DESIGN:
PROOF:
COUNTERSIGNATURE:
ACCREDITATION:
APPROVAL:
CB15060-2
1 General
1.1 General
LW43-252 GCB is used in electrical power system of AC 50Hzor 60Hz, 252kV, act as
control and protective equipment as well as being connecting circuit breaker.
1.2 Characteristic
Type LW43-252 takes SF6 gas as medium of insulating and arc-quenching with type CT-252
spring operation mechanism. It has features of high switching capacity low operating
power and high reliability.
1.3 Note
Instruction: The following contents shall be included: Complete instructions and data
for installation, operation, maintenance, repair, adjustment and caution. Anyone has to
read through the entire instruction before installation and maintenance. They must know
how to operate it.
Two kinds of indications NOTE and WARNING are in the explanation of instruction,
to former one, inconvenience or slight hurting might occur if not comply with it; to latter
one, hurting person or destroying equipment might happen if not complying with it. The
two indications are all shown in boldface.
GCB be designed, manufactured,tested and commissioned in conformity with publications
of IEC 62271-100 <<High-voltage alternating-current circuit-breakers>> and GB1984
<<High-voltage alternating-current circuit-breakers>>.
2 Operating conditions
2.1
Altitude (above sea level) not more than 1000mor not more than 3000m
2.2
25 K
The relative humidity : Daily average value is not more than 95%
Monthly average vaule is not more than 90%
34 m/s
2.6
2.7
2.8
1 / 23
CB15060-2
Table1 1
No.
Name
Unite
Technical data
Rated voltage
kV
252
Rated frequence
Hz
50/60
Rated current
1600/2000/2500/3150/4000
kA
31.5/40/50
kA
80/100/125
kA
80/100/125
kA
ISC90%ISC75%
kA
ISC25%
10
1.3/1.5
11
12
Across break
To earth
Across break
To earth
kV
kV
Across break
13
To earth
460/460+145
460
1050/1050+206
1050
1.3252/ 3
kV
1.3252/ 3
14
160
15
0.520
16
Operating sequence
O-0.3s-CO-3min-CO
17
Break time
ms
60.0
18
Opening time
ms
24.035.0
19
Closing time
ms
75.0110.0
20
Close-open time
ms
40.060.0
21
open-Close time
ms
300.0
22
Closing synchronization
ms
4.0
23
opening synchronization
ms
3.0
24
Travel
mm
230+-25..00
25
Contact travel
mm
452.0
26
55.0
2 / 23
CB15060-2
27
28
0.60/0.55/0.50
MPa
%
0.5
Water content of
Acceptance value
ppm
150
gas
Operation value
(v/v)
300
29
30
Mechanical endurance
Time
3000
31
500
Across break
Creepage
7812
mm
distance
33
To earth
6300/7812
40
kg
34
Weight of per CB
4000
Name
Unite
Technical data
DC 220/125/110
2/3.7/3.3
85% 110%Ua
2.5/6.5/5.8
65% 120% Ua
Rated voltage Ua
DC220/125/110AC220
85% 110% Ua
Power
600
3
4
5
3 / 23
CB15060-2
The time for charging operation of
15
Nm
76
W/V
2100/AC 220
closing spring
Moment
of
closing
spring
being
charged by manual
Table 3
NO.
1
Technical
Name
Remark
data
100 0-3.0
Fig. 11
GCB
1.40.3
is
open
position,
4 GCB construction
GCB construction is shown figure 1. GCB consist of three polesthey are installed on
top frameMechanism house are installed on side framespring mechanism consist of closing
system ,tripping systemoutput lever and rod are connected by connecting plateThe closing
system consists of devices that closing spring is charged and closing spring, closing
spring supply energy for GCB closing and trip spring is charged. GCB is closed by closing
system ,while trip spring is chargedThe trip system consists of trip spring and bumper.
A pole of CB construction
4 / 23
CB15060-2
4.1 GCB pole
Every pole of GCB has the independence SF6 gas monitoring systemthere are upper
terminal, interrupter, lower terminal, insulating rod, slide seal and seal rod, a pole
GCB is shown figure 2.
