciones, los
mismos son calculados a partir de la desagregacin de la demanda total del SIN por barras del sistema.
Dicha desagregacin es realizada a partir del anlisis de curvas de cargas tpicas por subestaciones para
distintos periodos de carga. Los valores de demanda por barra del sistema pueden ser encontrados en el
Anexo 2, donde se especifican los valores de demanda mxima de la subestacin, as como valores
coincidentes con la punta del sistema (demanda mxima simultnea). Se incluyen adems, valores
correspondientes a condiciones de carga media y leve del sistema.
Por otro lado, tambin se requiere la determinacin del factor de potencia por subestacin, ya que el
mismo es utilizado para determinar la demanda de potencia reactiva a partir de la proyeccin de demanda
de potencia activa. Los factores de potencia de las cargas del SIN son considerados constantes para todos
los aos del periodo analizado.

4.4

Exportacin

Otro aspecto considerado para la operacin del sistema son los intercambios de energa elctrica con los
pases vecinos a travs del Sistema ANDE, los cuales se constituyen finalmente en cargas para el sistema
de transmisin. Se adoptan los siguientes valores:

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 21

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Suministro al Sistema Norte Argentino (EMSA): actualmente en operacin y con un suministro


variable. Basado en antecedentes histricos se considera una venta de 25 MW, y teniendo como
punto de interconexin a la Subestacin Carlos Antonio Lpez.

No se considera el suministro a la Compaa Elctrica Paranaense (COPEL) desde la Subestacin Acaray,


ya que el mismo fue desactivado hace un par de aos debido a los problemas tcnicos que presenta el
convertidor de frecuencia.
Tampoco se considera el suministro al Sistema Nordeste Argentino desde el punto de interconexin en la
Subestacin Guarambar, ya que el mismo est desactivado desde el mes de Noviembre del ao 2010. Sin
embargo se aclara que conforme requerimientos del SADI, eventualmente, ANDE aun realiza algunos
intercambios de exportacin con dicho sistema argentino.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 22

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

5.

CONFIGURACIONES TOPOLGICAS

El detalle de las configuraciones adoptadas para el anlisis del SIN en el periodo de estudio se presenta a
continuacin:
5.1

Configuracin de Corto Plazo

Ante la inviabilidad tcnica de operar las Centrales de Itaip y Yacyret debido a la debilidad del Sistema
de Transmisin, por problemas de estabilidad y la diferencia de estatismo del Sistema Argentino y la CH
Itaip, del ao 2014 hasta el ao 2015 (periodo del corto plazo), se mantiene la operacin del SIN en dos
subsistemas separados.

Subsistema 1 (SS1): Alimentado por las CHs de Itaip y Acaray, operando en paralelo con el
sistema Brasileo. Este subsistema abastece normalmente a los Sistemas Este, Central, Norte,
parte del Sur y mayor parte del subsistema Metropolitano.

Subsistema 2 (SS2):Alimentados por la CH de Yacyret y operando en paralelo con el Sistema


Argentino de Interconexin (SADI). Este subsistema abastece a parte del Sistema Sur y parte del
Sistema Metropolitano, el cual es alimentado a travs de la LT 220 kV doble terna Ayolas San
Patricio Guarambar.

Es importante destacar, que con la entrada en servicio de la LT 500 kV Margen Derecha Villa Hayes es
posible alimentar todo Subsistema 1. Sin embargo, ante contingencias en dicha lnea, se requiere la mayor
transferencia posible de carga del Sistema Metropolitano sobre el Subsistema 2 de manera a distribuir
apropiadamente la carga entre las lneas de transmisin de 220 kV remanentes. Por ello, en el anlisis de
la contingencia arriba mencionada se admite la reconfiguracin del sistema con traspaso de carga del
Subsistema 1 al Subsistema 2 buscando evitar as sobrecargas o reducir requerimientos de corte de carga.
La parte del Sistema Metropolitano normalmente transferida al Subsistema 2 comprende las siguientes
cargas: EDEFOR (Clorinda), Guarambar, Villeta, Gran Hospital Nacional, Itaugu, San Antonio, Puerto
Sajonia, Republicano, Valle Apu y General Daz, as como Quiindy y Caapuc.
5.2

Configuracin de Medio Plazo

En el medio plazo, y atendiendo a la incorporacin de importantes obras de transmisin en el nivel de


500 kV dentro del Plan de Obras de Transmisin para el periodo 2014 2023, se adopta la operacin
totalmente interconectada del SIN en un nico sistema elctrico. En esta configuracin todas las centrales
de generacin, Acaray, Yguaz, Itaip y Yacyret se encuentran operando en forma sincronizada en un
solo sistema elctrico.
Con la operacin interconectada se logra adems de una optimizacin en la utilizacin de la
infraestructura de transmisin, una mayor flexibilidad operativa y aumento de la confiabilidad del
Sistema, con lo cual se tiene una mayor seguridad en el suministro.
Atendiendo a los estudios disponibles que indican la posibilidad de una operacin interconectada entre las
centrales de Itaip y Yacyret a partir de la existencia de un vnculo en 500 kV entre ambas junto con la
implementacin de adecuados dispositivos de control, esta configuracin es adoptada a partir de finales
del ao 2016, ao para el cual se recomienda la puesta en servicio de la LT 500 kV Ayolas Villa Hayes.
Dicha lnea de transmisin operando interconectada a la LT 500 kV Margen Derecha Villa Hayes se
constituira en el principal vnculo entre las centrales de Itaip y Yacyret.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 23

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

6.

CRONOGRAMA DE OBRAS DE GENERACIN Y TRANSMISIN

Como resultado de los distintos estudios que hacen al Plan Maestro de Generacin y Transmisin de
Corto y Medio Plazo, se tiene el Plan de Obras para el periodo 2014 2023, en donde se listan las obras
requeridas por la red para atender el crecimiento de la demanda del SIN.
El Plan de Obras se presenta como un listado cronolgico de las obras necesarias, indicndose las
principales caractersticas tales como: capacidad de los transformadores, lneas de transmisin y
longitudes de stas, as como una breve descripcin del proyecto. Adems de estas informaciones, se
incluyen la fecha recomendada de puesta en servicio y sus respectivos costos directos estimados, los
cuales se basan en la metodologa de costos modulares, cuyos valores son actualizados en funcin a los
costos promedios de licitaciones recientemente realizadas, y los cuales son apropiados para una
estimacin inicial a nivel de planificacin de los fondos requeridos para el financiamiento del Plan de
Obras.
En el Anexo 2, se presenta el Cronograma del Plan de Obras para el periodo 2014 2023, por Sistema y
por tipo de obra.
Dado el periodo de anlisis, para la determinacin de las obras requeridas por el sistema se asume que las
obras en curso y previstas para el ao 2013 son todas finalizadas y disponibles para su operacin en el ao
2014.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 24

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

7.

ANLISIS GENERAL DEL PERIODO

7.1

Anlisis del SIN en condiciones normales

7.1.1

Evaluacin del tronco principal de transmisin en 220 y 500 kV

En la siguiente Figura se observa la configuracin elctrica del SIN adoptada en general en el corto plazo
hasta el ao 2015, considerando la operacin de la LT 500 kV Margen Derecha Villa Hayes y una
separacin del SIN en dos subsistemas elctricamente asncronos y separados en las Subestaciones de
Guarambar y Carlos Antonio Lpez.
VHA 220 kV

VHA 500 kV

PBO 220 kV
2x
600 MVA

MD 500 kV

A CAT - SGA 220 kV


5x
375 MVA

IRY
220 kV
PCA 220 kV

SISTEMA NORTE
MD
220 kV

ctos. 4 y 5
LIM 220 kV
CYO 220 kV

PIH
220 kV

LUQ 220 kV
CAP
220 kV

PSA 220 kV

K30 220 kV

SLO 220 kV
ESA
220 kV
VIC
220 kV

BMO
220 kV

cto. 1
CZU 220 kV
ctos. 8 y 9

COV 220 kV

CDO 220 kV

CMY 220 kV
SAN
220 kV

ctos. 2 y 3
GUA ( SS1 )
220 kV

ACY 220 kV

PIR
220 kV

A APR 66 kV

ACY 66 kV

MCC
220 kV

LAM 220 kV
A PASO PE

PFO 220 kV

GUA ( SS2 )
220 kV

VAP 220 kV

PBU 220 kV
CAL 220 kV
CBO 220 kV

TRI 220 kV

SS1

SJB 220 kV
NAT 220 kV
SPA 220 kV
SS2

CAM 220 kV
AYO 220 kV
2 x 375 MVA
AYO 500 kV

YAC 500 kV

Figura 3. Configuracin Separada del Sistema de Transmisin del SIN, Periodo 2014-2015

Segn se observa en la Figura 3, el Subsistema 1 a partir del 2014 estara compuesto por el principal
tronco de transmisin del SIN, conformado por la LT 500 kV Margen Derecha Villa Hayes y toda la red
de transmisin en 220 kV proveniente del Este del pas incluyendo las siguientes lneas: doble terna LT
220 kV Margen Derecha Itakyry Caraya Limpio (circuitos 4 y 5), la doble terna LT 220 kV Acaray

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 25

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Coronel Oviedo Guarambar (circuitos 2 y 3), la doble terna LT 220 kV Acaray Kilmetro 30
(Circuitos 1 y 2) que continua como una doble terna LT 220 kV Kilmetro 30 Coronel Oviedo San
Lorenzo (Circuitos 8 y 9) y una LT 220 kV simple terna Kilmetro 30 Coronel Oviedo (Circuito 1).
Hasta el Sistema Metropolitano de Asuncin se tendran 5 circuitos en 220 kV provenientes del Sistema
Central. En lo que respecta a la LT 220 kV Acaray Presidente Franco, Presidente Franco Carlos
Antonio Lpez, la misma queda incluida dentro del Subsistema 1, generalmente hasta la Subestacin
Carlos Antonio Lpez.
El Subsistema SS2 est constituido bsicamente por la interconexin de la CH de Yacyret al Sistema a
travs de la LT 500 kV Yacyret Ayolas, los 2 auto-transformadores 500/220 kV de 375 MVA en la
Subestacin Ayolas, las LTs 220 kV Ayolas San Patricio y San Patricio Guarambar (doble terna),
adems de la LT 220 kV Ayolas Villalbn y de la LT 220 kV Coronel Bogado Trinidad, quedando de
esta manera la Subestacin Trinidad dentro del Subsistema SS2.
Esta configuracin puede ser alterada dependiendo de las disponibilidades elctricas y energticas de
ambos subsistemas. En los primeros aos, en condiciones normales el Subsistema 2 puede ser
minimizado, quedando el suministro desde la CH Yacyret limitado a las subestaciones del Sur del pas.
Sin embargo, con el correr de los aos y consecuente aumento de la demanda, la participacin de la CH
Yacyret nuevamente cobra mayor preponderancia, principalmente en situaciones de contingencia en el
SS1, as como ante la incorporacin de la LT 500 kV Ayolas Villa Hayes.
En las siguientes Tablas, se presentan los niveles de cargas en lneas de transmisin de 220 kV de los
corredores de transmisin del SIN en rgimen normal de operacin. Las tablas incluyen los valores
iniciales de capacidad, as como los valores finales posteriores a la incorporacin de obras de refuerzo.
Tabla 5. Carga en lneas del Sistema de Transmisin en condiciones normales Periodo Corto Plazo.

Este

Central

Sur

Norte

500 kV

LT (por circuito) y TR (por transform ador)

Potencia Nom inal

MD - ACY
ACY-K30
MD-IRY (4 y 5)
ACY-COV (2 y 3)
K30-COV (8 y 9)
K30-COV (1)
ACY-PFO
IRY-CAT-SGA
COV-SLO (1)
COV-GUA (2 y 3)
CYO-LIM (4 y 5)
COV-VIL
AYO-SPA
SPA-GUA (6 y 7)
SPA-CBO
AYO-CBO
CBO-TRI
CYO-SES
IRY-CUR-CCO
MD-VHA 500 kV
MD-LCD 500 kV
AYO-VHA 500 kV
AYO-TRI 500 Kv
Transf. MD 500/220 kV
Transf. AYO 500/220 kV
Transf. VHA 500/220 kV
Transf. ESA 500/220 kV
Transf. LCD 500/220 kV
Transf. TRI 500/220 kV

667
550
267/550
191
300
191
200/550
250
272
272
230
240
253
240
210
350
350
270
300
2000
2000
2000
2000
395
375/450
600
600
600
600

Carga (MVA)
2014
2015
424
488
235
269
246
263
139
159
152
170
133
162
195
86
34
35
158
173
143
160
65
73
77
92
193
147
110
119
167
52
127
75
156
173
111
124
896
1019

2016
455
234
244
132
144
135
109
36
121
106
35
104
183
167
36
133
62
209
132
782
580

271
223
485

314
240
544

294
288
503

2017
219
284
302
152
169
153
198
38
148
122
54
128
164
190
52
55
64
227
149
827
628
609
252
211
228
515
315
224

2018
263
316
255
154
172
155
194
40
186
179
87
140
154
175
52
61
73
254
169
947
629
665
234
215
226
457
370
313
201

La incorporacin de la LT 500 kV Margen Derecha Villa Hayes permite tener una condicin operativa
segura y con las lneas y transformadores del tronco de transmisin con mrgenes de carga adecuados. En
ese sentido, se aclara que la efectiva incorporacin al SIN de la LT 220 kV doble terna Villa Hayes
Puerto Sajonia prevista para finales del 2014 como obra complementaria al proyecto de 500 kV ser de
fundamental importancia, debido a que la misma permitir evacuar la inyeccin de potencia proveniente

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 26

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

desde la lnea de 500 kV Margen Derecha Villa Hayes, y por ende un alivio considerable en las lneas
de 220 kV provenientes del sur del pas.
En el Sistema Este, la incorporacin en el ao 2018 de la CH Yguaz produce una reduccin en los
niveles de carga de la LT 220 kV Margen Derecha Caraya. De igual forma, en el ao 2015 es
requerida la duplicacin de la LT 220 kV Acaray Presidente Franco de forma a evitar sobrecarga en
dicha lnea. En el Sistema Sur se observan bajos valores de carga hasta el ao 2015, ya que con la LT 500
kV Margen Derecha Villa Hayes el Subsistema 2 queda reducido sustancialmente a subestaciones de
este sistema, como explicado anteriormente. A partir del ao 2016, la incorporacin de la LT 500 kV
Ayolas Villa Hayes, con la consecuente interconexin y operacin del SIN en forma conjunta con los
sistemas de Brasil y Argentina, requiere valores crecientes de despacho de CH Yacyret, de forma a
optimizar la operacin del sistema de transmisin.En el Sistema Norte, la incorporacin de la LT 220 kV
Itakyry Curuguaty Capitn Bado Cerro Cor produce una importante reduccin en la carga de la LT
220 kV Caraya San Estanislao, evitando la sobrecarga de la misma y proveyendo una segunda
alimentacin al Norte del pas.
VHA
500 kV

VHA
220 kV
3x
600 MVA

MD 500 kV

PBO 220 kV

A SISTEMA
NORTE

A SISTEMA
NORTE

PCA 220 kV
SIC
220 kV

A CAT - SGA 220 kV


5x
375 MVA

IRY
220 kV

VAQ
220 kV

MD
220 kV

ctos. 4 y 5
LIM 220 kV
CYO 220 kV

PIH
220 kV

LUQ
220 kV
CAP
220 kV

PSA 220 kV

K30 220 kV
SLO 220 kV

VIC
220 kV

MAQ
220 kV

ESA
220 kV

A SRI

cto. 1
CZU 220 kV

BMO
220 kV

COV 220 kV

VEL

ctos. 8 y 9
CDO 220 kV

220 kV

CMY 220 kV
SAN
220 kV

ctos. 2 y 3

ACY 220 kV

PIR
220 kV

A APR 66 kV

ACY 66 kV

MCC
220 kV

LAM 220 kV
A PASO PE

GUA
220 kV
PFO 220 kV

VAP
220 kV

CBO 220 kV

TRI 220 kV

CAL 220 kV

PBU 220 kV

SJB
220 kV
SPA
220 kV
CAM 220 kV

NAT 220 kV

AYO 220 kV
2 x 375 MVA
AYO 500 kV

YAC 500 kV

Figura 4. Configuracin Interconectada del Sistema de Transmisin del SIN Ao 2016.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 27

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

En el sistema de transmisin en 500 kV, en el ao 2016, la incorporacin de la LT 500 kV Ayolas Villa


Hayes requiere la instalacin del 3 autotransformador 500/220 kV de 600 MVA en la Subestacin Villa
Hayes de manera a evitar la sobrecarga en la subestacin. En la siguiente figura se muestra
esquemticamente el sistema de transmisin previsto para el ao 2016.
En la siguiente figura se muestra esquemticamente el sistema de transmisin previsto para el ao 2023.
En el mismo se incorpora la segunda LT 500 kV Margen Derecha Villa Hayes con seccionamiento
previsto en Caraya, adems de otra LT 500 kV Margen Derecha Caraya, la LT 500 kV Ayolas
Trinidad II, la LT 500 kV Ayolas Eusebio Ayala, as como la LT 500 kV Margen Derecha Los
Cedrales, y las subestaciones en 500 kV Los Cedrales, Trinidad II, Eusebio Ayala y Caraya.
VHA
220 kV

VHA
500 kV
4x
600 MVA
MD 500 kV

2x
600 MVA

PBO 220 kV

A SISTEMA
NORTE

A SISTEMA
NORTE

PCA 220 kV
CYO 500 kV

SIC
220 kV

VAQ
220 kV

A CAT - SGA 220 kV


5x
375 MVA

IRY
220 kV

MD
220 kV

ctos. 4 y 5
LIM 220 kV
ALT
220 kV

LUQ
220 kV
SLO
220 kV
PSA 220 kV

2x
600 MVA

CYO 220 kV

PIH
220 kV

BMO
220 kV

YZU
K30 220 kV

VAU
220 kV
CAP
220 kV

ESA
500 kV

MAQ
220 kV
cto. 1
CZU 220 kV

VIC

CMY 220 kV

ctos. 8 y 9

220 kV

VEL

PIR
220 kV

220 kV
SAN
220 kV

CDO 220 kV
ESA
220 kV

ACY 220 kV

ctos. 2 y 3
COV 220 kV

LAM 220 kV

KM7
220 kV

A SRI - MAU

A APR 66 kV

ACY 66 kV

MCC
220 kV

GUA
220 kV

LCD 500 kV

2 x 600 MVA

A PASO PE
LCD 220 kV

PFO 220 kV

VTA II 220 kV

PBU 220 kV
VAP
220 kV

CBO 220 kV

TRI 220 kV

CAL 220 kV

SJB
220 kV
PIL II 220 kV

TRI II 500 kV
SPA
220 kV
CAM 220 kV

600 MVA
NAT 220 kV

VIN 220 kV
AYO 220 kV
3 x 375 MVA
AYO 500 kV

YAC 500 kV

Figura 5. Configuracin Interconectada del Sistema de Transmisin del SIN Ao 2023.

En la Tabla 6, pueden apreciarse los valores de carga estimados de las principales lneas y
transformadores del sistema de transmisin principal para el periodo 2019-2023.
En el Sistema Este, se tiene un progresivo aumento en la carga de las lneas principales hasta la puesta en
servicio de la segunda LT 500 kV Margen Derecha Villa Hayes prevista para finales del 2019. Sin dicha
lnea, para finales del ao 2019 el sistema no estara en condiciones de soportar la prdida de una de las
lneas de 500 kV. Por otra parte, se hace tambin necesaria la construccin de la Subestacin Los
Cedrales 500 kV, y su respectiva alimentacin desde la Subestacin Margen Derecha 500 kV, de manera
a evitar la saturacin de la capacidad de transformacin 500/220 kV en la Subestacin Margen Derecha.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 28

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Asociada a esta obra, se encuentra tambin la construccin de la doble terna en 220 kV Los Cedrales
Presidente Franco, de manera a poder inyectar potencia hacia las principales cargas de la regin de
Ciudad del Este. Tambin se prev para finales del ao 2022, la construccin de la LT 500 kV Ayolas
Eusebio Ayala, y para el ao 2023, la construccin de la Subestacin Caraya en 500 kV, as como el
seccionamiento de una de las lneas de 500 kV Margen Derecha Villa Hayes en dicha Subestacin. Por
ltimo, de igual manera se contempla para el 2023 la construccin de otra lnea de transmisin en 500 kV
Margen Derecha Caraya.
En el Sistema Sur, se mantienen niveles adecuados de carga en las lneas de 220 kV que alimentan a
subestaciones de dicho sistema, as como a subestaciones del Sistema Metropolitano. Para el ao 2017, se
prev la construccin de la Subestacin Trinidad II 500 kV, junto con la lnea de transmisin 500 kV
Ayolas Trinidad II, con el objetivo de aumentar sustancialmente la confiabilidad de la transmisin de
energa al rea de Encarnacin y zonas aledaas. De igual forma, se tiene prevista la construccin de la
LT 500 kV Ayolas Eusebio Ayala para el 2022, requerida para incrementar la inyeccin de potencia
activa y reactiva desde el Sistema Sur al Sistema Metropolitano, a efectos de abastecer la creciente
demanda de dicho Sistema.
En el Sistema Norte, se requiere la construccin de la LT 220 kV Villa Hayes Concepcin, de manera a
evitar la sobrecarga de la LT 200 kV Caraya San Estanislao, para el ao 2022 se requerir la
duplicacin de este ltimo circuito, debido al importante nivel de cargaque alcanza la regin Norte del
pas para dicho periodo.
Para el Sistema Oeste se tiene prevista la construccin de la LT 220 kV Concepcin Pozo Colorado y
Pozo Colorado Loma Plata, de manera a que con la misma se tenga una segunda alimentacin al Chaco.
De igual manera para el periodo correspondiente al mediano plazo se considera tambin la inclusinde la
LT 220 kV Vallem Toro Pampa, con la construccin de la Subestacin Toro Pampa, con la cual los
centros de carga principalmente las relacionadas a las localidades de Toro Pampa, Fuerte Olimpo, Baha
Negra, entre otros, tendrn mejores niveles de calidad de suministro, pues con la inyeccin de potencia
desde este nuevo centro de distribucin, permitir a la zona aumentar la confiabilidad del servicio,ya que
se tendrn mejoras sustanciales en los niveles de tensin.
Tabla 6. Carga en lneas del Sistema de Transmisin en condiciones normales Periodo Medio Plazo.

Este

Central

Sur

Norte

500 kV

LT (por circuito) y TR (por transform ador)

Nom inal

MD - ACY
ACY-K30
MD-IRY (4 y 5)
ACY-COV (2 y 3)
K30-COV (8 y 9)
K30-COV (1)
ACY-PFO
IRY-CAT-SGA
COV-SLO (1)
COV-GUA (2 y 3)
CYO-LIM (4 y 5)
COV-VIL
AYO-SPA
SPA-GUA (6 y 7)
SPA-CBO
AYO-CBO
CBO-TRI
CYO-SES
IRY-CUR-CCO
VHA-CON
MD-VHA 500 kV
MD-CYO 500 kV
MD-LCD 500 kV
AYO-VHA 500 kV
AYO-TRI 500 kV
Transf. MD 500/220 kV
Transf. AYO 500/220 kV
Transf. VHA 500/220 kV
Transf. ESA 500/220 kV
Transf. LCD 500/220 Kv
Transf. TRI 500/220 kV

667
550
267/550
191
300
191
550
250
272
272
230
240
375
240
210
350
350
270/350
350
350
2000
2000
2000
2000
2000
395
375
600
600
600
600

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 29

2019
244
292
215
131
150
133
154
43
181
176
69
164
152
169
45
63
67
208
139
103
701
711
562
617
258
189
222
587
496
280
229

Carga (MVA)
2020
2021
274
323
315
360
239
276
140
158
161
181
142
160
162
188
47
51
196
217
192
211
73
82
157
173
147
156
157
152
36
37
70
79
60
71
232
250
152
166
116
136
815
922
828
936
632
729
565
551
229
232
211
247
176
190
472
516
276
257
316
364
203
205

2022
362
404
305
172
193
178
198
56
246
242
80
182
137
126
36
80
73
151
164
124
1002
1017
822
323
196
276
172
562
347
411
170

2023
360
382
200
143
164
149
158
58
250
258
214
200
139
123
35
85
70
180
158
97
908
906
724
305
212
235
176
535
305
361
189

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Por su parte, el Sistema Metropolitano requiere la construccin de la segunda LT 500 kV Margen


Derecha Villa Hayes, tal como explicado anteriormente. La construccin de la Subestacin Eusebio
Ayala 500 kV es requerida de forma a evitar la sobrecarga de los autotransformadores en la Subestacin
Villa Hayes 500 kV, y de forma a aumentar la seguridad del suministro a toda la regin metropolitana de
Asuncin. Esta segunda subestacin en la zona, produce un aumento de la confiabilidad, ya que evita la
excesiva concentracin de capacidad de transformacin en una nica subestacin. Adems, ante
eventuales problemas o inconvenientes de interconexin del SIN con los sistemas brasilero y argentino,
de manera a no poder operar el mismo en forma paralela, la Subestacin Eusebio Ayala asumira una
funcin de suma importancia, principalmente para una adecuada y necesaria redistribucin de los flujos
de potencia hacia el sistema metropolitano.
7.1.2

Evaluacin de reactivos del sistema

Los dispositivos de compensacin reactiva proveen una capacidad de inyeccin dinmica y controlable, la
cual permite regular la tensin en distintos puntos del Sistema, as como aumentar la capacidad de
transmisin del mismo. Los siguientes equipos son considerados en el Sistema (existentes y futuros):

Subestacin San Lorenzo: compensador esttico de reactivo con una capacidad de -80 / +150
MVAr. Se prev para el mismo un Retrofit en sus instalaciones, de forma a sustituir el actual
sistema dinmico (Tiristores, filtros, etc.) de electrnica de potencia, por otro nuevo y de iguales
caractersticas, ao 2015 (futuro).

Subestacin Limpio: compensador esttico de reactivo con una capacidad de -150 / +250 MVAr
(existente).

Subestacin Horqueta: compensador esttico de reactivo con una capacidad de -80 / +150 MVAr
(existente).

Subestacin Guarambar: sistema esttico de compensacin reactiva con una capacidad de120/+300 MVAr, y con puesta en servicio a plena capacidad para el ltimo trimestre del 2015
(futuro). Dicho equipo estar compuesto por una rama dinmica de -120 / +140 MVAr y dos
bancos de capacitores maniobrables de 80 MVAr. Dicha configuracin proveer capacidad de
compensacin tanto para el SS1 como para el SS2 para la operacin separada del SIN.

Enlas Tablas 7 y 8 se muestran las inyecciones de potencia reactiva de los Compensadores Estticos de
Reactivo del Sistema. Puede apreciarse que las obras definidas en el Plan de Obras permitiran que todos
los equipos de compensacin operen con mrgenes de carga reactiva apreciables, de forma a permitir la
reaccin de los mismos ante contingencias en el sistema, principalmente en el corto plazo.
Tabla 7. Inyeccin de potencia reactiva de los Compensadores Estticos de Reactivo Condiciones Normales
Caso Punta Periodo 2014 - 2018
Reactivo (MVAr)
CER / Bancos
Nominal*
2014
2015
2016
2017
2018
San Lorenzo 66 kV
150
55
91
55
51
51
Limpio
250
67
106
52
41
201
Guarambar
300
172
246
206
223
213
Horqueta
150
20
46
56
76
113
* Valores mximos capacitivos
Tabla 8. Inyeccin de potencia reactiva de los Compensadores Estticos de Reactivo Condiciones Normales
Caso Punta Periodo 2019 - 2023
CER / Bancos
San Lorenzo 66 kV
Limpio
Guarambar
Horqueta
* Valores mximos capacitivos

Nominal*
150
250
300
150

Plan Maestro de Generacin y Transmisin (2014 2023)

2019
49
30
199
72

Pg. 30

2020
52
165
144
120

Reactivo (MVAr)
2021
2022
56
65
209
214
194
202
93
88

2023
80
210
245
76

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Dada la configuracin adoptada para el Sistema de Compensacin Reactiva de la Subestacin


Guarambar, con dos bancos fijos de 80 MVAr, dicho equipo resulta el ms exigido durante los primeros
aos hasta la incorporacin de la LT 500 kV Ayolas Villa Hayes en el ao 2016. Posterior a ello, puede
observarse un creciente requerimiento de reactivos del sistema, llegndose a reducir apreciablemente el
margen de carga reactiva de los compensadores para el ao 2020. Dichos mrgenes son restablecidos una
vez incorporada la segunda LT 500 kV Margen Derecha Villa Hayes.
Es importante resaltar, que adicionalmente se prev la instalacin de bancos de capacitores en 23 kV en
las distintas subestaciones del Sistema, de forma a acompaar el crecimiento de la demanda,
mantenindose factores de potencia aceptables en los transformadores de potencia que alimentan al
sistema de distribucin, optimizndose de esta forma la utilizacin de la capacidad de dichos
transformadores. El detalle de la compensacin reactiva instalada en 23 kV se presenta en el Anexo 2.
Complementariamente, se realiza el anlisis de curvas QV, de manera a evaluar el margen de estabilidad
del Sistema. En la Figura 5, se muestran la curva QV de la barra 220 kV de la Subestacin Guarambar
(SS1) correspondiente al ao 2014 en condiciones normales. Puede observarse, que la operacin con la
LT 500 kV Margen Derecha Villa Hayes permitira una operacin estable, an sin compensacin
reactiva en Guarambar.
383

Curva QV - Barra 220 kV de Guarambar

203

404 GUA B1 220

24

-156

-335
0,894

0,936

0,978

1,02

1,062

1,104

Tensin (pu)

Figura 6. Curvas QV Subestacin Guarambar (SS1) Caso Punta 2014 Condiciones Normales

Las Figuras 7 y 8 muestran las curvas QV de la barras de 220 kV de las Subestaciones Guarambar y
Horqueta, para los aos 2018 y 2023 respectivamente. En la Subestacin Guarambar, el margen de carga
reactiva disminuye progresivamente desde el ao 2014, como consecuencia del aumento en la demanda
del SIN, hasta que en el ao 2018 se tiene nuevamente un notorio aumento en tal indicador como
consecuencia de la incorporacin de la Subestacin Eusebio Ayala 500 kV. Dicho margen de carga
reactiva se ve disminuido para el 2023, nuevamente a consecuencia del importante aumento de carga,
mismo considerando en servicio la segunda LT 500 kV Margen Derecha Villa Hayes.
Curva QV - Barra 220 kV de Guarambar

235

Curva QV - Barra 220 kV de Horqueta

288

196

80

103

-75

11

-229

-82
0,95

-384

0,978

1,006

1,034

1,062

Tensin (pu)

1,

1,015

1,03

1,045

1,06

1,075

Tensin (pu)

Figura 7.Curvas QV Caso Punta 2018 Subestaciones Guarambar y Horqueta Condiciones Normales

En la Subestacin Horqueta, puede apreciarse un reducido margen de potencia reactiva (en torno a los 80
MVAr), lo cual subraya la dificultad de operacin sin el Compensador Esttico de Horqueta. Dicho
dficit de potencia reactiva se mantiene aproximadamente igual en el ao 2023, debido a diversas obras
de refuerzo en el sistema Norte y Oeste, como por ejemplo la LT 220 kV Villa Hayes Concepcin.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 31

1,09

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)
Curva QV - Barra 220 kV de Guarambar

164

Curva QV - Barra 220 kV de Horqueta

347

240

120

133

77

26

33

-10
1,034

-81
1,026

1,038

1,041

1,044

1,048

1,037

1,048

1,051

1,058

1,069

1,08

Tensin (pu)

Tensin (pu)

Figura 8.Curvas QV Caso Punta 2023 Subestaciones Guarambar y Horqueta Condiciones Normales

Cabe destacar del monitoreo de las curvas QV, que en las mismasse observan varios casos donde el
mnimo de la curva, que indica el lmite entre la regin de operacin estable (pendiente positiva) y la
regin de operacin inestable (pendiente negativa), se ubica dentro de la faja de tensiones de operacin
considerada Normal, lo que indica el alto grado de compensacin reactiva existente en el Sistema.
7.1.3 Evaluacin del margen de carga del sistema

Otro aspecto considerado en el anlisis realizado en estos estudios se refiere a la cargabilidad del sistema
de transmisin en el periodo. Para ello, se trazan las curvas PV de forma a percibir la evolucin del
margen de estabilidad y el impacto de las obras de refuerzo introducidas.
Las Tablas 9 y 10, muestran respectivamente los mrgenes de carga, en el corto y medio plazo, obtenidos
para un aumento de carga uniforme en todo el Sistema.
Tabla 9. Incremento de carga (Curva PV) Corto Plazo

Tabla 10. Incremento de carga (Curva PV) Medio Plazo

La Figura 9, muestra las curvas PV del sistema para el ao 2014, considerando la carga punta del Sistema
en condiciones normales. Puede apreciarse un aceptable margen de carga, debido entre otras obras, a la
entrada en operacin de la lnea LT 500 kV Margen Derecha Villa Hayes, las lneas LT 220 kV Villa
Hayes Puerto Sajonia I y II y el Compensador Esttico de Reactivos de la Subestacin Horqueta.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 32

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Figura 9. Curvas PV Punta 2014 - Normal

La Figura 9, muestra las curvas PV del sistema para el ao 2015, considerando la carga punta del Sistema
en condiciones normales. Puede apreciarse un reducido margen de carga, empezando a manifestarse los
mismos en las Subestaciones ubicadas en las fronteras de los Sistemas Este y Sur,lo que lleva a
caracterizar dicha rea como zona crtica del Sistema (Trinidad, Natalio, etc.), esto se debe
fundamentalmente a dos aspectos, al aumento de la demanda y a la configuracin radial de dichos locales,
abastecidos desde la Central Hidroelctrica de Yacyret, y considerando adems la operacin del SIN en
dos subsistemas elctricos aislados.
Curvas PV - Ao 2015 - Normal

1,068

1,042

1,017

0,991

V, 404 GUA B1 220

V, 475 PPE B1 220

V, 453 NAT TA 220

V, 479 LPA B1 220

V, 468 HOR B1 220

0,965
2965

3007

3048

3090

3132

3173

Crecimiento de Carga (MW)

Figura 10. Curvas PV Punta 2015 Normal

La Figura 11, muestra las curvas PV del sistema para el ao 2016, considerando la carga punta del
Sistema en condiciones normales. Puede apreciarse un considerable aumento en el margen de carga como
consecuencia de la incorporacin de la LT 500 kV Ayolas Villa Hayes y la operacin Interconectada de
los Sistemas Elctricos de Potencia de Paraguay, Argentina y Brasil.
Curvas PV - Ao 2016 - Normal

1,063

1,042

1,021

0,999

0,978
3260

V, 404 GUA B1 220

V, 475 PPE B1 220

V, 468 HOR B1 220

V, 479 LPA B1 220

3365

3471

3576

3681

3787

Crecimiento de Carga (MW)

Figura 11. Curvas PV Punta 2016 Normal

La Figura 12, muestra las curvas PV del sistema para el ao 2019, considerando la carga punta del
Sistema en condiciones normales. Puede apreciarse que pese al considerable incremento de la demanda
entre los aos 2016 y 2019, la reduccin en el margen de carga es pequea, debido a importantes obras
como la Subestacin Eusebio Ayala 500 kV (Ao 2018) y la segunda lnea LT 500 kV Margen Derecha
Villa Hayes (2019). Para este ao, la red de transmisin del Sistema Oeste se manifiesta como la zona
ms crtica del sistema, en relacin a la estabilidad de tensin.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 33

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)
Curvas PV - Ao 2019 - Normal

1,06

0,995

0,93

0,865
V, 404 GUA B1 220

V, 475 PPE B1 220

V, 468 HOR B1 220

V, 479 LPA B1 220

0,8
4324

4436

4548

4660

4772

4885

Crecimiento de Carga (MW)

Figura 12. Curvas PV Punta 2019 Normal

La Figura 13, muestra las curvas PV del sistema para el ao 2023, considerando la carga punta del
Sistema en condiciones normales. Puede apreciarse una reduccin en el margen de carga del Sistema
como consecuencia del aumento en la demanda, no obstante, cabe destacar que el perfil de tensiones en el
Sistema Oeste mejora considerablemente. Dicha mejora se debe principalmente a las nuevas obras de
refuerzos en lneas de transmisin de 220 kV para dicho Sistema, y previstas para finales del mediano
plazo.
Curvas PV - Ao 2023 - Normal

1,043

1,025

1,007

0,988

0,97
5935

V, 404 GUA

220

V, 475 PPE

220

V, 468 HOR

220

V, 479 LPA

220

6031

6127

6224

6320

6416

Crecimiento de Carga (MW)

Figura 13. Curvas PV Punta 2023 Normal

7.2

Anlisis de contingencias del SIN

Otro anlisis normalmente desarrollado en estudios de sistemas elctricos es la evaluacin del desempeo
ante la prdida de uno de sus elementos, ya sea, lnea de transmisin, transformador, generador o
dispositivo especial como compensadores estticos de reactivo.
Dada la naturaleza de los sistemas elctricos, y su exposicin a agentes externos, como por ejemplo,
condiciones atmosfricas desfavorables, es previsible la ocurrencia de eventos que producen la
desconexin temporal de distintos equipamientos de la red. Por ello, en esta seccin se evalan las
condiciones de operacin del sistema de transmisin ante la ocurrencia de distintas contingencias del tipo
Criterio N 1.
Considerando que las contingencias que involucran a la red de 500 kV son las que mayor impacto
producen en el sistema, afectando potencialmente a mayor nmero de usuarios, en la siguiente seccin se
muestran en detalle los niveles de carga en el sistema ante el fuera de servicio de distintas lneas de
transmisin en 500 kV previstas en el Plan de Obras.
En base a la operativa normal de ANDE, principalmente en los primeros aos en los cuales se tiene al
SIN operando en 2 sub-sistemas elctricamente separados, se adopta como criterio vlido la posibilidad
de reconfiguracin topolgica del SIN a fin de reducir eventuales sobrecargas.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 34

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

7.2.1 Principales contingencias en la red de 500 kV


7.2.1.1 Desconexin de la LT 500 kV Margen Derecha Villa Hayes

En las Tablas 12 y 13 se resumen respectivamente, los valores de carga de las principales lneas y
transformadores del SIN, as como la inyeccin de potencia reactiva requerida de los dispositivos de
compensacin reactiva ante la ocurrencia de una desconexin de la LT 500 kV Margen Derecha Villa
Hayes en el periodo 2014 2018, considerando la carga punta del sistema.
Puede mencionarse, desde el punto de vista de cargabilidad de elementos del SIN, que debido al elevado
monto de potencia transmitida por la LT 500 kV Margen Derecha Villa Hayes en condiciones normales
de operacin, el fuera de servicio de esta lnea ocasiona demandas de potencias a ser transmitidas
incompatibles con las capacidades de transmisin de las lneas del tronco principal de 220 kV, que
vinculan la generacin del Sistema Este con importantes Subestaciones del Sistema Central,
principalmente los circuitos 4 y 5, es decir, la lnea LT 220 kV doble terna Margen Derecha Itakyry
Caraya, donde en los aos 2014 y 2015, el SIN an no opera interconectado, se constituyen en los
elementos que limitan la capacidad de suministro del SIN. En otro aspecto, desde el punto de vista de
soporte reactivo, la indisponibilidad de la LT 500 kV Margen Derecha Villa Hayes produce importantes
dficit de reactivos, que en los aos 2014 y 2015 son suplidos en gran medida por la compensacin
reactiva en 220 kV disponible en las Subestaciones de San Lorenzo y Guarambar (2 x 80 MVAr en cada
local).
Se resalta adems que el Compensador Esttico de Reactivos previsto para la Subestacin Guarambar
para finales del 2015, brindar un soporte reactivo muy importante al Sistema Metropolitano y por ende al
SIN, principalmente ante una eventual indisponibilidad del CER de la Subestacin San Lorenzo, el cual
se encuentra cercano a la culminacin de su vida til (33 aos de operacin), en ese sentido, se plantea
tambin para el ao 2016 el correspondiente retrofit de dicho equipo de compensacin reactiva. La tabla
13 muestra valores referenciales de cortes de carga que seran requeridos para mantener la operacin de
los principales elementos del sistema dentro de los criterios tcnicos establecidos.
Tabla 11. Carga en lneas y transformadores del sistema de transmisin Periodo 2014-2018. Fuera de Servicio LT
500 kV Margen Derecha Villa Hayes Carga punta del sistema

Este

Central

Sur

Norte

500 kV

LT
MD - ACY
ACY-K30
MD-IRY (4 y 5)
ACY-COV (2 y 3)
K30-COV (8 y 9)
K30-COV (1)
ACY-PFO (1 y 2)
IRY-CAT-SGA
COV-SLO (1)
COV-GUA (2 y 3)
CYO-LIM (4 y 5)
COV-VIL
AYO-SPA
SPA-GUA (6 y 7)
SPA-CBO
AYO-CBO
CBO-TRI
CYO-SES
IRY-CUR-CCO
AYO-VHA 500 kV
AYO-TRI 500 kV
MD-LCD 500 kV
Transf. MD 500/220 kV
Transf. AYO 500/220 kV
Transf. VHA 500/220 kV
Transf. ESA 500/220 kV
Transf. LCD 500/220 kV
Transf. TRI 500/220 kV

Plan Maestro de Generacin y Transmisin (2014 2023)

Potencia en Em ergencia

667
660
267 / 660
229
360
229
210/660
300
272
272
230
260
294 / 375
270
210
350
350
270
360
2200
2200
2200
428
375
720
720
720
720

Pg. 35

Carga (MVA)
2014
2015
470
463
283
283
263
264
178
177
187
184
171
177
121
49
33
33
215
213
209
203
159
163
54
57
200
145
118
120
166
54
128
76
86
88
95
97
282
285
231
236
0
-

2016
484
262
267
151
163
153
93
36
151
126
68
103
243
232
38
168
85
206
136
1068
319
370
369
-

2017
320
386
400
221
240
222
280
38
250
225
153
128
196
229
79
78
100
220
168
915
249
872
300
272
328
437
202

2018
373
421
350
225
244
226
280
41
242
224
172
144
187
224
57
75
90
243
185
982
197
864
303
251
291
217
431
167

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Tabla 12. Inyeccin de potencia reactiva de los Compensadores Estticos de Reactivo Periodo 2014-2018. Fuera
de Servicio LT 500 kV Margen Derecha Villa Hayes Punta del Sistema

CER
San Lorenzo
Limpio
Guarambar
Horqueta

Nominal*
150
250
300
150

2014
35
74
176
-50

2015
-5
80
202
-47

Reactivo (MVAr)
2016
2017
80
145
212
247
231
300
61
101

2018
148
250
300
125

* Valores mximos capacitivos

La entrada en operacin en el ao 2016 de la LT 500 kV Ayolas Villa Hayes permitira reducir los
montos de carga que seran eventualmente desconectados ante la contingencia aqu analizada (Corte de
Carga I, indicada en la tabla 13), considerando la posibilidad de una mayor importacin de potencia del
Sistema Argentino de Interconexin SADI, a travs de la CH Yacyret, y teniendo en cuenta que la
mutua asistencia entre sistemas elctricos ante condiciones de emergencia es uno de los beneficios de la
interconexin elctrica. Con esta consideracin, ante la entrada en operacin de la Subestacin Los
Cedrales y la repotenciacin de la doble terna LT 220 kV Margen Derecha Itakyry, no existiran cortes
de carga en el ao 2017. Eventualmente, de no ser posible el incremento de intercambio con el SADI,
debern considerarse los cortes indicados en la lnea Corte de Carga II de la tabla 13.
Tabla 13. Cortes de carga requeridos Periodo 2012-2016. Fuera de Servicio LT 500 kV Margen Derecha Villa
Hayes Punta del Sistema
Ao
Corte de Carga I (MW)
Corte de Carga II (MW)*

2014
867
867

2015
1140
1140

2016
802
1297

2017
0
284

2018
90
451

* No considera incrento de intercambio con el SADI

Se observa en la tabla 12, la falta de soporte reactivo para el ao 2018, donde se aprecia que
prcticamente todos los Compensadores Estticos de Reactivos del SIN se encuentran operando prximos
a sus capacidades nominales. Para paliar esta situacin y poder minimizar los cortes de carga en dicho
ao, de manera a poder obtener los valores indicados en la tabla 14, se requiere la instalacin de
compensacin reactiva en 220 kV en el Sistema Central (especficamente la misma fue evaluada para la
Subestacin Caraya), donde para el efecto podra emplearse uno de los Bancos de Capacitores de 80
MVAr - 220 kV, actualmente instalados en la SE Guarambar.
Las Tablas 14 y 15 muestran los valores de carga de las principales lneas de transmisin y equipos del
SIN encontrados en el periodo 2019-2023, considerando la carga de punta del sistema, ante la
contingencia analizada, y la inyeccin de potencia reactiva por parte de los Compensadores Estticos.
En el ao 2019 se prev la puesta en servicio de la segunda LT 500 kV Margen Derecha Villa Hayes,
obra que mitigar en gran medida el impacto de la contingencia considerada en esta seccin. As, el
sistema estara en condiciones de soportar el fuera de servicio de la LT 500 kV Margen Derecha Villa
Hayes, sin ninguna consecuencia, salvo naturalmente, la reduccin en la confiabilidad, hasta el ao 2021
inclusive, teniendo en cuenta la posibilidad de un incremento en el intercambio con el SADI en ese ao.
No obstante, a partir del ao 2022 se observa la necesidad de efectuar cortes de carga debido a los flujos
de potencia a travs de las lneas del tronco secundario, que unen el sistema Central con el sistema
Metropolitano (circuitos 1, 2 y 3). Puede apreciarse en la tabla 16, que el soporte de potencia reactiva
en el periodo 2019-2023 es adecuado. La tabla 16 muestra valores referenciales de cortes de carga que
seran requeridos para mantener los flujos a travs de las lneas de transmisin en niveles compatibles con
sus capacidades en rgimen de emergencia.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 36

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Tabla 14. Carga en lneas y transformadores del Sistema de transmisin Periodo 2019-2023. Fuera de Servicio LT
500 kV Margen Derecha Villa Hayes Punta del Sistema

Este

Central

Sur

Norte

500 kV

LT
MD - ACY
ACY-K30
MD-IRY (4 y 5)
ACY-COV (2 y 3)
K30-COV (8 y 9)
K30-COV (1)
ACY-PFO (1 y 2)
IRY-CAT-SGA
COV-SLO (1)
COV-GUA (2 y 3)
CYO-LIM (4 y 5)
COV-VIL
AYO-SPA
SPA-GUA (6 y 7)
SPA-CBO
AYO-CBO
CBO-TRI
CYO-SES
IRY-CUR-CCO
MD-VHA 500 kV
MD-LCD 500 kV
AYO-VHA 500 kV
AYO-TRI 500 kV
Transf. MD 500/220 kV
Transf. AYO 500/220 kV
Transf. VHA 500/220 kV
Transf. ESA 500/220 kV
Transf. LCD 500/220 kV
Transf. TRI 500/220 kV

Em ergencia

667
274,8
660
229
326,4
229
660
312
272
272
230
260
375
270
210
350
350
270/550
450
2200
2200
2200
2200
428
450
720
720
720
720

2019
321
362
280
176
197
178
207
44
214
208
119
169
161
185
50
56
73
221
159
1125
729
680
215
251
232
474
388
363
190

Carga (MVA)
2020
2021
346
405
386
451
307
362
188
217
209
242
189
219
216
252
47
52
226
262
217
254
121
143
161
175
162
174
180
178
46
44
68
74
72
82
240
270
170
193
1223
1404
792
965
677
741
200
180
270
326
190
196
407
462
208
238
396
483
175
156

2022
405
442
353
212
236
213
242
51
255
245
137
174
171
174
46
75
82
263
188
1384
908
723
188
313
194
453
236
454
162

2023
422
472
361
213
234
218
246
54
261
263
127
184
147
143
39
75
82
151
178
1386
948
411
165
324
181
471
280
474
135

Tabla 15. Inyeccin de potencia reactiva de los Compensadores Estticos de Reactivo Periodo 2019-2023. Fuera
de Servicio LT 500 kV Margen Derecha Villa Hayes Punta del Sistema
CER
San Lorenzo
Limpio
Guarambar
Horqueta

Nominal*
150
250
300
150

2019
98
221
213
117

2020
141
246
300
150

Reactivo (MVAr)
2021
142
211
264
146

2022
147
245
295
127

2023
94
175
186
95

Tabla 16. Cortes de cargas requeridos Periodo 2017-2021.Fuera de Servicio LT 500 kV Margen Derecha Villa
Hayes Punta del Sistema
Ao
Corte de Carga I (MW)
Corte de Carga II (MW)*

2019
0
0

2020
0
115

2021
0
125

2022
393
538

2023
662
819

* No considera incremento de intercambio con el SADI

En general, puede concluirse que la contingencia constituida por el fuera de servicio de la LT 500 kV
Margen Derecha Villa Hayes representa la contingencia ms severa a nivel sistmico, debido a la
prdida sbita de suministro tanto de potencia activa como reactiva en el Sistema Metropolitano, principal
centro de carga del SIN.
Estudios especficos posteriores debern analizar la conveniencia tcnica y econmica de repotenciar las
lneas de 220 kV mencionadas en esta seccin (circuitos 1 al 5) o alguna otra medida equivalente, con
el propsito de evitar o mitigar los cortes de carga referenciales indicados anteriormente.
7.2.1.2 Desconexin de la LT 500 kV Ayolas Villa Hayes

En esta seccin se analiza el desempeo del sistema ante la ocurrencia de una desconexin de la LT 500
kV Ayolas Villa Hayes. Las Tablas 17 y 18 muestran los valores de carga de las principales lneas de
transmisin y equipos del SIN encontrados en el periodo 2016-2023, considerando la carga de punta del

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 37

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

sistema, ante la contingencia analizada, as como la inyeccin de potencia reactiva por parte de los
Compensadores Estticos.
Tabla 17. Carga en lneas y transformadores del Sistema de transmisin Periodo 2016-2023. Fuera de Servicio
LT 500 kV Ayolas Villa Hayes Punta del Sistema

Este

Central

Sur

Norte

500 kV

LT
MD - ACY
ACY-K30
MD-IRY (4 y 5)
ACY-COV (2 y 3)
K30-COV (8 y 9)
K30-COV (1)
ACY-PFO (1 y 2)
IRY-CAT-SGA
COV-SLO (1)
COV-GUA (2 y 3)
CYO-LIM (4 y 5)
COV-VIL
AYO-SPA
SPA-GUA (6 y 7)
SPA-CBO
AYO-CBO
CBO-TRI
CYO-SES
IRY-CUR-CCO
MD-VHA 500 kV
MD-CYO 500 kV
MD-LCD 500 kV
AYO-VHA 500 kV
AYO-TRI 500 kV
Transf. MD 500/220 kV
Transf. AYO 500/220 kV
Transf. VHA 500/220 kV
Transf. ESA 500/220 kV
Transf. LCD 500/220 kV
Transf. TRI 500/220 kV

Em ergencia

667
326,4
267 / 660
229
450
229
210/660
312
272
272
230
260
294 / 375
270
210
350
350
270
864
2200
2200
2200
2200
2200
428
375
720
720
720
720

2016
550
290
263
170
182
172
110
33
174
166
91
106
178
162
40
132
64
204
143
1164
241
282
412
-

2017
279
351
364
197
216
199
261
38
209
194
115
128
146
164
42
64
69
222
161
1216
783
221
269
212
424
391
189

Carga (MVA)
2018
2019
322
274
380
332
307
247
197
158
216
177
198
159
238
200
41
43
177
162
166
147
122
88
146
167
176
206
213
237
67
64
40
74
74
77
247
211
178
148
1263
873
886
746
618
210
309
260
216
238
289
421
559
72
242
372
308
208
283

2020
290
346
263
161
182
163
210
47
162
141
80
158
210
236
57
82
69
230
156
978
992
663
299
229
238
439
126
330
277

2021
333
391
299
178
202
180
228
51
186
161
89
175
230
242
57
89
74
251
172
1030
1046
736
314
259
262
493
139
368
296

2022
362
409
311
175
196
181
212
55
240
228
80
184
163
157
37
83
74
151
165
1013
1028
820
548
228
280
199
554
302
410
204

2023
357
385
202
145
166
150
167
58
240
240
214
201
158
148
38
87
72
180
158
915
914
715
516
239
234
191
521
263
356
217

Tabla 18. Inyeccin de potencia reactiva de los Compensadores Estticos de Reactivo Periodo 2016-2023. Fuera
de Servicio LT 500 kV Ayolas Villa Hayes Punta del Sistema
CER
San Lorenzo
Limpio
Guarambar
Horqueta

Nominal*
150
250
300
150

2016
148
164
200
70

2017
150
250
265
90

Reactivo (MVAr)
2019
2020
142
142
202
238
253
300
88
115

2018
141
250
300
118

2021
150
248
300
101

2022
148
189
244
90

2023
148
242
300
70

* Valores mximos capacitivos

Puede apreciarse en las tablas precedentes que, salvo en el ao 2016, las restricciones operativas se deben
al agotamiento del soporte reactivo en los Compensadores Estticos del sistema Metropolitano. Tambin,
en la tabla 20 se indican los cortes de carga referenciales requeridos para mantener las lneas y equipos
del SIN operando dentro de sus lmites nominales, ante la eventual contingencia analizada.
Tabla 19. Cortes de cargas requeridos Periodo 2016-2021. Fuera de Servicio LT 500 kV Ayolas Villa Hayes
Punta del Sistema
Ao
Corte de Carga (MW)

2016
81

2017
0

2018
25

2019
0

2020
28

2021
0

2022
0

2023
0

Los montos de corte presentados en la tabla 19, indican que esta contingencia es menos severa que la
analizada en la seccin anterior y que en general podran minimizarse con la instalacin de compensacin
reactiva en otros niveles de tensin, y de esta forma permitir operar a los Compensadores Estticos de
Reactivos de manera ms holgada, exceptuando al ao 2016, donde sera necesario anticipar la
repotenciacin de la LT 220 kV Margen Derecha Itakyry (prevista para el ao 2017), de manera
aanularlos cortes indicados.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 38

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

7.3

Evaluacin de prdidas de transmisin

La Tabla 20 muestra los valores de prdidas totales del sistema de transmisin, obtenidos de las
simulaciones de flujo de potencia para condiciones de carga mxima, media y leve.
Tabla 20. Prdidas de Transmisin del SIN.
Ao
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Punta
175
209
198
222
260
235
274
316
350
347

Prdidas (MW)
Media
Leve
138
57
174
69
159
69
178
76
203
85
193
74
219
86
246
103
279
109
289
109

Punta
5,8
6,1
5,3
5,4
5,8
4,8
5,2
5,5
5,7
5,3

Prdidas * (%)
Media
Leve
5,3
3,9
5,7
4,0
4,7
3,5
4,8
3,6
5,1
3,8
4,5
3,0
4,7
3,3
4,9
3,6
5,2
3,5
5,0
3,4

% Prdidas = Prdidas / Generacin total

En la Figura 14 se grafican los valores de prdidas totales del Sistema de la Tabla 20. Puede apreciarse el
efecto de la entrada en servicio de la LT 500 kV Margen Derecha Villa Hayes. A modo de referencia, se
puede indicar que en el ao 2013 (antes de la entrada parcial en operacin de la LT 500 kV Margen
Derecha Villa Hayes) se registraron valores de prdidas de transmisin en punta en torno a 11,4%
(Febrero 2013). Para el ao 2014, con la LT 500 kV Margen Derecha Villa Hayes y la obras
complementarias en operacin, se tendra una prdida de transmisin en punta prxima a 5,8% y unas
prdidas medias en torno a 5,2%.
En el 2016, puede observarse una reduccin en los valores porcentuales de prdidas, originada por la
inclusin de la LT 500 kV Ayolas Villa Hayes. Anlogamente, en el ao 2019, la puesta en servicio de
la segunda LT 500 kV Margen Derecha Villa Hayes produce nuevamente una reduccin en las prdidas
de transmisin. Obsrvese, que los valores de prdidas resultantes del Plan de Obras son inferiores a los
valores actuales, y consistente con el plan de paulatina reduccin de prdidas de la empresa.

Figura 14.Prdidas del sistema de transmisin en MW y en %.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 39

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

7.4

Interconexin con las Centrales Hidroelctricas Binacionales

7.4.1

Capacidad de interconexin con la CH Itaip

Actualmente, la interconexin del SIN con la CH Itaip est constituida por 5 conjuntos de
autotransformadores/reguladores 500/220 kV repotenciados a 450 MVA cada uno, lo cual da una
capacidad disponible de 2.250 MVA. Adicionalmente, se dispone de un sexto conjunto (Tx/Rx), con igual
capacidad que los anteriores para dar seguridad al suministro.
Con la puesta en servicio de la LT 500 kV Margen Derecha Villa Hayes, en el ao 2013 de forma a
optimizar la operacin del sistema de transmisin, se dispone de una capacidad nominal adicional de 600
MVA con un auto-transformador, y 1200 MVA con dos auto-transformadores, limitado por la capacidad
transformacin de la Subestacin 500 kV Villa Hayes.
Finalmente, tambin es importante destacar que se tienen previstas las obras de seccionamiento de las
LTs 500 kV L3 y L4, en la Subestacin Margen Derecha, que unen actualmente a la casa de mquinas de
la CH Itaip con la Subestacin Foz de Iguaz, lo cual producir un aumento en la confiabilidad y
seguridad del suministro al SIN.
En la siguiente tabla, se incluyen valores referenciales de la inyeccin de potencia requerida por el SIN
desde la CH Itaip en los casos de flujo de potencia para la punta del sistema en condiciones normales.
Los mismos pueden ser considerados como valores referenciales, ya que ante variaciones de carga, as
como la ocurrencia de contingencias los mismos pueden sufrir importantes variaciones. La inclusin en el
ao 2016 de la LT 500 kV Ayolas Villa Hayes produce un aumento relativo de la participacin de la
CH Yacyret en el SIN, lo cual se refleja en la reduccin de inyeccin de potencia desde la CH Itaip en
el ao 2016.
Tabla 21. Inyeccin de potencia desde la CH Itaip al SIN (MW).
Caso de punta Condiciones Normales.
2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2365

2694

2353

2597

2769

3098

3538

3978

4403

4819

7.4.2

Capacidad de interconexin con la CH Yacyret

Actualmente, la CH Yacyret se interconecta al SIN a travs de la Subestacin Ayolas por medio de dos
lneas de transmisin: una lnea de 500 kV (operando en 220 kV) y otra lnea de 220 kV simple terna.
Ambas lneas son alimentadas por autotransformadores 500/220 kV de 250 MVA instalados en la CH
Yacyret, con lo cual se tiene una capacidad de 500 MVA. La ANDE est llevando adelante la
ampliacin de la Subestacin Ayolas, previndose la instalacin de dos autotransformadores 500/220 kV
de 375 MVA en dicha subestacin. Esta obra, junto con las adecuaciones correspondientes en la salida de
500 kV en la CH Yacyret y la efectiva operacin en 500 kV de la lnea de transmisin existente,
permitirn aumentar la capacidad de inyeccin de potencia desde la CH Yacyret. Una vez culminadas las
obras en curso, previstas para el segundo semestre el 2014, se tendr una capacidad de 750 MVA.
En este sentido, de forma a compatibilizar la capacidad de transmisin del sistema ANDE, resulta
fundamental la repotenciacin de la LT 220 kV Ayolas San Patricio, doble terna, de manera a poder
evacuar eventualmente los 750 MVA de capacidad disponibles en la Subestacin Ayolas.
Estas obras resultan importantes con vistas a garantizar el suministro al SIN en casos de restricciones en
el sistema de transmisin proveniente de la CH Itaip en el corto plazo, y con vistas a la operacin
interconectada de las Centrales de Itaip y Yacyret en el medio y largo plazo.
En la siguiente tabla, se incluyen valores referenciales de la inyeccin de potencia requerida por el SIN
desde la CH Yacyret en los casos de flujo de potencia para la punta del sistema en condiciones normales.
Tabla 22. Inyeccin de potencia desde la CHYacyret al SIN (MW).
Caso de punta Condiciones Normales.
2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

456

502

1201

1328

1328

1338

1335

1338

1340

1337

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 40

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Puede apreciarse que la incorporacin de la LT 500 kV Margen Derecha Villa Hayes permite que el
sistema requiera en condiciones normales de valores bajos de inyeccin de potencia desdela CH Yacyret.
Esto se debe fundamentalmente a que, ante la operacin separada en dos subsistemas elctricos (SS1 y
SS2), la CH Yacyret sirva de fuente de generacin prcticamente al Sistema Sur. No obstante, en
condiciones de emergencia en el periodo 2014-2015, la participacin de la CH de Yacyret es
fundamental para minimizar los efectos de la indisponibilidad delneas de transmisin provenientes del
Sistema Este al Sistema Metropolitano.
Posteriormente, con la incorporacin de la LT 500 kV Ayolas Villa Hayes, en el ao 2016, se requieren
inyecciones superiores de potencia, de manera a optimizar la utilizacin de ejes de transmisin EsteCentral-Metropolitano y Sur-Metropolitano respectivamente.
Es importante destacar, que dado el paulatino incremento previsto en la participacin de la CH Yacyret
en el suministro del SIN, y a fin de evitar que la interconexin EBY-ANDE dependa del estado de una
nica lnea de transmisin, el Plan de Obras prev, junto con el proyecto de la LT 500 kV Ayolas Villa
Hayes, la construccin de la segunda LT 500 kV Yacyret Ayolas para el ao 2016 y de una LT 500 kV
Ayolas-Eusebio Ayala hasta la futura Subestacin 500 kV de Eusebio Ayala para el ao 2022. Esto dotar
de una redundancia suficiente a la interconexin, con lo cual se busca dar mayor seguridad y
confiabilidad al suministro desde la CH Yacyret.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 41

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

8.

ANLISIS POR SISTEMAS

A continuacin se hace una descripcin general del desempeo, as como los problemas encontrados en
los diferentes sistemas que componen el SIN: Central, Sur, Este, Metropolitano y Norte. Se describen las
obras incluidas dentro del Plan, as como un anlisis de la utilizacin de la capacidad de transmisin y
transformacin.
8.1

Sistema Central

Es importante destacar, que para el estudio se consideraron en operacin, desde el ao 2013, las nuevas
Subestaciones Itacurub del Rosario y San Juan Nepomuceno, importantes obras de refuerzo para la red
del Sistema Central.
En cuanto a obras de refuerzos de lneas de transmisin, las principales obras requeridas en la zona son:

LT 220 kV Caraya San Estanislao (47 km) y San Estanislao - Santa Rosa (96 km): Repotenciacin
a 270 MVA (ao 2014), necesarias debido a limitaciones en la capacidad de transmisin existente
hacia el Sistema Norte.

LT 220 kV Coronel Oviedo Coronel Oviedo II- Caraya: Repotenciacin de la simple terna a 350
MVA por cambio de conductores (2022), requerida para satisfacer la demanda de la zona.

LT 220 kV Caraya San Estanislao: Re-construccin en doble terna del circuito existente,
aproximadamente 47 km, (ao 2022), requerida ante el incremento del intercambio con el Sistema
Norte y necesaria ante la proyectada construccin del patio de 500 kV en la Subestacin Caraya.

LT 500 kV Margen Derecha Caraya y Subestacin Caraya: Construccin de la lnea de


transmisin en 500 kV de aproximadamente 210 km y la ampliacin de la subestacin Caraya con
dos bancos de auto-transformadores 500/220 kV de 600 MVA (ao 2023). Esta obra es requerida para
satisfacer la demanda de los Sistemas Central, Norte y Metropolitano, con reduccin del flujo de
potencia a travs del corredor de transmisin de 220 kV entre el Sistema Este y el Sistema Central
(Tronco principal de transmisin en 220 kV), permitiendo adems una mejor utilizacin de las lneas
de transmisin de 220 kV que parten del sistema Central para el Sistema Metropolitano (Tronco
secundario de transmisin en 220 kV).

Por otro lado, se incluyen en el Plan de Obras la construccin de las siguientes nuevas subestaciones:

Barrio San Pedro: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2015).

Vaquera: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2015).

Coronel Oviedo II: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2019).

Los nuevos centros de distribucin atienden fundamentalmente a la necesidad de reforzar las redes de
distribucin existentes, considerando que las distancias de distribucin se tornan incompatibles con los
niveles actuales de carga. Estas nuevas subestaciones, en general se encuentran en los extremos de los
alimentadores existentes, y la inyeccin de potencia desde los nuevos centros de distribucin permitir
aumentar la confiabilidad del servicio, as como la calidad del mismo, ya que se tendrn mejoras
sustanciales en los niveles de tensin.
Puede observarse que los nuevos centros de distribucin estarn alimentados todos en 220 kV, ya que por
el nivel de carga y el escenario adoptado de crecimiento de la demanda, soluciones basadas en el nivel de
tensin de 66 kV presentan un agotamiento rpido de la capacidad de transmisin y condiciones tcnicas
inferiores.
Por otro lado, el Plan contempla tambin el aumento de la capacidad de transformacin en subestaciones
existentes, de manera a acompaar el crecimiento de la demanda.
En la siguiente tabla, se presenta un resumen con el estado de carga de los transformadores que alimentan
la carga en 23 kV. La primera columna indica el total de subestaciones que atienden carga en 23 kV,
discriminndose, el nmero de subestaciones cuyos transformadores presentan un factor de utilizacin
igual o inferior a 80%, entre 80 y 90%, entre 90 y 100%, y superior a 100%, lo cual indica una sobrecarga

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 42

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

en los equipos. El factor de utilizacin es calculado comparando la carga mxima prevista para la
subestacin y la capacidad nominal del equipo de transformacin instalado en la misma en 23 kV.
Tabla 23. Estado de carga de transformadores (23 kV), Sistema Central
TOTAL
AO
2.013
2.014
2.015
2.016
2.017
2.018
2.019
2.020
2.021
2.022
2.023

Subestaciones segn
porcentaje de caraga de transform adores

SEs 23 kV
9
11
13
13
13
13
14
15
15
15
15

<80%
3
16
12
11
8
6
6
8
9
8
8

80% - 90%
1
3
2
3
1
5
4
4

90%-100%
4
3
1
1
2
5
5
6
1
3
3

>100%
2
-

Anlogamente, la siguiente tabla y figura presentan la capacidad total instalada en 23 kV en las


subestaciones del Sistema Central, as como una sumatoria de la capacidad que se encuentra en las franjas
de utilizacin anteriormente mencionadas.
Tabla 24. Capacidad instalada segn porcentaje de carga, Sistema Central
TOTAL

Capacidad Instalada segn

AO
2.013
2.014
2.015
2.016
2.017
2.018
2.019
2.020
2.021
2.022
2.023

porcentaje de carga

MVA
332
455
622
622
632
652
693
762
938
969
1.009

<80%
134
330
580
550
415
310
310
462
640
495
565

80% - 90%
30
133
125
145
42
268
288
235

90%-100%
115
125
42
42
83
217
238
258
30
185
208

>100%
83
-

Figura 15. Porcentaje de transformadores (23 kV) segn niveles de carga, Sistema Central.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 43

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

En general, puede observarse un aumento en la capacidad instalada prevista para el Sistema Central,
pasndose de 332 MVA en el 2013 a 1.009 MVA en el 2023, con eliminacin de las sobrecargas y
reduccin del porcentaje de equipos con altos niveles de carga.
8.2

Sistema Sur

Para la elaboracin del Plan de Obras, se asume la finalizacin para el ao 2013 e inicios del ao 2014, de
obras de refuerzo que se encuentran en ejecucin en el Sistema Sur, respectivamente: construccin de la
Subestacin Pirap 66 kV, y ampliacin de la Subestacin Ayolas, con la instalacin de 2
autotransformadores 500/220 kV de 375 MVA.
En cuanto a refuerzos de transmisin, las principales obras requeridas en la zona son:

LT 220 kV San Patricio Coronel Bogado: Repotenciacin a 250 MVA (ao 2014), requerida para
acompaar el crecimiento de la demanda originado por el desarrollo de la zona de Encarnacin como
consecuencia del Plan de Terminacin de Yacyret.

LT 220 kV de alimentacin a Cambyret: Construccin de una LT 220 kV a partir del seccionamiento


de la LT Trinidad Cnel. Bogado para alimentacin a Cambyret (ao 2014), obra requerida para
satisfacer la demanda de la zona de Encarnacin.

LT 220 kV Ayolas Coronel Bogado: Construccin de una simple terna de aproximadamente 65 km


(ao 2015), requerida para adecuar la capacidad de inyeccin de potencia desde la CH Yacyret al
SIN.

LT 220 kV Coronel Bogado - Trinidad: Construccin de una simple terna de aproximadamente 53 km


(ao 2015), requerida para atender la demanda en la zona y fortalecer el corredor de transmisin de
220 kV entre los Sistemas Sur y Este.

LT 220 kV Ayolas San Patricio: Repotenciacin por cambio de conductor a 375 MVA por terna
(ao 2017), requerida para adecuar la capacidad de inyeccin de potencia desde la CH Yacyret al
SIN.

LT 220 kV Santa Rita Mara Auxiliadora: Construccin de lnea de transmisin de 110 km para
alimentacin a Mara Auxiliadora (ao 2017), requerida para satisfacer la demanda de la zona y
constituirse adems en una segunda lnea de alimentacin desde las Centrales de Acaray e Itaip.

LT 500 kV Ayolas Trinidad II: Construccin de una simple terna de aproximadamente 129 km (ao
2017) y la construccin de la subestacin Trinidad II 500/220 kV con 600 MVA.

Subestacin Ayolas: Montaje del tercer autotransformador 500/220 kV de 375 MVA, refuerzo
requerido para adecuar la capacidad de inyeccin de potencia desde la CH Yacyret al SIN.

LT 220 kV Villalbn Villeta II: Construccin de una simple terna de aproximadamente 200 km (ao
2020). Con esta lnea se dispondr de una nueva interconexin entre el Sistema Sur y el Sistema
Metropolitano, lo cual acarrear un aumento de la capacidad de transmisin y confiabilidad del
servicio. Por otro lado, el trazado de esta lnea pasar por las proximidades de la ciudad de Pilar,
donde se pretende construir una nueva Subestacin de 220 kV (ao 2021), y a la vez discurrir
paralelo al cauce del ro Paraguay, propiciando condiciones para la asentamiento de instalaciones que
utilicen dicha va fluvial como medio de transporte.

