LAPORAN PENGUKURAN UDARA AMBIENT DAN KEBISINGAN

DI LINGKUNGAN KERJA DAN PERUSAHAAN

No

Tanggal

Titik Sampling

I
1
2
3

Lingkungan Kerja
14-Jan-16 Cement Mill
14-Jan-16 Tapak Helipad
14-Jan-16 Quarry Batu Kapur

II
4
5
6

Lingkungan Perusahaan
14-Jan-16 Kompleks Perumahan Dinas
14-Jan-16 Rs Antonio
14-Jan-16 Kelurahan Talang Jawa

I
1
2
3

Lingkungan Kerja
22-Feb-16 Cement Mill
22-Feb-16 Tapak Helipad
22-Feb-16 Quarry Batu Kapur

II
4

Lingkungan Perusahaan
22-Feb-16 Kompleks Perumahan Dinas

Berat Filter
(Mg)
Koson
Isi
g

Flow Rate
Ltr/Menit

Waktu
Menit

Konsentrasi Debu
Mg/m3

BMUA/NA
B

4.295
4.152
4.163

4.211
4.124
4.146

1000
1000
1000

60
60
60

1.4
0.467
0.283

10
10
10

4.037
4.132
4.108

4.028
4.121
4.105

1000
1000
1000

60
60
60

0.15
0.183
0.05

0.23
0.23
0.23

4.198
4.223
4.144

4.124
4.204
4.136

1000
1000
1000

60
60
60

1.233
0.317
0.133

10
10
10

4.05

4.043

1000

60

0.117

0.23

5
6

22-Feb-16 Rs Antonio
22-Feb-16 Kelurahan Talang Jawa

4.12
4.228

4.11
4.224

1000
1000

60
60

0.167
0.067

0.23
0.23

I
1
2
3

Lingkungan Kerja
21-Mar-16 Cement Mill
21-Mar-16 Tapak Helipad
21-Mar-16 Quarry Batu Kapur

4.572
4.67
4.422

4.124
4.204
4.136

1000
1000
1000

60
60
60

0.467
0.317
0.283

10
10
10

II
4
5
6

Lingkungan Perusahaan
21-Mar-16 Kompleks Perumahan Dinas
21-Mar-16 Rs Antonio
21-Mar-16 Kelurahan Talang Jawa

4.204
4.313
4.002

4.043
4.11
4.224

1000
1000
1000

60
60
60

0.1
0.183
0.083

0.23
0.23
0.23

I
1
2
3

Lingkungan Kerja
21-Apr-16 Cement Mill
21-Apr-16 Tapak Helipad
21-Apr-16 Quarry Batu Kapur

4.193
4.143
4.148

4.114
4.104
4.122

1000
1000
1000

60
60
60

1.317
0.65
0.433

10
10
10

II
4
5
6

Lingkungan Perusahaan
21-Apr-16 Kompleks Perumahan Dinas
21-Apr-16 Rs Antonio
21-Apr-16 Kelurahan Talang Jawa

4.056
4.053
4.144

4.05
4.042
4.14

1000
1000
1000

60
60
60

0.1
0.183
0.067

0.23
0.23
0.23

I
1

Lingkungan Kerja
19-Mei-16 Cement Mill

4.17

4.077

1000

60

1.55

10

2
3

19-Mei-16 Tapak Helipad


19-Mei-16 Quarry Batu Kapur

4.205
4.168

4.175
4.15

1000
1000

60
60

0.5
0.3

10
10

II
4
5
6

Lingkungan Perusahaan
19-Mei-16 Kompleks Perumahan Dinas
19-Mei-16 Rs Antonio
19-Mei-16 Kelurahan Talang Jawa

4.218
4.231
4.17

4.213
4.22
4.167

1000
1000
1000

60
60
60

0.083
0.183
0.05

0.23
0.23
0.23

I
1
2
3

Lingkungan Kerja
13-Jun-16 Cement Mill
13-Jun-16 Tapak Helipad
13-Jun-16 Quarry Batu Kapur

4.14
4.204
4.174

4.056
4.165
4.152

1000
1000
1000

60
60
60

1.4
0.65
0.367

10
10
10

II
4
5
6

Lingkungan Perusahaan
13-Jun-16 Kompleks Perumahan Dinas
13-Jun-16 Rs Antonio
13-Jun-16 Kelurahan Talang Jawa

4.25
4.269
4.173

4.245
4.26
4.17

1000
1000
1000

60
60
60

0.083
0.15
0.05

0.23
0.23
0.23

Pemantauan Emisi Debu Cerobong Grate Cooler Bulan Januari

Tanggal

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)

01 Januari 2016

80

02 Januari 2016

80

03 Januari 2016

80

04 Januari 2016
05 Januari 2016
06 Januari 2016
07 Januari 2016
08 Januari 2016
09 Januari 2016
10 Januari 2016
11 Januari 2016
12 Januari 2016
13 Januari 2016
14 Januari 2016
15 Januari 2016
16 Januari 2016
17 Januari 2016
18 Januari 2016
19 Januari 2016
20 Januari 2016

37.50
36.30
34.00
32.60
33.60
33.80
33.50
65.40
35.60
34.20
33.90
34.10
35.10
38.60
42.90
37.80
37.30

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

Keterangan
Breakdown, Kiln stop patch
job M25
Breakdown, Kiln stop patch
job M25
Breakdown, Kiln stop patch
job M25
-

21 Januari 2016

80

22 Januari 2016
23 Januari 2016

36.00

80
80

24 Januari 2016

80

25 Januari 2016
26 Januari 2016
27 Januari 2016
28 Januari 2016
29 Januari 2016
30 Januari 2016
31 Januari 2016

41.60
41.70
34.20
34.30
38.60
39.10
38.60

80
80
80
80
80
80
80

Pfister W1V72 trip short


circuit power supply 24V
PLC Grate Cooler blank
Fan grate cooler alarm
contactor
-

Hasil pencatatan harian emisi cerobong cement mill bulan januari


Tanggal

DEBU CEROBONG
Partikel Debu
Baku Mutu

Opasitas
Cerobong

Keterangan

01 Januari 2016
02 Januari 2016
03 Januari 2016
04 Januari 2016
05 Januari 2016
06 Januari 2016

(mg/ m)
1.60

(mg/ m)
80
80
80
80
80
80

%
3.00

07 Januari 2016

80

08 Januari 2016

80

09 Januari 2016
10 Januari 2016

2.70
1.10

80
80

3.00
4.00

11 Januari 2016

80

12 Januari 2016
13 Januari 2016
14 Januari 2016
15 Januari 2016
16 Januari 2016
17 Januari 2016
18 Januari 2016
19 Januari 2016
20 Januari 2016
21 Januari 2016

1.40
1.10
1.30
1.50

80
80
80
80
80
80
80
80
80
80

4.00
9.00
8.00
2.00

Silo Penuh
Silo Penuh
Silo Penuh
Ganti BC 1.1.85
Ganti BC 1.1.86
Two way chuet
0128_DG001.SV001 scrap
box movetime (2x)
Temperature BE 1.1.72
panas
Pipa bladder accumulator
M1 bocor
Bin limestone blok
Inlet BE 1.1.72 blok (3x)
Bin limestone blok
Bin limestone blok
Ganti BC 1.1.15
Perbaikan center gas M1
-