1
2
7
8
9
5 / 23
CB15060-2
lower terminal can be installed two different positionA position is a front of mechanism
house, others is back of mechanism house, there are name plate and SF6 gas density monitor
in front of mechanism house
the terminal is installed according to requirement user.
The terminal upper usually is a position of a front of mechanism house. Upper terminal
and lower terminal of installing hole is shown figure 3.
6 / 23
CB15060-2
1 Seal rod
2 Frame
3 Connecting plate
4 Lever
5 Driving rod
6 Spring mechanism
Figure 4 Frame and driving system
Frame is made of angle steel; a transmission system is covered in plate. The degrees
of protection IP5XW according to IEC 60529, degrees of protection provided by enclosure
(IP code). There is window for watching SF6 gas density monitor, there is GCB nameplate
in frond of spring mechanism house. There is a transmission system in frame, it connect
GCB and spring mechanism. It transmission power for operating GCB.
SF6 gas density monitor normally applied for GCB, The GCB is filled with SF6 gas at
a rated pressure of 0.6MPa at 20SF6 gas density monitor is a temperature compensated
type and can monitor the density
charged by power and manual. Closing spring supply power for closing GCB, while trip spring
is charged for trip GCB. GCB is operated at local or remote. Spring mechanism operating
principle and construct are shown figure 5.
7 / 23
CB15060-2
4.3.1 The process closing spring is charged: spring mechanism is open positionclosing
spring and tripping spring is discharged.
a
b Bias ratchet shaft-10 drive two ratchet-11,two ratchet drive ratchet wheel-14;
c
Ratchet wheel-14 is rotated clockwiseratchet wheel drive rod-18 , rod make that
When rod-18 passes dead point, ratchet wheel shaft 15 clockwise force on ratchet
e Spring mechanism closed position is shown figure 5-3). Closing spring is charged by
energizing motor for closing operation While pin B-20 is blacked by closing holding
latch-19.
4.3.3 Opening operation
When GCB is closing position, trip spring is charged. Lever-12 and lever-8 is rotated
clockwise by the force of trip spring, while clockwise force on lever-12 and lever-8 is
blocked by trip holding latch-7 and trip trgger-5. They is shown figure 5-1).
Process trip operation as follows
a Trip coil is energized by the opening signal, plunger of trip coil-4 is actuated to
kick trip trigger-5;
b Trip trigger-5 is rotated counterclockwise, trip holding latch is rotated 5 is
rotated counterclockwise to release trip holding latch-7 ;
c Trip holding latch-7 is rotated clockwise to release pin A-6;
d Lever-12 and lever-8 is rotated clockwise by the force of trip spring;
e Lever-8 drive GCB opening operation by driving system .
8 / 23
CB15060-2
4.3.4 Reclosing operation
Process reclosing operation as follows When GCB is close position, driving system
and control circuit of spring mechanism is ready for opening operation. When reclosing
relay give a signal for reclosing operation from control system, GCB is reclosed. If there
is not short-circuit fault in power system, reclosing operation will be success, GCB will
continuing to run; If there is short-circuit fault in power system, GCB will be opened
9 / 23
1-Plunter closing coil 2-Closing trigger 3-Trigger 4-Plugnger of trip coil 5- Trip tripper 6-Pina A
7-Trip holding latch 8-Lever 9 Lever shaft 10- Ratchet shaft 11- Ratchet 12-Lever 13-Cam 14-Ratchet
wheel
15-Cam shaft 16-Trip spring 17- Closing spring 18-rod 19-Closing holding latch 20-Pin B
(Closing spring
(Closing spring charged)
Figure 3) Closing
CB15060-2
Anti-pumping is a performer of GCB. When GCB closing coil is energized by the closing
signal. When GCB is closed. IF GCB of trip coil is energized by the trip signal. GCB is
opened, while GCB of closing coil is still energized by the closing signal, GCB is closed.
The process is pumping, pumping is not allowed in the power system. Pumping of GCB is very
danger. GCB operation mechanism has performance of anti-pumping.
4.36 Control circuit
Secondary schematic diagram is shown addenda B ; secondary wiring diagram IS shown
addenda C. Secondary diagram of Special project is shown tied diagram.