LT 220 kV Ayolas Villalbn: Repotenciacin por cambio de conductor a 375 MVA (ao 2020).
Asociado a la obra anterior, este refuerzo es necesario para robustecer el vnculo elctrico entre los
Sistemas Sur y Metropolitano.

LT 500 kV Ayolas Eusebio Ayala: Construccin de una simple terna de aproximadamente 225 km
(ao 2022), requerida para incrementar la inyeccin de potencia activa y reactiva mediante el tronco
secundario de transmisin de 220 kV al Sistema Metropolitano, a efectos de abastecer la creciente
demanda de dicho Sistema.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 44

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Por otro lado, el Plan de Obras prev la construccin de seis nuevos centros de distribucin:

Cambyret: subestacin 220/66/23 kV, con capacidades de transformacin 220/66 kV de 120 MVA
y 220/23 kV de 41,67 MVA (ao 2014).

Fram: subestacin 66/23 kV, con una capacidad de 30 MVA (ao2016).Mara Auxiliadora:
subestacin 220/23 kV, con una capacidad 41,67 MVA (ao 2017).

Costanera: subestacin 66/23 kV, con una capacidad de 30 MVA (ao 2019).

Yuty: subestacin 66/23 kV, con una capacidad de 30 MVA (ao 2020).

Pilar II: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2021).

La Subestacin Cambyret 220 kV responde a la necesidad de dotar de adecuada infraestructura de


transmisin a la regin, de forma a acompaar el crecimiento de la demanda elctrica originado por el
desarrollo de la zona de Encarnacin como consecuencia del Plan de Terminacin de Yacyret. As
tambin, la Subestacin Costanera es requerida principalmente por el importante crecimiento actual y
futuro de la zona de Encarnacin, con una proyeccin tendiente al desarrollo turstico y comercial.
Por otro lado, la Subestacin Mara Auxiliadora atender los requerimientos de la red de distribucin, que
como consecuencia de la creciente actividad agroindustrial de la zona, ya no podr ser atendida
adecuadamente desde los centros de distribucin existentes.
La construccin de la Subestacin de Yuty atiende fundamentalmente a la necesidad de reforzar las redes
de distribucin existentes, atendiendo a que las distancias de distribucin ya se vuelven incompatibles con
los niveles actuales de carga.
De similar manera, la Subestacin Pilar II, alimentada en 220 kV, acompaar el crecimiento de la
demanda de la zona de influencia de la Subestacin Pilar, ya que por el nivel de carga, soluciones basadas
en el nivel de tensin de 66 kV presentan un agotamiento rpido de la capacidad de transmisin y en
condiciones tcnicas inferiores.
Adicionalmente, se prev un aumento en la capacidad de transformacin para alimentacin a la red de
23 kV en prcticamente todos los centros de distribucin. En la siguiente tabla, se presenta un resumen
con el estado de carga de los transformadores que alimentan la carga en 23 kV, discriminndose el
nmero de subestaciones conforme al factor de utilizacin de los transformadores de las mismas. Como
fuera mencionado, el factor de utilizacin es calculado comparando la carga mxima prevista para la
subestacin y la capacidad nominal del equipo de transformacin instalado en la misma en 23 kV.
Tabla 25. Estado de carga de transformadores (23 kV), Sistema Sur
TOTAL
AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Subestaciones segn
porcentaje de caraga de transform adores

SEs 23 kV
11
12
12
13
14
14
15
15
15
15
15

<80%

80% - 90%

7
9
9
11
11
13
9
9
8
10
8

Plan Maestro de Generacin y Transmisin (2014 2023)

3
2
2
1
2
6
2
5
4
3

Pg. 45

90%-100%
1
1
1
1
1
1
4
2
1
4

>100%
-

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Anlogamente, se presentan en la siguiente tabla y la prxima figura, la capacidad total instalada en


23 kV en las subestaciones del Sistema Sur, as como una sumatoria de la capacidad que se encuentra en
las franjas de utilizacin anteriormente mencionadas.
Tabla 26. Capacidad instalada segn porcentaje de carga, Sistema Sur
TOTAL

Capacidad Instalada segn

AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

porcentaje de carga

MVA
343
467
483
563
605
605
685
685
810
882
920

<80%
237
398
397
480
482
565
458
458
537
675
582

80% - 90%
86
45
72
42
82
227
72
202
165
125

90%-100%
20
24
15
42
42
40
155
72
42
213

>100%
-

Figura 16. Porcentaje de transformadores (23 kV) segn niveles de carga, Sistema Sur.

En general, puede observarse un aumento en la capacidad instalada prevista para el Sistema Sur,
pasndose de 343 MVA en el 2013 a 920 MVA en el 2023. Con los proyectos del Plan de Obras, puede
apreciarse que los transformadores se mantienen operando dentro de sus lmites, con un 63% de
transformadores que operaran con un factor de utilizacin menor a 80%.
8.3

Sistema Este

Para la elaboracin del Plan de Obras, se asume la finalizacin para el ao 2013 de la construccin de la
Subestacin Kilmetro 15 en 66 kV y la Subestacin Minga Por, importantes obras de refuerzo de la red
del Sistema Este.
Se contempla en el plan las siguientes ampliaciones del parque de generacin del SIN:

Central Hidroelctrica de Acaray: Actualmente, se estn llevando adelante los trabajos de


restauracin y repotenciacin de los Grupos 3 y 4, estimndose que los mismos estaran
completamente culminados para el ao 2014, con lo cual se tendra una disponibilidad de 75 MVA
por mquina. Dado sus aos de servicio, se hacen necesarios tambin trabajos similares para los
Grupos 1 y 2. Se considera que estos ltimos estaran culminados para el ao 2015.

Central Hidroelctrica de Yguaz:Esta central tendra una capacidad total de generacin de 200 MW,
con dos unidades de 100 MW cada una, a ser despachada en horario de punta. Dicha capacidad de
generacin es considerada a partir del ao 2018.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 46

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

En cuanto a refuerzos de transmisin, las principales obras requeridas en la zona son:

LT 220 kV Itakyry Catuet Salto del Guair: Construccin de una simple terna de
aproximadamente 145 km (ao 2014), obra requerida para satisfacer la creciente demanda asociada al
desarrollo agroindustrial de la zona de Catuet y comercial de la zona de Salto del Guair. Esta obra
es de suma importancia, ya que el sistema de transmisin en 66 kV de la regin se encuentra
operando en su lmite, por lo que hasta tanto no se culmine este refuerzo, el abastecimiento de la
demanda adicional deber ser realizado a travs de generacin trmica local.

LT 220 kV Acaray Microcentro: Construccin de una lnea de 220 kV, con un tramo de poco ms de
5 km en doble terna y un tramo de aproximadamente 1 km de lnea de 220 kV subterrnea (ao
2015), refuerzo requerido para abastecer la demanda del microcentro de Ciudad del Este y descargar
la Subestacin Alto Paran.

LT 220 kV Acaray Presidente. Franco: Re-construccin en doble terna del circuito existente,
aproximadamente 10 km, (ao 2015), obra requerida ante la superacin de la capacidad de
transmisin existente, debido a la mayor participacin de la Subestacin Pte. Franco en el suministro
a la red de distribucin del rea Metropolitana de Ciudad del Este, as como tambin previendo la
construccin de la Subestacin Los Cedrales.

LT 220 kV K30 Santa Rita: Construccin de una lnea de 220 kV simple terna de aproximadamente
45 km (ao 2016), obra necesaria para acompaar el crecimiento de la demanda, producto de la
expansin agroindustrial de la zona.

LT 220 kV Margen Derecha Itakyry: Re-construccin en doble terna del circuito existente,
aproximadamente 71 km (ao 2017), refuerzo requerido ante el agotamiento de la capacidad de
transmisin entre tales locales.

LT 500 kV Margen Derecha Los Cedrales y Subestacin Los Cedrales 500 kV: Construccin de una
lnea de transmisin en 500 kV, simple terna de aproximadamente 25 km y la subestacin Los
Cedrales con dos bancos de auto-transformadores 500/220 kV de 600 MVA (ao 2017). Estas obras
son requeridas para atender la demanda en 220 kV de los Sistemas Este, Central y parte del Sur, ante
la saturacin de la capacidad de transformacin de la Subestacin Margen Derecha 220 kV.

LT 220 kV Los Cedrales Presidente Franco (10 km) y Presidente Franco Paranamb (39km):
Construccin de lnea de transmisin en doble terna, con capacidad de 350 MVA por terna (ao
2017), requeridas para evacuar la inyeccin de potencia proveniente desde la Subestacin Los
Cedrales y robustecer la interconexin entre los Sistemas Este y Sur.

LT 220 kV Paranamb Carlos A. Lpez (65 km) y Carlos A. Lpez Natalio (57km):
Repotenciacin de la simple terna a 350 MVA por cambio de conductores, obras requeridas para
evacuar la inyeccin de potencia proveniente desde la Subestacin Los Cedrales y robustecer la
interconexin entre los Sistemas Este y Sur.

Con relacin a nuevos centros de distribucin, el Plan de Obras prev la construccin de las siguientes
nuevas subestaciones:

Ciudad del Este: subestacin 66/23 kV, con una capacidad de 60 MVA (ao 2014).

Parque Industrial Hernandarias: subestacin 220/66/23 kV, con capacidades de transformacin


220/23 kV de 41,67 MVA y 220/66 kV de 60 MVA (ao 2014).

Catuet: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2014).

Salto del Guair: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2014).

Curuguaty: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2014).

Microcentro: subestacin 220/66/23 kV, con capacidades de transformacin 220/23 kV de 80 MVA y


220/66 de 60 MVA (ao 2015).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 47

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Juan Len Mallorqun: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2015).

Santa Rita: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2016).

Kilmetro 7: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2017).

La Subestacin Parque Industrial Hernandarias 220/66/23 kV, responde a la necesidad de dotar de


adecuada infraestructura de transmisin al departamento de Alto Paran, que le permita proyectarse como
un importante polo industrial, fundamental para el desarrollo y establecimiento de proyectos de inversin.
De igual manera, la Subestacin Microcentro permitir abastecer exclusivamente todo el microcentro de
Ciudad del Este, conllevando una reduccin considerable de distancias de nuevos alimentadores de
distribucin. De esta forma, la nueva Subestacin tambin ofrecer una mayor confiabilidad para el rea,
as como una respuesta adecuada a las actuales restricciones municipales, en lo que a construccin de
nuevas lneas de distribucin subterrneas se refiere.
Las dems Subestaciones atienden fundamentalmente a la necesidad de reforzar las redes de distribucin
existentes, teniendo en cuenta que las distancias de distribucin se tornan incompatibles con los niveles
actuales de carga.
De igual forma, se prev el aumento de potencia en prcticamente todas las subestaciones existentes. En
la siguiente tabla, se presenta un resumen con el estado de carga de los transformadores, calculado a partir
de los respectivos factores de utilizacin, que alimentan la carga en 23 kV del Sistema Este.
Tabla 27. Estado de carga de transformadores (23 kV), Sistema Este
TOTAL
AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Subestaciones segn
porcentaje de caraga de transform adores

SEs 23 kV
15
16
18
19
20
20
20
20
20
20
20

<80%

80% - 90%

5
10
12
13
12
14
14
11
12
11
9

4
2
3
1
3
3
5
4
5
3
6

90%-100%
6
4
3
5
5
3
1
5
3
6
5

>100%
-

Puede observarse, que de las 15 subestaciones del Sistema Este para el ao 2013, 6 subestaciones se
encontraran con sus transformadores operando con un factor de utilizacin entre 90 y 100%. Para el ao
2023, se tendran 20 subestaciones en servicio, de las cuales 5 subestaciones presentaran un factor de
utilizacin entre 90 y 100%.
Anlogamente, se presenta en la siguiente tabla, la capacidad total instalada en 23 kV en las subestaciones
del Sistema Este, as como una sumatoria de la capacidad que se encuentra en las franjas de utilizacin
anteriormente mencionadas.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 48

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Tabla 28. Capacidad instalada segn porcentaje de carga, Sistema Este


TOTAL

Capacidad Instalada segn

AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

porcentaje de carga

MVA
634
931
1.104
1.127
1.207
1.279
1.389
1.389
1.567
1.567
1.665

<80%
222
634
798
802
702
815
932
760
999
947
809

80% - 90%
120
120
223
60
240
263
377
262
363
222
472

90%-100%
292
177
82
265
265
200
80
367
205
398
385

>100%
-

Puede apreciarse, que para el 2013 se tendran 634 MVA instalados, requirindose para acompaar el
crecimiento de la demanda, de 1.665 MVA para el ao 2023. La siguiente figura muestra el estado de
carga de los transformadores para los aos 2013, 2018 y 2023, aprecindose que la gran capacidad
instalada en el corto plazo (hasta el 2018) permite tener un margen de carga apreciable en las
subestaciones, tenindose aproximadamente 64% de la capacidad instalada operando con un factor de
utilizacin inferior al 80%. Por otro lado, en el medio plazo (entre 2018 y 2023) se tiene un menor ritmo
en el aumento de la capacidad instalada, por lo que en el 2023 solamente el 49% de la capacidad instalada
estara operando con un factor de utilizacin inferior a 80%, mientras que el 23% de la capacidad
instalada tendra un factor de utilizacin entre 90 y 100%.

Figura 17. Porcentaje de transformadores (23 kV) segn niveles de carga, Sistema Este.

8.4

Sistema Metropolitano

Para la elaboracin del Plan de Obras, se asume la finalizacin para el ao 2013 de importantes obras de
transmisin, como la puesta en servicio de la lnea de transmisin en 500 kV Margen Derecha - Villa
Hayes, as como la construccin de la Subestacin Villa Hayes 500 kV, con dos autotransformadores
500/220 kV de 600 MVA y un transformador 220/23 kV de 41,67 MVA en servicio.
En cuanto a refuerzos de transmisin, los principales refuerzos requeridos en la zona son:

LT 220 kV Villa Hayes Puerto Sajonia: Construccin de una doble terna de aproximadamente 25
km, (ao 2014), requerida como obra complementaria al proyecto de 500 kV, de forma a evacuar la
inyeccin de potencia proveniente de la lnea de 500 kV Margen Derecha Villa Hayes.

LT 220 kV Villa Hayes Puerto Botnico Parque Caballero: Construccin de una doble terna,
aproximadamente 18 km, (ao 2016), requerida para evacuar la inyeccin de potencia inyectada por
las lneas de transmisin de 500 kV.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 49

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

LT 220 kV Limpio Luque San Lorenzo: Re-construccin en doble terna de la lnea existente, de
aproximadamente 25 km (ao 2016), requeridas para distribuir apropiadamente el flujo de potencia en
el anillo de 220 kV de la red de transmisin del Sistema Metropolitano.

LT 500 kV Ayolas Villa Hayes, LT 500 kV Yacyret Ayolas y ampliacin de la Subestacin Villa
Hayes: Construccin de la lnea de transmisin en 500 kV de aproximadamente 347 km entre Ayolas
y Villa Hayes, construccin de la segunda lnea de 500 kV entre la Central Hidroelctrica de Yacyret
y Ayolas, de aproximadamente 16 km y la ampliacin de la Subestacin Villa Hayes con la
instalacin del tercer auto-transformador 500/220 kV de 600 MVA (ao 2016). Estas obras son
requeridas para atender el incremento de la demanda del Sistema Metropolitano de Asuncin y
proporcionarle mayor confiabilidad al suministro de energa.

Subestacin Eusebio Ayala 500 kV: Seccionamiento de la LT 500 kV Ayolas Villa Hayes e
instalacin de un banco de auto-transformadores 500/220 kV de 600 MVA (ao 2018). Esta obra es
requerida de forma a dotar de una segunda inyeccin de potencia desde la red de 500 kV a la red de
220 kV del Sistema Metropolitano. Esta obra tambin incluira el seccionamiento de la doble terna
LT 220 kV Coronel Oviedo Guarambar, de modo a reforzar la capacidad del tronco secundario de
transmisin de 220 kV.

LT 500 kV Margen Derecha Villa Hayes (2 terna): Construccin de la lnea de transmisin en 500
kV de aproximadamente 341 km (ao 2019) y ampliacin de la Subestacin Villa Hayes y Margen
Derecha respectivamente. Esta obra es requerida para satisfacer la demanda del Sistema con una
mayor confiabilidad, ya que sin este refuerzo, el fuera de servicio de una de las dos lneas de
transmisin en 500 kV que transportan energa hasta la Subestacin Villa Hayes producira
importantes requerimientos de corte de carga.

Subestacin Eusebio Ayala 500 kV: ampliacin de la Subestacin Eusebio Ayala con la instalacin
del segundo auto-transformador 500/220 kV de 600 MVA adicional (ao 2020). Esta obra permitir
evitar sobrecargas en dicha subestacin y evacuar adecuadamente el flujo de potencia transportado
por la LT 500 kV Ayolas Eusebio Ayala.

Subestacin Villa Hayes 500 kV: ampliacin de la Subestacin Villa Hayes con la instalacin del
cuarto auto-transformador 500/220 kV de 600 MVA (ao 2020). Esta obra es requerida para evitar
sobrecargas en dicha subestacin y evacuar adecuadamente el flujo de potencia transportado por las
lneas de 500 kV que llegan a la Subestacin Villa Hayes 500 kV.

De igual manera, se tiene lneas de alimentacin en 220 kV a los nuevos Centros de Distribucin como
son Subestacin Barrio Molino (2015), Subestacin Villeta II (2017), Subestacin Villa Aurelia (2017).
Estas obras de transmisin, en general buscan adecuar la capacidad del tronco de transmisin a los
requerimientos de la demanda, con lo que se obtendra un sistema operando con mayor margen de carga
y con menores niveles de prdidas, lo cual repercute positivamente en todo el sistema. Adicionalmente,
las obras permiten soportar una contingencia simple en el tronco de transmisin con un grado de
afectacin razonable en el resto del sistema, lo cual se traduce en una mayor flexibilidad y aumento de la
confiabilidad del sistema.
Con relacin a nuevos centros de distribucin, el Plan de Obras prev la construccin de las siguientes
nuevas subestaciones:

Barrio Mburucuy: subestacin 66/23 kV, con una capacidad de 90 MVA (ao 2014).

Fernando de la Mora: subestacin 66/23 kV, con una capacidad de 90 MVA (ao 2014).

Mariano Roque Alonso: subestacin 66/23 kV, con una capacidad de 60 MVA (ao 2014).

La Colmena: subestacin 66/23 kV, con una capacidad de 20 MVA (ao 2015).

Barrio Molino: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2015).

Villa Elisa 220 kV: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2016).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 50

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Instituto de Previsin Social: subestacin 66/23 kV, con una capacidad de 60 MVA (ao 2017).

Villeta II: subestacin 220/23 kV, con una capacidad de 41,67 MVA (ao 2017).

Villa Aurelia 220 kV: subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2017).Altos:
subestacin 220/23 kV, con una capacidad de 80 MVA (ao 2022).

De igual forma, se puede destacar importantes obras de ampliacin de capacidad de transformacin en


subestaciones existentes, resaltndose la paulatina introduccin del nuevo mdulo de 80 MVA de
capacidad de transformacin 220/23 kV, en sustitucin al mdulo actual de 41,67 MVA, y del nuevo
mdulo de 50 MVA de capacidad de transformacin 66/23 kV, en sustitucin al mdulo actual de 30
MVA. As mismo, puede resaltarse la necesidad de duplicacin de la capacidad de transformacin en las
Subestaciones Puerto Botnico, Lambar, Parque Caballero y Puerto Sajonia las cuales se constituyen en
los mayores centros de distribucin del rea metropolitana de Asuncin.
En general, se requieren ampliaciones en prcticamente todas las subestaciones del Sistema
Metropolitano. En la siguiente tabla, se presenta un resumen con el estado de carga previsto de los
transformadores que alimentan la carga en 23 kV del Sistema Metropolitano. En la tabla se agrupan las
subestaciones segn el factor de utilizacin de su capacidad de transformacin.
Tabla 29. Estado de carga de transformadores (23 kV), Sistema Metropolitano
TOTAL
AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Subestaciones segn
porcentaje de caraga de transform adores

SEs 23 kV
27
32
34
35
36
36
36
36
36
37
37

<80%

80% - 90%

8
14
13
9
14
16
13
8
6
6
4

3
7
11
14
9
13
5
18
12
10
5

90%-100%
12
11
10
12
13
7
18
10
18
21
28

>100%
4
-

Anlogamente, se presenta en la siguiente figura y la prxima tabla, la capacidad total instalada en 23 kV


en las subestaciones del Sistema Metropolitano, as como una sumatoria de la capacidad que se encuentra
en las franjas de utilizacin anteriormente mencionadas.

Figura 18. Porcentaje de transformadores (23 kV) segn niveles de carga, Sistema Metropolitano.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 51

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Tabla 30. Capacidad instalada segn porcentaje de carga, Sistema Metropolitano


TOTAL

Capacidad Instalada segn

AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

porcentaje de carga

MVA
1.960
2.550
2.692
2.993
3.243
3.556
3.634
3.897
4.130
4.409
4.490

<80%
632
1.287
1.195
730
1.212
1.557
1.127
795
702
870
423

80% - 90%
202
443
770
1.418
1.017
1.262
402
1.895
1.252
1.202
510

90%-100%
787
820
727
845
1.015
737
2.105
1.207
2.177
2.337
3.557

>100%
340
-

Puede apreciarse que de las 27 subestaciones existentes en el Sistema Metropolitano en el 2013, con
1.960 MVA, para finales del 2023 se requerirn 37 subestaciones, con una capacidad instalada de
4.490 MVA Por el estado de carga de los transformadores, puede apreciarse que la capacidad a ser
instalada en el corto plazo produce mrgenes de carga apreciables, obtenindose aproximadamente el
44% del parque de transformadores con un factor de utilizacin por debajo del 80%.
En el medio plazo, se tiene una menor tasa de ampliaciones por lo que se tendra el 79% del parque de
transformadores con un factor de utilizacin entre 90 y 100%, lo cual apunta a un estrecho
acompaamiento de la demanda y una utilizacin de la capacidad instalada en el corto plazo, de forma a
reducir los requerimientos de recursos econmicos.
8.5

Sistema Norte

En relacin al Sistema Norte, las principales obras de transmisin requeridas en la zona son:

LT 220 kV Itakyry Curuguaty Capitn Bado Cerro Cor: Construccin de LT 220 kV simple
terna de aproximadamente 330 km (ao 2014). Esta obra de expansin de la red elctrica se
constituye en la segunda alimentacin al Sistema Norte, incrementando la capacidad de transmisin y
la confiabilidad del servicio de suministro de energa en la zona.

LT 220 kV Cruce Bella Vista Bella Vista Norte: Construccin de LT 220 kV simple terna de
aproximadamente 80 km (ao 2016). Esta obra permite ampliar el sistema de transmisin para
atender el potencial de crecimiento de la zona.

LT 220 kV Horqueta Concepcin II: Construccin de LT 220 kV simple terna de aproximadamente


45 km (ao 2016). Esta obra de refuerzo permite acompaar adecuadamente el crecimiento de la
demanda del rea de influencia de la Subestacin Concepcin, cuya topologa radial y carga elevada
desaconsejan alternativas en 66 kV.

LT 220 kV Villa Hayes Concepcin II: Construccin de LT 220 kV simple terna de


aproximadamente 200 km (ao 2019), refuerzo que constituye la primera etapa de una alimentacin
desde la Subestacin Villa Hayes al Sistema Oeste, y a su vez constituye la tercera alimentacin al
sistema Norte, incrementando la capacidad de transmisin y la confiabilidad del servicio,
suministrando adems soporte reactivo que permite una operacin ms holgada del Compensador
Esttico de Reactivo de la Subestacin Horqueta.

Por otro lado, el Plan de Obras prev la construccin de tres nuevos centros de distribucin:

Capitn Bado: subestacin 220/23 kV, con una capacidad 41,67 MVA (ao 2014).

Bella Vista Norte: subestacin 220/23 kV, con una capacidad de 20 MVA (ao 2016).

Concepcin II: subestacin 220/66/23 kV, con capacidades de transformacin 220/66 kV de 60


MVA (ao 2016) y 220/23 kV de 41,67 MVA (ao 2021).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 52

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Ambos locales atienden fundamentalmente a la necesidad de reforzar las redes de distribucin existentes,
atendiendo a que las distancias de distribucin se tornan incompatibles con los niveles actuales de carga.
Adicionalmente, se prev un aumento en la capacidad de transformacin para alimentacin a la red de
23 kV en prcticamente todos los centros de distribucin. En la siguiente tabla, se presenta un resumen
con el estado de carga de los transformadores que alimentan la carga en 23 kV, discriminndose el
nmero de subestaciones conforme al factor de utilizacin de los transformadores de las mismas. Como
fuera mencionado, el factor de utilizacin es calculado comparando la carga mxima prevista para la
subestacin y la capacidad nominal del equipo de transformacin instalado en la misma en 23 kV.
Tabla 31. Estado de carga de transformadores (23 kV), Sistema Norte
TOTAL

Subestaciones segn

AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

porcentaje de caraga de transform adores

SEs 23 kV
8
8
8
9
9
9
9
9
9
9
9

<80%

80% - 90%
4
7
7
7
7
8
7
6
7
6
4

1
1
1
1
1
2
1
2
2
4

90%-100%
3
1
1
1
2
1
1

>100%
-

Anlogamente, se presentan en la siguiente tabla y la prxima figura, la capacidad total instalada en


23 kV en las subestaciones del Sistema Norte, as como una sumatoria de la capacidad que se encuentra
en las franjas de utilizacin anteriormente mencionadas.
Tabla 32. Capacidad instalada segn porcentaje de carga, Sistema Norte
TOTAL

Capacidad Instalada segn

AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

porcentaje de carga

MVA
139
271
271
291
299
310
318
318
390
390
390

<80%
39
259
259
249
257
298
217
202
310
290
208

Plan Maestro de Generacin y Transmisin (2014 2023)

80% - 90%
30
12
12
30
12
102
15
80
80
122

Pg. 53

90%-100%
70
12
30
12
102
20
60

>100%
-

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Figura 19. Porcentaje de transformadores (23 kV) segn niveles de carga, Sistema Norte.

En general, puede observarse un aumento en la capacidad instalada prevista para el Sistema Norte,
pasndose de 139 MVA en el 2013 a 390 MVA en el 2023. Con los proyectos del Plan de Obras, puede
apreciarse que los transformadores se mantienen operando dentro de sus lmites, con slo un 15% de
transformadores que operaran con un factor de utilizacin entre 90 y 100%.

8.6

Sistema Oeste

En relacin al Sistema Oeste, las principales obras de transmisin requeridas en la zona son:

LT 220 kV Concepcin II Pozo Colorado Loma Plata: Construccin de LT 220 kV simple terna
de aproximadamente 280 km (ao 2021). Esta obra de expansin de la red elctrica se constituye en
la segunda alimentacin al Sistema Oeste, incrementando la capacidad de transmisin y la
confiabilidad del servicio en la zona y permitiendo mejores condiciones de suministro a nivel de
distribucin.

LT 220 kV Vallem II Toro Pampa: Construccin de LT 220 kV simple terna de aproximadamente


130 km (ao 2016), obra de expansin que mejorar las condiciones de suministro de energa en la
zona de Toro Pampa, principalmente, considerando la gran longitud de los alimentadores de
distribucin en la regin.

Por otro lado, el Plan de Obras prev la construccin de tre nuevos centros de distribucin:

Acueducto: subestacin 220/23 kV, con una capacidad 10 MVA (ao 2016).

Toro Pampa: subestacin 220/23 kV, con una capacidad 10 MVA (ao 2021).

Pozo Colorado: subestacin 220/23 kV, con una capacidad 10 MVA (ao 2021).

Estos locales atienden fundamentalmente a la necesidad de reforzar las redes de distribucin existentes,
atendiendo a que las distancias de distribucin se tornan incompatibles con los niveles actuales y
esperados de carga, salvo la Subestacin Acueducto, proyectada para atender un emprendimiento
especfico (Proyecto Acueducto para el Chaco Central).
Adicionalmente, se prev un aumento en la capacidad de transformacin para alimentacin a la red de
23 kV en prcticamente todos los centros de distribucin. En la siguiente tabla, se presenta un resumen
con el estado de carga de los transformadores que alimentan la carga en 23 kV, discriminndose el
nmero de subestaciones conforme al factor de utilizacin de los transformadores de las mismas. Como
fuera mencionado, el factor de utilizacin es calculado comparando la carga mxima prevista para la
subestacin y la capacidad nominal del equipo de transformacin instalado en la misma en 23 kV.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 54

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Tabla 33. Estado de carga de transformadores (23 kV), Sistema Oeste


TOTAL
AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Subestaciones segn
porcentaje de caraga de transform adores

SEs 23 kV
3
3
3
3
3
3
3
3
4
4
5

<80%
3
3
3
3
3
3
3
3
2
3
4

80% - 90%
1
1
-

90%-100%
1
1

>100%
-

Anlogamente, se presentan en la siguiente tabla y la prxima figura, la capacidad total instalada en 23


kV en las subestaciones del Sistema Oeste, as como una sumatoria de la capacidad que se encuentra en
las franjas de utilizacin anteriormente mencionadas.
Tabla 34. Capacidad instalada segn porcentaje de carga, Sistema Oeste.
TOTAL

Capacidad Instalada segn

AO
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

porcentaje de carga

MVA
47
47
47
47
32
32
32
32
42
57
67

<80%
47
47
47
47
32
32
32
32
25
45
55

80% - 90%
12
12
-

90%-100%
5
12

>100%
-

Figura 20. Porcentaje de transformadores (23 kV) segn niveles de carga, Sistema Oeste.

En general, puede observarse un aumento en la capacidad instalada prevista para el Sistema Oeste,
pasndose de 47 MVA en el 2013 a 67 MVA en el 2023, con prcticamente todos sus transformadores
operando de manera holgada (utilizacin menor al 82%).

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 55

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

9.

OTROS PLANES DE EXPANSIN DEL SISTEMA ELCTRICO

Con relacin a la expansin futura del Sistema Elctrico de la ANDE, dentro una visin estratgica en lo
referente a la integracin regional y buscando un mejor aprovechamiento de los recursos
hidroenergticos, podemos mencionar los principales planes de construccin de nuevas centrales de
generacin y ampliacin de otras existentes, as como los planes en lo referente a sistemas de transmisin
en 500 kV.
9.1

Planes de Generacin

Central Hidroelctrica de Acaray

La ampliacin de la casa de mquinas la Central Hidroelctrica de Acaray, con el Proyecto Acaray III,
que duplicara la motorizacin de la central con la adicin de 4 grupos de 75 MVA similares a los
existentes, de forma a minimizar la indisponibilidad de mquinas de la Central Acaray y minimizar el
efecto sobre la contratacin de la CH Itaip, al operar a plena capacidad en el horario de punta del SIN.
Segn el Estudio de los Ros de la Regin del Alto Paran, realizado para la ANDE y la ELETROBRAS
en la dcada del 70, es factible la utilizacin del caudal no turbinable de la CH Itaip, transfiriendo parte
del mismo, unos 2000 m3/s, por medio del canal Hernandarias al embalse de Acaray, con una
motorizacin intermedia en Hernandarias de 170 MW y energa adicional en torno a los 2.400 GWh.

Pequeas Centrales Hidroelctricas

Del estudio Atlas del Potencial Hidroenergtico del Paraguay, elaborado por la Itaipu Binacional, se han
seleccionado los locales con Potencial Hidroelctrico Aprovechable que se encuentran en las regiones
ms aisladas del sistema elctrico y alejadas de las centrales de generacin existentes, de forma tal a
utilizar la inyeccin de potencia y energa para estabilizar dichos sistemas regionales.
Los Puntos de Potencial Hidroelctrico Aprovechable, presentan un valor medio de factor de planta de
0,75 y seran aprovechados por medio de la construccin de Pequeas Centrales Hidroelctricas (PCH).
1. PCH Ypan I: Para abastecer parte de la demanda de la Ciudad de Concepcin con 7
MW y que podra generar al ao un promedio de 46 GWh.
2. PCH Ypan II:Para abastecer parte de la demanda de la localidad de Horqueta y regiones
aledaas con 8 MW y que podra generar al ao un promedio de 43 GWh.
3. PCH Ypan III:Para abastecer parte de la demanda de la localidad de Horqueta y
regiones aledaas con 12 MW y que podra generar al ao un promedio de 79 GWh.
4. PCH Jeju:Para abastecer parte de la demanda de la localidad de Santa Rosa y regiones
aledaas con 9 MW y que podra generar al ao un promedio de 66 GWh.
5. PCH Carap I:Para abastecer parte de la demanda de la Ciudad de Salto del Guar y
regiones aledaas con 10 MW y que podra generar al ao un promedio de 66 GWh.
6. PCH Carap II: Para abastecer parte de la demanda de la Ciudad de Salto del Guar y
regiones aledaas con 30 MW y que podra generar al ao un promedio de 197 GWh.
7. PCH Pirap:Para abastecer parte de la demanda de la localidad de Yuty y regiones
aledaas con 4 MW y que podra generar al ao un promedio de 26 GWh.

Centrales Hidroelctrica Ro Paraguay

En concordancia con la construccin de la Lnea de Transmisin 220 kV Villa Hayes-Concepcin y la


expansin de la red elctrica en el Chaco Paraguayo, se prev la construccin de las Central
Hidroelctricas sobre el Ro Paraguay, conforme a resultados del estudio Atlas del Potencial
Hidroenergtico del Paraguay, elaborado por la Itaipu Binacional.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 56

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

Centrales Hidroelctrica Ro Paraguay I

El proyecto se situara aguas debajo de la localidad de Villa del Rosario, sobre el Ro Paraguay.
El nivel mximo normal del embalse sera de 65.00 msnm, el salto (H) o diferencia entre este
nivel (NE) y el de restitucin (NR), para el caudal medio de 85 m/s sera de 5 m.
El proyecto de la central tiene 24 turbinas Tubo. La Potencia Instalada sera de 72 MW y la Firme
70 MW.
Se contemplan esclusas de navegacin de 325 m de longitud y 27 m de ancho con compuertas del
tipo Busco y tiempo medio de llenado de 6 minutos.

Centrales Hidroelctrica Ro Paraguay II

El proyecto se situara aguas arriba de la localidad de Villa del Rosario, sobre el Ro Paraguay.
El nivel mximo normal del embalse sera de 70.00 msnm, el salto (H) o diferencia entre este
nivel (NE) y el de restitucin (NR), para el caudal medio de 95 m/s sera de 5 m.
El proyecto de la central tiene 24 turbinas Tubo. La Potencia Instalada sera de 96 MW y la Firme
70 MW.
Se contemplan esclusas de navegacin de 325 m de longitud y 27 m de ancho con compuertas del
tipo busco y tiempo medio de llenado de 6 minutos.

Central Hidroelctrica del Brazo Aa Cu

Conforme indicado por el Gobierno


Nacional, la Entidad Binacional Yacyret
se
encuentra
avanzando
en
la
maquinizacin de la Presa sobre el Brazo
Aa Cu del Ro Paran. El objetivo de esta
obra es aprovechar el potencial hdrico del
caudal ecolgico mnimo requerido en
dicho brazo del Ro Paran.
El proyecto de la central tiene 5 turbinas
Bulbo de 9.50 m de dimetro. La Potencia
Instalada sera de 273 MW y la Firme 245
MW. Podra generar al ao un promedio de
1.800 GWh.
Para el proyecto de la central se utilizaran
5 vanos de los 16 vanos del vertedero
existente.
Dicha generacin sera inyectada directamente al sistema de 500 kV de la Casa de Mquinas de la CH
Yacyret, por lo que desde el punto de vista de transmisin, la interconexin en 500 kV existente y a ser
construida dentro del Plan de Obras, permitirn que dicha generacin adicional pueda ser incorporada sin
inconvenientes al SIN.

Central Hidroelctrica de Corpus Christi

El Gobierno Nacional ha indicado su voluntad de avanzar con el Proyecto de Construccin de la Central


Hidroelctrica de Corpus Christi. Dicho Por otro Proyecto es llevado discutido y llevado adelante en el
seno de la Comisin Mixta Paraguayo-Argentina del Ro Paran (COMIP).
El nivel mximo normal del embalse Corpus Christi sera de 105.00 msnm, el salto (H) o diferencia entre
este nivel (NE) y el de restitucin (NR), para el caudal medio de 11.600 m/s sera de 21 m. El proyecto

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 57

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

de la central tiene 20 turbinas Kaplan de 9.50 m de dimetro. La Potencia Instalada sera de 2.875 MW y
la Firme 2688 MW. Podra generar al ao un promedio de 18.600 GWh.
El proyecto de la central contiene un
vertedero de 28 vanos y una esclusa de
navegacin.
Dado el tiempo de construccin de un
proyecto de esta envergadura, en el presente
estudio que abarca el periodo 2014 2023,
en el Plan de Obras no se incluye la
generacin proveniente de la CH Corpus
Christi. Sin embargo debido a la proyeccin
del Margen de Reserva de Generacin es de
suma importancia que que el Proyecto
Corpus Christi sea tenido en cuenta en la
definicin del sistema de transmisin,
principalmente en lo que atae a las redes
de 500 kV, de manera a producir planes de
generacin y transmisin congruentes

Central Hidroelctrica de Itacor-Itat


El Gobierno Nacional ha indicado su
voluntad de avanzar con el Proyecto de
Construccin
de
la
Central
Hidroelctrica de Itacor-Itat. Dicho
Proyecto es discutido y llevado
adelante en el seno de la Comisin
Mixta Paraguayo-Argentina del Ro
Paran
(COMIP).
Originalmente
figuraba en el Tratado de Yacyret
como un embalse de regulacin aguas
debajo de la Central Hidroelctrica de
Yacyret.

El nivel mximo normal del embalse


Itacor-Itatsera de 61.00 msnm, el
salto (H) o diferencia entre este nivel
(NE) y el de restitucin (NR), para el caudal medio de 11.600 m/s sera de 13.04 m. El proyecto de la
central tiene 32 turbinas Bulbo de 7.50 m de dimetro. La Potencia Instalada sera de 1.600 MW y la
Firme 1425 MW. Podra generar al ao un promedio de 11.290 GWh.
El proyecto de la central contiene un vertedero de 76 vanos dividido en dos partes y una esclusa de
navegacin. Se presentan dos soluciones para la disposicin de estructuras sobre la misma traza, segn
que la esclusa se encuentre en margen paraguaya o argentina. En un futuro podra presentarse una nica
solucin con dos esclusas, una en cada margen.

9.2

Plan de Inversin en Redes de Transmisin de 500kV

El anlisis de la operacin actual del sistema de transmisin, as como la evaluacin del desempeo del
sistema ante contingencias en el futuro, condiciones ante las cuales el sistema operara con una red
exclusivamente en 220 kV, presentndose altos niveles de prdidas de transmisin, elevados
requerimientos de compensacin reactiva y de corte de carga, son claros indicadores de la necesidad de
refuerzos en 500 kV dentro de la red de transmisin nacional.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 58

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

REGION ORIENTAL
LARGO PLAZO

A TORO PAMPA

BELLA VISTA
NORTE

VALLEMI II

BRASIL

VALLEMI

A ACUEDUCTO
CERRO
CORA

CRUCE
BELLA VISTA

REGION
OCCIDENTAL

P. J. CABALLERO

YBY YAU

CONCEPCION II

CAPITAN
BADO

HORQUETA

A POZO COLORADO

YPANE III
( 12 MW )

CONCEPCION
YPANE II
( 8 MW )

YPANE I
( 7 MW )
RIO PARAGUAY II ( 96 MW )

SANTA ROSA

SALTO DEL
GUAIRA

SAN PEDRO
NORTE
JEJUI ( 7 MW )

ITACURUBI
DEL ROSARIO

RIO PARAGUAY I ( 72 MW )

VILLA HAYES

CATUETE

BARRIO
SAN PEDRO

CARAPA I ( 10 MW )

ACEPAR

LIMPIO

VILLA HAYES 500 kV

SAN ESTANISLAO
ALTOS

LUQUE
SICBRAS

PTO.
BOTANICO

MINGA
PORA

CARAYAO

EUSEBIO
AYALA

CNEL.
OVIEDO II

VAQUERIA

PARQUE
CABALLERO

ITAKYRY
YGUAZU
PARQUE INDUSTRIAL
HERNANDARIAS

CAMPO DOS
CAPIATA

SAN
LORENZO

CARAPA II ( 30 MW )

CURUGUATY

PTO. SAJONIA

CAAGUAZU

KM 15

ITAIPU

CAACUPE

KM 7
ACARAY ( 520 MW )
MICROCENTRO

LAMBARE

LA VICTORIA

SAN ANTONIO
PTO. MCAL.

CNEL. MALLORQUIN KM 30
OVIEDO

PIRAYU

ARGENTINA

CIUDAD DEL ESTE


LOS CEDRALES

NARANJAL

ITAUGUA
GUARAMBARE PARAGUARI

LA
COLMENA

VALLE APUA

CAAZAPA

CAAPUCU

QUIINDY

SAN JUAN
BAUTISTA

SAN JUAN
NEPOMUCENO

PARANAMBU

PASO PE

FRAM

C. A. LOPEZ
PIRAPO ( 4 MW )

YUTY
PILAR

ALTO PARANA
PTE. FRANCO

STA.
RITA

VILLARRICA

VILLETA

S. PEDRO
DEL PARANA
TRINIDAD II

SAN PATRICIO

MARIA AUXILIADORA

PIRAPO

NATALIO
CORPUS ( 2.875 MW )

VILLALBIN

AYOLAS
CNEL.
BOGADO
ITACORA
( 1.600 MW )

YACYRETA

SIMBOLOGIA

TRINIDAD
CAMBYRETA
COSTANERA
ENCARNACION

ARGENTINA

CENTRAL HIDROELECTRICA

OBRAS DE 500 kV

OBRAS DE 220 kV

OBRAS DE 66 kV

FECHA: 19/12/13

DP / DEG
ARCHIVO : 23-O

Figura 14. Mapa elctrico con proyectos de largo plazo

La implementacin de una red de 500 kV es fundamental con vistas a asegurar la disponibilidad de


energa elctrica en el largo plazo en los distintos puntos del pas, tanto en calidad como cantidad, de
manera a fomentar el desarrollo y bienestar nacional basados en la plena utilizacin de sus recursos
hidroelctricos.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 59

ANDE
Direccin de Planificacin General y Poltica Empresarial (DP)
Divisin de Estudios Energticos (DP/EE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

En este sentido, en el tem anterior 1.2.1 fue presentado el Plan de Obras que incluye dicho conjunto de
proyectos en 500 kV.
Estas importantes obras de transmisin aseguran un tronco de transmisin fuerte, que permite atender el
crecimiento de la demanda nacional considerado. De igual forma, en base a estudios disponibles (Estudio
de Optimizacin del Sistema Principal de Transmisin de la ANDE, del ao 2006, elaborado por ANDE y
ELETROBRAS y el recientemente elaborado por la consultora Leme Engenharia para la ampliacin de
transmisin de nuestro sistema elctrico nacional) este conjunto de obras permitir la operacin
interconectada de las Centrales de Itaip y Yacyret, con lo cual se obtendr una optimizacin tanto
elctrica como energtica del Sistema.
Por otro lado, considerando y pretendiendo avanzar en la integracin energtica regional, se vuelve vital
la construccin de estas redes elctricas de gran porte, de manera a viabilizar el transporte de energa. En
este contexto, en el Informe DPM/DEG/01/10 Sistema de 500 kV Estudio de Largo Plazo se analizan
alternativas de largo plazo, presentndose la necesidad de construccin de la LT 500 kV Margen Derecha
Los Cedrales Ayolas, conforme la demanda nacional o regional as lo requiera.
La construccin de esta lnea es compatible tanto con el proyecto de la Central Hidroelctrica Corpus,
como con la eventual instalacin de una industria electrointensiva de gran porte en algn punto sobre el
trazado de la misma.
Es importante destacar, que la operacin interconectada de los Sistemas Paraguayo, Argentino, Uruguayo
y Brasileo, a travs de las Centrales de Itaip y Yacyret, as como un intercambio energtico regional
ms fluido, requerir posiblemente de acuerdos operativos tripartitos, de manera a compatibilizar aspectos
tcnicos y comerciales.
Finalmente, cabe resaltar que el Plan de Obras de 500 kV esbozados en este Plan puede ser implementado
en forma gradual, con la incorporacin sucesiva de los proyectos mencionados, conforme a la evolucin
de la demanda, as como tambin a la disponibilidad de recursos econmicos y financieros de la ANDE.
La Figura 14 muestra un mapa elctrico incluyendo los proyectos de generacin y transmisin en 500 kV
previstos en un plazo de 20 aos.

Plan Maestro de Generacin y Transmisin (2014 2023)

Pg. 60

ANDE
Direccin de Planificacin General y Poltica Estratgica (DP)
Divisin de Estudios Energticos (DP/DEE)
Departamento de Estudios de Generacin y Transmisin (DP/DEG)

ANEXOS

Plan Maestro de Generacin y Transmisin Periodo 2014 - 2023

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.1
INTERCONEXIONES INTERNACIONALES Y SISTEMAS
REGIONALES DEL SISTEMA INTERCONECTADO NACIONAL

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

ANEXO A.1 - 2

INTERCONEXION CON LOS PAISES VECINOS


BOLIVIA

BRASIL

ALTO PARAGUAY

BOQUERON

DESCONECTADO

CONCEPCION

AMAMBAY

PRESIDENTE HAYES

SAN PEDRO

ARGENTINA

CANINDEYU

CAAGUAZU
CORDILLERA

DESCONECTADO

EDEFOR

DESCONECTADO

CENTRAL

GUAIRA

ALTO
PARANA

PARAGUARI CAAZAPA

EMSA
YACYRETA

6300 MW

MISIONES
EEMBUCU

25 MW

ITAPUA

ITAIPU
DESCONECTADO

COPEL
ENERSUL

1340 MWARGENTINA

ARGENTINA

.
FECHA: 23/12/13

DP / DEG
ARCHIVO : A.1-2

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.1-2

ANEXO A.1 - 1
SUBSISTEMAS DEL SISTEMA INTERCONECTADO NACIONAL

BOLIVIA

ALTO PARAGUAY

BRASIL

BOQUERON

AMAMBAY
CONCEPCION

BRASIL

PRESIDENTE HAYES

SAN PEDRO
CANINDEYU

CORDILLERA
CE
NT
RA
L

CAAGUAZU

ARGENTINA

ALTO
PARANA
GUAIRA

PARAGUARI
CAAZAPA

REFERENCIAS
SISTEMA METROPOLITANO
EEMBUCU

MISIONES

ITAPUA

SISTEMA CENTRAL

SISTEMA SUR

SISTEMA ESTE

ARGENTINA

SISTEMA NORTE

SISTEMA OESTE
FECHA: 23/12/13

DP / DEG

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

ARCHIVO : ANEXO1

A.1-1

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.2
LISTADO DE OBRAS SUBSISTEMAS DEL
SISTEMA INTERCONECTADO NACIONAL

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.3
MAPAS ELCTRICOS

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2014

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA

VALLEMI II

VALLEMI I

LOMA PLATA
FILADELFIA
CERRO
CORA

CRUCE
BELLA VISTA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO
HORQUETA
CONCEPCION

REGION
ORIENTAL
SAN PEDRO
NORTE

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA
CURUGUATY

VILLA HAYES

ACEPAR

SAN
ESTANISLAO

LIMPIO
EUSEBIO
AYALA
SICBRAS

MINGA
PORA

LUQUE

ARGENTINA

VILLA HAYES 500 kV

CARAYAO

ITAKYRY
PARQUE INDUSTRIAL
HERNANDARIAS

PTO. BOTANICO
PARQUE CABALLERO

S. LORENZO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

LAMBARE

ITAIPU
ALTO PARANA

ACARAY

LA VICTORIA
PTE. FRANCO

CAACUPE

SAN ANTONIO

PIRAYU

PTO. MARISCAL

VILLARRICA
ITAUGUA
GUARAMBARE

KM 30

NARANJAL

PARAGUARI
CAAZAPA
CAAPUCU
VALLE APUA

CIUDAD DEL ESTE

PARANAMBU

SAN JUAN
NEPOMUCENO

PASO PE

QUIINDY

C. A.
LOPEZ

SAN PEDRO
DEL PARANA
SAN JUAN
BAUTISTA

PILAR

PIRAPO
NATALIO

SAN
PATRICIO

ACEPAR

VILLA HAYES

VILLALBIN
AYOLAS

LIMPIO

REGION
OCCIDENTAL

TRINIDAD
CNEL.
BOGADO

VILLA HAYES 500 kV

CAMBYRETA
ENCARNACION

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

Bo.
MBURUCUYA

ARGENTINA

AERO
PUER
TO
INTER
NACIO
NAL

PTO. BOTANICO
PARQUE
CABALLERO

SICBRAS

JARDIN
BOTANICO

LUQUE

BANCO
CENTRAL

CENTRAL

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA
TRES
BOCAS

CAACUPE

ARGENTINA

OBRAS DE 220 kV EXISTENTES


OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

EUSEBIO
AYALA

CAPIATA

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL

PIRAYU

VILLETA

PARAGUARI

FECHA: 02/10/13

DP / DEG
ARCHIVO : 2014-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-1

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2015

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA

VALLEMI II

VALLEMI I

LOMA PLATA
FILADELFIA

CRUCE
BELLA VISTA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO
HORQUETA
CONCEPCION

REGION
ORIENTAL
SAN PEDRO
NORTE

VILLA HAYES

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

CURUGUATY

ACEPAR

SAN
ESTANISLAO

LIMPIO
EUSEBIO
AYALA
SICBRAS

MINGA
PORA

ARGENTINA

VILLA HAYES 500 kV

VAQUERIA

CARAYAO

PARQUE INDUSTRIAL
HERNANDARIAS

PTO. BOTANICO
PARQUE CABALLERO

S. LORENZO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

ALTO PARANA

CAACUPE

VILLARRICA
ITAUGUA
GUARAMBARE

PARAGUARI

CIUDAD DEL ESTE

KM 30

NARANJAL
LA
COLMENA
CAAPUCU

VALLE APUA

PTE. FRANCO

MALLORQUIN

PIRAYU

PTO. MARISCAL

PARANAMBU

SAN JUAN
NEPOMUCENO

CAAZAPA
PASO PE

QUIINDY

C. A.
LOPEZ

SAN PEDRO
DEL PARANA
SAN JUAN
BAUTISTA

PILAR

PIRAPO
NATALIO

SAN
PATRICIO

ACEPAR

VILLALBIN

TRINIDAD
AYOLAS

LIMPIO

REGION
OCCIDENTAL

CNEL.
BOGADO

VILLA HAYES 500 kV

ITAIPU
ACARAY
MICROCENTRO

LAMBARE

LA VICTORIA
SAN ANTONIO

VILLA HAYES

ITAKYRY

LUQUE

CAMBYRETA
ENCARNACION

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

Bo.
MBURUCUYA
BANCO
CENTRAL

CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

SICBRAS

LUQUE

REGION ORIENTAL

BARRIO
MOLINO

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA
TRES
BOCAS

CAACUPE

ARGENTINA

OBRAS DE 220 kV EXISTENTES


OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

EUSEBIO
AYALA

CAPIATA

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL

PIRAYU

VILLETA

PARAGUARI

FECHA: 07/10/13

DP / DEG
ARCHIVO : 2015-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-2

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2016

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I
CRUCE
BELLA VISTA

ACUEDUCTO

FILADELFIA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA
CONCEPCION

REGION
ORIENTAL
SAN PEDRO
NORTE

VILLA HAYES

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

ACEPAR

LUQUE EUSEBIO
AYALA
SICBRAS

VILLA HAYES 500 kV

CURUGUATY

SAN
ESTANISLAO

LIMPIO

ARGENTINA

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

MINGA
PORA
VAQUERIA

CARAYAO

ITAKYRY
PARQUE INDUSTRIAL
HERNANDARIAS

PTO. BOTANICO
PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA
CAACUPE

PUERTO SAJONIA

CAMPO DOS
KM 15

S. LORENZO
LAMBARE

ITAIPU
ACARAY
MICROCENTRO
ALTO PARANA

LA VICTORIA
SAN ANTONIO

PTE. FRANCO

MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLARRICA

KM 30

CIUDAD DEL ESTE


STA. RITA

ITAUGUA
GUARAMBARE

PARAGUARI

NARANJAL
LA
COLMENA
CAAPUCU

VALLE APUA

CAAZAPA

PARANAMBU

SAN JUAN
NEPOMUCENO

PASO PE

QUIINDY

C. A.
LOPEZ

SAN PEDRO
DEL PARANA
SAN JUAN
BAUTISTA

PILAR

PIRAPO
NATALIO

SAN
PATRICIO

ACEPAR

VILLA HAYES

FRAM

VILLALBIN
AYOLAS

LIMPIO

REGION
OCCIDENTAL

TRINIDAD
CNEL.
BOGADO

VILLA HAYES 500 kV

CAMBYRETA
ENCARNACION

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA
BANCO
CENTRAL

CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

LUQUE

BARRIO
MOLINO

SIMBOLOGIA

REGION ORIENTAL

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

F. DE LA
MORA

LAMBARE

CAPIATA

EUSEBIO
AYALA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO

VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
PIRAYU

VILLETA

PARAGUARI

FECHA: 08/10/13

DP / DEG
ARCHIVO : 2016-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-3

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2017

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I
CRUCE
BELLA VISTA

ACUEDUCTO

FILADELFIA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA
CONCEPCION

REGION
ORIENTAL
SAN PEDRO
NORTE

VILLA HAYES

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

ACEPAR

CURUGUATY
SAN
ESTANISLAO

LIMPIO
EUSEBIO
AYALA
SICBRAS

MINGA
PORA

LUQUE

ARGENTINA

VILLA HAYES 500 kV

VAQUERIA

CARAYAO

ITAKYRY
PARQUE INDUSTRIAL
HERNANDARIAS

PTO. BOTANICO
PARQUE CABALLERO

S. LORENZO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA
CAACUPE

PUERTO SAJONIA

CAMPO DOS
KM 15

LAMBARE

ITAIPU

KM 7

ACARAY

LA VICTORIA

MICROCENTRO

SAN ANTONIO
MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA
GUARAMBARE

PARAGUARI

NARANJAL

CIUDAD DEL ESTE


STA.
RITA

CAAZAPA

SAN JUAN
NEPOMUCENO

PASO PE

QUIINDY

C. A.
LOPEZ

SAN PEDRO
DEL PARANA
PIRAPO

SAN
PATRICIO

ACEPAR

VILLA HAYES

MARIA AUXILIADORA

SAN JUAN
BAUTISTA

PILAR

FRAM

REGION
OCCIDENTAL

TRINIDAD
AYOLAS
CNEL.
BOGADO

VILLA HAYES 500 kV

NATALIO

TRINIDAD II

VILLALBIN
LIMPIO

LOS CEDRALES
PARANAMBU

LA
COLMENA
CAAPUCU

VALLE APUA

ALTO PARANA

PTE. FRANCO

KM 30

CAMBYRETA
ENCARNACION

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

AERO
PUER
TO
INTERN
ACIONA
L

SICBRAS

LUQUE

BARRIO
MOLINO

SIMBOLOGIA

REGION ORIENTAL

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

F. DE LA
MORA

LAMBARE

CAPIATA

EUSEBIO
AYALA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO

VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA

PIRAYU

VILLETA II

PARAGUARI

FECHA: 10/10/13

DP / DEG
ARCHIVO : 2017-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-4

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2018

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I
CRUCE
BELLA VISTA

ACUEDUCTO

FILADELFIA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA
CONCEPCION

REGION
ORIENTAL
SAN PEDRO
NORTE

VILLA HAYES

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

ACEPAR

CURUGUATY

ITAKYRY

SAN
ESTANISLAO

LIMPIO

MINGA
PORA

YGUAZU

LUQUE

ARGENTINA

EUSEBIO
SICBRAS AYALA

VILLA HAYES 500 kV

VAQUERIA

CARAYAO

PARQUE INDUSTRIAL
HERNANDARIAS

PTO. BOTANICO
PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

CAACUPE

S. LORENZO

LAMBARE

ITAIPU

KM 7

ACARAY

LA VICTORIA

MICROCENTRO

SAN ANTONIO
MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA
GUARAMBARE

PARAGUARI

STA.
RITA

PARANAMBU
CAAZAPA

SAN JUAN
NEPOMUCENO

PASO PE

QUIINDY

C. A.
LOPEZ

SAN PEDRO
DEL PARANA
PIRAPO

SAN
PATRICIO

ACEPAR

VILLA HAYES

MARIA AUXILIADORA

SAN JUAN
BAUTISTA

PILAR

FRAM

REGION
OCCIDENTAL

TRINIDAD
AYOLAS
CNEL.
BOGADO

VILLA HAYES 500 kV

NATALIO

TRINIDAD II

VILLALBIN
LIMPIO

LOS CEDRALES

NARANJAL
LA
COLMENA
CAAPUCU

VALLE APUA

ALTO PARANA

PTE. FRANCO
CIUDAD DEL ESTE

KM 30

CAMBYRETA
ENCARNACION

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

LUQUE

BARRIO
MOLINO

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA

EUSEBIO
AYALA

CAPIATA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO
VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA

PIRAYU

VILLETA II

PARAGUARI

FECHA: 15/10/13

DP / DEG
ARCHIVO : 2018-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-5

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2019

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I
CRUCE
BELLA VISTA

ACUEDUCTO

FILADELFIA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA

REGION
ORIENTAL

CONCEPCION

SAN PEDRO
NORTE

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

VILLA HAYES

CURUGUATY

ACEPAR

SAN
ESTANISLAO

LIMPIO
LUQUE
SICBRAS

ARGENTINA
PTO. BOTANICO

EUSEBIO
AYALA

CARAYAO

ITAKYRY
MINGA
PORA

CNEL.
OVIEDO II
VAQUERIA

YGUAZU
PARQUE INDUSTRIAL

VILLA HAYES 500 kV

HERNANDARIAS

PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAACUPE

S. LORENZO

ITAIPU

CAMPO DOS
KM 15

KM 7
ACARAY

LAMBARE

LA VICTORIA

MICROCENTRO
ALTO PARANA

SAN ANTONIO
MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA
GUARAMBARE

PARAGUARI

STA.
RITA

PARANAMBU

SAN JUAN
NEPOMUCENO

CAAZAPA
PASO PE

QUIINDY

C. A.
LOPEZ

SAN PEDRO
DEL PARANA
PIRAPO

SAN
PATRICIO

ACEPAR

VILLA HAYES

MARIA AUXILIADORA

SAN JUAN
BAUTISTA

PILAR

FRAM

REGION
OCCIDENTAL

NATALIO

TRINIDAD II

VILLALBIN

TRINIDAD
AYOLAS

LIMPIO

CIUDAD DEL ESTE


LOS CEDRALES

NARANJAL
LA
COLMENA
CAAPUCU

VALLE APUA

PTE. FRANCO

KM 30

CAMBYRETA
CNEL.
BOGADO

COSTANERA
ENCARNACION

VILLA HAYES 500 kV

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

LUQUE

BARRIO
MOLINO

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA

EUSEBIO
AYALA

CAPIATA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO
VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA
VILLETA II

PIRAYU

PARAGUARI

FECHA: 16/10/13

DP / DEG
ARCHIVO : 2019-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-6

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2020

BOLIVIA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I

ACUEDUCTO

FILADELFIA

CRUCE
BELLA VISTA
CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA

REGION
ORIENTAL

CONCEPCION

SAN PEDRO
NORTE

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

VILLA HAYES

CURUGUATY

ACEPAR

SAN
ESTANISLAO

LIMPIO
LUQUE
SICBRAS EUSEBIO
AYALA

ARGENTINA

CARAYAO

ITAKYRY
MINGA
PORA

CNEL.
OVIEDO II
VAQUERIA

YGUAZU
PARQUE INDUSTRIAL
HERNANDARIAS

VILLA HAYES 500 kV

PTO. BOTANICO

PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

CAACUPE

S. LORENZO

LAMBARE

KM 7

ACARAY

LA VICTORIA

MICROCENTRO
ALTO PARANA

SAN ANTONIO
MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA
GUARAMBARE

ITAIPU

PARAGUARI

LA
COLMENA

STA.
RITA

PTE. FRANCO
CIUDAD DEL ESTE
LOS CEDRALES
PARANAMBU

SAN JUAN
NEPOMUCENO

CAAZAPA

CAAPUCU
VALLE APUA

KM 30

NARANJAL

PASO PE

QUIINDY

C. A.
LOPEZ
YUTY

SAN JUAN
BAUTISTA
PILAR
ACEPAR

VILLA HAYES

MARIA AUXILIADORA

SAN PEDRO
DEL PARANA

SAN
PATRICIO

FRAM

PIRAPO
NATALIO

TRINIDAD II

TRINIDAD
AYOLAS

LIMPIO

REGION
OCCIDENTAL

CAMBYRETA

VILLALBIN

CNEL.
BOGADO

COSTANERA
ENCARNACION

VILLA HAYES 500 kV

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

LUQUE

BARRIO
MOLINO

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA

EUSEBIO
AYALA

CAPIATA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO
VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA
VILLETA II

PIRAYU

PARAGUARI

FECHA: 17/10/13

DP / DEG
ARCHIVO : 2020-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-7

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2021

BOLIVIA

TORO PAMPA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I
CRUCE
BELLA VISTA

ACUEDUCTO

FILADELFIA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA

REGION
ORIENTAL

CONCEPCION

SAN PEDRO
NORTE

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

VILLA HAYES

CURUGUATY

ACEPAR

SAN
ESTANISLAO

LIMPIO
LUQUE
SICBRAS EUSEBIO
AYALA

ARGENTINA

CARAYAO

ITAKYRY
MINGA
PORA

CNEL.
OVIEDO II
VAQUERIA

YGUAZU
PARQUE INDUSTRIAL
HERNANDARIAS

VILLA HAYES 500 kV

PTO. BOTANICO

PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

CAACUPE

S. LORENZO

LAMBARE

ITAIPU

KM 7

ACARAY

LA VICTORIA

MICROCENTRO

SAN ANTONIO

ALTO PARANA
MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA
GUARAMBARE

PTE. FRANCO

KM 30
STA.
RITA

CIUDAD DEL ESTE


LOS CEDRALES

NARANJAL

PARAGUARI

LA
COLMENA
CAAPUCU

VALLE APUA

PARANAMBU

SAN JUAN
NEPOMUCENO

CAAZAPA
PASO PE

QUIINDY

C. A.
LOPEZ
YUTY

PILAR II
PILAR

SAN
PATRICIO

ACEPAR

VILLA HAYES

SAN JUAN
BAUTISTA

MARIA AUXILIADORA

SAN PEDRO
DEL PARANA
FRAM

PIRAPO
NATALIO

TRINIDAD II

TRINIDAD
AYOLAS

LIMPIO

REGION
OCCIDENTAL

CAMBYRETA

VILLALBIN

CNEL.
BOGADO

COSTANERA
ENCARNACION

VILLA HAYES 500 kV

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

LUQUE

BARRIO
MOLINO

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA

EUSEBIO
AYALA

CAPIATA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO
VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA

PIRAYU

VILLETA II

PARAGUARI

FECHA: 18/10/13

DP / DEG
ARCHIVO : 2021-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-8

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2022

BOLIVIA

TORO PAMPA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I
CRUCE
BELLA VISTA

ACUEDUCTO

FILADELFIA

CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA

REGION
ORIENTAL

CONCEPCION

SAN PEDRO
NORTE

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

VILLA HAYES

CURUGUATY

ACEPAR
LIMPIO

ALTOS
LUQUE
SICBRAS EUSEBIO
AYALA

ARGENTINA

SAN
ESTANISLAO
CARAYAO

ITAKYRY
MINGA
PORA

CNEL.
OVIEDO II
VAQUERIA

PARQUE INDUSTRIAL
HERNANDARIAS

VILLA HAYES 500 kV

PTO. BOTANICO

PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

CAACUPE

S. LORENZO

YGUAZU

LAMBARE

ITAIPU

KM 7

ACARAY

LA VICTORIA

MICROCENTRO

SAN ANTONIO

ALTO PARANA

MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA

PTE. FRANCO
CIUDAD DEL ESTE

KM 30
STA.
RITA

LOS CEDRALES

NARANJAL

PARAGUARI

LA
COLMENA

GUARAMBARE

CAAPUCU
VALLE APUA

PARANAMBU

SAN JUAN
NEPOMUCENO

CAAZAPA
PASO PE

QUIINDY

C. A.
LOPEZ
YUTY

PILAR II

SAN
PATRICIO

PILAR
ACEPAR

VILLA HAYES

SAN JUAN
BAUTISTA

MARIA AUXILIADORA

SAN PEDRO
DEL PARANA
FRAM

PIRAPO
NATALIO

TRINIDAD II

TRINIDAD
LIMPIO

REGION
OCCIDENTAL

VILLALBIN

AYOLAS

CAMBYRETA
CNEL.
BOGADO

COSTANERA
ENCARNACION

VILLA HAYES 500 kV

YACYRETA

MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

ALTOS

LUQUE

BARRIO
MOLINO

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA

EUSEBIO
AYALA

CAPIATA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO
VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA
VILLETA II

PIRAYU

PARAGUARI

FECHA: 23/10/13

DP / DEG
ARCHIVO : 2022-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-9

REPUBLICA DEL PARAGUAY - MAPA ELECTRICO


AO 2023

BOLIVIA

TORO PAMPA

BRASIL
REGION OCCIDENTAL

MARISCAL
ESTIGARRIBIA
BELLA VISTA
NORTE

VALLEMI II
LOMA PLATA

VALLEMI I

ACUEDUCTO

FILADELFIA

CRUCE
BELLA VISTA
CERRO
CORA

P. J. CABALLERO

YBY YAU

BRASIL

CAPITAN
BADO

CONCEPCION II
HORQUETA
POZO COLORADO

REGION
ORIENTAL

CONCEPCION

SAN PEDRO
NORTE

SANTA ROSA
CATUETE

ITACURUBI
DEL ROSARIO

SALTO DEL
GUAIRA

BARRIO SAN
PEDRO

VILLA HAYES

ACEPAR
LIMPIO

ALTOS
LUQUE
SICBRAS EUSEBIO
AYALA

ARGENTINA

CURUGUATY
VAQUERIA

SAN
ESTANISLAO
CARAYAO

ITAKYRY
MINGA
PORA

CNEL.
OVIEDO II

PARQUE INDUSTRIAL
HERNANDARIAS

VILLA HAYES 500 kV

PTO. BOTANICO

PARQUE CABALLERO

CAAGUAZU

CNEL.
OVIEDO

CAPIATA

PUERTO SAJONIA

CAMPO DOS
KM 15

CAACUPE

S. LORENZO

YGUAZU

LAMBARE

ITAIPU

KM 7

ACARAY

LA VICTORIA

MICROCENTRO

SAN ANTONIO

ALTO PARANA

MALLORQUIN

PTO. MARISCAL
PIRAYU

VILLETA II

VILLARRICA

ITAUGUA
GUARAMBARE

PTE. FRANCO
CIUDAD DEL ESTE

KM 30
STA.
RITA

LOS CEDRALES

NARANJAL

PARAGUARI

LA
COLMENA
CAAPUCU

VALLE APUA

PARANAMBU

SAN JUAN
NEPOMUCENO

CAAZAPA
PASO PE

QUIINDY

C. A.
LOPEZ
YUTY

PILAR II
PILAR

SAN
PATRICIO

ACEPAR

VILLA HAYES

SAN JUAN
BAUTISTA

MARIA AUXILIADORA

SAN PEDRO
DEL PARANA
FRAM

PIRAPO
NATALIO

TRINIDAD II

TRINIDAD
LIMPIO

REGION
OCCIDENTAL

VILLALBIN

AYOLAS

CAMBYRETA
CNEL.
BOGADO

COSTANERA
ENCARNACION

VILLA HAYES 500 kV

YACYRETA
MARIANO R.
ALONSO
VIAS CUE

SICBRAS

Bo.
MBURUCUYA

CENTRAL
IPS

BANCO
CENTRAL

ARGENTINA

AERO
PUER
TO
INTERN
ACIONA
L

JARDIN
BOTANICO

PTO. BOTANICO
PARQUE
CABALLERO

ALTOS

LUQUE

BARRIO
MOLINO

REGION ORIENTAL

SIMBOLOGIA

PTO.SAJONIA
S. MIGUEL
GRAL. DIAZ

Bo.
PARQUE

CENTRAL HIDROELECTRICA EXISTENTE

VILLA
AURELIA

SAN LORENZO

OBRAS DE 500 kV EXISTENTES

REPUBLICANO
CERRO
LAMBARE

LAMBARE

F. DE LA
MORA

EUSEBIO
AYALA

CAPIATA

TRES
BOCAS

CAACUPE

GRAN
HOSPITAL
NACIONAL

SAN ANTONIO
VILLA ELISA

ARGENTINA

OBRAS DE 66 kV EXISTENTES

ITAUGUA

LA VICTORIA
REFINERIA

OBRAS DE 220 kV EXISTENTES

OBRAS PROGRAMADAS EN EL AO

GUARAMBARE
PTO. MARISCAL
VILLETA
VILLETA II

PIRAYU

PARAGUARI

FECHA: 25/10/13

DP / DEG
ARCHIVO : 2023-M

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

A.3-10

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.4
PROYECCIN DE CARGAS POR BARRA PARA EL
PERIODO 2014 2023

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.41
1

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.42
2

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.43
3

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.44
4

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.45
5

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.46
6

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.47
7

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.48
8

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.49
9

ADMINIISTRACIN NACIONAL DE ELECTR


RICIDAD
PRO
OYECCIN DE CARGAS
S POR BARRAS
2014-2023

A.410
0

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.5
BALANCE DE GENERACIN Y DEMANDA DEL
SISTEMA

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

ANDE
DireccindePlanificacinGeneralyPolticaEmpresarial(DP)
DivisindeEstudiosEnergticos(DP/EE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

ADMINISTRACINNACIONALDEELECTRICIDAD
PLANMAESTRODEGENERACINYTRANSMISIN20142023

BALANCEDEGENERACIN,CARGASYPRDIDAS

Carga Punta del Sistema

Ao
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Itaip
2.365
2.694
2.353
2.597
2.769
3.098
3.538
3.978
4.403
4.819

Generacin (MW)
Acaray
Yguaz
Yacyret
456
214
502
214
1.201
214
1.328
214
1.328
214
200
1.338
214
200
1.335
214
200
1.338
214
200
1.340
214
200
1.337
214
200

Total
3.035
3.410
3.767
4.139
4.511
4.850
5.286
5.730
6.157
6.570

ANDE
2.835
3.176
3.544
3.892
4.226
4.590
4.988
5.389
5.782
6.197

Cargas (MW)
Ventas Prdidas
25
175
25
209
25
198
25
222
25
260
25
235
25
274
25
316
25
350
25
347

%
Prdidas
5,77
6,13
5,26
5,37
5,77
4,84
5,17
5,51
5,69
5,29

Total
2.630
3.045
3.354
3.677
3.974
4.283
4.651
5.028
5.419
5.773

ANDE
2.467
2.846
3.170
3.473
3.747
4.065
4.407
4.758
5.114
5.459

Cargas (MW)
Ventas Prdidas
25
138
25
174
25
159
25
178
25
203
25
193
25
219
25
246
25
279
25
289

%
Prdidas
5,26
5,70
4,75
4,85
5,10
4,51
4,71
4,89
5,15
5,00

Total
1.453
1.727
1.931
2.089
2.254
2.419
2.628
2.883
3.070
3.244

ANDE
1.371
1.633
1.838
1.988
2.144
2.321
2.517
2.755
2.936
3.109

Cargas (MW)
Ventas Prdidas
25
57
25
69
25
69
25
76
25
85
25
74
25
86
25
103
25
109
25
109

%
Prdidas
3,92
3,97
3,55
3,65
3,76
3,04
3,27
3,58
3,54
3,37

% Prdidas = Prdidas / Generacin total

Carga Media del Sistema

Ao
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Itaip
2.061
2.440
2.073
2.289
2.557
2.849
3.238
3.614
4.006
4.339

Generacin (MW)
Acaray
Yguaz
Yacyret
355
214
391
214
1.067
214
1.174
214
1.203
214
1.220
214
1.200
214
1.200
214
1.198
214
1.220
214
-

% Prdidas = Prdidas / Generacin total

Carga Leve del Sistema

Ao
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Itaip
1.025
1.279
1.138
1.258
1.386
1.543
1.763
2.003
2.199
2.472

Generacin (MW)
Acaray
Yguaz
Yacyret
214
214
234
214
579
214
617
214
654
214
663
214
651
214
666
214
657
214
558
214
-

% Prdidas = Prdidas / Generacin total

A51

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.6
LONGITUD DE LNEA Y CAPACIDAD
INSTALADA EN SUBESTACIONES

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Interconectado Nacional
Concepto

Unid.

