RATAMO - KESKUS (WORK PLAN)

w40
22

23

24

25

PM (Project
Manager)

Receive scope document/ project


documents from RFI + coordination
and clearing doubts with RFI + Study
of Design Criteria and study of Euro
codes for application of wind, snow
and earth pressure loads.

Global Static Analysis,


Design & Calculations

Engineer-1

Start of the etabs model based on


preliminary inputs.

W41
29

30

review and finalization of


workplan, design criteria and
drawings with krishi +
finalisation of WO/ATR.

Finalization ETAB Model after


Krisi inputs - Geometry

W42
6

13

14

15

16

19

W44
21

22

Project coordination + manual verification of analysis and


design

ETABS - Model Geometry + loading


Completion.

ETAB - Model Analysis & Design


finalization

Design of floor plates for Level level-0


+ Report preperation + reinforcement
intent.

Start of Safe model

12

W43

load take down.

20

23

Column design + reinfoircement intent of


columns

26

W45
27

28

29

30

W46
2

W47
9

10

Project coordination + manual verification of analysis and design

11

12

Grouping & Design of Pile Caps &


stair wall design + reinfoircement
beam design and reinforcement
Review + R/F Intent Grouping & Design intent of stair walls + Lift walls design intent
of Pile Caps + Reinforcement Intent
+ reinfoircement intent of walls

Design of floor plates for Level level-1 Design of floor plates for Level level-2 + Report Design of floor plates for Level level-3
+ Report preperation + reinforcement
preperation + reinforcement intent.
+ Report preperation + reinforcement
intent.
intent.

15

W48
16

17

18

19

22

W49
23

24

25

26

29

W50
30

W51
7

10

13

14

15

16

17

Project coordination + manual verification of analysis and design

Design of stair-1&2 +
reinforcement intent.

Design of floor plates for Level level-4


+ Report preperation + reinforcement
intent.

Design of stair- 3 & 4 +


reinforcement intent.

Hours to contribute for any revisions in the project either from RFI + architect or during constructrion phase.

Holiday

Engineer-2Trainee

28

Holiday - Deepawali

21

Project Introducion /
Inputs / Clarifications and
agreement on WO/ATR

Holiday - Dusherra

W39

Activity
GEC

RFI

Arrival of RFI Engineer to


GEC

GEC

TEKLA Modeling

KIRSI IN GEC OFFICE


Sharing Project Information with GEC Team & Co-ordination

BIM Modeler -1

TEKLA MODEL & GENEATION OF GENERAL ARRANGEMENT DRAWINGS & Typicals

Placing Column Reinforcement in TEKLA & Generation of Reinforcement Placing Pile Cap Reinforcement in TEKLA & Generation of Placing storage lift Wall Reinforcement in TEKLA & Generation
Drawings
Reinforcement Drawings
of Reinforcement Drawings

BIM Modeler -2
or CAD RC

Placing Pile Cap Reinforcement in


TEKLA & Generation of
Reinforcement Drawings

Placing Floor (0 level) Reinforcement in TEKLA &


Generation of Reinforcement Drawings

Placing Floor (1 level) Reinforcement in TEKLA


& Generation of Reinforcement Drawings

BIM Modeler -3
or CAD RC

HOD & management


Review (6 hrs each week)
Review - Design - project engineer + Principal
engineer

Review - structural drawings - project


engineer + Principal engineer

Placing Floor (2 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Placing Staircase 1 &2 Reinforcement in TEKLA &


Generation of Reinforcement Drawings

Placing Floor (3 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Placing Floor (4 level)


Reinforcement in TEKLA &
Generation of Reinforcement
Drawings

Placing passenger lift Wall Reinforcement in


Placing Staircase 3 Reinforcement
TEKLA & Generation of Reinforcement Drawings & in TEKLA & Generation of
Review
Reinforcement Drawings

HOD
Review

HOD
Review

review of load take down.

HOD
Review

Review of
Safe - slab at
level -0

HOD
Review

Review of etabs results + column design +


slab results for level 1 & 2.

HOD
Review

HOD
Review

HOD
Review

HOD
Review

Review of pile cap design + review Review of lift and stair wall design review of beam
of Slab results at level - 3 & 4
design

Drawings Review for column design

drawings review for pile cap

HOD
Review

Stairacse
review- 1&2

HOD
Review

HOD
Review

Placing Staircase 4
Reinforcement in
TEKLA & Generation
of Reinf. Dwgs.