22 Januari 2016
23 Januari 2016
24 Januari 2016
25 Januari 2016
26 Januari 2016

1.90
2.60
3.30
3.50
-

80
80
80
80
80

3.00
5.00
7.00
7.00
-

27 Januari 2016

80

28 Januari 2016
29 Januari 2016
30 Januari 2016
31 Januari 2016

5.10
-

80
80
80
80

11.00
-

Silo Penuh
Perbaikan Sensor Limit
Roller S1 & Perbaikan
Load Cell
Silo penuh
Shutdown
Shutdown

Hasil pencatatan harian emisi cerobong raw mill bulan januari 2016
Tanggal

DEBU CEROBONG
Partikel Debu Baku Mutu

Opasitas
Cerobong

Keterangan

01 Januari 2016
02 Januari 2016
03 Januari 2016
04 Januari 2016
05 Januari 2016
06 Januari 2016
07 Januari 2016

(mg/ m)
32.10
55.50
29.00

(mg/ m)
80
80
80
80
80
80
80

%
6.00
10.70
4.00

08 Januari 2016

80

09 Januari 2016
10 Januari 2016
11 Januari 2016

23.00
17.20
43.00

80
80
80

4.40
4.00
10.40

12 Januari 2016

13 Januari 2016
14 Januari 2016
15 Januari 2016
16 Januari 2016
17 Januari 2016

69.00
64.70
64.90
63.50
59.00

18 Januari 2016

19 Januari 2016
20 Januari 2016
21 Januari 2016
22 Januari 2016

59.00
61.20
-

80
80
80
80
80
80
80
80
80
80
80

16.60
14.60
14.70
14.00
12.00
11.90
12.90
-

Kiln stop
Kiln stop
Kiln stop
PLN Black out
Ganti motor traversing Rec.
LS
Program Pengecekan
Vertical Mill
Perbaikan stopper scraper
VRM lepas
Kiln stop
Kiln stop

23 Januari 2016

24 Januari 2016

25 Januari 2016
26 Januari 2016
27 Januari 2016
28 Januari 2016
29 Januari 2016
30 Januari 2016
31 Januari 2016

61.90
58.90
64.80
61.10
65.80
66.70

80

80
80
80
80
80
80
80
80

13.20
11.90
14.10
12.80
15.00
15.40

Perbaikan shaft gearbox


Belt A1J12 patah
Ganti motor scrapper
reclaimer Limestone A1L11
terbakar 2x
PLN Black out
-

Hasil pencatatan harian emisi cerobong raw mill bulan januari 2016

Tanggal

Keterangan

Baku Mutu

SOx

Baku Mutu

01 Januari 2016
02 Januari 2016
03 Januari 2016
04 Januari 2016
05 Januari 2016
06 Januari 2016
07 Januari 2016

NOx
(mg/
m)
2.60
18.60
7.80

(mg/ m)
1000
1000
1000
1000
1000
1000
1000

(mg/ m)
2.30
17.60
17.30

(mg/ m)
800
800
800
800
800
800
800

08 Januari 2016

1000

800

09 Januari 2016
10 Januari 2016
11 Januari 2016

4.60
1.50
10.10

1000
1000
1000

0.80
3.40
8.10

800
800
800

12 Januari 2016

1000

800

13 Januari 2016
14 Januari 2016
15 Januari 2016
16 Januari 2016
17 Januari 2016

24.00
23.80
4.50
28.30
9.40

1000
1000
1000
1000
1000

21.00
20.80
0.20
60.40
43.90

800
800
800
800
800

18 Januari 2016

1000

800

19 Januari 2016
20 Januari 2016

33.30
28.50

1000
1000

40.40
32.50

800
800

Kiln stop
Kiln stop
Kiln stop
PLN Black out
Ganti motor traversing Rec.
LS
Program Pengecekan Vertical
Mill
Perbaikan stopper scraper
VRM lepas
-

21 Januari 2016
22 Januari 2016

1000
1000

800
800

23 Januari 2016

1000

800

24 Januari 2016

1000

800

25 Januari 2016
26 Januari 2016
27 Januari 2016
28 Januari 2016
29 Januari 2016
30 Januari 2016
31 Januari 2016

12.90
5.00
1.10
13.30
6.90
58.50

1000
1000
1000
1000
1000
1000
1000

0.20
57.10
10.20
3.90
62.20
38.30

800
800
800
800
800
800
800

Kiln stop
Kiln stop
Perbaikan shaft gearbox Belt
A1J12 patah
Ganti motor scrapper
reclaimer Limestone A1L11
terbakar 2x
PLN Black out
-

Hasil pencatatan harian emisi cerobong grate cooler bulan februari 2016
Tanggal
01 Februari 2016
02 Februari 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
38.00
80
36.10
80

Keterangan
-

03 Februari 2016
04 Februari 2016
05 Februari 2016
06 Februari 2016
07 Februari 2016

36.60
35.00
36.70
33.40
34.70

80
80
80
80
80

08 Februari 2016

80

09 Februari 2016

80

10 Februari 2016

80

11 Februari 2016

80

12 Februari 2016
13 Februari 2016
14 Februari 2016
15 Februari 2016

39.90
36.60
37.80

80
80
80
80

16 Februari 2016

80

17 Februari 2016

80

18 Februari 2016

80

19 Februari 2016

80

20 Februari 2016

80

Breakdown (Perbaikan
Grate Cooler)
Breakdown (Perbaikan
Grate Cooler)
Breakdown (Perbaikan
Grate Cooler)
Breakdown (Perbaikan
Grate Cooler)
Level CF silo kritis (40%)
Ganti motor W1K22
terbakar
Breakdown, Kiln stop patch
job M26
Breakdown, Kiln stop patch
job M27
Breakdown, Kiln stop patch
job M28
Breakdown, Kiln stop patch
job M29

21 Februari 2016

80

22 Februari 2016
23 Februari 2016
24 Februari 2016
25 Februari 2016
26 Februari 2016
27 Februari 2016
28 Februari 2016
29 Februari 2016

40.40
38.50
41.70
40.90
43.00
40.20
43.50
45.70

80
80
80
80
80
80
80
80

Breakdown, Kiln stop patch


job M30
-

Hasil pencatatan harian emisi cerobong cement mill bulan februari 2016
Tanggal
01 Februari 2016
02 Februari 2016
03 Februari 2016
04 Februari 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu
(mg/ m)
(mg/ m)
80
80
80
80

Opasitas
Cerobong
%
-

Keterangan
Shutdown
Shutdown
Shutdown
Shutdown

05 Februari 2016
06 Februari 2016
07 Februari 2016
08 Februari 2016
09 Februari 2016
10 Februari 2016
11 Februari 2016
12 Februari 2016
13 Februari 2016
14 Februari 2016
15 Februari 2016
16 Februari 2016
17 Februari 2016
18 Februari 2016
19 Februari 2016
20 Februari 2016
21 Februari 2016
22 Februari 2016
23 Februari 2016
24 Februari 2016
25 Februari 2016
26 Februari 2016
27 Februari 2016
28 Februari 2016

