3)
4)
5)
6) VOLUME OF PIPELINE = R2 H
( 10KM X RADIUS OF PIPE 0.2M)
= 3.1416 X 0.2 X 0.2 X 10000
= 1256.64 CUM
SINCE FINAL ULLAGE REQUIRED IS 0.78 AND PIPE EXTENDS 0.5M ABOVE TANK TOP
1M
Water Pressure
1)
PRESSURE = DEPTH X DENSITY
PRESSURE = 8 X 1.025 = 8.2 TM-2
10M
THRUST = PRESSURE X AREA
8M
THRUST = 8.2 X 10X2 = 164 T
2)
2M
150 M
20 M
10 M
4608 = PRESSURE X 36 X D
PRESSURE = D/2 X 1.025
4608 = D/2 X 1.025 X 36 X D
D2 =
4608
=
1.025 X 18
249.75
D = 249.75
= 15.803M
6)
AREA = BASE X HEIGHT
= X 12 X 15 = 90 SQ M
HT OF O FROM TOP = 1/3 = 15/3 = 5 MTRS
HEAD
= 3 MTRS
TOTAL HEAD
= 8 MTRS
PRESSURE = DEPTH X DENSITY
= 8 X 1.025
= 8.2 TM-2
THRUST = PRESSURE X AREA
= 8.2 X 90
= 738 T
7)
EF = EG
BC GB
EF = 9/12 X 7
= 5.25M
CENTRE O = 9/3 = 3M
PRESSURE AT O =3X1.025
= 3.075
THRUST AT O = PRESSURE X AREA
=3.075 X X 5.25 X 2 X 9
=145.29 T
8)
PRESSURE = DEPTH X DENSITY
= 9.2 X 0.95
= 8.74 TM-2
THRUST = PRESSURE X AREA
= 8.74 X X 0.5 X 0.5
= 6.864 T
9)
0.2 M
10 M
a) TANK TOP
b) PRESSURE = DEPTH X DENSITY
= 16X 1.025
= 16.4 TM -2
THRUST = 25 X 20 X 16.4
= 8200T
c) PRESSURE ON TANK BOTTOM FROM INSIDE
PRESSURE = DEPTH X DENSITY
= 2X 1.025
= 2.05TM-2
THRUST
= 2.05 X 25X 20
= 1025T
C) PRESSURE ON TANK BOTTOM WHEN FLOATING AT DRAFT
OF 10M
1)
(3) FLOTATION
8m X 2m x 2m
W = u/w volume x density of water displaced
W = 8 x 2 x 1.6 x 1 = 25.6t
2)
3)
Let length be y
Mass = Volume x density
Mass = y x 3 x 2 x0.7
=4.2y t
Displacement = u/w volume x density
4.2 y =yx3xdx1.01
d = 4.2 / 3.03
= 1.386m
4)
Dia =2m
Radius 1m
AO = OB = OC
Draft DC= 0.6
OC DC = OD
1 0.6 = 0.4
DB2 = OB2 OD2
DB = 12 0.42
DB=0.916m
SIN BOD = 0.916
= 0.916
O
A
D
C
1.0
BOD = 66.340
ANGLE AOB = 132.690
Area of segment AOBC = AOB
Area of Circle
3600
Area of Segment AOBC = r2x AOB
360
= 3.1416X1X1X 132.69
360
= 1.1579 m2
Area of Triangle AOB
= x (0.916+0.916) x 0.4
=0.3664 m2
Area of segment ABC
=1.1579 0.3664
= 0.7915 m2
Underwater volume
= Area x ht
= 0.7915 x 10
=7.915 m3
W = u/w volume x density of water displaced
= 7.915 x 1
= 7.915 t
5)
6)
Present displacement
W = u/w volume x density
W = r2h x density
= 3.1416 x 0.6 x 0.6 x 1.4 x 1.016
= 1.6087 t
Total Displacement
W = u/w volume x density
= 3.1416 x 0.6 x 0.6 x 2 x1.1016
= 2.298 t
Lead shots which can be put inside
= 2.298 1.6087
= 0.6893 t
7)
Present Displacement
= volume x density
=10 x 5 x 3 x 1.025
=153.75 t
Displacement after barge is lifted =10 x 5 x 1 x 1.025
= 51.25 t
Load on Crane
= 102.5 t
8)
Present Displacement
= 2.4 x 1.2 x 0.2 x 1.012 = 0.5892
t
Displacement after putting wts = 2.4 x 1.2 x 0.8 x 1.012 = 2.3316 t
-------------Difference
1.7424 t
9)
Displacement = Volume x density
18450
= 150x20xdx 1.025
Draft (d) = 6 mtrs
10)
Displacement = 120 x 15 x 5 x 1.005
=9045
New displacement = 120 x 15 x 6 x 1.025
=11070
Difference is the cargo it can load =2025 t
2)
Lt displacement
displacemen
Dwt available
3)
= 12197.5 10906
= 1291.5 t
TPC = A / 100 X density
A = L x B xCw
TPC in SW = 200 x 20 x 0.8 x 1.025 = 32.80 tcm-1
100
TPC in Fw = 200 x 20 x 0.8 x 1 = 32.00 tcm-1
100
TPC in 1.015 = 200 x 20 x 0.8 x 1.015 = 32.48 tcm-1
100
4)
Underwater volume = L x B x D x Cw
= 20 x 10.5 x 1 x 0.82
= 172.2 Cum.
