EPS IN NORWAY
1972 - 2011
E18
Oslo sweden
150.000 m3 EPS
30 EPS constructions
50.000
m3 EPS
Oslo E -18 southern direction
200.000 m3 EPS
E6 Oslo - border
30 EPS constructions
100.000 m3 EPS
25 EPS constructions
Gothenborg norwegian border
400.000 m3 EPS
70 EPS constructions
Largest volum: 40000 m3
15 EPS
constru
ctions
EPS monitoring
Long term performance
Material behaviour
Compressive strength
Water absorption
Decay
Deformation
Deformation in EPS
Creep effects
EPS monitoring
Construction
Year
1972 /
73
12
24
1975
21
36*
1978
1977
1982
Lkkeberg bridge
1989
17
Loenga bridge
1984
21
34*
Compressive strength
kN/m2
Solbotmoan
Lenken
150
Langhus
Normal qual.
140
(9)
Loenga bridge
22 years
(24) (12)
130
(21)
120
110
Lkkeberg bridge
17 years
(7)
(7)
(0)
100
(0)
90
Design line
80
18
Vegdirektoratet
Vegteknisk avd.
Flom
Sande
20
22
24
26
( ) Year after
construction
Water content(volum % )
1.00
2.00
3.00
4.00
0
Depth below top EPS (cm)
Water content
< 1.0 % by volume
after more than
20 years in the
ground
0.00
10
20
30
Solbotmoan
Langhus
Lenken
40
50
60
70
80
90
100
GW level
Material
properties
PhDs on the use of EPS and material
properties from
www.internationalepsresearchers.
com
Who is able to come up with updated
webinformation on EPS in road
constructions (and other applications) ?
Is it neccesarry ?
Perhaps ..perhaps not
Do we need the 5th international conference
on EPS in 10 years time ?
LWA
5,5 kN /m3
EPS
0,5 kN/m3
000
000
000
000
000
000
000
000
000
000
0
Foamglass
EPS
LWA
Grimsyvegen
bridge 2006
E 6 Lkkeberg bridge.
E 6 Lkkeberg bridge.
Abutments
for
temporary
bridge
Abutments
for temporary
bridge supported
on EPS fill
supported on EPS fill
Construction of Lkkeberg
bridge 1989
28
30
32
Totalsetninger
(cm)
26
Settlements in
profile cm
Lkkeberg bridge
foundations on EPS
36,8 m
Shotcrete
EPS
E6
5,5 m
Sand/gravel
Clay (Quick)
EPS
Lkkeberg intersection
Settlements / deformation.
A
A
Profile A-A
4m
10,5 t
2m
EPS -235
EPS -180
Vegdirektoratet
Vegteknisk avd.
EPS
EPS -100
Grimyvegen bridge
Conclusion
From our experiences it may be fair to conclude that
no deficiency effects are to be expected from EPS
embankments placed in the ground for a normal life
cycle of 100 years.
This should hold true provided possible buoyancy
forces resulting from fluctuating water levels are
properly accounted for, the blocks are properly
protected from accidental spills of dissolving agents
and the applied stress level from dead loads is kept
below 30-50 % of the material strength.
The observed performance of the many projects
designed and constructed on these principles
around the world so far supports this conclusion.
Failures
Vegdirektoratet
Vegteknisk avd.
Flood level
> 85 cm above
predicted flood
level at design
stage in 1972
Biological deterioration