ISSN 0119-1144
42
INTRODUCTION
The Revised Master Plan for Forestry
Development in the Philippines (DENR and FAO
2003) stated that one of the ills confronting forestry
is the lack of new investments in the sector, primarily
from private funds. In addition, the older industry
players are continuously exiting out of business.
Hence, forest industry in the Philippines is
viewed as a sunset industry, compared to call
centers and e-commerce as sunrise industries.
Some of the reasons forwarded include the weak
and unstable policy environment in the country
with respect to forest utilization and the prohibitive
costs of forest investments coupled with attendant
high risks of such business ventures.
Indeed, the costs of forest development in the
country tremendously increased through the
years. Recent estimates by PICOP Resources
show that they need around PhP 40,000 ha-1 of
fast-growing tree plantation developed up to third
year of establishment (Tumambing 2008) based
on a PhP 200 prevailing wage rate in the uplands
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
provided by Memorandum Circular (MC) 200019 and Department Administrative Order (DAO)
2000-57 as adjusted depending on the site and
funding support2. The project costs contained in
the above guidelines that were implemented
since 2001 are already outdated and causing
confusion with respect to interested forest
developers. These costs were primarily based
from MC 04, 1990 updating of cost estimates for
reforestation contracts and DAO 31, of 1991 that
revised the guidelines for contract reforestation.
An updated costing would be very useful in
upgrading the costs of project activities. This is
deemed critical in the success of the future forest
development projects planned by the sector. The
detailed costs and activity standards provided
here would also be useful in future DENR
projects with similar components.
43
METHODS
Secondary Data gathering
Several secondary data about previous costs
and prices and forest rehabilitation lessons were
obtained from the DENR and its website, PICOP,
UP Land Grant Project, Center for International
Forestry Research (CIFOR) Project, Bantay
Kalikasan Foundation and other offices and agencies.
Primary Data Gathering
MC 2000-19 is a guideline for determining comprehensive site development costs for uplands projects while DAO 2000-57 is a cost guideline
for mangrove projects of the Forestry Sector Project of the DENR of which one of the Authors provided the baseline studies.
44
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
species
Rhizopora spp.
1st yr =
App.3 x 4
2x2
2,079
86,274
14.56
54.63%
10,599
6,774
6,865
4,246
11,828
3,906
2,562
8,636
2,501
2,717
2,948
1,625
9,461
5,800
3,728
Notes:
Labor costs=
282 pesos/day
1. The cost estimates were updated using 2007 prices.
2.
FGS - fast growing species, SGS - slow growing/indigenous species
<a - Large fruit trees like mango, durian and marang.
<b - Small fruit trees like kalamansi, guava, guyabano, etc., can also be used for agroforestry plantations
<c - Nursery operations for direct planting include gathering of propagues and storage to temporary depot.
(with nursery)
Mangrove Enrichment Planting <c
Sum for each operations
Percentages of each operations:
Yearly Precentage of Costs
Other mangrove
1.5 x 1.5
2x2
2x2
Nipa
Rhizopora spp.
Rhizopora spp.
2x3
5x2
4x4
10 x 10
2x2
4x4
appx 5 x 5
5x5
appx 5 x 5
5x5
5x5
NA
FGS
FGS
FGS
Fruit tree-based
w/ fuelwood
Pure fruit trees
Assorted
Bamboo
FGS/SGS
Rattan
Rubber
Mangrove Plantation
Agroforestry <a
Reforestation
Upland Components
1,629
103,083
17.39
2nd yr =
10,383
7,102
5,406
5,480
9,770
5,198
3,728
9,236
3,828
5,655
5,112
3,634
13,528
8,197
5,198
7,104
299,224
50.49
26.05%
16,011
24,616
15,417
16,276
26,408
21,902
23,629
15,170
10,478
16,406
14,490
5,198
37,958
29,535
18,626
783
26,614
4.49
3rd yr =
1,424
783
1,383
783
2,651
2,651
771
2,651
2,651
771
771
583
2,651
2,651
2,651
44,179
45,166
33,431
30,803
58,255
38,705
35,293
41,048
22,377
29,382
26,820
12,890
73,138
53,110
34,734
Total
cost
(PhP)
1,739 13,336
77,472 592,667
13.07 100.00
19.32%
5,762
5,891
4,361
4,018
7,599
5,049
4,603
5,354
2,919
3,832
3,498
1,849
9,540
6,927
4,530
Table 1. Updated cost estimates for forest development activities per ha (2007).
