Anda di halaman 1dari 4

Shahbaz Hassan

D-81, RVC Colony, Tarbela Power Station, 23470, Khyber Pakhtunkhwa, Pakistan
Telephone: 0092 334 5199944 (Mobile)
Email:Shahbaz.hassan@t4cjv.com

PROFESSIONAL PROFILE
An experienced design engineer having over 6 years experience of active construction
supervision, feasibility and detailed design assessments, preparation of bidding documents and
technical specifications, design review, project planning, implementation and experience of mega
and mini hydropower projects.
Key areas of experience include design and construction of mechanical and hydraulic steel
structures, detailed design of turbines, planning, implementation and supervision of projects
through collaboration of World Bank, Asian development Bank and Pakhtunkhwa energy
development organization (PEDO) stakeholders involvement.
Key skills include erection/installation and design of hydro mechanical and electro mechanical
equipment, technical project planning as per organizations strategic objectives, management
and supervision of project staff, dissemination of key project outputs, and supervision of site staff.

CAREER SUMMARY
May 2016 to Date, Gates Engineer, Associated Consulting Engineers Pvt. Ldt, Lahore,
Pakistan
Tarbela 4th extension project 1410 MW JV (Mott MacDonald UK and Coyne et Bellier France) is
US$ 840 Million, World Bank funded project which involves constructing a power house,
modifying a tunnel and installing three 470 MW power units.
Working on the project and looking after erection/installation and construction of mechanical
equipment in progress which includes erection/installation of generating units, 500 KV switchyard
installation activities, gantry crane installation and site tests of gantry cranes (600/50 ton), stay
ring assembly, pressure pipes, Eot cranes (600/50/10 tons), embedment of draft tube gates and
barge. Successfully supervised the replacement of damaged rubber seals of already existing
gates.
Oct 2014 to April 2016, Mechanical Engineer, AL-Kasib Group of Engineering Services,
Peshawar, Pakistan
As mechanical engineer, I have worked on design and design review of hydro mechanical works
on several hydropower projects with the firm. A brief summary is given below:
Jamshill - Turenmore Hydropower Project (260 MW)
Responsible for design criteria, detailed design report, drawings and cost estimate for the
hydraulic steel structures. Assignment was completed successfully before time and was
presented to client and approved. Main project facilities consists of power intake, bottom outlet,
under sluices, sandtrap, sediment flushing, draft tubes and tail race.
Hydraulic steel structures designed for the project are as follows:
Intake gates and Stoplogs: 5 Nos. of 7.5m wide x 9 m high x 16 m head, fixed wheel
Intake movable trashracks: 7.5 m wide x 2.8 m slant height (5 No)
Bottom outlet gates and stoplogs: 6 Nos. of 6 m wide x 4 m high x 25 m head
Under sluice gates and stoplogs: 5 Nos. of 7 m wide x 5 m high x 28 m head
Sandtrap gates: 10 Nos. of 7 m wide x 4.5 m high x 9.9 m head
Sediment Flushing gates: 30 Nos. of 1.25 m wide x 1 m high x 6.30 m head
Draft tube gates: 4 Nos. of 5.6 m wide x 6.8 m high x 95 m head
Tailrace Pond gates and stoplogs : 3 Nos. 5.5 m wide x 7 m high x 6 m design head
Gantry crane: 2 Nos. 70 ton for intake and dam
Terminal Structure gates: 3 Nos. 5.5 m wide x 7 m high x 6 m design head
Page 1 of 4

Turen More Kari Hydropower Project (350 MW):


Was responsible for design criteria, detailed design report, drawings and cost estimate for the
metal works. Project facilities includes headrace, draft tubes, by pass channel and penstocks.
Hydraulic steel structures designed for the project are as follows:
Headrace Tunnel trashracks: 2 Nos. 7.5 m wide x 3 m slant height
Draft tube gates: 8 Nos. 5.2 m wide x 3.3 m high x 17 m design head
Bypass channel stoplogs: 3 Nos. 5.5 m wide x 7 m high x 6 m design head
Penstock gate: 1 Nos. 8.9 m wide x 8.9 m high x 57 m design head
Jabori Hydropower Project (10.2 MW):
Evaluated, reviewed electromechanical equipments specifications and construction stage level-2
design of hydraulic steel structures for the project which consists of tyrolean intake, gravel trap
flushing, sandtrap inlet pond U/D & D/S, and sandtrap flushing.
Hydraulic steel structures reviewed for project are as follows:
Tyrolean Intake gate: 1 Nos. of 2.5 m wide x 2 m high, slide gate
Gravel trap flushing gate: 1 Nos. of .8 m wide x .8 m high, slide gate
Sandtrap (Inlet pound) U/S : 2 Nos. of 1.9 m wide x 2.3 m high, slide gate
Sandtrap Stoplogs (Inlet pound) U/S : 2 Nos. of 1.9 m wide x 2.3 m high
Sandtrap (Inlet Pound) D/S : 2 Nos. of 1.9 m wide x 2.3 m high, slide gate
Sandtrap Stoplogs (Inlet Pound) D/S : 2 Nos. of 1.9 m wide x 2.3 m high
Sandtrap flushing gates : 1 Nos. of .8 m wide x .8 m high, slide gate
Chapare Charkhil Hydropower Project (10.56 MW):
Designed hydraulic steel structures for the project which consists of under sluice, head
regulators, sediment excluders and flushing, forebay and tailrace pond facilities.
Hydraulic steel structures designed for the project are as follows:
Under sluice gates: 3 Nos. of 8 m wide x 3 m high x 2.5 m head.
Head regulator gates : 4 Nos. of 2.5 m wide x 1 m high x 1.5 m head
Sediment excluder gates : 4 Nos. of 2.05 m wide x 3.5 m high x .95 m head
Sediment flushing gates : 8 Nos. of .6 m wide x .6 m high x 7.8 m head
Forebay gates: 1 Nos. of 2.7 m wide x 2.7 m high x 8.2 m head
Tailrace Pond gates: 3 Nos. 2.5 m wide x 1.5 m high x 1.8 m design head
Balkani Hydropower Project (7.75 MW):
Deputed to provide technical consultancy on feasibility level and detailed design of hydraulic
steel structures and turbines on the project. Project consists of tyrolean intake, gravel trap, sand
trap, and draft tube facilities. Project consist of two horizontal shaft turbines.
Major metal works done on project are as follows:
Tyrolean intake gate : 1 Nos. of 2.28 m wide x 1.76 m high
Gravel trap gate : 1 Nos. of .6 m wide x .66 m high
Sand trap gate : 1 Nos. of .9 m wide x .9 m high
Draft tube gate : 2 Nos. of 3 m wide x 1.6 m high
Horizontal Francis turbine : 2 Nos. of 3.875 MW
Barandoo Hydropower Project (6.5 MW):
Successfully drafted inception report for mechanical works on the project.