Control circuit of operating mechanism consist of closing circuit, double trip circuit,
electrical anti- pumping circuit, control circuit of motor, lock out circuit for low gas
pressure, protect circuit for phase of disagreement, protect circuit for motor (there are
two circuit for motor over loading fault and over time fault), circuit for heater and lamp,
local-remote changeover switch for selecting local control and remote control.
4.3.6.1 Closing control circuit:
contact is on. Control system gives closing signal. Closing signal pass auxiliary switch-DL
of break contact, anti-pumping relay-FT contact, Contactor-ZL contact, Auxiliary relay-ZJ
contact and relay of SF6 gas low pressure cutout contact, closing coil is energized by
closing signal, plunger of closing coil is actuated, GCB is closed, while auxiliary
switch-DL of break contact is off and make contact is on. GCB is ready for opening operation.
4.3.6.2 Open control circuitGCB in closed position, auxiliary switch-DL of make contact
is on. Control system gives trip signal. Trip signal pass auxiliary switch-DL of make
contact and relay of SF6 gas low pressure cutout contact, trip coil is energized by trip
signal, plunger of trip coil is actuated, GCB is opened, while auxiliary switch-DL turn
off open control circuit and turn on close control circuit is off. GCB is ready for closing
operation.
4.3.6.3 Electrical anti-pumping circuit: GCB is closed by closing signal, contacts
position of auxiliary switch-DL are changed, anti-pumping circuit is on, relay
anti-pumping FT is energized, closing control circuit is off. There is still closing signal
in closing circuit, while GCB is opened by trip signal, contacts position of auxiliary
switch-DL are changed, anti pumping circuit is still held by contact relay anti-pumping
FT, close control circuit is still off, GCB is not closed. There is not closing signal
in close control circuit, relay anti-pumping FT is reset, close control circuit is ready
for closing operation.
4.3.6.4 Control circuit for motor: When GCB is closed, contacts limit switch CK are on.
Contactors of motor circuit are energized, motors run for closing spring being charged.
Closing spring is charged fully and the motor is switched off automatically by cam turning
off limit switch CK, motor stops. There are two protect circuit for motor, one is overtime
protect circuit, other is over loading protect circuit. When motor running time exceeds
30 s, make contact of time relay is closed. Auxiliary relay is energized; control circuit
of motor is opened. Motor stop running. When motor has over loading fault, make contact
10 / 23
CB15060-2
of thermal over relay is closed, auxiliary relay is energized; control circuit of motor
is opened. Motor stop running.
4.3.6.5 Locking circuit of low SF6 gas pressure: The monitoring system gives an alarma
signal by low pressure. When the gas feed alarm is on, SF6 gas should be supplied until
the rated pressure is obtained. When pressure arrived at locking pressure. Closed contacts
of denismeter will operate, relay of SF6 gas low-pressure cutout is energized, closing
circuit and open circuit is off. GCB cannot be operated
4.3.6.6 Protect circuit for phase disagreement: When GCB runs, it is operated for opening,
two phase GCB or single phase are opened, position contacts of auxiliary switch are changed.
Phase disagreement protection relay-QB is energized. After a delay for while, auxiliary
relay of- QB is energized for reclosing single phase. Coil of others is energized by control
voltage. Phase disagreement of GCB is avoided.
Note of relay-QB as follows:
a When GCB is installed for transformer or bus, strict operating asynchronism is
required. When a position of a single
Packing
There are eight pieces for packing GCB, they are shown figure 6.Every phase interrupter
is packing in wood box; every phase frame and spring mechanism is packing by membrane of
PVC, there are parts and tools in a box of accessories, there is a bottle SF6 gas for GCB.
11 / 23
CB15060-2
2.
When interrupter is transited, lifted, moved, interrupter pressure does not exceed
0.10 MPa.
5.3 Storage
If GCB is not installed as soon as, packing box of GCB have to be stored at indoors.
If packing box of GCB is stored at outdoor, they must be stored at aeration agitation place;
they must be covered by waterproof canvas. If packing box of GCB is stored for long time,
heaters are turned on in mechanism house. The time that packing box GCB is stored for less
half a year.
The box of accessories must be stored at indoor.