Existente
2013

2014

2015

2016

2017

Aumento Previsto
2018
2019
2020

2021

2022

2023

Total

Previsto
2023

Generacin

MW

200

52

200

252

452

Lneas en 500 kV

km

363

363

154

348

225

210

1.300

1.662

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

4.087
575
258

32
0

379
0

143
165

110
0

200
0

200
121

410
0

47
48

0
188

2.095
780

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

1.257
55
87

40
4

12
17

3
5

0
8

10
72

26
38

0
0

0
0

0
24

145
230

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

3.445
2.035
1.812
1.815

850
743
771
596

0
120
410
66

600
240
258
120

1.800
120
282
108

600
107
410
140

0
143
80
158

1.575
60
275
80

0
40
778
60

0
120
320
75

1.200
120
87
80

6.625
1.812
3.671
1.483

10.070
3.846
5.484
3.298

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

-230/400
-80/150

-120/140

240
180
822

0
0
0
300

0
40
0
117

0
0
0
18

0
0
0
102

0
0
160
57

0
0
0
36

0
0
0
99

0
0
0
132

0
0
0
99

0
0
0
6

-350/540
-80/150
0
280
340
1.788

Un.

73

10

Subestaciones

Plan Maestro de Generacin y Transmisin 2014-2023

6.182

1.402

-120/140

0
40
160
966
0
38

111

A.6-1

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Central
Concepto

Unid.

Existente
2013

Generacin

MW

Lneas en 500 kV

km

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

1.560

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

89

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

0
135
348
74

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

Subestaciones

Un.

Plan Maestro de Generacin y Transmisin 2014-2023

2014

2015

2016

2017

Aumento Previsto
2018
2019
2020

2021

2022

2023

210

Total

Previsto
2023

210

210
1.607

47
48

143

47
191

191
89

0
0

0
20
0
108
0
10

0
0
42
20

48

0
0
167
0

15
2

0
0
0

0
60
0
0

0
0
20

80
6

0
0
42
0

12
1

0
0
38
0

0
40
167

1.200
60
30

40

1.200
160
455
110

1.200
295
803
184

0
20
80
270

0
0
80
162
0
4

66

14

A.6-2

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Sur
Concepto

Unid.

Existente
2013

Generacin

MW

Lneas en 500 kV

km

15

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

674

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

254

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

500
235
108
248

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

Subestaciones

Un.

Plan Maestro de Generacin y Transmisin 2014-2023

0
60
0
72
0
11

2014

2015

2016

16

2017

Aumento Previsto
2018
2019
2020

2021

2022

2023

129

Total

Previsto
2023

145

160
1.152

50
64

118

110

200
121

478
228

10
55

26
38

46
93

0
0
0
80

375
0
0
30

43

300

250
120
137
50

42
1

0
60
0
16

0
0
80

600
0
0
10

0
0
42
0

0
0
167
0

6
1

42
30

38

1.225
180
425
296

1.725
415
533
544

0
0
0
48
0
7

0
60
0
120
18

A.6-3

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Este
Concepto

Unid.

Existente
2013

Generacin

MW

200

Lneas en 500 kV

km

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

487

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

276

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

2.345
418
223
397

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

Subestaciones

Un.

Plan Maestro de Generacin y Transmisin 2014-2023

2014

2015

2016

Total

Previsto
2023

252

452

25

25

25

120
122

332
122

2017

52

Aumento Previsto
2018
2019
2020

2021

2022

2023

200

820
145

22

45

293
17
75

0
0
20
138
0
14

0
180
273
80

17
75

0
60
163
30

0
20
42
20

1.200
0
80

81

30

12

24

0
27
68
30

0
60

60
0

30

12

18

0
0
118
60

38

27

1.200
407
783
250

3.545
824
1.006
647

0
0
0
210
0
10

0
0
20
348
24

A.6-4

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Metropolitano
Concepto

Unid.

Existente
2013

Generacin

MW

Lneas en 500 kV

km

348

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

738

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

297

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

600
1.113
1.023
1.012

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

-150/250
-80/150
0
60
160
454
0
28

Subestaciones

Un.

Plan Maestro de Generacin y Transmisin 2014-2023

2014

2015

2016

2017

Aumento Previsto
2018
2019
2020

347

2021

348

2022

2023

225

Total

Previsto
2023

920

1.267
871

50
51

10

51

23

33
12

40
4

2
17

3
5

0
17

600
383
278
366

0
0
80
20

600
120
197
20

0
60
160
90

600
80
300
90

0
23
38
40

188

133
239
374
77
56

1.200
237
30

0
233
0

120
278
40

-120/140

117

63

72

80
39

12

72

0
114

6
1

3.000
785
1.802
696

3.600
1.898
2.825
1.708

-120/140

-270/390
-80/150
0
60
240
949

0
0
80
495
0
11

39

A.6-5

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Norte
Concepto

Unid.

Existente
2013

Total

Previsto
2023

655
0

Lneas en 500 kV

km

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

418

0
330
0

0
0
0

125
0

0
0

0
0

200
0

0
0

0
0

0
0
0

0
0
0

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

265

0
0
0
0
0
0
60
42
80

0
0
0
0
0
0
0
0
0

0
5
0
0
0
0
60
10
0

0
0
0
0
0
0
0
42
8

0
0
6
0
0
0
0
0
0

0
0
0
0
0
0
0
0
8

0
0
0
0
0
0
0
0
20

0
0
0
0
0
0
0
93
0

0
0
0
0
0
0
0
0
0

0
0
0
0
0
60
0
0

0
0
0
0
0
12
0
1

0
0
0
40
0
3
0
0

0
0
0
0
0
6
0
2

0
0
0
0
0
0
0
0

0
0
0
0
0
6
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
6
0
0

0
0
0
0
0
6
0
0

0
0
0
0
0
6
0
0

0
0
0
0
0
0
0
0

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

-80/150

Subestaciones

Un.

Plan Maestro de Generacin y Transmisin 2014-2023

0
100
0
45
0
7

2023
0
0

0
105
109
37

2017
0
0

2022
0
0

MW

MVA
MVA
MVA
MVA

2016
0
0

2021
0
0

Generacin

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

2015
0
0

Aumento Previsto
2018
2019
2020
0
0
0
0
0
0

2014
0
0

0
0

0
0

0
0

1.073

270
0

5
6

0
180
187
116

0
285
296
153

-80/120

-80/120

0
40
0
45
0
3

0
140
0
90
10

A.6-6

ANDE
Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

ADMINISTRACION NACIONAL DE ELECTRICIDAD


PLAN MAESTRO DE GENERACION - TRANSMISION
2014 - 2023
Longitud de Lneas, Capacidad Instalada en Subestaciones
Sistema Oeste
Concepto

Unid.

Existente
2013

2014

2015

2016

2017

Aumento Previsto
2018
2019
2020

2021

2022

2023

Total

Previsto
2023

Generacin

MW

Lneas en 500 kV

km

Lneas en 220 kV
Construccin
Recapacitacin

km
km
km

210

Lneas en 66 kV
Construccin
Recapacitacin

km
km
km

76

Transformadores
500/220 kV
220/66 kV
220/23 kV
66/23 kV

MVA
MVA
MVA
MVA

0
30
0
47

Compensacin
CER 220 kV
CER 66 kV
Reac. 500 kV
Reac. 220 kV
B.C. 220 kV
B.C. 23 kV

MVAr
MVAr
MVAr
MVAr
MVAr
MVAr

Subestaciones

Un.

Plan Maestro de Generacin y Transmisin 2014-2023

660
40

410

450
0
76
24

0
40
10

0
60

0
10
15

0
0
6
0
3

6
1

0
24

0
100
20
15

0
130
20
62

0
0
0
6
0
3

0
0
0
12
6

A.6-7

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.7
DIAGRAMAS DE FLUJOS DE POTENCIA Y
TENSIONES DE BARRAS POR AO

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

AO 2014: RGIMEN NORMAL


154.9
2

VHA B1
446

220

1
101.8

1
103.7

1
1
37.6
101.8
1.005
1.010
PBO F1
505

1.009

VHA B1

66

346
0.968
11.4
1

1
20.1

1
1442.6

1
14.5

1
102.8

1
110.8

0.955

CMY

1.039

94.9
1

1
102.7
66

220
1409

1
49.4

1
49.3

1
69.2
1.073

69.2

1
66.9

HOR B1
468

20.9
1.037

SRO TA
467

220

1
33.3

1.090
4468

1
81.7

77.1

1
55.5

1.096

1
286.3
1.090
MD

1
44.0

3
44.2

66

127.0

0.988

1
29.5

1
26.9

1
12.8

1
31.8

1
13.4

1
164.1
23

220
GAQ

220

CON B1
66
372 0.974

1
13.6
1.052 1.033

1
109.5

0.984

IRY B1
484

1
85.6

1
13.6

1
113.0

1.056

1.016

CUR B1
492
1
91.1
1.079

1
94.0

1
98.5

1
103.8

PQF B1
490

1
286.3
1.006
F2 241.5
1485

1
5.9
BDO
66

PJC B1

66

2272
1.026

1
287.4
1.050

1.090

220

MD

1
287.4

1
196.5

1
204.7

1
204.7
1.096

1
204.9

1
286.3

1
286.3

1
286.3
1.006
F3 241.5
1486

1.090
MD

1
286.3
MD

220

1
264.4

1
286.3
1.006

1686.5
2

500

3
1686.5

1
287.4

220

1
978.7

1
978.2

2
997.6

2
997.1

3
976.7

3
975.7

4
976.7
1.061

4
975.7

1.050
1
966.1

1
966.1

FOZ B2
804

1
287.4
1.050
1.061

F4 241.5
1487

1
270.3

1.060

1
465.2

1
116.0

1
119.6

2
465.2

1
6.0

23

BDO B1
472
1.083

1.097

1.079

220
1
12.4

1
12.3
1.084

CUR ABC
2292
1.017

23

371

3.3

YBY B1
66
369
0.981

0.969

CBV B1
370

66

220

ACYC
2281

66
143.3
1

3
35.2

3
34.2
0.967

1
77.4

1
79.9

1
32.4

CAP A
293

23

1
31.4

0.950

CAP TA
493

1
38.8

1.025

0.967

COV B1
402

220

2
80.2

1
45.5

0.950

0.967
1
46.3

CAE BP
66
333

1
114.0
1.019

ESA B1
334

1.041

1
115.4

66

220

1.020
138.8

1
163.8

CZU TA

1
166.6

1
0.7

1
25.1

1
26.0

1
48.6

497

1
49.9

1
111.3

2
21.9

1
112.6

1.030

0.967

1.038

0.996

1
1.058

GUA B1
404

1
32.6
1.033

VTA BP
341

66

1
2.3
CVP BP

1 20.1

1
40.9

1.060

1
147.0
1.035

1
150.2
FMY TA
4433

6.0

1
152.8
2
152.8

1
135.3
1.043

1
137.4

16.5

1
39.5

GUA B3
4404

1
18.1

220

220

1
77.6

1
2.8

1.029

1
2.8

1
1
31.0
29.8
0.950
1.041
1.091

220

489

220

1
75.8

1
73.9

0.980
2
75.0

2
77.6

1
104.6
1.028

SJB TA
482

0.980
1
98.1

220
PBU TA
451

1
117.4
1.061
TRI B1

220
1.084

CBO TA
480

2239

PPO B1
355

CBO B1

1
20.1

66

380

nTS F1
1370

ENC B1

66

nTE F1
1360

66

360

1
11.7

66

TRI B1
454

1
104.0

1
179.2

1
117.5

1
28.5

1
28.9
1.060

1
1
14.8 14.4
1.005

220
1
207.8

1.073
2
206.1

1
1
16.6 16.5

1
16.5
1.012
SPP B1
362

16.4 1
1
32.6

1
14.0

1
14.2

1.019

1
11.5

21.1
2

0.950

1
CAM B1
378

0.970

66

CAM B2
220
478

1.053

21.0

21.7
2

NAT TA
453

1
32.4

1
211.6

2
210.0

1
124.9

1.035

0.940

1
29.5
1
29.2

1
230.0

2
230.0

1.098

500
856

2477.6
685.6

1
2570.7

1
2520.2
1.025

YAC19G

YAC B1
890

500

13.2

790
2021.0

1.043

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica
Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1.041
1
464.3

AYO B1

1
232.1

2
232.1

0.940

1
461.9

1
69.4

1
27.8

1.092

VIN B1
457

220

CDE B1
2304

1.000

66

220
0.993

1
28.7
1.021

1.026

220

456

1.038

1
69.1

220
1.078

21.5

1.017

AYO B1

CAL B1
452

1
0.950

1.033
1
33.0

66

1.029
1
14.1

66

1
33.0
1
126.9
1.052

1
14.2
1.044

PFO B1
389

220

12.6

1
175.6

1.005

1.100

1.000

66

220

0.953

SPA B1
487

1.100

66

354
23

1
19.5

APR BP
384

0.993

1.005

CDE
2204

23

66

1.011

23

1.016
ACYABC
1281
1
8.0

0.993

1
18.4

0.984

1
8.7

1
7.9

0.999

261

K15
298
2
18.2
0.958

ACYAB
281
1
8.9

2
39.5

66
VAP TA
461

66

2
18.4

1
18.6
1
46.2

0.975
2
41.0

1.045

VAP B1
361

1
99.3

1.023

1
41.0

1.096

PFO TA
66

1
75.0

GUA AB2

66

1
47.5

1
214.1

0.990

1
9.3

0.997

2
145.5

23

1.027

1
48.9

K15 TA
398

66

0.958

1
145.5

SJN TA
4497

1.036

0.971

ACY G4 13.8
184 60.0
G
27.3
1.045

ACY B3
382

1.047

220

ACY G3 13.8
183 60.0
G
27.3
1.045

1
9.3

1
5.4
3.6

0.973

66

1337

12.5
1
A

0.976
30.0
GUA B1
339

1
1
1
16.5
16.5
16.2
COV BP
66
373

1
16.5

QUI B1 FIC66
1338
1.039

VAP

1
30.8
1
48.0

1.039

PMA B1
220
730
1.033

1
34.9

66

305
1
40.3

0.956

1
50.6

1
31.1

nGI F1
66
1343

66

1.091

WMA
394

1
5.4

1.019

1.047

1.071

CZA B1
376

1
1.1

1
65.9
1.090

1
39.0

1
50.2

1
30.4

0.976

1
15.9

1
32.9

1
1.1
0.974

1
63.4

66

1
17.9

220

1
2.3

GHN B1
343

2
34.6

QUI B1 FIC66
RED TA
220
430 1.034

SAN TA
410

1
16.7

1
33.1

1
42.2
1.100

ACY G2 13.8
182 47.0
G
26.3

1.047

1
43.1
1.033

2
34.0
1.052 0.967

1.052

1
28.3

1
43.1

36.0
1

36.0
1
43.2

28.1

1
135.3

1
133.9

0.953
2

1
83.3

49.1

34.6

1
32.8

1.020
1.002

1
43.0

23
296

CAR
393

1
213.3

34.6
1

66

1
80.5

23
1.042

CDO
0.943

1
33.6

2
257.5
K30 BP
388

1
16.5

66

2
256.3

1
166.3

0.974
1
16.3

1
84.1

SAN
210

VIL BP
375

1
159.6

220

1
163.1

1
80.8

220

CDO TA
496

1
130.2

1
34.0

LAM_FIC
1400

1
81.2

1
34.6

0.967

0.953

1
81.4

220

1.022

154.7

0.967

1
27.6
PAR B1
66
335

1.032

12.4

PIR B1
425

66

12.5

41.5
1

1
41.5
1.008

1 16.4

220

1
34.0

1.032

1
12.5

41.6

1
41.5

1
65.9

1
257.5

1
12.0

29.3
1
10.3
1

66

1
20.4

nLT F1
1416

1.011

66
338
1.018

1
138.1
ITG B2
3331

66

1.008

1
6.9

1
27.3

QUI B1
66
337

CAU B1

66

15.8

VIC TA
220
2418
1.024

28.0
1
TBO B1
320

PIR B1
325

1
137.6

66

1
26.8
1.031
66

1
63.4
1
256.3

ACY G1 13.8
181 47.0
G
26.3
1.045

1.045

23

2
21.6

VIL B1
220
1.044 475

1
109.9

1
24.3

1.020

1
57.1

1.090

1
127.4

1.000

CZU
297

1
53.9

1
464.7

1.020
1
23.6

1
110.0
1.020

ITG BP
331

21.6
1

1
21.9

220

1
144.6

2
32.2

1
9.0

ESA TA
434

1
39.6

1
8.7

1
22.2

2
40.3

1.016
2
77.7

1
0.0

nGR F1
66
1311

2
38.8

1
51.8

2
32.4

1
40.2

2
464.7

1
40.5

1
9.2
509

2
34.2
0.967

1
53.9
1.090
1.090

220

2
35.2

66

K30 B1
488

12.6

FDM B1
323

1.022

1
51.8

220

1
40.3

2
12.6

1.014

1
32.2

1
44.3

23

1
38.2
1.047

1
32.4

1
43.2

1
39.1

23

1
25.4

1
43.2

SLO AB
201

1
25.3

BPA FIC
1303

1
43.3
1.010

220

8.1
1

SLO B1
403

46.0
1
66

1
35.7

24.5
1

1
1.012

66

1
12.6

SLO B1
301
55.3
1

VAU B1
2309

GDI B1
66
2311

1
7.0

B1
801

1.050

1.073

1.047

CCO B1
3371

1
286.3
1.006

1
286.3

11
3.2

1
39.6

VM1 B1
469

HOR B1
368

1
12.5

2
38.2
36.7
2

F1 241.5
1484

1
286.3

1
286.3

87.6

302

1
81.5

1
81.5

1
286.3

1483.4
1
196.5

1
130.5

0.967

1
22.4

1
22.4

GAQ TA
4466
1
13.6

1.087

1.052

1
2.7

66

1.039

1
22.4

1
22.4

0.993

1
13.7

1
40.7

1
219.5

SLO RE

1.007

1
162.3

1
15.2
1.053

471

1
44.3

1.080

220
479
1.066

1
114.8

1
2
1483.7 1686.6
1.061

0.0

1
44.8

1
30.6

1
8.8

1
57.3

22.2
1

66

24.5

1
35.9

1
81.9

1
81.9

LPA B1

1
113.0
1.055

1
1442.6

1
287.4
1.050

MD

PQF B2
220
590
1
193.1

1
126.3

1
23.1

1
13.7
1.100

1.085

220

1
48.8

1.080

0.967
36.7
1

28.2

66

REP B1
2308

LAM B1
66
316

1
46.4
CBV B1
220
1814

1.021

56.4
1

43.9
1

1
43.9

PSA B1
313

LAM F1

1.000

1
22.9

1.026

1
13.7
0.994

1
43.0

1
129.9

1
43.0

1
129.9

1
20.3

1.020

1.008

220

1
286.3
1.006
F5 241.5
1483

1
30.8
1
8.8

28.2

1
43.0

1
129.8

23
221

1.020

1.008

1
36.9

1
286.3
1.090
MD

1.062

1.033

510

1
50.6

LAM F2

1
29.4
1.094

1
286.3

3.0

LAM_PSA AER1
1405
1.034

1.020

3
1686.6

1
1442.6
500

1.020

1.000

1.021

220

1
46.4

66
1.016

BPA B1
303

LAM B1
405

1
15.7

2
13.7
1.100

ACY B2
401

1.000

LAM_PSA AER2
1407
1.034

1
113.0

CCO B1

1
8.8

66
1313

LAM_PSA SUB1
1406
1.034
1
129.9

LUQ

1
33.2

1
67.5

1
43.8

43.8

43.0

129.9

1.020

nCP F1
LAM_PSA SUB2
1408
1.034

1
46.1

220

1
143.9

1
38.2
1
68.2

2
68.2

130.0
1

42.9
1

2
67.5

nBC F1
1326
PSA F1
513

VM2 B1
1469

1.026

220

0.967

1.003

1
14.5

1.020

23

220

1.087
1
1
14.5
14.5
1.073

2266

1
63.8

1
33.3
1
8.7

1
8.7

1
33.3

154.0
1

154.0
2

66
1.019

LUQ TA
421

1.020

1
111.3
1.057

3
45.3

1.034

PSA F2
514

BSP B1
412

1.080
1

nBS F1
1308

CYO A
285

PQI B1
4495
1.096

IRY B2
220
4484

1
1442.3

IPU B2
805
1.061

2
13.7

220

1
13.7

220

1.090
1

20.5

PSA B2
220
4413

1.003

220

1.071

1.020

CAT B1
491

1
13.9

MD B1
483

HOR comp 220


1
221.3

1.022

66
3311

CAT2 A
23
2291 1.021

SGA A
23
2491 1.014

220

2
64.9
220

466

66

1
68.1

SES TA

311

CEN B2

1
68.2
1.039

2
65.0

11.8

1
14.2

1
24.3

66

CYO

485

1.000

CEN B1

220

66

66

1.100
SGA B1
220
4491 1.094
SICBRAS
4409

1.020
LIM RE
411

1
19.7

B1

LIM B1
220
409
1
19.8

1.020

1
14.7

PQI B1
4395

0.982

66

LIM B1

1
1
19.3
19.3
0.990
1
76.8

MD HER2
1516

1.100

ACE B1
345

0.972

66
1.018

1
14.5

1.041

344

SMI B1
308

1
6297.4

2
462.7

14.2
1

20.9

nPS F1
1306

1
950.0

VHA F1
3346

1
19.0

66

1
20.1

1
49.9

1
49.9

PCA B1
324

1
76.8

1
24.4

1.022

1
938.1

1
938.1

500

18

1
6369.1
1.048
1.024

0.905

0.967
1.034

20.3

1.000

2
456.8

0.993

1.021

1
103.7

1
1.000

1
16.5

1
10.0

1.005

1.000

1
16.1

1
10.1

20.0
1

1
37.6
1.000

1
925.3

6293.2
980.6

0.997

2246

1
204.4

1
37.6

1
462.7
0.905

IPU10G
700
G

1
196.7

1
37.6

1
47.8

1
456.8

23

IPU B1
800

500

500

110.8

1
13.2

1
48.2

VHA AB2

220

1
11.4

PBO B1
408

66

327
1.005
1.023
PCA F2
525

183.6
2

182.7
2
182.7

PBO F2
506 1.010

AMP B1

1
11.3

14.5

1
77.1

1
77.1
1
50.0

1
50.0

PBO B1
66
306
1
11.3

66

11.4

0.985

0.985

1.023
PCA F1
524

66

1.008
MRA B1
304
1.012

MD B2
802

500
CYO B1
885

94.9

VCU B1
307
1.030

1
158.0

VHA B1
846

183.6
1

1
78.8

220

1
78.8

PCA AB
424

157.7

154.9
1

1.024

23

1.014

23

500

AO 2014: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500 KV MARGEN DERECHA - VILLA HAYES
42.1
VHA B1
446

220

42.1

VHA B1
846

13.8

57.3

1.020

57.6

18.4
1.072

nPS F1
1306

0.0

VHA B1

66

346
0.988

5.7

3.8

66
1.080

0.983

5.7

PQI B1
4395

1.100
118.5

114.1

66
123.6

B1

220
1409
SGA B1

66

LIM B1
220
409

344

157.0

18.0

11.8

167.2
1.083

164.8

76.8
1.125

76.8

-47.8 HOR B1
468

74.1
1.086

220

SRO TA
467

1.002
4468

15.7

33.1

220

30.4

BSP B1
412

56.6
1.059

56.3

CCO B1

12.3

16.7

50.1

42.3

31.1

37.3

220

56.3
1.066

28.7

37.4

33.0
22.3
22.2

7.3

1.037

20.5

9.2

21.1

9.0

MD
305.9
PQF B1
490

304.4

304.4
1.028
F2 241.5
1485

1.032

220

MD

225.6

225.6

229.5

229.5
1.066

229.6

305.9

304.4

304.4
1.028
F3 241.5
1486

1.032
MD

174.8

CON B1
66
372 1.050

IRY B1
484

163.0

23

305.9

304.4

1.038

PJC B1
371

66

CBV B1
370

66

2272
1.016

284.1

304.4
1.028

978.2

997.6

997.1

976.7

975.7

976.7
1.060

975.7

FOZ B2

284.1

804

299.0
1.050
1.060

F4 241.5
1487

280.1

168.0

82.8

88.5

220

1.060

500.9

97.4

101.7

500.9

4.0

BDO B1
472

1.066

1.069

220
9.1

9.0
1.080

1.084

23

CUR ABC
2292
1.018

23

3.6

YBY B1
66
369
1.035
1.029

220

ACYC
2281

66
57.0

SLO B1
403

220

SLO AB
201

23

25.7

66

23.0

85.2

90.3

21.2

CAP A
293

0.950

CAP TA
493

220

56.0

1.018

1.060

25.9

26.2

220

1.047
66

23.0

ESA TA
434

26.2

1.026

1.047

1.033

149.0

CAE BP
66
333

191.3
1.088

ESA B1
334

192.5

66

228.9

21.5

37.5
1.042

37.1

161.7

GUA B1
404

220

24.8

190.5
VIL BP
375

19.0

24.8
1.054 1.047

224.1
1.094

QUI B1 FIC66
1338
1.087

3.6
4.1

190.6

VAP B1
361

2.8

1.082

8.4

16.4

49.6

19.6
19.3
0.950
1.088

88.6

108.1
1.047

SJB TA
482

49.6
1.020

107.6

220
PBU TA
451

1.071

PPO B1
355

CBO TA
480

CBO B1

66

380

nTS F1
1370

ENC B1

66

nTE F1
1360

66

360

66

11.7

TRI B1
454

11.5

13.413.3
25.3

25.6
1.060

220

487

15.2

15.2
1.047

18.9

15.1

0.950

220

19.5
CAL B1
452

66
66

CAM B2
220
478

1.056

18.8

0.950

19.3

1.033

NAT TA
453

129.8
1.056

21.1

20.9

219.5

217.9

1.032

2497.0
663.2

2583.6
YAC19G

1.025
13.2

2534.5

YAC B1
890

500

790
2021.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1.039

29.4
29.3

238.2

238.2
G

1.037

1.091

VIN B1
457

CDE B1
2304

0.996

66

220

220
0.993

28.6
1.026

64.3

127.8
1.040

239.6

239.6
500
856

477.9

479.2

AYO B1

1.033

27.8
63.7

AYO B1
220
456
1.097

0.940

220
1.074

CAM B1
378

0.972

1.019

0.940

6.1

15.1
41.9 1.022

66

42.3

215.9

214.1

SPP B1
362
14.9 14.4
1.007

1.076

13.1

13.3
1.014

8.8

109.1

179.0

127.1

175.5

PFO B1
389

1.032

0.993
1.027

24.8

66

220

13.5

1.100

0.994

66

23

2239

SPA B1

1.100

220

126.6
1.067
354

13.2

1.069

220

489

89.0

TRI B1

1.014

APR BP
384

220

2.7

1.010

6.2
1.011

1.068

220

106.6

GUA AB2

1.021
ACYABC
1281

6.1

220

0.993

CDE
2204

23

66

23

5.9
0.975

129.3

40.0

GUA B3
4404

49.3
1.000

6.0
28.5

31.2

VAP TA
461

12.5

0.993

281

28.5

66

1.020

31.3

29.2

215.7

37.9

20.8

66

49.3
20.9

31.0

12.5
34.7

ACYAB
190.6

1.009

66

35.3

16.2
10.7

K15
298

12.3
0.975

10.6

1.001

29.2

215.0
1.088

66

0.975

23

1.023

0.990

K15 TA
398

66

ACY B3
382

7.9
2.4

0.980

66

129.0

A
261

1.101

66

ACY G4 13.8
184 60.0
G
36.9
1.035

10.6

1.020

1.060

ACY G2 13.8
182 47.0
G
35.9
1.035
ACY G3 13.8
183 60.0
G
36.9
1.035

12.3

1.071

22.9

0.998

VAP

20.4
GUA B1
339

WMA
394

7.9

PFO TA
1.6

26.3

3.6
0.980

12.6

66

26.1
0.982

25.0
1.100

184.0

SJN TA
4497

20.4
19.5

VTA BP
341

24.8

1.078

8.0

PMA B1
220
730
1.025

188.3

0.994

1.6
CVP BP
305

23

1337

8.0

20.1

nGI F1
66
1343

66

296

1.069

1.090

66

200.1
CDO

10.8
CZA B1
376

184.0

10.7

8.0

220

1.025

0.994

11.1

21.3
1.073

CAR
393

70.4

1.033

220

QUI B1 FIC66
RED TA
220
430 1.026

0.0

GHN B1
343

21.3
0.999

66

66.7

224.7
FMY TA
4433

214.9

23.4

1.094

197.3

0.983

11.7
11.7
11.5
COV BP
66
373

1.087

24.6

0.991

SAN TA
410

302.0

ACY G1 13.8
181 47.0
G
35.9
1.035

1.033

23.4

0.967
22.9

302.0

301.7

0.981

176.8

50.7

23
1.039

301.7

10.7

22.9
A

174.8

195.0

K30 BP
388

22.6

24.6

66

214.6

SAN
210

66

220

1.047

18.9
PAR B1
66
335

1.083

CDO TA
496

56.6

58.3

11.6

1.086

220

24.0
1.046

10.7
8.1

66.1

LAM_FIC
1400

PIR B1
425

15.4

66
338
1.075

1.036
0.967

70.4

66.7
1.090

1.068

1.073
67.3

66.1

QUI B1
66
337

CAU B1

163.9
ITG B2
3331

20.2
42.7

66

66.2

1.021

66

176.4

1.055
nLT F1
1416

PIR B1
325

220

1.033
19.0

138.4

VIC TA
220
2418
1.094

19.4

66

23

1.031

VIL B1
220
1.075 475

163.2

23.9
1.055

TBO B1
320

14.5

163.2

1.078

1.047

0.7
0.0

66

1.019

66

CZU
297

14.5

171.7

23.3

25.5

220

14.5

21.8

1.032

138.3
1.091

35.6

59.2

1.033
13.7

1.000

56.0

501.9

497

230.6

23.7

ITG BP
331

1.090

183.6

14.5

177.9
CZU TA

148.6

1.085

13.8

nGR F1
66
1311

220

501.9

220

90.6
0.950

5.9

15.5

25.9

26.6

GDI B1
66
2311

509

K30 B1
488

22.8
1.060

26.7

59.2
1.090

COV B1
402

32.6

1.068

23

21.0

25.4

1.066
FDM B1
323

1.020

22.8
1.060

39.1

8.8

38.6

38.6

8.8

38.6

24.8

BPA FIC
1303

40.7

1.070

23

25.3
1.033

41.3

25.4

35.4

35.0

66

85.5

19.1

978.7

1.073

1.060

BDO
66

MD

220

278.2
1.074

1.017

79.7

CCO B1
3371

299.0
1.050

113.3

9.4
CUR B1
492

77.1
1.079

1456.7
1281.2

223.9

92.3
GAQ

1456.7

500

15.6

220

9.4
1.073 1.060

B1
801

299.0
1.050

3.7

25.2

24.5

SLO B1
301
34.9

VAU B1
2309

29.6

6.2

15.7

36.4

1.1

96.0

GAQ TA
4466

9.4

299.0
1.050

18.5

302

40.7

1.1

95.9
54.0

90.9

13.2
1.071

304.4
1.028

17.6

66

66

187.6

54.0

PQF B2
220
590

F1 241.5
1484

8.8

SLO RE

34.5

66

1.084

25.5

25.5

35.4

115.1

PSA B1
313

REP B1
2308

LAM B1
66
316

24.6
1.090

304.4
1.032
MD

-91.9

55.9

55.9
1.000

66

1.7

6.2

28.7

28.7

96.0

6.1

1.100

1.033

13.3

305.9

ACY B2
401

LAM F1

1.033
25.5

510

9.7

9.7
1.100

1.3

96.1

28.7

1.019

LAM F2

220

1.020

52.1

1.100

VM1 B1
469
1.048

220
479
1.013

56.7

299.0
1.050

1.072

LAM_PSA AER1
1405
1.094

1.098

304.4
1.028
F5 241.5
1483

2.3

1.095

220

LPA B1

304.4

0.969

1.076

220

1281.3 1456.6
1.060

1.019

1.000

1.019

LAM B1
405

23
221

66
1.076

BPA B1
303

1407

220

1.069

15.6

4.0

HOR B1
368

6.2

66
1313

LAM_PSA SUB1
1406
1.094

1.000

LAM_PSA AER2

PQI B1
4495
1.067

9.7

169.5

1.027

305.9
1.032
MD

9.7
IRY B2
220
4484

1.047

23

1223.1
500

1223.2

29.7

28.8

28.8

1.020

nCP F1
LAM_PSA SUB2
1408
1.095

37.4

1.047
24.5

31.0

44.9

44.9

nBC F1
1326
PSA F1
513

CYO A
285

1.060

1.077

7.7

25.0

1.047

LUQ

0.967

1.048

1.088

220
25.0

43.8

43.8

5.7

97.8

1.3

96.1

1.020

220

9.7
1.100

220

11.3
1.087

45.3

32.4

220

57.7

LUQ TA
421

1.100

VM2 B1
1469

13.8

31.1

6.1

66
1.080

6.1

38.3

38.3

nBS F1
1308

1.094

PSA F2
514

46.0
CBV B1
220
1814

37.7

PSA B2
220
4413

1.100

46.0

50.1

1.050

1.019

CAT B1
491

11.6

9.7

2266
1.071

1.084

66
3311

1223.0

1.032

311

CEN B2

IPU B2
805

220

1.060
9.7

HOR comp 220

471

66

MD B1
483

1.100

23

2291 1.026

168.5

1.000

CEN B1

CAT2 A

SGA A
23
2491 1.004

220

1.087

466

66

170.3

SES TA

30.8

13.0

157.7

47.8

56.1

CYO

1.087
LIM RE
411

1.082
SMI B1
308

220

485

11.0

11.0
11.0
0.996

220

4491 1.091
SICBRAS
4409

119.0
LIM B1

66

66
0.963

CMY

1.086
ACE B1
345

0.989

1456.6
1223.2
MD HER2
1516

1.087

5.7

18.5

56.0

0.0

VHA F1
3346

1.083

10.9

66

5415.5

0.905

0.989

57.6

6.0

PCA B1

1.047

1.005

13.8
57.3
1.005
1.073
PBO F1
505

1.000

18.5

35.2

35.2

13.8
1.000

5413.7
1.035
1.024

0.905

5.1

13.8

31.8

500

18

11.1

5.2

13.4

32.4

0.0

23

225.8

10.8

5407.4
260.5

2246

5.7

327
1.070
1.084
PCA F2
525

324
16.8

0.0
VHA AB2

220

10.9

1.000

1.084

110.2

110.1
PBO B1
408

IPU10G
700
G

229.3

66

110.1

105.3
PBO F2
506 1.073

IPU B1
800

500

500

114.3

AMP B1

66

7.7

3.8

52.0

52.0
35.2

35.2

1.000

PBO B1
306
7.7

66

0.985

0.985

1.084
PCA F1
524

66

1.072
MRA B1
304
1.076

MD B2
802

500
CYO B1
885

123.4

VCU B1
307
1.081

52.7

220

52.7

PCA AB
424

105.4

110.2

1.010

23

1.018

23

500

AO 2015: RGIMEN NORMAL

172.3
VHA B1
446

220

172.3

VHA B1
846

34.6

108.2

23.8
1.007

508.1

513.0

66
346
0.970

1453.0

0.942

17.9

13.0

PQI B1
4395

1.060
121.1

128.5

66
113.6

B1

220
1409
SGA B1
220
4491 1.080
SICBRAS

66

27.0

23.6

75.0

81.6
1.029

HOR B1
468

47.8
1.029

SRO TA
467

220

227.4

220

BSP B1
412

86.5

119.3
1.048

47.8

91.1

1.071

121.0

12.7

25.0

1.020

61.2

50.8

49.3
29.1

33.4

93.6

SLO B1
301

CON B1
66
372 0.956

0.974

9.7

220

220

329.0

329.0
0.997
F1 241.5
1484

1.105
MD

332.6
1.050

PQF B2
220
590

328.7
PQF B1
490

329.0

329.0
0.997
F2 241.5
1485

1.105

220

MD

VAQ TA
427

130.1

132.7

BSP A
212

23

178.8

GAQ TA

220

4466

15.2
1.040

17.1

GAQ

17.1
1.037 0.993

180.7
A
23
2266

37.5

234.2

239.6

239.6

1.096

141.1
1.061

248.9

248.9
1.099

249.4

328.7

1682.4

329.0

329.0
0.997
F3 241.5
1486

1.105
MD

328.7

329.0

6.0

23

2272
1.024

329.0
0.997

897.9

915.9

915.3

896.7

895.6

896.7
1.059

895.6

FOZ B2

1329.3

804

332.6
1.050
1.059

F4 241.5
1487

289.9

138.1

113.2

118.3
1.060

BDO B1

66

1329.2

898.6

95.1

1.047

BDO
CCO B1

MD

133.3

282.1

107.4

332.6
1.050

143.3

1.044
CUR B1
492

104.5
1.067

1682.4

500

1479.8

220

16.6
1.019

B1
801

332.6
1.050

220

130.4

133.8

537.0
1.101

1.074

220

472
1.073

12.2

1.058

537.0

12.1
1.075

CUR ABC
2292
1.022

23

PJC B1

66

0.961

CBV B1
370

66

BMO A
2222

ACY B2
401

23

ACYC
2281

66
154.9

SLO AB

23

42.3

66

32.3

78.5

80.1

29.7

CAP

23

CAP TA
493

66

32.3

35.6

220

402

36.7

1.020
CZU TA

67.0

67.7

CAE BP
66
333

127.5
1.015

ESA B1
334

1.050

129.3

66

177.3

220

0.7

24.4

49.7

51.0

128.2
1.022

0.953

1.043

COV AB
273

VIL BP
375

25.8
1.038

GUA B1

66
338
1.019

28.1

32.6
1.049 0.967

162.7
1.024

220
131.4

45.1

VAP B1
361

27.2

23.0

53.1

51.7

261

2.8

1.029

87.2

9.6

9.4
1.010
ACYABC
1281

37.1

94.3

166.8

1.006

220

1.097

SJB TA
482

110.0

220
PBU TA
451

1.089

PPO B1
355

480

CBO B1
380

66

66

nTS F1
1370

ENC B1
360

66

nTE F1
1360

66

66

15.1

TRI B1
454

12.111.9
25.4

25.6
1.087

220

SPP B1
362
16.7 16.1
1.007

159.5

158.2

1.092

11.8

11.9
1.015

26.1
36.3 1.023

220

14.7

0.966

2589.5

2547.9
1.025

YAC19G
790

YAC B1
890

500

13.2

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

2021.0

1.045

500
856

139.3

33.5
1.095

31.1

252.0
251.3

252.0
503.7

66

30.3
CAL B1
452

CAM B2
220
478

1.086

28.8

0.950

30.1

220

CDE B1
2304

1.010

0.954

1.045

VIN B1
457

220

66

37.0

136.8

1.100

NAT TA
453

63.8

81.6

35.7

1.019

30.7

1.086

15.2

220
1.011

31.9
1.070

20.6

62.6

1.011

1.000

CDE
2204

502.5

AYO B1

1.036

0.950

1.082
CAM B1
378

66

1.052
29.0

27.4

1.081

1.098

251.3

0.954

161.1

160.0
AYO B1

27.1
1.069

66

37.0

456

27.1

PFO B1
389

220

16.5

56.4
56.9

130.1

114.6

1.085

1.100

1.009

66

220

1.020

SPA B1
487

1.100

220

129.2
1.090

28.3

21.3

489

111.7
1.084

CBO TA

2523.2
582.0

APR BP
384

220

31.9
30.6
1.000
1.041

84.7

8.5
0.993

2.8

87.2

8.5
1.099

220

81.3
1.076

23

66

23

281

37.1
1.073

0.975

220

82.3

22.8

0.979

ACYAB

175.1

37.8

66
0.958

0.972

37.8

SJN TA
4497

K15
298

22.5

66

TRI B1
354

1.020

ACY B3
382

2.1
3.7
49.7

11.5

VAP TA
461

106.1

23

220

50.0
1.097

66

1.047

GUA AB2
2239

ADU
5401

82.9

GUA B3
4404

83.7
0.994

0.972
1.020

94.3

163.9
1.025

66

0.958

6.1

14.5
1.047

17.4

17.4

1.047

53.2

6.1

PFO TA
66

83.7
29.4

52.2

6.3

23

1.026

0.974

1.091

1.012

1.025

66

K15 TA
398

66
22.7

83.2

CVP BP
305

ACY G4 13.8
184 60.0
G
25.9
1.045

165.5

1.027

12.3
VAP

0.982

2.5

1337

PMA B1
220
730
1.021

40.1

28.5
GUA B1
339

WMA
394

2.2

34.9

66

44.3
0.956

40.5

71.0

24.9

nGI F1
66
1343

66

4.6

13.7

70.7

26.7
1.022

29.1

0.981

4.6
0.973

21.6

72.2

2.5

GHN B1
343

QUI B1 FIC66
1338
1.039

220

26.8

47.8

VTA BP
341

RED TA
220
430 1.022

34.0

47.7
1.022

42.4
1.100

175.1

220

QUI B1 FIC66
1.039

67.8
1.000

SAN TA
410

65.3
1.090

94.3

GUA B2
5404

34.0

0.940

43.2

14.5

14.5
1.066

COL BP
322

6.3

23

1.047

17.9
CZA B1
66
376

63.0

66

ACY G3 13.8
183 60.0
G
25.9
1.045

1.073

72.2

23
1.049

19.0

43.6

166.4
FMY TA
4433

132.9

12.3

0.980

CAR
393

165.5
100.3

40.8

SAN
210

45.6
0.999

20.3
20.1
20.3
COV BP
66
6.4
373
1.003

1.060

32.9

17.4

52.9

0.940

32.9
47.7

27.6
PAR B1
66
335

1.031

12.1

12.3

32.5

220

17.3

296

0.995
19.9

1.091
32.9

LAM_FIC
1400

23.4

295.2
66

185.7
CDO

14.5

1.041

32.3
1.012

295.2

293.4
K30 BP
388

181.6

95.2

32.9

99.6

32.4
32.3

23.0

152.6

182.4

0.937

0.967

0.973

9.8

66

95.3

66

220

16.5

27.9

1.015
nLT F1
1416

1.001

220

66

1.011
1.003

32.6

1.029

114.4
ITG B2
3331

PIR B1
425

1.020
26.1

QUI B1
66
337

CAU B1

220

26.6

14.1

66

18.8

PIR B1
325

114.2

66

VIL B1
220
1.028 475

23.4

CDO TA
496

175.8

17.5

0.0

ITG BP
331

66

293.4
1.021

1.050

1.020

VIC TA
220
2418
1.019

12.4

1.007

TBO B1
320

65.3

63.0

23.1

129.7

23

ACY G2 13.8
182 47.0
G
24.9
1.045

23

497

180.5

23.3

25.1

1.013

58.5

19.3

66

53.2

536.0

1.090

149.0

54.9

CZU
297

23.3

51.3

176.1

1.020
18.9
58.7
1.017

1.000

23.1

154.7

173.7
1.075

94.3

9.5

24.4

0.967

1.019

220

80.4
0.950

12.3

ESA TA
434

36.7

53.2
1.090

220

488
536.0

160.0
35.6

44.3

K30 B1

220

21.3

44.7

MAQ B1
415

31.5
0.967

GDI B1
66
2311

nGR F1
66
1311

1.090

51.3
COV B1

1.028

0.967

21.6

1.021

220

29.0

0.950

33.2

46.7

33.0

FDM B1
323

1.022
ACY G1 13.8
181 47.0
G
24.9
1.045

31.5
0.967

293
45.5

23

41.2
1.047

16.5

BPA FIC
1303

45.5

16.5

24.5

0.967

LAM F1
509

220

1.017

50.2

95.1

95.1

IRY B1
484

328.7

MD

31.4
16.7

15.6
1.100

0.996

19.6
0.993

8.0
45.7
1.017

16.0

16.0

220

36.6

24.8

66

78.8

16.0

15.5
PQI B1
4495
1.097

371

YBY B1
66
369
0.976

19.8

404

16.0

16.2

97.0

VAU B1
2309

1.047

14.1

332.6
1.050

201

1.017

REP B1
2308

LAM B1
66
316

16.1
16.2
1.060

20.3

23.0

1.000

329.0
0.997
F5 241.5
1483

3.4

220

3.4

BMO B1
4222

19.8

48.7

30.0

0.980

1.012

329.0
1.105
MD

3371

28.9

14.2

36.7

14.8
15.1

0.979

13.7

35.5

220

1.017
90.6

23.2

41.8

97.7

368

3.4

32.1

66

1.006

LAM F2
510
1.012

328.7

30.0

SLO B1

19.6
SLO RE
302

66

9.7

55.3

24.5

66

47.7

156.7

-53.4

54.7
97.7

VM1 B1
469
1.077

220
479
1.068

66

9.7

44.8

44.8
44.7

44.7

157.0

47.7

157.0

29.4

47.7

157.0

117.6

403

1.019

15.6
1.100

3.7

LAM_PSA AER1
1405
1.023

0.980

HOR B1

1.018

1.085

PSA B1
313

1480.1 1682.6
1.059

1.007

1.000

1.007

220

LPA B1

20.2

6.0

1.055

66
1.019

BPA B1
303

LAM B1
405

23
221

41.8

0.967
35.5

71.3

71.3

66
1313

LAM_PSA SUB1
1406
1.023

1.000

LAM_PSA AER2
1407
1.022

1453.0
500

1453.0
1.059

15.5

220

14.7
1.073

1.020

23

1.073

1.078
45.3

225.9
36.8

36.8
70.4

70.4

156.3

47.7
47.7

157.0

nBC F1
1326
PSA F1
513
1.007

nCP F1
LAM_PSA SUB2
1408
1.023

LUQ

0.980

134.0
1.023

11.9
11.9

58.8

50.0

220

1.021

220

0.967

1.029

VM2 B1
1469

155.4

LUQ TA
421

1.007

69.3

32.1

66
1.020

1.023

PSA F2
514

55.7
CBV B1
220
1814

52.5

32.1

9.6

nBS F1
1308
9.6

171.1

171.1

1.007

CYO A
285
1.018

132.3

220

1.067

PSA B2
220
4413

1.029

55.7

53.2

46.0

1.022

66
3311

220

220

1.044

CCO B1

471

CEN B2

1452.7

1.105

HOR comp 220


1.111

1.000

66
311

CAT B1
491

14.9

73.1
SES TA

4468

CEN B1

CAT2 A
23
2291 1.018

SGA A
23
2491 1.013

220

82.7

71.8

112.5 106.5
1.087

112.5

IPU B2
805

220

1.081
11.8

32.2

13.0

28.0

466

66

1.007
LIM RE
411

1.020
SMI B1
308

CYO

485

23.2

22.6
22.6
0.995

220

4409

LIM B1
220
409

344

MD B1
483

1.100

120.8
LIM B1

66

66
0.982

CMY

1.030
ACE B1
345

0.974

66
1.018

17.9

MD HER2
1516

1.031

17.9
VHA B1

1682.6

VHA F1
3346

1.024

22.2

nPS F1
1306

6296.1

0.905

0.973

109.4

24.0

66

0.967

1.017

109.4
1.005

34.6
108.2
1.005
1.007
PBO F1
505

1.000

24.0

49.6

49.6

34.6
1.000

6369.6
1.046
1.024

0.984

10.7

34.6

52.5

1078.6

500

18

1048.7

10.9

13.8

52.9

1048.7
1025.9

6291.6
994.3

29.1

240.0

12.2

513.0
0.905

2246

23.0

PCA B1
324

23

220

IPU10G
700
G

248.6

327
1.002
1.023
PCA F2
525

75.0

25.2

PBO B1
408

27.8

1.000

1.022

508.1
VHA AB2

PBO F2
506 1.007

IPU B1
800

500

500

128.3

66

191.1

190.1

12.4

17.8

79.4

79.4
49.7

49.7

1.000

AMP B1

190.1

161.4

PBO B1
66
306
12.4

66

13.0

0.985

0.985

1.023
PCA F1
524

66

1.006
MRA B1
304
1.009

MD B2
802

500
CYO B1
885

113.8

VCU B1
307
1.021

80.5

220

80.5

PCA AB
424

161.1

191.1

1.018

23

1.012

23

500

AO 2015: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500 KV MARGEN DERECHA - VILLA HAYES

24.4
VHA B1
446

220

24.4

VHA B1
846

13.1

15.0

32.1

31.6

15.0

61.5

14.8
1.061

0.0

VHA B1

66
346
0.973

7.9

0.963

7.9

9.5

PQI B1
4395

1.100
116.1

112.0

66
120.9

B1

220
1409
SGA B1
220
4491 1.095
SICBRAS

66

137.4

14.3

42.5

170.2
1.062

-47.9 HOR B1
468

84.6
1.064

SRO TA
467

220

19.0

28.6

220

BSP B1
412

52.0
1.064

47.9

28.8

1.082

52.8

9.4

14.2

36.9
5.7

220

IRY B1
484

13.4

220

9.9

310.0

308.9

1.100

308.9
1.032
F1 241.5
1484

1.046
MD

0.985

305.3
1.050
MD

24.6

9.8
VAQ TA
427

12.6

163.7

166.9

28.6

PQF B2
220
590

310.0
PQF B1
490

308.9

308.9
1.032
F2 241.5
1485

1.046

220

MD

32.3
21.1

21.0

9.8
1.067

10.4

220

93.6
GAQ

10.4
1.066 1.033

1380.4
1214.2

220

35.3

234.5

237.7

237.7

1.084

172.2
1.072

241.8

241.8
1.083

242.0

310.0

308.9

308.9
1.032
F3 241.5
1486

1.046
MD

310.0

308.9

85.9

91.9
1.087

BDO B1

66

3.9

23

2272
1.025

308.9
1.032

898.7

916.8

916.1

897.6

896.4

897.6
1.071

896.4

FOZ B2

365.2

804

305.3
1.050
1.071

F4 241.5
1487

285.6

171.2

1.073

BDO
CCO B1

MD

282.1
1.066

1.016

82.0

365.2

899.4

118.9

10.3
CUR B1
492

79.6
1.090

305.3
1.050

174.7

165.5

A
23
2266

1380.4

500

220

100.1

104.6

501.8
1.084

1.079

220

472
1.096

8.4

1.071

501.8

8.3
1.091

CUR ABC
2292
1.017

23

1.009

PJC B1

66

371
2.8

CON B1
66
372 1.026

GAQ TA
4466

23

B1
801

305.3
1.050

3371

21.1

7.6

21.6

9.0
9.3

220

91.8

1.027

7.8
BSP A
212

2.7
1.002

CBV B1
370

66

BMO A
2222

ACY B2
401

23

1.016

ACYC
2281

66
56.3

SLO AB

23

25.1

66

19.2

72.7

75.8

17.6

CAP

23

CAP TA
493

220

54.6
COV B1

17.6

0.950

1.025

1.033

66

19.2

21.6

220

402

21.7

1.033

1.022

26.3

220

1.047
CZU TA

147.2

147.6

CAE BP
66
333

187.3
1.062

ESA B1
334

1.073

189.1

66

224.4

220

0.7

21.7

35.9

35.4

160.5
1.061

1.033

1.043

COV AB
273

VIL BP
375

GUA B1

66
338
1.021

14.0

23.3

10.2

17.3
PAR B1
66
335

1.027

7.1

17.4

23.5
1.051 1.020

212.5
1.060

220
191.9
RED TA
220
430 1.025
24.9

211.0
1.057

VAP B1
361

2.6

1.046

16.7

1.004

11.1
220

1.086

107.1

PBU TA
451

1.089

128.1
1.063

PPO B1
355

480

CBO B1
380

17.2

66

12.312.1

nTS F1
1370

ENC B1
360

66

25.3

25.5
1.087

220

SPP B1
362
16.8 16.1
0.991

155.8

154.5

1.072

nTE F1
1360

66

66

15.1

TRI B1
454

24.2
35.6 1.009

220

14.7

0.949

2594.9

2549.8
1.025

YAC B1
890

500

13.2
2021.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1.056

500
856

138.4

33.1
1.081

31.3

247.7
248.5

247.7
496.5

66

29.6
CAL B1
452

CAM B2
220
478

1.069

28.2

0.950

29.4

220

CDE B1
2304

1.014

0.969

1.055

VIN B1
457

220

66

36.1

135.9

1.087

NAT TA
453

63.6

81.5

35.1

1.006

30.7

1.068

13.2

220
0.993

31.9
1.051

18.5

62.7

0.993

1.039

CDE
2204

497.0

AYO B1

1.048

0.950

1.092
CAM B1
378

66

1.034
28.4

25.3

1.062

1.085

248.5

0.969

157.5

156.3
AYO B1

25.1
1.053

66

36.1

456

25.1

PFO B1
389

220

6.1

12.0

12.1
1.000

17.4

66

11.2

56.8
58.0

128.6

108.5

1.027

1.100

1.009

66

220

0.993

SPA B1
487

1.100

220

17.8

220

13.7

107.3
1.045

SJB TA
482

YAC19G
790

17.4

489

89.2

CBO TA

2517.4
629.5

APR BP
384

220

18.2
17.9
1.000
1.032

49.9

6.1

1.017

6.2
1.011

TRI B1
354

1.007

5.8
ACYABC
1281

1.085
220

81.3
1.057

23

66

23

281
5.9

24.2

52.9

213.9

2.6

89.4

14.4

0.997

ACYAB
24.2
1.087

0.975

220

105.9

23

14.3
34.3

192.3

24.1

66

34.6

66

11.2

49.9

K15
298

14.2

0.993
0.990

52.4

VAP TA
461

1.033

GUA AB2
2239

ACY B3
382

4.0
2.3
29.5

38.6

GUA B3
4404

49.7
0.988

220

29.8
1.085

36.2

30.5

ADU
5401

66

1.033

18.4
30.2

0.990
1.022

24.1

SJN TA
4497

66

0.993

6.4

9.5
1.060

PFO TA
66

49.7

0.979

K15 TA
398

66

6.4

10.2

10.2

1.003
18.3

1.5

26.0

3.9

23
261

1.060

66

1.084

1.060

9.4

ACY G4 13.8
184 60.0
G
33.6
1.045

14.1

12.9

66

25.8
0.971

CVP BP
305

WMA
394

4.0

1.013

0.985

1.5

0.9

52.9

1.068

7.1
VAP

17.9
GUA B1
339

0.9
0.990

1337

PMA B1
220
730
1.025

204.3

17.1

VTA BP
341

nGI F1
66
1343

66

23.5
1.100

17.8

1.025

0.984

23.4

52.4

-107.0

0.0

GHN B1
343

QUI B1 FIC66
1338
1.031

220

20.0

1.068

23

9.5

1.073

COL BP
322

4.0

68.8
1.090

183.6

QUI B1 FIC66
1.031

119.3
1.000

SAN TA
410

296

10.9
CZA B1
66
376

65.5

66

192.3

220

10.2

GUA B2
5404

20.0

0.980
19.7

11.2

23.9

ACY G3 13.8
183 60.0
G
33.6
1.045

1.087

106.6

23
1.030

1.073

CAR
393

215.9
FMY TA
4433

193.1

7.1

23.8
0.999

306.7
66

183.6

25.1

SAN
210

306.7

305.7

199.3
CDO

12.8
12.6
12.8
COV BP
66
4.2
373
0.997

1.073

166.0

7.1

82.6

51.5

0.980

195.7

0.995
23.3

196.9

K30 BP
388

9.4

12.7

0.948
19.7

220

14.0

177.2

220

0.978

59.0

1.063

82.6
1.016

LAM_FIC
1400

60.9

66

1.020

0.982

52.7

84.6
82.6

23.5

1.046

165.2

1.040
66

1.019

220

1.047
24.3

QUI B1
66
337

CAU B1

162.0

17.7

PIR B1
425

66

1.011
nLT F1
1416

66

15.9

PIR B1
325

220

17.0

1.004

VIL B1
220
1.066 475

14.0
1.047

161.6

66

24.3
1.055

14.0

305.7
CDO TA
496

191.2

10.7

0.0

ITG BP
331

ITG B2
3331

68.8

65.5

1.027
1.067

ACY G2 13.8
182 47.0
G
32.7
1.045

23

14.6

162.3

23

14.0

VIC TA
220
2418
1.063

21.3

1.004

66

57.3

502.4

497

226.9

14.5

21.8

1.044

126.5

7.5

TBO B1
320

54.6

191.9

1.090

173.4

66

CZU
297

14.5

189.6
1.077

1.047
7.5
126.3
1.064

1.000

14.6

175.6

76.1
0.950

6.3

ESA TA
434

21.7

57.3
1.090

220

488
502.4

180.7
21.6

K30 B1

220

23.9

26.4

MAQ B1
415

19.1
1.033

21.4

27.7

1.090

19.1
1.033

36.0

1.057

GDI B1
66
2311

nGR F1
66
1311

1.011
ACY G1 13.8
181 47.0
G
32.7
1.045

22.3

35.5

35.5

23

24.8
1.060

11.4

BPA FIC
1303

293

FDM B1
323

LAM F1
509

220

12.0
1.047

1.033

16.9

60.9

305.3
1.050

37.8

72.9

38.6

308.9
1.032
F5 241.5
1483

11.4

36.8

66

35.6
1.055

204.6

60.9

220

404

38.6

9.9
PQI B1
4495
1.083

9.8

120.7

VAU B1
2309

1.072

14.0

1.009

YBY B1
66
369
1.010

12.0

51.1

1.058

REP B1
2308

LAM B1
66
316

308.9
1.046
MD

201

36.3

38.6

38.6
1.000

BMO B1
4222

12.0

37.3

24.9

6.9

28.4

17.4

SLO B1
301
5.7

5.9
66

1.100

1.011

220

1.063

66

63.4

63.4
LAM F2
510
1.011

368

7.8

21.4

SLO B1

12.1
SLO RE
302

1.004
1.100

66

1.7

6.9

26.3

26.3

87.1

66

1.0

87.3

-91.7

403

1.0

87.1

28.6

1.3

87.1

57.3

53.0

1.068

310.0

2.2

LAM_PSA AER1
1405
1.068

220

1214.3 1380.4
1.071

1.004

BPA B1
303

LAM B1
405

VM1 B1
469
1.068

220
479
1.045

66
1.064

1.000

1.003

HOR B1

1.028

1.071

PSA B1
313

1163.9
500

1163.9

25.0

66
1313

LAM_PSA SUB1
1406
1.068

1.000

LAM_PSA AER2
1407
1.068

LPA B1

12.6

3.9

1.053

6.9

26.3

26.3

1.004

nCP F1
LAM_PSA SUB2
1408
1.068

23
221

33.6

1.020
21.4

26.2

45.1

45.1

nBC F1
1326
PSA F1
513

9.8

1.047

23

1.100

1.069
26.2

20.3
21.7

21.7

1.020

LUQ

0.993

62.1

1.047

7.8

48.3

31.8

220

1.063

220

43.6

43.6

86.7

5.4
1.3

87.1

1.004

VM2 B1
1469

56.1

LUQ TA
421

PSA F2
514

49.0
CBV B1
220
1814

46.1

26.3

66
1.067

1.068

1.100

CYO A
285
1.023

60.5

220

28.9

26.3

6.6

nBS F1
1308
6.6

20.6

20.6

1.004

220

220

1.066

CCO B1

1.060

PSA B2
220
4413

1.100

49.0

52.9

50.1

1.070

66
3311

9.9
1.100

1.046

HOR comp 220


1.012

471

CEN B2

1163.7

1.071
9.9

220

11.2
1.100

168.0

1.000

66
311

CAT B1
491

11.4

1.087

163.8

4468

CEN B1

CAT2 A
23
2291 1.016

SGA A
23
2491 1.007

220

173.8

SES TA

88.2
1.109

88.2

IPU B2
805

220

1.093
11.8

26.0

10.2

138.2

466

66

1.060
LIM RE
411

1.069
SMI B1
308

CYO

485

16.3

16.1
16.1
0.989

220

4409

LIM B1
220
409

344

MD B1
483

1.100

116.5
LIM B1

66

66
0.979

CMY

1.064
ACE B1
345

0.976

66
1.067

1380.4
1163.9
MD HER2
1516

1.064

7.9

15.9

nPS F1
1306

0.0

VHA F1
3346

1.062

14.8

66

5137.0

0.905

0.973

61.2

5.8

PCA B1
324

1.007

1.027

61.2
1.005

15.0
61.5
1.005
1.061
PBO F1
505

1.000

14.8

27.0

27.0

15.0
1.000

5119.3
1.042
1.024

0.905

17.6

4.8

10.6

0.0

23

500

18

2246

4.8

327
1.058
1.070
PCA F2
525

42.3

14.3

0.0

5118.9
60.7

220
17.1

1.000

1.070

PBO B1
408

237.9

66

105.7
VHA AB2

PBO F2
506 1.061

IPU10G
700
G

241.5

AMP B1

105.5
105.5

7.6

IPU B1
800

500

500

112.2

44.3

44.3
27.0

27.0

1.000

66

89.2

PBO B1
66
306
7.6

MRA B1
304
1.064

9.5

44.6

0.985

0.985

1.070
PCA F1
524

66

1.060

1.060

MD B2
802

500
CYO B1
885

120.7

VCU B1
307

220
44.6

PCA AB
424

7.9

89.2

105.7

1.007

23

1.013

23

500

AO 2016: RGIMEN NORMAL

192.7
VHA B1

220

446
192.7
146.3

CYO B1
885

AMP B1

66

12.8

14.2

34.1

58.1

57.8

34.1

116.5

1689.1
MD HER2
1516

484.2

240.8

ACE B1
345

0.970

249.0

66
231.0

21.6

PQI B1
4395

SGA B1

22.3

11.8

39.0
1.039

29.6

HOR B1
468

58.9

SRO TA
467

220

HOR comp 220


1.116

227.8

113.2

4468
1.000

116.5

220

BSP B1
412

149.5
1.043

CBV B1
220
1814

151.0

32.3

52.7

76.2
SLO B1

66

302

220

30.1

23.0

17.0

53.3

66

368

0.981

GAQ TA

220

4466

17.6
1.042

17.1

GAQ

17.1
1.041 1.007

22.7

39.0

66

307.2
0.997

309.9
1.050

PQF B2
220
590

PQF B1
490

307.2

307.2
0.997
F2 241.5
1485

220

MD

309.9

BPA FIC
1303

38.9

216.5

221.3

221.3

1.096

112.5
1.066

232.3

232.3
1.099

232.7

307.0

1688.9

307.2

307.2
0.997
F3 241.5
1486

1.105
MD

309.9
1.050
955.1

307.0

307.2
MD

105.8

307.2
0.997

101.3

FDM B1
323

36.9

36.9

66

33.9

261.1

82.0

84.6

113.7

109.0

1.033

4.9

66

125.3
1.060

BDO B1
6.9

23

2272
1.026

120.4

980.3
1.055

501.1

138.6

141.9

501.1
1.101

1.075

220

472
1.063

13.4

13.3
1.071

CUR B
2292
1.017

PJC B1
371

66

0.960

CBV B1

23

66

370

ACY B2
401

66

33.9

CAP

23

CAP TA
493

220

36.0

220

402

37.2

79.9

36.0

ESA TA
434

37.2

1.015

0.980

220

1.020

24.4

CAE BP
66
333

73.8
1.027

ESA B1
334

1.050

74.7

66

125.9

47.9

52.7
1.043

54.7

96.8
1.033

0.953

COV AB
273

72.0

48.0

338
1.038
GUA B1

VIL BP
375

220

PAR B1
335

1.051

12.4

30.2
66

30.9

44.1
1.052 0.953

220
71.4

23
296

46.4

45.6
1.100

13.0

7.1
0.976

7.1

65.3
1.090

WMA
394

6.5

16.4

COL BP
322

ADU
5401

220

0.976

53.2

138.6

145.3

138.6

145.3

41.2

40.3

70.3

40.3
1.040

1.041

40.5

70.6

GHN B1
343

39.8
24.5

nGI F1
66
1343

66

VAP

18.2

19.7

8.7

VAP B1
361

66

APR BP
384

1.087
220
SRI AB

23

2288
2.9

1.027

66

VAP TA
461

23
261

GUA B1
339

1.095

1.009

1.009

2.8

220

4488

12.5

1.046

2.8

33.2
31.8
0.950
1.061

1.017
1.096
PFO TA

220

220
PBU TA
451

156.5

TRI B1
354
CBO TA

39.0

159.0

180.7

37.6

13.213.1
29.6

29.6
1.073

220
196.9

198.5
201.3

nTS F1
1370

ENC B1
360

66

11.3

11.4
1.012
SPP B1
362

19.1 18.3
1.009

1.083

199.9

66

25.3
39.5 1.025

AYO B1

220

456

1202.7

3254.6
1.025

YAC19G
790

13.2
2021.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1.042

35.8

146.0

1.094

35.0

297.6
299.2

297.6
0.940

1.040

603.8

YAC B1
500
890
1.040

3328.4

500

1201.1

AYO B1
856

26.1

26.1
1.068

66

PPO B1
355

66

16.7

TRI B1
454

CAM B1
378

66

VIN B1
457

220

PFO B1
389

16.2

66

220

1.045
31.3

26.4

0.950

32.6
CAL B1
452

CAM B2
220
478

1.084

31.1

0.950

32.4

1.077

220

CDE B1
2304

1.006

66

39.9

143.4

1.073

NAT TA
453

59.1

67.4

39.1

1.023

5.5

1.082

14.0

18.2

58.3

5.4

220
0.993

35.5
1.073
1.012

1.076

299.2

0.940

nTE F1
1360

66

0.961

39.9

1.101

66

35.4

SPA B1
487

CBO B1
380

1.100

1.007

66

220

480

3221.7
G
836.0

1.086

179.3
1.073

1.042

1.100

220

14.4

151.7

23.8

27.1
0.980

18.3

26.0
23

36.6

GUA AB2
2239

23.8

SJB TA
482
1.022

23.5

155.0
1.051

65.1
1.020

36.5

64.0
1.005

18.3

57.8

125.1

67.5
1.073

0.993
18.2

56.6

123.3

18.2

1.020

16.2

0.983

489

65.1

120.6

64.0

120.2

49.3

66

71.5

48.4
0.963

CVP BP
305

71.7

66

23.5

15.9
VTA BP
341

ACYABC
1281

1.013

220

1.031

CDE A
2204

23

66

23

1.015

9.3
0.993

1.099
SJN TA
4497

25.2

0.982

10.4
0.975

9.3

SRI B1

PMA B1
220
730
1.038

10.6
40.3

1.060

12.4

33.6

32.5
55.0

25.6
54.7

ACYAB
281

119.9

66

56.4

110.5

1337

QUI B1 FIC66
1338
1.059

K15
298

24.9

66

119.8

220

RED TA
220
430 1.039

66

0.940

4.5
ACY B3
382

1.6
3.9

53.6
1.098

41.2

108.9
1.043

K15 TA
398

66

0.940
1.025

1.060

220

ACY G4 13.8
184 60.0
G
25.7
1.045

16.4
1.047

1.073

ACY G3 13.8
183 60.0
G
25.7
1.045

4.6
0.975

CZA B1
66
376

ACY G2 13.8
182 47.0
G
24.7

25.2

1.093

16.4

1.6

1.047

20.2

8.4

63.0

66

119.8

0.967
31.5

1.009

21.8

53.5

0.967

CAR
393

8.7

SAN TA
410

23
1.041

18.2

32.6
1.000

12.5

SAN
210

54.8

57.1

66

111.1
FMY TA
4433

QUI B1 FIC66
1.058

33.6
62.5

40.8

47.4

101.5

45.6

18.2

GUA B2
5404

12.5

46.3

0.967

15.5

414
46.7

1.021

CDO

22.8
22.8
22.7
COV BP
66
8.5
373
1.001

1.073

72.7

1.074
60.4

220

16.2

VEL B1

257.4
K30 BP
388

154.7

16.4

26.4

1.051

31.3
1.016

1.005

121.9

0.989

17.2

2.8

220

23

66

109.4 109.1
25.8

109.1
1.037

257.4

256.2

0.920

0.998

45.2

220

119.9

31.4
31.3

VEL AB
214

220

42.9

66

31.5

1.022

PIR B1
425

1.005

45.6

66

1.020
nLT F1
1416

VIL B1
220
1.033 475

26.4

0.953

118.6

14.6

256.2
153.6
CDO TA
496

157.7

22.4
18.1

404

101.4
1.043

66

44.1

1.029

65.3

63.0

149.1

ACY G1 13.8
181 47.0
G
24.7
1.045

1.045
500.3

23

1.025
1.058

1.020
44.5

QUI B1
66
337

66

53.1

147.5

25.8

97.7

23

20.3

PIR B1
325

CAU B1

51.2

1.090
26.1

28.3

VIC TA
220
2418
1.032

66

66

48.1

53.1
1.090
1.090

220

497

1.020

118.7

48.0

ITG BP
331

43.0
1.013

TBO B1
320

CZU
297

26.1

145.8
1.081

1.020
27.1
0.998

15.9

39.4

LAM_FIC
1400

220

127.3

119.6

15.5

25.8

127.3
CZU TA

23.0

72.5
1.029

1.023

1.018

488

8.8

59.8

130.7

84.9
0.950

K30 B1

220

500.3

33.0

48.9

18.3

MAQ B1
415

23

45.7

51.2
COV B1

1.022

0.980
49.4

220

ACYC
2281

30.3
0.980

14.9

16.3

980.3

804

220

33.0

31.1

0.950

17.8

101.4

981.2

981.2
1.056

FOZ B2

1.056

F4 241.5
1487

1.047

14.7

nGR F1
66
1311

1.015

1001.8

268.0

23

0.980

37.6

1.027

GDI B1
66
2311

1.000

982.8

1002.3

309.9
1.050

98.2
1.051

0.980

LAM F1
509

983.3
955.2

114.1

23

293
37.1
1.024

1.007

1688.9

500

2.0

YBY B1
66
369

0.977
37.4

219.8
A
23
2266

1.026

B1
801

1.050

1.019

15.6

82.3

16.3

F1 241.5
1484

1.105

47.1

37.0

90.4

90.4
16.3
16.3

104.1

220

99.9

39.0

1.046

14.6

307.2
1.105
MD

307.0

30.0
0.993

SLO AB
201

120.7

1.026

REP B1
2308

LAM B1
66
316

220

307.0

1485.5

17.0

25.8

1.000

102.5

CUR B1
492

110.9
1.056

CCO B1

0.974

16.1

37.7

BMO A
2222

30.4
1.028

1.028

1.015

IRY B1
484

16.4
1.100

0.997

MD

33.9

3371

29.3

38.1

217.0
1.018

13.2
A
23
212

BDO

29.5

38.1

16.5
CN2

BMO B1
220
4222

30.4

301

VAU B1
2309

49.3

43.0

39.9

SLO RE

134.6

66

36.3

66

1.042

LAM F2
510
1.015

220

56.5
21.1

PSA B1
313

60.3

66

57.7

62.7

62.7
101.3

16.8

45.5
46.2

-85.8

SLO B1

24.4

92.2

92.2

1.007

37.7

52.4

28.7

1.072

47.6

1.007

HOR B1

220

220

1.041
B1
66
3372

13.2

BSP

6.9

1.056

220
479
1.038

49.7

62.9

43.3

114.8

101.3

160.7
160.6
160.6
160.3

220

PQI B1
4495
1.097

18.0
VAQ TA
427

1485.8 1689.1
1.056

309.9
1.050

CON B1
66
372 1.032

LAM_PSA AER1
1405
1.045

LAM B1
405

307.2
0.997
F5 241.5
1483

1.031

1.000

1.024

307.2

5.0

BPA B1
303

LAM_PSA AER2
1407
1.045

VM1 B1
469

1.051

66
1.033

403

1.000

220

35.0

67.8

ACU B1
4479

LUQ A
23
221
1.020

22.5

1.047

1.066

B1
4472
1.059

43.3

66
1313

LAM_PSA SUB1
1406
1.046

18.1

1.020

23

220

37.5

CN2

54.4

36.1

0.980

0.980

LPA B1

nCP F1
LAM_PSA SUB2
1408
1.046

307.0
1.105
MD

16.4

220

16.0
1.073

18.0
18.1
1.060

16.4
1.100

4414
54.9

1.056
56.6

226.2

52.7

120.7

69.9

79.8

85.5

85.5

nBC F1
1326
PSA F1
513
1.027

62.9

101.3

160.7

1.027

BVN B1

1.062

2.5

86.6
79.1

1.100

PSA F2
514

4.8

0.980

1.020

471

23.4

220

1.031

220

79.1

159.8

100.1

VM2 B1
1469

CYO A
285
1.022

163.6

220

1.062

LUQ TA
421

CAT B1
491

16.1

165.3

63.9
5.2

1.046

1.100

81.1
1.063

42.9

191.6

191.6

56.1

66
1.038

220

220

1.041

CCO B1

55.5

51.8

1.034

PSA B2
220
4413

1444.2
1.056

16.4

1.105

58.9

52.7

52.0

60.3

nBS F1
1308

1443.9

1444.2
500

1.100

23

2291 1.014

26.2

1.040

66
311

CAT2 A

SGA A
23
2491 1.010

220

36.6

SES TA
466

53.4
1.068

53.4

IPU B2
805

220

1.080

135.1

CEN B1

485

22.6

1.040

31.5

CYO

1.020
LIM RE
411

36.2

75.4

75.0

220

4409

LIM B1
220
409
22.1

66

220

4491 1.079
SICBRAS

66

MD B1
483

0.984

CMY B1 220
1.045 1409

238.8
LIM B1
344

66

66

11.8

19.9
19.9
VHA F1 3346 1.087
0.969

0.964

11.9

13.0

66
1.036

1.051

19.9

232.0

66
346
0.966

36.5

75.4

633.4

0.900

247.9

VHA B1

22.0
22.0
0.991

SMI B1
308

6306.0

485.1

475.8

474.9

231.9

1.020

nPS F1
1306

6384.7
1.044
1.024

825.5

1.043

21.1

1.043

29.5

116.5

36.5

115.0

114.6

23
2246
28.2
1.022
0.980

1.005

36.0

66

825.2

500

18

1.004

34.1
114.6
1.005
1.021
PBO F1
505

1.000

PCA B1
324

825.5
823.2

IPU10G
700
6300.0
G
1036.3

0.900

1.000

1.044
PCA F2
525

115.0

34.1

485.1

475.8

130.6

130.5

408

IPU B1
800

500

500

1444.2

327
1.015

75.0

220

PBO F2
506 1.021

VHA AB2

1.000

86.6

PBO B1

13.4

0.900

130.6

130.5

PBO B1
66
306
13.4

66

19.9

115.0 146.2

115.0 146.2

1.000

66

1.019
MRA B1
304
1.022

13.0

VCU B1
307

177.9

1.034

0.900

0.900

1.044
PCA F1
524

MD B2
802

500

221.6

145.7

161.0

220
161.0

PCA AB
424

VHA B1
846

130.9

130.8
178.6

1.023

23

1.030

23

500

AO 2016: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500 KV MARGEN DERECHA - VILLA HAYES