March 2012- September 2014


Gates and Steel Structure Engineer, National Development
Consultant, Lahore, Pakistan.
Dasu Hydropower Consultants JV (Nippon Koei Japan & Dolsar Turkey) was a USD 4.278
Billion, World Bank funded 4320 MW hydropower project:
Successfully accomplished the design criteria, detailed design, design report, bid documents,
technical specifications and detailed drawings for hydraulic steel structure works on the project
under supervision of Chief Mechanical engineer. Project consists of design of gates for intake
facilities, low level outlet facilities, tailrace facilities, and diversion facilities. Being a part of a
consortium of renowned partners, I have successfully completed the design of spillway radial
Page 2 of 4

gates (16.5 m wide x 21.4 m high) which are one of its kind in the world and already approved by
client and project is currently in construction phase.
Hydraulic steel structures of project are as follows:
Spillway radial gates: 8 Nos. of 16.5 m wide x 21.4 m high x 22 m design head
Spillway Stoplogs: 8 Nos. of 16.5 m wide x 22 m high x 21 m design head
Intake service gates & Stoplogs: 4 Nos. of 9.5 m wide x 12 m high x 76 m design head
Intake movable trashracks: 4 Nos. of 8 m wide x 3.2 m slant high (10 nos.)
LLO maintenance gates: 9 Nos. of 8.4 m wide x 8.4 m high x 119 m design head
LLO guard gates: 9 Nos. of 5.1 m wide x 6.4 m high x 118.4 m design head
LLO regulating gates: 9 Nos. of 5.1 m wide x 6.4 m high x 118.4 m design head
Tailrace outlet gates: 8 Nos. of 9 m wide x 8 m high x 17.4 m design head
Diversion gate No. 1 & 2: 2 Nos. of 8.4 m wide x 20 m high
June 2010- February 2012 Project Engineer (entry level), E&M Lot KC04 Division, Dongfong
Electric Corporation Limited China, Pakistan.
Khan Khwar hydropower project 72 MW was a USD 160 million Islamic development Bank
funded 72 MW hydropower project.
Worked as a part of the E&M team of DongFong in construction supervision of
erection/installation and commissioning of hydropower project, scope of work includes installation
and commissioning of vertical francis turbines 2x32 MW, horizontal shaft pelton turbine 4 MW,
switchyard equipment, 11 KV transmission lines, powerhouse OHTC, HVAC systems, electro
mechanical site tests of generating units, transformers, handling and taking over, site
coordination meetings, EOT claims meeting with employers and engineers, and managing day to
day site project staff and activities.

EDUCATION AND QUALIFICATION


University of Engineering and Technology, Pakistan
2016 - 2018
Mechanical Engineering (Msc), Dynamics and Controls
My research area is of improvements in design of hydraulic steel structures as very little research
work has been carried out to date
Bachelors of Science in Engineering, (AIR University), Pakistan
2006 2010
Final year project was Design of pico hydropower plant with emphases on design of cross flow
turbine

SKILLS
Solidworks 2016, AutoCad Mechanical 2012, Auto desk Inventor pro 2016(Cad/Cam), TurbnProKC04 (Hydraulic Turbine), MS Office 2013, Matlab 2015

ASSOCIATIONS
Pakistan Engineering Council (PEC Member ID: Mechatro-584), Engineers Australia Professional
Engineer Level 1

LANGUAGES
English (Bilingual proficiency)

Pashto (Native proficiency)

Urdu (Bilingual proficiency)

Page 3 of 4

HOBBIES
Pets (domestic breed of Rottweiler),

Pleasure reading,

Computer games.

PERSONAL
Age: 28 Years by September, 2016,
Gender:
Nationality: Pakistani (hold no second nationality)

Male,

Marital

Status:

Married

Page 4 of 4