Installation Overview
n
n
n
n
n
n
Introduction
Swap Over View
Product Over view
Installation requirements
Installation preparations
Installation work flow
Confidential?
Site Overview
Confidential?
SCENARIO-6: 2G/3G ONLY + OUTDOOR + INSUFFICIENT SPACE SWAP
Step 4: Power on ZTE BS8900A and set it on air.
To Existing BSC/RNC
Service Rack
Existing BTS/Nb
BS8900A
GND
Confidential?
Confidential?
Introduction
n
This docs provides ZXSDR BS8900A GU360 Product overview, Installation preparations
and General Installation work flow..
Product Overview:The ZXSDR BS8900A GU360 is an outdoor dual-mode Macro base station,
it consists of various cabinet.
Cabinet
Full Name
Description
BC8910A
RC8910A
Confidential?
Cabinet
Descriptio
combinatio n
n
Power
supply
No of
supported
RSU
BC8900A+
RC8900A
Only DC
supply
RSU 6
A cabinet
combination
scenario
applicable
where only
DC power
supply is
used
Confidential?
Installation Requirements
n
Confidential?
Installation Preparation
n
Microsoft Office
Word 97 - 2003 Document
Confidential?
Environment Acceptance
n
n
Confidential?
Installation workflow
Confidential?
Material check and unpacking as per BOQ in presence of Customer ,ZTE and
Partners.
Confidential?
Confidential?
Confidential?
Confidential?
Drilling holes
Confidential?
Align the base holes with fastening holes on concrete ground. And secure
the cabinet base with four bolts as shown in above pics.
Confidential?
n
n
n
Confidential?
Align the holes on the latches with the fastening holes on the base and fasten the
two latches with M6 Allen bolts.
Lay the cabinet on the base, push it until the latches are fully inserted into the
aligning holes.
Open the front door and secure the cabinet on the base with two rubber washers
and two M12 Allen bolts
2007, ZTE Corporation. All rights reserved.
n
n
n
Confidential?
Align the holes on the latches with the fastening holes on the base and fasten the
two latches with M6 Allen bolts.
Lay the cabinet on the base, push it until the latches are fully inserted into the
aligning holes.
Open the front door and secure the cabinet on the base with two rubber washers
and two M12 Allen bolts
2007, ZTE Corporation. All rights reserved.
n
n
n
Confidential?
Align the holes on the latches with the fastening holes on the base and fasten the
two latches with M6 Allen bolts.
Lay the cabinet on the base, push it until the latches are fully inserted into the
aligning holes.
Open the front door and secure the cabinet on the base with two rubber washers
and two M12 Allen bolts
2007, ZTE Corporation. All rights reserved.
Confidential?
n
n
n
Remove the end caps from the cable through of the RC8910A cabinet.
Secure the cabinet with Rubber washers and M12 bolts.
Remove two plates covering the cable holes for cabling.
Confidential?
n
n
n
Remove the end caps from the cable through of the RC8910A cabinet.
Secure the cabinet with Rubber washers and M12 bolts.
Remove two plates covering the cable holes for cabling.
Confidential?
Backup 63Amp
breaker available
n
n
Confidential?
n
n
n
Confidential?
n
n
n
Confidential?
Confidential?
Standard RSU Slot maps for ZXSDR BS8900A
Confidential?
Confidential?
RSU Slot Mapping for Single band Outdoor BTS S2/2/2 &S4/4/4
Conf..
G1
G3
G2
Note:- TX port of RSU82 connect at RX 0 port of FS card and vice versa, TX port of RSU 40 will connect at RX 1 port of FS card &
Vice versa.
Confidential?
Confidential?
E1 cable punching
Confidential?
DDF
Lightening Protection
Unit(LPU)
n
Alarm Port
E1/T1 Port
2007, ZTE Corporation. All rights reserved.
Confidential?
Confidential?
Protective grounding wire, Power cable & Monitoring cable installed
* MON cable connect at RSU 82 for O/D BTS & RSU 60 for I/D BTS, But it may vary from Circle to circle & based on
site situation. BSS team will decide the same.
2007, ZTE Corporation. All rights reserved.
Confidential?
Confidential?
Internal Cable connection diagram
Confidential?
Confidential?
DC Power distribution
Confidential?
Confidential?
Cable
Qty.
Color
Specification
Blue
25 sqmm
-48V RTN/0V/GND
Black
25 sqmm
PGND
Yellow Green
35 sqmm
25 & 35 sqmm
Copper Lugs
Confidential?
Structure of a cable- after lug preparation
1.Round bare terminal -- Lug
2. Label
3. Label position
4. Power cable
Confidential?
Confidential?
Confidential?
BTS PGND
Confidential?
Labeling requirements
S1 Ant 2 (RX)
S1 Ant 1 (TX)
S2 Ant 1 (TX)
S2 Ant 2 (RX)
Confidential?
MCB labeling
63 Amp
-48 V
-48 V
-48 V RTN
Confidential?
Confidential?
Jumper Part
Feeder Part
Feeder-Jumper connections(Indoor)
Connected
cable(B2) from
Bias Tee to
AISG port of
RSU card
2007, ZTE Corporation. All rights reserved.
Confidential?
Jumper
Connect here
Feeder Connect
here
To RSU
Card
Cable identification-B1 & Pin
Configuration
Cable identification-B2
& Pin Configuration
2007, ZTE Corporation. All rights reserved.
Confidential?
Confidential?
Antenna installationCase 1
n
2
3
4
5
2007, ZTE Corporation. All rights reserved.
Confidential?
Antenna installationCase 2
IF Antenna Freq is 1710-2170MHz
Antenna
Frequency
1710-2170
MHz
Confidential?
RET
Confidential?
Confidential?
(Outdoor)
Jumper Part
Feeder Part
Bias Tee
BT-M5S2
Connection b/n
RET and Bias Tee
Confidential?
Connection b/n RET and Bias Tee BT-M5S2
Continued
Bias Tee BT-M5S2
Grounding at Tower
To Jumper
RET Actuator
BT-M5S2
BIAS-T
connected at
Antenna TX
port only.
Bias Tee
To Feeder
Cable
Name-A
2007, ZTE Corporation. All rights reserved.
Continued
Confidential?
Feeder Routing
1. Distance between
two clamps should be
1~1.5 meter.
Continued
Confidential?
Jumper Routing
Should label 200mm below from
Antenna end
TX Sector 2
S2 ANT1)
ZTE WCDMA
indicates 3G
2100
RX Sector 2
(S2 ANT2)
Standard Grounding
Confidential?
n
n
Confidential?
If the length of a feeder = 20m, then ground it at two points, one within 2m from the antenna
feeder connector and the other that is near the outdoor feeder window and connected to the
outdoor ground bar;
If 20m < its length = 60m, add a ground point with 2m from the point where it leaves the iron
tower or the rooftop;
If its length >60m, it is required to add one more ground point for every 20 more meters.
Each
Grounding
cable should be
routed along
with their feeder
Paint should be scratch
2007, ZTE Corporation. All rights reserved.
Confidential?
Labels of Jumpers
RX Sector 1(S1
ANT2)
TX Sector 1(S1
ANT1)
Confidential?
Feeder & Jumper cable labels must have minimum 200mm distance from their
connector.
200-300mm
Feeder part
200-300mm
Jumper part
Equipment Room
Confidential?
(Indoor Installations)
Confidential?
Tools required for BTS New/Swap
Continued..
Confidential?
Confidential?
Keep All the De-installed accessories ( Power cable, PGND, Nuts bolt, Jumper cables)
Inside Old De-installed BTS. Prepare list of de-installed materials and handover to