PERHITUNGAN BONGKARAN LANTAI DASAR

KETERANGAN
p
l
t
L
No
Sumbu X & Y
(m)
(m)
(m)
(m2)
1
X1
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
2
X2
2.075
3.55
7.36625
3
X3
3.9
3.55
13.845
4
X4
2.475
3.55
8.78625
5
X5
2.475
3.55
8.78625
6
X6
3.9
3.55
13.845
7
X7
3.95
3.55
14.0225
8
X8
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
9
Y1
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
4
3.55
14.2
10
Y2
4.37
3.55
15.5135
11
Y3
4.125
3.55
14.64375
12
Y4
3.95
3.55
14.0225
3.9
3.55
13.845
3.9
3.55
13.845
3.95
3.55
14.0225
13
Y5
8.85
3.55
31.4175
14
Y6
3.9
3.55
13.845
3.9
3.55
13.845
Total
467.251

No

PERHITUNGAN BONGKARAN LANTAI 1


KETERANGAN
p
l
t
Sumbu X & Y
(m)
(m)
(m)
X1
4
3.55
4
3.55
4
3.55
4
3.55
4
3.55
4
3.55
4
3.55
X2
3.9
3.55
X3
4.25
3.55
X4
4.25
3.55
X5
3.9
3.55
X6
4
3.55
4
3.55
4
3.55
4
3.55
4
3.55
4
3.55
4
3.55
Y1
4
3.55
4
3.55
2
2.5
jendela eks
3
2.5
jendela eks
2
2.5
jendela eks
4
3.55
4
3.55
Y2
3.95
3.55
3.9
3.55
3.9
3.55
3.95
3.55
Y3
8.83
3.55
Y4
3.9
3.55
8.4
3.55
3.9
3.55
Bongkaran janggutan lt.1
Start pojok kiri bawah
Searah jarum jam

36.145
32.425

0.4
0.4

L
(m2)
14.2
14.2
14.2
14.2
14.2
14.2
14.2
13.845
15.0875
15.0875
13.845
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
5
7.5
5
14.2
14.2
14.0225
13.845
13.845
14.0225
31.3465
13.845
29.82
13.845

14.458
12.97

8.6
4.925
4.275
4.925
8.6
32.425

0.4
0.4
0.4
0.4
0.4
0.4

3.44
1.97
1.71
1.97
3.44
12.97
528.4845

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

PERHITUNGAN BONGKARAN LANTAI 2


KETERANGAN
p
l
Sumbu X & Y
(m)
(m)
X1
1.9
X2
3.875
X3
1.9
X4
1.25
X5
2.2
X6
1.9
Y1
2.125
Y2
2.125
Y3
2.125
Y4
7
1.125
0.975
0.6
Y5
1.1
3.8
1.1
BONGKARAN JENDELA Lt2

t
(m)
3.55
3.55
3.55
3.55
3.55
3.55
3.55
3.55
3.55
3.55
3.55
3.55
3.55
2.35
3.55
2.35

asumsi bongkaran opening = +15cm (kanan), +15cm (kiri) + (atas dan bawah)

17
18
19
20

JD 1 = (3x2,4) ; 9bh
JD 2 = (6x2,4) ; 1bh
JD 3 = (2x2,4) ; 2bh
JD 4 = (2,0676x2,4) ; 2bh
CIPING KERAMIK KM MANDI LT2

21
22
23
24
25
26
27
CIPING KERAMIK JANITOR SAMPING LIFT

TOTAL

3.3
6.3
2.3
2.3676

2.7
2.7
2.7
2.7

3.875
1.9
2.125
1.625
2.4
2.575
4.325

3.55
3.55
3.55
3.55
3.55
3.55
3.55

1.5
2.125
2.3
2.325

3
3
3
3

L
(m2)
6.745
13.75625
6.745
4.4375
7.81
6.745
7.54375
7.54375
7.54375
24.85
3.99375
3.46125
2.13
2.585
13.49
2.585

80.19
17.01
12.42
12.78504

13.75625
6.745
7.54375
5.76875
8.52
9.14125
15.35375

4.5
6.375
6.9
6.975
335.949

PERHITUNGAN KANOPI ATAP


No

Kanopi
1 Lt2

p
5.125
5.125
20.35
4.5
4.5
5.675
5.675
4.5
4.5
20.35

L Vol (m2)
1.5
7.6875
1.5
7.6875
1.5
30.525
1.5
6.75
1.5
6.75
1.5
8.5125
1.5
8.5125
1.5
6.75
1.5
6.75
1.5
30.525

5.125
7.035
19.6
7.125
5.125
20.35
4.5
4.5
5.675
5.675
4.5
4.5
20.35

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5

Sub Total
2 Lt3
3 Lt4
4 Lt5
5 Lt6
6 Top Kanopi samping

Sub total
GRAND TOTAL

7.6875
10.5525
29.4
10.6875
7.6875
30.525
6.75
6.75
8.5125
8.5125
6.75
6.75
30.525

120.45
120.45
120.45
120.45
120.45

171.09
773.34

No
1

Keterangan
Bongkaran Atap Utama

Nb

: sumber Vol perhitungan Mbak Ade

Vol

Satuan
562 m2

No
1
2
3
4
5
6
7
8
9

Keterangan
Lt. Dasar
Lt.1
Lt.2
Lt.3
Lt.4
Lt.5
Lt.6
Atap Kanopi Samping dr Lt.2-6
Atap utama
Total

Volume
Satuan
467.25 m2
528.48 m2
335.95 m2
335.95 m2
335.95 m2
335.95 m2
335.95 m2
773.34 m2
562 m2
4010.82 m2