Anda di halaman 1dari 6

ABB Utilities GmbH

RTU560
Remote Terminal Unit
Installation
Assembly Instruction RTU560E

Note

Mounting of C-rail

Read the general installation instructions and/or


the data sheets and setting instructions first.

Fasten the C-rail with 6 screws as shown in


Figure 1 and Figure 2.

All cables used require double insulation made of


PVC, TFE, PTFE or neoprene. Additionally, the
cable shall be specified for up to 300 V.
The power cable and the battery cable shall have
a cross section of 1 mm2.
The process cable shall have a cross section of
max. 0.5 mm2.

C-rail

Power connection

General Assembly
For the installation use the assembly package
560HMS80 1KGT 010200 R0001.
The assembly package contains the following
parts:
U

C-rail with six screws.

T-head bolt for earth connection point and


two earthing cable.

Plain washer, tooth lock washer and nuts.

Label with earthing symbol.

Cable clip and base plastic shielded.

Five canle clips and bases for the process


cable.

Seven stepped nibble.

Dok.-Nr.: 1KGT 150 531 V000 0

Fig. 1: Position within housing

Fig. 2: C-rail with T-head bolt

ABB Utilities GmbH


Assembly Instruction RTU560E

RTU560

Open the cable penetration

Power cable

Before installing the housing make sure that all


the openings required for the power cable and the
process cable are open.

Use always a 3-core power cable (Fig. 4).


Use a 2-pole disconnector for RTU560E. Install
the disconnector at a reachable place.

Use a hammer and crewdriver or a drill to break


them open. (Fig. 3)
Use attached stepped nibles to close the wholes.

Fig. 4: Power cable

Use for power supply only!


Fig. 3: Cable penetration

Strip 130 mm of the insulation of the power cable.


Bend the green/yellow aerthing cable away from
the over two.Pull a heatshrinking sleeve, 110 mm
long, 8 mm O over the over cores (L and N
conductors) up to the insulation of the power
cable, and shrink the sleeve.

Install earthing point


The T-head bolt is the central point for earthing.
Mark this central earthing point with a label.
Insert T-head bolt into the C-rail approx. 45 mm
away from the edge of the lower part and put plain
washer U6,4 on it
Connect both cable to Phnix plug connectors of
the power supply 560PSU80/81. Connect the long
cable with P4 / PG, the short one with P2 / PE.
Fig. 5: Heatshrinking Sleeve
Pull a heatshrinking sleeve, 15 mm long, 8 mm O,
over the three cores so that part of it covers the
outer insulation of the supply lead and the over
part covers the three cores (Fig. 5). Shrink the
sleeve.

Dok.-Nr.: 1KGT 150 531 V000 0

ABB Utilities GmbH


RTU560

Assembly Instruction RTU560E

Pull the power cable through the provided opening


in the housing and close the opening with a
stepped nipple (Fig. 6).

Connect a Phnix P2 plug connector of the power


supply unit (3-pole) to the assembly cable and
tighten the three cores (Fig. 7).

Fig. 6: Power cable

Attach a ring cable lug M6 to the green/yellow


wire (earth), cross section of the wire. Attach a
ferrule of appropriate cross section to the other
two wires (blue, brown).

Fig. 7: Phnix P2 plug connector


Fasten the power cable with a BBS clip on the
C-rail.

Put the ring cable lug of the green-yellow wire


over the T-head bolt. Put a plain washer M6 and a
tooth lock washer M6 on the T-head bolt and
fasten with a nut M6 (Fig. 8).
Earthing symbol
Power cable

Stepped nipple

Fig. 8: T-head bolt

Dok.-Nr.: 1KGT 150 531 V000 0

Must be plastic. (clip and base)

ABB Utilities GmbH


Assembly Instruction RTU560E

RTU560

The assembly package has the following order


number:

Connect the two inner connections of the batteries


with the short 1-core cable (+ pole to pole), and
the outer connections with the long 2-core cable.
Connect the other end of the cable to the Phnix
P3 (T1, T2) plug connector of the power supply
unit (Fig. 9).

560BMM80 1KGT010100R0001.

Observe polarity!

It contains:

Connect or earth the battery cable shield. Cut


approx. 5 cm of the upper cable shield and clamp
it with a metal clip.

Battery assembly

2 batteries 12 V 3,5 Ah

Battery plate and 3 screws

Short cable, 1-core

Long cable, 2-cores

Metal clips

Temperature sensor

Stepped nibble

Connect the temperature sensor directly to the


power supply unit 560PSU81 Phnix P3 (B+, B-)
plug connector.

Battery
Sonnenschein
12 V, 3,5 Ah

Connecting cable
Battery cable

Fig. 9: Battery connection

Assembly
Insert the two batteries and fasten by means of
the supplied battery plate and screws

Fig. 10: Earthing the battery cable

Dok.-Nr.: 1KGT 150 531 V000 0

ABB Utilities GmbH


RTU560

Assembly Instruction RTU560E

Installation of 560FOC80

Process Wiring

The assembly package has the number


560FOM80 1KGT010300 R0001.

Read the data sheets and/or the installation


instructions of 560MIO80 and/or 560PSU80/81.

It contains:

The shields of all process cables shall be earthed.

C-rail with screws

Cable (4-core, 0.5 mm2, double insulation)

Metal clip

The double cable insulation must lead up to the


input of 560MIO80 and be stabilized with a
heatshrinking sleeve.

The opto-coupler is used exclusively for


Peripheral Bus extensions. Hence several
housings (max. 7) can be connected.
Neutral position of light is off !
Important
Connect TA (Plug connector P6, 560PSU80/81)
withD
Connect TB (Plug connector P6, 560PSU80/81)
with D
Attach ferrules to the cores
Power is supplied by 560PSU80/81 plug
connector P6 (5 V and GND) (Fig. 11).

Plug connector
P6 of
560PSU80/81

Connect or earth
shielding.

Fig. 12: Shielding of process cable

ferrules

Double insulation
Heatshrinking sleeve
for mechanical
stability, 0.4 mm thick

Fig. 11: Installation of the opto-coupler


Fig. 13: Insulation of process cable

Dok.-Nr.: 1KGT 150 531 V000 0

ABB Utilities GmbH


Assembly Instruction RTU560E

RTU560

ABB
ABB Utilities GmbH
Kallstadter Str.1, 68309 Mannheim
Telephone:: +49 (0) 621 381-7592
Telefax: +49 (0) 621 381-7622
www.abb.de/uta

Dok.-Nr.: 1KGT 150 531 V000 0