Components
Species
Spacing
Operation Costs (PhP)
Project
(M)
Nursery
Plantation
Maintenance Infrastructure management
cost (PhP)
operation establishment and protection
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
45
46
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
f. Enrichment planting
g. Rattan plantations which include palasan,
limuran, and sika, among others.
h. Rubber plantation
i. Timber stand improvement
j. Nipa plantation under 2 x 2 m spacing
k. Mangrove plantation involving the direct
planting technique using the Rhizopora Spp.
at 2 x 2 m spacing
l. Mangrove plantation involving the direct
planting technique using the Rhizopora Spp.
at 1.5 x 1.5 m spacing
m. Mangrove plantation involving species with
small propagules or seeds whose planting
materials are raised in the nursery; and,
n. Mangrove enrichment planting.
Forest Development Costs
The costs for all forest development activities
considered in this study are summarized in Table
1. These costs were based on PhP 282 per day
reference labor wage rate. The costs are divided
into two major components namely, the operations
costs and the project management costs.
Operations costs include nursery activities,
plantation establishment, plantation protection
and maintenance, and the costs of infrastructure
needed for the project. On the other hand, project
management costs constitute the overhead costs
in implementing forest development activities.
On the average, nursery operations share 15.0%
of costs, plantation establishment 17.4%, plantation
maint enance and pr otection 49.8%, and
infrastructure 4.7%, while project management
constitutes 13.1% (Table 1). The bulk of these
costs come from labor ranging from 73 to 86% of
the total operations costs. Hence, total forest
development cost is sensitive to prevailing labor
wage rate in the locality. It was also noted that
the total cost of forest plantation development is
sensitive to spacing. For example, by considering
different spacings, the total costs of reforestation
is only PhP 36,760 ha-1 for the first three years of
operations under 4 x 4 m spacing while the costs
would be PhP 74,039 under a 2 x 3 m spacing
(Table 1).
As to the average percentage distribution of
costs for the first three years of operations, the
first year accounts for 55% of total costs, with 26
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
47
Table 2. Cost estimates for common forest tree plantations (Gmelina, Mangium, and Falcata; 2 x 3 m
spacing).
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
48
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Table 3. Cost estimates for common forest tree plantations (Gmelina, Mangium, and Falcata; 5 x 2 m
spacing).
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
accessibility, water sources, and available area,
among others. The estimated nursery establishment
cost is around PhP 200,000 each.
c. Production of Planting Materials
The activities in the production phase include
procurement/handling of quality or certified
seeds, nursery bed preparation, sowing of seeds,
gathering and preparation of soil, potting of
seedlings, preparation of potbeds and pot
arrangements, maintenance of seedlings (i.e.
cultivation, weeding, fertilization, hardening,
grading) and other activities in the nursery.
Fertilizer application involves putting a small
pinch per plastic bag (5 gm/bag). The costs of
tools and implements used in the nursery are also
part of the production phase. The nursery operations
costs for each forest development component are
provided in Table 1. The standards for nursery
activities are presented in Tables 2-17 that provide
the costs for all necessary activities with the
production standards ha-1 provided under the
columns of goal ha-1 while the required labor in
terms of man days for a given activity are
presented under the column of man days required.
d. Plantation Establishment
The ideal time for plantation establishment is
at the start of rainy season when the soil is
already wet up to the half m deep or more and
until about two-thirds of the season when some
rains are still expected towards its tail-end. The
timing is important to stabilize the condition of
the transplanted seedlings in time for dry season
as well as to accommodate the required
maintenance passes to improve survival.