6.80
5.50
5.50
6.20
7.10
5.90
1.30
1.10
-

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

15.00
12.00
12.00
14.00
16.00
12.00
1.00
1.00
-

29 Februari 2016

80

Shutdown
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Lanjut Pebaikan Bearing
Bucket 1.1.72

Hasil pencatatan harian emisi cerobong raw mill bulan februari 2016
Tanggal
01 Februari 2016
02 Februari 2016
03 Februari 2016
04 Februari 2016
05 Februari 2016

DEBU CEROBONG
Partikel Debu Baku Mutu
(mg/ m)
(mg/ m)
70.40
80
70.90
80
71.10
80
80
80

Opasitas
Cerobong
%
17.00
17.30
17.40
-

Keterangan
PLN Black Out
Tunggu gas panas kiln

06 Februari 2016

07 Februari 2016
08 Februari 2016
09 Februari 2016
10 Februari 2016
11 Februari 2016

70.00
-

12 Februari 2016

13 Februari 2016

14 Februari 2016

15 Februari 2016
16 Februari 2016
17 Februari 2016
18 Februari 2016
19 Februari 2016
20 Februari 2016
21 Februari 2016
22 Februari 2016
23 Februari 2016
24 Februari 2016
25 Februari 2016

67.00
34.10
69.10
72.70

26 Februari 2016

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

17.20
16.10
8.50
16.50
18.10
-

80

PLN Black Out (lanjutan tgl


5)
Kiln Stop
Kiln Stop
Kiln Stop
Kiln Stop
Perbaikan snap ring gearbox
trolley recl clay patah
Perbaikan shaft gearbox
A1J12 patah
Lanjut Perbaikan shaft
gearbox A1J12 patah
Kiln stop
Kiln stop
Kiln stop
Kiln stop
Kiln stop
Ganti Bearing Motor R1J01
PLN Black Out
Classifier Trip Motor
Ready/ Ganti Inverter Main
Drive

27 Februari 2016

80

28 Februari 2016
29 Februari 2016

68.80
-

80
80

16.70
-

Lanjut Pekerjaan Ganti


Inverter Main Drive
Kiln Stop 2x

Hasil pencatatan harian emisi cerobong raw mill bulan februari 2016

Tanggal

01 Februari 2016
02 Februari 2016
03 Februari 2016
04 Februari 2016

NOx
(mg/
m)
31.90
41.90
28.70
-

Baku Mutu

SOx

Baku Mutu

Keterangan

(mg/ m)
1000
1000
1000
1000

(mg/ m)
31.30
56.60
24.20
-

(mg/ m)
800
800
800
800

PLN Black Out

05 Februari 2016

1000

800

06 Februari 2016

1000

800

07 Februari 2016
08 Februari 2016
09 Februari 2016
10 Februari 2016
11 Februari 2016

12.90
-

1000
1000
1000
1000
1000

2.80
-

800
800
800
800
800

12 Februari 2016

1000

800

13 Februari 2016

1000

800

14 Februari 2016

1000

800

15 Februari 2016
16 Februari 2016
17 Februari 2016
18 Februari 2016
19 Februari 2016
20 Februari 2016
21 Februari 2016
22 Februari 2016
23 Februari 2016
24 Februari 2016
25 Februari 2016

25.20
30.80
36.30
30.00

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000

19.60
14.80
34.70
27.20

800
800
800
800
800
800
800
800
800
800
800

Tunggu gas panas kiln


PLN Black Out (lanjutan tgl
5)
Kiln Stop
Kiln Stop
Kiln Stop
Kiln Stop
Perbaikan snap ring gearbox
trolley recl clay patah
Perbaikan shaft gearbox
A1J12 patah
Lanjut Perbaikan shaft
gearbox A1J12 patah
Kiln stop
Kiln stop
Kiln stop
Kiln stop
Kiln stop
Ganti Bearing Motor R1J01
PLN Black Out
-

26 Februari 2016

1000

800

27 Februari 2016

1000

800

28 Februari 2016
29 Februari 2016

22.50
-

1000
1000

6.10
-

800
800

Classifier Trip Motor Ready/


Ganti Inverter Main Drive
Lanjut Pekerjaan Ganti
Inverter Main Drive
Kiln Stop 2x

Hasil pencatatan harian emisi cerobong grate cooler bulan maret 2016
Tanggal
01 Maret 2016
02 Maret 2016
03 Maret 2016
04 Maret 2016
05 Maret 2016
06 Maret 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
80
80
80
80
80
80

Keterangan
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown

07 Maret 2016
08 Maret 2016
09 Maret 2016
10 Maret 2016
11 Maret 2016
12 Maret 2016
13 Maret 2016
14 Maret 2016
15 Maret 2016
16 Maret 2016
17 Maret 2016
18 Maret 2016
19 Maret 2016

80
80
80
80
80
80
80
80
80
80
80
80
80

20 Maret 2016

80

21 Maret 2016
22 Maret 2016
23 Maret 2016
24 Maret 2016
25 Maret 2016
26 Maret 2016
27 Maret 2016
28 Maret 2016
29 Maret 2016
30 Maret 2016

41.90
43.40
40.40
37.70
39.30
36.40
39.50

80
80
80
80
80
80
80
80
80
80

Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Level Cf Silo <40 %
Perbaikan Safety plug Fluid
coupling W1A10 jebol
Level CF silo rendah ; <50%
Level CF silo rendah ; <50%
Level CF silo rendah ; <50%
-

31 Maret 2016

80

Level CF silo rendah ; 38%

Hasil pencatatan harian emisi cerobong cement mill bulan maret 2016
Tanggal
01 Maret 2016
02 Maret 2016
03 Maret 2016
04 Maret 2016
05 Maret 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu
(mg/ m)
(mg/ m)
80
80
80
80
80

Opasitas
Cerobong
%
-

Keterangan
Silo penuh
Silo penuh
Silo penuh
PLN Black out
Under voltage

06 Maret 2016
07 Maret 2016

2.30
2.30

80
80

4.00
4.00

08 Maret 2016

80

09 Maret 2016
10 Maret 2016
11 Maret 2016
12 Maret 2016
13 Maret 2016
14 Maret 2016
15 Maret 2016

2.70
3,2\

80
80
80
80
80
80
80

5.00
6.00

16 Maret 2016

80

17 Maret 2016

80

18 Maret 2016
19 Maret 2016
20 Maret 2016
21 Maret 2016
22 Maret 2016

3.40
3.50
-

80
80
80
80
80

7.00
7.00
-

23 Maret 2016

80

24 Maret 2016
25 Maret 2016
26 Maret 2016
27 Maret 2016

3.20
3.10

80
80
80
80

7.00
6.00

Blade rotary feeder


tersangkut di casing
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Pembersihan bucket BE
1.1.72
Pembersihan bucket BE
1.1.72
Silo penuh
Silo penuh
Silo penuh
Auxilliaries HSLM stop
sequenz alarm
Bin limestone blok
Bin limestone blok
-

28 Maret 2016
29 Maret 2016
30 Maret 2016
31 Maret 2016

3.30
3.10

80
80
80
80

7.00
6.00

Silo penuh
Tunggu Gas Panas Kiln
-

Hasil pencatatan harian emisi cerobong raw mill bulan maret 2016
Tanggal
01 Maret 2016
02 Maret 2016
03 Maret 2016
04 Maret 2016
05 Maret 2016