6 Installation
GCB is checked accord to packing list before Erection. If there are any problems in
checking, user will contact with manufactory.
Note: 1 When it is rain and wind, GCB is not installed.
2 SF6 gas pipe and valve are not impacted.
3 When GCB is installed, parts of GCB are moved gently, parts are not bumped, nut
of rod is not loosened, it will be avoided that closing position and opening position
are not changed.
4 The process that GCB is installed at site, there are engineer and worker from
12 / 23
CB15060-2
manufactory for guarding erection, they have enough experience for installing at site.
5 When interrupter is installed, lifter must be used, it is not allowed that ladder
lean against GCB.
6 It is not allowed that porcelain is impacted by tool and crane.
Warning
1 When it is not right way that packing boxes are lifted, it can cause that packing
box is dumpedequipment is damaged, worker is hurt.
2 The process that GCB is installed at site, screws are tightened in right way, wrong
way will cause that GCB is dumped, equipment is damaged, worker is hurt. All screws, nut,
spring washer, washer must be supplied by manufactory for installing GCB; they are
tightened by torque spanners, their intensity is 8.8 class.
M6
5.880.6 NmM8
M12
47.15 Nm M16
M24
38238 Nm
13.71.5 NmM10
11820 NmM20
27.53 Nm
21622 Nm
13 / 23
CB15060-2
6.2.1.10 Overhead lines are installed
6.2.1.11 Ground wires are installed
6.2.1.12 Inspection and test at site
6.2.2 Installing sequence
6.2.2.1
Installing frameFrame and spring mechanism are lifted by craneFrame and spring
mechanism position is according with type LW 252 GCB assembly drawing and installing
foundation drawing , they are dandled gently, every foundation bolts must through
installing hole. Nuts, spring washer and washer are installed. If installing frame is
leaned, adjust installing frame in washer. When installing frame is right, all foundation
bolt will be tightened. Open the door of frame; take down protecting cover and packing
material.
6.2.2.3 Installing Interrupter: Two end interrupter are tied to with nylon lifting sling
loading being 2-3t, horizontal interrupter turn over verticality interrupter by
interrupter bottom protection plate. When interrupter is verticality, interrupter bottom
protection plate is removed. When interrupter seal rod is opening position
between centre of interrupter and centre of frame of interrupter is same, between gas valve
position and gas pipe position is also same, interrupter is put on top flange frame. Six
bolts install interrupter; two symmetry bolts is tightened together in the same time. All
bolts is tightened, nylon lifting sling is removed. Other interrupters are installed by
same way on other phase frame.
6.2.2.4 Installing manual operation device: support plate of manual operation device is
installed by bolt at side spring mechanism. Nut, washer, bearing, rod of manual operation
are installed on support plate. Rod of manual operation is put into pin of lever, rod of
manual operation is rotated counterclockwise for closing GCB by detent, rod of manual
operation is rotated clockwise for opening GCB by detent, they are shown figure 7.
14 / 23
CB15060-2
6.2.2.5 Manual operation device is installed at frame with seal rod 8 and connecting
plate 3, they are shown figure 4.
Seal rod-8 of GCB is opening position,
To pole
value at 20 .
There are frosts on SF6 hose for supplying SF6 gas GCB. It is normal. Reducing
pressure for supplying SF6 gas GCB, there are not frosts on SF6 pipe.
3
6.2.2.8
electrical principle diagrams and wiring diagrams. Field wiring are finished, inlet of
cable is sealed in rubber for proofing against water, insect and dust.
Note1 Field wiring are done at control circuit being off.
2 Field wiring are done at spring mechanism closing spring and trip spring is free.
6.2.2.9
Installing terminal: Overhead line is connected with upper terminal and lower
terminalupper terminal and lower terminal can be installed two different positionA
15 / 23
CB15060-2
position is a front of mechanism house ,others is back of mechanism house, there are a
name plate and a SF6 gas density monitor in front of mechanism house
the terminal is
installed according to requirement customer. The upper terminal usually is a position of
a front of mechanism house. First terminal and terminal connector are polished in 400#
sand paper. Second they are cleaned in pure alcohol. Finally daubed their surface with
electric cream and install M16 bolt. Overhead lines are installed on other terminal by
same way.