Plantation establishment entails the following
activities: brushing that requires clearing a strip
2 m wide along the planting line; staking using
bamboo or wooden poles; hole digging of
appropriate depth; seedling transport/hauling
from nursery or temporary seedling depot to a
suitable location in the plantation site; planting
which entails removal of seedling from the plastic
bag using a sharp knife to slice the plastic without
disturbing the soil, and the costs of tools and
materials in the said plantation establishment. The
plantation establishment costs for each forest
49
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
50
ha.
Graded trail this is a labor intensive activity,
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
51
Table 4. Cost estimates for common forest tree plantations (Gmelina, Mangium, and Falcata; 4 x 4 m
spacing).
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
52
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
- Spacing for mango is 10 x 10 m while that of fuelwood is 2 x 2 m with only 2 strips in between rows of mango.
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
53
Table 6. Cost estimates of fruit tree plantations (Pure fruit trees; e.g., coffee, cacao, kalamansi,
guyabano, etc., 4 x 4 m Spacing).
Note:
** - Estimated nursery establishment cost is P200,000.00
54
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
Table 8. Cost estimates for Bamboo (5 x 5 m spacing).
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
55
56
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
57
Table 9. Cost estimates for enrichment planting (Gmelina, Mangium, Falcata; 5 x 5 m Approximate
Spacing).
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
58
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
Table 10. Cost estimates for rattan plantation (5 x 5 m spacing).
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
59
60
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Notes:
* - Supplemental planting is conducted in areas where natural regenerations are lacking or very irregular.
** - Estimated nursery establishment cost is P200,000.00
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
61
Notes:
* - Maintenance includes cultivation, weeding, fertilization, hardening, grading, and other activities in the nursery.
** - Estimated nursery establishment cost is P200,000.00
62
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
63
Table 14. Cost standard for mangrove plantation, direct planting (B. lalaki, B. babae, B. bato 2 x 2 m
spacing).
64
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Table 15. Cost standard for mangrove plantation, direct planting (B. lalaki, B. babae, B. bato 1.5 x 1.5
m spacing).
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
65
Table 16. Cost standard for mangrove plantation with nursery (Pagatpat, Potatan, Tanggal, etc.) 2 x 2 m
spacing).
66
Activity and Cost Standards for Forest Development and Rehabilitation in the
Philippines
Table 17. Cost standard for mangrove enrichment planting through direct planting of Rhizopora Spp.
Journal of Environmental Science and Management Vol. 12. No. 1 (June 2009)
Reforestation
DENR, 2000. Department Administrative Order 200057. Guidelines Governing the Implementation and
Management of Mangrove Subprojects Under
The Forestry Sector Project.
DENR & FAO, 2003. Revised Master Plan for Forestry
Development in the Philippines.
DENR, 2000. Memorandum Circular 2000-19.
Guidelines Governing the Update of Costings for
DENR-FSP Watershed Subprojects Under JBIC
Funding.
DENR, 2000. Memorandum Circular 04, series of
1990. Updating of Cost Estimates for Reforestation
Contracts and Provi ding Guidelines for
Implementing Cost-Saving/Low Cost Approaches,
Scheduling Disbursements and Establishing
Duration of Contracts.
ERDB. 1989. Reforestation Species: Bakauan Babae,
Bakauan Lalaki and Bakauan Bato. Research
Information Series on Ecosystems- RISE. ERDB,
College, Laguna.
ERDB. 1990. Reforestation Species: Bagras. Research
Information Series on Ecosystems- RISE. ERDB,
College, Laguna.
ERDS. 1994. Mangrove Regeneration and Management.
Fisheries Sector Program. ERDS. Region IV-A.
DENR.
Malabrigo, P. 2008. Pers. Comm.
Mendoza, M. 2008. Pers. Comm.
Tumambing, D. 2007. Pers. Comm.
67