DEBU CEROBONG
Partikel Debu Baku Mutu
(mg/ m)
(mg/ m)
80
80
80
80
80

Opasitas
Cerobong
%
-

Keterangan
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown

06 Maret 2016
07 Maret 2016
08 Maret 2016
09 Maret 2016
10 Maret 2016
11 Maret 2016
12 Maret 2016
13 Maret 2016
14 Maret 2016
15 Maret 2016
16 Maret 2016
17 Maret 2016
18 Maret 2016

19 Maret 2016

20 Maret 2016

21 Maret 2016
22 Maret 2016

68.80

23 Maret 2016

24 Maret 2016
25 Maret 2016

66.20
58.40

26 Maret 2016

27 Maret 2016

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

16.70
15.00
11.30
-

Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Perbaikan Main Drive Mill
Motor
Kiln stop dan Supply clay
kurang
EP fan JiP12 trip
Kiln stop 2x, Vibrasi 2x,
Belt dosing clay miring
Mill fan vibrasi, Ganti
bearing Mill Fan
Ganti bearing Mill Fan

28 Maret 2016
29 Maret 2016

30 Maret 2016

31 Maret 2016

80
80

80

80

Ganti bearing Mill Fan


Ganti bearing Mill Fan
Chute Feed Gate Buntu/
Bersihkan coating (3x)
Perbaikan Chute Feed Gate /
Pasang Airchock

Hasil pencatatan harian emisi cerobong raw mill bulan maret 2016

Tanggal

01 Maret 2016
02 Maret 2016
03 Maret 2016
04 Maret 2016

NOx
(mg/
m)
-

Baku Mutu

SOx

Baku Mutu

Keterangan

(mg/ m)
1000
1000
1000
1000

(mg/ m)
-

(mg/ m)
800
800
800
800

Shutdown
Shutdown
Shutdown
Shutdown

05 Maret 2016
06 Maret 2016
07 Maret 2016
08 Maret 2016
09 Maret 2016
10 Maret 2016
11 Maret 2016
12 Maret 2016
13 Maret 2016
14 Maret 2016
15 Maret 2016
16 Maret 2016
17 Maret 2016
18 Maret 2016

1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000

800
800
800
800
800
800
800
800
800
800
800
800
800
800

19 Maret 2016

1000

800

20 Maret 2016

1000

800

21 Maret 2016
22 Maret 2016

36.50

1000
1000

15.00

800
800

23 Maret 2016

1000

800

24 Maret 2016
25 Maret 2016

39.50
37.60

1000
1000

24.70
17.80

800
800

Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Shutdown
Perbaikan Main Drive Mill
Motor
Kiln stop dan Supply clay
kurang
EP fan JiP12 trip
Kiln stop 2x, Vibrasi 2x, Belt
dosing clay miring
-

26 Maret 2016

1000

800

27 Maret 2016
28 Maret 2016
29 Maret 2016

1000
1000
1000

800
800

30 Maret 2016

1000

31 Maret 2016

1000

800

Mill fan vibrasi, Ganti bearing


Mill Fan
Ganti bearing Mill Fan
Ganti bearing Mill Fan
Ganti bearing Mill Fan
Chute Feed Gate Buntu/
Bersihkan coating (3x)
Perbaikan Chute Feed Gate /
Pasang Airchock

Hasil pencatatan harian emisi cerobong grate cooler bulan april 2016
Tanggal
01 April 2016
02 April 2016
03 April 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
42.70
80
40.10
80
39.90
80

04 April 2016

80

05 April 2016

36.60

80

Keterangan
Bucket W1A10 Over
Current/ W1A27 Lepas Spie
-

06 April 2016

80

07 April 2016
08 April 2016
09 April 2016
10 April 2016
11 April 2016
12 April 2016
13 April 2016
14 April 2016
15 April 2016
16 April 2016
17 April 2016
18 April 2016
19 April 2016
20 April 2016
21 April 2016
22 April 2016
23 April 2016
24 April 2016
25 April 2016
26 April 2016
27 April 2016
28 April 2016
29 April 2016

37.00
37.60
33.40
39.10
40.10
41.00
39.10
40.10
41.60
39.20
39.60
40.00
41.60
43.00
44.30
40.80
38.10
40.70
42.30
39.80
42.00
42.50

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

Level L11/12 low krn Coal


Mill stop ganti tension rod
patah
Pembersihan Impeller IDF A
-

30 April 2016

40.90

80

Hasil pencatatan harian emisi cerobong cement mill bulan april 2016
Partikel Debu
(mg/ m)

Baku Mutu

Opasitas
Cerobong

(mg/ m)

01 April 2016

80

02 April 2016
03 April 2016
04 April 2016
05 April 2016

3.40
2.60
3.50

80
80
80
80

7.00
5.00
7.00

DEBU CEROBONG

Tanggal

Keterangan
Lanjut Perbaikan Belt
1.1.46 Putus
Silo Penuh
-

06 April 2016
07 April 2016
08 April 2016
09 April 2016
10 April 2016
11 April 2016
12 April 2016
13 April 2016
14 April 2016
15 April 2016
16 April 2016
17 April 2016
18 April 2016
19 April 2016
20 April 2016
21 April 2016
22 April 2016
23 April 2016
24 April 2016
25 April 2016
26 April 2016
27 April 2016
28 April 2016
29 April 2016
30 April 2016

3.30
3.70
3.60
3.50
3.40
3.20
3.10
3.30
3.80
1.60
-

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

7.00
8.00
7.00
7.00
7.00
7.00
6.00
6.00
8.00
2.00
-

Silo penuh
Silo Penuh
Silo Penuh
Silo Penuh
Silo Penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Motor Mill Trip
Silo penuh

Hasil pencatatan harian emisi cerobong raw mill bulan april 2016
Partikel Debu
(mg/ m)

Baku Mutu

Opasitas
Cerobong

(mg/ m)

