Anda di halaman 1dari 13

M/s.

ACE ENERGY
EQUIPMENTS PVT LTD
200
KG/hr
CAPACITY:
SIB (w.o.no-005)
BOILER:
HORIZONTAL
TYPE:
COMPANY:

1
2
3

Pipe Dia
Cost/Kg (M.S)
CostPipe Per M(coil)

BOILER

DESCRIPTION
Shell
End plate
Furnace
Fire tubes
Man hole
Man hole Dummy
Bolt and nut
Fire Door
Flanges
Flanges
Flanges
Nozzle pipe
Nozzle pipe
Nozzle pipe
Lifting hook
Chimney Duct
Chimney pipe
Gay rope
Bottom leg
Bottom base plate

63.5
38.5
365
LENGTH IN WIDTH IN HEIGHT SHEET DIA THICKNESS COIL DIAMETER
MM
MM
IN MM
IN MM
IN MM
ID IN MM
1520
-1520
1520
250
-8"
400
---500
150
150
150
500
6000
30000
150
250

-------350
------100
---75
250

--------1 1/2"
1"
3/4"
1 1/2"
1"
3/4"
----300
--

1200
1175
600
-400
400
1"
300
-------8"
8"
6
---

10
14
12
-14
14
-14
------16
3.5
4.5
--16

---------------------

1500
450
450
-1400
1400
4000
2"
450
--450
-1400
1400
4000
2"
--450
70
CAPACITY/
SIZE
300cc
--600
-1"
3/4"
1"
1"
4"DIAL
3/8"

50
-1400
-1240
1240
50
----1400
-1240
1240
50
-----RANGE
---------0-21
--

---------------------TYPE
-----S/E
S/E
S/E
S/E
BOT/E
--

-1400
-1400
---5/8"
16
-12
-1400
---5/8"
-12
16
63
MAKE
---

REVERSE CHAMBER
SMOKE CHAMBER
ACCESSORIES

Supporting angles
Round portion
Top portion
Door
Door flanges
Insulation ring
flat
Blot and Nut
Handle
Fire crete cement
Aspestos rope
Round portion
Top portion
Door
Insulation ring
flat
Blot and Nut
Fire crete cement
Aspestos rope
Handle
Push
DETAILS
Water level controller
Pump
Motor
Fire bar
Control Panel
Steam valve
Air vend valve
Safety valve
Blowdown valve
Pressure Gauge
Q type sifen

---ATAM
ATAM
IBR
ATAM
---

6
5
10
10
10
5
6
----10
10
10
5
6
-----MATERIAL
---C.I
-G.M
G.M
G.M
F.S
S.S
--

----------------------------------

ACCESSORIES
OTHERS LABOUR CHARGES

Niddle valve
Water level gauge
Non return valve
Gasket
Paints
Labour charges

3/8"
3/4"
1"
----

--Vertical
----

---

------

--G.M
----

-------

----

Labour Charges
Referactory

--

--

--

--

--

--

Labour Charges lathe


work

--

--

--

--

--

--

Labour charges for


Painting
Insulation
Transport charges
Crane charges
Water for hydro test
Consumbles

--

--

--

--

--

--

------

------

------

------

------

------

PIPE DIAMETER TOTAL LENGTH


IN MM
TURNS
IN M
---63.5
-----------------

---24
-----------------

---36.48
-----------------

T.NO.OF
PIPES
IN L

QUANTITY

---6
-----------------

1
2
1
-1
1
2
1
3
4
1
3
2
2
2
3
1
1
1
4

AREA
(m2)
57.32
30.37
34.39
-4.40
1.76
-8.33
-------1.40
16.31
-4.00

WEIGHT
(KG)

RATE

450
238
270
105
35
14
6
65
------4
11
128
-3
31

17325
9180
10395
13315
1330
532
450
2517
246
272
56
174
76
36
145
616
7168
2010
111
1209

----------------------------------

----------------------------------

----------------------------------

----------------------------------

2
1
2
1
1
1
1
30
2
7
-2
1
1
1
1
30
7
-4
8
1
1
1
1
43
1
1
1
1
1
1
1

-9.90
12.60
15.40
3.32
1.66
-0.18
--3.15
15.40
3.32
1.66
---0.36
--------------

57
78
99
121
26
13
9
5
1.42
175
1
25
121
26
13
9
5
175
1
2.84
16
----238
--------