7 Site test
Note1 Installed GCB is finished. GCB is opening position. Pins that spring mechanism
cannot be operated are dismounted. GCB is operated slowly by manual operation device,
while motor circuit and control circuit has to be off.
2 Pressure of GCB is lower than its rate pressure; GCB cannot be operated quickly
by spring mechanism.
3 Before GCB running, Overhead line is not connected to GCB.
4 When GCB pressure is under 0.30MPa, GCB is operated quickly by spring mechanism.
It will be damaged.
5 Check on all pins, whether there are circlip on the pin. Check on all bolt, whether they
is tightened.
7.1
7.1.1 Inspecting stroke of GCB Inspecting stroke of GCB is according with value of table
1, table2 and table3. Inspecting stroke of GCB is recorded. They are shown figure 9. When
seal rod of interrupter is opened position, measure dimension A1.When seal of interrupter
is closed position, measure dimension A3. Stroke of GCB is A1- A3.
7.1.2 Electric contact stroke of the CBA lamp is installed at between upper terminal
and lower terminal. GCB is closed slowly by manual operating device. When lamp is on,
contact touch the position, measure dimension A2. Go on closing GCB, when GCB is at closed
position, measure dimension A3. Electric contact stroke of the CB is A2-A3.
1) Opened position
3) Closed position
16 / 23
CB15060-2
10. When piston is at closed position, measures dimension B2 of trip spring. When piston
is at opened position, measures dimension B1 of trip spring. Mechanism piston stroke is
B2-B1.
7.1.4 Measurement of the resistance of the main circuit.
When GCB is at closed position, measure resistance of the main circuit, it does
not
exceed 55.
7.1.5 Measure dielectric resistance
When GCB is at closing position and opening position, measure dielectric resistance
at different position. Dielectric resistance measure instrument measure voltage is 1000V,
dielectric resistance of GCB exceed 1000 M.Dielectric resistance measure instrument
measure voltage is 500V, dielectric resistance of control circuit exceed 10 M.
7.1.6 Characteristic quantities test
When GCB is operated by spring mechanism, measure closing time, opening time and the
time for charging operation of closing spring.
7.1.7 Measure micro moisture-content
Charge valve connect to pressure releasing valvepipeline and micro moisture-content
surveying instrument . measure micro moisture-content of SF6 gas, measure result is
compensated according to ambient temperature. SF6 gas allowable moisture content: Accepted
value150 ppm(v/v) , In service value300 ppm(v/v).
7.1.8 Power frequency voltage tests
GCB power frequency voltage tests are tested according to table8 at site.
Adjusting GCB: GCB of routine tests are done at factory GCB is adjusted at factory. GCB
will not be adjusted at site. Measure dimensions in table 3.
7.2
7.2.1 Gap of between lever and cam(G3 = 1.40.3), they are shown figure 11.
If dimension G3 is not right, adjust joint of lever-8 at figure 5.
Mechanism
a Opening position
b Closing position
17 / 23
CB15060-2
is off. They are shown Fig.12. When it is 7mm, limit switch turn off. When it is 8mm, limit
switch turn on.
Sort
Trouble
Reason
Measures
fault
SF6
No operate for
Operati
1
gas
pressure is low
Closing spring
cannot
fault
closing
ng
be
charged.
Other
inspect
stroke
of
trip
plunger.
No operate for
opening
Supply voltage
lacking
Control circuit
fault
18 / 23
CB15060-2
SF6
gas
pressure is low
Other
inspect
stroke
of
trip
plunger.
SF6 gas
density
monitor system
monitor
system
alarm at a
fault
pressure of
Leakage
Circuit control
fault
contact.
CB15060-2
7.3.5 Inspect circuit for heaters. Turns off and turns on heaters are right.
7.3.6 Overhead line is connected with terminalupper terminal and lower terminal can
be installed two different positionthe terminal is installed according to requirement
customer. First terminals and overhead line are polished in 400# sand paper. Second they
are cleaned in pure alcohol.
7.3.7 Clean all porcelain in water.
7.3.8 Before service GCB, check up all result of site test, write site test report. Customer
and manufacturer have a copy site test report.