01 April 2016

80

02 April 2016
03 April 2016
04 April 2016
05 April 2016
06 April 2016

58.40
66.00
-

80
80
80
80
80

11.3
15.50
-

DEBU CEROBONG

Tanggal

Keterangan
Lanjut Atasi Feed Gate
Block
PLN Black Out
Kiln Stop 2x
Kiln Stop

07 April 2016

54.70

80

9.60

08 April 2016

80

09 April 2016

10 April 2016

11 April 2016
12 April 2016
13 April 2016
14 April 2016
15 April 2016
16 April 2016
17 April 2016

71.70
67.40
70.20
70.60
72.70
-

18 April 2016

19 April 2016

20 April 2016
21 April 2016
22 April 2016
23 April 2016
24 April 2016
25 April 2016

69.10
68.50
70.00
52.10

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

Vibrasi,clay tekor 2x,


Bersihkan Coating di BT,
KW Mill tinggi;
pengosongan Mill

Change pile clay, Vibrasi,


clay kurang 2x, Kiln stop

Pembersihan lantai BT,


Vibrasi, clay kurang 2x
Black out; over voltage 2x
Kiln stop

17.60
16.10
17.00
16.70
18.10
-

Mill Vibrasi 4x, KW Mill


tinggi; pengososngan Mill

Ganti baut adjuster chain


Bucket Towing patah
Kiln stop
Black out
-

16.50
16.70
16.90
12.20

26 April 2016
27 April 2016
28 April 2016
29 April 2016

34.10
67.00
70.00
71.10

30 April 2016

80
80
80
80

8.50
16.10
17.20
17.40

Lanjut Perbaikan Chain


Apron Dosimat Limestone

80

Hasil pencatatan harian emisi cerobong raw mill bulan april 2016

Tanggal

01 April 2016
02 April 2016
03 April 2016
04 April 2016

NOx
(mg/
m)
35.00
-

Baku Mutu

SOx

Baku Mutu

Keterangan

(mg/ m)
1000
1000
1000
1000

(mg/ m)
10.70
-

(mg/ m)
800
800
800
800

Lanjut Atasi Feed Gate Block


PLN Black Out
Kiln Stop 2x

05 April 2016
06 April 2016
07 April 2016

38.40
35.60

1000
1000
1000

19.30
11.00

800
800
800

08 April 2016

1000

800

09 April 2016

1000

800

Change pile clay, Vibrasi, clay


kurang 2x, Kiln stop

10 April 2016

1000

800

11 April 2016
12 April 2016
13 April 2016
14 April 2016
15 April 2016
16 April 2016
17 April 2016

33.60
35.20
35.70
35.80
34.10
-

1000
1000
1000
1000
1000
1000
1000

8.30
11.00
11.00
12.60
8.70
-

800
800
800
800
800
800
800

Pembersihan lantai BT,


Vibrasi, clay kurang 2x
Black out; over voltage 2x
Kiln stop

18 April 2016

1000

800

Mill Vibrasi 4x, KW Mill tinggi;


pengososngan Mill

19 April 2016

1000

800

20 April 2016
21 April 2016
22 April 2016
23 April 2016

34.20
41.00
-

1000
1000
1000
1000

10.80
26.50
-

800
800
800
800

Ganti baut adjuster chain


Bucket Towing patah
Kiln stop
Black out

Kiln Stop
Vibrasi,clay tekor 2x,
Bersihkan Coating di BT, KW
Mill tinggi; pengosongan Mill

24 April 2016
25 April 2016
26 April 2016
27 April 2016
28 April 2016
29 April 2016

35.90
37.60
36.20
36.10
38.00
42.80

1000
1000
1000
1000
1000
1000

14.80
22.20
20.50
16.40
17.30
24.50

800
800
800
800
800
800

30 April 2016

1000

800

Lanjut Perbaikan Chain Apron


Dosimat Limestone

Hasil pencatatan harian emisi cerobong grate cooler bulan mei 2016
Tanggal
01 Mei 2016
02 Mei 2016
03 Mei 2016
04 Mei 2016
05 Mei 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
40.70
80
29.50
80
30.70
80
46.80
80
49.40
80

Keterangan
-

06 Mei 2016
07 Mei 2016

47.20

80
80

08 Mei 2016

80

09 Mei 2016
10 Mei 2016
11 Mei 2016
12 Mei 2016
13 Mei 2016
14 Mei 2016
15 Mei 2016
16 Mei 2016
17 Mei 2016
18 Mei 2016
19 Mei 2016
20 Mei 2016

47.00
47.30
48.90
49.20
38.70
49.70
48.10
47.90
50.20

80
80
80
80
80
80
80
80
80
80
80
80

21 Mei 2016

80

22 Mei 2016

47.30

80

23 Mei 2016

80

24 Mei 2016
25 Mei 2016
26 Mei 2016
27 Mei 2016
28 Mei 2016

39.70
46.00
47.10
47.40
46.60

80
80
80
80
80

PLN Black Out 2x


Lanjut Kegiatan Penggantian
Motor Fan Fluxo H1H30
Patch job M34
Patch job M34
Patch job M34
EP trip; Analyzer W1A50
fault
Ganti flexible hose Grate
Cooler patah
-

29 Mei 2016
30 Mei 2016
31 Mei 2016

47.00
48.10
46.40

80
80
80

Hasil pencatatan harian emisi cerobong cement mill bulan mei 2016
Baku Mutu
(mg/ m)

01 Mei 2016
02 Mei 2016

Partikel Debu
(mg/ m)
1.70
-

Opasitas
Cerobong

80
80

2.00
-

Silo Penuh

03 Mei 2016

80

04 Mei 2016
05 Mei 2016

1.90
-

80
80

3.00
-

Beban Puncak / PLN ada


Trouble
Silo Penuh

DEBU CEROBONG

Tanggal

Keterangan

06 Mei 2016
07 Mei 2016
08 Mei 2016
09 Mei 2016
10 Mei 2016
11 Mei 2016
12 Mei 2016
13 Mei 2016
14 Mei 2016
15 Mei 2016
16 Mei 2016
17 Mei 2016
18 Mei 2016
19 Mei 2016
20 Mei 2016
21 Mei 2016
22 Mei 2016
23 Mei 2016
24 Mei 2016
25 Mei 2016
26 Mei 2016
27 Mei 2016
28 Mei 2016
29 Mei 2016
30 Mei 2016

3.00
3.00
3.00
3.10
22.20
1.10
1.10
6.20
4.40
4.70
4.90
4.50

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

6.00
6.00
5.00
6.00
26.00
1.00
1.00
14.00
10.00
11.00
11.00
10.00

Silo Penuh
Silo Penuh
Silo Penuh
Silo Penuh
Silo Penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
-

31 Mei 2016

4.90

80

11.00

Hasil pencatatan harian emisi cerobong raw mill bulan mei 2016
Partikel Debu
(mg/ m)

Baku Mutu

Opasitas
Cerobong

(mg/ m)

01 Mei 2016

80

02 Mei 2016
03 Mei 2016
04 Mei 2016
05 Mei 2016

70.40
69.50
71.10
70.00

80
80
80
80

17.00
16.60
17.40
17.20

DEBU CEROBONG

Tanggal

Keterangan
Material Block dalam Fluxo
3x
-

06 Mei 2016
07 Mei 2016
08 Mei 2016
09 Mei 2016
10 Mei 2016

67.00
34.10

80
80
80
80
80

16.10
8.50

PLN Black Out


Kiln Stop

11 Mei 2016

80

12 Mei 2016
13 Mei 2016
14 Mei 2016
15 Mei 2016
16 Mei 2016

52.10
-

80
80
80
80
80

12.20
-

Stopper crapper Vertical Mill


Lepas 1 pcs
Kiln stop
Kiln stop
Kiln stop
Ganti static cone Mill Fan

17 Mei 2016

18 Mei 2016
19 Mei 2016

70.00
68.50

20 Mei 2016

21 Mei 2016
22 Mei 2016
23 Mei 2016

72.40
-

24 Mei 2016

25 Mei 2016
26 Mei 2016
27 Mei 2016

69.10
68.80
70.20

80
80
80
80
80
80
80
80
80
80
80

16.90
16.70
17.90
16.50
16.70
17.00

PLN Black Out


-

Temp bearing Motor Mill


Fan High
Ganti roda rake car
reclaimer LS pecah
Kiln stop
Kiln stop
Perbaikan pipa hydraulic
M03 bocor
-