2197
2992
3808
4654
1003
502
363
375
240
4725
240
1008
204
56
58
363
2250
4725
240
240
450
0
7000
6500
7000
15708
12500
1800
855
2250
1021
950
120

-------

-------

-------

-------

1
1
-----

-------

-------

220
1900
1660
700
1500
30000

--

--

--

--

--

--

--

2000

--

--

--

--

--

--

--

2500

--

--

--

--

--

--

--

1000

------

------

-----36

-----6

------

-----225.24

-----2578

5000
2800
2800
600
11800
200039

TOTAL

Total Project Cost

200039

ACE ENERGY EQUIPMENTS PVT LT


Plate cost Weight /Kg
Pipe cost Weight /Kg
DESCRIPTION
Shell
Shell
End plate
End plate
Top cover
Pipe
Pipe
Pipe
Flanges
Flanges
Flanges
Flanges
Bend
Bend
Coupling

36.5
45
LENGTH IN
MM
2200
750
---1500
2000
1200
--------

EXPANS
PIPE DIA IN
INCH
-----4"
2"
1 1/2"
--------

SIZE
IN INCH
--------4"
2"
1 1/2"
3/4"
2"
1 1/2"
1/2"
TOTAL

Y EQUIPMENTS PVT LTD


EXPANSION TANK
SHEET DIA IN
MM
800
600
800
600
500
----------TOTAL

THICKNESS
IN MM
4
4
8
8
8
-----------

QUANTITY

WEIGHT

RATE

1
2
2
4
2
---2
1
1
2
3
2
2

174
89
80
90
31
22
12
5
--------

6339
3242
2934
3301
1146
979
557
236
1008
204
148
112
174
76
36

504

20492

ACE ENERGY EQUIPMENTS PVT


Plate cost Weight /Kg
Pipe cost Weight /Kg
DESCRIPTION
Plate-1(front&back)
Plate-2(side)
Plate-3(top&bottom)
End plate
Cone portion-1
Cone portion-2
Cleaning dummy
Duct
Duct flanges(OD&ID)
Flanges(OD&ID)
Flanges(OD&ID)
Supporting materials
Bolt &nut
Aspestos rope
Pipe

36.5
45
LENGTH IN
MM
2000
2000
1100
1200
1100
520
520
120
500
1200
500
-2"
-1200

AIR
WIDTH IN
MM
1100
520
520
620
520
520
400
-380
620
400
----

HEIGHT
IN MM
----400
400
--1100
250
---

TOTAL

GY EQUIPMENTS PVT LTD


AIR PREHEATER
SHEET DIA IN
MM
-------400
-520
200
-1/2"
12
60.3
TOTAL

THICKNESS
IN MM
4
4
4
10
4
4
10
4
8
8
10
----

QUANTITY

WEIGHT

RATE

2
2
2
2
4
4
2
2
4
2
4
-100
--

138
65
36
117
72
34
33
9
21
22
47
10
5
3
321

5043
2384
1311
4263
2622
1240
1192
346
761
789
1719
365
900
660
13504

933

37098

ACE ENERGY EQUIPMENTS PV


Plate cost Weight /Kg
Pipe cost Weight /Kg
DESCRIPTION
Cleaning door dummy
Cleaning duct
Cleaning duct
Cleaning door flanges
Supporting pieces

36.5
45
LENGTH IN
MM
600
600
250
600
330

CLEANING DOO
WIDTH IN
MM
360
250
250
360
330

HEIGHT
IN MM
---500
-TOTAL

GY EQUIPMENTS PVT LTD


CLEANING DOORS&SUPPORTING PIECES
SHEET DIA IN
MM
---250
-TOTAL

THICKNESS
IN MM
5
4
4
5
10

QUANTITY

WEIGHT

RATE

6
12
12
6
17

51
57
24
21
73

1857
2063
860
782
2652

225

8214

ACE ENERGY EQUIPMENTS PVT LTD


ACCESSORIES
Accessories
Oil Level Switch
Pressure Gauge
Diff Pre Switch
ID Fan
FD Fan
ID Fan Motor
FD fan Motor
Circulation Pump

PUMP Motor

1
2
1
1
1
1
1

Each
Rate
2850
550
1250
70000
0
0
0

Total
Rate
2850
1100
1250
70000
0
0
0

81002

81002

Capacity

Quantity

7.5 HP

Total

156202

Anda mungkin juga menyukai