this
inspection is necessary for the safety of residents and occupants of the
building as the person is not able to use the building and part of building that
is newly erected or installed until requirements set out in this section are
met. 2002,c.9,s.18.. Inspection service is done to insure the construction or
alteration to existing structure according to minimum standards providing by
building codes.
Solar collector:- they are installed to capture solar radiation for heating
air or water to generate electricity. They must be built in compliance with
construction , electricity and fire codes in order to be safe and reliable . Most
of the standards for solar systems are set forth in national electrical code ,
which provide specification on equipment, installation method and design
protocols. A building permit to install solar collector system with a face area
equals to or greater than 5 m2. A permit is required to ensure that building is
capable of supporting the additional weight of panels and connection
systems.