28 Mei 2016

67.40

29 Mei 2016

30 Mei 2016

31 Mei 2016

66.00

80

16.10

Perbaikan rel guide roller


reclaimer Limestone

Perbaikan gawang bucket


towing
-

80
80
80

15.50

Hasil pencatatan harian emisi cerobong raw mill bulan mei 2016
Keterangan
Tanggal

01 Mei 2016
02 Mei 2016
03 Mei 2016
04 Mei 2016

NOx
(mg/
m)
44.40
72.30
102.1
0

Baku Mutu

SOx

Baku Mutu

(mg/ m)
1000
1000
1000

(mg/ m)
40.30
53.60

(mg/ m)
800
800
800

1000

65.70

800

Material Block dalam Fluxo 3x


-

05 Mei 2016
06 Mei 2016
07 Mei 2016
08 Mei 2016
09 Mei 2016
10 Mei 2016

96.20
99.80
80.90

1000
1000
1000
1000
1000
1000

82.80
68.10
46.70

800
800
800
800
800
800

PLN Black Out


Kiln Stop

11 Mei 2016

1000

800

12 Mei 2016
13 Mei 2016
14 Mei 2016
15 Mei 2016
16 Mei 2016

86.90
-

1000
1000
1000
1000
1000

49.50
-

800
800
800
800
800

Stopper crapper Vertical Mill


Lepas 1 pcs
Kiln stop
Kiln stop
Kiln stop
Ganti static cone Mill Fan

17 Mei 2016

1000

800

18 Mei 2016
19 Mei 2016

79.80
70.10

1000
1000

38.30
40.20

800
800

20 Mei 2016

1000

800

21 Mei 2016
22 Mei 2016
23 Mei 2016

64.00
-

1000
1000
1000

41.00
-

800
800
800

24 Mei 2016

1000

800

25 Mei 2016

68.30

1000

39.40

800

PLN Black Out


-

Temp bearing Motor Mill Fan


High
Ganti roda rake car reclaimer
LS pecah
Kiln stop
Kiln stop
Perbaikan pipa hydraulic M03
bocor
-

26 Mei 2016
27 Mei 2016
28 Mei 2016

53.50
57.40
56.60

1000
1000
1000

49.50
54.50
58.70

800
800
800

29 Mei 2016

1000

800

Perbaikan rel guide roller


reclaimer Limestone

1000

800

Perbaikan gawang bucket


towing

1000

49.10

800

30 Mei 2016
31 Mei 2016

58.70

Hasil pencatatan harian emisi cerobong grate cooler bulan juni 2016
Tanggal
01 Juni 2016
02 Juni 2016
03 Juni 2016
04 Juni 2016
05 Juni 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
47.80
80
49.50
80
48.30
80
48.10
80
47.30
80

Keterangan
-

06 Juni 2016
07 Juni 2016
08 Juni 2016
09 Juni 2016
10 Juni 2016
11 Juni 2016
12 Juni 2016

49.40
48.30
46.90
46.20
53.80
47.30
46.40

80
80
80
80
80
80
80

13 Juni 2016

80

14 Juni 2016
15 Juni 2016
16 Juni 2016
17 Juni 2016
18 Juni 2016
19 Juni 2016

48.30
49.20
47.00
51.50
52.90
48.30

80
80
80
80
80
80

20 Juni 2016

80

21 Juni 2016

80

22 Juni 2016
23 Juni 2016
24 Juni 2016
25 Juni 2016
26 Juni 2016

49.60
47.60
46.60
46.90
48.00

80
80
80
80
80

27 Juni 2016

80

Ganti Piston Grate Cooler 3


Lepas
Ganti Metal Hose Grate
Cooler
Lanjut Pekerjaan Ganti
Metal Hose Grate Cooler
Perbaikan / Adjust Belt
Bucket W1A15 Miring

28 Juni 2016
29 Juni 2016
30 Juni 2016

43.50
46.50
46.70

80
80
80

Hasil pencatatan harian emisi cerobong cement mill bulan juni 2016
Baku Mutu
(mg/ m)

01 Juni 2016
02 Juni 2016

Partikel Debu
(mg/ m)
4.80
4.90

Opasitas
Cerobong

80
80

11.00
11.00

03 Juni 2016

80

04 Juni 2016
05 Juni 2016

4.70
4.80

80
80

11.00
11.00

Program Mekanik cek BE


01 dan 02
-

DEBU CEROBONG

Tanggal

Keterangan

06 Juni 2016
07 Juni 2016
08 Juni 2016
09 Juni 2016
10 Juni 2016
11 Juni 2016
12 Juni 2016
13 Juni 2016
14 Juni 2016
15 Juni 2016
16 Juni 2016

4.90
5.20
4.70
5.20
5.20
5.20
5.10
5.60

80
80
80
80
80
80
80
80
80
80
80

11.00
12.00
11.00
12.00
12.00
12.00
12.00
13.00

Silo penuh
Silo penuh
Ganti belt BC 1.1.85
-

17 Juni 2016

80

Perbaikan plat classifier


yang patah

18 Juni 2016

80

19 Juni 2016
20 Juni 2016

6.10
6.10

80
80

14.00
14.00

Perbaikan plat classifier


yang patah
-

21 Juni 2016

80

Perbaikan Bucket 1.1.62,


Chain Putus

22 Juni 2016

80

23 Juni 2016
24 Juni 2016
25 Juni 2016
26 Juni 2016
27 Juni 2016

5.70
6.00
5.90
5.80
5.80

80
80
80
80
80

13.00
14.00
14.00
14.00
14.00

Lanjut Perbaikan Chain


Bucket 1.1.62 Putus
-

28 Juni 2016
29 Juni 2016
30 Juni 2016

6.10
6.20
6.00

80
80
80

14.00
15.00
14.00

Hasil pencatatan harian emisi cerobong raw mill bulan juni 2016
Partikel Debu
(mg/ m)

Baku Mutu

Opasitas
Cerobong

(mg/ m)

01 Juni 2016

80

02 Juni 2016
03 Juni 2016

71.70
67.40

80
80

17.60
16.10

04 Juni 2016

DEBU CEROBONG

Tanggal

80

Keterangan
Motor traversing high speed
terbakar
Ganti roda rake car
Reclaimer Limestone

05 Juni 2016

70.20

06 Juni 2016

07 Juni 2016
08 Juni 2016

70.60

09 Juni 2016

10 Juni 2016
11 Juni 2016
12 Juni 2016

80
80
80
80

17.00

Perbaikan bucket towing


bengkok
R1U01 block
-

16.70
-

68.80
72.70
69.10

80
80
80
80

16.70
18.10
16.50

13 Juni 2016

80

14 Juni 2016
15 Juni 2016
16 Juni 2016
17 Juni 2016
18 Juni 2016
19 Juni 2016

68.50
70.00
52.10
67.00
72.60
70.00

80
80
80
80
80
80

16.70
16.90
12.20
16.10
18.00
17.20

20 Juni 2016

21 Juni 2016
22 Juni 2016
23 Juni 2016
24 Juni 2016

71.10
70.90

80
80
80
80
80

17.40
17.30

PLC Raw Mill komunikasi


error
Kiln Stop, Ganti Scrapper
Verical Mill
CF Silo Penuh (92 %), Kiln
Stop
Kiln Stop
CF Silo Penuh
-

