(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
I.
QUANTITY AND
UNIT
1.0 Lumpsum
NAME OF ITEM:
EARTHWORKS
CLEARING OF SITE
PRICE
NO.
QTY.
UNIT
COST
(P)
UNIT
RATE (P)
MATERIALS
TOTAL for
MATERIALS
SEQUENCE OF OPERATIONS:
EQUIPMENT
LABOR
DESIGNATION OF PERSONNEL
NO. of
UNITS
NO. of
HOURS
HOURLY
RATE (P)
HOURLY
RATE
Labor
L.S.
PREPARED BY:
_____________________________
Contractor
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
II.
SOIL POISONING
NAME AND SPECIFICATIONS OF MATERIALS
Lentrex
QTY.
UNIT
gals.
UNIT
RATE (P)
COST
(P)
MATERIALS
PRICE
NO.
1
QUANTITY AND
UNIT
1.0 Lumpsum
NAME OF ITEM:
TOTAL for
MATERIALS
SEQUENCE OF OPERATIONS:
EQUIPMENT
NO. of
HOURS
HOURLY
RATE (P)
DESIGNATION OF PERSONNEL
LABOR
NO. of
UNITS
Labor
L.S.
PREPARED BY:
_____________________________
Contractor
HOURLY
RATE
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
III.
EXCAVATION WORKS
NAME AND SPECIFICATIONS OF MATERIALS
.
.
QTY.
UNIT
40
130
cu.m.
cu.m.
COST
(P)
UNIT
RATE (P)
MATERIALS
PRICE
NO.
1
2
QUANTITY AND
UNIT
1.0 Lumpsum
NAME OF ITEM:
TOTAL for
MATERIALS
LABOR
EQUIPMENT
SEQUENCE OF OPERATIONS:
NAME, CAPACITY & HP RATING EQUIPMENT
DESIGNATION OF PERSONNEL
1
2
.
.
Excavation Works
Backfilling Works
NO. of
UNITS
NO. of
HOURS
PREPARED BY:
_____________________________
Contractor
HOURLY
RATE (P)
HOURLY
RATE
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
IV.
.
.
.
QTY.
UNIT
75
4,500
60
pcs.
bd.ft.
kgs.
UNIT
RATE (P)
COST
(P)
MATERIALS
PRICE
NO.
1
2
3
QUANTITY AND
UNIT
1.0 Lumpsum
NAME OF ITEM:
TOTAL for
MATERIALS
SEQUENCE OF OPERATIONS:
EQUIPMENT
LABOR
DESIGNATION OF PERSONNEL
Labor
NO. of
UNITS
NO. of
HOURS
HOURLY
RATE (P)
HOURLY
RATE
L.S.
PREPARED BY:
_____________________________
Contractor
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
V.
CONCRETE FOOTING
NAME AND SPECIFICATIONS OF MATERIALS
.
.
.
.
.
.
Portland Cement
Washed Sand
Screened or Crushed Gravel, 3/4"
Screened or Crushed Gravel, G1
16mm x 6m Def. Bar
G.I. Tie Wire # 16
QTY.
UNIT
130
8
8
7
96
20
bags
cu.m.
cu.m.
cu.m.
pcs.
kgs.
UNIT
RATE (P)
MATERIALS
PRICE
NO.
1
2
3
4
5
6
QUANTITY AND
UNIT
14.4 cu.m.
NAME OF ITEM:
TOTAL for
MATERIALS
EQUIPMENT
SEQUENCE OF OPERATIONS:
NAME, CAPACITY & HP RATING EQUIPMENT
1
2
.
.
LABOR
DESIGNATION OF PERSONNEL
NO. of
UNITS
1
1
NO. of
HOURS
32
16
Labor
L.S.
PREPARED BY:
_____________________________
Contractor
HOURLY
RATE (P)
HOURLY
RATE
COST
(P)
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
VI.
CONCRETE COLUMN
NAME AND SPECIFICATIONS OF MATERIALS
.
.
.
.
.
.
Portland Cement
Washed Sand
Screened or Crushed Gravel, 3/4"
16mm x 7.5m Def. Bar
10mm x 6m Def. Bar
G.I. Tie Wire # 16
QTY.
UNIT
153
9
17
160
128
50
bags
cu.m.
cu.m.
pcs.
pcs.
kgs.