124.8
VHA B1

220

446
124.8
132.3

CYO B1
885

AMP B1

66

12.9

14.2

29.1

57.9

57.5

29.1

23
2246
28.1
1.015
0.967

107.8
1.005

159.7

ACE B1
345

0.976

PQI B1
4395

165.3

66
154.2

SGA B1

69.8
1.032

59.6

HOR B1
468

64.2

SRO TA
467

220

HOR comp 220


1.119

153.7

220

BSP B1
412

110.0
64.2

4468
1.000

113.5

145.4
1.040

CBV B1
220
1814

146.9

29.7

40.6

75.9

42.6

66

302

27.7

66

220

328.9

329.3
1.119
MD

F1 241.5
1484

PQF B2
220
590

328.9

329.3
0.983

333.3
1.050

PQF B1
490

329.3

329.3
0.983
F2 241.5
1485

1.119

220

MD

333.3

22.6

123.9

126.3

22.8

17.0

53.3

66

368

0.977

17.0

220
GAQ

17.0
1.035 1.007

220

38.8

236.6

242.4

242.4

1.094

134.7
1.059

253.2

253.2
1.098

253.6

328.9

1705.6

329.3

329.3
0.983
F3 241.5
1486

1.119
MD

328.9

BPA FIC
1303

329.3
MD

127.1

329.3
0.983

285.1

FDM B1
323

44.1

44.1

66

33.7

220

118.0
1.033

4.8

66

129.6
1.047

BDO B1
6.9

23

2272
1.021

124.7

1160.9
1.043

532.4

142.8

146.1

532.4
1.100

1.070

220

472
1.058

13.3

13.3
1.065

CUR B
2292
1.025

23

PJC B1
371

66

0.958

CBV B1

66

370

ACY B2
401

23

84.8

87.5

ACYC
2281

CAP

23

CAP TA
493

220

33.7

1.025

35.9

220

402

37.0

69.2

ESA TA
434

37.0
0.980

106.6
1.028

ESA B1
334

1.053

1.033

37.3

220

51.5
1.040

53.5

115.4
1.030

0.953

COV AB
273

25.7

VIL BP
375

37.4

177.9

GUA B1

66

44.5

PAR B1
335

1.032

12.3

30.1
66

30.7

44.5
1.055 0.940

220
92.1

65.6
1.090

45.5

44.6
1.100

13.1

6.3
0.974

6.3

WMA
394

16.3

1.6

16.4

COL BP
322

6.5
ADU
5401

220

165.5
165.5

41.5

39.8

40.4

40.2

GHN B1
343

120.2
108.3

nGI F1
66
1343

66

VAP

GUA B1
339

19.6

8.7

VAP B1
361

1.092

66

APR BP
384

1.073
220
SRI AB

23

2288
2.9

1.027

66

VAP TA
461

23
261

2.8

1.012

220

4488

18.1

1.029

2.8

33.1
31.7
0.950
1.043

1.027
1.095
PFO TA

220

27.0

233.4

220
PBU TA
451

241.1

0.980

TRI B1
354
CBO TA

40.8

234.0

248.8

38.6

14.314.2
30.2

30.4
1.073

220
259.3

261.5
266.8

nTS F1
1370

ENC B1
360

66

12.6

12.7
1.008
SPP B1
362

19.1 18.3
1.003

1.073

264.8

66

23.6
39.6 1.022

AYO B1

220

456

1868.8

3233.8
1.025

YAC19G
790

13.2
1340.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1.047

35.7

183.6

1.089

35.1

381.5
385.0

381.5
0.940

1.040
1089.9

YAC B1
500
890
1.050

3323.1

500

1858.8

AYO B1
856

24.3

24.3
1.063

66

PPO B1
355

CAM B1
378

66

VIN B1
457

220

23.4

66

16.7

TRI B1
454

PFO B1
389

16.2

66

220

1.039
30.4

24.5

0.950

31.6
CAL B1
452

CAM B2
220
478

1.078

30.2

0.950

31.4

1.072

220

CDE B1
2304

1.005

66

39.9

179.5

1.060

NAT TA
453

71.7

91.3

39.3

1.021

38.4

1.073

4.4

9.7

70.5

35.2

220
0.993

17.4
1.067
1.011

1.067

385.0

0.940

nTE F1
1360

66

0.954

39.9

1.096

66

8.9

SPA B1
487

CBO B1
380

1.100

1.005

66

220

480

3174.5
G
982.5

1.084

246.1
1.061

1.036

1.100

220

23.7

25.9
23

18.2

GUA AB2
2239

36.4

1.016

23.7

SJB TA
482

14.3

225.4
1.034

48.0
1.047

36.4

48.5
0.999

18.2

8.9

197.2

90.4
1.065

0.993
18.2

8.9

195.3

18.2

1.047

24.7

0.996

489

48.0

85.4

48.5

86.2

1.6

66

36.8

1.7
0.995

CVP BP
305

40.6

66

23.4

24.3
VTA BP
341

ACYABC
1281

1.098

220

1.014

9.3
0.993

101.9

CDE A
2204

23

66

23

10.3
0.975

1.008

1.005

10.6

1.025

12.5

25.1

0.980

ACYAB
281

9.3

SRI B1

PMA B1
220
730
1.034

25.5

40.5

12.3

1.030

5.1

55.2

40.5

131.1

66

56.9

1.060

101.9

62.7

120.1
1.030

K15
298

24.8
0.940

66

101.9

220

32.4
27.2

66

0.940
0.973

53.0

156.9

SJN TA
4497

K15 TA
398

66

ACY B3
382

1.6
3.9

53.3
1.096

1337

QUI B1 FIC66
1338
1.041

ACY G4 13.8
184 60.0
G
26.5
1.045

5.2

1.019

41.5

129.1
1.037

ACY G3 13.8
183 60.0
G
26.5
1.045

16.3
1.047

1.067

ACY G2 13.8
182 47.0
G
25.5

25.1

0.973

CZA B1
66
376

8.7

0.953
31.3

1.005

23
296

1.091

18.1

SAN TA
410

23
1.046

RED TA
220
430 1.035

12.4

59.4
1.000

23.9

SAN
210

27.2

1.047

20.1

8.4

63.2

66

156.9

QUI B1 FIC66
1.040

62.7
62.1

40.6

47.1

21.2

1.060

220

18.1

GUA B2
5404

12.4

50.3

0.953

24.7

414
46.5

1.022

93.5

1.094
60.1

220

21.7

52.1

0.967

CAR
393

131.3
FMY TA
4433

1.044

2.8

VEL B1

46.3

6.5

30.0
1.018

0.993

55.3

66

101.9

66

30.1

220

23

CDO

22.7
22.7
22.5
COV BP
66
8.4
373
0.999

1.060

64.6

30.0
30.0

VEL AB
214

287.0
K30 BP
388

173.8

0.987

128.6
1.030

287.0

285.4

0.918

1.000

66.4

220

16.4

26.4

22.4

220

141.1

108.0 107.7
25.7

66

1.020

1.014

220

46.3

178.7

nLT F1
1416

PIR B1
425

0.998

66

0.940

1.032

18.0

404

6.7

VIL B1
220
1.027 475

26.4

1.020
46.2

QUI B1
66
337

66

338
1.020

66

37.5

285.4
173.5
CDO TA
496

177.6

20.3

PIR B1
325

CAU B1

65.6

63.2

167.6

ACY G1 13.8
181 47.0
G
25.5
1.045

1.045
531.4

23

1.003
1.051

1.020

VIC TA
220
2418
1.032

66

44.4
1.011

TBO B1
320

53.5

167.0

1.090

116.6

23

25.7

24.4

37.8

CZU
297

26.1

51.5

497

157.9

26.1

27.2

117.7

98.4

37.4

ITG BP
331

23.9

25.7

145.3

155.5

138.0

15.7

20.9

108.3

66

164.8
1.077

1.033
26.2
0.995

117.6
1.031

1.015

LAM_FIC
1400

220
CZU TA

55.0

CAE BP
66
333

53.5
1.090
1.090

220

488

8.8

61.2

35.9
1.017

87.8
54.0

K30 B1

220

531.4
149.9

48.7

20.9

MAQ B1
415

32.8
0.980

0.950

1.017

51.5
COV B1

30.2
0.980

23

45.5

32.8

31.0

0.950

66
49.1

220

1.047

0.980

45.2

20.4

1.030

1160.9

1.045

F4 241.5
1487

23

15.5

nGR F1
66
1311

20.9

1162.2

1162.2
1.045

FOZ B2

293.6

46.9

1.025

GDI B1
66
2311

1.017

1186.3

804

131.5

0.980

1.000

1163.8

1187.2

333.3
1.050

1.022

293
44.2
1.021

LAM F1
509

1164.6
268.9

2.0

YBY B1
66
369

0.975
37.3

268.9

119.1
1.044
CUR B1
492

115.1
1.052

CCO B1

0.970

16.0

37.5

214.9
A
23
2266

333.3
1.050

136.7

16.9
1.021

1705.6

500

1500.2

3371

29.3

38.0

GAQ TA
4466

17.5
1.037

BDO

29.5

38.0

16.4
16.7

45.3
46.0

212.3
1.028

13.1
A
23
212

B1
801

1.050

29.8
0.993

SLO AB
201

47.8

85.2

6.7

IRY B1
484

16.6
1.100

0.996

MD

33.9

120.8

VAU B1
2309

1.049

12.5

12.5

BMO A
2222

30.3
1.030

5.0

1.021

REP B1
2308

LAM B1
66
316

CN2

BMO B1
220
4222

30.3

57.4

27.9

12.5

12.5
1.000

220

29.9

301

82.1

65.3

SLO RE

37.8

42.3

38.3

61.7

20.6

66

85.2

66

46.5

66

0.980

1.018

220

79.8
24.9

PSA B1
313

108.3

101.4

101.4
98.4

LAM F2
510
1.018

1.007

37.5

40.5

SLO B1

SLO B1

20.6

94.6

-93.8

1.019
0.980

HOR B1

220

220

1.040
B1
66
3372

13.2

BSP

6.9

1.055

220
479
1.037

38.0

65.5
65.3

94.5
94.5

29.3

20.5

94.4

146.6

1.083

51.8

1.028

PQI B1
4495
1.096

17.9
VAQ TA
427

1500.7 1706.0
1.046

333.3
1.050

CON B1
66
372 1.031

LAM_PSA AER1
1405
1.031

220

329.3
0.983
F5 241.5
1483

1.021

1.000

1.014

LAM B1
405

329.3

5.0

BPA B1
303

LAM_PSA AER2
1407
1.030

VM1 B1
469

1.050

66
1.025

403

1.000

220

34.8

67.5

ACU B1
4479

LUQ A
23
221
1.020

22.4

1.047

1.065

B1
4472
1.058

42.6

66
1313

LAM_PSA SUB1
1406
1.031

18.1

1.020

23

220

37.3

CN2

54.2

35.9

0.980

0.980

LPA B1

nCP F1
LAM_PSA SUB2
1408
1.031

328.9
1.119
MD

16.5

220

16.0
1.060

17.9
18.1
1.060

16.6
1.100

4414
54.8

1.055
56.4

153.2

40.6

57.7

69.6

68.9

87.6

87.6

nBC F1
1326
PSA F1
513
1.017

65.5

20.5

94.4

1.017

BVN B1

1.059

2.4

76.2

1.100

PSA F2
514

4.8

0.980

1.007

471

23.2

220

1.030

220

80.7

80.7

93.3

19.4

VM2 B1
1469

CYO A
285
1.015

159.4

220

1.059

LUQ TA
421

CAT B1
491

16.1

161.0

68.6
5.2

1.031

1.100

80.8
1.062

42.2

124.1

124.1

60.9

66
1.028

220

220

1.037

CCO B1

60.2

56.0

1.024

PSA B2
220
4413

1429.5
1.046

16.5

1.119

65.0

nBS F1
1308

1429.1

1429.6
500

1.100

23

2291 1.023

61.0

1.034

66
311

CAT2 A

SGA A
23
2491 1.005

220

70.8

SES TA
466

40.7

28.9

11.8

235.8 212.2
1.149

235.8

IPU B2
805

220

1.076

LIM RE
411

41.2

68.3

68.0

17.9

85.5

CEN B1

1.007

1.029
66

CYO

485

15.8

SMI B1
308

220

4409

LIM B1
220
409

23.9

23.2
23.2
0.998

220

4491 1.074
SICBRAS

66

MD B1
483

0.983

CMY B1 220
1.031 1409

159.5
LIM B1
344

66

66

11.4

18.6
18.6
VHA F1 3346 1.060
0.974

0.929

11.5

14.0

66
1.025
41.4

68.3

1706.0
MD HER2
1516

341.8

1.029

18.5

252.8

66
346
0.972

22.8

nPS F1
1306

1.032

6339.9

1026.8

0.900

165.3

1.006

VHA B1

24.6

66

6474.9
1.043
1.024

342.5

341.4

340.7
1.022

154.3

40.7

PCA B1
324

29.4

107.8

41.4

101.9

106.7

29.1
106.7
1.005
1.007
PBO F1
505

1.000

500

18

0.900

1.000

1.032
PCA F2
525

101.9

29.1

IPU10G
700
6300.0
G
1494.6

342.5

341.4

118.8

118.8

408

IPU B1
800

500

500

1429.5

327
1.002

68.0

220

PBO F2
506 1.007

VHA AB2

1.000

76.0

PBO B1

13.4

0.900

118.8

118.8

PBO B1
66
306
13.4

66

18.5

101.9 133.3

101.9 133.3

1.000

66

1.006
MRA B1
304
1.009

13.9

VCU B1
307

160.7

1.014

0.900

0.900

1.032
PCA F1
524

MD B2
802

500

242.7

131.9

145.5

220
145.5

PCA AB
424

VHA B1
846

119.2

119.1
161.2

1.022

23

1.028

23

500

AO 2017: RGIMEN NORMAL

194.0
VHA B1

220

446
194.0
155.5

AMP B1
327
1.021

66

PBO B1

13.4

220
408

PBO F2
506 1.022

141.4

141.7

141.4

141.7

36.7

38.8

38.8

126.5

1.000

129.2
1.000

38.8
126.5
1.000
1.022
PBO F1
505

48.3

220

BSP B1
412

160.4

66.2

1.007

25.1

83.4

38.0

19.7

SLO B1

SLO RE
302

66

146.2

SLO B1
66
301

51.9

PQI B1
4495
1.093

220

222.2

222.2
1.005
F5 241.5
1483

1.090
MD

20.4

37.2
IRY B1
484

19.7

220

222.2
1.090
MD

222.5
1.050

0.992

F1 241.5
1484

222.2
1.005

222.5
1.050
MD

17.6

VAQ TA
427

PQF B2
220
590

222.3
PQF B1
490

222.2

222.2
1.005
F2 241.5
1485

1.090

220

MD

222.5

25.4

135.7

138.4

220
GAQ

19.2
1.032 1.007

40.6

252.9

255.4
1.091

147.6
1.067

238.2
A
23
2266

255.4

268.2
1.095

268.2

268.4

222.3

1684.9

222.2

222.2
1.005
F3 241.5
1486

1.090
MD

222.3

222.2
MD

139.2

326.8

129.8

66

138.2

143.3

222.2
1.005

66

PJC B1
371

66

923.1

941.5

940.9

921.8

920.7

921.8
1.056

920.7

8.9

1.033

11.9

0.980

YBY B1
66
369

F4 241.5
1487

662.9
1.056

331.3

220

1.056

240.1

157.7

161.4

240.1
1.096

1.081

220

472
1.048

14.5

14.4
1.066

CUR B
2292
1.024

23

42.3

8.0

0.999

0.995
CBV B1
370

220

45.5

BMO B1
220
4222

45.7

BMO A
2222

45.7

66

ACY B2
401

23

1.015

ACYC
2281

51.0

51.5
SLO AB
201

146.5
24.1

VAU B1
2309

66

37.8
BPA FIC
1303

44.8
36.4

36.2

36.2

1.026

66

29.9

85.1

88.1

27.5

CAP A
293

23

CAP TA
493

220

51.9

1.019

0.993

34.7

35.9

220

0.967
29.9

29.3

148.5

49.6

CAE BP
66
333

88.6
1.029

ESA B1
334

48.0

1.050

90.1

66

154.2

45.5

45.4

31.5

68.2

70.6

110.7
1.033

0.953

1.046

COV AB
273

1.022

71.3

PIR B1
325

VIC TA
220
2418
1.036

66

338
1.031

41.6
1.011

GUA B1

43.1

QUI B1
66
337

66

66

45.8

PAR B1
335

1.044

12.8

34.4
66

35.3

45.8
1.050 0.953

1.092

K15 TA
398

220

66
20.9
53.7

166.1
40.7

39.8
1.060

11.5

40.7

127.2

1.012
ACYABC
1281

39.8

40.5

29.9

66

330.4

1.087

3.5
1.015

66

23

1.046

3.4

34.6
33.1
0.950
1.055

1.016

MAU B1
449

1.101

1.033

174.3
1.048

61.0
1.033

SJB TA
482
1.023
GUA AB2
2239

35.9
23

1.099
220

489

38.0

172.5

220
1.046

MAU AB
249

23

PBU TA
451

177.9

0.967

220
1.095

202.8
1.069
TRI B1
354

8.5

PPO B1
355

8.1

220
440

480

SPA B1

220

29.0
1.060

nTS F1
1370

ENC B1
360

66

25.4
43.5 1.020

nTE F1
1360

66

26.2

26.2
1.058

66

19.5

TRI B1
454

18.8

0.949

66

66

1.024
35.3

26.4

0.950

36.8
CAL B1
452

66
CAM B1
378

PFO B1
389

220

CAM B2
220
478

1.073

35.1

0.950

36.5

1.077

220

CDE B1
2304

1.004

66

43.7

177.3

177.3

7.8

8.0
1.008
SPP B1
362

21.9 20.8
1.006

1.080

8.1

23
240

66

9.5 9.4
29.2

64.5

487
AB

CBO B1
380

59.5
55.6

204.7

1.033

VT2

220

1.045
179.4

B1

8.1

VT2

66

1.047

NAT TA
453

15.7
43.7

1.014

43.5

220
0.980

0.980

81.8

83.4

25.6
1.015

39.1

60.1

1.062

237.6
72.9
1.060
1.000

39.7

0.940

666.4
1.035
G

2668.1
563.4

2726.9

2686.0

662.7

1.025
YAC19G

13.2

790
1340.0

1.045

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

235.2

220

PQIS B1

635.7

662.8

VIN B1
457

500
8480

1.049
235.2

1.089

1.044
262.6

500

666.5

AYO B1
856

500

237.7

237.7

0.940

YAC B1
890

27.1
1.066

21.6

179.6

179.6

1.073

28.1

1.099
235.2

220
456

235.2

AYO B1

33.8

21.6

68.8
1.019

APR BP
384

1.009

1.100

1.006

66

1.045
CBO TA

1.100

25.7

0.981

PFO TA

1.047

25.7

60.3
1.001

144.3

43.3

52.9

142.2

43.5

17.4
51.9

220

61.0

52.4

44.6

60.3

1.053

1.103

2288

11.8

SRI AB

14.0

261

66

664.0
332.0
0.950

220

329.5

VAP TA
461

23

25.5

LCD B2
8889

332.0
0.950

56.1

CVP BP
305

330.4

21.8

12.9
VAP

GUA B1
339

VAP B1
361

220

330.4

330.4

PMA B1
220
730
1.041

34.8
1.006

2.8

17.6

329.5

55.5

nGI F1
66
1343

LCD TA
4489

1.097

21.8

56.0
1.042

66

SRI B1 220
4488

25.5

70.5

1.020

1.012

220

217.3

70.2

10.0

1.096

217.3

50.1

10.0
0.993

SJN TA
4497

CDE A
2204

23

23

11.2
0.975

51.3

220

0.983

ACYAB
281

216.7

1.025

20.7
1.017

55.2

66

1337

QUI B1 FIC66
1338
1.053

A
23
298

20.4

0.958
0.969

59.4

216.7

QUI B1 FIC66
1.052
RED TA
220
430 1.042

K15

0.958

12.5
ACY B3
382

8.3
3.9

59.7
1.095

157.8

125.3
1.046

66

66

12.4
ADU
5401

19.7

0.964

6.5

1.024

13.4

43.8

ACY G4 13.8
184 60.0
G
27.3
1.045

20.6

0.968

COL BP
322

1.045
ACY G3 13.8
183 60.0
G
27.3
1.045

23.6
1.033

17.2
66

WMA
394

8.3

51.3

GHN B1
343
1.006

1.3

53.5

49.2

1.043

VTA BP
341

1.3
0.968

166.1

220

17.6

88.0
48.0
1.000

35.8

48.9

46.7
1.100

128.2
FMY TA
4433

65.9
1.090

53.5

SAN TA
410

0.953
34.5

100.3

220

50.1

23
1.053

63.4

66

21.2

13.5

SAN
210

47.9
34.7

23.6

23.8
1.069

17.6

220

CAR
393

1.033

22.8
CZA B1
66
376

11.2

23
296

10.3

414

12.9

GUA B2
5404

68.8

12.9

VEL B1
52.2

125.6
1.039

89.3

1.091
0.953

16.9

1.007

24.9

35.6

66

13.5

100.2
1.045

51.2
1.016

10.4

100.2

23
214

301.0
K30 BP
388

157.8
59.5

40.8

220
1400

47.0

37.3
1.014

2.8

VEL AB
LAM_FIC

37.1
0.964

19.8
19.8
19.9
COV BP
66
11.3
373
1.025

1.087

47.5

1.054

66.3

CDO

23.8

29.8

311.5

299.6

180.5

1.006

57.6

37.5
37.3

297.8
1.095

220

0.930

0.999

22.8

66

37.5

1.021

133.8

1.090

1.060

17.4

13.2

66

134.6 133.4
28.9

66

1.020
nLT F1
1416

1.002

220

VIL BP
375

65.9

63.4
311.2

296.7
CDO TA
496

ACY G2 13.8
182 47.0
G
26.4

53.9

240.0
22.2

174.2

35.6

51.9

1.027

28.5

0.964

240.0

220

26.8

49.6

PIR B1
425

23

22.9

1.017

37.1

47.5

136.6
TBO B1
320

VIL B1
220
475 1.030

29.8

19.2
17.5

220

66

40.4

23

168.5

0.953

1.021

KM7 A
2298

184.5

1.020

CAU B1

17.2

49.6

1.000

167.3

KM7 B1
4498

1.100

1.059

1.020

136.2

49.6

ITG BP
331

16.9

CZU
297

112.0

23
130.8

12.4

nGR F1
66
1311

28.5

28.7

165.2
1.080

ACY G1 13.8
181 47.0
G
26.4
1.045

1.090

220

497

156.6

28.7

33.0

0.995

71.6
1.034

1.032
FICT VAU 220
3409

17.9
LAM F1
509

220

K30 B1
488

220

1.033
12.2

49.4

1.020

1.033
144.1
CZU TA

48.4

18.3

45.5

220

88.5
0.950

1.032

ESA TA
434

69.6
0.967

1.028
85.4

1.046

220
2409

67.2

66
48.4

MAQ B1
415

25.9

54.5
63.1

86.7

VAU B1

FDM B1
323

53.9
1.090

COV B1
402

26.9

0.950

54.1

1.011

29.3
0.993

36.9

1.029

23

49.8
1.047

23

1.027
20.9

220

45.2
1.007

1.032

FOZ B2
804

222.5
1.050

1.047
BDO B1

CCO B1
3371

923.6
1176.8

37.9

1.043

1176.8

144.3

1.020

23

2272
1.022

222.5
1.050

90.2
1.050

1.013

1684.9

500

149.9

19.0
CUR B1
492

126.7
1.040

BDO

37.9

HOR B1
368

1.6

1.046
B1
66
3372

19.2

B1
801

1.050
1482.0

220

91.4

65.2

66

91.9

91.9

222.3

37.5

220

42.7

CN2

220
479
0.996

GAQ TA
4466

19.2
1.034

8.8

12.0

B1
4472
1.042

42.7

51.3

-91.0

37.0

22.5

22.5

222.3

18.2
1.100

8.0

43.4
43.4

220

234.1
1.016

0.993

1.067

18.3

60.4

VM1 B1
469

50.1

31.5

61.0
48.1
45.7

28.6

24.1

GDI B1
66
2311

22.5

22.5

20.2
20.4
1.060

1.020

23

1.017

14.6
BSP A
23
14.7
212

69.4

5.7
1.045

1.025

0.993

13.2

18.2
1.100

18.1

CON B1
66
372
1.035

114.4

13.4

REP B1
2308

18.1

220

1.031

66

1.013

CAT B1
491

1.060

176.4

174.4

220

42.3

1.014

404

LAM B1
66
316

23

17.6

BVN B1
220
4414
5.1

CN2

220

45.1

CYO A
285

220

1.028

CCO B1

0.967
20.0

1.025

59.3

32.3

146.6

62.5

ACU B1
4479

220

28.9

1.000

SGA A
23
2491 1.010

220

56.4

158.7
1.027

220

61.2

57.3
86.5

220

1.035

0.993

1482.2 1685.0
1.056

1.056

13.6

120.7

CBV B1
1814

18.6

48.3

239.9

VM2 B1
1469

0.993

1450.2
500

1450.2

2.0

45.4

63.6

117.8

45.7

65.4

65.4

65.2
40.7

SRO TA
467

220

1.000

1.034

1.027

1.013

1450.0

1.090

4468

66

100.1

152.2
152.1
152.1

100.1

HOR B1
468

80.7
HOR comp 220
1.120

LUQ A
23
221
1.017

100.1

151.9

41.3

403

1.045

LAM F2
510
1.013

46.3

80.7

40.4
40.4

42.2
1.064

1.069

34.5

92.9

92.9

55.8
1.040

SES TA
466

1.046

LAM_PSA AER1
1405
1.047

1.020

CYO

45.2

66
1.038

1.000

PSA B1
313

220

471

1.047

220

11.8

1.042

82.6

89.0

89.0

66
1313

IPU B2
805

220

1.083

LPA B1

LAM_PSA SUB1
1406
1.048

1.023

LAM B1
405

13.6

24.7

48.3

86.7

45.3

192.9

192.9
82.6

151.5

98.7
100.1

152.2

nBC F1
1326

CAT2 A

2291 1.022

1.020

75.5

PSA F1
513

220

485

147.0

BPA B1
303

1407

SICBRAS
4409

LIM B1
220
409

1.048

1.026

1.000

LAM_PSA AER2

SGA B1

4491 1.081

241.3

220

MD B1
483

1.100

236.7
66

66

66
0.976

CMY B1 220
1.047 1409

66

1.100

nCP F1
LAM_PSA SUB2
1408
1.048

PQI B1
4395

13.8

40.1

23.5

229.0

42.2

LUQ TA
421

1.026

246.7

66

LIM RE
411

1.048

PSA F2
514

0.965

267.7

15.1

238.6

ACE B1
345

23.9
23.9
0.989

PSA B2
220
4413

1.100

1685.0
MD HER2
1516

495.9

245.7

13.4

19.6

19.8
19.8
VHA F1 3346 1.100
0.964

11.0

nBS F1
1308

6300.2

660.7

0.900

1.052

229.8

66
346
0.961

19.7

28.3

VHA B1

28.4

1.034

6351.0
1.040
1.024

496.9

487.5

486.6
1.044

40.4

66
311

6300.0
803.4

834.1

833.5

36.0

92.6

35.3

SMI B1
308

24.9

129.2

40.3

80.4

80.0

1.040

833.5

500

18

1450.2
38.8

LIM B1
344

nPS F1
66
1306 1.037

496.9
830.6

IPU10G
700

36.7
36.7

40.4

80.4

80.0

23
2246
24.6
1.020
1.022

0.966

IPS B1
66
328 1.028

0.900
487.5

IPU B1
800

500

500

1.005
VHA AB2

1.021

IPS_SMI_F166
3306 1.035

CEN B1

CYO B1
885

0.900

36.1

28.3

IPS_PBO_F266
4306 1.022

121.8

121.8

PBO B1
66
306
13.4

66

1.000

1.044
PCA F2
525

1.000

92.7

66

1.020
MRA B1
304
1.017

15.1

183.2

VCU B1
307

28.3

121.9 152.6

121.9 152.6

1.000

PCA B1
66
324 1.044

1.035

0.900

0.900

1.044
PCA F1
524

MD B2
802

500

255.8

154.6

168.1

220
168.1

PCA AB
424

VHA B1
846

142.1

141.8
184.0

66

500

23

500

AO 2017: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500 KV MARGEN DERECHA - VILLA HAYES

111.9
VHA B1

220

446
111.9
135.6

AMP B1
327
1.000

66

PBO B1

13.4

220
408

PBO F2
506 1.001

125.0

125.2

125.0

125.2

36.7

VHA AB2
33.6

33.6

115.9

1.000

117.1
1.000

33.6
115.9
1.000
1.001
PBO F1
505

18.8

12.2

CAT B1
491

17.6

18.9

306.0

18.9

306.0

307.4

1.100

307.4
0.974
F5 241.5
1483

1.134
MD

20.2
20.4
1.047

18.8

220
PQI B1
4495
1.093

220

20.4

37.2
IRY B1
484

19.7

220

307.4

1.100

1.134
MD

315.7
1.050

0.995

F1 241.5
1484

307.4
0.974

315.7
1.050
MD

17.6
1.047

VAQ TA
427

0.980

23

1.028

25.1

25.4

210.5

216.1

PQF B2
220
590

306.0
PQF B1
490

307.4

307.4
0.974
F2 241.5
1485

1.134

220

MD

315.7

0.980

83.5

38.9

220

40.4

332.0

337.9
1.089

337.9

351.3
1.098

351.3

351.8

306.0

1690.9

307.4

307.4
0.974
F3 241.5
1486

1.134
MD

306.0

307.4

307.4
0.974

MD

213.8

427.7

146.5

154.8

38.8

HOR B1
368

66
1.039

160.5

CCO B1
3371

66

PJC B1
371

66

F4 241.5
1487

965.4

964.4

965.4
1.051

964.4

915.8

220

1.050

351.9

174.9

179.5

351.9
1.100

1.067

220
14.4

14.4
1.047

CUR B
2292
1.018

23

38.4
1.031

YBY B1
66
369

42.3

2.9

1.002

0.995
CBV B1
370

-33.6

SLO B1

220

66

56.0

93.9

SLO B1
66
301

45.5

BMO B1
220
4222

45.6

ACY B2
401

23

VAU B1
2309

66

1.025

ACYC
2281
51.5

SLO AB
201

58.0
BPA FIC
1303

30.1
50.1

50.0

50.0

1.024

66

29.8

90.6

91.3

27.4

CAP A
293

23

CAP TA
493

220

51.8

1.029

0.967

34.7

36.0

220

0.953
29.8

29.2

219.5

184.0
1.008

ESA B1
334

48.1

32.3

66

73.3

120.4

PIR B1
325

32.5

338
1.000
GUA B1

47.8

QUI B1
66
337

66

66

48.2

PAR B1
335

1.014

12.8

34.4
66

35.3

48.2
1.053 0.927

18.1
18.1
17.9
COV BP
66
11.3
373
0.997

1.033

49.9

225.3
1.010

23
296

44.9

WMA
394

11.1

6.5

K15 TA
398

ADU
5401

220

66
20.9

58.4

56.6

242.6
42.4

41.4
1.060

11.5

26.8

228.1

1.010
ACYABC
1281

41.4

40.5

66

456.3

1.073

1.011

3.4

34.7
33.0
0.950
1.024

1.021

MAU B1
449

1.092

1.007

206.6
1.021

GUA AB2
2239

37.9

208.1

220
1.037

MAU AB
249

23

PBU TA
451

215.3

0.940

220
1.091

240.4
1.047
TRI B1
354

8.5

66
PPO B1
355

1.020
8.1

CBO TA

220
440

480

SPA B1

220

28.6
1.033

nTS F1
1370

ENC B1
360

66

19.0
46.8 1.019

nTE F1
1360

66

19.3

19.3
1.037

66

19.6

TRI B1
454

18.8

0.947

66

66

0.995
32.7

19.4

0.950

33.4
CAL B1
452

66
CAM B1
378

PFO B1
389

220

CAM B2
220
478

1.045

32.5

0.950

33.2

1.056

220

CDE B1
2304

1.003

66

46.6

209.2

209.2

7.7

8.0
1.007
SPP B1
362

21.9 20.7
1.004

1.062

8.1

23
240

66

9.3 9.1
28.8

90.2

487
AB

CBO B1
380

87.7
83.6

243.5

1.007

VT2

220

1.020
214.5

B1

8.1

VT2

1.005

66

0.980

NAT TA
453

40.0
46.6

1.016

47.5

220
0.980

0.980

93.5

95.0

48.3
1.014

39.1

85.3

1.020

215.2
107.4
1.015
1.050

39.9

0.925

824.2
1.035
G

2963.5
841.3

3080.6

3008.4

819.6

1.025
YAC19G

13.2

790
1340.0

1.036

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

210.7

220

PQIS B1

945.2

820.2

VIN B1
457

500
8480

1.043
210.7

1.081

1.033
257.3

500

824.8

AYO B1
856

500

281.3

281.3

0.925

YAC B1
890

91.7
1.034

21.6

213.6

213.6

1.043

53.6

1.092
275.2

220
456

275.2

AYO B1

56.3

21.6

104.7
1.021

APR BP
384

1.008

1.100

25.7

35.9
23

1.100

25.7

60.1
1.007

SJB TA
482
1.027

1.098
220

489

43.3

0.983

PFO TA

1.047

43.5

59.5
1.003

176.8

21.8

52.8

174.7

131.6

17.2
51.8

220

60.1

130.2

44.5

59.5

1.047

1.100

11.7

3.5
1.021

66

23

2288

14.0

SRI AB

455.2

261

66

914.2
457.1
0.950

220

25.5

VAP TA
461

23

21.8

LCD B2
8889

457.1
0.950

91.2

CVP BP
305

456.3

455.2

12.9
VAP

GUA B1
339

VAP B1
361

220

456.3

456.3

PMA B1
220
730
1.016

129.4
1.009

2.8

17.6

25.5

144.9

nGI F1
66
1343

LCD TA
4489

1.089

307.0

144.5
1.014

66

SRI B1 220
4488

307.0

70.3

1.018

1.011

220

91.5

70.1

10.0

1.096

91.5

161.7

9.9
0.993

SJN TA
4497

CDE A
2204

23

23

11.2
0.975

42.4

20.9

220

0.979

ACYAB
281

306.5

0.991

20.7
1.013

0.963

59.4

66

1337

QUI B1 FIC66
1338
1.022

A
23
298

20.4
0.958

15.5
ACY B3
382

11.1
3.9

59.7
1.095

306.5

QUI B1 FIC66
1.022
RED TA
220
430 1.017

K15

0.958
0.998

225.0

225.2
1.014

66

66

23.6
1.033

242.6

220

ACY G4 13.8
184 60.0
G
27.1
1.045

15.2
0.962

COL BP
322

1.045
ACY G3 13.8
183 60.0
G
27.1
1.045

20.6

13.4

0.966

4.1

1.083

23.6

23.9
1.043

17.0

43.8

4.1
0.962

93.1

GHN B1
343

66

43.8
1.100

34.4

229.5
FMY TA
4433

65.8
1.090

93.1

49.8

1.014

VTA BP
341

63.4

66

29.7

190.1
142.3
1.000

36.0

1.009

1.033

22.7
CZA B1
66
376

11.2

13.5

SAN TA
410

0.940

49.6

24.9

33.0

0.978

17.6

220

161.7

34.6
31.2

34.3
0.964
0.999

190.9

12.9

GUA B2
5404

69.0

23
1.037

CDO

23.9

30.2

CAR
393

13.5

414.2
66

251.1

130.6 129.3
29.1

423.2
1.094

K30 BP
388

10.3

SAN
210

204.0
0.899

17.6

220

410.8

409.8

10.4

414

66

33.0

1.090

225.0

12.9

VEL B1
52.2

0.963

220

VIL BP
375

0.964
34.3

49.9

153.9

1.159
0.940

16.8

0.980

VIL B1
220
475 0.996

30.2

65.8

63.4
422.2

407.3
220

ACY G2 13.8
182 47.0
G
26.2

53.8

351.0
22.1

249.6
CDO TA
496

236.8

51.8

1.025

260.3

17.9
17.5

220

40.8

30.6
1.015

51.2
1.015

56.3

36.0
1.019

17.2

30.6

23
214

PIR B1
425

23

22.8

0.982
1.027

0.927

1.024

153.7

2.8

220
1400

23

28.5

180.5

23

1.019

36.2

VEL AB
LAM_FIC

COV AB
273

1.020

CAU B1

7.1

66

66.4

KM7 A
2298

351.0

220

1.060

36.1
36.0

178.4
1.001

66

1.022

1.008

75.7
0.927

1.046

186.1

16.6

CZU
297

241.1

KM7 B1
4498

1.100
28.9

38.6

VIC TA
220
2418
1.015

66

66

nLT F1
1416

28.5

28.9

236.1
1.060

ACY G1 13.8
181 47.0
G
26.2
1.045

1.090

220

497

1.020

185.2

32.5

ITG BP
331

46.2
1.015

32.6

220

254.8

29.1

17.1

TBO B1
320

249.6

198.4

16.8

38.3

185.0

K30 B1
488

220

1.033
36.8
0.997

120.2
1.015

1.014
FICT VAU 220
3409

1.008

1.000

CAE BP
66
333
9.8

45.5

9.8

nGR F1
66
1311

124.8

1.060

45.6

23.9
LAM F1
509

1.033
210.4
CZU TA

124.6

24.6

45.6

220

91.7
0.950

1.014

ESA TA
434

69.7
0.953

1.019
91.0

1.056

220
2409

67.2

66
58.3

MAQ B1
415

25.9

54.6
66.7

73.0

VAU B1

FDM B1
323

53.8
1.090

COV B1
402

26.9

0.950

54.2

1.012

29.2
0.967

51.4

1.029

23

49.8
1.047

23

1.022
4.8

220

45.2
0.980

145.3
70.7

21.8

BMO A
2222

45.6
1.014

126.7

66

152.9

SLO RE
302

FOZ B2

1.051

439.5

1.033
BDO B1
472
1.027

8.8

23

2272
1.028

985.6

804

224.9

0.993

BDO

966.9

986.1

315.7
1.050

125.1
1.019
CUR B1
492

143.3
1.021

967.4
1071.5

230.9

19.0
1.015

1071.5

8.7

0.980
42.8

1.039
B1
66
3372

224.0
A
23
2266

GAQ

315.7
1.050

38.8

12.4

220

42.8

51.4

CN2

220

19.2
1.006 0.980

1690.9

500

8.5

43.5

B1
4472
1.036

1.017

220
479
0.988

19.2

8.8

12.2

50.2

220

GAQ TA
4466

19.1
1.008

0.980

20.9

43.5

18.3
VM1 B1
469

220.8
1.024

14.6
BSP A
23
14.7
212

B1
801

1.050
1487.3

225.3
1.041

164.1

162.6

86.4

5.7
1.031

1.072

18.6

59.3

32.2

CYO A
285

BVN B1
220
4414

CN2

1.006

31.5

61.0
32.1

66

22.2

46.5

67.2

220

220

1.009
220

42.4

1.018

220

30.2

71.1

71.1
39.0

149.0

83.3

5.1

46.8

71.3

71.3

46.8

31.1

29.6

88.2
88.3
88.3

29.8

23

CON B1
66
372
1.028

155.4

29.8

88.5

BSP B1
412

CCO B1

0.953
21.3

220

60.3

163.7

32.2

70.7

62.4

ACU B1
4479

30.2

1.018

1487.6 1691.1
1.051

3.3

66

128.9

106.1

106.1

SGA A
23
2491 1.009

220

155.6

220

147.6
1.013

220

78.4

73.7

1.023

GDI B1
66
2311

18.8

CBV B1
1814

86.4

0.967

16.7

114.0

110.5

47.8
47.9
32.3

0.967

403

REP B1
2308
18.8

110.8

1.000

1.016

0.967

1449.3
500

1449.3
1.051

1.134

4468

404

LAM B1
66
316

SRO TA
467

220

HOR comp 220


1.139

VM2 B1
1469

1.115

18.8

18.8
1.000

1449.0

1.015

0.967

1.018

110.5 HOR B1
468

286.1 251.9
1.159

66

103.1

103.1
LAM F2
510
1.018

146.2

LUQ A
23
221
1.027

1.012
0.967

152.3
1.016

SES TA
466

1.032

LAM_PSA AER1
1405
1.017

1.014

CYO

142.5

66
1.023

1.000

PSA B1
313

220

471

1.017

220

11.8

1.021

85.6

93.5

93.5

66
1313

IPU B2
805

220

1.069

LPA B1

LAM_PSA SUB1
1406
1.017

1.007

LAM B1
405

101.8

28.4

32.2

72.8

46.4

111.3

111.3
85.6

86.4

25.8
29.6

88.2

nBC F1
1326

CAT2 A

2291 1.021

0.993

101.1

PSA F1
513

220

485

94.1

BPA B1
303

1407

SICBRAS
4409

LIM B1
220
409

1.042

1.011

1.000

LAM_PSA AER2

SGA B1

4491 1.067

164.3

220

MD B1
483

1.100

83.8
66

66

66
0.978

CMY B1 220
1.019 1409

66

1.100

nCP F1
LAM_PSA SUB2
1408
1.017

PQI B1
4395

12.4

47.4

26.8

78.2

286.1

LUQ TA
421

1.011

90.3

66

LIM RE
411

1.018

PSA F2
514

0.923

100.9

nBS F1
1308

6317.1

1691.1
MD HER2
1516

302.0

350.1

18.0

84.4

ACE B1
345

27.4
27.4
0.991

PSA B2
220
4413

1.100

17.1

17.3
17.3
VHA F1 3346 1.073
0.961

90.1

29.6

34.8

1.017

6420.1
1.043
1.024

907.3

0.900

78.6

66
346
0.960

17.3

34.6

VHA B1

47.9

66
311

6300.0
1236.2

500

18

302.6

300.6

300.0
1.019

34.4

79.9

33.6

SMI B1
308

24.9

1.012

47.8

69.3

69.0

1.023

302.6

300.6

117.1

LIM B1
344

nPS F1
66
1306 1.019

IPU10G
700

1449.3
33.6

47.8

69.3

69.0

23
2246
24.6
0.993
1.016

0.965

IPS B1
66
328 1.009

0.900

IPU B1
800

500

500

36.7
36.7

1.001

IPS_SMI_F166
3306 1.018

CEN B1

CYO B1
885

0.900

36.1

34.6

IPS_PBO_F266
4306 1.002

102.5

102.5

PBO B1
66
306
13.4

66

1.000

1.027
PCA F2
525

1.000

79.8

66

1.000
MRA B1
304
0.997

17.9

158.3

VCU B1
307

34.6

102.5 134.2

102.5 134.2

1.000

PCA B1
66
324 1.026

1.004

0.900

0.900

1.027
PCA F1
524

MD B2
802

500

338.9

135.1

145.8

220
145.8

PCA AB
424

VHA B1
846

125.5

125.3
158.8

66

500

23

500

AO 2018: RGIMEN NORMAL

174.8
VHA B1

220

446
174.8
157.1

66
PBO B1

16.1

220
408

PBO F2
506 1.029

154.6

155.2

154.6

155.2

VHA AB2
55.8

55.8

145.6

1.000

153.9

BSP B1
412

175.9

77.4

28.0

93.8

6.2

41.9

24.7

41.3

HOR B1
368

66

21.6

267.1
A
23
2266

GAQ

21.6
1.027 0.993

171.0

225.7

225.7
0.998
F5 241.5
1483

1.105
MD

22.5

220

225.7
1.105
MD

228.4
1.050

1.001

F1 241.5
1484

225.7
0.998

228.4
1.050
MD

215.6

PQF B2
220
590

225.2
PQF B1
490

225.7

225.7
0.998
F2 241.5
1485

1.105

220

MD

228.4

220

43.9

213.4

215.3
1.095

181.2
1.068

215.3

232.0
1.100

232.0

232.1

225.2

1683.0

225.7

225.7
0.998
F3 241.5
1486

1.105
MD

225.2

225.7
MD

171.3

156.3

162.4

225.7
0.998

47.7

F4 241.5
1487

881.1

879.9

881.1
1.061

879.9

10.3

195.6

667.1

1.061

289.7
1.101

1.083

220

472
1.033

15.6

15.6
1.059

CUR B
2292
1.015

23

1.090

66

8.7

YZU G1 13.8
185 1.020
100.0
11.4

66

YZU G2 13.8
186 1.020

100.0
11.5

ACY B2
401

23

50.0
1.025

1.007

66

BGD B1
SLO AB
201

42.5
BPA FIC
1303

66

30.9

825

23

40.8

40.8

30.0
0.993

41.7

94.9

99.3

55.0

CAP A
293

23

CAP TA
493

34.6

30.9

60.6

68.1

69.5

354.3

CAE BP
66
333

194.4
1.046

ESA B1
334

59.8

44.0

198.0

66

127.7

56.4

38.1

40.3

92.6
0.953

108.2
COV AB
273

111.2

69.1

1.4

PIR B1
325

VIC TA
220
2418
1.049

66

CAU B1

44.3

338
1.028

49.0
1.007

GUA B1

66

51.0

QUI B1
66
337

66

PIR B1
425

20.1

220

PAR B1
335

1.040

13.1

45.2

130.4
32.5

220

1.006
159.3

32.5

39.4

45.2
1.050 0.967

99.3

52.7
1.095

26.1

7.0

COL BP
322

K15 TA
398

ADU
5401

220

66.6
1.097

66
23.3

60.3

58.6

169.0
42.8

ACYAB
281

41.9
1.060

11.8

42.8

1.015
ACYABC
1281

41.9

11.4

23
2288 1.016

220

GUA AB2
2239

24.0
23

24.5

155.8

220

MAU

23
249

PBU TA
451

220
1.092

187.3
1.069
TRI B1
354

12.6

PPO B1
355

12.8

480

SPA B1

220

66

11.811.6
34.4

34.1
1.047

71.7

487

nTS F1
1370

ENC B1
360

66

25.5
55.8 1.020

nTE F1
1360

66

66

20.8

168.7

168.7

19.9

CAM B1
378

0.938

66

0.950

39.4
CAL B1
452

CAM B2
220
478

1.063

37.8

0.950

39.1

0.993

77.7

NAT TA
453

57.3

1.022

30.1

1.063

85.6

24.2

86.9

66.5

210.4
81.7
1.045

1.000

207.9

45.6

43.5

229.2

229.2
2733.5

2688.4

663.0

1.025
YAC19G

13.2

790

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1340.0

1.028

683.2

663.3

VIN B1
457

220

PQIS B1
8480

1.033
207.9

232.0

232.0
666.7
2667.6
596.6

240.3

500

1.081

1.027
667.0

YAC B1
890
1.020

CDE B1
2304

1.001

52.9
1.058

66

220
0.980

0.980

1.009
1.046

0.925

500

1.070

220

35.9

1.096

0.925

AYO B1
856

66

1.010
38.1

26.5

66

55.6

220
456

26.2
1.051

PFO B1
389

220

26.5

1.013

AYO B1

26.2

TRI B1
454

55.6

166.7

166.7

9.7

9.9
1.008
SPP B1
362

25.2 23.6
1.006

1.078

12.7

23
240

CBO B1
380

61.9
56.3

1.033

VT2 AB

220

1.054
164.1

220
440

188.7

B1

12.8

VT2

66

500

APR BP
384

1.007

1.100

1.003

66

1.055
CBO TA

1.100

1.028

160.4

1.020

1.096
220

489

160.0
1.054

62.3
1.047

SJB TA
482
1.012

PFO TA

25.4

0.974

1.099

1.047

11.4

220
449

13.9

MAU B1

128.1

22.7

61.5
0.995

126.0

25.2

38.4
36.4
0.950
1.052

25.4

53.3

1.062

333.8

3.7

22.4

1.029

45.1

52.2

332.0
0.975

62.3
1.047

17.1

663.9
334.0
1.096

333.8

3.7
1.029

66

61.5

334.0

23

45.4

44.7

66

19.2

20.3

SRI AB

LCD B2
8889

332.0
0.975

22.7

CVP BP
305

334.0

22.4

GUA B1
339

66
VAP TA
461

220

334.0

25.2

A
261

3.4

VAP B1
361

13.3
VAP

1.023

1.015

LCD TA
4489

1.087

20.3

PMA B1
220
730
1.051

71.3
1.001

220
4488

213.0

97.9

nGI F1
66
1343

SRI B1

73.8

98.1
1.050

66

1.099

220

1.032

1337

10.2

1.099

213.0

40.5

70.7

10.2
0.993

72.5

70.4

29.5

114.1

CDE A
2204

23

23

11.5
0.975

SJN TA
4497

0.985

66

72.5

36.5

QUI B1 FIC66
1338
1.050

23.0
1.035

0.974

66.3

213.0
1.066

A
23
298

22.7

0.940
1.013

213.0

112.0

K15

0.940

12.2
ACY B3
382

7.9
4.1

26.1
1.047

66

66

12.1
0.974

26.4
1.075

ACY G4 13.8
184 60.0
G
25.7
1.045

23.0

88.7

0.957

WMA
394

7.9

15.2

43.9

3.0

1.047

23.9
CZA B1
66
376

16.8
66

3.0
0.974

73.8

16.9

GHN B1
343

VTA BP
341

51.6
1.100

33.4

89.4

220

37.4

1.000

23
296

11.5

0.967

16.3

65.3
1.090

50.9

68.6

63.0

66

15.6

SAN TA
410

23
1.042

15.6

CDO

12.4

184.3

20.3

SAN
210

RED TA
220
430 1.052

13.3

220

26.4

39.7

CAR
393

160.8

QUI B1 FIC66
1.049

16.7

VEL B1
414
1.050

156.8
35.4
1.000

40.8

57.4

220

36.5
71.8

35.9
68.4

GUA B2
5404

13.3

51.1

0.967

17.0

56.1

313.1
66

169.0

220

1.064

3.3

1.007

1.019

LAM_FIC 220
1400 1.051

0.980

346.7
1.098

113.2
FMY TA
4433

64.8

1.088
68.9

1.100

187.7

98.2

45.1
1.013

23

41.5
0.996

21.0
21.0
21.1
COV BP
66
12.5
373
1.014

20.5

46.8

24.1

45.3
45.1

VEL AB
214

302.5

K30 BP
388

1.045
ACY G3 13.8
183 60.0
G
25.7
1.045

1.060

66

45.3

1.017

133.5

1.090

311.7

0.910
26.4

33.8

91.0

38.1
66

66

1.020

9.2

66

0.993

1.051

nLT F1
1416

VIL BP
375
39.7

65.3

63.0
346.3

301.5
220

ACY G2 13.8
182 47.0
G
24.7

53.1

289.3
43.8

177.1
CDO TA
496

149.6 147.8

1.064

46.8

135.6

44.3

31.8

0.980

41.5

51.2

160.8

66

TBO B1
320

VIL B1
220
475 1.040

33.8

289.3

220

1.025
43.9

171.6

0.967

1.015

23

188.2

1.020
135.2

44.3

ITG BP
331

KM7 A
2298

23

1.008
1.068

1.020

16.9

38.0

169.9

KM7 B1
4498

1.073

109.8

23

190.3

1.018

CZU
297

32.1

167.9
1.086

ACY G1 13.8
181 47.0
G
24.7
1.045

1.090

220

497

129.8

32.1
88.1

1.062

1.004

69.2
1.047

1.046
FICT VAU 220
3409

16.7

220

K30 B1
488

220

1.047
1.6

56.6

21.7

nGR F1
66
1311

31.8

145.2
106.3

1.054

56.6

1.047

0.993

CZU TA
105.8

22.4

1.045

149.6

99.7
0.950

1.049

220
2409

67.0
1.015

95.2

MAQ B1
415

434

30.0

66
52.7

220

220

32.3

68.7

85.5

VAU B1

FDM B1
323

53.1
1.090

ESA TA

23

1.013

51.2
COV B1
402

35.9
0.993

60.2

ACYC
2281
51.0
1.047

0.900
1.027

0.993

220

52.8

220

53.5

0.950

1.030

500
0.973
359.9

VAU B1
2309

128.7

BMO A
2222

50.7
1.046

FOZ B2

1.061

289.7
182.8

0.991
CBV B1
370

899.3

804

220

177.9

1.090
PJC B1
371

882.2

900.0

228.4
1.050

280.5

YZU B1 220
481 1.097

1.035

YBY B1
66
369
0.996

882.9
1359.6

1.047
BDO B1

66

1359.5

178.0

1.007

23

2272
1.018

228.4
1.050

127.3
276.7

146.7

1683.0

500

184.3

1.053

1.019

B1
801

1.050
1480.3

21.3
CUR B1
492

143.5
1.024

CCO B1
3371

1.044

1.3

1.048
B1
66
3372

220

4466

21.2
1.030

BDO

50.9
26.0

40.9

25.9

220

40.9

48.3

BMO B1
220
4222

50.7

107.8

GDI B1
66
2311

25.9

25.9

167.4

30.5

66

1.026

68.4

IRY B1
484

21.7

41.3

13.1

0.967

48.2

CN2

0.993

9.2

225.2

333.7

SLO RE
302

51.8

66

22.0

REP B1
2308

225.2

17.5
1.100

691.5

220

50.6

1.028

1.012

PQI B1
4495
1.097
41.2

8.7

49.3
49.3

220

12.8

57.3

220

B1
4472
1.035

GAQ TA

261.1
1.028

10.2

1.068

20.5
VM1 B1
469

220
479
0.956

404

LAM B1
66
316

22.8
VAQ TA
427

28.4

0.967

0.999

58.6

SLO B1

123.5

SLO B1
66
301

40.4

1.000

22.5
22.8
1.060

1.020

23

1.016

19.2
BSP A
23
19.4
212

80.7

5.5

20.8

66.6

35.7

-92.1

91.8

91.8
25.9
1.000

17.5
1.100

17.5

220

19.5
1.060

196.4

0.980

220

48.0

0.980

34.7

67.2

28.8

25.8

LAM F1
509

CAT B1
491

19.5

220
4414

1.034

CN2

220

40.6

CYO A
285

220

193.9

1.021

CCO B1

BVN B1

0.953
25.3

1.000
66.8

209.4

43.8

107.9

69.1

ACU B1
4479

220

64.7

1.012

17.5

21.7

43.8

85.4

52.6

115.1

1.023

LAM F2
510
1.012

SGA A
23
2491 1.007

220

23

1.8

52.2

38.5

124.4

44.9
45.0

45.0
43.8

42.8

0.993

1480.5 1683.0
1.061

1.061

CON B1
66
372
1.035

41.5

69.2

220

174.2
1.019

220

72.2

67.5
96.0

220

1.048

0.993

1455.6
500

1455.6

1.027

72.3

72.3
68.1

133.6

CBV B1
1814

52.6

72.5

72.5

1.000

68.0

113.4
113.4
113.4
113.4

SRO TA
467

220

131.4

4468

VM2 B1
1469

0.8

1.033

1455.4

1.105

LUQ A
23
221
1.026

66

71.3

92.3

92.3

124.4 HOR B1
468
HOR comp 220
1.150

66
1.033

LAM_PSA AER1
1405
1.053

1.033

CAT2 A

2291 1.023

83.5

221.2 200.8
1.161

1.073

1.052

91.9

SES TA
466

403

1.018

88.9
1.051

1.033

1.000

PSA B1
313

CYO

79.4

66
1.036

43.6

102.5

102.5

66
1313

220

471

1.054

220

11.8

1.054

96.2

96.2

113.1

66.3
68.0

113.4

1.020

IPU B2
805

220

1.084

124.0

BPA B1
303

LAM B1
405

43.3

27.6

LPA B1

LAM_PSA SUB1
1406
1.054

220

485

210.4

nBC F1
1326
PSA F1
513

1.000

1407

SICBRAS
4409

LIM B1
220
409

112.7

1.100

nCP F1

LAM_PSA AER2

SGA B1

4491 1.081

66

220

MD B1
483

1.060

1.020

221.2

66

66
0.996

CMY B1 220
1.054 1409

176.0
66

LIM RE
411

LUQ TA
421

1.020

PQI B1
4395

231.6

44.7

26.1

169.3

26.7
26.7
0.997

1.054

LAM_PSA SUB2
1408
1.054

183.6

66

LIM B1
344

nBS F1
1308

PSA F2
514

0.961

198.6

16.8

16.1

176.5

ACE B1
345

0.972

PSA B2
220
4413

1.100

1683.0
1455.6
MD HER2
1516

438.4

99.3

0.7

19.4

19.6
19.6
VHA F1 3346 1.100
0.969

183.3

66
346
0.967

169.5

VHA B1

1.055

1.042
52.3

174.1

174.1

1.030

6300.0

0.900

45.0

73.5

73.1
91.7

42.1

SMI B1
308

6345.8
1.044
1.024

439.3

433.9

433.1
1.044

41.5

1.037

66
311

25.6

153.9
19.6

16.1

1.029

nPS F1
66
1306 1.036

6300.0
761.2

1005.2

986.7

351.1
55.8
145.6
0.960
1.029
PBO F1
505

44.9

73.5

73.1

23
2246
25.3
1.020
1.024

0.960

55.8
16.1

IPS B1
66
328 1.030

986.7

500

18

0.999

43.3
43.7

439.3
971.0

IPU10G
700

0.900

67.8
68.1

0.900
433.9

IPU B1
800

500

500

99.3

66

IPS_SMI_F166
3306 1.035

CEN B1

CYO B1
885

100.7

AMP B1
327
1.026

IPS_PBO_F266
4306 1.029

109.7

109.7

PBO B1
306
16.1

66

1.000

1.041
PCA F2
525

1.000

91.7

66

1.028
MRA B1
304
1.023

16.8

160.7

VCU B1
307

16.1

109.7 144.9

109.7 144.9

1.000

PCA B1
66
324 1.040

1.037

0.913

0.913

1.041
PCA F1
524

MD B2
802

500

100.6

156.2

158.1

220
158.1

PCA AB
424

VHA B1
846

155.6

155.0
161.1

66

500

23

500

AO 2018: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500 KV MARGEN DERECHA - VILLA HAYES
111.2
VHA B1