5)
6)
Displacement = U/W volume X density
= L x B x D X Cw x Density
Cw =
Displacement
=
_____14000________
L X B XD X DENSITY
160 X 20 X6.1 X 1.025
7)
=O.69973
RB = total volume underwater volume
=(18 x 5 x 2 ) ( 18 X 5 x 1.4)
= 54
RB % = Above water volume X 100 = ____54___ x 100
Total Volume
180
=30%
8)
Displacement = U/W volume x density
2000 =V x 1
V = 2000 m3
Total Volume = 50 x 10 x 7
=3500 m3
RB = Total Volume underwater volume
= 3500 - 2000
= 1500 m3
RB % = 1500 X 100 = 42.85 %
3500
9)
TPC = A/100 X density of water displaced
30 = A / 100 X 1.025
A = 2926.82 m2
TPC in FW = 2926.82 x 1
100
= 29.2682
TPC in 1.018 = 2926.82 X 1.018 = 29.795
100
10)
TPC in SW = A / 100 X 1.025
A = 40 x 100
1.025
= 3902.43.
2)
3)
Change of Draft = Change of RD X FWA = 1.01 1.0 X 16.0
0.025
0.025
= 6.4cm sink.
4)
Change of Draft = Change of RD X FWA = 1.018 -1.006 x 17.5
O.025
0.025
= 8.4 cm rise
5)
FWA = ____W______ = 18000
= 18cm
40XTPC
40X25
Change of Draft = Change of RD X FWA = 1.025 -1.018 x 18
0.025
0.025
=5.04 cm
6)
Displacement in RD 1.025= 20 x 4 x 1.05 x 1.025 = 86.1
Since displacement is constant
Displacement in RD 1.012 = 86.1 = 20 x 4 x d x 1.012
Draft d = 86.1
=1.063m
80.96
7)
RD % = Above water vol X 100 = Above water vol x 100
Total vol
18 x 5 x 2
Displacement in 1.000 = 18 x 5 x 1.4 x1
= 126
Since displacement is constant 126 = 18 x 5 x d x 1.025
D = 1.365
Under water vol = 18 x 5 x 1.365
= 122.85 m3
Above water vol = Total vol u/w vol
= 18X5x2 122.85
=57.15 m3
RD % = 57.15 X 100
180
=31.71 %
8)
Displacement in 1.025 = vol x density
3000 = l x b x 5 x 1.025
Lxb = 585.365 m2
Displacement in 1.018 = vol x density
= 585.365X5x1.018
= 2979.50 t
9)
10)
12)
13)
Stbd side
50mm
Port
Side
Summer loadline
Mean Draft port & Stbd =00 + 5 =5/2 = 2.5 cm below summer
loadline.
Vessel is listed to Stbd.
FWA =_____W_______
40TPC
W = 40X24X18 =17280 t
= 1.025 1.005
X 18
0.025
14)
Change of Draft = change of RD X FWA
=15 cm
0.025
= 1.025 1.010
0.025
X 25
15)
Change of draft = Change of RD X FWA = 1.025 1.015 X 20 = 8
cm
0.025
0,025
Freeboard is 2.1 m + 0.08
= 2.18m 2.0m
=18cm
TPC in SW = A/100 X 1.025
A/100 = 24 / 1.025
TPC in DW = 24/1.025 x 1.015
= 23.76tm-1
Cargo to load = 18 x 23.76
= 427.68t
16)
20mm
Summer
loadline
50mm
Port side + stbd side = 2+5
2
2
= 3.5cm or 35mm
FWA =
W
= 15000 = 15cm
40TPC
40 x25
Stbd side
Port side
17)
30 cm
45mm
60 cm
WNA
S
17.5cm
w/l
W
WNA
4.5cm
18)
Winter load line =1/48 x 7.2 (summer draft )= 0.15m Or 15 cm.