25 Juni 2016

26 Juni 2016
27 Juni 2016
28 Juni 2016
29 Juni 2016
30 Juni 2016

Perbaikan Coupling
Traversing Reclaimer
Limestone
Kiln Stop
-

80
80
80
80
80
80

70.40
55.50
29.00
32.10

17.00
10.70
4.00
6.00

Hasil pencatatan harian emisi cerobong raw mill bulan juni 2016

NOx
(mg/
m)

Baku Mutu

SOx

Baku Mutu

(mg/ m)

(mg/ m)

(mg/ m)

01 Juni 2016

1000

800

02 Juni 2016

52.60

1000

45.50

800

Tanggal

Keterangan

Motor traversing high speed


terbakar
-

03 Juni 2016

54.00

1000

25.70

800

04 Juni 2016

1000

800

05 Juni 2016

53.60

1000

12.00

800

Ganti roda rake car Reclaimer


Limestone
-

06 Juni 2016

1000

800

07 Juni 2016
08 Juni 2016

40.50

1000
1000

17.30

800
800

09 Juni 2016

1000

800

10 Juni 2016
11 Juni 2016
12 Juni 2016

38.00
39.50
43.90

1000
1000
1000

20.40
18.90
24.30

800
800
800

13 Juni 2016

1000

800

14 Juni 2016
15 Juni 2016
16 Juni 2016
17 Juni 2016
18 Juni 2016
19 Juni 2016

40.20
40.70
38.50
41.20
43.50
39.90

1000
1000
1000
1000
1000
1000

16.90
20.80
21.90
29.40
29.60
27.00

800
800
800
800
800
800

20 Juni 2016

1000

800

21 Juni 2016
22 Juni 2016

1000
1000

800
800

Perbaikan bucket towing


bengkok
R1U01 block
PLC Raw Mill komunikasi
error
Kiln Stop, Ganti Scrapper
Verical Mill
CF Silo Penuh (92 %), Kiln
Stop
Kiln Stop
CF Silo Penuh

23 Juni 2016
24 Juni 2016

37.00
36.10

1000
1000

14.90
6.60

800
800

25 Juni 2016

1000

800

26 Juni 2016
27 Juni 2016
28 Juni 2016
29 Juni 2016

36.00
35.70
44.50

1000
1000
1000
1000

4.20
13.70
24.50

800
800
800
800

Kiln Stop
-

30 Juni 2016

44.00

1000

15.80

800

Perbaikan Coupling
Traversing Reclaimer
Limestone

Hasil pencatatan harian emisi cerobong grate cooler bulan juli 2016
Tanggal
01 Juli 2016
02 Juli 2016
03 Juli 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
25.10
80
26.00
80
29.00
80

Keterangan
-

04 Juli 2016
05 Juli 2016
06 Juli 2016
07 Juli 2016
08 Juli 2016
09 Juli 2016
10 Juli 2016
11 Juli 2016
12 Juli 2016
13 Juli 2016
14 Juli 2016
15 Juli 2016
16 Juli 2016
17 Juli 2016
18 Juli 2016
19 Juli 2016
20 Juli 2016
21 Juli 2016
22 Juli 2016
23 Juli 2016
24 Juli 2016
25 Juli 2016
26 Juli 2016
27 Juli 2016
28 Juli 2016
29 Juli 2016

37.50
36.30
34.00
32.60
47.80
47.80
50.90
46.20
49.30
46.70
48.20
47.30
44.60
44.60
43.60
48.70
46.10
46.00
49.20
46.40
45.80
47.00
48.00

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

Pembersihan coating IDF B


PLN Black out
Lanjut PLN Black out
-

30 Juli 2016
31 Juli 2016

48.00
47.90

80
80

Hasil pencatatan harian emisi cerobong cement mill bulan juli 2016
Baku Mutu

Opasitas
Cerobong

(mg/ m)

80
80
80
80

DEBU CEROBONG

Tanggal
01 Juli 2016
02 Juli 2016
03 Juli 2016
04 Juli 2016

Partikel Debu
(mg/ m)
-

Keterangan
Silo penuh
Silo penuh
Silo penuh
Silo penuh

05 Juli 2016
06 Juli 2016
07 Juli 2016
08 Juli 2016
09 Juli 2016
10 Juli 2016
11 Juli 2016
12 Juli 2016
13 Juli 2016
14 Juli 2016
15 Juli 2016
16 Juli 2016
17 Juli 2016
18 Juli 2016
19 Juli 2016
20 Juli 2016
21 Juli 2016
22 Juli 2016

6,3
6,7
7,2
5,9
-

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

15.00
16.00
17.00
14.00
-

Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh
Silo penuh

23 Juli 2016

80

24 Juli 2016
25 Juli 2016
26 Juli 2016
27 Juli 2016
28 Juli 2016

6,3
6,4

80
80
80
80
80

15.00
15.00

HGG di stop (permintaan


Bagian Pembakaran)
PLN Black out
PLN Black out
Silo penuh
-

29 Juli 2016
30 Juli 2016
31 Juli 2016

7,0
6,8
6,3

80
80
80

16.00
16.00
15.00

Hasil pencatatan harian emisi cerobong raw mill bulan juli 2016
Baku Mutu

Opasitas
Cerobong

(mg/ m)

80
80
80
80
80

14.00
15.00
11.30
9.60
15.50

DEBU CEROBONG

Tanggal
01 Juli 2016
02 Juli 2016
03 Juli 2016
04 Juli 2016
05 Juli 2016

Partikel Debu
(mg/ m)
63.60
66.20
58.40
54.70
66.00

Keterangan
-

06 Juli 2016

67.40

07\ Juli 2016

08 Juli 2016
09 Juli 2016

70.20
70.80

10 Juli 2016

11 Juli 2016

12 Juli 2016

80
80
80
80

16.10
17.00
17.60

Perbaikan baut coupling


traversing recl LS patah
-

Cf Silo level high + energy


saving

80

80

Cf Silo level high + energy


saving
Cf Silo level high

13 Juli 2016

80

14 Juli 2016
15 Juli 2016
16 Juli 2016
17 Juli 2016
18 Juli 2016
19 Juli 2016
20 Juli 2016
21 Juli 2016
22 Juli 2016
23 Juli 2016
24 Juli 2016
25 Juli 2016
26 Juli 2016

70.60
70.90
68.80
69.10
68.50
52.10
-

80
80
80
80
80
80
80
80
80
80
80
80
80

16.70
17.60
16.70
16.50
16.70
12.20
-

80

Cf Silo level high + energy


saving
Las Rake car recl LS
CF Silo level high
CF Silo level high
Kiln stop
PLN Black Out
PLN Black Out
Mill Vibrasi

27 Juli 2016

28 Juli 2016

29 Juli 2016

30 Juli 2016

67.00

31 Juli 2016

80

80

80
80

16.10
-

80

Vibrating Reject R1J11


Overload
Perbaikan Hanger Rake Car
Reclaimer Limestone
Lanjut Perbaikan Hanger
Rake Car Reclaimer
Limestone
Perbaikan Sambungan Belt
A1J12