220

446
111.2
142.5

66
PBO B1

15.5

220
408

PBO F2
506 1.030

138.2

138.5

138.2

138.5

VHA AB2
43.6

43.6

130.4

1.000

135.7

23.4

17.9

17.9

309.2

17.9

309.2

310.7

1.100

310.7
0.976
F5 241.5
1483

1.134
MD

22.5
22.8
1.047

24.4

PQI B1
4495
1.095

220

22.8

41.2
IRY B1
484

21.7

220

1.134
MD

319.8
1.050

1.002

F1 241.5
1484

310.7
0.976

319.8
1.050
MD

19.5
1.060

310.7

1.100

296.4

19.5

17.9

220

PQF B2
220
590

309.2
PQF B1
490

310.7

310.7
0.976
F2 241.5
1485

1.134

220

MD

319.8

VAQ TA
427

1.007

23

1.020

28.0

28.4

244.7

249.4

220

43.8

291.8

295.7
1.092

259.5
1.054

183.5

42.9

295.7

313.3
1.099

313.3

313.6

309.2

1688.9

310.7

310.7
0.976
F3 241.5
1486

1.134
MD

309.2

310.7

377.4

161.2

170.8

66

310.7
0.976

195.3

965.5

964.5

965.5
1.054

964.5

10.3

911.4

1.054

1.101

1.076

220

472
1.016

15.6

15.6
1.045

CUR B
2292
1.015

23

1.090

66

9.5

YZU G1 13.8
185 1.046
100.0
25.3

66

YZU G2 13.8
186 1.046

100.0
25.3

BMO B1
220
4222

48.8

13.3

BMO A
2222

48.8

ACY B2
401

23

48.2
1.017

1.007

1.037

BGD B1

159.5

VAU B1
2309

66

SLO AB
201

58.4
BPA FIC
1303

66

29.6

825

23

53.0

52.8

52.8

28.2
1.039

28.9
0.993

54.5

95.9

97.4

52.8

CAP A
293

23

CAP TA
493

33.3

29.6

58.3

26.2

204.2

CAE BP
66
333

248.6
1.035

ESA B1
334

57.2

251.9

66

248.7

54.2

54.0

40.3

42.3

91.1
0.940

179.5
COV AB
273

216.6

PIR B1
325

VIC TA
220
2418
1.040

66

CAU B1

43.7

GUA B1

66

48.2

QUI B1
66
337

66

338
1.022

46.7
1.016

32.5

PIR B1
425

PAR B1
335

1.034

12.6

42.9

220

1.009
32.5

37.7

42.9
1.050 0.967

1.086

26.1

COL BP
322

K15 TA
398

14.9
ADU
5401

220

66
23.3

63.4

61.4

246.4

ACYAB
281

43.5
1.060

11.8

44.4

1.011
ACYABC
1281

43.5

11.4

23
2288 1.020

220

0.986

GUA AB2
2239

23.0
23

PFO TA

23.5

205.6

220

MAU

23
249

1.019
PBU TA
451

211.4

1.007

220
1.089

238.6
1.064
TRI B1
354

12.2

66
PPO B1
355

12.3

1.048
480

SPA B1

220

66

10.810.7
33.9

33.6
1.047

68.5

487

nTS F1
1370

ENC B1
360

66

27.3
54.6 1.019

nTE F1
1360

66

66

20.7

CAM B1
378

0.940

205.7

205.7

66

19.8

0.950

40.5
CAL B1
452

CAM B2
220
478

1.067

38.7

0.950

40.2

1.007

95.5

NAT TA
453

55.8

1.021

79.0

1.067

97.1

80.4

98.3

62.5

180.6
98.5
1.052

1.025

179.3

46.2

43.8

263.7

263.7
3194.4

3107.7

869.1

1.050
YAC19G

13.2

790
1340.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

1.071

1047.6

870.2

VIN B1
457

220

PQIS B1
8480

1.071
179.3

267.9

267.9
873.9
3042.1
974.8

210.5

500

1.084

1.067
875.0

YAC B1
890
1.048

107.8
1.059

CDE B1
2304

0.997

66

500

66

220
0.980

0.980

1.005
1.053

0.954

500

1.068

220

36.1

1.100

0.954

AYO B1
856

PFO B1
389

1.014
39.0

28.5

66

54.5

220
456

28.2
1.053

1.000

APR BP
384

1.004

1.100

220

27.4

1.021

AYO B1

28.2

TRI B1
454

54.5

202.2

202.2

8.5

8.7
1.008
SPP B1
362

25.2 23.6
1.008

1.076

12.2

23
240

80.5

1.020

VT2 AB

CBO B1
380

84.0

1.100

66

220

1.047
211.2

220
440

CBO TA

241.2

B1

12.3

VT2

1.093
220

489

204.6
1.044

59.8
1.033

SJB TA
482
1.022

1.089

1.047

11.3

220
449

13.8

MAU B1

174.1

25.4

59.3
1.005

172.2

25.2

36.7
34.9
0.950
1.045

25.4

50.7

1.055

458.6

3.6

22.7

1.029

45.2

49.8

454.3
0.975

59.8
1.033

16.9

908.7
458.4
1.091

22.4

3.6
1.023

66

59.3

458.4

23

45.4

42.5

66

LCD B2
8889

454.3
0.975

22.7

CVP BP
305

458.4

22.4

GUA B1
339

SRI AB

220

458.4

66
VAP TA
461

1.019

1.012

LCD TA
4489

458.6

A
261

3.2

VAP B1
361

12.7
VAP

220
4488

1.073

19.5

PMA B1
220
730
1.044

137.4
1.010

SRI B1

25.2

162.3

nGI F1
66
1343

1.090

220

1.005

1337

10.2

1.096

307.0

161.7
1.041

66

10.2
0.993

307.0

39.0

68.2

29.3

219.2

CDE A
2204

23

23

11.5
0.975

102.7

67.9

0.980

66

44.4

SJN TA
4497

23.0
1.029

0.968

66.3

102.7

161.0

QUI B1 FIC66
1338
1.043

A
23
298

22.7
0.940

15.0
ACY B3
382

10.7
4.1

66.6
1.095

307.4
1.041

K15

0.940
1.019

19.0

217.3

66

66

26.1
1.020

148.1

0.970

7.0
0.967

26.4
1.053

ACY G4 13.8
184 60.0
G
27.2
1.045

23.0

15.2

41.9

WMA
394

10.7

1.020

23.9
CZA B1
66
376

16.7
66

4.9

102.8

64.2

1.010

4.9
0.967

102.8

220

35.8

GHN B1
343

VTA BP
341

48.8
1.100

145.6

0.953

64.1

49.8
33.1

109.2

SAN TA
410

23
1.052

23
296

11.5

15.6

SAN
210

65.9
1.090

307.4

QUI B1 FIC66
1.042
RED TA
220
430 1.045

12.7

220

63.4

66

1.045
ACY G3 13.8
183 60.0
G
27.2
1.045

231.5

19.5

205.2
142.5
1.000

39.3

27.6

220

161.0

34.4
27.0

GUA B2
5404
1.184

68.7

16.6

VEL B1
414
1.041

CDO

11.9

256.9

19.5

66.0

0.953

16.8

55.0

428.0
CAR
393

246.4

220

1.043

3.2

53.9

26.3

39.4

461.7

66

218.5
FMY TA
4433

171.9

12.7

64.6

0.993

1.027

LAM_FIC 220
1400 1.042

416.8

K30 BP
388

231.5
151.5

151.0

64.5
1.016
66.1

1.073

232.2

30.3

66

23

0.953

1.090

1.060

65.4
64.5

VEL AB
214

41.1
0.997

21.4
21.4
21.5
COV BP
66
12.0
373
1.017

20.8

44.0

66

1.031

1.021

205.9

65.9

63.4

424.2

0.914

0.997

1.040

15.8

408.7

1.093

220

26.4

33.7

86.7

36.6
66

CDO TA
496

ACY G2 13.8
182 47.0
G
26.3

53.9

460.6

414.1

66

39.4

51.8

43.8

253.6

VIL BP
375

0.953

408.7

220

1.020

31.8

149.4 147.3

1.043
206.8

23

43.9

1.010

41.1

44.0

183.8

nLT F1
1416

23

242.7

0.967

1.018

19.3

220

66

43.8

VIL B1
220
475 1.014

33.7

0.993
182.8

43.7

ITG BP
331

KM7 A
2298

265.0

0.993

16.7

TBO B1
320

244.9

KM7 B1
4498

1.073

1.042

201.5
171.9

119.6

90.3

4.9

35.8

CZU
297

181.2

23

234.1

1.022

31.8

32.1

240.5
1.067

ACY G1 13.8
181 47.0
G
26.3
1.045

1.090

220

497

250.5

32.1
87.3

1.063

1.013

119.5
1.039

1.037
FICT VAU 220
3409

16.5

220

K30 B1
488

220

1.020
5.1

43.4

1.020
214.9

170.9

1.077

54.2

30.4

nGR F1
66
1311

66.6
0.980

CZU TA
170.9

31.9

1.037

222.2

97.8
0.950

1.072

220
2409

64.4
1.021

96.3

MAQ B1
415

434

28.9

66
68.9

220

220

15.6

70.1

86.5

VAU B1

FDM B1
323

53.9
1.090

ESA TA

23

1.025

51.8
COV B1
402

34.4
0.980

57.8

ACYC
2281
50.9
1.033

0.900
1.019

0.993

220

52.7

220

51.5

0.950

1.043

500
0.957

30.6

66

208.0

SLO RE
302

168.3

66

151.2

220

48.6

824.4

SLO B1

82.2

SLO B1
66
301

1009.6

-25.3

FOZ B2

1.054

410.1

42.0
47.7

F4 241.5
1487

410.1
199.3

0.989
CBV B1
370

985.7

804

220

193.3

1.090
PJC B1
371

967.0

986.2

319.8
1.050

385.2

YZU B1 220
481 1.101

1.035

YBY B1
66
369
0.993

967.4
1040.2

1.033
BDO B1

CCO B1
3371

1.044

177.7

0.980

23

2272
1.029

1040.2

258.9
CUR B1
492

157.9
1.010

BDO

42.3

66

2.2

1.044
B1
66
3372

HOR B1
368

MD

248.4

1.043

1.025

319.8
1.050

149.6

21.3

9.6

0.967
48.3

58.7

CN2

253.2
A
23
2266

GAQ

21.6
1.019 0.980

1688.9

500

265.5

42.3

12.6

220

0.995

220
479
0.952

21.6

10.2

12.3

57.3

220

21.2
1.022

220
4414

6.2

24.3

49.4
49.4

20.8
VM1 B1
469

220

4466

19.2
BSP A
23
19.4
212

0.953

1.065

B1
4472
1.032

GAQ TA

248.0
1.022

0.980

95.3

5.4

48.3

34.3

CYO A
285

B1
801

1.050
1485.6

32.2

54.7

36.3

70.5

139.5
93.9

32.3

53.4

GDI B1
66
2311

40.0

40.0

220

220

181.3

1.015
220

48.1

0.976

33.4

64.7
33.7

73.4

73.4
26.2

220

31.4
55.1

161.4

25.9

43.9
43.8
43.8
43.4
88.9

66.6

66.4

ACU B1
4479

1.040

27.0

163.6

92.4

1.023

CN2

0.993

15.8

CAT B1
491

2.6

31.3

REP B1
2308

BSP B1
412

CCO B1

BVN B1

0.953
24.9

20.5

66.8

148.0

33.7

53.7

0.993

1485.9 1689.2
1.055

1.055

CON B1
66
372
1.032

56.5

1.013

SGA A
23
2491 1.014

220

23

312.4

24.0

49.4
49.7
49.8

49.8
33.8
33.7

0.993

1447.1
500

1447.1

1.031

13.1

1.000

179.7

220

162.0
1.014

220

87.3

82.4
96.1

0.996

404

LAM B1
66
316

122.9

CBV B1
1814

220

1.038

15.2

40.1

40.1
1.000

120.2

1.000

LUQ A
23
221
1.017

66

LAM F1
509

1446.8

1.134

4468

403

1.047

1.014

SRO TA
467

220

HOR comp 220


1.159

VM2 B1
1469

1.136

136.9

88.9
90.3
LAM F2
510
1.014

139.5 HOR B1
468

295.5 260.5
1.182

66
1.041

1.028
1.047

CAT2 A

2291 1.016

171.3

1.022

LAM_PSA AER1
1405
1.043

1.045

176.1
1.038

SES TA
466

66
1.042

1.000

PSA B1
313

CYO

167.3

55.1

66
1313

220

471

1.044

220

11.8

45.3
86.4

102.8

102.8

73.6

73.6

1.025

IPU B2
805

220

1.077

LPA B1

LAM_PSA SUB1
1406
1.044

1.023

LAM B1
405

130.2

25.2

1.042

nBC F1
1326

220

485

82.4

BPA B1
303

1407

SICBRAS
4409

LIM B1
220
409

125.0

PSA F1
513

nCP F1

LAM_PSA AER2

SGA B1

4491 1.074

148.3

220

MD B1
483

1.047

1.020

295.5

66

66
1.001

CMY B1 220
1.040 1409

66

1.087

1.000

PQI B1
4395

56.9
66

LIM RE
411

96.3

96.3

45.7

22.3
25.9

43.9

1.025

61.1

55.1

24.5
24.5
0.993

LUQ TA
421

LAM_PSA SUB2
1408
1.044

0.939

66

LIM B1
344

1.044

PSA F2
514

1689.2
1447.1
MD HER2
1516

272.7

199.2

14.0

21.7

58.4

ACE B1
345

0.971

nBS F1
1308

6309.2

99.6

15.1

PSA B2
220
4413

1.087

16.6

16.6
16.6
VHA F1 3346 1.073
0.969

60.5

66
346
0.967

55.9

VHA B1

1.038

1.039
54.8

110.2

110.2

1.035

6395.9
1.044
1.024

0.900

49.8

67.4

67.1
91.2

44.6

SMI B1
308

500

18

273.2

271.9

271.3
1.029

129.4

1.042

66
311

24.6

135.7
16.6

21.6

1.029

nPS F1
66
1306 1.040

6300.0
1103.5

819.1
43.6
130.4
0.960
1.030
PBO F1
505

49.7

67.4

67.1

23
2246
24.4
1.007
1.023

0.960

43.6
21.6

IPS B1
66
328 1.033

273.2

271.9

41.6
41.9

IPU10G
700

0.900

65.0
65.3

0.900

IPU B1
800

500

500

99.6

66

IPS_SMI_F166
3306 1.039

CEN B1

CYO B1
885

103.2

AMP B1
327
1.027

IPS_PBO_F266
4306 1.030

101.5

101.5

PBO B1
306
15.5

66

1.000

1.045
PCA F2
525

1.000

91.2

66

1.028
MRA B1
304
1.024

13.9

151.3

VCU B1
307

21.6

101.6 134.5

101.6 134.5

1.000

PCA B1
66
324 1.044

1.022

0.900

0.900

1.045
PCA F1
524

MD B2
802

500

103.1

141.9

146.2

220
146.2

PCA AB
424

VHA B1
846

138.9

138.6
151.7

66

500

23

500

AO 2019: RGIMEN NORMAL

211.1
VHA B1
446

220

211.1
MD B2
802

166.6

30.3

40.1
40.1

BVN B1

5.9

30.8

6.8

43.0

23.7

BSP

GAQ TA
4466

216.5
1.028

29.3

25.5
1.038

23

26.6

220
GAQ

26.6
1.034 0.993

112.7
1.028

179.9

21.0

181.2
181.2

200.1
PQF B1
490

201.5
1.050

200.2

200.2
1.010
F2 241.5
1485

1.090

220

MD

154.0
1.076

196.4
1.099

196.4

1.096

201.5

196.4

200.1

200.2
1.010
F3 241.5
1486

MD

200.1

200.2

101.6

233.7
1.062

1.018

201.5
1.050
1662.5

200.2
1.010

808.0

806.8

823.6

822.5

806.4

804.7

806.4
1.067

804.7

FOZ B2

1662.6

804

201.5
1.050

F4 241.5
1487

600.1
1.067

236.1

149.7
220

1.067

268.2

126.4

130.9

66

PJC B1
371

66

147.7

151.2

195.9

268.2

1.047
11.8

23

BDO B1
472
1.043

1.100

1.087

220
16.8

16.7
1.069

CUR B
2292
1.024

2272
1.025

23

41.7

1.090

YZU G1 13.8
185 1.020
101.9

7.8

2.3

220

1.090

7.6

14.8

0.978
VM1 B1
469

1681.7

500

1681.7

200.2
1.090

MD

221.2
23

B1
801

1.050

156.4

YZU B1 220
481 1.100

1.033

YBY B1
66
369
0.993
0.987

CBV B1
370

66
CO2 B1
448

100.0
9.7
G

YZU G2 13.8
186 1.020

100.0
9.8

1.075

220
112.1

2.4

220
479
0.927

BMO A
2222

55.9

23
CO2 AB
248

54.9
1.026

1.007

SLO AB
201

44.2

66
BPA FIC
1303

42.5

42.5

66

35.2

825

23

34.1
0.993

43.5

99.2

103.7

62.7

CAP A
293

23

CAP TA
493

1.026

37.6

99.6

ESA TA

64.8

46.5

112.2

61.0

191.2
1.052

ESA B1
334

37.6

39.6

195.3

66

84.2

92.9

98.3
0.967

79.9

63.0

VIC TA
220
2418
1.055

66

46.7

GUA B1
404

COV AB
273

73.3

PIR B1
325

66

53.2

48.2

PIR B1
425

66
338
0.974

220

103.4

22.2

1.079

43.3

48.2
1.054 0.967

30.1

186.9

23

71.0

296

33.7

28.8

K15 TA
398

ADU
5401

220

73.4
1.097

66
23.2

47.4

46.7

144.1

ACYAB
281

39.0
1.047

11.4

1.011
ACYABC
1281

39.0

29.9

SRI AB

23
2288 1.015

220

153.7
1.058

1.047
SJB TA
482

35.0
23

36.4

147.7

220

MAU

23
249

PBU TA
451

TRI B1

14.1

1.092

PPO B1
355

14.4

1.062

220
440

66

7.0 6.8

nTS F1
1370

ENC B1

66

nTE F1
1360

66

360

34.3

33.7
1.033

72.5

28.6 26.5
1.008

5.5

5.7
1.007

164.4

164.4

166.3

166.3

18.5

COS B1
3363

18.8
1.047

66

22.7

CAM B1
378
66

66
1.033

TRI B1
454

21.6

0.950

38.4

1.058

35.8

0.950

37.2
NAT TA
453

38.2

1.017
1.015

30.7

30.9

38.4
1.018

19.5

102.6

672.0

2739.9

2698.3

668.3

1.025
YAC19G

13.2

790
1340.0

1.055

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

68.4

1.046

1.025

242.3

48.9

46.9

245.3
75.7

234.1
272.2

1.075

VIN B1
457

220
PQIS B1
8480

1.060
242.3

234.1

650.4

500

668.6

672.3

YAC B1
890
1.045
2678.7
576.1

34.2
1.057

220
0.950

0.950

1.035

1.054

66
2304

29.1
1.048

0.954

500

CDE B1
0.997

0.950
28.5
101.3

0.954

AYO B1
856

1.070

220

38.2
1.033

1.092
231.6

220
456

231.6

AYO B1

71.6

66

220

37.5
CAL B1
452

CAM B2
220
478

1.062

PFO B1
389

0.998
36.0

18.9

66

45.9
20.5

18.8

45.7 1.018

SPP B1
362
0.928

1.076

14.2

23
240

48.2

157.5

220

54.3

28.5

SPA B1
487

VT2 AB

CBO B1
380

1.033

66

220

1.062
182.2

B1

14.4

VT2

CBO TA
480

1.003

66

354

220

180.9
1.069

500

APR BP
384

1.006

1.100

1.030

152.0

1.007

2239

1.100

19.0

65.1

57.6

1.000

1.097
220

489

41.5

64.2

1.014
GUA AB2

PFO TA

1.047

57.9

0.978

56.9

120.0

19.3

55.7

117.6

19.3

18.1

1.100

30.2

220
449

31.7

MAU B1

41.3

41.6
40.3
1.022
1.003

299.6

3.9

19.0

0.993

299.6

3.9

65.1
1.047

1.067

23
1.014

66

64.2

298.9
0.975

41.5

48.1

66

597.8
299.9
1.097

19.3

CVP BP
305

299.9

41.3

12.5

66
VAP TA
461

LCD B2
8889

298.9
0.975

19.0

GUA B1
339

VAP B1
361

299.9

170.0

VAP

261

3.7

22.5

220

299.9

66.4

66

1.012

LCD TA
4489

1.087

14.7

PMA B1
220
730
1.058

53.4
1.004

1.019

1.098

64.2

73.3

nGI F1
66
1343

220
4488

66.4

73.5
1.060

QUI B1 FIC66
1338
1.001

40.5

70.2

SRI B1

9.7
0.993

170.0

69.9

9.7

1.100

220

1337

CDE A
2204

23

23

11.1
0.975

40.5

169.7

64.2

18.9

0.996

66

76.7

SJN TA
4497

22.9
1.027

1.003

73.1

40.5

1.031

23

298

ACY B3
382

8.3
4.2

22.6

0.958
1.044

169.7

1.077

K15

0.958

6.4

137.2

74.1

66

66

28.4
1.020

1.081

COL BP
322

ACY G4 13.8
184 60.0
G
25.9
1.045

6.2
1.003

CZA B1
66
376

1.045
ACY G3 13.8
183 60.0
G
25.9
1.045

22.9
7.2

66.3

0.960

WMA
394

8.3

14.6

47.2

14.8

1.096

28.4

17.6
66

14.8
1.005

69.1

GHN B1
343

VTA BP
341

69.0
1.060

1.020

24.9

13.6

1.090

66

12.5

220

36.5
34.8

1.003

14.9

RED TA
220
430 1.059

1.000
SAN TA
410

0.980

34.5

144.1

220

QUI B1 FIC66
1.000

70.1

23
1.051

CAR
393

161.0

22.4

66

65.4

19.0

152.5
18.6

14.7

SAN
210

K30 BP
388

63.0

14.9

220

18.9

35.5
92.4

37.7

40.8

220

27.1

48.3

0.900

1.090
321.1

75.9
FMY TA
4433

22.4

GUA B2
5404

17.0

VEL B1
414
1.060

51.1
1.033

65.4

63.0
320.8

284.4

ACY G2 13.8
182 47.0
G
25.0

53.2

1.098

137.2

14.7

52.8

0.980

18.0

58.6

1.100

87.6

1.080
68.2

1.007
57.2

48.0
272.9

283.3

CDO

48.3

29.4
29.4
30.6
COV BP
66
13.7
373
1.095

27.8

1.078

42.1

23

106.4

28.8

31.1

50.1

21.7

3.7

1.028

220

0.996

1.073

86.6

1.020
VEL AB
214

66

51.3

ACY G1 13.8
181 47.0
G
25.0
1.045

1.047

42.4
42.1

47.9

272.2

176.3 173.0

92.7

42.0
PAR B1
66
335

0.989

14.4

VIL BP
375

268.0

220

1.020

CDO TA
496

147.7

53.2

268.0

1.073

0.900
51.1

50.1

66

1.026

42.3

1.022

VIL B1
220
475 1.041

31.1

1.023

1.060

66

23

KM7 B1
4498

23

164.1

30.1

155.1

KM7 A
2298

152.1

0.967

1.020

134.8

nLT F1
1416

145.3

35.1
1.005

1.075

23

1.020
QUI B1
66
337

CAU B1

220

66

5.9

CZU
297

35.8

81.9

1.020

134.5

46.7

ITG BP
331

1.012

1.090
1.090

220

497

189.8

50.9
1.008

46.7

220

86.8

35.8

1.055

0.998

63.2
1.053

17.6

TBO B1
320

35.1

120.1
89.6

143.6
1.090

1.047

61.3

16.9

123.8
1.047

0.993

CAE BP
66
333

K30 B1
488

220

220

CZU TA
89.1

6.1

1.023

MAQ B1
415

481.6

1.061

1.051
FICT VAU 220
3409

41.7

220

104.1
0.950

25.4

61.3

COV B1
402

434
76.0

23

49.2
1.047

39.2

72.9
1.016

54.5

51.1

51.3

34.1

66

1.051

ACYC
2281

500

35.6

FDM B1
323

1.058

220
2409

220

0.994

0.900

0.993

35.2

ACY B2
401

1.053
23

220

60.7

0.950

1.036

24.4

21.6

200.2
1.010

MD

PQF B2
220
590

1.090

1.007

CCO B1
3371

BGD B1

6.0

21.6

21.6

142.9

46.9

37.9

69.5

86.2

62.5

92.2

VAU B1

GDI B1
66
2311

92.3

F1 241.5
1484

1479.2

220

42.1

15.5

1.043

0.993

92.3

200.2
1.090
MD

10.2

BMO B1
220
4222

55.9
1.051

62.3

LAM_FIC 220
1400 1.062

220

200.1

182.7

220

55.7

0.993

5.9

IRY B1
484

15.9
1.100

1.001

672.6

52.5

VAU B1
2309

1.032

1.019

LAM B1
66
316

220

45.2

26.0

115.2

493.0

29.4

42.7

REP B1
2308

140.0

CUR B1
492

BDO

42.1

102.6

66

51.6

19.6

1.000

201.5
1.050

2266
23.2
A
212

11.7

HOR B1
368

22.5

63.0

SLO B1
403

146.9

SLO B1
66
301

102.1

102.1
1.000

31.4

0.967

22.7

72.3

53.5

36.2

ACU B1
220
4479 0.954

CON B1
66
1.023
372

-93.4

66

302

29.3

nGR F1
66
1311

PQI B1
4495
1.097

23.8
VAQ TA
427

220

1.072

VM2 B1
220
1469 0.978

1.034

509

1.019

200.2
1.010
F5 241.5
1483

4414

63.8

29.2

SLO RE

45.6

LAM F1

1.019
21.6

510

200.2
1.090
MD

15.9

220

21.5

25.3

1.020

23

1.022

0.980

45.1

1.034

72.6

1.038
B1
66
3372

CN2

140.2

66

50.5

42.2

69.9

92.2

55.7

105.1
55.9

48.8

73.2

73.2

155.7
155.7
155.5

CYO A
285

37.6

LAM F2

24.9
25.3
1.060

142.3

220

105.3

45.8
50.9

116.8

66
43.1

1.020

200.1

1.020

1.028
1.020

220

220

140.5

1.029

41.2

30.0

1.033

54.3

0.993

8.6

53.4

104.1

104.1

1.060

118.7

CCO B1

1.033

LPA B1

1.064

220

CAT B1
491

21.4
1.060

1.032

LAM_PSA AER1
1405
1.064

LAM B1
405

54.0

54.3

244.5

0.993
70.2

37.3

140.3

72.4

1.053

1.081

PSA B1
313

117.2
1.024

220

35.7

32.0

66
1.039

1.000

1.024

76.7

40.2
49.0
49.0

1407

BSP B1
412

471
0.940

220

LUQ A
23
221
1.029

BPA B1
303

LAM_PSA AER2

71.9

CBV B1
1814

0.967

92.1

155.8

LAM_PSA SUB1
1406
1.064

220

1.035

50.9

66
1313

SRO TA
467

220

67.8

1.000

CN2 B1
4472

1479.3 1681.7
1.067

1.067
15.9

144.4

1.104
4468

42.7

106.6

106.6

73.3

73.3

nCP F1

1.000

HOR B1
468

76.8

66
1.041

nBC F1
1326
PSA F1
513

23

2291 1.020

63.9

1.059

220

CAT2 A

SGA A
23
2491 1.006

220

72.9

60.6

147.7

100.5

1.100

1.026

70.6
1.057

SES TA

30.7
1.075

1467.1
500

1467.1

1.086
11.8

71.9

86.1

50.5

209.7

209.7
90.8

100.5

154.8

92.1

155.8

1.026

1.033

245.7

LUQ TA
421

LAM_PSA SUB2
1408
1.064

CYO

485
23.9

66

1.065

PSA F2
514

220

466

PSA B2
220
4413

220

4491 1.082

23.6

LIM RE
411

nBS F1
1308

1467.0

1.060
SGA B1
SICBRAS
4409

LIM B1
220
409

49.0

SMI B1
308

IPU B2
805

220

1.100

196.2

40.0

22.6

233.0
240.8
66

30.7

MD B1
483

15.9

20.3

CMY B1 220
1.065 1409

181.4

12.8

15.2

251.0

23.0
23.0
0.996

66

66
0.999

242.8

311

1.100

PQI B1
4395

HOR comp 220

42.0

1.035

1467.1
MD HER2
1516

0.986

109.9

66

LIM B1
344

40.1

76.5

76.2
91.3

66

211.0
577.5

20.6

21.5

66
1.042

1.042

CEN B1

1681.7

0.900

20.6
20.6
VHA F1 3346 1.100
0.974

ACE B1
345

40.1

76.6

76.2

66
0.970

6307.6

198.8

VHA B1
346

8.6

0.974

IPS_SMI_F166
3306 1.041

nPS F1
1306

578.6

565.5

564.3
20.5

15.2

1.040

IPS B1
66
328 1.038

25.3
1.070

168.8
1.060

6315.1
1.043
1.024

99.4

168.8
0.960

99.4

159.1

66.2
159.1
0.960
1.041
PBO F1
505

100.5

66.2
1.000

66.1

758.8

500

100.5

66.1
44.3

44.4

764.9

1.024
CYO B1
885

249.9

69.5

764.9

500

18

770.4
0.900

23
2246
25.1
1.033
1.027

IPU10G
700
6300.0
G
436.6

578.6

565.5

167.2

166.5

408

VHA AB2

15.2

IPS_PBO_F266
4306 1.040

220

PBO F2
506 1.041

IPU B1
800

500

747.5
759.3

233.9

66

PBO B1

17.4
69.4

15.2

112.2 151.8

112.2 151.8
112.1

AMP B1
327
1.039

167.2

166.5

PBO B1
66
306
17.4

66

1.000

1.046
PCA F2
525

1.000

91.3

66

1.039
MRA B1
304
1.036

12.8

165.0

VCU B1
307

112.1

1.000

PCA B1
66
324 1.045

1.053

0.927

0.927

1.046
PCA F1
524

500

0.900

10.2

165.5

165.0

220
165.0

PCA AB
424

VHA B1
846

167.6

166.9
165.4

66

500

23

500

AO 2019: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500KV MARGEN DERECHA - VILLA HAYES
188.1
VHA B1
446

220

188.1
MD B2
802

157.9

53.4
53.5

CYO A
285

30.9

BVN B1

6.8

43.7

29.5

26.6

220
GAQ

26.6
1.002 0.967

1.036

233.5

236.1
236.1

258.8
PQF B1
490

259.8
0.985

265.8
1.050

259.8

259.8
0.985
F2 241.5
1485

1.119

220

MD

202.2
1.050

252.0
1.097

252.0

1.091

265.8

252.2

258.8

1678.7

500

1678.7

259.8

259.8
0.985
F3 241.5
1486

1.119
MD

258.8

259.8

265.8
1.050
1798.4

259.8
0.985

1.119
MD

226.9
23

B1
801

1.050

793.4

792.2

808.7

807.5

791.8

790.1

791.8
1.058

790.1

FOZ B2

1798.5

804

206.7

113.5

302.1
1.027

1.013

265.8
1.050

F4 241.5
1487

771.7
1.058

307.6

199.7
220

1.059

353.1

143.7

149.3

PJC B1
371

66

170.5

195.1

353.1

1.033

0.980

66

166.0

11.8

23

BDO B1
472
1.019

1.098

1.073

220
16.8

16.7
1.048

CUR B
2292
1.017

2272
1.029

23

42.5

1.090

YZU G1 13.8
185 1.020
114.6

7.9

1.9

220

1.090

7.8

14.9

0.963
VM1 B1
469

0.985
CBV B1
370

66
CO2 B1
448

100.0
15.3
G

YZU G2 13.8
186 1.020

100.0
15.3

1.037

220
124.8

2.2

220
479
0.910

BMO A
2222

55.8

23
CO2 AB
248

54.9
1.029

0.967

SLO AB
201

48.0

66
BPA FIC
1303

44.5

44.5

66

35.3

825

23

34.1
0.967

45.5

94.3

95.9

62.9

CAP A
293

23

CAP TA
493

1.014

FDM B1

37.6

94.6

ESA TA

64.7

124.9
1.020

0.953

61.2

216.5
1.012

ESA B1
334

40.6

43.0

221.3

66

159.6

96.1

101.7
0.927

123.8

66.1

VIC TA
220
2418
1.015

66

39.5

GUA B1
404

COV AB
273

139.0

PIR B1
325

66

55.9

49.6

PIR B1
425

66
338
0.944

220

148.4

22.2

1.034

43.3

49.6
1.053 0.927

30.3

211.5

69.8
33.4

28.9

K15 TA
398

ADU
5401

220

73.3
1.093

66
23.2

49.4

48.6

193.1

ACYAB
281

39.0
1.047

11.4

1.028
ACYABC
1281

39.0

29.7

SRI AB

23
2288 1.017

220

166.4
1.029

1.007
SJB TA
482

35.0
23

36.4

159.8

220

MAU

23
249

PBU TA
451

TRI B1

14.1

1.088

66

354

PPO B1
355

14.4

1.020

220
440

CBO TA
480

53.5

171.8

220

6.6 6.4

nTS F1
1370

ENC B1

66

nTE F1
1360

66

360

33.5

32.9
1.033

66.5

28.5 26.4
1.015

5.8

6.1
1.016

174.4

174.4

176.8

176.8

COS B1
3363

19.7
1.058

66

22.6

CAM B1
378
66

66
1.033

TRI B1
454

21.5

0.950

38.4

1.069

36.1

0.950

37.5
NAT TA
453

38.2

1.016
1.025

30.7

30.9

38.4
1.028

48.9

108.6

691.3

2805.8

2743.7

687.4

1.025
YAC19G

13.2

790
1340.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin
1.049

61.5

1.057

1.000

199.7

48.7

46.9

201.0
81.5

243.1
224.7

1.080

VIN B1
457

220
PQIS B1
8480

1.050
199.7

243.1

711.2

500

689.3

693.1

YAC B1
890
1.047
2692.9
788.0

78.9
1.062

220
0.950

0.950

1.031

1.046

66
2304

23.1
1.058

0.940

500

CDE B1
0.994

0.950
48.0
107.3

0.940

AYO B1
856

1.070

220

38.2
1.033

1.097
239.4

220
456

239.4

AYO B1

78.2

66

220

37.8
CAL B1
452

CAM B2
220
478

1.068

PFO B1
389

1.011
36.3

19.8

66

45.9
13.4

19.7

45.7 1.029

SPP B1
362
0.937

1.073

14.2

19.3

79.7

SPA B1
487

23
240

66

380

0.993

VT2 AB

CBO B1

57.2

0.999

66

220

1.020
198.6

B1

14.4

VT2

220

196.5
1.058

500

APR BP
384

1.003

1.100

1.019

165.4

0.967

2239

1.100

19.0

65.2

57.6

0.997

1.093
220

489

42.5

64.1

1.014
GUA AB2

PFO TA

1.047

57.9

0.975

56.9

129.4

19.3

55.7

127.5

19.3

17.5

1.089

32.4

220
449

33.8

MAU B1

42.2

41.7
40.4
1.022
0.974

386.8

3.9

19.0

0.957

386.8

3.9

65.2
1.007

1.058

23
1.022

66

64.1

384.5
0.975

42.5

48.2

66

769.1
386.9
1.092

19.3

CVP BP
305

386.9

42.2

12.5

66
VAP TA
461

LCD B2
8889

384.5
0.975

19.0

GUA B1
339

VAP B1
361

386.9

227.1

VAP

261

3.7

22.5

220

386.9

92.8

66

1.009

LCD TA
4489

1.073

14.8

PMA B1
220
730
1.016

89.9
1.000

1.016

1.095

92.3

107.7

nGI F1
66
1343

220
4488

92.8

107.7
1.014

QUI B1 FIC66
1338
0.972

40.5

70.3

SRI B1

9.7
0.993

227.1

70.0

9.7

1.088

220

1337

CDE A
2204

23

23

11.1
0.957

40.4

227.1

92.3

49.4

0.994

66

142.0

SJN TA
4497

22.9
1.025

1.002

73.1

40.4

0.991

23

298

ACY B3
382

9.9
4.2

22.6

0.958
1.016

227.1

1.038

K15

0.958

8.9

182.0

139.9

66

66

28.4
1.020

1.054

COL BP
322

ACY G4 13.8
184 60.0
G
28.1
1.045

8.8
1.003

CZA B1
66
376

ACY G2 13.8
182 47.0
G
27.2
1.045
ACY G3 13.8
183 60.0
G
28.1
1.045

22.9
7.2

120.8

0.957

WMA
394

9.9

14.6

47.3

15.3

1.085

28.4

16.9
66

15.3
1.005

119.3

GHN B1
343

VTA BP
341

67.6
1.047

1.020

24.8

13.7

1.090

66

12.5

220

36.5
1.0

1.000

23
296

14.9

RED TA
220
430 1.017

1.000
SAN TA
410

0.940

1.2

193.1

220

QUI B1 FIC66
0.970

70.1

23
1.049

22.4

27.2

47.3

0.900

CAR
393

18.8

177.8
47.2

14.8

SAN
210

50.1
1.002

66

66.3

14.9

220

49.4

35.5
57.5

91.0

40.8

220

K30 BP
388

63.7

208.0
CDO

47.3

1.090
395.9

141.2
FMY TA
4433

22.4

GUA B2
5404

16.2

VEL B1
414
1.014

151.9

66.3

63.7
395.0

358.9

ACY G1 13.8
181 47.0
G
27.2
1.045

54.3

1.092

182.0

14.8

51.0

0.940

17.4

58.7

1.087

114.1

1.066
68.2

0.967
57.3

48.1
346.9

356.0

0.948

26.7
26.7
27.6
COV BP
66
13.8
373
1.051

25.5

1.034

36.3

23

220

28.9

31.5

51.7

10.5

3.7

1.024

47.9

1.027

113.3

1.016
VEL AB
214

66

52.2

352.1

344.9

175.4 171.5

86.2

42.0
PAR B1
66
335

0.959

14.5

VIL BP
375

352.1

220

1.015

CDO TA
496

193.5

54.3

1.047

36.4
36.3

23

KM7 B1
4498

23

1.073

0.900
50.1

51.7

66

1.017

36.5

1.016

VIL B1
220
475 1.002

31.5

0.980
181.0

KM7 A
2298

213.8

30.3

1.016

66

193.1

201.5

0.927

1.019

137.4

nLT F1
1416

190.1
1.069

35.1
0.998

1.041

23

1.020
QUI B1
66
337

CAU B1

220

66

1.3

CZU
297

35.9

125.4

1.020

136.9

39.5

ITG BP
331

1.023

1.090
1.090

220

497

215.2

53.5
1.004

39.5

220

161.8

35.9

1.055

0.995

66.0
1.015

16.8

TBO B1
320

35.1

164.5
121.8

CAE BP
66
333

K30 B1
488

220

1.020

61.5

16.2

170.1

CZU TA
121.5

5.3

1.016

MAQ B1
415

96.2
0.950

1.012
FICT VAU 220
3409

41.4

220

360.9

1.050

39.3

COV B1
402

220

76.0

23

49.2
1.033

434

22.5

61.5

51.0

39.2

72.9
1.019

52.5

1.012

ACYC
2281

500

52.2

34.1

66

323

1.047

220
2409

220

0.952

0.900

0.967

35.3

ACY B2
401

1.057
23

220

60.8

0.950

1.024

21.8

17.8

46.7

26.0

132.7

CCO B1
3371

BGD B1

5.1

17.7

17.7

F1 241.5
1484

1476.6

220

37.9

61.4

62.3

62.7

57.2

VAU B1

GDI B1
66
2311

57.4

259.8
1.119
MD

MD

PQF B2
220
590

YZU B1 220
481 1.090

1.026

YBY B1
66
369
0.993

0.953

57.4

220

258.8

10.2

BMO B1
220
4222

55.8
1.013

62.5

LAM_FIC 220
1400 1.015

IRY B1
484

16.3
1.100

1.000

366.8

220

55.7

0.967

1.3

191.0

35.8

VAU B1
2309

1.020

1.015

LAM B1
66
316

186.3

CUR B1
492

129.6
1.006

369.3

20.7

44.6

REP B1
2308

220

45.3

42.9

15.6

66

98.3

8.3

1.000

265.8
1.050

735.2

101.8

64.9

302

20.7

nGR F1
66
1311

259.8
0.985
F5 241.5
1483

2266
25.6
1.006

23

BDO

42.9

102.9

HOR B1
368

22.5

72.8

GAQ TA
4466

222.3
1.029

23.2
A
212

11.7

22.7

63.1

SLO B1
403

133.3

SLO B1
66
301

107.4

107.4
1.000

31.5

0.953

1.075

72.5

53.6

36.3

-46.0

66

1.021

509

1.016

PQI B1
4495
1.093

23.8
VAQ TA
427

220

63.9

29.6

SLO RE

43.8

LAM F1

1.016
17.8

510

259.8

4414
5.9

ACU B1
220
4479 0.939

23.7

BSP

91.0

LAM F2

258.8
1.119
MD

16.4

220

21.5

25.3

0.993

23

1.014

0.953

63.1

1.016

VM2 B1
220
1469 0.964

118.9

66

37.0

41.8

61.8

57.2

43.7

85.4
56.0

47.2
37.2

118.3

66
46.7

0.967

24.9
25.3
1.047

149.4

220

105.8

CON B1
66
1.020
372

57.2

64.9

131.4
131.4
131.3

1.035
B1
66
3372

CN2

54.3

0.967

1476.8 1678.8
1.058

0.980

1.021
0.967

220

220

147.7

1.002

59.3

30.3

1.017

54.3

225.0

0.967
70.3

37.4

119.0

72.5

1.015

11.2

90.2

110.8

110.8

1.013

127.0

CCO B1

1.015

LPA B1

1.016

220

CAT B1
491

21.4
1.047

1.023

LAM_PSA AER1
1405
1.016

LAM B1
405

40.0

0.953

1.087

PSA B1
313

125.5
1.003

220

54.0

48.9

66
1.026

1.000

1.018

BSP B1
412

471

44.0

66
1313

LAM_PSA SUB1
1406
1.017
131.5

1407

220

LUQ A
23
221
1.017

BPA B1
303

LAM_PSA AER2

CBV B1
1814

0.927

37.2

nCP F1

85.2

130.3

53.4
47.3
47.3

99.3
103.0

103.0

65.0

65.0

1.020

220

1.024

66
1.028

nBC F1
1326
PSA F1
513

1.000

80.8

1.000

26.8
62.0

36.8

186.8

186.8
99.3

56.4

130.5

57.2

131.5

1.020

SRO TA
467

220

117.2

1.033

16.3
1.100

190.5

1.138
4468

CN2 B1
4472

1468.4
500

1468.4
1.058

19.4

130.3 HOR B1
468

246.8 220.7
1.143

1.022

220

23

2291 1.019

113.1
SES TA

133.9

LUQ TA
421

CAT2 A

SGA A
23
2491 1.005

220

122.3

109.5

226.3

1.017

1468.1

1.071
11.8

66

PSA B2
220
4413

LAM_PSA SUB2
1408
1.016

119.3
1.019

466

nBS F1
1308

PSA F2
514

485
69.0

311

1.033

CYO

0.993

47.4

26.0

1.025

220

4491 1.067
220

HOR comp 220

SMI B1
308

IPU B2
805

220

1.060
SGA B1
SICBRAS
4409

LIM B1
220
409

27.7

246.8

MD B1
483

16.4

20.1

53.0

26.1

165.5
172.5
66

26.7
26.7
0.993

53.5

79.4

CMY B1 220
1.022 1409

251.5

16.7

21.9

180.2
66

LIM B1
344

66

66
0.997

173.0

ACE B1
345

PQI B1
4395

236.5

66
0.962

1468.4
MD HER2
1516

0.934

91.4

198.4

21.9

19.7

VHA B1
346

11.2

53.4

79.4

79.0
79.0

67.6

66

390.9
485.2

19.5

19.7
19.7
VHA F1 3346 1.073
0.964

LIM RE
411

66
1.027

1.030

CEN B1

1678.8

0.900
478.5

1.014

67.8

IPS_SMI_F166
3306 1.026

nPS F1
1306

486.1

479.5

152.5

0.967

IPS B1
66
328 1.017

25.4
1.023

1.013

6300.8

99.2

152.5

53.2
146.3
0.960
1.014
PBO F1
505

99.2

146.3
0.960

53.1

6358.1
1.043
1.024

500

101.2

53.2
1.000

CYO B1
885

101.2

53.1
44.2

44.3

500

18

0.900
23
2246
25.1
0.993
1.020

179.9

69.9

IPU10G
700
6300.0
G
857.4

486.1

479.5

154.9

154.3

408

VHA AB2

21.9

IPS_PBO_F266
4306 1.013

220

PBO F2
506 1.014

IPU B1
800

500

1161.2
1087.4

165.7

66

PBO B1

17.4
69.8

21.9

107.3 147.5

107.3 147.5
107.2

AMP B1
327
1.012

154.9

154.3

PBO B1
66
306
17.4

66

1.000

1.033
PCA F2
525

1.000

67.3

66

1.011
MRA B1
304
1.007

16.6

163.3

VCU B1
307

107.2

1.000

PCA B1
66
324 1.032

1.007

0.900

0.900

1.033
PCA F1
524

500

0.900

10.2

156.7

159.7

220
159.7

PCA AB
424

VHA B1
846

155.3

154.7
163.9

66

500

23

500

AO 2020: RGIMEN NORMAL

228.4
VHA B1

220

446
0.900

228.4
187.9

452.7

VHA B1

460.2

500

MD B2
802

846
180.5

22.3

BVN B1

33.9

220

4466

30.2
A
23
212

28.3
1.032

29.5

149.4

152.5

31.9

22.9
202.0

PQF B2
220
590

220

50.6

200.2

201.8

201.8

66

PQF B1
490

BPA FIC
1303

164.7
1.072

66

220.5

224.2

B1
801

1677.6

500

1677.6

224.5

224.5
1.012
F3 241.5
1486

1.090
MD

224.2

224.5

113.6

1.058

226.6
1.050
2124.0

714.0

711.9

727.7

725.7

712.6

710.0

712.6
1.072

710.1

2124.1

224.5
1.012

137.2

0.993

BDO B1

66

13.6

23

2272
1.025

142.4
1.047

F4 241.5
1487

677.2
1.072

263.4

220

1.073

302.3

160.3

164.5

195.8

302.3
1.101

1.085

220

472
1.031

18.0

18.0
1.061

CUR B
2292
1.015

23

45.2
16.1
2.8

220

99.4

24.5

YZU B1 220
481 1.099

99.4

3371

1.090
PJC B1
371

1.029

1.090

66

YZU G1 13.8
185 1.020

0.980
CBV B1
370

66
CO2 B1
448

100.0
10.5
G

YZU G2 13.8
186 1.020

100.0
10.6

1.071

220

2.9

23
CO2 AB
248

825

23

105.9

62.8

CAP

23

CAP TA
493

220

0.900
ESA TA

ACYC
2281
50.3

1.029

0.993

38.0

62.8

FDM B1

COV B1

220

MAQ B1
415

402

267.1

145.7

K30 B1

220

101.8

76.6

266.6

206.7
1.051

ESA B1
334

66.5

37.4

211.5

66

88.4

62.8

45.6

49.2

101.7

84.3

0.967

COV AB
273

76.8

61.3

VIC TA
220
2418
1.052

66

37.8

QUI B1
66
337

66

338
0.968
GUA B1

PIR B1
325

66

55.5

51.7

110.3
33.4

PIR B1
425

1.011

220

169.1

33.4

24.1

220

PAR B1
335

0.984

15.6

46.2
66

47.9

51.7
1.045 0.967

1.100

54.0
203.3

220

77.3
35.1

WMA
394

31.0

7.3

7.4

31.6

COL BP
322

K15 TA
398

ADU
5401

220

5.1
ACY B3
382

7.3
4.2

80.8
1.098

0.999

80.5

66
25.2

51.6

50.8

154.4
42.6
12.5

1.026
ACYABC
1281

23
2288 1.025

141.5
1.057

220

MAU

168.3
1.073

CBO B1
380

66

SPP B1
362

66

YUT B1

35.8

33.3

6.8

58.1

220
440

nTS F1
1370

47.0

PBU TA
451

159.8

159.8
161.5

127.3

1.025

130.0

220
456

SPA B1
487

2697.9

667.0

1.025
13.2
1340.0

1.043

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

nTE F1
1360

18.4

18.4
1.053

25.0

66

CAM B1
378

220

1.033

49.2
20.3

64.3

COS B1
3363

66

66

41.3

33.5

33.6

23.6

0.950

40.2
CAL B1
452

CAM B2
220
478

1.063

38.2

0.950

39.9

NAT TA
453

41.2

41.3
1.024

1.000

1.072

220

CDE B1
0.993

66
2304

0.950

0.950
0.950

24.8
104.2

21.2

105.4

56.1
1.062

27.9
214.2
68.4

1.000

1.054

PQIS B1
8480

1.046
212.7

183.3
238.2

66

220

41.2
1.033

1.067

PFO B1
389

0.996
38.5

18.5

0.940

588.2

183.3

183.4

0.940

76.5

181.8

181.9

181.8
670.7

2743.5

66

1.100

220

1.026

667.5

500

1.035

1.100

1.042
671.3

YAC B1
890

500

18.1
49.0 1.026

TRI B1
454

1.055

0.940

AYO B1
856

3.1

1.093

66

0.980

1.021

AYO B1

ENC B1
360

66

3.1
1.029

1.046

220

161.5

15.5

23
240

9.5

220

55.0

VT2 AB

1.081

45.2

80.1

1.081
VIN B1
457

9.5

45.9
38.5

144.8

169.4

78.1

15.7

1.020

PPO B1
355

220

1.059

1.100

1.026

66

0.951

480

73.6

B1

CBO TA

TRI B1
354

6.8

0.966

VT2

YAC19G
790

23
249

66

363

58.1
1.057

2674.3
G
612.3

136.0

20.9

132.2

45.1

39.3
0.993

63.7

37.6
23

500

APR BP
384

1.004

64.0

73.5
1.033

SJB TA
482
GUA AB2
2239

1.099
220

489

21.3

71.5
0.996

1.019

PFO TA

20.9

62.2

1.098

1.047

32.1

220
449

33.5

MAU B1

103.8

45.1

60.7
0.971

101.6

45.0

45.4
43.8
1.020
1.000

21.3

1.033

18.3

1.071

338.0

4.3

21.3

0.975

73.5

20.9

4.3
1.029

66

71.5

337.9
0.975

86.2

53.1

66

675.8
338.4
1.100

23
261

97.6

CVP BP
305

338.4

338.0

31.7

24.3

SRI AB
220

45.0

VAP

GUA B1
339

66
VAP TA
461

LCD B2
8889

337.9
0.975

178.4

0.996

4.0

VAP B1
361

338.4

97.6

66

24.4

16.0

PMA B1
220
730
1.053

61.4

220

338.4

178.4

105.1

nGI F1
66
1343

LCD TA
4489

1.073

86.2

105.0
1.054

220
4488

1.014

1.010

1.099
SRI B1

10.6

1.100

84.9

40.5

70.7

220

10.6
0.993

84.9

70.4

SJN TA
4497
1.030

CDE A
2204

23

23

12.1
0.957

42.6

178.1

80.6

1337

QUI B1 FIC66
1338
0.997

25.0

0.993

ACYAB
281

1.047

44.4

A
23
298

24.7

66

44.4

1.073

K15

0.975

0.975
1.036

13.6

77.7

66

66

31.0
1.020

1.077

4.9
0.999

CZA B1
66
376

ACY G4 13.8
184 60.0
G
25.1
1.045

24.9

15.9

52.0
0.950

14.2

1.095

17.4
66

14.3
1.001

212.6

GHN B1
343

VTA BP
341

74.9
1.060

13.6

-34.3

64.8
38.1

0.995

23
296

16.3

62.8

220

RED TA
220
430 1.054

16.0

0.980

37.6

65.0
1.090

178.1

QUI B1 FIC66
0.996

16.2

SAN TA
410

23
1.043

1.020

23.6

14.9

62.8

66

19.6

166.0
35.5
1.000

40.8

48.4
121.4

64.8

18.3

48.1

16.3

220

34.3

0.980

4.0

SAN
210
1.055

CAR
393

154.4

24.3

GUA B2
5404

16.0

44.6

50.4
1.023

1.020

306.2
66

ACY G3 13.8
183 60.0
G
25.1
1.045

147.0

20.4

44.7

23

25.5

51.0

346.4
1.098

79.9
FMY TA
4433

44.0

1.020

214 1.028

293.5

K30 BP
388

147.0
94.9

94.0

44.4

VEL AB

54.1
0.900
1.028

1.090

172.7

0.997

29.3
29.3
30.5
COV BP
66
15.0
373
1.089

27.8

1.077

62.8

113.3

65.0

62.8

304.7

CDO

51.0

1.045
302.0

1.047

1.027

220

66

ACY G2 13.8
182 47.0
G
24.2

52.8

345.9

292.5
220

31.6

34.7

92.1

66

66

VEL B1
414

VIL BP
375

51.0

52.8

163.4
CDO TA
496

1.064

1.055

48.4

26.4

168.2 165.3

1.078

54.0

137.9

48.1

VIL B1
220
0.900
4751.039
54.1

34.7

302.0

220

1.016
52.4

158.5

0.967

1.006

23

176.1

1.020

CAU B1

404

1.021

23

1.006
1.071

1.020

137.5

37.8

ITG BP
331

66

nLT F1
1416

KM7 B1
4498

1.073

86.3

23

207.0

53.1
0.998

37.8

CZU
297

51.6

KM7 A
2298

155.6

497

91.3

26.9
96.0

1.053

0.973

61.2
1.052

17.3

TBO B1
320

220

153.8
1.088

1.047
13.6

63.1

16.1

50.8

128.4
104.9

CAE BP
66
333

1.060

63.1

1.046

0.980

CZU TA
104.5

29.9
1.049

132.3

106.3
0.950

52.8
1.090
1.090

220

ACY G1 13.8
181 47.0
G
24.2
1.045

488

34.8

220
2409

73.6
1.030

52.0

1.014

51.0

0.900

220

39.5

61.0

66

323

23

49.8
1.073

434

61.0

0.950

220

500
0.983

34.3
0.993

101.4

ACY B2
401

1.059
23

78.0

1.026

FOZ B2
804

226.6
1.050

160.0

32.7

64.3

VAU B1

98.0

75.1

61.0

25.7

226.6

31.1

35.3

42.8

1.036

1.057

38.9

121.4

MD

1.050

167.4

45.6

17.0

CCO B1

1.041

YBY B1
66
369
0.989

0.964
VM1 B1
469

293
41.9

41.9

13.8

121.4

220

260.2

124.6

BDO

BGD B1

28.4

LAM_FIC 220
1400 1.057

226.6
1.050

224.5
1.012
F2 241.5
1485

54.1
1.005

SLO AB
201

43.7

1.050
FICT VAU 220
3409

44.4

224.5
1.012

224.5

1.090

CUR B1
492

121.8
1.018

270.8

VAU B1
2309

1.023

1.022

F1 241.5
1484

1.090

220.4
1.100

220.4

1.096

100.6

113.2

66

368

220
479
0.900

BMO A
2222

55.0
1.050

64.1

6.9

224.5
1.090
MD

224.2

1475.6

28.8
1.021

1475.7 1677.6
1.072

MD
220.1

220

224.2

MD

245.0
A
23
2266

GAQ

29.6
1.026 0.979

13.4

HOR B1

80.1

BMO B1
220
4222

54.9

148.7

GDI B1
66
2311

25.7

25.7

34.7

0.953

24.8

70.2

220

54.7

0.993

7.0

IRY B1
484

16.4
1.100

1.002

0.980

1.019

1481.1

226.6
1.050

198.7

46.8

51.5
26.8

42.0

REP B1
2308

LAM B1
66
316

VAQ TA
427

220

7.4

1.076

79.7

58.3

59.2

31.3

BSP

GAQ TA

239.1
1.023

0.967

270.3

66

302

1.033

1.000

224.5
1.012
F5 241.5
1483

618.3

SLO RE

52.4

66

103.4

103.4
25.7
1.000

220

49.8
26.1

1.007

23

1.027

155.9

1.023

70.6

SLO B1

153.8

SLO B1
66
301

18.1

nGR F1
66
1311

224.5

4414
6.4

ACU B1
220
4479 0.934

1.035

LAM F1
509

1.020

PQI B1
4495
1.098

100.6

64.8

117.7

-93.2

39.1

1.020

224.2
1.090
MD

16.5

220

23.7

28.0

157.8

220

117.0

59.2

254.6
36.8

CYO A
285

220

52.8

1.029

VM2 B1
220
1469 0.965

35.7

69.2

71.3

148.8
42.9

29.1

26.6

66

55.9

39.5

129.3

CCO B1

1.029

60.8

43.0

98.1

56.4

116.5

42.7

75.5

121.4

127.7
1.023

47.8

32.8

1.036

CON B1
66
372
1.029

1.079

121.4

151.8

220

43.9

LAM F2
510
1.020

27.5
28.0
1.047

16.4
1.100

0.980

1.028
1.020

62.6

LPA B1

77.9

77.9

152.0
152.0

1.057

105.0

105.0

220

CAT B1
491

23.5
1.047

1.032

LAM_PSA AER1
1405
1.060

LAM B1
405

1.044
B1
66
3372

CN2

8.7

1.023

133.5

33.7
33.8

33.8
43.0

47.5

0.993

0.993

BSP B1
412

471

0.967

1.053

220

220

42.8

35.5

66
1.040

1.000

PSA B1
313

83.8

CBV B1
1814

0.940

220

LUQ A
23
221
1.029

BPA B1
303

LAM_PSA AER2
1407
1.060

1.000

403

1.000

79.4

4468

CN2 B1
4472

121.4

152.0

LAM_PSA SUB1
1406
1.061

1481.0

1481.1
500

1.072
16.5

154.2

39.3

66
1313

SRO TA
467

220

1.040

43.0

LAM_PSA SUB2
1408
1.061

133.5 HOR B1
468
HOR comp 220
1.156

56.4

nCP F1

IPU B2
805

220

1.071

23

2291 1.025

68.2

178.5 164.9
1.148

33.7

76.8
46.9

112.7

112.7

78.0

78.0

1.025

CAT2 A

SGA A
23
2491 1.011

220

77.0

SES TA
466

66
1.042

nBC F1
1326
PSA F1
513

73.9
1.057

63.6

1.061

106.0

106.0

151.0

120.1
121.4

152.0

1.025

11.8

154.7

220

MD B1
483

1.081

120.2

1.100

PSA F2
514

31.0

256.3

LUQ TA
421

1.033

178.5

1.061

CYO

485

66

nBS F1
1308

220

4491 1.076
220

4409

LIM B1
220
409

23.5

22.8
22.8
0.997

PSA B2
220
4413

1.100

SGA B1
SICBRAS

66

114.5

12.8

5.7

33.6

22.4

248.0
255.5

33.7

76.8

76.4
76.4

104.1
226.7

226.7

1.035

56.0

66
311

CMY B1 220
1.064 1409

66

LIM B1
344

66

66
0.999

264.9

LIM RE
411

66
1.043

1.044

CEN B1

PQI B1
4395

28.4

IPS_SMI_F166
3306 1.042

SMI B1
308

1481.1
MD HER2
1516

0.977

123.8

257.0

ACE B1
345

0.975

nPS F1
1306

1677.6
124.2
460.2

20.8

20.8
20.8
VHA F1 3346 1.100
0.974

66
0.971

6310.0

32.1

VHA B1
346

8.7

6311.8
1.047
1.024

0.900

145.5

20.8

1.039

IPS B1
66
328 1.038

461.1

453.6

452.7

171.7
1.056

887.2

500

24.4
1.068

5.7

IPS_PBO_F266
4306 1.039

171.7

77.0
162.4
0.960
1.040
PBO F1
505

12.8

5.7

1.047
PCA F2
525

162.4
0.960

76.9

883.8

1.017
CYO B1
885

45.6

77.0
1.000

48.4
48.6

883.8

8.3

76.9

23
2246
24.3
1.026
1.033

500

18

878.2

0.900

VHA AB2

8.4

77.5

461.1

453.6

180.1

179.1

408

264.0

66

180.1

220

PBO F2
506 1.040

77.4

1.000

120.0

120.0

AMP B1

PBO B1

18.8

IPU10G
700
6300.0
G
385.2

865.5
179.1

PBO B1
66
306
18.8

66

327
1.038

1.000

104.3

66

1.038
MRA B1
304
1.033

5.7

120.0 173.8

120.0 173.8

1.000

PCA B1
66
324 1.047

1.047

0.900

0.900

1.047
PCA F1
524

VCU B1
307

201.2

193.1

220
193.1

PCA AB
424

IPU B1
800

500

873.9

0.900

248.7

185.9

179.6
202.2

66

500

23

1.012

500

AO 2020: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500KV MARGEN DERECHA - VILLA HAYES
199.4
VHA B1