Mean draft = 60-20 =40 /2 =20 mm below W or 2 cm
20mm above
winter LL
60cm below
19)
Present freeboard port 3m stbd 2.9m Mean 2.95m
Change in draft = Change in RD X FWA = 1.025-1.020 X 200 = 40mm
or 4 cm.
0.025
0.025
Change in Draft = 2.95 + 4cm = 2.99m
TPC in SW = A/100 X 1.025
30 /1.025 = A/100
TPC in DW = A/100 X 1.020
= 30/1.025 X 1.020 =29.85 tm-1
Diff between S free board & draft 2.99 2.8
= 0.19 m or 19 cm.
Cargo to load = 19cm X 29.85
= 567.15t
20)
Present Freeboard = 1.68 + 1.79 = 1.735m
in RD 1.017
2
Change in Draft = 1.025 1.017 X 150 =48mm or 4.8cm
0.025
Freeboard in water SW = 1.735 +0.048 =1.783m
Freeboard tropical 1.63 balance to load = 1.783-1.63
= 0.153m or 15.3 cm
TPC in SW = A/100 X 1.025
Or A/100 = 20.4 / 1.025
TPC in Water RD 1.017 =20.4/1.025 X 1.017
= 20.24tcm-1
Cargo to load = 20.24 X 15.3cm
= 309.67t
1)
GG1 =wd / W
Shift of G = KG of ship Kg of Wt
= 6.2 1.7
= 4.5 m
Wt on board = 8800 t
New wt to be added = 200 t
Total wt on board = 8800 + 200
= 9000 t
GG1 = wd / W
= 200 x 4.5 / 9000
= 0.1 m
Since wt is loaded below KG of vessel the new KG = 6.2 - 0.1
= 6.1 m
2)
GG1 = wd / W
= 600 x (11 6) / (12600 600 )
= 600 x 5 / 12000 = 0.25 m
Final Kg = 6 0.25 = 5.75 m
3)
GG1 = wd / W
= 100 x (15 4) / (9900 + 100 )
= 100 x 11 / 10000 = 0.11 m
NEW KG = 4 + 0.11 =4.11 m
4)
GG1 = wd / W
= 500 x ( 6.3 3) / (11500 500)
= 500 x 3.3 / 11000
= 0.15 m
New KG = 6.3 + 0.15
= 6.15m
5)
GG1 = wd / W
= 500 x 15 = 7500 / 10000
10000
= 0.75m KG will decrease
6)
7)
8)
GG1 = wd / W
= 300 x ( 11.5 2.5 ) / 9000
= 300 x 9 / 9000
= 0.3 m
Final KG = 10.5m+ 0.3m
= 10.8 m
GG1 = wd / W
9 8.7 = w x (15- 8.7) / 9000 +w
0.3 x (9009 +w) = 6.3 x w
2702.7 + 0.3w = 6.3w
w= 2702.7 /6
= 450.45 t
Stage 1
As soon as the weight is lifted off the tank top the weight shifts
from UD to derrick head.
KG of weight in upper deck 8 m
Kg of weight when on derrick head 20 m
Shift of weight ( d )= 20 8
= 12m
GG1 = wd / W
= 300 x 12 / 12000
= 0.3 m
Initial KG 7.6m
KG after derrick takes the weight = 7.6 + 0.3
= 7.9 m
Stage 2
When weight is placed in LH
Shift of weight 8 2
=6m
GG1 = 300 X 6 / 12000
= 0.15m
Final KG = 7.6 0.15
= 7.45m
9)
When the weight is picked up by the jumbo derrick the g travels to
the derrick head.