7.4 Put in order at site.
After installing and site test, install all cover plate.
8 Maintenance and operating
8.1 Inspect GCB in service.
8.1.1 Verify integrity porcelain, whether they are right.
8.1.2 Verify SF6 gas density monitor and record result of pressure SF6 gas.
8.1.3 Verify position indication, it and GCB are same position.
8.1.4 Verify parts of GCB surface, whether they have rust.
8.1.5 Verify circuit for heater, whether they are right.
8.1.6 Verify connection between terminal and power-line, whether they are right.
8.1.7 Avoid water filtered into breaker, welding line and seams between bolt and nut,daubed
with glue D05.
8.2 Maintenance of GCB
GCB do not require special maintenance operations. When GCB is in service for three
years, preventive maintenance of out of service GCB will be done in hours
8.2.1 Verify surface porcelain, clean it in water.
8.2.2 Verify surface parts of GCB. When surface parts have rust, rust part will be painted,
rust bolt, nut, washer and spring will be replaced.
Warning: Pressure of SF6 gas is at 0.6MPa(0.5MPa) in GCB, dismantle a old bolt and
have to install a new bolt as soon as.
8.2.3 Inspect all bolt. If bolt is loose, it will be tightened.
8.2.4 Inspect terminal for high voltage. If they are very hot, they will be repaired.
8.2.5 All move parts of mechanism will be lubricated.
8.2.6 Inspect and record micro moisture-content.
8.2.7 Measure Resistance of main circuit.
8.2.8 Inspect control circuit.
8.3 Repair GCB
Out of service GCB, dismount interrupter, inspect all every parts of interrupter, damage
parts will be replaced. GCB will be repaired as follow.
8.3.1 Continuum operating for 12 years;
8.3.2 Mechanical duration 3000 time;
8.3.3 GCB beak 50kA for 16 time.
9 Supply documents for user
9.1 Installation and operating instruction
1
9.2 Packing list for LW43-252
1
9.3 Certificate
1
20 / 23
CB15060-2
1
1
Drawing No.
Name
Quantity
8ZDK.920.004
Blot
12
GB 6170
Nut M24
12
GB 97.1
Washer 24
12
GB 93
Spring washer 24
12
GB 894.1
Circlip 16
12
8ZDK.064.009
Terminal
GB 5783
Blot M1655
12
GB 5782
Blot M1675
12
GB 97.1
Washer 16
24
10
GB 93
Spring washer 16
42
11
1box
12
1box
13
1box
14
Fluoro-silicone grease
15
30m
16
17
1box
2
18
30m
Charge pipeline
1 copy
19
GB301
Axletree 51210
20
8ZDK.940.050
Profiled nut
21
5ZDK.235.007
Tip bar
22
23
SF6 gas
1set
50kg
1copy
24
Packing list
1copy
25
Certificate
1copy
26
1copy
21 / 23
Note
CB15060-2
Type
Name
Quantity
Trip coil
Closing coil
Motor
Travel switch
AC/DC contactor
Note
Type
Name
Micro
Quantity
Note
1set
moisture-content
surveying
1set
surveying
1set
instrument
3
Main
circuit
resistance
instrument
4
1set
Vacuum pump
1set
TRANSFORMER
SUBSTATION NAME
No.
Install content
TECHNOLOGY
REQUIREMENT
Bolt/Nut M24 12
pole
ectinguish chamber
Nut M16
22 / 23
6
16
RESULT
B
C
Note
CB15060-2
5
0.60MPa
Wiring
credibility
Operation
7
Opening operation
Closing operation
Operating sequence.
Site test
Measure
mechanical
Technology
characteristics
requirement
15.0s
is charged.
Closing time
75.0110.0 ms
Opening time
2435ms
Measure resistance of
55.0
mail circuit
8
Measure dielectric
>1000M
resistance
Power frequence
46080% kV
withstand voltagerms
SF6 gas alarm
0.55 MPa
pressure(20)
SF6 gas lock
0.50 MPa
pressure(20)
Inspect leakage of SF6
0.5 %/Year
gas
Measure moisture-content
9
150 ppm
10
11
User
Inspector
manufacturing Inspector
Director
Director
Data
Data
23 / 23