220

446
0.900

199.4
172.5

381.0

VHA B1

383.6

500

MD B2
802

846
167.4

20.2
20.2
VHA F1 3346 1.100
0.964

23.8

BVN B1

34.0

220

4466

30.2
A
23
212

28.3
1.026

29.6

28.9

205.1

258.8

277.0

220

PQF B2
220
590

PQF B1
490

220

50.5

255.5

258.4

258.4

BPA FIC
1303

217.1
1.061

66

281.2

1675.1

500

1675.1

282.0

282.0
0.997
F3 241.5
1486

1.105
MD

281.2

282.0
MD

287.2
1.050
2135.4

721.0

719.1

734.9

733.0

719.6

717.2

719.5
1.066

717.2

2135.5

282.0
0.997

F4 241.5
1487

844.5
1.066

337.0

220

1.067

380.1

66

178.1

183.2

195.3

380.1
1.098

1.077

220

472
1.020

18.0

18.0
1.049

CUR B
2292
1.017

23

45.9

24.5

YZU B1 220
481 1.093

15.9
2.3

220

99.2

3371

1.090
PJC B1
371

1.023

1.090

66

YZU G1 13.8
185 1.020

0.976
CBV B1
370

66
CO2 B1
448

100.0
13.9
G

YZU G2 13.8
186 1.020

100.0
14.0

1.050

220

2.6

23
CO2 AB
248

825

23

105.4

CAP

23

CAP TA
493

220

0.900
ESA TA

ACYC
2281

1.028

38.0

62.9

COV B1

220

MAQ B1
415

402

197.6

K30 B1

220

159.7

61.1
76.6

1.027
66.1

103.9

197.2

140.0

CAE BP
66
333

233.7
1.034

ESA B1
334

66.5

1.072

34.7

238.6

66

167.5

62.9

46.4

49.9

101.9

131.8

0.953

COV AB
273

145.9

90.9

VIC TA
220
2418
1.039

66

158.0

35.0

QUI B1
66
337

66

338
0.957
GUA B1

33.5

PIR B1
325

66

56.4

52.1

PIR B1
425

0.986

220

24.1

220

PAR B1
335

0.973

15.7

193.7

33.5

47.8

52.1
1.047 0.953

1.100

54.3
225.1

220

34.8

31.0

31.6

COL BP
322

K15 TA
398

7.4

6.6
ADU
5401

220

6.8
ACY B3
382

7.4
4.2

80.9
1.093

1.003

80.6

66
25.2

54.2

53.3

205.4
44.1
12.5

1.010
ACYABC
1281

23
2288 1.015

220
449

162.1
1.047

220

MAU

191.9
1.067

CBO B1
380

66

SPP B1
362

66

YUT B1

35.6

33.2

6.8

1.017
PBU TA
451

71.1

220
440

nTS F1
1370

48.1

175.6

175.6
178.0

141.5

1.015

144.7

220
456

SPA B1
487

2838.9

735.1

1.050
13.2
1340.0

1.046

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

nTE F1
1360

18.2

18.2
1.053

25.0

66

CAM B1
378

220

1.033

48.9
16.3

76.7

COS B1
3363

66

66

41.1

33.5

33.6

23.6

0.950

40.1
CAL B1
452

CAM B2
220
478

1.062

38.2

0.950

39.9

NAT TA
453

40.9

41.1
1.025

0.999

1.066

220

CDE B1
0.992

66
2304

0.950

0.950
0.950

68.7
111.1

70.4

112.3

102.5
1.057

25.4
184.5
80.1

1.000

1.053

PQIS B1
8480

1.047
183.5

198.7
208.3

66

220

40.9
1.033

1.065

PFO B1
389

0.996
38.5

18.3

0.940

706.7

198.7

198.7

0.940

74.3

196.7

196.7

196.7
739.2

2905.6

66

1.100

220

1.025

736.3

500

1.020

1.099

1.044
740.4

YAC B1
890

500

17.9
48.7 1.026

TRI B1
454

1.053

0.940

AYO B1
856

4.1

1.100

66

0.967

1.022

AYO B1

ENC B1
360

66

3.9
1.035

1.056

220

178.0

15.6

23
240

10.5

1.088

103.8

VT2 AB

1.075

46.2

78.6

1.078
VIN B1
457

10.6

55.7
49.9

166.5

193.6

91.5

15.8

1.020

PPO B1
355

220

1.048

220

66

0.962

480

86.4

B1

CBO TA

TRI B1
354

6.8

0.977

VT2

YAC19G
790

23
249

66

363

71.0
1.047

2795.0
G
794.0

159.3

20.9

154.6

45.9

39.2
0.980

63.7

37.6
23

500

APR BP
384

1.005

64.0

73.6
1.020

SJB TA
482
GUA AB2
2239

1.094
220

489

21.3

71.7
1.000

1.023

PFO TA

20.9

62.1

1.088

1.047

35.8

MAU B1

124.2

45.9

60.6
0.975

122.1

37.3

45.6
44.0
1.020
0.989

45.6

1.020

18.6

1.064

422.0

4.3

21.3

0.975

73.6

21.3

4.3
1.017

66

71.7

421.3
0.975

110.3

53.0

66

842.7
422.5
1.095

23
261

147.0

CVP BP
305

422.5

20.9

31.5

24.4

SRI AB
220

422.0

VAP

GUA B1
339

66
VAP TA
461

LCD B2
8889

421.3
0.975

45.6

1.000

4.0

VAP B1
361

422.5

144.6

66

24.5

16.0

PMA B1
220
730
1.043

97.6

220

422.5

236.4

146.4

nGI F1
66
1343

LCD TA
4489

1.073

236.4

146.0
1.039

220
4488

1.018

1.014

1.089
SRI B1

10.6

1.095

109.7

40.5

70.4

220

10.6
0.993

109.7

70.1

SJN TA
4497
1.006

CDE A
2204

23

23

12.1
0.975

44.1

236.2

148.8

1337

QUI B1 FIC66
1338
0.986

25.0

0.998

ACYAB
281

1.033

46.1

A
23
298

24.7

66

46.1

1.051

K15

0.975

0.975
1.016

13.6

146.7

66

66

31.0
1.020

1.058

ACY G4 13.8
184 60.0
G
28.1
1.045

24.8

15.9

51.9
0.954

WMA
394

7.4

1.003

CZA B1
66
376

17.6
66

13.2

1.086

183.5

GHN B1
343
0.999

13.2
1.004

110.3

157.3

64.8
17.3

VTA BP
341

72.6
1.047

13.6

62.8

220

RED TA
220
430 1.044

16.0

0.967

17.3

75.0

236.2

QUI B1 FIC66
0.985

16.4

SAN TA
410

23
1.042

23
296

19.4

190.9
139.5
1.000

40.8

48.4
79.5

64.8

18.5

48.1

66.2
1.090

16.3

220

157.3

0.967

4.0

SAN
210
1.039

1.020

23.7

14.9

63.7

66

205.4

24.4

GUA B2
5404

16.0

56.8

63.5
1.180

1.007

ACY G3 13.8
183 60.0
G
28.1
1.045

194.4

21.4

57.2

23

25.8

51.0

CAR
393

148.0
FMY TA
4433

102.0

1.007

214 1.025

54.3
0.900

66

194.4
127.5

126.7

56.6

VEL AB

382.4
K30 BP
388

221.3

0.963

1.005

422.9

379.5

CDO

51.0

28.0
28.0
29.1
COV BP
66
15.1
373
1.060

26.6

88.3

46.2
66

369.3
1.092

220

31.6

35.0

1.053

62.8

161.5

1.090

1.033

1.028

220

66

66.2

63.7
422.0

367.3

1.034

66

66

VEL B1
414

VIL BP
375

ACY G2 13.8
182 47.0
G
27.2

54.3

1.045

52.7

214.2
CDO TA
496

168.9 165.6

1.054

54.3

1.040

48.4

26.4

0.953

1.008

168.1

48.1

VIL B1
220
0.900
4751.016
54.3

35.0

52.2

379.2
52.4

206.1

379.2

220

1.024

227.2

1.020

CAU B1

404

1.016

23

1.012
1.049

1.020

167.2

35.0

ITG BP
331

66

nLT F1
1416

23

1.060

133.4

23

228.4

54.1
1.002

35.1

CZU
297

51.6

KM7 A
2298

205.4

497

169.6

26.9
96.5

1.046

0.973

90.9
1.037

17.6

TBO B1
320

220

202.4
1.072

1.020
15.3

63.1

16.4

50.7

175.2
CZU TA

139.7

34.5

63.1

1.020

0.967

105.8
0.950

1.034

180.7

KM7 B1
4498

16.3

220
2409

73.6

66

54.3
1.090
1.090

220

ACY G1 13.8
181 47.0
G
27.2
1.045

488

34.8

68.3

81.4

VAU B1

FDM B1
323

1.023

52.2

0.900

220

39.5

23

49.8
1.060

434

61.1
0.980

220

50.2

0.959

34.3

62.9

0.950

ACY B2
401

1.052
23

329.4

500

FOZ B2
804

287.2
1.050

213.7

32.8

64.4

79.5

33.8

277.8

130.6

160.1
1.033

BDO B1
13.5

23

2272
1.028

1.024

0.980

103.6

1.069

38.5

79.5

B1
801

31.2

35.3

55.1

1.038

15.6

79.5

287.2
1.050

221.2

46.4

16.8

CCO B1

1.035

YBY B1
66
369
0.985

0.977
VM1 B1
469

293
53.4

53.4

32.5

LAM_FIC 220
1400 1.039

287.2
1.050

282.0
0.997
F2 241.5
1485

MD

277.6
1.096

277.6

1.091

1.050

154.0

0.980

BDO

BGD B1

1.035
FICT VAU 220
3409

56.6

282.0
0.997

282.0

220

331.2

141.8

54.0
0.993

SLO AB
201

59.1

1.019

1.019

F1 241.5
1484

1.105

1.105

CUR B1
492

138.6
1.012

199.5

66

64.2

10.8

282.0
1.105
MD

281.2

0.967

1.014

281.2

1.000

1473.3

28.8
1.013

1473.5 1675.1
1.066

MD

49.9
IRY B1
484

16.7
1.100

24.5

220

99.2

112.9

66

368

151.2

VAU B1
2309

53.5

GDI B1
66
2311

33.8

33.8

201.2

251.8
A
23
2266

GAQ

29.6
1.021 0.980

13.4

220
479
0.915

BMO A
2222

55.0
1.035

126.5
16.7

1.033

1.000

1478.5

287.2
1.050

727.5

66

302

19.2

nGR F1
66
1311

282.0
0.997
F5 241.5
1483

198.4

47.6

HOR B1

79.8

BMO B1
220
4222

55.0

0.980

10.9

34.8

0.953

24.8

70.0

220

54.8

1.034

REP B1
2308

LAM B1
66
316

VAQ TA
427

220

7.4

1.074

ACU B1
220
4479 0.947

31.3

BSP

GAQ TA

246.1
1.021

0.967

199.9

SLO RE

159.2

66

102.9

102.9
33.8
1.000

PQI B1
4495
1.093

26.2

1.007

23

1.019

164.0

220

70.6

SLO B1

136.8

SLO B1
66
301

34.7

LAM F1
509

1.015

282.0

4414
6.4

79.5

58.5

59.4

36.8

0.0

57.1
16.8

45.1

38.9

68.7

79.5

52.5

97.8
61.1
59.4

229.3

37.6

31.8

11.7

1.020

281.2
1.105
MD

16.7

220

23.7

28.0

165.9

71.9

1.029

29.6

34.8
45.3

127.4

69.7

69.7

111.3
111.3
111.2

CYO A
285

101.9

LAM F2
510
1.015

27.5
28.0
1.033

16.7
1.100

0.967

1.024
1.020

220

220

1.021

67.4

VM2 B1
220
1469 0.977

LPA B1

66

97.8

103.4

103.4

1.040

138.6

CCO B1

116.4

CON B1
66
372
1.016

1.129

PSA B1
313

CAT B1
491

23.5
1.047

1.027

LAM_PSA AER1
1405
1.040

220

48.5

66
1.035

1.000

1.021

LAM B1
405

1.031
B1
66
3372

CN2

137.1
1.025

1.028

35.7

69.2

71.3

126.7

0.980

0.980

BSP B1
412

471

1.040

LUQ A
23
221
1.027

BPA B1
303

LAM_PSA AER2
1407
1.040

179.3

40.7
40.7

40.7
40.6
37.6
37.6

1.037

220

220

62.5

54.9
0.953

220

403

1.000

96.2

CBV B1
1814

0.980

79.5

111.3

LAM_PSA SUB1
1406
1.040

SRO TA
467

220

91.9

1.000

45.3

66
1313

1478.3

1478.5
500

1.066
16.7

205.8

4468

37.9

109.2

109.2

69.8

69.8

1.023

nCP F1
LAM_PSA SUB2
1408
1.040

179.3 HOR B1
468
HOR comp 220
1.199

CN2 B1
4472

104.8

104.8

79.2

111.6

79.5

111.3

1.023

IPU B2
805

220

1.060

23

2291 1.015

117.4

66
1.036

nBC F1
1326
PSA F1
513

CAT2 A

SGA A
23
2491 1.016

220

127.1

SES TA
466

1.049

220

124.1
1.040

113.7

156.9

1.060

PSA F2
514

11.8

1.043

LUQ TA
421

MD B1
483

1.072

137.4

1.041

1.060

71.1

290.9 256.9
1.181

290.9

PSA B2
220
4413

1.007

230.4

nBS F1
1308

CYO

485

66

81.3

198.6

198.6

1.030

220

4491 1.067
220

4409

29.4

28.3
28.3
0.996

37.7

37.2
83.6

66
311
45.0

CEN B1

SGA B1
SICBRAS

LIM B1
220
409

101.0

40.5

27.6

185.5
66

101.0

18.3

6.1

66

LIM RE
411

66
1.035

71.9

71.5

SMI B1
308

CMY B1 220
1.042 1409

191.9

40.7

71.9

71.5

198.9

LIM B1
344

66

66
1.000

192.2

ACE B1
345

PQI B1
4395

132.2

66
0.963

1478.5
MD HER2
1516

0.944

104.5

69.9

IPS_SMI_F166
3306 1.034

1.036

353.5
383.6

19.8

32.2

VHA B1
346

0.969

nPS F1
1306

1675.1

0.900

159.4

1.031

20.1

1.026

IPS B1
66
328 1.028

384.4

381.8

381.0

161.4

11.7

6300.3

500

24.4
1.042

6.1

IPS_PBO_F266
4306 1.026

161.4

68.6
154.3
0.960
1.027
PBO F1
505

18.3

6.1

1.040
PCA F2
525

154.3
0.960

68.5

46.4

68.6
1.000

CYO B1
885

8.7

68.5

23
2246
24.3
1.028
1.007

48.4
48.6

6336.8
1.047
1.024

0.900

VHA AB2

8.7

77.7

384.4

381.8

500

18

167.0

166.2

408

198.7

66

167.0

220

PBO F2
506 1.027

77.6

1.000

105.2

105.2

AMP B1

PBO B1

18.8

IPU10G
700
6300.0
G
682.1

1207.8
166.2

PBO B1
66
306
18.8

66

327
1.025

1.000

83.5

66

1.025
MRA B1
304
1.019

6.1

105.2 161.1

105.2 161.1

1.000

PCA B1
66
324 1.039

1.023

0.900

0.900

1.040
PCA F1
524

VCU B1
307

182.2

176.2

220
176.2

PCA AB
424

IPU B1
800

500

1303.5

0.900

185.6

171.0

166.6
183.0

66

500

23

1.017

500

AO 2021: RGIMEN NORMAL


257.0
VHA B1
446

220

0.900

257.0
188.7

486.4

VHA B1

493.9

500

MD B2
802

846

44.4
44.4

18.5

36.5

VAU B1
2309

BPA FIC
1303

45.8

45.8

50.8

32.1

1.039

CCO B1
3371

66

PJC B1
371

66

FDM B1

100.7

1.029

149.5

155.2

15.4

BDO B1
472
1.028

CO2 B1
448

76.7

34.3

174.4

179.2

44.2
228.7

272.0

195.2

0.900
ESA TA

271.7

64.1

271.1

YZU G2 13.8
186 1.020

100.0
14.2

0.967

23

ACY B2
401

1.056

224.9
1.036

ESA B1
334
48.4

230.0

66

ACYC
2281

99.0

48.5

PIR B1
325

66

COV B1
402

220

MAQ B1
415

50.0

49.6

220

K30 B1

220
488

KM7 A
2298

KM7 B1
4498

23

26.2

220

95.2

0.953

COV AB
273

91.6

123.8
29.7

VIL B1
475 1.017

30.7

220

1.021
34.4

176.2
VIL BP
375

66

49.3

126.8

1.059
29.7

30.7

CDO

53.7

57.3
0.900

26.2

53.7

28.5
28.5
29.5
COV BP
66

1.100

16.4

CAR
393

1.090

23

84.3

81.1

15.0
0.999

1.047

36.4

15.0

WMA
394

220

K15 TA
398

ADU
5401

220

ACY B3
382

66
18.2

56.5

55.5

172.6
46.2

ACYAB
281

44.5
1.047

11.6

1.026
ACYABC
1281

44.5

33.5

SRI AB

23
2288 1.014

220

66

4.5

29.0

20.1

4.5

49.9
47.9
1.007
0.994

0.975

MAU B1

220
449

1.089
PFO TA

100.3

102.2

1.047

1.015
PBU TA
451

220
1.086

2709.7

671.5

1.025
13.2

790
1340.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin
1.032

169.9

15.3

44.9 1.022

15.3
1.044

23.6

66

50.0
TRI B1
454

22.3

220

0.990
39.3

15.3

0.950

41.1
CAL B1
452

0.980
CAM B1
378

220
27.7

74.9

COS B1
3363

66

66
1.033

45.3
40.4

36.4

36.5

1.053

39.1

0.950

40.8
NAT TA
453

40.1

40.4
1.020

CAM B2
220
478

1.063

220

567.9

CDE B1

66
2304

0.998

220
0.950

0.950
0.950

40.1
1.033

41.4

1.062

66

116.7

41.1

117.9

77.8
1.051

16.6

169.9

172.0

nTE F1
1360

66

16.7

15.1

35.2
214.6
79.0
1.045

1.000

0.925

195.9

195.9

86.9

193.7

193.7

193.7
195.9
2762.7
YAC19G

3.6

1.042

0.925

672.4

500
675.2

2677.7
680.2

1.101

1.030
676.1

YAC B1
890
1.027
G

500

48.1

ENC B1
360

66

3.3
1.030

PFO B1
389

16.7

49.4

10.2

1.001

66

1.045

0.925

AYO B1
856

172.0

101.5

132.5

129.9

220
456

10.3

1.016

239.5

35.7

AYO B1

0.985

1.053

VIN B1
220
1.077 457

PPO B1
355

78.0

1.023

354

8.4

90.2

1.078

23
240

66

50.2

nTS F1
1370

SPA B1
487

TRI B1

16.6

220

99.9
1.072

66

220

47.8
40.1

163.7

T1
458

163.7

PIL

75.5

YUT B1
363

16.7

CBO TA
480

66

36.5
8.6
0.992

1.040

0.967

VT2 AB

38.7

220

162.5

220
440

74.6

B1

37.6

VT2

162.5

40.7

1.040

SJB TA
482

SPP B1
362

16.6

1.068

66

122.6

146.9

142.1

40.5

CBO B1
380

44.5

23
249

1.007

2239

PQIS B1
8480

1.035

500

APR BP
384

1.003

1.100

46.0

58.2

46.0

MAU
57.6
23

103.0

0.980

138.1
1.021
GUA AB2

1.100

121.3

1.034

1.042

71.1

103.0

69.3

212.7

1.019

44.6

212.7

44.0

17.3

36.5

1.063

1.094
220

489

71.1
0.980

386.9
0.975

23
1.021

66

69.3

773.7
388.2
1.094

43.6

CVP BP
305

388.2

387.8

14.9

66
VAP TA
461

LCD B2
8889

386.9
0.975

45.7

GUA B1
339

VAP B1
361

388.2

387.8

VAP

261

4.3

26.6

17.6

PMA B1
220
730
1.036

66.0
1.021

220

388.2

45.7

66

1.073

205.5

111.1

nGI F1
66
1343

1.008

LCD TA
4489

205.5

111.1
1.034

QUI B1 FIC66
1338
0.991

40.5

68.9

220
4488

101.9

68.6

SRI B1

1.015

1.096
1.090

220

9.9
0.993

14.9

20.9

SJN TA
4497

9.9

17.7

220

1.007

1337

CDE A
2204

23

23

11.3
0.957

46.2

205.5

95.1
1.054

18.1

0.991

66

205.5

QUI B1 FIC66
RED TA
220
430 1.037

23

17.9

1.029

0.997

86.5

172.6

26.5

182.9
20.5

A
298

163.9

92.4

K15

0.958

5.9

8.1
4.3

86.7
1.094

37.7

54.5

66

66

0.958
1.016

144.3
1.006

33.6
1.020

27.3

36.1

ACY G4 13.8
184 60.0
G
27.4
1.045

5.8
0.998

34.5

ACY G2 13.8
182 47.0
G
26.4
1.045
ACY G3 13.8
183 60.0
G
27.4
1.045

18.0
7.6

1.088

33.6

8.1

94.3
FMY TA
4433

65.9

66

101.9

GHN B1
343

66

66

63.5

163.9

67.5
24.9

VTA BP
341

K30 BP
388

1.062

COL BP
322

16.2

1.058

373

219.7

1.090

342.0

1.020

24.0

1.030
27.2

296

CZA B1
66
376

1.007

51.4

65.9

63.5
395.0
1.093

339.6

191.8

34.5

51.4

49.6
1.050 0.953

220

0.961

182.1 178.0

186.5

34.8
325.2

323.6
182.4
CDO TA
496

ACY G1 13.8
181 47.0
G
26.4
1.045

53.9

353.7

394.1

0.900

57.3

51.9

34.8
1.060

23

53.9
1.090
1.090

220

17.7

66.1

1.020

1.010
1.053

1.000

220

1.014

1.060
34.4

196.4

111.5

1.000
SAN TA
410

0.967

24.9

CZU
297

173.6

28.9

97.0

23

88.9

47.5
PAR B1
66
335

0.977

17.1

0.990

67.5

23
1.049

55.4

56.6

171.3
1.076

497

0.953

1.009

17.5

52.8
130.1

220

107.9

1.020

66
338
0.959

40.8

1.034

24.5

66.1
SAN
210

1.007
52.2

130.1

52.8

23

214 1.016

147.9
1.020

105.3

105.0

PIR B1
425

23

46.1

51.9

0.900

29.5

1.047

QUI B1
66
337

CAU B1

220

20.9

28.7

130.1

GUA B2
5404

4.3

52.2
VEL AB
LAM_FIC 220
1400 1.035

220

1.073

1.059
51.5

1.066

1.090

143.5
102.1

9.6

0.967

620.7

775.7

1.099

100.0
14.1

1.020

1.060
220

620.6

804

1.064

353.7

45.1

1.007
VEL B1
414

624.2

624.2
1.064

FOZ B2

19.3

220

110.7

36.0
1.017

F4 241.5
1487

1.047

36.0
36.0

634.4

354.6

23

26.5

36.1

1.018

622.3

637.5

2600.9

262.5
1.050

46.4

66

1.018

66

257.4
0.994

220

0.993

17.5

nLT F1
1416

257.4

500
0.966

1.038

2.8

2600.8

625.4

1.052

0.967

140.1

34.6

262.5
1.050

354.6

1.052

220

0.973

48.2
1.036

66

TBO B1
320

1.017

GUA B1
404

257.4
0.994
F3 241.5
1486

MD

1.076
19.3
CUR B
2292
1.018

66

64.1

VIC TA
220
2418
1.036

66

48.3
1.012

41.6

1671.6

257.4
1.110

303.3

48.6

2.6

63.2

CAE BP
66
333

26.7

256.5

220

167.6

139.7

ITG BP
331

24.4

272.9

256.5

220

223.9

1.018

1671.6

500

1.033

0.993

23

2272
1.018

CZU TA

76.1

B1
801

184.3

1.020

76.0

34.6

114.7

CUR B1
492

2.7

CAP TA
493

63.2

101.7

1.035
FICT VAU 220
3409

34.6

19.3

19.3

181.0
1.059

9.5

26.7

CBV B1
370

272.6
1.098

272.6

MD

CO2 AB
248

23

21.3

114.7
1.000

2.9

228.4

298.1

104.6
0.950

17.9

nGR F1
66
1311

262.5
1.050

176.3

TOR
B1 220
4470

1.050

21.9

REP B1
2308

LAM B1
66
316

228.4
1.092

1.042

23

59.4

18.3

76.0

262.5
1.050

257.4
0.994
F2 241.5
1485

MD

23

1.029
53.0

257.4
0.994

257.4
1.110

220

120.1

GAQ A
2266

434

66

323

256.5
PQF B1
490

1.110

36.0

65.6
77.8

66.4

GDI B1
66
2311

19.3

19.3
1.000

226.1

1.090

825

CAP A
293

0.980

54.7

31.7

0.970

59.4

61.1

1.035

F1 241.5
1484

1470.3

220

YZU G1 13.8
185 1.020

33.3

61.1

0.950

1.046

220
2409

257.4
1.110
MD

MD

PQF B2
220
590

0.993

509

1.017

220

256.5

169.4

9.4

2.7

220

23

0.980

LAM F1

1.017

IRY B1
484

0.0
1.100

0.999

261.0

32.7
1.012 0.967

135.9

1.023

0.980

104.2

32.7

54.4

510

220

54.8

YZU B1 220
481
1.092

1.026

16.4

1.073
VM1 B1
469

220

167.8

18.7

24.1

34.3

100.3

65.4

VAU B1

262.5
1.050

54.5
0.993

SLO AB
201

66

1470.4 1671.5
1.064

1.014
31.2
1.018

23

BDO

49.2

66

19.1

17.5

HOR B1
368

YBY B1
66
369
0.977

1.070 4479

BMO A
2222

55.5
1.034

1.024

1.020

PQI B1
4495
1.094

49.2

65.9

26.8

32.6

220

GAQ TA
4466

255.0

33.1
A
212

132.8
1.022

BGD B1

46.9

257.4
0.994
F5 241.5
1483

57.6

55.5

46.9

66

257.4
1.110
MD

0.0

220

28.8
VAQ TA
427

164.2

15.2

27.1

ACU B1

220
479
1.059

BMO B1
220
4222

1.022
45.9

256.5

18.7

0.993

0.953

1469

21.2

55.3

8.1

1.066

30.5

56.1

31.6

31.8

66.5

174.1

SLO B1
66
301

7.3

30.9

76.5

220
4414

56.4

36.4

CAT B1
491
26.1

1.033

121.3

20.3

56.1

1.071

34.4

BSP

274.8

302

0.0
1.100

603.6

66

42.8

0.980

LAM F2

0.993

23

18.5

1.027

0.953

275.4

SLO RE

220

159.6

66

38.8

41.9

66.8

172.0

130.3

T1 220
4487

53.4

66

130.3

171.7

65.5

65.5

66.5

159.8

SLO B1
403

57.5

67.4

67.4

-86.0

45.7

1.022
0.980

PZC

CON B1
66
1.038
372

7.3

67.1

118.9

118.9

1.033

65.0

31.8

291.8

47.2
39.0

130.3

172.1
172.0

28.7

1.036

220

7.0

VM2 B1
220
1.073

LPA B1

LAM_PSA AER1
1405
1.037

LAM B1
405

1.042
B1
66
3372

CN2

BVN B1

1.026

114.8

23

2291 1.021

25.8

30.2
30.9
1.033

1.037

167.1

61.7

74.3

1.057

31.6

47.2

0.993

1.071

PSA B1
313

CYO A
285

168.7

1.017

56.1

33.0

66
1.029

1.000

1.020

220

220

220

1.039

LUQ A
23
221
1.029

BPA B1
303

1407

15.9

1.020

0.993

51.6

1.082

LAM_PSA SUB1
1406
1.037

141.1

CCO B1

471
42.2

43.1

66
1313

BSP B1
412

139.8
1.026

220

1.039

39.0

67.6

67.6

1.022

1.000

LAM_PSA AER2

220

1.037

220

47.0

111.7

111.7

nBC F1
1326
PSA F1
513

100.2

CBV B1
1814

0.967

136.1

31.6
77.6

38.6

254.4

254.4

66
1.032

108.4

108.4

171.2

129.9
130.3

172.1

1.022

95.5

1.000

93.4

1.047

nCP F1
LAM_PSA SUB2
1408
1.037

220

1.060

LUQ TA
421

PSA F2
514

SRO TA
467

220

101.2

44.3
47.2

30.8

1.148
4468

1.045

CN2 B1
4472

1494.0
500

1494.0
1.064

0.0

43.3

101.2 HOR B1
468

231.4 209.0
1.157

175.3

1.037

CAT2 A

SGA A
23
2491 1.008

220

85.8

SES TA

311

1.047

82.7
1.041

72.1

293.7

PSA B2
220
4413

1493.9

1.068
11.8

66

nBS F1
1308

485
37.5

466
44.4

77.6

77.3

1.028

CYO

HOR comp 220

SMI B1
308

220

4491 1.063
220

1.060
LIM RE
411

231.4

IPU B2
805

220

1.060
SGA B1
SICBRAS
4409

LIM B1
220
409

12.4

12.4
12.4
0.989

MD B1
483

198.4

5.7

7.7

44.1

12.3

271.5
66

35.1

1.033

80.9

CMY B1 220
1.046 1409

278.6

44.4

77.7

77.3

287.2
66

LIM B1
344

66

66
1.012

279.7

ACE B1
345

0.985

nPS F1
66
1306 1.031

66

1671.5

PQI B1
4395

99.2

66
0.986

6305.7

1494.0
MD HER2
1516

0.958

143.0

99.2

VHA B1
346

6318.4
1.041
1.024

125.1
493.9

33.3

31.9
31.9
VHA F1 3346 1.007
0.998

101.0

1.021
7.3

995.3

500

0.900
486.4

1.037

31.6

7.7

7.7

IPS_SMI_F166
3306 1.030

CEN B1

487.4
26.9
1.049

176.2

5.6

197.8

112.7

176.2

73.8
166.6
0.960
1.022
PBO F1
505

1.000

IPS_PBO_F266
4306 1.021

166.6
0.960

73.7

978.3

0.999
CYO B1
885

494.9

101.0

73.8
1.000

978.3
962.8

0.900

24.9

73.7

23
2246
26.7
1.020
1.022

500

18

24.1

VHA AB2

53.0
53.2

7.7

112.8 174.2

112.8 174.2

76.3

494.9

487.4

182.8

181.7

408

24.9

66

182.8

220

PBO F2
506 1.022

76.2

167.3

AMP B1
327
1.019

PBO B1

20.3

286.5

66

IPU10G
700
6300.0
G
482.1

948.8
181.7

PBO B1
66
306
20.3

MRA B1
304
1.014

IPS B1
66
328 1.023
80.8

66

1.020

1.037
PCA F2
525

1.000
112.7

1.000

PCA B1
66
324 1.036

VCU B1
307

0.900

0.900

1.037
PCA F1
524

1.028

IPU B1
800

500

980.3

0.900

272.0

186.6

191.9

220
191.9

PCA AB
424

183.3

182.2
198.8

66

500

23

500

AO 2021: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500 KV MARGEN DERECHA - VILLA HAYES

232.7
VHA B1
446

220

0.900

232.7
161.6

409.3

VHA B1

413.3

500

MD B2
802

846

25.1

25.2

VAU B1
2309

BPA FIC
1303

50.4

50.4

34.4

98.2

50.6

66

PJC B1
371

66

220

61.3

FDM B1

99.0

76.7

22.6

76.1

76.2

171.1

178.3

242.0
1.030

15.4

BDO B1
472
0.992

22.8

197.6

204.5

45.4
301.4

346.1

194.8

2.6

264.4

66

52.0

66

142.2

YZU G2 13.8
186 1.020

100.0
20.6

220

0.927

23

ACY B2
401

1.055

55.9

52.6

220

MAQ B1
415

1.020

220

K30 B1

220
488

KM7 A
2298

KM7 B1
4498

23

COV AB
273

171.6

0.975

49.3

30.0

1.008
217.2

30.0

156.8

184.2

26.7

50.3

CDO

1.033

16.5

CAR
393

23

81.7

78.5

14.1
1.001

1.033

36.1

14.1

1.090

66

WMA
394

220

ADU
5401

220

ACY B3
382

18.2
58.6

237.6
45.7

44.2
1.047

11.6

1.009
ACYABC
1281

44.2

33.4

37.8

14.9

66
SRI AB
VAP TA
461

CVP BP
305

66

23
2288 1.017

220

1011.5
504.6

4.5

4.5

50.1
48.1
0.967
0.992

0.975

MAU B1

220
449

1.078

117.9

119.5

PFO TA

1.004
PBU TA
451

220
1.088

2932.6

788.6

1.075
13.2

790
1340.0

1.090

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

186.8

15.8

44.8 1.015

15.8
1.038

23.7

66

50.0
TRI B1
454

22.4

220

0.982
39.8

15.9

0.950

41.6
CAL B1
452

0.980
CAM B1
378

220
20.8

86.2

COS B1
3363

66

66
1.033

45.2
40.4

36.4

36.5

1.046

39.5

0.950

41.3
NAT TA
453

40.2

40.4
1.013

CAM B2
220
478

1.058

220

803.4

CDE B1

66
2304

1.001

220
0.950

0.950
0.950

40.2
1.033

108.1

1.053

66

124.9

110.2

126.1

144.8
1.045

16.6

186.8

190.2

nTE F1
1360

66

16.7

15.6

29.5
169.8
89.2
1.040

1.050

0.975

213.1

213.1

81.4

209.5

209.5

209.5
213.1
3035.9
YAC19G

3.1

1.045

0.975

792.3

500
793.0

2804.8
1161.7

1.094

1.085
796.7

YAC B1
890
1.050
G

500

47.3

ENC B1
360

66

2.8
1.022

PFO B1
389

16.7

48.7

9.5

1.004

66

1.039

0.975

AYO B1
856

190.2

114.7

147.7

144.4

220
456

9.5

1.009

195.6

35.8

AYO B1

0.974

1.044

VIN B1
220
1.053 457

PPO B1
355

147.1

1.011

354

8.4

85.6

1.062

23
240

66

50.2

nTS F1
1370

SPA B1
487

TRI B1

16.6

220

113.5
1.039

66

220

51.9
47.1

188.5

T1
458

188.5

PIL

88.8

YUT B1
363

16.7

CBO TA
480

66

36.6
8.5
0.982

0.987

0.927

VT2 AB

38.8

220

186.4

220
440

88.0

B1

37.7

VT2

186.4

52.8

0.986

SJB TA
482

SPP B1
362

16.6

1.044

66

193.9

169.5

165.5

52.8

CBO B1
380

47.6

23
249

0.953

2239

PQIS B1
8480

1.088

500

APR BP
384

1.006

1.100

47.6

58.2

47.6

MAU
57.6
23

137.9

0.940

158.6
1.023
GUA AB2

1.100

189.1

1.023

1.000

69.9

137.9

68.2

169.1

1.007

44.8

169.1

44.1

1.046

1.096
220

489

1.047
17.3

36.6

505.7
0.950

1.099

69.9
0.940

27.9

504.6

23
1.019

66

68.2

LCD B2
8889

505.7
0.950

46.7

GUA B1
339

VAP B1
361

504.6

503.2

VAP

261

4.3

26.7

17.6

220

504.6

47.2

66

1.060

PMA B1
220
730
0.982

128.9
1.010

1.011

LCD TA
4489

503.2

166.0

nGI F1
66
1343

1.017

1.095

47.2

164.9
0.974

QUI B1 FIC66
1338
0.990

40.6

69.3

220
4488

276.6

69.1

SRI B1

9.9
0.993

276.6

121.5

9.9

1.079

220

1337

CDE A
2204

23

23

11.3
0.975

45.7

14.9

23.5

220

18.1

0.993

ACYAB
281

276.2

174.4

SJN TA
4497

23

66

59.6

66

276.2

0.962

17.9

1.032

0.999

86.5

237.6

1.010

K15

298

219.2

172.3

66

0.958

8.2

8.7
4.3

86.7
1.093

164.6
0.994

K15 TA
398

66

0.958
0.983

26.1

36.2

33.7
1.020

173.7
FMY TA
4433

ACY G4 13.8
184 60.0
G
27.8
1.045

8.1
1.000

34.6

ACY G2 13.8
182 47.0
G
26.9
1.045
ACY G3 13.8
183 60.0
G
27.8
1.045

18.0
7.6

1.077

33.7

1.031

COL BP
322

16.2

66.1

8.7

1.020

24.2

1.015

373

249.9

296

CZA B1
66
376

24.7
24.7
24.7
COV BP
66

24.1

54.8

66

137.6

GHN B1
343

66

K30 BP
388

63.6

250.8

0.910

0.985

QUI B1 FIC66
RED TA
220
430 0.983

67.5
43.0

VTA BP
341

440.4

19.9

212.1
109.3
1.000

SAN TA
410

66.2

1.010

66

50.3

0.900

1.090
494.1

1.090

17.8

220

0.988

67.5

0.913

43.4

VIL BP
375

0.900

53.5

66.1

63.6

422.4

433.9

17.7

GUA B2
5404

121.6

23
1.045

220

34.6

31.2

26.6

51.3

0.913

17.5

52.7
89.7

232.7

1.002

125.2

40.8

0.972

34.8
492.0

176.3 172.0

1.008

27.6

66.2
SAN
210

0.940
52.2

89.8

52.7

23

214 1.023

220
53.5

0.950

10.1

4.3

52.2
VEL AB
LAM_FIC 220
1400 0.972

34.4

417.9
CDO TA
496

ACY G1 13.8
181 47.0
G
26.9
1.045

54.1

1.018

246.6

219.2

1.097
220

VIL B1
475 0.973

31.2

52.1

444.3

1.060

23

54.1
1.090
1.090

220

34.8

261.1

138.2

0.940
VEL B1
414

0.967
1.012

23

54.8

52.6
1.048 0.900

1.014

1.060
34.4

29.0

151.6

179.4

137.6

39.1
1.010

CZU
297

235.8

497

150.0

81.5

47.5
PAR B1
66
335

23

46.1

1.047

38.9
39.1

55.7

57.1

230.6
1.052

26.6

39.2

1.011

220

199.1

66

1.005

66

206.9

0.900

1.007

26.3

17.5

nLT F1
1416

220

52.1
COV B1
402

1.020
QUI B1
66
337

1.052

1.090

0.900

197.0

0.913

220

616.7

1013.6
1.050

ACYC
2281

0.983

4.2

F4 241.5
1487

1.073

109.0

PIR B1
425

157.5

22.8

89.8

PIR B1
325

616.7

804

1.100

29.7

102.6
1.039

620.0

620.0
1.051

FOZ B2

19.3
23

198.3

ESA B1
334

630.3

446.1

220

215.3

257.2
0.981

618.3

633.2

2739.8

342.0
1.050

446.1

100.0
20.5

1.020

17.1

329.3
0.963

46.4

0.900

0.962

220

66

TBO B1
320

1.011

GUA B1
404

2739.5

621.2

500
0.925

215.7

65.8

53.6
1.003

329.3

220

50.6
10.0

28.3

CO2 B1
448

220

48.3

66
338
0.957

342.0
1.050

1.024

0.953

CAU B1

329.3
0.963
F3 241.5
1486

MD

398.5

1.008

64.2

135.3

1671.0

500

1671.0

329.3
1.150

1.060
19.3
CUR B
2292
1.017

66

64.2

VIC TA
220
2418
0.982

66

327.1

444.3

CAE BP
66
333

65.5
0.982

348.1

327.1

220

0.927

ESA TA

B1
801

249.0

184.7
63.3

25.6

44.7

342.0
1.050

1.007

0.953

23

2272
1.024

256.1

22.8

121.4

CUR B1
492

0.966
CBV B1
370

347.5
1.098

347.5

MD

CZU TA

0.981
FICT VAU 220
3409

121.4
1.000

21.6

21.6

300.5
300.5

1.020

ITG BP
331

329.3
0.963
F2 241.5
1485

MD

386.1

2.2

CAP TA
493

63.3

21.0

23.3

342.0
1.050

240.6

59.5

135.0

19.0

4.2

294.8

1.087

1.006

23

98.6
0.950

1.011

329.3
0.963

329.3
1.150

220

140.8

GAQ A
2266

TOR
B1 220
4470

1.038

21.7

nGR F1
66
1311

327.1
PQF B1
490

1.150

CO2 AB
248

23

1.015

54.6

31.7

434

19.4

76.1

F1 241.5
1484

23

1.014
52.9

0.980

329.3
1.150
MD

1469.7

220

YZU G1 13.8
185 1.020

825

CAP A
293

66

323

1.035

220
2409

327.1

227.7

36.1

65.5
27.9

67.2

VAU B1

GDI B1
66
2311

REP B1
2308

LAM B1
66
316

PQF B2
220
590

0.953

21.6

21.6
1.000

220

49.9
1.9

220

23

0.940

509

1.012

IRY B1
484

0.0
1.100

1.000

MD

54.9

1.090

1.021

59.5
0.940

65.4

LAM F1

1.012

220

271.3

32.7
0.977 0.927

125.1

510

PQI B1
4495
1.092

YZU B1 220
481
1.081

33.4

61.3

0.950

1.007

1.003

CCO B1
3371

1.024

0.940

98.7

32.7

157.6

54.5
0.940

SLO AB
201

66

31.3
0.984

23

154.6
0.989

BGD B1

51.9

342.0
1.050

1.022
33.1
A
212

BDO

1.034

18.4

17.0

66

YBY B1
66
369
0.974

1.050 4479
1.053
VM1 B1
469

GAQ TA
4466

265.0

228.8

18.8

9.9

220

HOR B1
368

16.1

ACU B1

BMO A
2222

55.5
0.980

55.0

66

329.3
0.963
F5 241.5
1483

18.8

0.967

24.1

55.5

1470.0 1671.1
1.051

198.5

52.2

31.9
67.0

26.8

33.7

54.2

1.049

220
479
1.037

BMO B1
220
4222

1.003
50.5

329.3
1.150
MD

0.0

220

28.8
VAQ TA
427

222.7

15.2

1469

23.0

55.4

8.1

141.8

11.3

327.1

137.6

27.9

67.2

44.8

154.7

SLO B1
66
301

38.8

0.0
1.100

389.4

302

30.9

133.0

18.5

0.927

27.1

T1 220
4487

34.4

BSP

219.4

66

1497.5
500

1497.5
1.051

0.0

828.5

SLO RE

220

133.9

66

0.913

LAM F2

0.967

23

18.5

1.025

0.927

219.8

66

CAT B1
491
26.1

1.020

220
4414

1.065

32.3

54.2

31.6

PZC

51.6

SLO B1
403

149.2

69.9

69.9

132.8

90.0

132.8

65.5

0.0

90.0

132.6

32.8

116.7
42.9

27.8

29.9

53.2

1.013
0.913

7.1

VM2 B1
220
1.054

LPA B1

119.4

23

2291 1.017

25.8

30.3
30.9
1.020

1.028

179.3

0.987

74.3

CON B1
66
1.029
372

27.9

128.4

127.2

127.2

0.968

1.033
B1
66
3372

CN2

31.7

66.6

0.953

65.5

66.6

134.0

0.953

32.8

1.035

31.7

263.1

43.0

0.982

BVN B1

1.015

0.970

220

26.8

66
1.009

LAM_PSA AER1
1405
0.971

LAM B1
405

CYO A
285

180.4

83.9

1.013

1.007

1.093

PSA B1
313

220

220

220

1.012

LUQ A
23
221
1.013

1.000

1.018

154.7

CCO B1

79.9

62.8

66
1.012

BPA B1
303

1407

220

31.6

43.0

CN2 B1
4472

90.1

132.9

1.000

154.2
1.001

220

75.3

1.062

LAM_PSA SUB1
1406
0.971

BSP B1
412

471
67.6

39.0

66
1313

117.5

CBV B1
1814

0.953

27.8

nCP F1

LAM_PSA AER2

114.6

1.000

9.3
27.7

27.9

229.6

229.6

119.9

119.9

69.9

69.9

1.019

220

1.045

123.3

123.3

91.1

132.4

90.1

132.9

1.019

SRO TA
467

220

173.5

68.9
43.0

9.7

1.191
4468

0.987

nBC F1
1326
PSA F1
513

1497.1

99.2

173.5 HOR B1
468

236.8 211.2
1.107

152.3

0.927

CAT2 A

SGA A
23
2491 1.005

220

99.2

68.8
68.9

68.9

73.5

SES TA

155.6

220

143.7

129.2

264.5

LUQ TA
421

IPU B2
805

220

1.051
11.8

66

0.971

LAM_PSA SUB2
1408
0.971

140.1
0.986

466

PSA B2
220
4413

PSA F2
514

CYO

485
82.3

311

0.927

220

1.007
LIM RE
411

nBS F1
1308

220

4491 1.046

13.4

236.7

MD B1
483

1.047
SGA B1
SICBRAS
4409

LIM B1
220
409

102.1

67.9

13.4

195.3
201.7
66

13.5
13.5
0.987

66

66

44.3

CMY B1 220
0.986 1409

102.1

7.9

35.9

208.7
66

LIM B1
344

68.8

73.5

73.2
73.2

SMI B1
308

1.014

PQI B1
4395

1.018
201.9

ACE B1
345

1497.5
MD HER2
1516

0.896

123.3

HOR comp 220


1.013

28.0

1671.1
421.0
413.3

34.6

32.9
32.9
VHA F1 3346 0.940
0.999

66
0.987

6308.1

24.9

VHA B1
346

27.4

6393.3
1.040
1.024

500

0.900
409.3

0.978

81.5

nPS F1
66
1306 1.008

66

410.1
26.9
0.986

157.4

0.985

IPS_SMI_F166
3306 1.006

CEN B1

CYO B1
885

414.1

24.1

157.4

61.8
152.2
0.960
0.985
PBO F1
505

500

18

0.900

24.9

152.2
0.960

61.7

32.6

35.7

87.3

61.8
1.000

35.7

152.4

152.4

87.3

61.7

23
2246
26.7
0.967
1.014

53.1
53.2

0.983

IPS B1
66
328 0.992
27.9

159.6

158.8

408

VHA AB2

35.6

IPS_PBO_F266
4306 0.985

87.2

PCA B1
66
324 1.016

76.3

414.1

410.1

220

PBO F2
506 0.985

76.2

184.4

66

PBO B1

20.3

208.5

AMP B1
327
0.981

159.6

158.8

PBO B1
66
306
20.3

66

1.000

1.017
PCA F2
525

1.000
87.2

1.000

66

0.982
MRA B1
304
0.976

IPU10G
700
6300.0
G
1088.2

1315.9

7.8

163.7

VCU B1
307

0.900

0.900

1.017
PCA F1
524

0.971

IPU B1
800

500

1475.2

0.900

195.3

160.2

161.8

220
161.8

PCA AB
424

160.0

159.2
164.3

66

500

23

500

AO 2022: RGIMEN NORMAL


291.6
VHA B1
446

220

0.900

291.6
190.4

529.4

VHA B1

538.6

500

MD B2
802

846

184.0

238.1 214.4
1.159

19.9

1.029

35.0

51.9

71.2

40.0

40.0

65.7

CAP

56.4

48.7

155.3

90.8

27.8

155.1

2.9

254.9
1.035

ESA B1
334

58.1

0.980

ACY B2
401

1.062

ACYC
2281

0.900

0.900

COV B1

220

MAQ B1
415

402

K30 B1

220

220
488

KM7 A
2298

113.2

113.7

103.5

0.953

COV AB
273

98.4

PIR B1
425

49.0

32.5

49.0
1.052 0.953

25.9

55.9

CDO

1.100

23

18.0

17.1
1.002

17.1

WMA
394

10.5

7.7

220

1.000

ADU
5401

220

0.999

94.1

66
19.9

61.4

60.2

188.4
47.6

45.9
10.4

1.012
ACYABC
1281

113.8

66

VAP

GUA B1
339

38.8

66
SRI AB
VAP TA
461

CVP BP
305

66

4.8
1.030

66

68.8

438.6

23
2288 1.022

220

438.6

875.2
438.6

4.8

54.1
51.7
0.993
1.004

0.975

71.6

MAU B1

220
449

73.1

1.082
PFO TA

23

0.999
PBU TA
451

249

220
1.086

2680.5
631.3

2753.8

2705.5

670.5

1.025
YAC19G
790

13.2
1340.0

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin
1.031

nTE F1
1360

16.7

16.7
1.042

19.5

66

54.5

18.7
1.001

39.8

16.8

0.950

41.5
CAL B1
452

0.980
CAM B1
378

220

1.020

47.4
32.5

77.5

COS B1
3363

66

66

43.2

39.4

39.5

1.050

39.6

0.950

41.2

NAT TA
453

43.2

43.2
1.019

CAM B2
220
478

87.3

174.8

174.8

66
2304

220
0.950

0.950
0.950

87.5
123.1

89.2

124.3

128.3
1.045

39.8
1.037
81.4
1.040

1.000

PQIS B1
8480
175.0

176.9

CDE B1
0.996

43.2
1.020

1.058

1.034

331.9

332.1

201.7

1.058

220

18.0

149.7

149.7

66

66

54.8

16.5
47.2 1.020

0.925

176.9

176.9
674.3
1.024
G

1.030

2.3

PFO B1
389

220

1.039

0.925

671.0

500

1.100

500
674.8

YAC B1
890

51.7

ENC B1
360

66

2.1
1.025

TRI B1
454

18.3

53.3

9.6

1.001

66

176.1

0.925

AYO B1
856

9.6

1.014

115.8

114.0

220
456
174.8

AYO B1

VIN B1
220
1.076 457

PPO B1
355

18.3

nTS F1
1370

SPA B1
487

66

0.967

1.046

151.0

1.071

1.015

9.0

90.9

151.0

84.4

38.7

23

83.2

TRI B1
354

130.1

55.3

66

18.0

220

9.2

480

39.0

136.0

T1
458

136.0

PIL

YUT B1
363

220

47.5

1.077

240

40.0

66

0.977
CBO TA

1.039

0.967

VT2 AB

42.8

220

SPP B1
362

18.3

220
440

57.7

B1

41.0

VT2

135.4

18.7

SJB TA
482
135.4

1.068

1.039

66

177.9

120.7

110.8

18.7

CBO B1
380

45.1

62.1
1.007

2239

500

APR BP
384

1.004

1.100

47.7

MAU
61.2
23

47.7

0.979

108.7
1.017
GUA AB2

1.100

18.0

1.032

1.042

70.8

132.9

68.8

132.9

1.015

48.0

1.064

1.093
220

489

1.047

173.9

47.3

437.6
0.975

1.094

175.0

39.7

LCD B2
8889

437.6
0.975

70.8
0.979

25.8

220

438.6

23
261

4.8

VAP B1
361

18.9

1.020

1.010

LCD TA
4489

1.060

28.8

PMA B1
220
730
1.035

50.8

nGI F1
66
1343

220
4488

44.1

113.9
1.031

SRI B1

438.0

40.5

68.9

1.086

220

1.020

1.095

47.4

68.6

SJN TA
4497

1337

9.0
0.993

438.0

30.0

QUI B1 FIC66
1338
1.001

9.0

47.4

220

1.012

QUI B1 FIC66
0.999
RED TA
220
430 1.036

CDE A
2204

23

23

10.1
0.975

45.9

216.3

102.2

16.2

212.3
29.2

19.7

0.990

ACYAB
281

1.047

47.6

23

19.4

66

216.3

A
298

ACY B3
382

10.5
4.4

94.3
1.093

188.4

1.058

K15

0.958

8.4

178.9

99.2

66

0.958
1.030

22.5

1.001

K15 TA
398

66

32.5
1.020

119.5
39.2

ACY G4 13.8
184 60.0
G
28.0
1.045

8.3

101.6
FMY TA
4433

1.045
ACY G3 13.8
183 60.0
G
28.0
1.045

19.6

1.086

23.8
66

1.090

66

216.4

GHN B1
343

VTA BP
341

88.1
1.033

32.5

32.9
1.064

COL BP
322

17.7

92.4
40.8

1.020

24.3
CZA B1
66
376

1.064

373

252.1

296

1.032
50.8

66.2

204.9

0.999

0.900

CAR
393

63.7

23.4

220

1.000

63.9
36.0

1.019

141.3

66

132.7

SAN TA
410

0.967

36.4

K30 BP
388

216.4

63.9

23
1.049

66

55.9

1.012

28.6

GUA B2
5404

30.0

0.967

62.8

53.7
179.3

375.0

16.2

62.8
SAN
210

1.030

VIL BP
375

0.900

59.6

1.090
442.2

372.1

23.3

52.5
179.5

0.980 53.7
0.980

191.8

30.4
30.4
31.5
COV BP
66

28.9

66.2

63.7
441.0

32.9

33.8

89.5
46.6

44.8
353.7
1.092

220

28.6

52.5

43.9
351.9

192.7 188.0

50.8

66.5

18.8

23

214 1.028

1.023

CDO TA
496

ACY G2 13.8
182 47.0
G
27.1

54.2

396.4

178.9

1.067
220

220
59.6

1.068

133.7

40.8

VEL AB
LAM_FIC 220
1400 1.031

47.4

53.7
VEL B1
414

VIL B1
475 1.020

33.8

1.068

20.9

0.980

23

52.1

44.8
1.047

209.6

32.5

217.9

43.9

198.5

0.953

1.015

0.985

18.3

18.8

26.5

52.5

1.024
1.056

23

0.997

220

133.0

66

26.3
1.019

CZU
297

193.2

30.9

105.3

138.1

13.5

26.3
26.3

59.3

60.0

190.5
1.073

54.2
1.090
1.090

220

1.047

497
31.2

106.3
1.047

66

51.4

1.020
ACY G1 13.8
181 47.0
G
27.1
1.045

1.047

25.5

nLT F1
1416

220

116.2

66

1.019

1.021

159.0
1.020

1.020

220

KM7 B1
4498

23

23

41.4
1.073

1.020
PIR B1
325

220

186.8

23

41.4

1.039

9.1

305.2

YZU G2 13.8
186 1.020

100.0
16.3

220

262.7

66

145.0
TBO B1
320

179.5

GUA B1
404

66

28.2
9.2

1.090

333.0

45.1
PAR B1
66
335

1.069

1.098

52.1
ESA TA

51.0

28.3

547.6

1.043

154.4

QUI B1
66
337

547.5

804

877.0

220

47.1

66
338
0.966

552.7

552.6
1.066

FOZ B2

16.4
23

51.2

500

0.993

CAU B1

559.7

1.066

0.982

69.4

42.2

49.5
1.012

36.3

1.019

66

549.0

564.3

294.8
1.050

397.4

100.0
16.2

0.980

333.7

VIC TA
220
2418
1.034

23.4

4.8

17.5

17.5

ITG BP
331

20.8
1.021

288.3
0.993

F4 241.5
1487

396.4

120.7

553.7
3036.9

220

B1 220

0.965

144.5

28.1

1.000
REP B1
2308

LAM B1
66
316

195.0

1.055
CO2 B1
448

258.4

28.1

17.5

nGR F1
66
1311

288.3

335.3

1.071
16.4
CUR B
2292
1.026

66

69.4

CAE BP
66
333

42.0
1.034

1.031
FICT VAU 220
3409

107.9

107.9
17.5
1.000

175.1

220

472
1.012

CZU TA

155.5

3036.7

397.4

170.3

1.020

17.5
509

1.019

BDO B1
17.4

4.0
TOR
4470

CAP TA
493

294.8
1.050

1.020

23

2272
1.027

153.9

198.0

120.3

26.3
LAM F1

1.019

148.0

94.1
0.950

288.3
0.993
F3 241.5
1486

220

9.5
CBV B1
370

30.0

23

25.2
155.1

1668.0

500

1668.0

288.3
1.110

23.3

GDI B1
66
2311

B1
801

294.8
1.050

194.3
CUR B1
492

CO2 AB
248

68.1

1.050

287.2

146.6

55.0

17.8

306.5

23

68.1

1.022

323

1.046

306.2
1.096

306.2

287.2

1.041

23

0.973

434

66

1.031

MD

202.9

39.7

71.4

57.2

220
2409

1.110

220

1.110

39.0

72.5

65.9

179.7

VAU B1

PQF B1
490

328.4

GAQ A
2266

66.4

510

199.1
1.054

YZU G1 13.8
185 1.020

825

0.993
FDM B1

294.8
1.050

288.3
0.993
F2 241.5
1485

MD

1.090

50.7

1.015

251.2

1.088

1.025

33.5

9.5

4.0

220

55.0
0.993

251.2

66

30.9

56.4

248.2

371

23

0.993

93.8
0.950

59.4

0.993
1.047

288.3
0.993

288.3

1467.1

220

51.9

19.5

66

340.0

31.6

90.5

185.0

50.7

0.980

SLO AB
201

66

34.1
1.035 0.993
GAQ TA
220
4466

0.967

1.021

1.024

1.020

F1 241.5
1484

MD

PQF B2
220
590

YZU B1 220
481 1.088

BGD B1

40.9

294.8
1.050

3371

1.030

18.2

1.045 4479

293
40.2

34.1

132.6

340.7

BPA FIC
1303

75.0

13.3

288.3
1.110
MD

287.2

186.8

24.5

52.1

52.1

43.0

181.2

157.1
33.6
1.040

23

BDO
CCO B1

1.044

YBY B1
66
369
0.984

1.050
VM1 B1
469

216.9

34.5
A
212

129.5
1.002

PJC B1

220

BSP

104.3

1.022

0.980

LAM F2

19.9

1.021

0.980

35.4

409.1

66.5

66

287.2

132.7

28.4

31.4

368

65.0

VAU B1
2309

220

0.0
1.100

0.998

MD

17.1

66

18.2

28.9

35.1

ACU B1

BMO A
2222

0.980

203.2
24.7

220

157.0

0.927

29.2

58.1

1.050

220
479
1.031

220

301

42.0
24.2

66

288.3
0.993
F5 241.5
1483

409.4

BMO B1
4222

205.1

66

53.7

HOR B1
1469

24.8

220

VAQ TA
427

19.9

1.007

220

8.9

1.081

34.2

58.1

T1 220
4487

56.9

SLO B1
403

2.4

57.5

36.6

66

288.3

4414
7.7

65.0
34.1

34.3

67.9

1.022

36.0

VM2 B1
220
1.051

PZC

CON B1
66
372 1.033

-77.9

SLO RE
302

66

IRY B1
484

148.4

12.5

123.7

34.2

36.0

1.038
B1
66
3372

CN2

66.8

66.8

0.993

SLO B1

55.7

55.7
179.7

23
285
1.029

19.9

213.6

1.026

77.7

31.6
28.5

28.9

PQI B1
4495
1.091
58.8

30.8

157.0

220

1.021

LPA B1

115.5

31.5

220

56.5
BVN B1

0.940

34.3

337.8

36.1

203.5

67.9

71.2

36.1

0.993

181.0

CCO B1

50.3

1.028

179.8

180.3

BSP B1
412

179.2
1.023

220

46.9

36.1

1.043

1.035

104.3

180.3
180.3
179.9

220

471

66
1.029

1.025
0.980

125.7

CBV B1
1814

6.7

1.007

1.075

53.0

111.4

111.4

1.031

220

LUQ A
23
221
1.024

LAM_PSA AER1
1405
1.034

220

CYO

220

157.1
95.0

42.0
36.0

23.3

24.1

66
1.032

BPA B1
303

1.024

SES TA

SRO TA
467
123.1

1.000

CN2 B1
4472

1.000

PSA B1
313

76.4

220

1.059

1.000

LAM B1
405

HOR B1
468

95.0

1.130
4468

28.5

66
1313

31.2
31.5
1.033

287.2
1.110
MD

0.0

220

28.4
1.020

80.1

1.043

1.046

109.0
110.2

110.2

55.8

55.8

1.026

CAT B1
491

28.0

485

0.0
1.100

1.065

44.9

1.044

nBC F1
1326
PSA F1
513

nCP F1

LAM_PSA AER2
1407
1.033

44.0

87.9

1.020

LAM_PSA SUB1
1406
1.034

80.7
1.040

220

CAT2 A
23
2291 1.026

SGA A
23
2491 1.015

220

1467.2 1667.9
1.066

1.007
11.8

206.9

220

1507.6
500

1507.6
1.066

0.0

55.5

1.047

340.4

nBS F1
1308

1507.5

198.4

42.2
42.2

42.2

74.4

74.1
74.5
287.8

287.8
109.0

179.8

179.5
179.8

180.3

1.026

36.4
ALT F
4407

66

LUQ TA
421

LAM_PSA SUB2
1408
1.034

CYO
83.8

12.6

238.1

1.034

PSA F2
514

220

466

PSA B2
220
4413

1.020

SGA B1
220
4491 1.061
SICBRAS
4409

LIM B1
220
409

LIM RE
411

66
1.031

IPU B2
805

220

1.020

251.6

66

344

12.5
12.5
0.992

MD B1
483

99.2

1.3

10.5

41.9

12.5

323.5

CMY B1 220
1.046 1409

330.6
LIM B1

66

66
1.024

339.9
66

HOR comp 220

SMI B1
308

1.029

28.0

66
311

PQI B1
4395

34.0

1.034

CEN B1

1507.6
MD HER2
1516

0.960

130.6

332.3

ACE B1
345

42.2

74.4

74.1

66
0.985

0.984

IPS_SMI_F166
3306 1.030

nPS F1
1306

1667.9
260.2
538.6

30.9

29.9
29.9
VHA F1 3346 1.020
0.994

99.2

10.5

10.5

29.7

VHA B1
346

2.5

6308.8

0.900
529.4

176.6
1.037

6313.5
1.042
1.024

500

26.9
1.049

1.020

IPS B1
66
328 1.023

539.6

101.3

176.6
0.960

71.9
166.9
0.960
1.022
PBO F1
505

6300.0
413.0

1084.3

101.3

166.9

0.998
CYO B1
885

24.8

71.9
1.000

71.8

1056.8

1036.2

0.900
530.4

52.1
52.2

G
1056.8

500

18

24.5

71.8

23
2246
26.7
1.023
1.020

IPU10G
700

539.6

530.4

24.8

77.5

VHA AB2

1.3

200.1

184.0

182.9

77.4

10.5

IPS_PBO_F266
4306 1.021

182.9

197.6

66

1021.0

220
408

PBO F2
506 1.022

338.9

AMP B1

PBO B1

22.0

1.000

109.3

109.3

PBO B1
66
306
21.9

66

327
1.018
1.038
PCA F2
525

1.000

74.4

66

1.019
MRA B1
304
1.014

324.3

188.3

193.9
109.3 176.1

109.3 176.1

1.000

PCA B1
66
324 1.037

VCU B1
307

0.900

0.900

1.038
PCA F1
524

1.028

IPU B1
800

500

1068.0

0.900

201.2

220
193.9

PCA AB
424

184.5

183.4

66

500

23

1.023

500

AO 2022: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO LT 500KV MARGEN DERECHA - VILLA HAYES
225.7
VHA B1
446