KG of derrick = 25m
KG of vessel = 9.2m
Shift of d =25-9.2
=15.8m
A) When 50t of weight is added the displacement will be 4950 +50 =
5000t
GG1 = w d = 50 x 15.8 = 0.158 m
W
5000
Till the weight is lifted off the derrick the KG of vessel will remain
the same
Old KG
= 9.2
Shift GG1 = 0.158
New KG
= 9.358
B) When weight is loaded on upper deck
d= 9.2 -8 = 1.2m
GG1 = w x d = 50 x 1.2 = 0.012 m
W
5000
Old KG = 9.2 m
GG1
= 0.012 m
New KG = 9.188 m
10)
A) When the weight is picked up by the derrick the weight shifts to
the derrick head
Hence the shift of G d =22 - 5 = 17m
GG1 = w x d = 20 x 17 = 0.057 m
W
6000
Old KG
=8m
GG1
= 0.057m
New KG = 8.057 m
B) After Discharging the G moves back
d = 8 -5 = 3m
The new displacement will be 6000 20 = 5980t
GG1 = w x d = 20 x 3 = 0.010
5980
Old KG = 8m
GG1 = 0.01
New KG = 8.01 m
KG
4.2
2
3.2
1
MOMENT
LOAD
DISCH
8400
600
640
500
10140
Final KG
=
Moment
=
Weight
1014
0
3000
Final KG
=
3.38m
2)
KG
(m)
CARGO
Descripti
on
Ship
Cargo no
Final KG
1LH
=
Cargo
deck
Cargo no
Final KG
3TD
=
CARGO
NO4LH
Total
LOAD
3000
DISC
H
MOMENT
LOAD
DISCH
3.9 11700
Moment
200 1640
=
0
Weight300 4000
600
6.4
1920
4.11 m150
5.2
780
350
4000
1400
16400
3)
CARGO
Description LOAD
Ship
10000
Cargo
Cargo
Total
10000
-400
Final W
9600
KG (m)
DISCH
250
150
400
MOMENT
LOAD
DISCH
6 60000
3
750
4
600
60000
1350
-1350
58650
Final KG=
moment =
Weight
Final KG=
6.109 m
58650
=
9600
4)
Description
Ship
No1 LH
No2TD
No3 LH
UD No5
Total
Final W
CARGO
KG (m)
MOMENT
LOAD
DISCH
LOAD
DISCH
12000
4.3
51600
200
2.6
520
250
3.4
850
1000
4
4000
550
8
4400
12000
2000
51600
9770
-2000
-9770
10000
41830
Final KG =
5)
Description
Ship
Cargo
Cargo
Bunkers
Cargo
Bunkers
Total
Final W
Final KG =
41830 =
10000
4.183
m
CARGO
KG (m)
MOMENT
LOAD
DISCH
LOAD
DISCH
2000
3.66
7320
1500
5.5
8250
3500
4.6
16100
1520
0.6
912
2000
2.44
4880
900
0.4
360
8520
2900
32582
5240
-2900
-5240
5620
27342
Final
Moment=
Final
Weight
4.865 m
27342
5620
6)
Description
Ship
Loads
Loads
Total
CARGO
LOAD
DISCH
3200
5200
W
8400
Final KG =
44800+10.4w
7)
Description
MOMENT
LOAD
DISCH
6.2
19840
4.8
24960
10.4 10.4w
44800
=6
8400 +w
44800 +10.4w
=50400+6w
4.4w =5600
CARGO
w=1272.72 KG
t (m)
LOAD
DISCH
Ship
Loads
Loads
Total
Final KG =
2600
4600
w
7200+w
35688 +10w =
7200+w
Final KG =
35688 +10w =
10w-5.11w=
w=
8)
KG (m)
MOMENT
LOAD
DISC
H
4.88
12688
5
23000
10
10w
35688+10w
5.11
36792+5.11w
1104
225.76t
KG
(m)
CARGO
Descriptio
n
MOMENT
LOA
D
DISCH
656
Ship
8000
8.2
00
When weight is taken by derrick the wt is still on board
25 (-)
220 when derrick takes
Final KG =
67800
8.475m
Discharge
100 =3
0 the wt
8000
678
Total
8000
100
00
LOAD
DISC
H
CARGO
KG (m)
MOMENT
Description
LOAD
DISCH
LOAD
DISCH
Ship
8000
8.2
65600
Discharge
100 3m
300
Final KG =8000
65300 = 100 8.265
Total
65600
m
100
300
7900
7900
65300
(9)
200
15200
122920=
KG
(m)
MOMENT
LOAD
DISCH
7.9
118500
30(-)7.
9
(+)4420
122920
8.086
m
15200
CARGO
Descriptio LOA DISC
n
D
H
1500
Ship
0
Cargo
200
1520
0
Final
KG=
120900
=
15200
KG
(m)
MOMENT
DISC
LOAD H
11850
7.9
0
12
2400
12090
0
7.95
4m
(10)
(a)WHEN THE WEIGHT IS PICKED UP BY SHORE DERRICK IT IS AS
GOOD AS THE WEIGHT DISCHARGED FROM VESSEL
CARGO
Description
LOAD
DISCH
Ship
11000
Cargo shift
180
10820
Final KG
=
(b)
77040=
10820
KG
(m)
MOMENT
LOAD
DISCH
7.2m
79200
12
2160
77040
7.12
0m
WHEN THE WEIGHT IS
RELOADED ON BOARD