UNIT RATE
(P)
MATERIALS
PRICE
NO.
1
2
3
4
5
6
QUANTITY AND
UNIT
16.896 cu.m.
NAME OF ITEM:
TOTAL for
MATERIALS
EQUIPMENT
SEQUENCE OF OPERATIONS:
NAME, CAPACITY & HP RATING EQUIPMENT
1
2
.
.
LABOR
DESIGNATION OF PERSONNEL
NO. of
UNITS
1
1
Labor
L.S.
PREPARED BY:
_____________________________
Contractor
NO. of
HOURS
48
32
HOURLY
RATE (P)
HOURLY
RATE
COST
(P)
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
ITEM NO.
VII.
CONCRETE FLOORING
NAME AND SPECIFICATIONS OF MATERIALS
.
.
.
.
.
.
Portland Cement
Washed Sand
Screened or Crushed Gravel, 3/4"
Screened or Crushed Gravel, G1
10mm x 6m Def. Bar
G.I. Tie Wire # 16
QTY.
UNIT
507
20
20
20
275
20
bags
cu.m.
cu.m.
cu.m.
pcs.
kgs.
UNIT
RATE (P)
MATERIALS
PRICE
NO.
1
2
3
4
5
6
QUANTITY AND
UNIT
56.25 cu.m.
NAME OF ITEM:
TOTAL for
MATERIALS
EQUIPMENT
SEQUENCE OF OPERATIONS:
NAME, CAPACITY & HP RATING EQUIPMENT
1
2
3
.
.
.
Road Roller
One Bagger Concrete Mixer
Bar Cutter
LABOR
DESIGNATION OF PERSONNEL
NO. of
UNITS
1
1
1
NO. of
HOURS
48
48
48
Labor
L.S.
PREPARED BY:
_____________________________
Contractor
HOURLY
RATE (P)
HOURLY
RATE
COST
(P)
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
MATERIALS
ITEM NO.
VIII.
PRICE
NO.
1
2
3
4
5
6
7
8
QUANTITY AND
UNIT
13.5 cu.m.
NAME OF ITEM:
CONCRETE BEAM
NAME AND SPECIFICATIONS OF MATERIALS
.
.
.
.
.
.
.
.
Portland Cement
Washed Sand
Screened or Crushed Gravel, 3/4"
20mm x 6m Def. Bar
16mm x 6m Def. Bar
10mm x 6m Def. Bar
G.I. Tie Wire # 16
20mm x 350mm Anchor Bolts
QTY.
UNIT
122
7
14
30
126
160
35
96
bags
cu.m.
cu.m.
pcs.
pcs.
pcs.
kgs.
pcs.
UNIT
RATE (P)
TOTAL for
MATERIALS
EQUIPMENT
SEQUENCE OF OPERATIONS:
NAME, CAPACITY & HP RATING EQUIPMENT
1
2
.
.
LABOR
DESIGNATION OF PERSONNEL
NO. of
UNITS
1
1
NO. of
HOURS
64
64
Labor
L.S.
PREPARED BY:
_____________________________
Contractor
HOURLY
RATE (P)
HOURLY
RATE
COST
(P)
DETAILED ESTIMATES
(In Pesos)
NAME OF PROJECT:
CONSTRUCTION OF MULTI-PURPOSE BUILDING (Covered Court)
BRGY. PILAWAY, INFANTA, QUEZON
MATERIALS
ITEM NO.
IX.
PRICE
NO.
1
2
3
4
5
6
7
8
QUANTITY AND
UNIT
1.0 Lumpsum
NAME OF ITEM:
PAINTING WORKS
NAME AND SPECIFICATIONS OF MATERIALS
.
.
.
.
.
.
.
.
QTY.
UNIT
6
6
5
5
10
10
10
200
tins
tins
sacks
lit.
lit.
pcs.
pcs.
pcs.
UNIT
RATE (P)
COST
(P)
TOTAL for
MATERIALS
SEQUENCE OF OPERATIONS:
EQUIPMENT
DESIGNATION OF PERSONNEL
LABOR
NO. of
NO. of
UNITS
HOURS
HOURLY
RATE
(P)
HOURLY
RATE
Labor
L.S.
PREPARED BY:
_____________________________
Contractor