220

0.900

225.7
169.7

412.2

VHA B1

415.7

500

MD B2
802

846

166.5

56.8
56.9

56.9

44.6

BMO B1
4222

32.5

55.5

61.3

CAP

BDO B1
15.4

201.1

76.7

24.5

2.6

256.8
1.008

ESA B1
334
51.9

68.2

PIR B1
325

141.2

45.7

YZU G2 13.8
186 1.050

100.0
30.7

0.940

23

ACY B2
401

1.057

66

53.5

ACYC
2281

0.900

222.0

0.900

COV B1

220

MAQ B1
415

402

K30 B1

220

220
488

KM7 A
2298

0.927

COV AB
273

168.3

PIR B1
425

176.0

VIL BP
375

0.900

66

180.0

29.9

CDO

55.1

26.7

51.7
0.900

1.002

1.060

53.3

23

82.5

CAR
393

14.8
1.000

14.8

64.2
1.090

66

WMA
394

9.3

7.6

220

0.999

ADU
5401

220

0.998

86.4

66
18.2

59.1

58.1

231.0
45.7

44.1
11.6

1.026
ACYABC
1281

66

VAP

33.4
14.9

66
SRI AB
VAP TA
461

CVP BP
305

66

4.5
1.028

66

67.4

483.3

23
2288 1.017

220

483.3

965.1
483.3

4.5

50.0
48.0
0.980
1.000

0.975

118.5

MAU B1

220
449

120.3

1.078
PFO TA

23

1.004
PBU TA
451

249

220
1.083

2825.0
1051.2

3014.2

2922.9

779.7

1.070
YAC19G
790

13.2
1340.0

1.089

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

nTE F1
1360

15.7

15.7
1.040

23.7

66

50.0

22.4
0.984

39.7

15.7

0.950

41.5
CAL B1
452

0.980
CAM B1
378

220

1.033

45.2
22.9

86.8

COS B1
3363

66

66

40.4

36.4

36.5

1.048

39.4

0.950

41.2

NAT TA
453

40.1

40.4
1.015

CAM B2
220
478

203.9

82.0

206.9

CDE B1
0.996

66
2304

220
0.950

0.950
0.950

40.1
1.033

99.2

1.056

124.5

101.3

125.6

135.7
1.045

31.5
1.040
90.0
1.042

1.050

1.088

PQIS B1
8480
176.1

209.9

1.056

220

16.6

184.4

184.4

66

66

50.2

15.5
44.9 1.017

0.975

784.3

206.9
209.9

209.9
784.1
1.050
G

1.085

3.3

PFO B1
389

220

1.041

0.975

782.8

500

1.097

500
787.2

YAC B1
890

47.5

ENC B1
360

66

3.0
1.025

TRI B1
454

16.7

48.8

9.8

0.999

66

177.0

0.975

AYO B1
856

9.8

1.011

146.5

143.3

220
456
206.9

AYO B1

VIN B1
220
1.064 457

PPO B1
355

16.7

nTS F1
1370

SPA B1
487

66

0.979

1.047

187.4

1.055

1.028

8.4

86.1

187.4

114.0

35.7

23

112.5

TRI B1
354

137.7

88.3

66

16.6

220

8.5

480

49.5

186.0

T1
458

186.0

PIL

YUT B1
363

220

55.0

1.069

240

36.6

66

0.986
CBO TA

1.016

0.940

VT2 AB

38.8

220

SPP B1
362

16.7

220
440

86.6

B1

37.6

VT2

184.2

52.9

SJB TA
482
184.2

1.055

1.015

66

183.7

167.4

164.3

52.7

CBO B1
380

47.0

58.2
0.980

2239

500

APR BP
384

1.001

1.100

47.2

MAU
57.6
23

47.2

0.967

158.6
1.024
GUA AB2

1.100

16.6

1.027

1.021

68.9

132.7

67.4

132.7

1.011

44.7

1.063

1.091
220

489

1.047

179.5

44.1

482.6
0.975

1.092

176.1

36.6

LCD B2
8889

482.6
0.975

68.9
0.967

27.2

220

483.3

23
261

GUA B1
339

VAP B1
361

17.6

PMA B1
220
730
1.011

118.0
1.016

4.3

1.060

26.7

1.014

1.008

LCD TA
4489

46.1

157.6

nGI F1
66
1343

220
4488

482.5

156.8
1.005

SRI B1

46.8

40.5

69.2

1.079

220

482.5

69.0

SJN TA
4497

1337

9.9

1.092

46.8

145.9

QUI B1 FIC66
1338
0.998

9.9
0.993

264.9

220

0.978

QUI B1 FIC66
0.996
RED TA
220
430 1.012

CDE A
2204

23

23

11.3
0.957

44.1

264.8

170.7

19.9

210.9
129.6

18.1

0.991

ACYAB
281

1.047

45.7

23

17.9

66

264.8

A
298

ACY B3
382

9.3
4.3

86.6
1.090

231.0

1.026

K15

0.958

8.5

215.8

169.0

66

0.958
0.991

17.3

0.999

K15 TA
398

66

33.7
1.020

163.4
36.2

ACY G4 13.8
184 60.0
G
29.8
1.045

8.3

170.0
FMY TA
4433

67.0

1.045
ACY G3 13.8
183 60.0
G
29.8
1.045

18.0

1.077

25.5
66

79.2
1.033

36.1

33.7

34.6
1.038

COL BP
322

16.2

1.030

373

247.2

16.5

66

132.3

GHN B1
343

VTA BP
341

K30 BP
388

1.020

24.2
CZA B1
66
376
1.000

25.7
25.7
26.0
COV BP
66

24.8

296
34.6

31.1

84.2
51.3
1.050 0.927

429.7

245.6

0.926

51.7

0.927

26.6

220

1.000

67.5
31.4

1.015

228.3

178.8 174.5

53.3

1.090
483.2

264.9

SAN TA
410

0.940

31.8

220
55.1

67.0

64.2
481.4

424.4

14.9

67.5

66.2

52.7
91.3

17.6

GUA B2
5404

145.9

0.940

23
1.048

VIL B1
475 0.988

31.1

1.031
215.0

34.8
412.0
1.088

220

17.8

52.2

34.4

CDO TA
496

17.7

SAN
210
1.004

0.967

91.4

66.2

23

214 1.028

1.015

408.4
0.981

1.025

0.968

220

442.6

239.9

254.3

29.9

124.5

1.142
220

23

ACY G2 13.8
182 47.0
G
28.8

55.1

34.8
1.060

26.6

VEL AB
LAM_FIC 220
1400 1.004

56.5

52.7
VEL B1
414

34.4

52.9

215.8

17.6

0.967

CZU
297

229.8

29.0

149.0

23

140.4

40.8

52.2

55.6

56.9

225.5
1.056

55.1
1.090
1.090

220

1.060

497

147.5

1.030

4.3

38.2
1.020

220

194.8

108.6

139.9

38.2
38.2

201.9
1.020

193.2

7.2

66

38.4

1.015

1.024
ACY G1 13.8
181 47.0
G
28.8
1.045

1.047

22.9

nLT F1
1416

9.0

KM7 B1
4498

23

23

46.1
1.060

29.7

51.3

49.3

220

46.4

1.011

1.019

1.067

1.090

220

262.8

66

102.3
1.048

1.010

0.983

17.1

628.8

967.1

1.097

100.0
30.7

1.020

220

628.7

804

1.034

218.1

47.5
PAR B1
66
335

632.3

632.2
1.066

FOZ B2

19.3
23

194.7

26.3

642.7

1.066

369.8

500

64.1

QUI B1
66
337

630.4

645.7

333.8

442.6

136.2

633.5
2650.6

1.050

52.9
ESA TA

163.8

24.8

91.4

GUA B1
404

323.8
0.984

F4 241.5
1487

220

48.2

66
338
0.965

323.8

0.944

0.967

CAU B1

2650.4

220

0.940

66

26.9

1.020

66

333.8
1.050

444.2

1.024
CO2 B1
448

218.5

VIC TA
220
2418
1.009

66

TBO B1
320

337.8

293.5

196.1

49.4

66

1.020

163.1

ITG BP
331

323.8
0.984
F3 241.5
1486

MD

387.5

9.4

9.3

27.8

CBV B1
370

252.1

51.5
1.009

41.0

1670.0

323.8
1.120

1.067
19.3
CUR B
2292
1.013

B1 220

0.971

25.1

322.0

444.2

194.6

220

472
1.004

0.967

64.1

CAE BP
66
333

68.1
1.009

1.008
FICT VAU 220
3409

339.4

1.020

23

2272
1.022

175.4

CZU TA

76.1

24.7

21.6

21.6

168.5

1.020

76.1

24.7

21.6
1.000

1670.0

500

220

182.6

20.2

22.8

B1
801

333.8
1.050

236.4
CUR B1
492

2.8
TOR
4470

CAP TA
493

63.2

63.2

135.9

338.9
1.095

338.9

139.7

1.025

23

102.7
0.950

1.015

MD

322.0

37.8

51.1

102.1

23.7

nGR F1
66
1311

1.120

220

378.3

GAQ A
2266

59.5

1.057

76.1

PQF B1
490

244.7

YZU G1 13.8
185 1.050

434

24.5

20.8

9.0

238.7
1.042

1.026

31.6

36.0

65.5

91.5

63.2

58.4

1.008

333.8
1.050

323.8
0.984
F2 241.5
1485

1.120

CO2 AB
248

23

1.014

1.030

323

1.053

220
2409

GDI B1
66
2311

REP B1
2308

LAM B1
66
316

292.8

1.087

50.0

17.7
2.5

220

59.5

66

120.3

120.3
21.6
1.000

292.8

66

33.4

0.967

288.5

1.090

825

0.967

61.3

54.7

371

23

0.967

VAU B1

323.8
0.984

323.8

814.1

34.4

102.3

65.3
FDM B1

F1 241.5
1484

322.0

1468.9

220

0.967

509

1.020

225.6

54.5

SLO AB
201

0.950

1.023

1.019

323.8
1.120
MD

MD

PQF B2
220
590

YZU B1 220
481 1.096

BGD B1

101.7

32.6
0.995 0.940
GAQ TA
220
4466

66

1.024

66

55.3

220

322.0

23

293
53.6

53.6

32.6

0.967

55.5

58.9
BPA FIC
1303

53.7
7.5

333.8
1.050

3371

1.018

16.7

1.059 4479

BMO A
2222

0.967

1.019

LAM F1

1.020

220.4

269.9
31.2
1.001

23

124.5

510

18.7

155.1

222.4

66

CCO B1

1.031

YBY B1
66
369
0.977

1.062
VM1 B1
469

178.0

33.1
A
212

152.0
1.001

PJC B1

220

BSP

BDO

50.0

67.0

220

1.007

155.7

66

368

146.9

VAU B1
2309

IRY B1
484

0.0
1.100

0.997

MD

15.2

66

18.7

26.7

33.8

ACU B1

220
479
1.047

301

36.5

0.940

LAM F2

VAQ TA
427

24.1

220

134.9
25.5

220

263.6

0.940

1469

22.7

SLO B1
403

154.6

56.9
25.7

66

28.2

41.3

66

0.0
PQI B1
4495
1.090

54.8
28.8

18.7

0.980

220

51.6

HOR B1

27.0

54.5

1.059

51.9

0.0

SLO RE
302

66

323.8
0.984
F5 241.5
1483

4414
8.1

1.072

31.9

54.5

31.6

31.8

66.5

T1 220
4487

36.6
28.3

30.9

23.1

63.5

18.5

182.3

22.3
63.2

31.6

39.9

BVN B1

7.1

VM2 B1
220
1.063

PZC

LPA B1

64.2

64.2
91.5

23
285
1.033

1.025

0.940

34.4

80.7

1.023

1.020

123.7

30.8

18.5

176.6

1.002

74.8

CON B1
66
372 1.040

91.5

136.9

1.044
B1
66
3372

CN2

65.5

65.5

0.967

55.3

136.9
136.9
136.7

CYO

220

220

220

1.022

31.8

264.5

40.0

135.0

66.5

50.7

40.0

0.967

151.1

CCO B1

76.3

33.4

1.045

1.010

SLO B1

118.0

125.5

125.5

BSP B1
412

150.2
1.013

220

71.7

63.7

16.2

1.007

1.112

PSA B1
313

220

471

66
1.022

1.018
0.940

220

LUQ A
23
221
1.029

LAM_PSA AER1
1405
1.004

1.000

111.5

CBV B1
1814

0.953

115.2

17.1

66
1.023

1.000

1.018

220

SRO TA
467
107.8

1.000

CN2 B1
4472

BPA B1
303

LAM B1
405

220

141.8

56.8
40.1

16.2

66
1313

323.8
1.120
MD

225.5

1.173
4468

1.071

1.000

LAM_PSA AER2
1407
1.003

141.8 HOR B1
468

277.7 245.1
1.150

28.3

nCP F1

322.0

1.059

1.052

111.4
112.5

112.5

64.3

64.3

1.020

LAM_PSA SUB1
1406
1.004

0.0
1.100

0.980

1.015

nBC F1
1326
PSA F1
513

1469.1 1670.0
1.066

1.066
0.0

220

26.1
1.020

30.2
30.8
1.020

SES TA

127.2

0.993

CAT B1
491

25.7

485

137.5
1.012

11.8

156.6

220

CAT2 A
23
2291 1.026

SGA A
23
2491 1.013

220

1493.3
500

1493.3

1.047

1.020

265.8

nBS F1
1308

1493.0

132.3

72.2

71.9
51.9
223.7

223.7
92.2

111.4

136.3

91.5

136.9

1.020

82.1

66

LUQ TA
421

LAM_PSA SUB2
1408
1.003

140.8

13.5

277.7

1.004

PSA F2
514

CYO

466

PSA B2
220
4413

0.993

220

HOR comp 220

SMI B1
308

1.021

27.9

66
311

SGA B1
220
4491 1.054
SICBRAS
4409

LIM B1
220
409

LIM RE
411

66
1.020

IPU B2
805

220

200.3

56.3

13.4

202.1

CMY B1 220
1.013 1409

208.4
66

344

13.5
13.5
0.997

MD B1
483

100.2

5.5

22.2

215.1
66

LIM B1

66

66
1.015

208.5

ACE B1
345

56.8

72.2

71.9

66
0.993

PQI B1
4395

100.2

22.1

30.6

VHA B1
346

22.8

1493.3
MD HER2
1516

0.919

122.4

81.2

1.024

CEN B1

401.8
415.7

32.2

30.9
30.9
VHA F1 3346 0.967
1.004

0.992

IPS_SMI_F166
3306 1.018

nPS F1
1306

1670.0

0.900
412.2

1.003

6300.7

26.9
1.013

163.0

104.6

163.0
0.960

64.7
156.5
0.960
1.004
PBO F1
505

6355.9
1.050
1.024

500

104.6

156.5

CYO B1
885

416.5

24.9

64.7
1.000

64.6

6300.0
841.1

24.1

64.6

500

18

0.900
413.0

52.9
53.0

IPU10G
700

416.5

413.0

24.9

76.3

23
2246
26.7
1.028
0.980

5.5

174.5

166.5

165.6
VHA AB2

1.003

IPS B1
66
328 1.008
51.5

165.6

76.2

22.1

IPS_PBO_F266
4306 1.003

1328.4

220
408

PBO F2
506 1.004

215.0

66

PBO B1

20.3

1.000

94.9

94.9

AMP B1
327
1.001
1.027
PCA F2
525

1.000

PCA B1
66
324 1.026

PBO B1
66
306
20.3

66

22.1

158.8

158.8
95.0

95.0

1.000

66

1.001
MRA B1
304
0.996

202.1

168.1

171.1

VCU B1
307

0.900

0.900

1.027
PCA F1
524

0.996

IPU B1
800

500

1474.6

0.900

175.3

220
171.1

PCA AB
424

166.9

166.0

66

500

23

1.029

500

AO 2023: RGIMEN NORMAL

301.6
VHA B1

220

446
0.900

301.6
194.2

504.3

VHA B1

513.9

500

MD B2
802

846
188.5

55.4

34.4
1.090 1.047
GAQ TA
220
4466

88.2

63.7

162.8

162.6

1.049

102.1
1.092

144.0

149.8

171.7

CBV B1
370

66

YZU G2 13.8
186 1.015

100.0
7.1

220

29.1

0.993

ACY B2
401

1.057

97.9

500

ACYC
2281
46.8

0.900

294.1

0.900

COV B1

220

MAQ B1
415

402

175.1

28.9

220

K30 B1

220
488

KM7 A
2298

28.2

220

PIR B1
325

66

52.0

51.4

PIR B1
425

69.4
COV AB
273

85.6

32.3

234.0

32.3

51.4
1.049 0.953

50.8

269.3

220

23
296

101.8

19.4
0.999

19.4

WMA
394

12.2

7.8
0.997

24.0

COL BP
322

ADU
5401

220

ACY B3
382

66
21.6

63.7

62.1

157.0
54.3

51.5
11.6

1.026
ACYABC
1281

51.5

GUA B1
339

49.0
26.3

66
SRI AB
VAP TA
461

CVP BP
305

66

5.1
1.025

66

71.4

23
2288 1.021

220

384.7

766.0
384.7

5.1

56.1
53.5
0.993
1.001

0.975

66.3

MAU B1

220
449

67.9

1.081
PFO TA

23

0.996
PBU TA
451

249

220
1.087

220
456

2.7

14.8
45.5 1.022

151.2

151.2
152.6

152.6

15.0

15.0
1.041

21.0

66

20.1

CAM B1
378

220

1.020

45.8
35.7

74.2

COS B1
3363

66

66

43.8

42.1

42.3

0.950

43.1
CAL B1
452

1.048

41.0

0.950

42.8

NAT TA
453

43.6

43.8
1.020

CAM B2
220
478

76.4

131.7

93.8

179.2

179.2

1.040

2677.1
626.4

2749.4

2701.7

668.7

1.025
YAC19G
790

13.2
1340.0

1.032

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

PQIS B1
8480
195.8

314.2

1.034

314.0

218.7

669.2

195.8

181.4

181.4

181.4
672.4
1.025
G

0.925

500
1.031

672.9

AYO B1
856
500

119.1
1.048

220
0.950

0.950

1.029
78.2

1.000

YAC B1
890

66
2304

42.2
1.037

0.925

CDE B1
0.992

0.950
75.2
130.5

196.9

0.925

1.059

220

43.6
1.020

1.056

66

0.993
41.3

15.0

0.967

1.016

1.100

nTE F1
1360

66

PFO B1
389

220

19.4

56.7

ENC B1
360

66

2.3
1.028

TRI B1
454

19.7

58.9

10.1

1.051

VIN B1
220
1.076 457

115.9

114.2

AYO B1

10.1

0.998

66

19.7

nTS F1
1370

SPA B1
487

PPO B1
355

0.958

96.7

82.9

1.070

1.027

179.2

19.6

23

81.8

9.8

66

120.7

51.0

TRI B1
354

19.4

220

66

59.0

10.0

480

38.0

T1
458

132.7

PIL

YUT B1
363

220

46.7

1.077

240

43.9

66

0.970
CBO TA

1.041

0.993

VT2 AB

47.4

220

SPP B1
362

59.2

220
440

53.7

B1

20.0

VT2

132.1

13.8

SJB TA
482
132.1

1.068

1.040

66

169.3

116.5

105.4

14.7

CBO B1
380

44.8

65.8
1.007

132.7

64.6
23

500

APR BP
384

1.001

1.100

49.3

MAU

GUA AB2
2239

49.3

0.980

103.6
1.013

1.100

19.7

1.028

1.009

1.042

73.7

19.4

71.4

127.4

51.2

127.4

50.3

1.061

1.093
220

489

1.047

165.7

42.6

383.0
0.975

1.093

73.7
0.980

25.7

LCD B2
8889

383.0
0.975

23
261

5.1

VAP B1
361

20.5
VAP

384.7

43.8

66

28.6

PMA B1
220
730
1.036

68.3
1.015

220

384.7

384.5

140.4

nGI F1
66
1343

1.047

49.1

140.1
1.029

QUI B1 FIC66
1338
0.997

40.5

68.9

1.008

LCD TA
4489

384.5

68.6

220
4488

1.015

1.096

49.1

77.3

SRI B1

10.0
0.993

173.2

220

10.0

1.087

220

1337

CDE A
2204

23

23

11.3
0.957

54.3

173.0

134.0

SJN TA
4497

21.3

0.983

ACYAB
281

1.033

173.0

1.021

A
23
298

21.0

66

157.0

1.073

K15

1.012

0.996

101.4

149.6

131.8

66

0.958

9.2

12.2
4.3

101.6
1.094

24.1

0.994

K15 TA
398

66

0.958
1.044

115.6
41.9

23.8
1.020

1.074

ACY G4 13.8
184 60.0
G
27.1
1.045

9.2

1.020

26.4
CZA B1
66
376

ACY G3 13.8
183
60.0
G
27.1
1.045

21.3

1.089

45.7

23.5
66

96.5
1.033

49.9

173.2

GHN B1
343

VTA BP
341

65.8
1.090

127.2

RED TA
220
430 1.037

68.7
40.7

1.015

CDO

21.0

63.4

66

133.2
FMY TA
4433

QUI B1 FIC66

72.4
1.000

SAN TA
410

0.967

41.2

1.100

53.5

24.6

227.2
0.996

68.7

23
1.041

28.4

77.4

CAR
393

175.4

1.004

1.046

28.5

220

77.3

0.967

67.3

61.3
187.4

0.900

66

127.2

1.027

338.5
K30 BP
388

25.8

67.3
SAN
210

61.3

108.3

419.1

336.4

25.0

59.4
187.6

0.980
0.980

66

48.9

81.7

1.090

1.093

220

25.0

59.4

VIL BP
375

0.900

30.2
30.2
31.4
COV BP
66
21.5
1.084
373

28.7

65.8

63.4

313.5

312.2
CDO TA
496

28.5

23

214 1.017

GUA B2
5404
1.109

220

1.045

54.6

167.2

1.027

85.7

20.4

VEL AB
LAM_FIC 220
1400 1.029

49.9

61.3
VEL B1
414

33.2

162.2

ACY G2 13.8
182
47.0
G
26.2

53.8

395.4

1.016

46.1

33.5

51.8

54.6
1.047

149.6

40.8

0.980

220

53.5

92.1

48.9
PAR B1
66
335

53.1

53.1

1.033

51.6

1.073

5.1

59.4

162.2

23

215.0 208.8

144.0

20.4

18.5

18.4
1.021

160.3
1.081

178.8
VIL B1
475 1.030

33.5

1.073

19.3

18.4
18.4

1.090

1.047

418.0

1.068

105.1

143.3

1.020

66

CZU
297

72.0

23

1.013

220

53.8

220

ACY G1 13.8
181
47.0
G
26.2
1.045

1.033

20.5

nLT F1
1416

1.022

63.8

64.7

0.953

1.007

0.982

19.7

KM7 B1
4498

23

497

152.6

130.9

1.041

9.6

220

33.7

119.1

29.3

187.6

150.4

110.9
0.967

66

25.4

1.021

267.9

66

1.020
118.9

GUA B1

66

TBO B1
320

127.2
1.020

1.020

28.1

1.016

1.090

220

23

46.5
1.073

123.3

QUI B1
66
337

220

212.3

23

0.985

70.9

104.0
1.042

1.064

29.8

CO2 B1
448

0.993

ESA B1
334

486.1

199.3

100.0
7.1
1.074

51.8

50.4

486.0

1.090

YZU G1 13.8
185 1.015

0.996

ESA TA

259.2
1.036

492.6

492.6
1.062

FOZ B2
804

1.100

1.090

294.7

120.8

496.9

768.2

220

46.8

487.3

503.0

249.7
1.050

66

70.9

0.966

66
338
0.959

245.5
0.994

F4 241.5
1487

17.3
23

YZU B1 220
481
1.099

0.993

CAU B1

245.5

395.4

CAE BP
66
333

493.6
3421.5

1.058

TOR
B1 220
4470

CAP TA
493

3421.2

396.5

371

33.2

23

249.7
1.050

1.061

1.089
17.3
CUR B
2292
1.013

CO2 AB
248

VIC TA
220
2418
1.033

66

245.5
0.994
F3 241.5
1486

219.6

196.5

220

472
1.020

277.0

50.1
1.008

36.3

1668.1

245.5
1.110

396.5

167.0

1.020

ITG BP
331

244.8

220

97.9

23.1

216.1

23

69.5

27.7
1.034

216.0
1.099

216.0

99.6

14.7

23

62.2

120.5

1.032
FICT VAU 220
3409

29.3

1.000

1668.1

500

1.047

1.0

69.5

22.6

20.3

B1
801

249.7
1.050

96.9
CUR B1
492

CZU TA

175.8

1.022

MD

244.8

157.0

220

1.053

175.3

29.3

nGR F1
66
1311

1.110

220

159.0

98.4

20.6
LAM F1
509

249.7
1.050

245.5
0.994
F2 241.5
1485

104.7

66
3371

434

21.3

175.3

245.5
0.994

245.5

MD

99.6

33.9

59.5

15.5
14.8

31.1
1.047
VM1 B1
469

162.6

1.096

1.097

23

29.1

1.022
95.2
0.950

1.032

F1 241.5
1484

1.110

0.980

300.6

CAP

161.5

43.2

220
2409

PQF B1
490

90.6

42.2

68.1

76.7
53.6

69.1

VAU B1

245.5
1.110
MD

244.8

217.6

GAQ A
2266

130.3

57.3

1.017

63.7

1.024

33.8

BDO B1

CCO B1
1.095

1.079

YBY B1
66
369
0.993

62.2
0.993

34.4

2272
1.025

34.9

63.7

84.6

197.6
33.9
1.094

23

BDO

825

0.993

98.1
0.950

51.4

249.7
1.050

1467.2

220

58.6

38.0
28.6

35.7

94.9

21.6

0.900

23

66

323

245.5
0.994
F5 241.5
1483

MD

PQF B2
220
590

100.3

31.6
77.0

66

30.8

38.7

59.0
59.0

0.980

0.993
FDM B1

244.8

1.000
215.7

220

0.0
1.100

57.5

220

197.4

289.2

33.8
A
212

14.5

1.041 4479

58.7

24.0

53.9

36.6

82.2

51.9

51.9

179.7
179.7

187.9

66

VAQ TA
427

21.6

57.3

SLO AB
201

67.9

187.9

179.4

59.3

59.3

23.4

14.0

0.900

HOR B1
368

PJC B1

220

BSP

118.6

404

14.0

IRY B1
484

33.2

1.060

29.8

95.6

1.029

21.4

1.016

1.020

34.6

1.014

1.025

1.060

245.5

MD

127.3
1.003

BGD B1

42.9

244.8
1.110
MD

0.0
PQI B1
4495
1.096

63.7

0.993

GDI B1
66
2311

9.6

ACU B1

293
41.8

41.8

1.021

REP B1
2308

LAM B1
66
316

1.049

BMO A
2222

0.980

1.023
42.0

70.2

118.6

118.6

BPA FIC
1303

80.4

0.0
1.100

26.0

220
479
1.026

220

46.2

66

19.7

14.0

14.0
1.000

36.7

69.0

265.6

69.0

37.0

BMO B1
4222

265.4
VAU B1
2309

1467.2 1667.9
1.061

1.061
0.0

220

30.9

34.3

451.7

23
285
1.028

34.5

220

79.9
29.9

25.6

0.967

1.022

39.0

37.0

220

265.1

SLO B1
66
301

113.8

113.8

66

45.0
29.5

1.026

LAM F2
510
1.022

SLO RE
302

7.9
66

LAM_PSA AER1
1405
1.031

0.967

65.2

37.0

30.2

SLO B1
403

1.083

PSA B1
313

1.025

1.028

T1 220
4487

25.7
24.0

-93.9

21.4

281.1

471

9.7

1.073
1469

VM2 B1
220
1.048

PZC

CON B1
66
1.031
372

118.7

220

BVN B1

8.5

82.6

LPA B1

66

33.8
34.3
1.047

197.4

1.062
220
47.4

1.023

1.029

188.0

179.8

1.037
B1
66
3372

CN2

247.5

CCO B1

1.022

67.5

67.5

0.993

CYO

220

220

40.0

32.4

1.045

333.6

333.6

30.3

265.9

0.993

BSP B1
412

4414
38.5

1.007

1.036

220

242.7
1.042

220

39.2

26.0

66
1.029

BPA B1
303

LAM B1
405

173.6

CBV B1
1814

0.953

220

LUQ A
23
221
1.021

1.000

451.7

SES TA
466

1.4

30.2
30.3

CN2 B1
4472

29.3

1523.1
500

1523.1

1.080

171.5

1.049

146.7

CAT B1
491

30.2
1.033

233.5

223.8
1.048
SRO TA
467

1.056

LAM_PSA SUB1
1406
1.032

224.7
1.048

220

220

1.000

24.0

66
1313

CAT2 A
23
2291 1.023

SGA A
23
2491 1.013

220

197.6

4468

21.0

114.1

114.1

51.9

1.027

1.000

LAM_PSA AER2
1407
1.031

HOR B1
468

81.2
HOR comp 220
1.121
81.2

55.7
55.7

55.7

232.9 210.2
1.157

66
1.032

nBC F1
1326
PSA F1
513

51.9

188.0

179.8

1.027

167.4

1.045

113.9

179.2

187.6

113.9

1.007

nCP F1
LAM_PSA SUB2
1408
1.032

166.6

336.2

220

IPU B2
805
1523.0

1.060
11.8

336.1

LUQ TA
421

PSA F2
514

163.2
ALT F
4407

1.020

232.9

1.032

CYO A
485

234.5

75.9

nBS F1
1308

220

4409

25.2

LIM RE
411

PSA B2
220
4413

1.007

SGA B1
220
4491 1.076
SICBRAS

LIM B1
220
409

66

68.9

297.0

297.0

1.030

66

220

393.3

14.5

9.7

55.1

23.8

254.8

24.3
24.3
0.991

MD B1
483

1.047

262.0
66

55.6

76.9
20.2

73.8

66
311
23.5

CEN B1

CMY B1 220
1.047 1409

162.4

1.034
SMI B1
308

PQI B1
4395

66

1.009
271.0

344

66
1.031

1667.9
1523.1
1.000

0.963

102.2

66

LIM B1

55.7

76.9

76.6
76.6

nPS F1
1306

20.6

263.4

ACE B1
345

6324.5

961.1

MD HER2
1516

457.5

300.0

66
0.963

0.967

IPS_SMI_F166
3306 1.029

948.1

457.5

392.9

20.8

VHA B1
346

7.9

6303.2
1.033
1.024

280.9
513.9
0.900

20.8
20.8
VHA F1 3346 1.100
0.965

500

18

0.900

0.900
504.3

14.5

9.7

1.019

IPS B1
66
328 1.019

59.3
1.050

180.7
1.038

962.4

100.2

180.7
0.960

9.7

IPS_PBO_F266
4306 1.019

170.5

74.2
170.5
0.960
1.020
PBO F1
505

949.0

6300.0
201.6

515.0

25.6

74.2
1.000

74.1

IPU10G
700
G

500

967.9

0.900
505.3

14.7

74.1

23
2246
57.3
0.993
1.021

53.9
54.1

515.0

505.3

188.0

186.8

408

VHA AB2

1.000

112.4

112.4

73.3

188.0

220

PBO F2
506 1.020

73.1

14.1

66

PBO B1

23.2

CYO B1
885
983.0

270.2

AMP B1

935.6
186.8

PBO B1
66
306
23.2

66

327
1.017
1.038
PCA F2
525

1.000

73.6

66
324 1.037

66

1.017
MRA B1
304
1.014

9.7

112.5 179.1

112.5 179.1

1.000

PCA B1

1.029

0.900

0.900

1.038
PCA F1
524

VCU B1
307

203.2

197.2

220
197.2

PCA AB
424

IPU B1
800

500

963.9

0.900

255.4

191.9

187.3
204.3

66

500

23

500

AO 2023: RGIMEN DE EMERGENCIA: FUERA DE SERVICIO SE 500 KV CARAYAO

235.2
VHA B1

220

446
0.900

235.2
162.0

430.7

VHA B1

435.5

500

MD B2
802

846
157.9

48.3

BSP

56.8

30.8
1.028 0.993
GAQ TA
220
4466

227.9

232.8

49.9
300.4

299.7

246.6
1.048

162.4

169.3

165.1

24.9

CAP TA
493

190.7

195.8

CBV B1
370

66

104.1

YZU G2 13.8
186 1.050

26.6
26.1

0.967

23

ACY B2
401

1.053

500

ACYC
2281

0.900

COV B1

220

MAQ B1
415

402

220

K30 B1

220
488

KM7 A
2298

182.4

119.2

29.0

48.7

46.8

0.975

29.0

86.2

1.100

48.3
267.6

23
296

85.7

15.3

WMA
394

10.4

7.0

COL BP
322

220

K15 TA
398

ADU
5401

220

ACY B3
382

10.4
3.9

90.9
1.092

66
19.3

61.8

60.6

233.4
46.9

ACYAB
281

45.2
1.047

10.5

1.010
ACYABC
1281

45.2

44.4

SRI AB

23
2288 1.018

220

CVP BP
305

66

4.6
1.018

66

63.3

1009.9
506.1

4.6

49.7
47.7
0.993
0.992

0.975

89.0

MAU B1

220
449

89.8

1.075
PFO TA

23

0.994
PBU TA
451

249

220
1.088

220
456

49.4

ENC B1
360

66

2.7

2.4
1.028

15.8
41.6 1.023

160.3

160.3
162.2

162.2

nTE F1
1360

66

16.1

16.1
1.045

18.7

66

18.0

220

1.033

42.1
26.6

86.9

COS B1
3363

66

66

39.7

38.0

38.2

1.007
38.1

16.1

0.950

39.6
CAL B1
452

1.054

37.8

0.950

39.3

NAT TA
453

39.2

39.7
1.021

CAM B2
220
478

138.1

129.5

82.1

183.8

183.8

1.041

2837.5
867.7

2967.2

2893.8

762.3

1.025
YAC19G
790

13.2
1340.0

1.036

Administracin Nacional de Electricidad


Direccin de Planificacin General y Poltica Empresarial
Divisin de Estudios Energticos
Departamento de Estudios de Generacin y Transmisin

PQIS B1
8480
140.2

424.6

1.036

424.2

170.4

763.6

140.2

186.4

186.4

186.4
766.5
1.036
G

0.925

500
1.032

767.8

AYO B1
856
500

176.0
1.046

220
0.950

0.950

1.040
90.3

1.000

YAC B1
890

66
2304

34.8
1.041

0.925

CDE B1
0.998

0.950
135.7
128.4

140.9

0.925

1.057

220

39.2
1.033

1.058

66

220

0.980
CAM B1
378

PFO B1
389

52.7
TRI B1
454

17.5

50.8

8.6

1.002

66

17.7

8.5

1.017

1.100

PPO B1
355

17.7

nTS F1
1370

SPA B1
487

66

0.974

1.048

VIN B1
220
1.069 457

126.2

124.3

AYO B1

8.9

86.6

94.3

1.060

1.022

183.8

17.6

23

93.3

TRI B1
354

178.8

66.5

66

17.5

220

9.1

480

41.9

T1
458

153.5

PIL

YUT B1
363

220

49.1

1.074

240

39.5

66

0.982
CBO TA

1.018

0.980

VT2 AB

42.1

220

SPP B1
362

53.0

220
440

68.7

B1

17.9

VT2

152.5

33.0

SJB TA
482
152.5

1.061

1.016

66

224.6

136.6

129.4

33.5

CBO B1
380

45.9

58.8
0.980

153.5

58.1
23

500

APR BP
384

1.004

1.100

47.5

MAU

GUA AB2
2239

47.5

0.967

126.3
1.025

1.100

17.7

1.027

1.011

1.026

64.8

17.5

63.3

150.2

45.6

150.2

44.9

1.065

1.094
220

489

1.047

218.5

37.9

505.0
0.975

1.095

64.8
0.967

22.5

506.1

23

44.9

GUA B1
339

66
VAP TA
461

LCD B2
8889

505.0
0.975

505.4

A
261

4.6

VAP B1
361

18.2
VAP

506.1

47.2

66

25.6

PMA B1
220
730
1.012

89.0
1.017

220

506.1

505.4

159.5

nGI F1
66
1343

1.047

47.2

158.7
1.005

QUI B1 FIC66
1338
0.989

36.5

61.4

1.008

LCD TA
4489

269.2

61.1

220
4488

1.018

1.095

269.2

21.7

SRI B1

9.1
0.993

150.5

220

9.1

1.079

220

1337

CDE A
2204

23

23

10.2
0.975

46.9

269.0

161.2

SJN TA
4497

19.1

0.990

66

269.0

0.993

A
23
298

18.9

1.025

0.999

90.7

233.4

1.038

K15

0.958

9.5

219.2

159.4

66

66

0.958
1.023

21.7

0.998

21.5
1.020

134.5
37.5

ACY G4 13.8
184 60.0
G
28.2
1.045

9.4
1.000

21.6
1.050

ACY G3 13.8
183
60.0
G
28.2
1.045

19.0

1.081

41.2

20.7
66

15.3
1.001

150.5

GHN B1
343

VTA BP
341

82.1
1.033

45.6

1.020

23.7
CZA B1
66
376

18.8

66.3
1.090

160.6
FMY TA
4433

QUI B1 FIC66
0.987
RED TA
220
430 1.013

61.4
45.7

1.017

CDO

23.6

229.8
21.3
1.000

SAN TA
410

0.953

46.1

25.3

69.5

63.7

66

22.8

220

21.7

23
1.038

0.900

245.5

0.990

1.023

25.5

GUA B2
5404

61.4

60.4

54.4
130.6

73.0

CAR
393

23.2

1.004

443.7
66

22.5

60.4
SAN
210

54.4

183.6

517.2
1.090

K30 BP
388

22.4

53.2
130.7

0.953
0.953

66

43.9

28.7
28.7
30.0
COV BP
66
19.2
1.057
373

27.2

1.090

438.5

25.5

53.2

46.4

0.953

18.1

23

214 1.029

VIL BP
375

0.900

0.997

119.2

36.8

VEL AB
LAM_FIC 220
1400 1.005

30.1

66.3

63.7

419.8

416.5
220

41.5

48.3

46.8
1.047 0.940

44.9

1.045

48.7

242.0
CDO TA
496

ACY G2 13.8
182
47.0
G
27.3

54.3

462.6

1.018

30.0

231.7

0.940

154.4

1.037
220

220

52.2

48.7
1.047

47.6

191.2 186.3

1.045
236.3

47.6

23

1.006

46.1

1.045

54.4
VEL B1
414

235.9

252.9
VIL B1
475 1.001

30.1

0.983

220

18.5

18.0

0.953

231.6
1.061

515.2

1.037

179.6

153.7

4.6

53.2

CZU
297

147.2

23

1.020

18.1

23.5

23.2
1.017

1.090

1.047

23.3
23.2

57.5

58.2
30.3

PIR B1
425

54.3

220

ACY G1 13.8
181
47.0
G
27.3
1.045

1.047

497

145.6
COV AB
273

66

1.020

66

220

184.0

158.8

1.016

nLT F1
1416

200.8
1.020

99.8
0.953

159.2

1.020

KM7 B1
4498

23

219.2

66

13.4

130.7

66

43.5
PAR B1
66
335

1.019

1.090
0.900

23

42.0
1.073

220

272.3

66

94.9

1.012

25.2

220

42.1

194.5

PIR B1
325

1.069

100.0
29.0

0.961

263.2

1.042

607.0

220
26.6

CO2 B1
448

52.2

ESA B1
334

606.9

1012.2
1.067

1.090

100.0
28.9
1.037

0.967

47.8

610.9

610.8
1.067

FOZ B2
804

199.9

162.1

1.009

ESA TA

264.6
1.015

620.4

1.099

YZU G1 13.8
185 1.050

35.7

194.4

608.5

623.8

346.1
1.050

462.6

QUI B1
66
337

17.6

335.8
0.986

F4 241.5
1487

15.6
23

YZU B1 220
481
1.099

1.020

220

335.8

220

44.9

612.0
2758.4

464.3

1.090

263.7

45.8

GUA B1

2758.1

66

35.7

0.978

66
338
0.955

346.1
1.050

1.039

1.007

CAU B1

335.8
0.986
F3 241.5
1486

MD

396.9

371

29.9

23

CAE BP
66
333

158.5

47.1
1.012

25.3

1668.6

335.8
1.120

1.072
15.7
CUR B
2292
1.023

CO2 AB
248

VIC TA
220
2418
1.010

66

334.1

464.3

184.9

220

472
1.005

274.6

22.3

1.016

1668.6

500

220

1.020

ITG BP
331

349.4

334.1

212.4

45.4
1.011

348.9
1.097

348.9

23

36.2

20.4

TBO B1
320

B1
801

346.1
1.050

100.0

13.1

23

55.9

193.6

1.008
FICT VAU 220
3409

33.4

MD

1.020

1.6

36.2

17.7

25.3

1.000

1.120

220

243.9
CUR B1
492

CZU TA

165.0

17.9

346.1
1.050

335.8
0.986
F2 241.5
1485

160.4

TOR
B1 220
4470

1.050

1.020

335.8
0.986

335.8

252.6

53.8
1.4

220

299.7

1.089

1.033

23

26.1

295.4

66
3371

434

18.6

164.5

25.3

nGR F1
66
1311

PQF B1
490

387.9

GAQ A
2266

85.0

18.2
LAM F1
509

F1 241.5
1484

1.120

38.1

60.7

1.047

164.5

335.8
1.120
MD

334.1

233.1

0.967

269.4

CAP

1.029

57.8

1.024

30.4

150.4

51.4

1.021
83.8
0.950

1.007

334.1

1467.7

220

38.6

220
2409

346.1
1.050

MD

PQF B2
220
590

100.0

31.0

54.4

13.3
13.0

1.053
VM1 B1
469

55.9
0.967

30.8

BDO B1

31.3

56.8

19.4

156.2
30.7
1.032

23

2272
1.027

825

0.967

84.6
0.950

47.7

0.0
1.100

156.0

218.1

30.3
A
212

BDO

CCO B1
1.093

1.079

23

66

323

335.8
0.986
F5 241.5
1483

472.1

0.953

0.967
FDM B1

335.8
1.120
MD

0.999
347.7

220

104.1

30.4
69.9

27.7

33.7

28.0

54.6

25.3

31.9

83.5

18.1

18.4

35.3

54.6

52.9

66

VAQ TA
427

51.4

404

18.4

IRY B1
484

30.0

19.4

0.900

YBY B1
66
369
1.008

1.049 4479

52.7

52.9

SLO AB
201

60.5

70.2
49.8

54.4

VAU B1

GDI B1
66
2311

13.4

220

1.007
0.993

334.1

MD

13.0

66

BGD B1

37.6

0.0
1.100

0.0
PQI B1
4495
1.092

57.1

0.993

1.025

0.980

30.8

1.026

1.026

1.023

130.8

122.2

36.9

36.9

19.3
19.3

215.1

471

PJC B1

220

293
37.1

89.7

102.9

102.9

BPA FIC
1303

70.8

1467.9 1668.7
1.068

1.068
0.0

220

27.6

30.7

156.0

105.7

1.023

REP B1
2308

LAM B1
66
316

ACU B1

BMO A
2222

0.953

42.9

66

23
285
1.036

147.1
0.996

220
479
1.036

220

1.006

212.0

97.0

19.7

50.0

33.5

14.6

VAU B1
2309

17.7

18.4

18.4
1.000

33.3

61.7

173.3

61.7

33.5

BMO B1
4222

173.3
21.0

1496.5
500

1496.5

23.7

93.6

41.9
20.8

0.967

1.016

30.2

33.5

220

173.1

SLO B1
66
301

100.6

100.6

66

16.6
66

1.023

LAM F2
510
1.016

SLO RE
302

96.8

48.3

48.3

122.3
122.3

130.8

66

LAM_PSA AER1
1405
1.006

0.967

1.051

14.6
19.7

130.8

SLO B1
403

1.086

PSA B1
313

1.023

1.005

T1 220
4487

LPA B1

1.000

30.3
30.7
1.047

31.4

220

0.900

HOR B1
368

1.026

-80.0

CYO

220

220

1.021
220
66.6

8.7

1.081
1469

VM2 B1
220
1.054

PZC

CON B1
66
1.031
372

105.8

220

BVN B1

7.6

77.1

66
1.026

29.5

186.3

CCO B1

1.017

62.6

33.4

18.8

1.036
B1
66
3372

CN2

184.6
1.020

1.016

60.7

60.7

0.980

BSP B1
412

61.3

31.2

1.039

233.3

233.3

18.8

173.5

0.980

220

4414
28.2

1.007

1.012

SES TA
466

220

57.3

47.7
0.940

220

LUQ A
23
221
1.017

BPA B1
303

LAM B1
405

CBV B1
1814

1.062

1.000

LAM_PSA AER2
1407
1.006

130.4

102.7

55.9
56.0

56.0
18.8

CN2 B1
4472

147.3

1496.3

1.066

128.1

1.000

19.7

66
1313

CAT B1
491

27.1
1.033

156.2

4468

14.6
54.1

106.1

106.1

48.4

48.4

1.025

CAT2 A
23
2291 1.015

SGA A
23
2491 1.003

220

130.0

126.9
1.015
SRO TA
467

1.044

220

127.7
1.015

220

220

HOR comp 220


1.135

66
1.028

nBC F1
1326
PSA F1
513

LAM_PSA SUB1
1406
1.007
122.3

102.7 HOR B1
468

191.8 175.1
1.112

1.016

106.4

106.4

122.3

130.6
130.8

122.3

1.025

78.1

94.5

0.980

nCP F1
LAM_PSA SUB2
1408
1.007

77.3

234.3

LUQ TA
421

PSA F2
514

11.8

234.2

1.007

IPU B2
805

220

0.993

191.8

PSA B2
220
4413

0.980

74.8
ALT F
4407

66

nBS F1
1308

CYO A
485

130.8

0.993

18.7

13.8
56.7
232.8

232.8

1.026

19.3

66
311

220

4409

23.8

55.8

65.5

65.2

SMI B1
308

SGA B1
220
4491 1.063
SICBRAS

LIM B1
220
409

LIM RE
411

66
1.026

MD B1
483

505.0

55.3

22.6

237.9
244.2
66

344

23.0
23.0
0.989

66

66

1.047

74.0

1.029

CEN B1

CMY B1 220
1.016 1409

268.8

14.6

11.4

251.7
66

LIM B1

IPS_SMI_F166
3306 1.024

nPS F1
1306

PQI B1
4395

1.011
245.0

ACE B1
345

55.9

65.5

65.2

66
0.962

1496.5
MD HER2
1516

0.927

104.9

504.6

19.5

VHA B1
346

0.966

IPS B1
66
328 1.014

1668.7
503.3
435.5

19.3

19.6
19.6
VHA F1 3346 1.073
0.963

14.6

1.012

6300.0

0.900
430.7

16.5

6345.2
1.050
1.024

52.8
1.018

152.8
1.009

500

18

436.4

23.4

152.8

61.4
147.3
0.960
1.013
PBO F1
505

11.4

IPS_PBO_F266
4306 1.012

147.3
0.960

61.3

6300.0
756.1

0.900
431.5

13.9

61.4
1.000

11.4

92.7

61.3

23
2246
51.3
0.967
1.023

48.3
48.4

436.4

431.5

157.5

156.8

408

VHA AB2

1.000

92.6

92.6

65.6

157.5

IPU10G
700
G

500

220

PBO F2
506 1.013

65.5

13.4

66

PBO B1

20.9

CYO B1
885

251.2

AMP B1

1338.4
156.8

PBO B1
66
306
20.9

66

327
1.010
1.032
PCA F2
525

1.000

56.4

66
324 1.032

66

1.010
MRA B1
304
1.008

11.4

152.9

152.9

92.7

1.000

PCA B1

1.002

0.900

0.900

1.032
PCA F1
524

VCU B1
307

169.5

164.8

220
164.8

PCA AB
424

IPU B1
800

500

1479.7

0.900

238.3

160.7

157.2
170.2

66

500

23

500

ANDE
DireccindePlanificacinGeneralyPolticaEstratgica(DP)
DivisindeEstudiosEnergticos(DP/DEE)
DepartamentodeEstudiosdeGeneracinyTransmisin(DP/DEG)