HOD
Review

Stairacse
review- 3&4

drawings review for slab and beam reinforcement drawings review for slab and beam review of draawings for slab and
at level 0 & 1 + walls
reinforcement at level 2 +
beams at level 3 & 4 + staircase 3
staircase 1 &2
&4

Activity
Receive scope document/ project
documents from RFI + coordination and
clearing doubts with RFI + Study of
Design Criteria and study of Euro codes
for application of wind, snow and earth
pressure loads.
Anyother loads to be discussed with Kirsi

Review of Inputs documents &


Drawings
Clarifications
through VC Start ETAB/ Model
- Geometry
Finalization of work Plan on the basis of
ETAB - Model Geometry + loading
clarifications made during week 39th +
Completion.
Review
of checklist
ETABS Model
Geometry
+
preparing
of the
structural
loading
analysis and design + Project
management.+
manual
ETAB - Model Analysis
& load
Design Run.load
calculations.
application
Review of ETAB - Model Analysis &
Design Run. Review of ETABS Model
Loading
Revision in the model based on review
and preparing finalized etabs model.
Analysis & Design on Etabs

Analysis & comparison of verification


of load take down.
Design of Structural elements -Beams, Columns & Walls
Grouping & Design of Pile Caps &
Review + R/F Intent
Grouping & Design of Pile Caps &
Review + R/F Intent
Preparation of reinforcement intent
of columns + Walls
Manual calculation Load take down
.Study of Design Criteria and study of
Euro codes for application of wind, snow
and earth pressure loads.
Anyother loads to be discussed with Kirsi

Manual calculation Load take down


Manual verification 5% Beams &
Columns

Grouping & Design of Pile Caps &


Review
Grouping & Preparation of Column
Schedule & Design intent & Reviews

Design & Preparation of


reinforcement intent of satircases
Safe modelling of floor slabs - level zero
to 4th floor with loading incorporations
Safe analysis & design of floor slabs level zero to 4th floor with loading
incorporations
verification of safe results with manual
calcs.
Design of Floor Plates in SAFE & Design
Reports & Rebar Intent
Design of Floor Plates in SAFE & Design
Reports & Rebar Intent
Design review of slabs with manual
calculations.
Design review of slabs with manual
calculations.

Engineer

Acitivity

Senior design Engineer

Receive scope document/ project docum


+ coordination and clearing doubts wit
of Design Criteria and study of Euro cod
application of wind, snow and earth pre
Anyother loads to be discussed with Kir
down

Load take down + manual calculations

Manual design calculations + design re

Project documentation
total nos
of hours
spend on
project
Asst.
Design
Engineer
-1

Etabs model preperation + completion+


review

Etabs model analysis and design + rev

Etabs model finalization after attending


of review

design verification with manual calcula


cap grouping and design

preperation of reinforcement intent of c


walls
total nos
of hours
spend on
project
Asst.
Design
Engineer
-2

Safe model preperation + completion+


review

Safe model analysis and design + revie

preperation of reinforcement intent of s


preperation
total nos
of hours
spend on
project

principal Review of ATR + Coordination with RFI


documentation + structural calcs + rev
structural design intents + strcutural d
quality control

total nos
of hours
spend on
project

HOD
total nos
of hours
spend on
project
Total nos of hours spend on the project by whole staf

Conteng
encies
(10%) of
total
hours
spend to
cover
the
scope
due to
missund
erstood
of ATR.

Engineer
-3 ( to be
used if
consider
able
comment
s been
received
from
Finland
office
during
the
project
flow
week ) 5% of
total
hours
spend to
cover
the
scope

Total nos of hours spend on the project


by whole staf

Acitivity

41

32 hrs per week

40 hrs per week

pe document/ project documents from RFI 32


on and clearing doubts with RFI + Study
iteria and study of Euro codes for
of wind, snow and earth pressure loads.
ads to be discussed with Kirsi + load take

32

own + manual calculations

gn calculations + design review

40

42

43

32 hrs per week

40

40 hrs per week

39

32 hrs per week

weeks + hours per week

Engineer hour spend per week

40

32

mentation
236

preperation + completion+ loading

32

40

analysis and design + review

40

finalization after attending all comments

32

cation with manual calculations + pile


g and design

of reinforcement intent of columns and

preperation + completion+ loading

248

analysis and design + review

40

32

of reinforcement intent of slabs + report


176

TR + Coordination with RFI + project


ion + structural calcs + review of
esign intents + strcutural drawings +
rol

16

16

20

20

16

140

6
48

848

85

50

983

hrs

46

32 hrs per week

40 hrs per week

pend per week


45

32 hrs per week

s per week

44

20

20

20

32

32

40

32

16
16

40

16

16

20

Keep Resource for incorporation of any design changes due to comments or architectural changes

rchitectural changes & Review of Reinforcement Drawings