GH
A
GH
C
GH
B
8650
GH
2
2500
GH
B
GH
A
GH
1
8650
3800
2500
8650
GH
C
8650
00ZZ01-001001
B
00ZZ01-001001
B3
B4
TOP 4.350
PARAPET LEVEL
SSL 3.750
ROOF LEVEL
SSL 3.750
ROOF LEVEL
200
B2
GH
1
TOP 4.350
PARAPET LEVEL
B3
B1
B3
B1
B2
LVL 2.850
CEILING LEVEL
B1 T1
B3
B4
LVL 2.850
CEILING LEVEL
S1
B1
B1
3800
B2 T2
00ZZ01-001001
C1
SSL = 3.750
C1
C1
C1
C1
C2
B3
B2
FFL 0.000
FGL -0.150
GROUND FLOOR
SITE LEVEL
200
FFL 0.000
GROUND FLOOR
GH
2
B4
-0.580
-0.580
TOP OF FOUND
200 THK. R.C.
PARAPET WALL
(TYP) W1
F3
F3
F1
00ZZ01-001001
F1
X
00ZZ01-001001
ROOF LEVEL
TOP OF FOUND
00ZZ01-001001
Y
00ZZ01-001001
00ZZ01-001001
GH
A
8650
00ZZ01-001001
2500
4325
400 350
Section B
GH
C
GH
B
F1
375 375
Section A
F1
GH
A
EXTERNAL WALL TO
ARCHITECT'S DETAIL
4325
EXTERNAL LANDSCAPE
OR RAMPS
GH
1
250
250
T1
SSL = -0.080
T10's
FGL -0.150
SITE LEVEL
-0.580
TOP OF FOUND
00ZZ01-001001
C1
750 x 600DP. STRIP
FOUNDATION
(TYP).
600
NORTH
KEY PLAN
250
-0.580
TOP OF FOUND
T10-400 U-BARS
T10-200
T10-200
SHEAR
LINKS
T10-400 U-BARS
5T20 TOP
5T20 TOP
PROJECT
LOAD NORTH
CENTRE C
TANKING
MEMBRANE TYP.
COLD JOINT
T10-200 SHEAR LINKS
5T20 BTM.
TANKING MEMBRANE
(TYP)
C1
225
100
C1
FGL -0.150
SITE LEVEL
COLD JOINT
C2
GH
2
LdC
3800
LdT
LdT
A393 MESH
T10
580
S2
T2
FFL 0.000
GROUND FLOOR
LtA
T10-200
FFL 0.000
GROUND FLOOR
M
AK
KA
H
C2
C1
LdC
C1
600
100
C1
225
5T20 BOTTOM
A
350
BLINDING
750
BLINDING
REINFORCED STRIP
FOUNDATION F1,
SEE FOUNDATION SCHEDULE
00ZZ01-001001
REINFORCED STRIP
FOUNDATION
400
DETAIL X
DETAIL Y
00ZZ01-001001
00ZZ01-001001
GROUND FLOOR
REVISION:
00ZZ01-001001
GH
A
GH
C
GH
B
8650
2500
4325
350 400
REF
C1
C2
4325
375 375
C1
375 375
C1
C1
F3
SIZE
250 x 300mm
250 x 250mm
GH
1
F4
V1
C2
V1
V2
F1
V2
2T20
-
V3
-
V1
V2
V1
F1
V1
4T20
4T20
S1
3L T8-150
2L T8-150
S2
-
Comments
REV.
V1
S1/S2
V1
V1
TYPE 1
F1
1.
S1/S2
TYPE 2
NOTES:R.C SLAB SCHEDULE
325 425
Ref
F2
C1
C1
F3
DATE
DESCRIPTION OF REVISION
(dd/mm/yyyy)
APP.
F4
C2
Thickness (mm)
B1
B2
S1
200
T12-200
T12-200
S2
200
DRAWN BY:
DESIGNED BY:
RGP
CHECKED BY:
PD
APPROVED BY:
BR
ARCH
CIVL
STRC
CDJ
PAVN
ELEC
DATE:
(dd/mm/yyyy)
10/03/2012
MECH
ELTN
DATE
APPROVED AS SUBMITTED
APPROVED WITH IND. CHANGES
DISAPPROVED, RESUBMIT
C1
RR
RR
RR
V1
00ZZ01-001001
GH
2
NOTES:-
F1
3800
Cross
Section
Type
1
2
400 350
425 325
F2
T1
T2
T1A
T12-200 T12-200
T10-200
T10-200
T2A
1.
2.
REINFORCEMENT LAYERS:
T4
T12-200
T12-200
T12-200
CLIENT:
FF2
FF1
A
00ZZ01-001001
NF1
NF2
PLAN
5
00ZZ01-001001
Mark
W1
Thickness (mm)
Generic - 200mm
FF2
T10-150
LINKS
-
CONSTRUCTION MANAGER:
R.C. BEAM SCHEDULE
REF
B1
B2
B3
B4
SIZE (W x D)
250X300
250X300
250X300
250X300
BEAM
TYPE
1***
1
2
1*
B1
3T16
3T16
3T16
3T16
B2
-
B3
-
A
3T16
3T16
*3T16
C
3T16
3T16
3T16
3T16
D1
3T16
**3T16
D2
S1
2L T8-200
2L T8-200
2L T8-200
2L T8-200
S1
2L T8-200
2L T8-200
2L T8-200
2L T8-200
Comments
*** A - REPEATED ON BOTH SIDES
CONTRACTOR:
DESIGN CONSULTANT:
Grand total: 8
Ref
F1
F2
F3
F4
Grand total: 7
SIZE (BxD)
750x600 (F1)
750x600 (F2)
750x600 (F3)
750x600 (F4)
TYPE
1***
1
2
1*
B1
5T20
5T20
5T20
5T20
B2
-
B3
-
FINAL DESIGN
STRUCTURAL
DRAWING TITLE:
D2
S1
4L T10-200
4L T10-200
4L T10-200
4L T10-200
LOAD CENTER C
GUARD HOUSE A
GENERAL ARRANGEMENT
S2
Comments
4L T10-200 *** A - REPEATED ON BOTH SIDES
4L T10-200
4L T10-200
4L T10-200 * - TOP REINFORCEMENT AT DISCONTINUOUS END.
** TOP REINFORCEMENT ST CONTINUOUS END
PROJECT NUMBER
J-10-422-PF-0
SCALE (A0)
1:100
DRAWING NUMBER
SHEET
REV.
422-C130-FD-S- 00ZZ01
001
C
001