Anexo A.8
DIAGRAMAS UNIFILARES DEL SIN

PlanMaestrodeGeneracinyTransmisinPeriodo20142023

SISTEMA INTERCONECTADO NACIONAL


AO 2014

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

MD - ITAIPU 220 kV
TR - 6
26 MVA
LT 66 kV MD - IPU
60
MVA 66 kV

2x
60 MVA

60
MVA

CERRO
CORA
220 kV

12
MVA

20
MVA

20
MVA

YBY-YAU
66 kV

23 kV

CURUGUATY

12 MVA

41.67

23 kV
12
MVAr

23 kV

23 kV

CURUGUATY

66 kV
30
MVA

23 kV
12 MVAr

30
MVA

2 x 30
MVA
60 MVA
66 kV

2 x 30
MVA
6 MVAr
6 MVAr

220 kV

23 kV
6 MVAr
6 MVAr

23 kV
3 MVAr

27 MVAr

PASO PE
220 kV

41.67 MVA

PIRAYU 220 kV

23 kV
8.4 MVAr
12 MVAr

2 x 60
MVA

60
MVA

PIRAYU

10
MVA

30
MVA

66 kV

CAAZAPA
66 kV

LIMPIO 220 kV

41.67
MVA

60 MVA

23 kV

LIMPIO

QUIINDY

6 MVAr

30
MVA

VILLALBIN 66 kV

66 kV

23 kV

12
MVA
23 kV
3 MVAr

CAAPUCU

PILAR 66 kV

66 kV
2 x 12 MVA

20 MVA

LUQUE 220 kV

66 kV

VILLA HAYES 500 kV


2x
600
MVA

ACEPAR

23 kV
9 MVAr

23 kV

23 kV
12 MVAr
6 MVAr

41.67
MVA
23 kV

VIAS CUE

2 x 300/180/120
MVA
23 kV

3x
41.67 MVA

SAN LORENZO 66kV

MARIANO
ROQUE
ALONSO
66 kV

20 MVA

36 MVAr

2x
80 MVAr

2x
120
MVA

66 kV
PTO. BOTANICO
220 kV

18 MVAr

23 kV
6 MVAr

18 MVAr
6 MVAr

3 MVAr

2x
80 MVAr

41.67
MVA

2 x 120 MVA
GUARAMBARE 66kV

23 kV
30
MVA

2x
41.67
MVA

GRAN
HOSPITAL
NACIONAL

23 kV

ITAUGUA 66 kV

ADM

ANERETA

23 kV
12 MVAr

CLORINDA
CERVEPAR

VILLETA 66 kV

CER
23 kV

CAACUPE
66 kV
3 x 30
MVA

2 x 30
MVA
23 kV

12 MVAr

12 MVAr

SAN ANTONIO
220 kV

66 kV

TCR 1

CAIASA

23 kV
LAMBARE 220 kV
2 x 300/180/120
MVA
23 kV

TCR 2

36 + 12 MVAr

23 kV
BARRIO
PARQUE
66 kV

23 kV
24 MVAr
6 MVAr

2 x 30 MVA

3 x 30
MVA

3 x 30
MVA

41.67
MVA

41.67
MVA

23 kV

18 MVAr
6 MVAr

F. A.

VILLA AURELIA

2 X 30 MVA

24 MVAr

6 MVAr
6 MVAr

FILTRO x 5

23 kV

BARRIO
MBURUCUYA
66 kV

23 kV

PTO.
MARISCAL

30
MVA

2 x 30 MVA
F. DE LA MORA 66 kV

23 kV

PTO. BOTANICO
66 kV

20 MVAr

LA
VICTORIA
220 kV

SAN LORENZO
220 kV

60
MVA

3 MVAr
6 MVAr

GUARAMBARE 220 kV

2 x 41.67 MVA

24 MVAr

VILLA
HAYES
220 kV

23 kV

23 kV
2.4 MVAr

CAPIATA
220 kV

2 x 41.67 MVA

30 MVA
CEMENTERA
YGUAZU

23 kV

30/25/10
MVA

23 kV

23 kV
12 MVAr

VILLALBIN 220 kV

66 kV

ERIDAY

37.5
MVA

66 kV

20
MVA

30 MVA

12 MVAr
VILLA HAYES

VALLE APUA
220 kV

23 kV
6 MVAr 6 MVAr

EUSEBIO AYALA 66 kV

23 kV

23 kV
6 MVAr
3 MVAr

ALEACIONES
YGUAZU

66 kV

60 MVA

41.67
MVA

30 MVA

20
MVA

COMPAIA
METALURGICA
YGUAZU

CLYFSA

20 MVAr

66 kV

23 kV
3 MVAr

66 kV

220 kV

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

2 X 375
MVA

6 MVAr

20 MVA

PARAGUARI

EUSEBIO AYALA

SAN JUAN
NEPOMUCENO
220 kV

12 MVAr

23 kV

20
MVAr

23 kV

30
MVA

23 kV

2 x 30
MVA

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

41.67
MVA

66 kV

500 kV

SAN PATRICIO 220 kV

S. J. BAUTISTA
220 kV

120 MVA

66 kV

10 x 172.5 MVA
YACYRETA

30
MVA

23 kV
3 MVAr

23 kV
6 + 9 MVAr

VILLARRICA
66 kV
120 MVA

20 MVAr

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr

41.67 MVA

66 kV

SICBRAS 220 kV

41.67
MVA
23 kV
3 MVAr

30
MVA

SAN PEDRO
DEL PARANA
66 kV

23 kV

60 MVA

41.67
MVA

30/20/15
MVA

CNEL.
BOGADO
66 kV

CAMBYRETA
66 kV

4 x 30
23 kV
MVA
3 MVAr

6 MVAr
6 MVAr

CORONEL
OVIEDO

41.67
MVA

30 MVA

23 kV

3 MVAr

CNEL. BOGADO 220 kV

220 kV

60
MVA

23 kV
12 MVAr

66 kV

CORONEL OVIEDO
220 kV

CARAYAO 220 kV

23 kV
3 MVAr
3 MVAr

ENCARNACION

23 kV
6 MVAr

23 kV
12 MVAr

41.67
MVA

3 + 6 MVAr

66 kV

2x
41.67
MVA

ITACURUBI
DEL ROSARIO
220 kV
41.67 MVA

CAMBYRETA

30
MVA
23 kV

PIRAPO

CAAGUAZU
220 kV

20 MVA

SISTEMA
EMSA

23 kV

23 kV
3 MVAr

TRINIDAD 66 kV

41.67
MVA

41.67
MVA

220
kV
41.67
MVA

20
MVAr

2 x 60 MVA

SAN PEDRO NORTE


66 kV

41.67MVA

C. A.
LOPEZ
220 kV

NATALIO

SANTA ROSA
66 kV

SAN
ESTANISLAO
220 kV

12
MVA
23 kV
3 MVAr

TRINIDAD 220 kV

-80 / + 150 MVAr

40/20/20
MVA

3 MVAr

23 kV
12 MVAr

CARGIL

23 kV

66 kV

2 x 20
MVA

12 MVAr

6 MVAr

30/20/15
MVA

66 kV
NARANJAL

23 kV

CAMPO
DOS
220 kV

23 kV

23 kV
3 MVAr
3 MVAr

120
MVA

3x
20
MVA

30
MVA

PARANAMBU
220 kV

12 MVAr

CER

SANTA ROSA
220 kV
41.67
MVA

WHITE
MARTINS

23 kV

MVA
23 kV
6 MVAr

3 x 25
MVA

2 x 30
MVA
23 kV

6 MVAr
6 MVAr

ALTO
PARANA
66 kV

20 MVAr

41.67

80 MVA

CER

KM 30

23 kV

23 kV
6 MVAr

3 x 25
MVA

23
kV
12 MVAr

23 kV

23 kV
12 MVAr

20 MVAr

HORQUETA

6 MVAr
6 MVAr

3 x 19
MVA

CIUDAD DEL
ESTE
66 kV

2 x 30
MVA

KM 30 220 kV

120 MVA

23 kV

SALTO
DEL GUAIRA
220 kV

23 kV
21.5 MVAr

30/25/20
MVA

66 kV

HERNANDARIAS
66 kV

6.3 kV
VALLEMI II
220 kV

HORQUETA

41.67
MVA

CATUETE
66 kV

3 x 19
MVA

2x
41.67
MVA
66 kV

PTE.
FRANCO

KM 15 66 kV

2 x 20 MVA
20
MVAr

20
MVA

13.8 kV

PTE. FRANCO 220kV


2x
60
MVA

2 x 20 MVA

23 kV

MVA

GEN. 4
60 MVA

13.8 kV

60 MVA

ACARAY 66 kV

VALLEMI
220 kV

66 kV

220 kV
CATUETE
220 kV

60 MVA

23 kV
12 MVAr

LOMA PLATA 66 kV

12 MVAr
23 kV
2 x 30
MVA
CONCEPCION

41.67
MVA

INPASA
66 kV

23 kV

20
MVAr

CRUCE
BELLA
VISTA

GEN. 3
60 MVA

13.8 kV

ACARAY 220 kV
80
MVA

66 kV

23 kV
6 MVAr

CAPITAN
BADO
220 kV

23 kV
6 MVAr

13.8 kV

FILADELFIA

2 x 30/20/15
MVA

23 kV

ITAKYRY 66 kV

10
MVA

66 kV

GEN. 2
56 MVA

GEN. 1
56 MVA

30 MVA
LOMA
PLATA
220 kV

CERRO CORA
66 kV

MINGA
PORA
66 kV

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

P. J. CABALLERO
66 kV

2 x 30/20/15
MVA
23 kV

ITAKYRY
66 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

41.67
23 kV
MVA

ITAKYRY 220 kV

ITAKYRY 220 kV

TR - 7
26 MVA
6 MVAr
12 MVAr

PARQUE
INDUSTRIAL
220 kV

LT 66 kV MD - FI

23 kV

24 MVAr
LAMBARE 66 kV

TRES BOCAS
66 kV

PARQUE CABALLERO

220 kV
BANCO CENTRAL
66 kV

2 x 120/60/60
MVA

24 MVAr
23 kV

20
MVA

18 + 6 MVAr
PARQUE
CABALLERO

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

3 x 30
MVA

PTO. SAJONIA 220 kV

23 kV
12 MVAr
6 MVAr

23 kV

66 kV

66 kV

19 MVAr
6 MVAr

2 x 120/80/40
MVA
23 kV

SAN MIGUEL

66 kV
GRAL. DIAZ

18 MVAr

3 x 30
MVA

23 kV
18 MVAr
6 MVAr

66 kV

66 kV

3 x 30 MVA

23 kV
CENTRAL 66kV

18 MVAr

2 x 30
MVA
23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 02/10/13

DP / DEG
ARCHIVO : 2014-D

A.8-1

SISTEMA INTERCONECTADO NACIONAL


AO 2015

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

MD - ITAIPU 220 kV
TR - 6
26 MVA
LT 66 kV MD - IPU
60
MVA 66 kV

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

41.67
23 kV
MVA

CERRO
CORA
220 kV

12
MVA

20
MVA

60
MVA

23 kV
6 MVAr

30
MVA

12 MVA

41.67

CATUETE
220 kV

23 kV

23 kV

23 kV

CURUGUATY

66 kV

23 kV
12 MVAr

23 kV
21.5 MVAr

2 x 20 MVA
20
MVAr

2 x 30
MVA

6.3 kV
60 MVA
66 kV

12 MVAr

2 x 30
MVA

20 MVAr

41.67

120
MVA

CAMPO
DOS
220 kV

41.67
MVA

23 kV
41.67
MVA

23 kV
3 MVAr

SAN PEDRO NORTE


66 kV

40/20/20
MVA

23 kV
6 MVAr

BARRIO
SAN PEDRO
220 kV

23 kV
3 MVAr

SAN
ESTANISLAO
220 kV

41.67MVA
23 kV
6 MVAr

23 kV

PASO PE
220 kV

23 kV
15 MVAr

VILLARRICA
66 kV

10
30
MVA
MVA
23 kV
LA
COLMENA
12 MVAr

30
MVA

66 kV
2 x 30
MVA
23 kV

60
MVA

PIRAYU

23 kV

LIMPIO 220 kV

23 kV

LIMPIO

QUIINDY

30 MVA

12 MVAr

VILLALBIN 220 kV

66 kV

2 x 15 MVA

23 kV

30/25/10
MVA

66 kV

66 kV

23 kV

60 MVA
VILLALBIN
66 kV

66 kV

12
MVA
23 kV
3 MVAr

CAAPUCU

12 MVAr
VILLA HAYES

ERIDAY

37.5
MVA

23 kV

23 kV

66 kV

6 MVAr

VALLE APUA
220 kV

20
MVA

6 MVAr

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

2 X 375
MVA

23 kV
3 MVAr

66 kV
30
MVA

23 kV
6 MVAr 6 MVAr

EUSEBIO AYALA 66 kV

ALEACIONES
YGUAZU

66 kV

20
MVA

COMPAIA
METALURGICA
YGUAZU

60 MVA

23 kV

30 MVA
23 kV
9 MVAr

60 MVA

220 kV

41.67
MVA

3 MVAr
41.67
MVA

20
MVAr

41.67
MVA

PARAGUARI

EUSEBIO AYALA

AYOLAS
500 kV

41.67
MVA
23 kV
6 MVAr

23 kV

SAN JUAN
NEPOMUCENO
220 kV

CAAZAPA
66 kV

20
MVA

YACYRETA
500 kV

SAN PATRICIO 220 kV

S. J. BAUTISTA
220 kV

66 kV

20 MVA

66 kV

CLYFSA

20 MVAr

12 MVAr

PIRAYU 220 kV

23 kV
20.4 MVAr

2 x 60
MVA
41.67 MVA

120 MVA

10 x 172.5 MVA

30
MVA

23 kV
3 MVAr

20 MVAr

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr

SAN PEDRO
DEL PARANA
66 kV

27 MVAr

2 X 41.67
MVA

66 kV

SICBRAS 220 kV

66 kV

23 kV

41.67
MVA
23 kV
3 MVAr

30
MVA

CAMBYRETA
66 kV

6 MVAr

60 MVA
CORONEL
OVIEDO

41.67
MVA

CNEL. BOGADO 220 kV

30/20/15
MVA

CNEL.
BOGADO
66 kV

CORONEL OVIEDO
220 kV

CARAYAO 220 kV

120 MVA

ENCARNACION
4 x 30
23 kV
3 MVAr MVA

SISTEMA
EMSA

3 MVAr

23 kV
3 MVAr

220 kV

60
MVA

23 kV
12 MVAr

66 kV

30 MVA

23 kV
6 MVAr

23 kV
12 MVAr

23 kV
6 MVAr

66 kV

12 MVAr

41.67 MVA

2 x 41.67MVA

41.67
MVA

23 kV
9 MVAr

PIRAPO

2x
41.67
MVA

ITACURUBI
DEL ROSARIO
220 kV

41.67
MVA

20
MVAr

CAMBYRETA

30
MVA

12 MVAr

41.67
MVA
23 kV

220
kV

TRINIDAD 220 kV

2 x 60 MVA
TRINIDAD 66 kV

23 kV

C. A.
LOPEZ
220 kV

23 kV
3 MVAr
NATALIO

41.67 MVA

CAAGUAZU
220 kV

20 MVA

SANTA ROSA
66 kV

3 MVAr
12
MVA

23 kV
12 MVAr

23 kV
6 MVAr
2 x 41.67
MVA

30/20/15
MVA
23 kV

66 kV

2 x 20
MVA

12 MVAr

CARGIL

-80 / + 150 MVAr

PARANAMBU
220 kV

66 kV
NARANJAL

MALLORQUIN
220 kV

CER

PILAR 66 kV

66 kV
2 x 20 MVA

20 MVA

LUQUE 220 kV

66 kV
30 MVA
CEMENTERA
YGUAZU

VILLA HAYES 500 kV


2x
600
MVA

ACEPAR

23 kV
9 MVAr

23 kV

VILLA
HAYES
220 kV

23 kV
18 MVAr

41.67
MVA

BARRIO
MOLINO
220 kV

60
MVA

23 kV

66 kV

2x
80 MVAr

2x
120
MVA

23 kV
6 MVAr

PTO. BOTANICO
220 kV

23 kV

20 MVA

36 + 12 MVAr

SAN LORENZO 66kV

MARIANO
ROQUE
ALONSO
66 kV

2 x 120 MVA
GUARAMBARE 66kV
30
MVA

23 kV
24 MVAr

ITAUGUA 66 kV

CER

ADM

ANERETA

23 kV

-120 / + 300 MVAr

CLORINDA
CERVEPAR

VILLETA 66 kV

SAN ANTONIO
220 kV

2 x 30 MVA
CER
23 kV

CAACUPE
66 kV

2 X 30 MVA

12 MVAr

12 MVAr

23 kV

TCR 1

LAMBARE 220 kV
2 x 300/180/120
MVA
23 kV

TCR 2

3 x 30
MVA
BARRIO
PARQUE
66 kV

23 kV
30 MVAr

2 x 30 MVA

24 MVAr

F. A.

VILLA AURELIA
66 kV

3 x 30
MVA

41.67
MVA

41.67
MVA

12 MVAr
FILTRO x 5

23 kV

BARRIO
MBURUCUYA
66 kV

CAIASA

23 kV

24 MVAr

3 x 30
MVA

23 kV

23 kV

PTO.
MARISCAL

30
MVA
12 MVAr
6 MVAr

24 MVAr

F. DE LA MORA 66 kV

2 x 30
MVA

PTO. BOTANICO
66 kV

41.67
MVA
23 kV

GRAN
HOSPITAL
NACIONAL

23 kV
3 MVAr

2x
80 MVAr

2x
41.67
MVA

3x
41.67 MVA
23 kV

VIAS CUE

2 x 300/180/120
MVA

20 MVAr

LA
VICTORIA
220 kV

SAN LORENZO
220 kV

80
MVA

9 MVAr

GUARAMBARE 220 kV

2 x 41.67 MVA

24 MVAr

23 kV

23 kV
2.4 MVAr

CAPIATA
220 kV

2 x 41.67 MVA

23 kV

66 kV

12 MVAr
6 MVAr

MVA
23 kV
6 MVAr

80
MVA

60
MVA

23 kV

ALTO
PARANA
66 kV

23 kV
6 MVAr

MICROCENTRO
220 kV

2 x 30
MVA

3x
20
MVA

30
MVA

12 MVAr 23 kV

SANTA ROSA
220 kV

CER

WHITE
MARTINS

220 kV

VAQUERIA
220 kV

41.67
MVA

23 kV
12 MVAr
6 MVAr

KM 30

20 MVAr

HORQUETA

23 kV
6 MVAr

3 x 25
MVA

A APR 66 kV

23
kV
12 MVAr

CIUDAD DEL
ESTE
66 kV

2 x 30
MVA
23 kV
12 MVAr

KM 30 220 kV

23 kV

80 MVA

3 x 25
MVA

2x
41.67
MVA
66 kV

PTE.
FRANCO
HERNANDARIAS
66 kV
KM 15 66 kV

120 MVA

23 kV
SALTO
DEL GUAIRA
220 kV

3 x 19
MVA

PTE. FRANCO 220kV

2 x 20 MVA

30/25/20
MVA

66 kV

30
MVA

3 x 19
MVA

60 MVA

2x
60
MVA

VALLEMI II
220 kV

20
MVA

HORQUETA

41.67
MVA

13.8 kV

ACARAY 66 kV

MVA

12
MVAr

30
MVA

60 MVA

23 kV

VALLEMI
220 kV

23 kV

GEN. 4
65 MVA

13.8 kV

ACY 66 kV

12 MVAr

LOMA PLATA 66 kV

66 kV

220 kV

CATUETE
66 kV

YBY-YAU
66 kV

23 kV
3 MVAr

CURUGUATY

INPASA
66 kV

6 MVAr

12 MVAr
23 kV
2 x 30
MVA
CONCEPCION

41.67
MVA

23 kV
6 MVAr

GEN. 3
65 MVA

13.8 kV

ACARAY 220 kV
80
MVA

23 kV

20
MVAr

66 kV
CRUCE
BELLA
VISTA

CAPITAN
BADO
220 kV

13.8 kV

FILADELFIA

2 x 30/20/15
MVA

23 kV

ITAKYRY 66 kV

10
MVA

66 kV

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
LOMA
PLATA
220 kV

23 kV

MINGA
PORA
66 kV

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

CERRO CORA
66 kV

2 x 30/20/15
MVA

60 MVA
ITAKYRY 66 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

P. J. CABALLERO
66 kV

ITAKYRY 220 kV

LT 66 kV MD - FI

23 kV

48 MVAr

23 kV
24 MVAr

LAMBARE 66 kV

TRES BOCAS
66 kV

PARQUE CABALLERO

220 kV
BANCO CENTRAL
66 kV

2 x 120/60/60
MVA

24 MVAr

23 kV

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

24 MVAr
PARQUE
CABALLERO

3 x 30
MVA

PTO. SAJONIA 220 kV

23 kV
18 MVAr
6 MVAr

23 kV

66 kV

2 x 120/80/40
MVA
23 kV

SAN MIGUEL

66 kV
GRAL. DIAZ

18 + 12 MVAr

3 x 30
MVA

23 kV
24 MVAr

66 kV

66 kV

3 x 30 MVA

23 kV
CENTRAL 66kV

12 MVAr
6 MVAr

2 x 30
MVA
23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 07/10/13

DP / DEG
ARCHIVO : 2015-D

A.8-2

SISTEMA INTERCONECTADO NACIONAL


AO 2016

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

MD - ITAIPU 220 kV
TR - 6
26 MVA
LT 66 kV MD - IPU
60
MVA 66 kV

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

CERRO
CORA
220 kV

ITAKYRY 66 kV

12
MVA

20
MVA

60
MVA

23 kV
6 MVAr

66 kV

41.6 7

CATUETE
220 kV

23 kV

MVA
23 kV

CURUGUATY

12
MVAr

BELLA
VISTA
NORTE

23 kV
12 MVAr

30
MVA
23 kV
21.5 MVAr

120 MVA

23 kV

23 kV

SALTO
DEL GUAIRA
220 kV

20 MVAr
CONCEPCION II

2 x 30
MVA
60 MVA
STA.
RITA
220 kV

23 kV

220 kV

20 MVAr

41.67

WHITE
MARTINS

ALTO
PARANA
66 kV

23 kV
6 MVAr
6 MVAr

23 kV
6 MVAr
VAQUERIA
220 kV

120
MVA

CAMPO
DOS
220 kV

41.67
MVA

23 kV
41.67
MVA

23 kV
3 MVAr

SAN PEDRO NORTE


66 kV

40/20/20
MVA

23 kV
6 MVAr

BARRIO
SAN PEDRO
220 kV

23 kV
3 MVAr

SAN
ESTANISLAO
220 kV

41.67MVA
23 kV
6 MVAr

2x
30
MVA
23 kV
9 MVAr

12 MVAr
PIRAPO
66 kV

ENCARNACION

23 kV

CNEL. BOGADO 220 kV

66 kV

23 kV
3 MVAr

120 MVA
66 kV

23 kV
15 MVAr

VILLARRICA
66 kV

120 MVA

10
MVA

30
MVA

66 kV

23 kV
12 MVAr

PIRAYU

CAAZAPA
66 kV

20
MVA
23 kV

LIMPIO 220 kV

CER

60 MVA

23 kV

LIMPIO

COMPAIA
METALURGICA
YGUAZU

60 MVA

QUIINDY

30 MVA

12 MVAr

ERIDAY

VILLALBIN 220 kV

66 kV

2 x 15 MVA

23 kV

30/25/10
MVA

66 kV

66 kV

23 kV

60 MVA
VILLALBIN
66 kV

66 kV

12
MVA

23 kV

23 kV

20
MVA

37.5
MVA

20
MVA

6 MVAr

66 kV

23 kV

VALLE APUA
220 kV

30
MVA

23 kV
6 MVAr 6 MVAr

EUSEBIO AYALA 66 kV

ALEACIONES
YGUAZU

66 kV

12 MVAr

30
MVA

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

6 MVAr

23 kV
3 MVAr

66 kV

220 kV

23 kV

30 MVA
23 kV
9 MVAr

41.67
MVA

PARAGUARI

EUSEBIO AYALA

41.67
MVA

3 MVAr
41.67
MVA

20
MVAr

41.67
MVA
23 kV

SAN JUAN
NEPOMUCENO
220 kV

2 X 375
MVA

23 kV
6 MVAr

S. J. BAUTISTA
220 kV

66 kV

20 MVA

66 kV

CLYFSA

20 MVAr

23 kV
20.4 MVAr

60
MVA

30
MVA

23 kV
LA
COLMENA 12 MVAr

2 x 30
MVA

PIRAYU 220 kV
2 x 60
MVA

41.67 MVA

AYOLAS
500 kV

41.67
MVA

20 MVAr

PASO PE
220 kV

66 kV

SICBRAS 220 kV

SAN PATRICIO 220 kV

2 X 41.67
MVA

60 MVA
CORONEL
OVIEDO

41.67
MVA
23 kV
6 MVAr

500 kV

23 kV
3 MVAr

23 kV

10 x 172.5 MVA
YACYRETA

30
MVA

30 MVA

CARAYAO 220 kV

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr
30
MVA

SAN PEDRO
DEL PARANA
66 kV

FRAM
27 MVAr

CORONEL OVIEDO
220 kV

41.67
MVA

30/20/15
MVA

CNEL.
BOGADO
66 kV

CAMBYRETA
66 kV

23 kV

18 MVAr

23 kV
6 MVAr

23 kV
12 MVAr

SISTEMA
EMSA

3 MVAr

23 kV
3 MVAr

220 kV

60
MVA

4 x 30
23 kV
3 MVAr MVA

41.67 MVA

2 x 41.67MVA

CAMBYRETA

23 kV
12 MVAr

30 MVA

2x
41.67
MVA

ITACURUBI
DEL ROSARIO
220 kV

41.67
MVA

20
MVAr

41.67
MVA
66 kV

41.67
MVA
23 kV

220
kV

TRINIDAD 220 kV

2 x 60 MVA
TRINIDAD 66 kV

23 kV

C. A.
LOPEZ
220 kV

23 kV
3 MVAr
NATALIO

41.67 MVA

CAAGUAZU
220 kV

20 MVA

SANTA ROSA
66 kV

3 MVAr
12
MVA

23 kV
12 MVAr

23 kV
6 MVAr
2 x 41.67
MVA

30/20/15
MVA
23 kV

66 kV

2 x 30
MVA

12 MVAr

CARGIL

-80 / + 150 MVAr

SANTA ROSA
220 kV

PARANAMBU
220 kV

66 kV

MALLORQUIN
220 kV

CER

23 kV
3 MVAr

CAAPUCU

VILLA HAYES

PILAR 66 kV

66 kV
2 x 20 MVA

20 MVA

66 kV
LUQUE 220 kV
CEMENTERA
YGUAZU

VILLA HAYES 500 kV


3x
600 MVA

ACEPAR

80
MVA

23 kV
9 MVAr

9 MVAr

GUARAMBARE 220 kV

2 x 41.67 MVA

41.67
MVA

23 kV

23 kV
2.4 MVAr

CAPIATA
220 kV

30 MVA

23 kV

66 kV

18 MVAr

NARANJAL

23 kV
6 MVAr

80
MVA

60
MVA

23 kV

MVA

80 MVA

MICROCENTRO
220 kV

2 x 30
MVA

3x
20
MVA

30
MVA

12 MVAr 23 kV

6 MVAr

220 kV

23 kV
18 MVAr

KM 30
2 x 30
MVA

23 kV

HORQUETA

12 MVAr

66 kV

41.67
MVA

23
kV
12 MVAr

CIUDAD DEL
ESTE
66 kV

2 x 30
MVA
23 kV
12 MVAr
6 MVAr

KM 30 220 kV

6.3 kV

30/25/20
MVA

66 kV

20
MVA

HERNANDARIAS
66 kV
KM 15 66 kV

VALLEMI II 220 kV

60
MVA

HORQUETA

220 kV
30
MVA

20
MVA

23 kV

66 kV

41.67
MVA

CATUETE
66 kV

66 kV

2x
41.67
MVA
66 kV

PTE.
FRANCO

2 x 20 MVA

2x
20
MVA

20
MVAr

23 kV

3 x 25
MVA

A APR 66 kV

PTE. FRANCO 220kV


2x
60
MVA

VALLEMI 220 kV
CONCEPCION 66 kV

12 MVA

3 x 25
MVA

ACARAY 66 kV

23 kV

2 x 30
MVA

YBY-YAU
66 kV

3 x 19
MVA

60 MVA

12 MVAr

ACUEDUCTO
220 kV

220 kV
10
MVA

60 MVA

23 kV

LOMA PLATA

66 kV

12 MVAr
23 kV

41.67
MVA
23 kV
3 MVAr

CURUGUATY

INPASA
66 kV

23 kV
6 MVAr

GEN. 4
65 MVA

13.8 kV

ACY 66 kV

80
MVA

10
MVA

30
MVA
23 kV
6 MVAr

20
MVAr

66 kV

GEN. 3
65 MVA

13.8 kV

3 x 19
MVA

60
MVA

CRUCE
BELLA
VISTA

CAPITAN
BADO
220 kV

13.8 kV

13.8 kV

FILADELFIA

ACARAY 220 kV

30/20/15
MVA

23 kV

MINGA
PORA
66 kV

66 kV

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
LOMA
PLATA
220 kV

CERRO CORA
66 kV

2 x 30/20/15
MVA
23 kV

60 MVA

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

P. J. CABALLERO
66 kV

ITAKYRY 66 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

41.67
23 kV
MVA

ITAKYRY 220 kV

LT 66 kV MD - FI

23 kV

23 kV
VILLA
HAYES
220 kV

23 kV

24 MVAr

23 kV

18 MVAr

BARRIO
MOLINO
220 kV

60
MVA

41.67
MVA

80
MVA

66 kV

2x
80 MVAr

2x
120
MVA

23 kV
6 MVAr

PTO. BOTANICO
220 kV

23 kV

20 MVA

48 MVAr

SAN LORENZO 66kV

MARIANO
ROQUE
ALONSO
66 kV

2 x 120 MVA
GUARAMBARE 66kV
30
MVA

23 kV
24 MVAr

ITAUGUA 66 kV

CER

ADM

ANERETA

23 kV

-120 / + 300 MVAr

CLORINDA
CERVEPAR

VILLETA 66 kV

SAN ANTONIO
220 kV

2 x 30 MVA
CER
23 kV

CAACUPE
66 kV
3 x 30
MVA
12 MVAr

12 MVAr

BARRIO
MBURUCUYA
66 kV

CAIASA

23 kV
30 MVAr

23 kV

TCR 1

LAMBARE 220 kV
VILLA ELISA

2 x 300/180/120
MVA
23 kV

TCR 2

3 x 30
MVA
BARRIO
PARQUE
66 kV

80
MVA

41.67
MVA

23 kV

2 x 30 MVA

24 MVAr

F. A.

VILLA AURELIA
66 kV

3 x 30
MVA

2 X 30 MVA

24 MVAr

12 MVAr
FILTRO x 5

23 kV

23 kV

23 kV

PTO.
MARISCAL

30
MVA
18 MVAr

24 MVAr

F. DE LA MORA 66 kV

2 x 30
MVA

PTO. BOTANICO
66 kV

41.67
MVA
23 kV

GRAN
HOSPITAL
NACIONAL

23 kV
3 MVAr

2x
80 MVAr

2x
41.67
MVA

3x
41.67 MVA
23 kV

VIAS CUE

2 x 300/180/120
MVA

20 MVAr

LA
VICTORIA
220 kV

SAN LORENZO
220 kV

220 kV

48 MVAr

23 kV

80
MVA

24 MVAr
LAMBARE 66 kV

TRES BOCAS

23 kV
18 MVAr

66 kV
PARQUE CABALLERO

220 kV

2 x 300/180/120
MVA

BANCO CENTRAL
66 kV
24 MVAr

23 kV
PARQUE
CABALLERO
66 kV

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

24 MVAr

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

2 x 120/80/40
MVA
23 kV

SAN MIGUEL

66 kV
GRAL. DIAZ

30 MVAr

3 x 30
MVA

23 kV
24 MVAr

66 kV

66 kV

3 x 30 MVA

23 kV
CENTRAL 66kV

18 MVAr

2 x 30
MVA
23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 08/10/13

DP / DEG
ARCHIVO : 2016-D

A.8-3

SISTEMA INTERCONECTADO NACIONAL


AO 2017

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

MD - ITAIPU 220 kV
TR - 6
26 MVA
LT 66 kV MD - IPU
60
MVA 66 kV

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

41.67
23 kV
MVA

12
MVA

60
MVA

CERRO
CORA
220 kV

6 MVAr

YBY-YAU
66 kV

23 kV

CURUGUATY

3 MVAr

66 kV

12
MVAr

23 kV

23 kV
21.5 MVAr

MVA

VAQUERIA
220 kV

41.67
MVA

23 kV
3 MVAr

23 kV
6 MVAr

BARRIO
SAN PEDRO
220 kV

SAN
ESTANISLAO
220 kV

41.67MVA
23 kV
6 MVAr

600 MVA
TRINIDAD 500 kV

PIRAPO
66 kV

CAMBYRETA
41.67
MVA

ENCARNACION

27 MVAr

66 kV

23 kV
3 MVAr

CARAYAO 220 kV

20
MVAr

60 MVA
CORONEL
OVIEDO

41.67
MVA

120 MVA

23 kV
20.4 MVAr

66 kV

23 kV
15 MVAr

VILLARRICA
66 kV

120 MVA
66 kV

23 kV

23 kV

CER

23 kV

LIMPIO

COMPAIA
METALURGICA
YGUAZU

120 MVA

23 kV

30 MVA

30
MVA

QUIINDY

6 MVAr

66 kV

23 kV
12 MVAr

23 kV
3 MVAr

23 kV
60 MVA
VILLALBIN
66 kV

66 kV

CAAPUCU

CLORINDA

PILAR 66 kV

ANERETA

66 kV

2 x 20 MVA

20 MVA
PTO.
MARISCAL

LUQUE 220 kV

30 MVA

3x
600 MVA

23 kV

12
MVA

VILLA HAYES

23 kV
2.4 MVAr

CAPIATA
220 kV

80
MVA

23 kV
9 MVAr

ACEPAR

66 kV

23 kV

66 kV

CEMENTERA
YGUAZU

2 x 15 MVA
30/25/10
MVA

20
MVA

2 x 30 MVA

VILLALBIN 220 kV

66 kV

ERIDAY

37.5
MVA

23 kV
6 MVAr 6 MVAr

12 MVAr

VILLA HAYES 500 kV

23 kV

VALLE APUA
220 kV

30
MVA

EUSEBIO AYALA 66 kV

ALEACIONES
YGUAZU

66 kV

66 kV

20
MVA

23 kV
3 MVAr

66 kV

220 kV

41.67
MVA

23 kV
9 MVAr
60 MVA

PARAGUARI

EUSEBIO AYALA

SAN JUAN
NEPOMUCENO
220 kV

3 MVAr
41.67
MVA

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

2 X 375
MVA

6 MVAr

CAAZAPA
66 kV

20
MVA

LIMPIO 220 kV

41.67
MVA

23 kV

66 kV

CLYFSA

20 MVAr

20
MVAr

41.67
MVA

66 kV

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

S. J. BAUTISTA
220 kV

2 x 60
MVA
PIRAYU

30
MVA

23 kV
LA
COLMENA 12 MVAr

12 MVAr

YACYRETA
500 kV
SAN PATRICIO 220 kV

20 MVA

10
MVA

30
MVA

2 x 30
MVA

PIRAYU 220 kV

2x
60
MVA

41.67 MVA

SICBRAS 220 kV

10 x 172.5 MVA

2 X 41.67
MVA

PASO PE
220 kV

66 kV

23 kV
6 MVAr

23 kV
3 MVAr

23 kV

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

30
MVA

30 MVA
CORONEL OVIEDO
220 kV

41.67
MVA
23 kV
3 MVAr

30
MVA

SAN PEDRO
DEL PARANA
66 kV

FRAM

23 kV

23 kV
6 MVAr

23 kV
12 MVAr

30/20/15
MVA

CNEL.
BOGADO
66 kV

CAMBYRETA
66 kV

4 x 30
23 kV
3 MVAr MVA

23 kV

CNEL. BOGADO 220 kV

220 kV

60
MVA

23 kV
12 MVAr

66 kV

30 MVA

18 MVAr
6 MVAr

41.67 MVA

2 x 41.67MVA

3 MVAr

20
MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

12 MVAr

2x
41.67
MVA

ITACURUBI
DEL ROSARIO
220 kV

SISTEMA
EMSA

23 kV

23 kV
3 MVAr

TRINIDAD 66 kV

CAAGUAZU
220 kV

23 kV
3 MVAr

41.67
MVA

41.67 MVA

23 kV

20 MVA

SANTA ROSA
66 kV

C. A.
LOPEZ
220 kV

NATALIO
220
kV
41.67
MVA

23 kV
3 MVAr

23 kV
12 MVAr

23 kV
6 MVAr

SAN PEDRO NORTE


66 kV

40/20/20
MVA

12
MVA

TRINIDAD 220 kV

2 x 41.67
MVA

23 kV

30/20/15
MVA
23 kV
3 MVAr

66 kV

2 x 30
MVA

12 MVAr

CARGIL

CAMPO
DOS
220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

120
MVA

MALLORQUIN
220 kV

41.67
MVA
23 kV

PARANAMBU
220 kV

66 kV
NARANJAL

23 kV
6 MVAr

LOS
CEDRALES
220 kV

2 x 30
MVA

3x
20
MVA

30
MVA

12 MVAr 23 kV

220 kV

CER

6 MVAr

WHITE
MARTINS

500 kV

LOS CEDRALES

2x
600
MVA

23 kV
18 MVAr

ALTO
PARANA
66 kV

KM 30

MARIA
AUXILIADORA

20 MVAr

41.67

23 kV
12 MVAr

23 kV

23 kV
18 MVAr

2 x 30
MVA

23 kV
6 MVAr

220 kV

80 MVA

66 kV

41.67
MVA

23 kV

220 kV

HORQUETA

12 MVAr

SALTO
DEL GUAIRA
220 kV

20 MVAr
CONCEPCION II

120 MVA

23 kV

2 x 30
MVA
60 MVA

STA.
RITA
220 kV

80
MVA
23
kV

60
MVA
66 kV

23
kV
12 MVAr

66 kV

CIUDAD DEL
ESTE
66 kV

2 x 30
MVA
23 kV
18 MVAr

KM 30 220 kV

6.3 kV

30/25/20
MVA

66 kV

20
MVA

30
MVA

HERNANDARIAS
66 kV
KM 15 66 kV

2x
20
MVA

MICROCENTRO
220 kV

2x
41.67
MVA

PTE.
FRANCO

2x
20 MVA

VALLEMI II 220 kV

60
MVA

HORQUETA

220 kV

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

23 kV
24 MVAr

VALLEMI 220 kV

66 kV

20
MVA

3 x 25
MVA

ACARAY 66 kV

80 MVA

20
MVAr

23 kV

23 kV

66 kV

23 kV
12 MVAr

30
MVA

BELLA
VISTA
NORTE

MVA
23 kV

CURUGUATY

41.67
MVA

CATUETE
66 kV

20 MVA

41.67

CATUETE
220 kV

3 x 19
MVA

60 MVA

12 MVAr

KM 7
220 kV

ACUEDUCTO
220 kV

220 kV
10
MVA
23 kV

60 MVA

23 kV

LOMA PLATA

66 kV

12 MVAr
23 kV
2 x 30
MVA
CONCEPCION 66 kV

6 MVAr

GEN. 4
65 MVA

13.8 kV

ACY 66 kV
80
MVA

10
MVA

23 kV
41.67
MVA

INPASA
66 kV

23 kV
6 MVAr

GEN. 3
65 MVA

13.8 kV

3 x 19
MVA

60
MVA

CRUCE
BELLA
VISTA

41.67
MVA

30
MVA
23 kV

20
MVAr

66 kV

CAPITAN
BADO
220 kV

13.8 kV

13.8 kV

FILADELFIA

ACARAY 220 kV

30/20/15
MVA

23 kV

ITAKYRY 66 kV

66 kV

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
LOMA
PLATA
220 kV

23 kV

MINGA
PORA
66 kV

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

CERRO CORA
66 kV

2 x 30/20/15
MVA

60 MVA
ITAKYRY 66 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

P. J. CABALLERO
66 kV

ITAKYRY 220 kV

LT 66 kV MD - FI

23 kV

41.67
MVA

80
MVA

41.67 MVA

23 kV

23 kV
9 MVAr

ADM

GUARAMBARE 220 kV

24 MVAr
VILLA
HAYES
220 kV

18 MVAr

80
MVA

60
MVA
66 kV
PTO. BOTANICO
220 kV

23 kV

23 kV

ITAUGUA 66 kV

80
MVA

FILTRO x 5

23 kV

12 MVAr

66 kV
3 x 30
MVA

23 kV

23 kV

BARRIO
PARQUE
66 kV

TCR 1

CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

23 kV
6 MVAr

23 kV
24 MVAr

CAIASA

23 kV

23 kV

2 x 30 MVA

BANCO CENTRAL
66 kV
24 MVAr

23 kV

30 MVAr
12 MVAr

23 kV
LAMBARE 220 kV
2 x 300/128/120
MVA
23 kV

TCR 2

VILLA ELISA
220 kV

48 MVAr
80
MVA

24 MVAr
LAMBARE 66 kV

TRES BOCAS

3 x 30
MVA

3 x 30
MVA

23 kV
18 MVAr

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

12 MVAr

2 x 300/180/120
MVA

80
MVA

41.67
MVA

2 X 30
MVA

66 kV
2 x 30
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO
66 kV

-120 / + 300 MVAr


41.67
MVA

24 MVAr

F. A.

VILLA AURELIA

23 kV

3 x 30
MVA

CER

VILLETA II
220 kV

18 MVAr

2 X 30
MVA

12 MVAr

IPS 66 kV

220 kV

23 kV
24 MVAr

23 kV

18 MVAr

PARQUE CABALLERO

GRAN
HOSPITAL
NACIONAL

CAACUPE
66 kV

12 MVAr
BARRIO
MBURUCUYA
66 kV

2 x 120 MVA
GUARAMBARE 66kV
2 X 30
MVA

CER

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

41.67
MVA
23 kV

24 MVAr

F. DE LA MORA 66 kV
VILLA
AURELIA
220 kV

2 x 30
MVA

3 MVAr

2x
80 MVAr

2x
41.67
MVA

3x
41.67 MVA

SAN LORENZO 66kV

20 MVA

48 MVAr

2x
80 MVAr

2x
120
MVA

23 kV

MARIANO
ROQUE
ALONSO
66 kV

VIAS CUE

2 x 300/180/120
MVA

20 MVAr

LA
VICTORIA
220 kV

SAN LORENZO
220 kV

23 kV
6 MVAr
12 MVAr

23 kV
12 MVAr

23 kV

BARRIO
MOLINO
220 kV

41.67
MVA

2 x 120/80/40
MVA
23 kV

24 MVAr
GRAL. DIAZ

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV
3 x 30 MVA

18 MVAr

2 x 30
MVA

23 kV
24 MVAr
12 MVAr

23 kV

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 10/10/13

DP / DEG
ARCHIVO : 2017-D

A.8-4

SISTEMA INTERCONECTADO NACIONAL


AO 2018

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

GEN. YGUAZU
2 X 100 MVA
MD - ITAIPU 220 kV

13.8
kV

13.8
kV

TR - 6
26 MVA

2x
112/134 MVA

LT 66 kV MD - IPU
60
MVA 66 kV

YGUAZU
220 kV

CERRO
CORA
220 kV

ITAKYRY 66 kV

12
MVA

60
MVA

30
MVA
23
kV
6 MVAr

66 kV

YBY-YAU
66 kV

20 MVA

41.67
MVA

CATUETE
220 kV

BELLA
VISTA
NORTE

23 kV

CURUGUATY

66 kV

CATUETE
66 kV

23 kV

SALTO
DEL GUAIRA
220 kV

23 kV
21.5 MVAr

2 x 30
MVA

20 MVAr

20 MVAr

41.67

MVA
23 kV
12 MVAr

23 kV

VAQUERIA
220 kV

41.67
MVA

23 kV
3 MVAr

23 kV
6 MVAr

BARRIO
SAN PEDRO
220 kV

SAN PEDRO NORTE


66 kV

40/20/20
MVA

23 kV
6 MVAr

23 kV

CLYFSA

20 MVAr

23 kV

LIMPIO 220 kV

23 kV

60 MVA

CER

23 kV

LIMPIO

PARAGUARI

41.67
MVA
30
MVA

600
MVA

6 MVAr

CEMENTERA
YGUAZU

3x
600 MVA

CAPIATA
220 kV

41.67
MVA

23 kV

23 kV

23 kV

GRAN
HOSPITAL
NACIONAL

23 kV

23 kV

BARRIO
PARQUE
66 kV

23 kV
24 MVAr

ITAUGUA 66 kV

-120 / + 300 MVAr

18 MVAr
41.67
MVA

23 kV
24 MVAr

CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

23 kV
6 MVAr

CAIASA

23 kV

23 kV

2 x 30 MVA

80
MVA

41.67
MVA

2 X 30
MVA

30 MVAr
12 MVAr

23 kV
LAMBARE 220 kV
VILLA ELISA

TCR 1

2 x 300/180/120
MVA
23 kV

TCR 2

220 kV

80
MVA

48 MVAr
24 MVAr

23 kV

LAMBARE 66 kV

TRES BOCAS

18 MVAr

66 kV
2 x 30
MVA

BANCO CENTRAL
66 kV
24 MVAr

23 kV

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

12 MVAr

2 x 300/180/120
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO

CER

VILLETA II
220 kV

23 kV

24 MVAr

F. A.

VILLA AURELIA

IPS 66 kV

220 kV

2 x 120 MVA
GUARAMBARE 66kV
2 X 30
MVA

FILTRO x 5

66 kV
3 x 30
MVA

23 kV

6 MVAr

2 X 50
MVA

23 kV
12 MVAr

2 x 20 MVA
ADM

GUARAMBARE 220 kV

CER

12 MVAr

3 x 30
MVA

PILAR 66 kV

PTO.
MARISCAL

41.67
MVA

CAACUPE
66 kV

80
MVA

18 MVAr

23 kV
3 MVAr

66 kV

23 kV

23 kV

12 MVAr
12 MVAr
BARRIO
MBURUCUYA
66 kV

PARQUE CABALLERO

2x
80 MVAr

2x
41.67
MVA

2x
41.67 MVA

80
MVA

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

VILLALBIN
66 kV

CLORINDA
ANERETA

24 MVAr

F. DE LA MORA 66 kV
VILLA
AURELIA
220 kV

2 x 50
MVA

3 MVAr

20 MVAr

LA
VICTORIA
220 kV

SAN LORENZO 66kV

66 kV

20 MVA

48 MVAr

60 MVA

9 MVAr

80
MVA

2x
80 MVAr

2x
120
MVA

23 kV

66 kV

23 kV
2.4 MVAr

23 kV

MARIANO
ROQUE
ALONSO

VIAS CUE

VILLALBIN 220 kV

30/25/10
MVA

20 MVA

SAN LORENZO
220 kV

66 kV

2 x 300/180/120
MVA

66 kV

ERIDAY

12
MVA

CAAPUCU

18 MVAr

80
MVA

PTO. BOTANICO
220 kV

66 kV

2 x 15 MVA

66 kV

23 kV

23 kV

BARRIO
MOLINO
220 kV

23 kV
12 MVAr

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

23 kV

66 kV

23 kV

41.67 MVA

23 kV
18 MVAr

23 kV

2 X 375
MVA

12 MVAr

24 MVAr

60
MVA

20
MVAr

41.67
MVA

37.5
MVA

30
MVA

66 kV

VILLA
HAYES
220 kV

41.67
MVA

QUIINDY

2 x 30 MVA

LUQUE 220 kV

23 kV
9 MVAr

ACEPAR

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

220 kV

EUSEBIO AYALA

VILLA HAYES

VILLA HAYES 500 kV

30
MVA

23 kV
6 MVAr 6 MVAr

12 MVAr

80
MVA

SAN PATRICIO 220 kV

VALLE APUA
220 kV

66 kV

23 kV

30 MVA

EUSEBIO AYALA

66 kV

500 kV

6 MVAr

120 MVA

30 MVA

41.67 MVA
23 kV
3 MVAr
3 MVAr

66 kV

EUSEBIO
AYALA
500 kV

ALEACIONES
YGUAZU

66 kV

10 x 172.5 MVA
YACYRETA

23 kV

SAN JUAN
NEPOMUCENO
220 kV

23 kV
9 MVAr

41.67
MVA

23 kV
3 MVAr
30
MVA

S. J. BAUTISTA
220 kV

2 x 60
MVA
PIRAYU

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr

23 kV
3 MVAr

PIRAYU 220 kV

3 MVAr
41.67
MVA

66 kV

41.67
MVA

30
MVA

SAN PEDRO
DEL PARANA
66 kV

FRAM

80 MVAr

COMPAIA
METALURGICA
YGUAZU

30/20/15
MVA

20
MVA

30
30
MVA
MVA
23 kV
LA
COLMENA 12 MVAr
6 MVAr
66 kV
CAAZAPA
20
66 kV
MVA

30
MVA

66 kV
2 x 30
MVA
12 MVAr

23 kV
12 MVAr

66 kV

27 MVAr

23 kV
20.4 MVAr

23 kV
15 MVAr

VILLARRICA
66 kV

120 MVA

2 X 41.67
MVA

2x
60
MVA

41.67 MVA

600 MVA

CAMBYRETA
66 kV

23 kV

PASO PE
220 kV

66 kV

66 kV

ENCARNACION

20
MVAr

SISTEMA
EMSA

3 MVAr

CNEL. BOGADO 220 kV

CNEL.
BOGADO
66 kV

60
MVA

4 x 30
23 kV
3 MVAr MVA

23 kV

SICBRAS 220 kV

23 kV

TRINIDAD 500 kV

41.67
MVA

CORONEL OVIEDO
220 kV

41.67
MVA

120 MVA

66 kV

24 MVAr

60 MVA
CORONEL
OVIEDO

41.67
MVA

23 kV
3 MVAr

220 kV

30 MVA

CARAYAO 220 kV

41.67
MVA

20
MVAr

CAMBYRETA

30 MVA

2x
41.67
MVA

23 kV
6 MVAr

23 kV
12 MVAr

23 kV
6 MVAr

PIRAPO

41.67 MVA

2 x 41.67MVA

C. A.
LOPEZ
220 kV

NATALIO
220
kV

23 kV
3 MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

12 MVAr

23 kV
3 MVAr

2 x 30
MVA

TRINIDAD 66 kV

CAAGUAZU
220 kV

ITACURUBI
DEL ROSARIO
220 kV

12
MVA

41.67 MVA

23 kV

20 MVA

SANTA ROSA
66 kV

SAN
ESTANISLAO
220 kV

41.67MVA

66 kV

23 kV
12 MVAr

23 kV
6 MVAr
2 x 41.67
MVA

23 kV

41.67
MVA
23 kV
3 MVAr

66 kV
NARANJAL

TRINIDAD 220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

CAMPO
DOS
220 kV

PARANAMBU
220 kV
120
MVA

CARGIL

41.67
MVA
23 kV

LOS
CEDRALES
220 kV

2 x 30
MVA

MALLORQUIN
220 kV

220 kV

CER

2x
600
MVA

23 kV
18 MVAr

3x
30
20
MVA
MVA
23 kV
6 MVAr
12 MVAr

WHITE
MARTINS

500 kV

LOS CEDRALES

ALTO
PARANA
66 kV

KM 30

12 MVAr 23 kV
6 MVAr

MARIA
AUXILIADORA

6 MVAr

23 kV
18 MVAr

3 x 30
MVA

23 kV
6 MVAr

220 kV

80 MVA

66 kV

41.67
MVA

23 kV

HORQUETA

12 MVAr

60 MVA

80
MVA
23
kV

60
MVA
66 kV

23
kV
12 MVAr

66 kV

CIUDAD DEL
ESTE
66 kV

2 x 30
MVA
23 kV
18 MVAr

KM 30 220 kV

6.3 kV

220 kV

CONCEPCION II

120 MVA

HERNANDARIAS
66 kV
KM 15 66 kV

STA.
RITA
220 kV

MICROCENTRO
220 kV

2x
41.67
MVA

PTE.
FRANCO

2x
20 MVA

2x
20
MVA

30/25/20
MVA

66 kV

20
MVA
23 kV

30
MVA

23 kV
12 MVAr

30
MVA

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

VALLEMI II 220 kV

60
MVA

HORQUETA

220 kV

41.67
MVA

3 x 25
MVA

ACARAY 66 kV

23 kV
24 MVAr

VALLEMI 220 kV

66 kV

20
MVA

3 x 19
MVA

60 MVA

80 MVA

20
MVAr

23 kV

23 kV

60 MVA

23 kV
12 MVAr

KM 7
220 kV

ACUEDUCTO
220 kV

220 kV
10
MVA
23 kV
12
MVAr

LOMA PLATA

66 kV

12 MVAr
23 kV
2 x 30
MVA
CONCEPCION 66 kV

GEN. 4
65 MVA

13.8 kV

ACY 66 kV
80
MVA

10
MVA

23 kV
6 MVAr
6 MVAr

23 kV
3 MVAr

CURUGUATY

23 kV
6 MVAr

GEN. 3
65 MVA

13.8 kV

3 x 19
MVA

60
MVA

CRUCE
BELLA
VISTA

41.67
MVA

41.67
MVA

INPASA
66 kV

20
MVAr

66 kV

CAPITAN
BADO
220 kV

13.8 kV

13.8 kV

FILADELFIA

ACARAY 220 kV

30/20/15
MVA

23 kV

MINGA
PORA
66 kV

66 kV

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
LOMA
PLATA
220 kV

CERRO CORA
66 kV

41.67
MVA
23 kV

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

P. J. CABALLERO
66 kV
2 x 30/20/15
MVA
23 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

41.67
MVA 23 kV

ITAKYRY 220 kV

60 MVA
ITAKYRY
66 kV

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

LT 66 kV MD - FI

23 kV

2 x 300/180/120
MVA
23 kV

24 MVAr
GRAL. DIAZ

66 kV

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV
3 x 30 MVA

18 MVAr

2 x 30
MVA

23 kV
24 MVAr
12 MVAr

23 kV

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 15/10/13

DP / DEG
ARCHIVO : 2018-D

A.8-5

SISTEMA INTERCONECTADO NACIONAL


AO 2019

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

GEN. YGUAZU
2 X 100 MVA
MD - ITAIPU 220 kV

13.8
kV

13.8
kV

TR - 6
26 MVA

2x
112/134 MVA

LT 66 kV MD - IPU
60
MVA 66 kV

YGUAZU
220 kV

41.67
23 kV
MVA

2 x 30/20/15
MVA

YBY-YAU
66 kV

23 kV
3 MVAr

66 kV

23 kV
21.5 MVAr

66 kV

20
MVA
23 kV

30
MVA
23 kV

SALTO
DEL GUAIRA
220 kV

20 MVAr

41.67

20 MVAr

41.67
MVA

23 kV
3 MVAr

23 kV
6 MVAr
6 MVAr

BARRIO
SAN PEDRO
220 kV

23 kV
6 MVAr

66 kV

41.67
MVA

ENCARNACION

23 kV

27 MVAr

41.67
MVA
23 kV
6 MVAr

23 kV
6 MVAr

SICBRAS 220 kV

23 kV

23 kV
15 MVAr

VILLARRICA
66 kV

120
MVA

66 kV

30
MVA

23 kV
12 MVAr

66 kV

CLYFSA

20 MVAr

PARAGUARI
30
MVA

600
MVA

23 kV

30 MVA

6 MVAr

CEMENTERA
YGUAZU

3x
600
MVA

80
MVA

23 kV
9 MVAr

ACEPAR

CAPIATA
220 kV

41.67
MVA

23 kV

VILLA
HAYES
220 kV

66 kV
PTO. BOTANICO
220 kV

23 kV

23 kV

18 MVAr

GRAN
HOSPITAL
NACIONAL

23 kV
24 MVAr

ITAUGUA 66 kV

23 kV

23 kV

BARRIO
PARQUE
66 kV

23 kV

-120 / + 300 MVAr


41.67
MVA
CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

23 kV
6 MVAr

23 kV
24 MVAr

CAIASA

23 kV

23 kV

2 x 30 MVA

80
MVA

41.67
MVA

2 X 30
MVA

30 MVAr
12 MVAr

23 kV
LAMBARE 220 kV
VILLA ELISA

TCR 1

2 x 300/180/120
MVA
23 kV

TCR 2

220 kV

80
MVA

48 MVAr
24 MVAr

23 kV
18 MVAr

LAMBARE 66 kV

TRES BOCAS
66 kV

BANCO CENTRAL
66 kV
24 MVAr

23 kV

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

12 MVAr

2 x 300/180/120
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO

CER

VILLETA II
220 kV

18 MVAr

24 MVAr

F. A.

66 kV
3 x 30
MVA

2 x 30
MVA

220 kV

2 x 120 MVA
GUARAMBARE 66kV
2 X 30
MVA

FILTRO x 5

VILLA AURELIA

23 kV
12 MVAr

3 x 30
MVA

23 kV

6 MVAr

2 X 50
MVA

12 MVAr
12 MVAr

IPS 66 kV

PARQUE CABALLERO

41.67
MVA

CAACUPE
66 kV

80
MVA

BARRIO
MBURUCUYA
66 kV

ADM

23 kV

23 kV

24 MVAr

3 x 20 MVA

PTO.
MARISCAL

GUARAMBARE 220 kV

CER

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

23 kV
3 MVAr

66 kV

24 MVAr

F. DE LA MORA 66 kV
VILLA
AURELIA
220 kV

2 x 50
MVA

3 MVAr

2x
80 MVAr

2x
41.67
MVA

2x
41.67 MVA

80
MVA

SAN LORENZO 66kV

20 MVA

48 MVAr

2x
80 MVAr

2x
120
MVA

23 kV

MARIANO
ROQUE
ALONSO
66 kV

VIAS CUE

2 x 300/180/120
MVA

20 MVAr

LA
VICTORIA
220 kV

SAN LORENZO
220 kV

23 kV
18 MVAr

23 kV
12 MVAr

18 MVAr

80
MVA

60
MVA

VILLALBIN
66 kV

PILAR 66 kV

9 MVAr

23 kV

BARRIO
MOLINO
220 kV

41.67
MVA

60 MVA

CLORINDA

23 kV
2.4 MVAr

80
MVA

41.67 MVA

23 kV

66 kV

ANERETA

30 MVA

23 kV
12 MVAr

24 MVAr

23 kV

12
MVA

CAAPUCU

2 x 30 MVA

LUQUE 220 kV

VILLALBIN 220 kV

30/25/10
MVA

66 kV

66 kV

23 kV

66 kV

VILLA HAYES
66 kV

66 kV

ERIDAY
2 x 15 MVA

60
MVA

30
MVA

EUSEBIO AYALA

12 MVAr

VILLA HAYES 500 kV

QUIINDY

120 MVA

30 MVA

66 kV

220 kV

EUSEBIO AYALA

ALEACIONES
YGUAZU

66 kV

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

VALLE APUA
220 kV

66 kV
30
MVA

23 kV
6 MVAr 6 MVAr

23 kV
9 MVAr
LIMPIO

23 kV

23 kV
EUSEBIO
AYALA
500 kV

41.67
MVA

CAAZAPA
66 kV

20
MVA
23 kV

23 kV

20
MVAr

41.67
MVA

23 kV
6 MVAr

66 kV

2 X 375
MVA

6 MVAr

3 MVAr

CER

41.67 MVA

PIRAYU

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

S. J. BAUTISTA
220 kV

2 x 60
MVA
COMPAIA
METALURGICA
YGUAZU

SAN JUAN
NEPOMUCENO
220 kV

23 kV
LA
COLMENA 18 MVAr

LIMPIO 220 kV

60 MVA

SAN PATRICIO 220 kV

20
MVA

30
MVA

30
MVA

2 x 30
MVA

41.67
MVA

YACYRETA
500 kV

3 MVAr

120 MVA

66 kV

80
MVA

10 x 172.5 MVA

23 kV

PIRAYU 220 kV

23 kV
20.4 MVAr
2x
60
MVA

23 kV
3 MVAr
30
MVA

30
MVA

80 MVAr

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

FRAM
66 kV

23 kV

2 X 41.67
MVA

PASO PE
220 kV

41.67 MVA

41.67
MVA
23 kV
3 MVAr

30
MVA

SAN PEDRO
DEL PARANA
66 kV

66 kV
2 x 30
MVA

CORONEL OVIEDO
220 kV
20
MVAr

30/20/15
MVA

CNEL.
BOGADO
66 kV

COSTANERA

23 kV

24 MVAr

60 MVA
220 kV CORONEL
OVIEDO
41.67
66 kV
MVA

SISTEMA
EMSA

600 MVA

CAMBYRETA
66 kV

CORONEL
OVIEDO II
CARAYAO 220 kV

3 MVAr

CNEL. BOGADO 220 kV

220 kV

2x
60
MVA

23 kV
12 MVAr

66 kV

4 x 30
23 kV
3 MVAr MVA

23 kV
6 MVAr

23 kV
12 MVAr

23 kV

23 kV
3 MVAr

TRINIDAD 500 kV
CAMBYRETA

30 MVA

2x
41.67
MVA

41.67 MVA

2 x 41.67MVA

23 kV
3 MVAr

20
MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

PIRAPO

CAAGUAZU
220 kV

ITACURUBI
DEL ROSARIO
220 kV

41.67
MVA

220
kV
41.67
MVA

TRINIDAD 66 kV

12 MVAr

23 kV
3 MVAr

NATALIO

41.67 MVA

23 kV

20 MVA

SANTA ROSA
66 kV

SAN
ESTANISLAO
220 kV

41.67MVA

12
MVA

2 x 30
MVA

C. A.
LOPEZ
220 kV

23 kV
3 MVAr

66 kV

12 MVAr

23 kV
6 MVAr

SAN PEDRO NORTE


66 kV

40/20/20
MVA

41.67
MVA

66 kV
NARANJAL

TRINIDAD 220 kV

2 x 41.67
MVA

23 kV

120
MVA

23 kV

CAMPO
DOS
220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

18 MVAr

CARGIL

41.67
MVA
23 kV

VAQUERIA
220 kV

PARANAMBU
220 kV

23 kV

MALLORQUIN
220 kV

220 kV

CER

3 x 30
MVA

3x
30
20
MVA
MVA
23 kV
6 MVAr
12 MVAr

WHITE
MARTINS

18 MVAr 23 kV

MARIA
AUXILIADORA

MVA
23 kV
12 MVAr

23 kV
6 MVAr

3 x 30
MVA

23 kV
6 MVAr

LOS
CEDRALES
220 kV

ALTO
PARANA
66 kV

KM 30

41.67
MVA

23 kV

220 kV

80 MVA

66 kV

23 kV
18 MVAr

500 kV

LOS CEDRALES
2x
600
MVA

CIUDAD DEL
ESTE

2 x 30
MVA
23 kV
18 MVAr

2 x 30
MVA
120
MVA

80
MVA
23
kV

60
MVA
66 kV

23
kV
12 MVAr
12 MVAr

66 kV

66 kV

KM 30 220 kV

6.3 kV

CONCEPCION II

120 MVA

HERNANDARIAS
66 kV
KM 15 66 kV

STA.
RITA
220 kV

MICROCENTRO
220 kV

2x
41.67
MVA

PTE.
FRANCO

2x
20 MVA

2x
20
MVA

HORQUETA

12 MVAr

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

23 kV
24 MVAr

30/25/20
MVA

220 kV

3 x 25
MVA

ACARAY 66 kV

VALLEMI II 220 kV

60
MVA

HORQUETA

220 kV

23 kV
12 MVAr

66 kV

20
MVA

3 x 19
MVA

60 MVA

80 MVA

20
MVAr

23 kV

23 kV

66 kV

41.67
MVA

30
MVA

BELLA
VISTA
NORTE

23 kV

CURUGUATY

CATUETE
66 kV

20 MVA

41.67
MVA

CATUETE
220 kV

60 MVA

23 kV
12 MVAr

KM 7
220 kV

VALLEMI 220 kV

220 kV
10
MVA
23 kV
12
MVAr

66 kV
LOMA PLATA
ACUEDUCTO
220 kV

12 MVAr
23 kV
2 x 30
MVA
CONCEPCION 66 kV

41.67
MVA
CURUGUATY

23 kV
6 MVAr

GEN. 4
65 MVA

13.8 kV

ACY 66 kV
80
MVA

10
MVA

23 kV
12 MVAr

23
kV
6 MVAr
INPASA
66 kV

20
MVAr

66 kV

GEN. 3
65 MVA

13.8 kV

3 x 19
MVA

2x
60
MVA

CRUCE
BELLA
VISTA

41.67
MVA

13.8 kV

13.8 kV

FILADELFIA

ACARAY 220 kV

30/20/15
MVA

20
MVA

CAPITAN
BADO
220 kV

30
MVA

23 kV

66 kV

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
LOMA
PLATA
220 kV

60
MVA

CERRO
CORA
220 kV

ITAKYRY 66 kV
MINGA
PORA
66 kV

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

CERRO CORA
66 kV

41.67
MVA
23 kV

23 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

P. J. CABALLERO
66 kV

ITAKYRY 220 kV

60 MVA
ITAKYRY
66 kV

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

LT 66 kV MD - FI

23 kV

2 x 300/180/120
MVA
23 kV

24 MVAr
GRAL. DIAZ

66 kV

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV

18 MVAr

3 x 30 MVA
3 x 30
MVA

23 kV
24 MVAr

23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 16/10/13

DP / DEG
ARCHIVO : 2019-D

A.8-6

SISTEMA INTERCONECTADO NACIONAL


AO 2020

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

GEN. YGUAZU
2 X 100 MVA
MD - ITAIPU 220 kV

13.8
kV

13.8
kV

TR - 6
26 MVA

2x
112/134 MVA

LT 66 kV MD - IPU
60
MVA

YGUAZU
220 kV

41.67
23 kV
MVA

2 x 30/20/15
MVA

YBY-YAU
66 kV

23 kV

CURUGUATY

6 MVAr

3 MVAr

66 kV

23 kV
21.5 MVAr

KM 30 220 kV

20 MVAr

220 kV

41.67
MVA

23 kV
3 MVAr

23 kV
12 MVAr

BARRIO
SAN PEDRO
220 kV

23 kV
12 MVAr

PIRAPO
66 kV

ENCARNACION

23 kV

23 kV

24 MVAr

23 kV
6 MVAr

23 kV
12 MVAr

66 kV

66 kV
2 x 30
MVA

FRAM

23 kV

66 kV

41.67
MVA
23 kV
6 MVAr

20
MVAr

23 kV
6 MVAr

SICBRAS 220 kV

PASO PE
220 kV

23 kV
15 MVAr

66 kV

30
MVA

30
MVA

30
MVA

23 kV
12 MVAr

66 kV

CLYFSA

20 MVAr

23 kV

LIMPIO

PARAGUARI

6 MVAr

80
MVA

23 kV
9 MVAr

CAPIATA
220 kV

41.67
MVA

23 kV

MARIANO
ROQUE
ALONSO
66 kV

VIAS CUE

23 kV

F. DE LA MORA 66 kV

20 MVAr

2x
80 MVAr

41.67
MVA

GRAN
HOSPITAL
NACIONAL

80
MVA
24 MVAr
6 MVAr

23 kV

23 kV

23 kV

BARRIO
PARQUE
66 kV

41.67
MVA
CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

23 kV
6 MVAr

23 kV
24 MVAr

CAIASA

23 kV

23 kV

3 x 30 MVA

80
MVA

80
MVA

2 X 30
MVA

30 MVAr
12 MVAr

23 kV
LAMBARE 220 kV
VILLA ELISA

TCR 1

2 x 300/180/120
MVA
23 kV

TCR 2

220 kV

80
MVA

80
MVA

48 MVAr
24 MVAr

23 kV

LAMBARE 66 kV

TRES BOCAS

IPS 66 kV

18 MVAr
30 MVAr

66 kV
2 x 30
MVA

BANCO CENTRAL
66 kV
24 MVAr

23 kV
12 MVAr

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

2 x 300/180/120
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO

-120 / + 300 MVAr

18 MVAr

ITAUGUA 66 kV

24 MVAr

F. A.

66 kV
3 x 30
MVA

CER

VILLETA II
220 kV

23 kV

FILTRO x 5

VILLA AURELIA

23 kV
12 MVAr

18 MVAr

2 x 120 MVA
GUARAMBARE 66kV
2 X 30
MVA

2 X 50
MVA

3 x 30
MVA

23 kV

GUARAMBARE 220 kV

CER

24 MVAr

80
MVA

ADM

23 kV
6 MVAr

23 kV

24 MVAr
BARRIO
MBURUCUYA
66 kV

220 kV

41.67
MVA
41.67
MVA
23 kV
24 MVAr 12 MVAr

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

2x
80
MVA

PILAR 66 kV

3 x 20 MVA

PTO.
MCAL.

9 MVAr

CAACUPE
66 kV

VILLA
AURELIA
220 kV

2 x 50
MVA

3 MVAr

2x
80 MVAr

2x
120
MVA

66 kV

ANERETA

23 kV
3 MVAr

66 kV

23 kV
2.4 MVAr

LA
VICTORIA
220 kV

SAN LORENZO 66kV

20 MVA

48 MVAr

23 kV
12 MVAr

18 MVAr

66 kV

12
MVA

CAAPUCU

60 MVA
VILLALBIN

66 kV
CLORINDA

30 MVA

SAN LORENZO
220 kV

23 kV
18 MVAr

VILLALBIN 220 kV
23 kV
30/25/10
MVA

23 kV

23 kV

23 kV

80
MVA

66 kV

ERIDAY
2 x 15 MVA

66 kV

66 kV

80
MVA

41.67 MVA

24 MVAr

PTO. BOTANICO
220 kV

PARQUE CABALLERO

66 kV

60
MVA

30
MVA

66 kV
2 x 30 MVA

60
MVA

2 x 300/180/120
MVA

QUIINDY

120 MVA

BARRIO
MOLINO
220 kV

41.67
MVA

23 kV

AYOLAS

AYOLAS
220 kV

23 kV

40
MVA

23 kV

3 X 375
MVA

220 kV

EUSEBIO AYALA

ACEPAR

30
MVA

23 kV
6 MVAr 6 MVAr

EUSEBIO AYALA

LUQUE 220 kV

4x
600 MVA

23 kV
12 MVAr

20
MVAr

41.67
MVA

VALLE APUA
220 kV

66 kV
30
MVA

2x
600
MVA

23 kV

30 MVA

ALEACIONES
YGUAZU

66 kV

30 MVA

VILLA
HAYES
220 kV

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

20
MVA
23 kV

VILLA HAYES

CEMENTERA
YGUAZU

41.67 MVA
23 kV
6 MVAr

66 kV

EUSEBIO
AYALA
500 kV

23 kV
9 MVAr
60 MVA

66 kV

VILLA HAYES 500 kV

SAN PATRICIO 220 kV

6 MVAr

3 MVAr

23 kV
12 MVAr
12 MVAr

500 kV

S. J. BAUTISTA
220 kV

2 x 60
MVA
PIRAYU

41.67
MVA

CAAZAPA
66 kV

20
MVA

LIMPIO 220 kV

CER

10 x 172.5 MVA
YACYRETA

23 kV 23 kV

COMPAIA
METALURGICA
YGUAZU

SAN JUAN
NEPOMUCENO
220 kV

23 kV
LA
COLMENA 18 MVAr

2 x 30
MVA

80
MVA

30
MVA

23 kV
3 MVAr

120 MVA

66 kV

80
MVA

66 kV
23 kV
3 MVAr

PIRAYU 220 kV

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

30
MVA

30 MVA

YUTY

30
MVA

80 MVAr

23 kV
20.4 MVAr
2x
60
MVA

41.67 MVA
VILLARRICA
66 kV

120
MVA

2 X 41.67
MVA

41.67
MVA
23 kV
3 MVAr

SAN
PEDRO
DEL PARANA

COSTANERA
27 MVAr

30/20/15
MVA

CNEL.
BOGADO
66 kV

CAMBYRETA
66 kV

CORONEL OVIEDO
220 kV

60 MVA
220 kV CORONEL
OVIEDO
41.67
66 kV
MVA

600 MVA

CNEL. BOGADO 220 kV

220 kV

2x
60
MVA

23 kV
12 MVAr

66 kV

CORONEL
OVIEDO II
CARAYAO 220 kV

SISTEMA
EMSA

TRINIDAD 500 kV

41.67
MVA

4x
30
23 kV
3 MVAr MVA

41.67 MVA

2 x 41.67MVA

3 MVAr

20
MVAr

CAMBYRETA

30 MVA
41.67
MVA

80
MVA

23 kV

23 kV
3 MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

12 MVAr

23 kV
3 + 3 MVAr

23 kV
3 MVAr

TRINIDAD 66 kV

CAAGUAZU
220 kV

ITACURUBI
DEL ROSARIO
220 kV

41.67
MVA

41.67 MVA

23 kV

20 MVA

SANTA ROSA
66 kV

SAN
ESTANISLAO
220 kV

41.67MVA

NATALIO
220
kV
41.67
MVA

12 MVAr

23 kV
6 MVAr

SAN PEDRO NORTE


66 kV

40/20/20
MVA

12
MVA

2 x 30
MVA

C. A.
LOPEZ
220 kV

23 kV
3 MVAr

66 kV

TRINIDAD 220 kV

2 x 41.67
MVA

23 kV

41.67
MVA

66 kV
NARANJAL

23 kV

CAMPO
DOS
220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

120
MVA

CARGIL

41.67
MVA
23 kV

VAQUERIA
220 kV

18 MVAr

MALLORQUIN
220 kV

220 kV

CER

23 kV
12 MVAr

23 kV
6 MVAr

PARANAMBU
220 kV

23 kV

3x
30
20
MVA
MVA
23 kV
6 MVAr
12 MVAr

WHITE
MARTINS

18 MVAr 23 kV

MARIA
AUXILIADORA

20 MVAr

41.67
MVA

80 MVA

3 x 30
MVA

23 kV
6 MVAr

LOS
CEDRALES
220 kV

3 x 30
MVA

ALTO
PARANA
66 kV

KM 30

41.67
MVA

23 kV

HORQUETA

12 MVAr

66 kV

23 kV
18 MVAr

500 kV

LOS CEDRALES
2x
600
MVA

CIUDAD DEL
ESTE

2 x 30
MVA
23 kV
18 MVAr

2x
30
MVA

120
MVA

80
MVA
23
kV

60
MVA
66 kV

23
kV
24 MVAr

66 kV

66 kV

KM 15 66 kV

STA.
RITA
220 kV

MICROCENTRO
220 kV

2x
41.67
MVA

PTE.
FRANCO
HERNANDARIAS
66 kV

6.3 kV

CONCEPCION II

120 MVA

23 kV

23 kV

SALTO
DEL GUAIRA
220 kV

66 kV

20
MVA

30
MVA

23 kV
12 MVAr

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

2x
20 MVA

2x
20
MVA

30/25/20
MVA

220 kV

3 x 25
MVA

ACARAY 66 kV

VALLEMI II 220 kV

60
MVA

HORQUETA

220 kV

3 x 19
MVA

60 MVA

12 MVAr
18 MVAr

23 kV
24 MVAr

VALLEMI 220 kV

66 kV

20
MVA

60 MVA

23 kV
KM 7
220 kV
80
MVA

20
MVAr

23 kV

23 kV

66 kV

41.67
MVA

30
MVA

BELLA
VISTA
NORTE

23 kV

CURUGUATY

CATUETE
66 kV

20 MVA

41.67
MVA

CATUETE
220 kV

66 kV
LOMA PLATA

10
MVA

220 kV
10
MVA
23 kV
12
MVAr

GEN. 4
65 MVA

13.8 kV

ACY 66 kV
80
MVA

ACUEDUCTO
220 kV

12 MVAr
23 kV
2 x 30
MVA
CONCEPCION 66 kV

41.67
MVA

INPASA
66 kV

23 kV

6 MVAr

23 kV
12 MVAr

23
kV
6 MVAr

20
MVAr

66 kV

GEN. 3
65 MVA

13.8 kV

3 x 19
MVA

2x
60
MVA

CRUCE
BELLA
VISTA

41.67
MVA

13.8 kV

13.8 kV

FILADELFIA

ACARAY 220 kV

30/20/15
MVA

20
MVA

CAPITAN
BADO
220 kV

30
MVA

23 kV

66 kV

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
LOMA
PLATA
220 kV

60
MVA

CERRO
CORA
220 kV

ITAKYRY 66 kV
MINGA
PORA
66 kV

COPEL
3 MVAr
23 kV

66 kV

2x
30 MVA

CERRO CORA
66 kV

41.67
MVA
23 kV

23 kV

ITAKYRY
66 kV

5.4 MVA

MCAL.
ESTIGARRIBIA

23 kV

P. J. CABALLERO
66 kV

ITAKYRY 220 kV
2x
60 MVA

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

LT 66 kV MD - FI

23 kV

66 kV

2 x 300/180/120
MVA
23 kV

24 + 12 MVAr
GRAL. DIAZ

66 kV

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV

18 MVAr

3 x 30 MVA
3 x 30
MVA

23 kV
24 MVAr

23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 17/10/13

DP / DEG
ARCHIVO : 2020-D

A.8-7

SISTEMA INTERCONECTADO NACIONAL


AO 2021

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

GEN. YGUAZU
2 X 100 MVA
MD - ITAIPU 220 kV

13.8
kV

13.8
kV

TR - 6
26 MVA

2x
112/134 MVA

LT 66 kV MD - IPU

YGUAZU
220 kV

2x
30 MVA

P. J. CABALLERO
66 kV
2 x 30/20/15
MVA

CERRO
CORA
220 kV

ITAKYRY 66 kV
MINGA
PORA
66 kV
30
MVA

60
MVA

41.67
MVA

YBY-YAU
66 kV

220 kV
41.67
MVA

CATUETE
220 kV

66 kV
LOMA PLATA

66 kV

CATUETE
66 kV

HORQUETA

KM 30 220 kV

20
MVAr

41.67
MVA

2x
41.67
MVA

23 kV
3 MVAr

23 kV
12 MVAr

BARRIO
SAN PEDRO
220 kV

23 kV

SAN PEDRO NORTE


66 kV

23 kV
6 MVAr

66 kV

ENCARNACION

23 kV

23 kV

24 MVAr

220 kV
2x
41.67
MVA

2 x 41.67
MVA

120
MVA

120 MVA

66 kV

23 kV
15 MVAr

VILLARRICA
66 kV

66 kV

66 kV

30
MVA

30
MVA

23 kV
12 MVAr

23 kV

23 kV

60 MVA

CER

23 kV

LIMPIO

66 kV
LUQUE 220 kV

66 kV

VILLA
HAYES
220 kV

80
MVA

23 kV
9 MVAr

23 kV
12 MVAr

66 kV
MARIANO
ROQUE
ALONSO
66 kV

VIAS CUE

2 x 300/180/120
MVA
23 kV

23 kV

41.67
MVA
23 kV

23 kV
30 MVAr

2x
80 MVAr

80
MVA

2 x 120 MVA

80
MVA

23 kV

23 kV

BARRIO
PARQUE
66 kV

TCR 1

23 kV

-120 / + 300 MVAr

18 MVAr
41.67
MVA
CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

23 kV
6 MVAr

23 kV
24 MVAr

CAIASA

23 kV

23 kV

3 x 30 MVA

80
MVA

80
MVA

2 X 30
MVA

30 MVAr
18 MVAr

12 MVAr

23 kV
LAMBARE 220 kV
VILLA ELISA
220 kV

2 x 300/180/120
MVA
23 kV

TCR 2

80
MVA

80
MVA

48 MVAr
24 MVAr

23 kV

LAMBARE 66 kV

TRES BOCAS

IPS 66 kV

48 MVAr

66 kV
2 x 30
MVA

BANCO CENTRAL
66 kV
24 MVAr

23 kV

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

12 MVAr

2 x 300/180/120
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO

VILLETA II
220 kV

ITAUGUA 66 kV

24 MVAr

F. A.

66 kV
3 x 30
MVA

CER

2 X 30
MVA

GRAN
HOSPITAL
NACIONAL

FILTRO x 5

VILLA AURELIA
12 MVAr
24 MVAr

23 kV

GUARAMBARE 66kV

23 kV
6 MVAr
18 MVAr

2 X 50
MVA

3 x 30
MVA

3 x 20 MVA

23 kV

ADM

GUARAMBARE 220 kV

CER

24 MVAr

2 x 80
MVA

18 MVAr

220 kV

20 MVAr

23 kV

24 MVAr
BARRIO
MBURUCUYA
66 kV

PARQUE CABALLERO

41.67
MVA

2x
80
MVA

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

66 kV

9 MVAr

CAACUPE
66 kV

VILLA
AURELIA
220 kV

2 x 50
MVA

3 MVAr

41.67
MVA

PTO.
MCAL.

36 MVAr

F. DE LA MORA 66 kV

20 MVA

48 MVAr

VILLALBIN

PILAR 66 kV

23 kV
2.4 MVAr

LA
VICTORIA
220 kV

2x
80 MVAr

2x
120
MVA

60 MVA

PILAR II
220 kV

ANERETA

30 MVA

80
MVA

SAN LORENZO 66kV

CLORINDA

12
MVA

CAAPUCU

SAN LORENZO
220 kV

PTO. BOTANICO
220 kV

VILLALBIN 220 kV

30/25/10
MVA
66 kV

66 kV

23 kV
3 MVAr
66 kV

23 kV

18 MVAr
30 MVAr

80
MVA

66 kV

ERIDAY
2 x 15 MVA

23 kV

30
MVA

23 kV

BARRIO
MOLINO
220 kV

23 kV
18 MVAr

66 kV

23 kV

66 kV

12 MVAr

80 MVA

24 MVAr
24 MVAr

60
MVA

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

60
MVA

23 kV

2 x 30 MVA
CAPIATA
220 kV

80
MVA

23 kV

4x
600 MVA

80
MVA

QUIINDY

120 MVA

30 MVA

6 MVAr

3 X 375
MVA

220 kV

EUSEBIO AYALA

ACEPAR

30
MVA

23 kV
6 MVAr 6 MVAr

EUSEBIO AYALA

VILLA HAYES

CEMENTERA
YGUAZU

20
MVAr

23 kV

VALLE APUA
220 kV

66 kV

24 MVAr

VILLA HAYES 500 kV

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

2 x 41.67
MVA

23 kV
6 MVAr

PARAGUARI

6 MVAr

ALEACIONES
YGUAZU

66 kV

SAN PATRICIO 220 kV

S. J. BAUTISTA
220 kV

66 kV

30
MVA

2x
600
MVA

23 kV

30 MVA
23 kV
9 MVAr

80
MVA

500 kV

23 kV

3 MVAr
80
MVA

10 x 172.5 MVA
YACYRETA

23 kV

23 kV
6 MVAr

41.67 MVA

PIRAYU

EUSEBIO
AYALA
500 kV

2x
41.67
MVA

CAAZAPA
66 kV

20
MVA

23 kV
3 MVAr

30 MVA

3 + 6 MVAr

30
MVA

30
MVA

PIRAYU 220 kV
2 x 60
MVA

SAN JUAN
NEPOMUCENO
220 kV

66 kV

CLYFSA

20 MVAr

LIMPIO 220 kV

66 kV

20
MVA

30
MVA

23 kV
LA
COLMENA 18 MVAr

2 x 30
MVA

YUTY

FRAM
66 kV

23 kV

80 MVAr

COMPAIA
METALURGICA
YGUAZU

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr
30
MVA

66 kV

23 kV
20.4 MVAr
2x
60
MVA

41.67 MVA

6 MVAr

SICBRAS 220 kV

2 X 41.67
MVA

PASO PE
220 kV

66 kV

23 kV
6 MVAr

20
MVAr

2x
41.67
MVA

30/20/15
MVA

SAN
PEDRO
DEL PARANA

COSTANERA
27 MVAr

CORONEL OVIEDO
220 kV

60 MVA
CORONEL
OVIEDO

600 MVA

CNEL.
BOGADO
66 kV

CAMBYRETA
66 kV

CORONEL
OVIEDO II
CARAYAO 220 kV

SISTEMA
EMSA

CNEL. BOGADO 220 kV

220 kV

2x
60
MVA

23 kV
12 MVAr

66 kV

2 x 30
MVA

23 kV
6 MVAr

23 kV
12 MVAr

23 kV
3 MVAr

TRINIDAD 500 kV

2x
41.67
MVA

4x
30
23 kV
3 MVAr MVA

41.67 MVA

2 x 41.67MVA

41.67
MVA

20
MVAr

CAMBYRETA

30 MVA
41.67
MVA

80
MVA

C. A.
LOPEZ
220 kV

NATALIO
220
kV
41.67
MVA

23 kV
3 MVAr

23 kV
3 MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

12 MVAr

23 kV
6 MVAr

12
MVA

2 x 30
MVA

12 MVAr

TRINIDAD 66 kV

CAAGUAZU
220 kV

ITACURUBI
DEL ROSARIO
220 kV

66 kV

41.67 MVA

23 kV

30 MVA

SANTA ROSA
66 kV

41.67
MVA
23 kV
3 MVAr

66 kV
NARANJAL

12 MVAr

23 kV
6 MVAr

PIRAPO

SAN
ESTANISLAO
220 kV

41.67MVA

120
MVA

TRINIDAD 220 kV

2 x 41.67
MVA

60
MVA

18 MVAr

23 kV

23 kV

LOS
CEDRALES
220 kV

PARANAMBU
220 kV

23 kV

CARGIL

CAMPO
DOS
220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

2x
600
MVA

3 x 30
MVA

MALLORQUIN
220 kV

41.67
MVA

220 kV
10
MVA

VAQUERIA
220 kV

23 kV
6 MVAr

500 kV

LOS CEDRALES

3x
20
MVA

30
MVA

18 MVAr 23 kV

220 kV

CER

WHITE
MARTINS

80
MVA
23
kV

60
MVA
66 kV

23 kV
24 MVAr

CIUDAD DEL
ESTE

ALTO
PARANA
66 kV

KM 30

MARIA
AUXILIADORA

TORO
PAMPA

23 kV
12 MVAr

23 kV
18 MVAr

3 x 30
MVA

23 kV
6 MVAr

220 kV

20 MVAr

23 kV
6 MVAr

66 kV

66 kV

66 kV

3x
30
MVA
23 kV
18 MVAr

3x
30
MVA

120
MVA

41.67
MVA

23 kV

12 MVAr

80 MVA

HERNANDARIAS
66 kV

6.3 kV
STA.
RITA
220 kV

MICROCENTRO
220 kV
80
MVA

41.67
MVA

PTE.
FRANCO

2x
20 MVA

KM 15 66 kV

30/25/20
MVA

CONCEPCION II

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

23 kV
24 MVAr
2x
20
MVA

20
MVAr

41.67
MVA

120 MVA

23 kV

23 kV

SALTO
DEL GUAIRA
220 kV

23 kV
21.5 MVAr

66 kV

20
MVA

30
MVA

23 kV
12 MVAr

30
MVA

3 x 25
MVA

ACARAY 66 kV

VALLEMI II 220 kV

220 kV

3 x 19
MVA

60 MVA

30 MVAr

2x
80
MVA

VALLEMI 220 kV

23
kV

60
MVA

HORQUETA

220 kV

41.67
MVA

66
kV

20
MVA

60 MVA

23 kV
KM 7
220 kV

ACUEDUCTO
220 kV

23 kV

23 kV

BELLA
VISTA
NORTE

23 kV

CURUGUATY

80
MVA

66 kV

18 MVAr
23 kV
2 x 30
MVA
CONCEPCION 66 kV

GEN. 4
65 MVA

13.8 kV

ACY 66 kV

20 MVA

10
MVA
23 kV
12
MVAr

3 x 19
MVA

2x
60
MVA

10
MVA

23 kV
3 MVAr

CURUGUATY

INPASA
66 kV

23 kV
6 MVAr

GEN. 3
65 MVA

13.8 kV

ACARAY 220 kV

30/20/15
MVA

66 kV

13.8 kV

13.8 kV

FILADELFIA

CRUCE
BELLA
VISTA

2x
41.67
MVA

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
66 kV

23 kV

23 kV
12 + 6 MVAr

23
kV
6 MVAr

20
MVAr

20
MVA

CAPITAN
BADO
220 kV

COPEL
3 MVAr
23 kV

LOMA
PLATA
220 kV

CERRO CORA
66 kV

41.67
MVA
23 kV

23 kV

ITAKYRY
66 kV

5.4 MVA

MCAL.
ESTIGARRIBIA
66 kV

23 kV

41.67
23 kV
MVA

ITAKYRY 220 kV
2x
60 MVA

TR - 7
26 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

LT 66 kV MD - FI

23 kV

66 kV

2 x 60
MVA

2 x 300/180/120
MVA
23 kV

36 MVAr
GRAL. DIAZ

66 kV

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV

18 MVAr

3 x 30 MVA
3 x 30
MVA

23 kV
24 MVAr

23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 18/10/13

DP / DEG
ARCHIVO : 2021-D

A.8-8

SISTEMA INTERCONECTADO NACIONAL


AO 2022

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

GEN. YGUAZU
2 X 100 MVA
MD - ITAIPU 220 kV

13.8
kV

13.8
kV

TR - 6
26 MVA

2x
112/134 MVA

LT 66 kV MD - IPU

YGUAZU
220 kV

LT 66 kV MD - FI

23 kV

66 kV

2 x 60
MVA

TR - 7
26 MVA
20 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

41.67
23 kV
MVA

2 x 30/20/15
MVA
23 kV

20
MVAr
LOMA
PLATA
220 kV

CERRO CORA
66 kV

41.67
MVA
23 kV
CERRO
CORA
220 kV

ITAKYRY 66 kV
MINGA
PORA
66 kV

60
MVA

30
MVA

41.67
MVA

23 kV
6 MVAr

3 MVAr

66 kV
LOMA PLATA

23 kV
21.5 MVAr

66 kV

20
MVA
23 kV

30
MVA
23 kV

SALTO
DEL GUAIRA
220 kV

41.67
MVA

KM 30 220 kV

30/25/20
MVA
20
MVAr

TORO
PAMPA

VAQUERIA
220 kV

23 kV

23 kV

2x
41.67
MVA

23 kV
3 MVAr

23 kV
12 MVAr

BARRIO
SAN PEDRO
220 kV

SAN PEDRO NORTE


66 kV

23 kV
6 MVAr
6 MVAr

220 kV
2x
41.67
MVA

ALTOS
220 kV

23 kV
6 MVAr

6 MVAr
12 MVAr

SICBRAS 220 kV

6 MVAr
120
MVA
66 kV

23 kV

20
MVAr

23 kV
15 MVAr

30
MVA

20 MVAr

CAAZAPA
66 kV

20
MVA

23 kV
60 MVA

CER

23 kV

LIMPIO

ALEACIONES
YGUAZU

66 kV

VILLA
HAYES
220 kV

23 kV

CAPIATA
220 kV

QUIINDY

23 kV

18 MVAr

MARIANO
ROQUE
ALONSO
66 kV

23 kV

23 kV

2 x 80
MVA

120
MVA

2x
80 MVAr

23 kV

23 kV

BARRIO
PARQUE
66 kV

23 kV

30 MVAr

2 x 120 MVA

GRAN
HOSPITAL
NACIONAL

CER

VILLETA II
220 kV

23 kV

-120 / + 300 MVAr

18 MVAr
41.67
MVA

ITAUGUA 66 kV
CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

23 kV
6 MVAr

23 kV
24 MVAr

CAIASA

23 kV

23 kV

3 x 30 MVA

80
MVA

80
MVA

2 X 30
MVA

48 MVAr
12 MVAr

23 kV
LAMBARE 220 kV

24 MVAr

F. A.

VILLA ELISA
TCR 1

2 x 300/180/120
MVA
23 kV

TCR 2

220 kV

3 x 80
MVA

48 MVAr
24 MVAr

23 kV

LAMBARE 66 kV

TRES BOCAS

IPS 66 kV

48 MVAr

66 kV
2 x 30
MVA

BANCO CENTRAL
66 kV
24 MVAr

23 kV

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

66 kV

25 MVAr

3 x 30
MVA

20
MVA

12 MVAr

2 x 300/180/120
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO

3 x 20 MVA

23 kV

GUARAMBARE 66kV
2 X 30
MVA

80
MVA

23 kV

80
MVA

2 X 50
MVA

66 kV
3 x 30
MVA

41.67
MVA

PTO.
MCAL.
ADM

23 kV
24 MVAr

FILTRO x 5

VILLA AURELIA

23 kV

PILAR 66 kV

GUARAMBARE 220 kV

CER

3 x 30
MVA
18 MVAr

220 kV

41.67
MVA
23 kV

24 MVAr

36 MVAr

PARQUE CABALLERO

20 MVAr

23 kV

24 MVAr
BARRIO
MBURUCUYA
66 kV

80
MVA

2x
80
MVA

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

66 kV

PILAR II
220 kV

ANERETA

9 MVAr

CAACUPE
66 kV

VILLA
AURELIA
220 kV

2 x 50
MVA

3 MVAr

12
MVA

36 MVAr

F. DE LA MORA 66 kV

20 MVA

48 MVAr

60 MVA
VILLALBIN

66 kV
CLORINDA

30 MVA

LA
VICTORIA
220 kV

2x
80 MVAr

2x
120
MVA

VILLALBIN 220 kV

30/25/10
MVA

23 kV
66 kV

23 kV
3 MVAr
66 kV

80
MVA

SAN LORENZO 66kV

66 kV

ERIDAY
2 x 15 MVA

23 kV
2.4 MVAr

48 MVAr

66 kV

VIAS CUE

66 kV

23 kV

30
MVA

CAAPUCU

SAN LORENZO
220 kV

PTO. BOTANICO
220 kV
2 x 300/180/120
MVA

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

60
MVA

66 kV

23 kV

23 kV

12 MVAr

6 MVAr

23 kV

23 kV

2 x 80
MVA

60
MVA

20
MVAr

23 kV

3 X 375
MVA

220 kV

12 MVAr

80 MVA

48 MVAr

30
MVA

23 kV
6 MVAr 6 MVAr

120 MVA

BARRIO
MOLINO
220 kV

80
MVA

AYOLAS
500 kV
41.67
MVA
23 kV
6 MVAr

VALLE APUA
220 kV

66 kV
30
MVA

EUSEBIO AYALA

9 MVAr
6 MVAr

80
MVA

4x
600 MVA

SAN PATRICIO 220 kV

2 x 41.67
MVA

41.67 MVA
23 kV
6 MVAr

66 kV

2 x 30 MVA

80
MVA

23 kV
9 MVAr

9 MVAr

6 MVAr
S. J. BAUTISTA
220 kV

PARAGUARI

2x
600
MVA

6 MVAr
6 MVAr

LUQUE 220 kV

66 kV

500 kV

23 kV

23 kV

66 kV

30 MVA

10 x 172.5 MVA
YACYRETA

23 kV

30
MVA

30
MVA

23 kV
3 MVAr

2x
30 MVA

YUTY
66 kV

PIRAYU 220 kV

EUSEBIO AYALA

ACEPAR

66 kV

30
MVA

23 kV

VILLA HAYES

CEMENTERA
YGUAZU

66 kV

FRAM

23 kV

EUSEBIO
AYALA
500 kV

24 MVAr

VILLA HAYES 500 kV

SAN
PEDRO
DEL PARANA

COSTANERA

2 x 30
MVA

PIRAYU

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr

2 x 60
MVA

23 kV

2x
30 MVA

23 kV

80
MVA

23 kV
12 MVAr

66 kV

2x
41.67
MVA

30/20/15
MVA

CNEL.
BOGADO
66 kV

2x
60
MVA

66 kV

27 MVAr

80 MVAr

COMPAIA
METALURGICA
YGUAZU

2x
41.67
MVA

66 kV

3 MVAr
80
MVA

SISTEMA
EMSA

600 MVA

SAN JUAN
NEPOMUCENO
220 kV

23 kV
LA
COLMENA 18 MVAr

LIMPIO 220 kV

3 MVAr

20
MVA

30
MVA

30
MVA

CLYFSA

23 kV

CNEL. BOGADO 220 kV

220 kV

CAMBYRETA
66 kV

23 kV
20.4 MVAr
2x
60
MVA

41.67 MVA
VILLARRICA
66 kV

66 kV

2 X 41.67
MVA

PASO PE
220 kV

66 kV

23 kV

2 x 30
MVA
12 MVAr

23 kV

24 MVAr
12 MVAr

60 MVA
CORONEL
OVIEDO

23 kV
3 MVAr
6 MVAr

TRINIDAD 500 kV

2x
41.67
MVA

ENCARNACION

CORONEL OVIEDO
220 kV

80
MVA
23 kV

120 MVA

PIRAPO

CAMBYRETA

4x
30
23 kV
3 MVAr MVA

CORONEL
OVIEDO II

CARAYAO 220 kV

C. A.
LOPEZ
220 kV

41.67
MVA

220
kV
2x
41.67
MVA
23 kV
3 MVAr

20
MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

66 kV

23 kV
6 + 6 MVAr

23 kV
12 MVAr
12 MVAr

2 x 30
MVA

NATALIO

41.67 MVA

30 MVA
41.67
MVA

80
MVA

41.67 MVA

2 x 41.67MVA

2 x 41.67
MVA

12 MVAr
6 MVAr

23 kV
6 MVAr

12
MVA

TRINIDAD 66 kV

CAAGUAZU
220 kV

ITACURUBI
DEL ROSARIO
220 kV

66 kV

12 MVAr

23 kV
6 MVAr

23 kV

30 MVA

SANTA ROSA
66 kV

SAN
ESTANISLAO
220 kV

41.67MVA

41.67
MVA
23 kV
3 MVAr
9 MVAr

66 kV
NARANJAL

TRINIDAD 220 kV

2 x 41.67
MVA

60
MVA

120
MVA

23 kV

CAMPO
DOS
220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

18 MVAr

CARGIL

41.67
MVA

10
MVA

PARANAMBU
220 kV

23 kV

MALLORQUIN
220 kV

220 kV

220 kV

LOS
CEDRALES
220 kV

3 x 30
MVA

3x
30
20
MVA
MVA
23 kV
6 MVAr
12 MVAr

WHITE
MARTINS

18 MVAr 23 kV

MARIA
AUXILIADORA

CER

3x
30
MVA

ALTO
PARANA
66 kV

KM 30
3 x 30
MVA

23 kV
6 MVAr

41.67
MVA
23 kV
12 MVAr
6 MVAr

66 kV

500 kV

LOS CEDRALES
2x
600
MVA

CIUDAD DEL
ESTE

23 kV
18 MVAr

23 kV
18 MVAr

80
MVA
23
kV

60
MVA
66 kV

23 kV
24 MVAr

66 kV

66 kV

3x
30
MVA

120
MVA

41.67
MVA

23 kV

220 kV

20 MVAr

23 kV
6 MVAr
6 MVAr

HERNANDARIAS
66 kV

6.3 kV
STA.
RITA
220 kV

MICROCENTRO
220 kV
80
MVA

41.67
MVA

PTE.
FRANCO

2x
20 MVA

KM 15 66 kV

12 MVAr

80 MVA

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

23 kV
24 MVAr
2x
20
MVA

20
MVAr

CONCEPCION II

120 MVA
HORQUETA

3 x 25
MVA

ACARAY 66 kV

VALLEMI II 220 kV

220 kV

3 x 19
MVA

60 MVA

30 MVAr

2x
80
MVA

VALLEMI 220 kV

23
kV

60
MVA

HORQUETA

220 kV

23 kV
12 MVAr

30
MVA

20
MVA

66 kV

41.67
MVA

66
kV

23 kV

BELLA
VISTA
NORTE

23 kV

CURUGUATY

CATUETE
66 kV

23 kV

41.67
MVA

CATUETE
220 kV

60 MVA

23 kV
KM 7
220 kV

ACUEDUCTO
220 kV

20 MVA
220 kV

10
MVA
23 kV
12
MVAr

GEN. 4
65 MVA

13.8 kV

ACY 66 kV
80
MVA

66 kV

18 MVAr
23 kV
2 x 30
MVA
CONCEPCION 66 kV

YBY-YAU
66 kV

23 kV

CURUGUATY

INPASA
66 kV

3 x 19
MVA

2x
60
MVA

10
MVA

23 kV
18 MVAr

23
kV
6 MVAr

GEN. 3
65 MVA

13.8 kV

ACARAY 220 kV

30/20/15
MVA

66 kV

13.8 kV

13.8 kV

FILADELFIA

CRUCE
BELLA
VISTA

2x
41.67
MVA

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
66 kV

23 kV
20
MVA

CAPITAN
BADO
220 kV

COPEL
3 MVAr
23 kV

2x
30 MVA

P. J. CABALLERO
66 kV

ITAKYRY 220 kV
2x
60 MVA
ITAKYRY
66 kV

MCAL.
ESTIGARRIBIA
66 kV

23 kV

2 x 300/180/120
MVA
23 kV

36 MVAr
GRAL. DIAZ

66 kV

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV

18 MVAr

3 x 30 MVA
3 x 30
MVA

23 kV
24 MVAr

23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 23/10/13

DP / DEG
ARCHIVO : 2022-D

A.8-9

SISTEMA INTERCONECTADO NACIONAL


AO 2023

GEN. 10
10 x 823.6 MVA
18 kV
10 x ( 3 x 275 ) MVA
ITAIPU 500 kV

MD - ITAIPU 500 kV
FOZ DE YGUAZU 500 kV

GEN. YGUAZU
2 X 100 MVA
MD - ITAIPU 220 kV

13.8
kV

13.8
kV

TR - 6
26 MVA

2x
112/134 MVA

LT 66 kV MD - IPU

YGUAZU
220 kV

LT 66 kV MD - FI

23 kV

66 kV

2 x 60
MVA

TR - 7
26 MVA
20 MVA
18 MVAr

PARQUE
INDUSTRIAL
220 kV

41.67
23 kV
MVA

2x
30 MVA

P. J. CABALLERO
66 kV

ITAKYRY 220 kV
2 x 30/20/15
MVA

2x
60 MVA

CERRO
CORA
220 kV

ITAKYRY 66 kV
MINGA
PORA
66 kV
30
MVA

23 kV
18 MVAr

23
kV
6 MVAr

41.67
MVA
23 kV

CURUGUATY

INPASA
66 kV

YBY-YAU
66 kV

30
MVA

23 kV
12 MVAr

30
MVA

23 kV

SALTO
DEL GUAIRA
220 kV

23 kV
21.5 MVAr

66
kV

20
MVA

66 kV

41.67
MVA

CATUETE
66 kV

66 kV
23 kV

220 kV

HORQUETA

20
MVA
23 kV

66 kV

60
MVA

41.67
MVA

30/25/20
MVA
20
MVAr

CONCEPCION II

HORQUETA

KM 30 220 kV

41.67
MVA

10
MVA

VAQUERIA
220 kV

23 kV

23 kV
3 MVAr

41.67
MVA

23 kV
12 MVAr

BARRIO
SAN PEDRO
220 kV

SAN PEDRO NORTE


66 kV

60
MVA

23 kV
12 MVAr

66 kV

2x
41.67
MVA

220 kV

23 kV
36 MVAr

27 MVAr

66 kV

2 x 41.67
MVA

2 x 600
MVA

2x
41.67
MVA

ALTOS
220 kV

23 kV
12 MVAr
CARAYAO 500 kV
120
MVA
66 kV

23 kV

VILLARRICA
66 kV

23 kV
15 MVAr

50
MVA

CAAZAPA
66 kV

30
MVA

LIMPIO

12 MVAr

ALEACIONES
YGUAZU

66 kV

LUQUE 220 kV

80
MVA

23 kV
9 MVAr

23 kV

18 MVAr
66 kV
MARIANO
ROQUE
ALONSO
66 kV

VIAS CUE

2 x 300/180/120
MVA
23 kV

23 kV

2 x 80
MVA

120
MVA

23 kV

BANCO CENTRAL
66 kV
24 MVAr

23 kV
12 MVAr

CERVEPAR

VILLETA
66 kV

SAN ANTONIO
220 kV

6 MVAr
6 MVAr

23 kV
24 MVAr

CAIASA

23 kV

23 kV

3 x 30 MVA

80
MVA

80
MVA

2 X 30
MVA

48 MVAr
12 MVAr

23 kV
LAMBARE 220 kV
VILLA ELISA

TCR 1

2 x 300/180/120
MVA
23 kV

TCR 2

220 kV

3 x 80
MVA

48 MVAr

23 kV
24 MVAr

23 kV

LAMBARE 66 kV

TRES BOCAS

3 x 30
MVA

3 x 30
MVA

23 kV

23 kV

REPUBLICANO

48 MVAr

66 kV

25 MVAr

3 x 30
MVA

20
MVA

2 x 300/180/120
MVA

PTO. SAJONIA 220 kV

23 kV
24 MVAr

23 kV

23 kV
PARQUE
CABALLERO

-120 / + 300 MVAr


2x
41.67
MVA
23 kV

66 kV

3 x 30
MVA

220 kV

23 kV
18 MVAr

ITAUGUA 66 kV

24 MVAr

F. A.

66 kV

BARRIO
PARQUE
66 kV

CER

VILLETA II
220 kV

3 x 30
MVA

IPS 66 kV

PARQUE CABALLERO

30 MVAr

2 x 120 MVA

GRAN
HOSPITAL
NACIONAL

FILTRO x 5

VILLA AURELIA
36 MVAr

23 kV

GUARAMBARE 66kV
2 X 30
MVA

80
MVA

23 kV

80
MVA
23 kV
24 MVAr

2 X 50
MVA

23 kV

3 x 20 MVA

23 kV

ADM

GUARAMBARE 220 kV

CER

24 MVAr

3 x 30
MVA
18 MVAr

41.67
MVA
23 kV

2x
80 MVAr

23 kV

24 MVAr
BARRIO
MBURUCUYA
66 kV

80
MVA

2x
80
MVA

3 x 30
MVA

23 kV

PTO. BOTANICO
66 kV

20 MVAr

CAACUPE
66 kV

VILLA
AURELIA
220 kV

2 x 50
MVA

3 MVAr

41.67
MVA

PTO.
MCAL.

36 MVAr

F. DE LA MORA 66 kV

20 MVA

48 MVAr

PILAR 66 kV

9 MVAr

LA
VICTORIA
220 kV

2x
80 MVAr

2x
120
MVA

66 kV

PILAR II
220 kV

ANERETA

30 MVA

80
MVA

SAN LORENZO 66kV

60 MVA
VILLALBIN

66 kV

23 kV
2.4 MVAr

SAN LORENZO
220 kV

PTO. BOTANICO
220 kV

23 kV

12
MVA

CAAPUCU

23 kV

23 kV

VILLALBIN 220 kV

30/25/10
MVA

CLORINDA

23 kV
3 MVAr
66 kV

23 kV

48 MVAr

2 x 80
MVA

66 kV

ERIDAY

23 kV

30
MVA

23 kV

BARRIO
MOLINO
220 kV

12 MVAr

66 kV

2 x 15 MVA

66 kV

66 kV

12 MVAr

80 MVA

48 MVAr

60
MVA

AYOLAS
220 kV

23 kV

40
MVA
AYOLAS

60
MVA

23 kV

2 x 30 MVA
CAPIATA
220 kV

80
MVA

4x
600 MVA

80
MVA

QUIINDY

66 kV

66 kV

VILLA
HAYES
220 kV

6 MVAr

3 X 375
MVA

220 kV

EUSEBIO AYALA

30 MVA
ACEPAR

20
MVAr

23 kV

VALLE APUA
220 kV

66 kV
30
MVA

23 kV
6 MVAr 6 MVAr

120 MVA

VILLA HAYES

CEMENTERA
YGUAZU

PARAGUARI
30
MVA

EUSEBIO AYALA

15 MVAr

24 MVAr

VILLA HAYES 500 kV

23 kV
6 MVAr

66 kV

EUSEBIO
AYALA
500 kV
2x
600
MVA

23 kV

2x
30 MVA
23 kV

23 kV

2 x 41.67
MVA

41.67 MVA

PIRAYU

AYOLAS
500 kV
80
MVA
23 kV
6 MVAr

23 kV

2x
41.67
MVA

66 kV

CLYFSA

20 MVAr

23 kV
3 MVAr

CER

COMPAIA
METALURGICA
YGUAZU

SAN PATRICIO 220 kV

SAN JUAN
NEPOMUCENO
220 kV

23 kV
LA
COLMENA 18 MVAr

12 MVAr

60 MVA

9 MVAr

S. J. BAUTISTA
220 kV

20
MVA

50
MVA

30
MVA

LIMPIO 220 kV

80
MVA

120
MVA

500 kV

23 kV
6 MVAr

PIRAYU 220 kV

23 kV
20.4 MVAr

60
MVA

10 x 172.5 MVA
YACYRETA

23 kV

66 kV
2 x 30
MVA

80
MVA

23 kV

23 kV
3 MVAr

23 kV

30
MVA

30
MVA

80 MVAr

2 x 60
MVA
41.67 MVA

80
MVA

120 MVA

PASO PE
220 kV

66 kV

23 kV
18 MVAr

SICBRAS 220 kV

2 X 41.67
MVA

30
MVA

2x
30 MVA

YUTY
66 kV

FRAM
66 kV

10 GENERADORES
YACYRETA
10 x 175 MVA
13.8 kV

23 kV
3 MVAr

66 kV
2 x 30
MVA

2x
41.67
MVA

30/20/15
MVA

SAN
PEDRO
DEL PARANA

COSTANERA

23 kV

20
MVAr

SISTEMA
EMSA

600 MVA

CNEL.
BOGADO
66 kV

CAMBYRETA
66 kV

CORONEL OVIEDO
220 kV

60 MVA
CORONEL
OVIEDO

3 MVAr

CNEL. BOGADO 220 kV

220 kV

2x
60
MVA

23 kV
12 MVAr

66 kV

4x
23 kV
30
3 MVAr MVA

CORONEL
OVIEDO II
CARAYAO 220 kV

23 kV

TRINIDAD 500 kV
CAMBYRETA

ENCARNACION

30 MVA
41.67
MVA

23 kV
12 MVAr

23 kV
24 MVAr

41.67
MVA

220
kV
2x
41.67
MVA
23 kV
3 MVAr

20
MVAr

2 x 60 MVA

2x
30
MVA
23 kV
9 MVAr

41.67 MVA

2 x 41.67MVA

C. A.
LOPEZ
220 kV

NATALIO

23 kV
3 MVAr

TRINIDAD 66 kV

PIRAPO
CAAGUAZU
220 kV

80
MVA

ITACURUBI
DEL ROSARIO
220 kV

2 x 30
MVA

12 MVAr

41.67 MVA

18 MVAr

23 kV
6 MVAr

41.67
MVA
23 kV
12 MVAr

12
MVA

18 MVAr

23 kV
6 MVAr
80
MVA

23 kV

30 MVA

SANTA ROSA
66 kV

SAN
ESTANISLAO
220 kV

41.67MVA

23 kV
6 MVAr

66 kV

23 kV

23 kV

2x
41.67
MVA

120
MVA
66 kV
NARANJAL

TRINIDAD 220 kV

CAMPO
DOS
220 kV

-80 / + 150 MVAr

SANTA ROSA
220 kV

41.67
MVA

18 MVAr

3x
20
MVA

30
MVA

PARANAMBU
220 kV

23 kV

CARGIL

41.67
MVA

220 kV

LOS
CEDRALES
220 kV

3 x 30
MVA

MALLORQUIN
220 kV

220 kV

CER

WHITE
MARTINS

18 MVAr 23 kV

MARIA
AUXILIADORA

TORO
PAMPA

23 kV
18 MVAr

3x
30
MVA

ALTO
PARANA
66 kV

KM 30

500 kV

LOS CEDRALES
2x
600
MVA

CIUDAD DEL
ESTE

23 kV
18 MVAr

23 kV
18 MVAr

3 x 30
MVA

23 kV
6 MVAr

220 kV

20 MVAr

23 kV
12 MVAr

66 kV

41.67
MVA

23 kV

12 MVAr

80 MVA

120
MVA

80
MVA
23
kV

60
MVA
66 kV

66 kV

3x
30
MVA

6.3 kV
STA.
RITA
220 kV

MICROCENTRO
220 kV

80
41.67
MVA
MVA
23 kV
66 kV
24 MVAr

PTE.
FRANCO
HERNANDARIAS
66 kV
KM 15 66 kV

VALLEMI II 220 kV

220 kV

3 x 25
MVA

A APR 66 kV
PTE. FRANCO 220kV
2x
60
MVA

2x
20 MVA

2x
20
MVA

20
MVAr

23
kV

120 MVA

3 x 25
MVA

ACARAY 66 kV

23 kV
24 MVAr

VALLEMI 220 kV

23 kV
CONCEPCION

23 kV

BELLA
VISTA
NORTE

23 kV

CURUGUATY

10
MVA

2 x 30
MVA

3 x 19
MVA

60 MVA

30 MVAr

2x
80
MVA

10
MVA

220 kV

60 MVA

23 kV
KM 7
220 kV

ACUEDUCTO
220 kV

20 MVA

41.67
MVA

CATUETE
220 kV

66 kV
LOMA PLATA

POZO
COLORADO

18 MVAr

GEN. 4
65 MVA

13.8 kV

ACY 66 kV
80
MVA

66 kV

3 MVAr

220 kV
10
MVA

23 kV

3 x 19
MVA

2x
60
MVA

23 kV
6 MVAr

66 kV

GEN. 3
65 MVA

13.8 kV

ACARAY 220 kV

30/20/15
MVA

CRUCE
BELLA
VISTA

2x
41.67
MVA

CAPITAN
BADO
220 kV

13.8 kV

13.8 kV

FILADELFIA

220 kV

20
MVA

GEN. 2
61 MVA

GEN. 1
61 MVA

30 MVA
66 kV

23 kV

2x
60
MVA

COPEL
3 MVAr
23 kV

20
MVAr

LOMA
PLATA

CERRO CORA
66 kV

80
MVA
23 kV

23 kV

ITAKYRY
66 kV

23 kV
12
MVAr

MCAL.
ESTIGARRIBIA
66 kV

23 kV

2 x 300/180/120
MVA
23 kV

36 MVAr
GRAL. DIAZ

66 kV

66 kV

30 MVAr
66 kV

SAN MIGUEL

3 x 30
MVA

66 kV

23 kV
CENTRAL 66kV

18 MVAr

3 x 30 MVA
3 x 30
MVA

23 kV
24 MVAr

23 kV
12 MVAr

REFERENCIA
500 kV

OBRAS PROGRAMAS EN EL AO

220 kV
66 kV

ADECUACION Y/O CAMBIO

23 kV

Plan Maestro de Generacin y Transmisin de Corto y Medio Plazo ( 2014 -2023 )

FECHA: 25/10/13

DP / DEG
ARCHIVO : 2023-D

A.8-10