Hasil pencatatan harian emisi cerobong raw mill bulan juli 2016

Tanggal

01 Juli 2016
02 Juli 2016

NOx
(mg/
m)
42.10
30.00

Baku Mutu

SOx

Baku Mutu

Keterangan

(mg/ m)
1000
1000

(mg/ m)
52.30
27.20

(mg/ m)
800
800

03 Juli 2016
04 Juli 2016
05 Juli 2016
06 Juli 2016

15.10
11.50
22.50
43.40

1000
1000
1000
1000

7.70
3.30
6.10
58.60

800
800
800
800

07 Juli 2016

1000

800

08 Juli 2016

4.00

1000

11.40

800

Perbaikan baut coupling


traversing recl LS patah
-

09 Juli 2016

3.00

1000

8.60

800

10 Juli 2016

1000

800

Cf Silo level high + energy


saving

11 Juli 2016

1000

800

12 Juli 2016

1000

800

Cf Silo level high + energy


saving
Cf Silo level high

13 Juli 2016

1000

800

14 Juli 2016
15 Juli 2016
16 Juli 2016
17 Juli 2016
18 Juli 2016
19 Juli 2016
20 Juli 2016
21 Juli 2016
22 Juli 2016

57.60
56.90
60.20
53.90
53.50
59.40

1000
1000
1000
1000
1000
1000
1000
1000
1000

54.60
57.50
60.50
39.30
4.40
57.30

800
800
800
800
800
800
800
800
800

Cf Silo level high + energy


saving
Las Rake car recl LS
CF Silo level high
CF Silo level high
-

23 Juli 2016
24 Juli 2016
25 Juli 2016
26 Juli 2016

1000
1000
1000
1000

800
800
800
800

27 Juli 2016

1000

800

28 Juli 2016

1000

800

Perbaikan Hanger Rake Car


Reclaimer Limestone

29 Juli 2016

1000

800

30 Juli 2016

45.20

1000

30.30

800

Lanjut Perbaikan Hanger Rake


Car Reclaimer Limestone
-

31 Juli 2016

1000

800

Kiln stop
PLN Black Out
PLN Black Out
Mill Vibrasi
Vibrating Reject R1J11
Overload

Perbaikan Sambungan Belt


A1J12

Hasil pencatatan harian emisi cerobong grate cooler bulan agustus 2016
Tanggal
01 Agustus 2016
02 Agustus 2016
03 Agustus 2016
04 Agustus 2016

DEBU CEROBONG
Partikel Debu
Baku Mutu Emisi
(mg/ m)
(mg/ m)
46.40
80
80
80
80

Keterangan
Breakdown
Breakdown
Breakdown

05 Agustus 2016
06 Agustus 2016
07 Agustus 2016
08 Agustus 2016
09 Agustus 2016
10 Agustus 2016
11 Agustus 2016
12 Agustus 2016
13 Agustus 2016
14 Agustus 2016
15 Agustus 2016
16 Agustus 2016
17 Agustus 2016

43.70
48.40
45.50
45.20
37.60
44.70
44.70
46.60
45.30
47.70

80
80
80
80
80
80
80
80
80
80
80
80
80

18 Agustus 2016

80

19 Agustus 2016
20 Agustus 2016
21 Agustus 2016

43.60
46.60
-

80
80
80

22 Agustus 2016

80

23 Agustus 2016
24 Agustus 2016
25 Agustus 2016
26 Agustus 2016
27 Agustus 2016
28 Agustus 2016

44.30
46.30
45.00
43.30
44.20
43.90

80
80
80
80
80
80

Breakdown
Breakdown
PLC Grate Cooler Blank
Hammer Crusher Slip/ Oli
Fluid Coupling Kurang
Cyclone 3B Block
Lanjut Atasi Cyclone 3B
Block
-

29 Agustus 2016
30 Agustus 2016

80
80

31 Agustus 2016

80

PLN Black out


Cyclone 3B block + Bricking
Breakdown, Bricking M2229,5

Hasil pencatatan harian emisi cerobong cement mill bulan agustus 2016
Baku Mutu

Opasitas
Cerobong

(mg/ m)

80
80

15.00
-

DEBU CEROBONG

Tanggal
01 Agustus 2016
02 Agustus 2016

Partikel Debu
(mg/ m)
6.20
-

Keterangan
Silo Penuh

03 Agustus 2016

80

04 Agustus 2016
05 Agustus 2016
06 Agustus 2016
07 Agustus 2016
08 Agustus 2016
09 Agustus 2016
10 Agustus 2016
11 Agustus 2016
12 Agustus 2016
13 Agustus 2016
14 Agustus 2016
15 Agustus 2016
16 Agustus 2016
17 Agustus 2016
18 Agustus 2016
19 Agustus 2016
20 Agustus 2016
21 Agustus 2016
22 Agustus 2016
23 Agustus 2016
24 Agustus 2016
25 Agustus 2016

6.60
6.00
63.00
6.10
6.20
5.70
5.20
6.50
4.90
4.90
4.80
5.30
3.30
1.80
3.30
2.50
3.10

80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

15.00
14.00
15.00
14.00
14.00
13.00
12.00
13.00
11.00
11.00
11.00
12.00
7.00
3.00
7.00
5.00
6.00

Alarm feedback weigher


clinker ( Apron clinker
tersangkut di double plate)
Repair rotary feeder
Silo penuh
Silo penuh
Silo penuh
silo penuh
-

26 Agustus 2016
27 Agustus 2016
28 Agustus 2016
29 Agustus 2016
30 Agustus 2016
31 Agustus 2016

3.10
3.10
4.00
3.70

80
80
80
80
80
80

7.00
7.00
9.00
8.00

Bin limestone blok


PLN Black out
-

Hasil pencatatan harian emisi cerobong raw mill bulan agustus 2016
Baku Mutu
(mg/ m)

01 Agustus 2016

Partikel Debu
(mg/ m)
54.70

Opasitas
Cerobong

80

9.60

02 Agustus 2016

80

Stop Pengosongan Bin Pfister


(Program Shutdown)

DEBU CEROBONG

Tanggal

Keterangan

03 Agustus 2016
04 Agustus 2016
05 Agustus 2016
06 Agustus 2016
07 Agustus 2016
08 Agustus 2016
09 Agustus 2016
10 Agustus 2016
11 Agustus 2016
12 Agustus 2016
13 Agustus 2016
14 Agustus 2016

66.00
67.40
68.50
48.20
68.80
52.10

80
80
80
80
80
80
80
80
80
80
80
80

15.50
16.10
17.10
11.00
16.70
12.20

15 Agustus 2016

80

16 Agustus 2016
17 Agustus 2016
18 Agustus 2016
19 Agustus 2016
20 Agustus 2016
21 Agustus 2016
22 Agustus 2016
23 Agustus 2016
24 Agustus 2016
25 Agustus 2016
26 Agustus 2016
27 Agustus 2016

34.10
37.90
38.00
37.90
37.20
39.00
37.80
36.80
37.20

80
80
80
80
80
80
80
80
80
80
80
80

8.50
20.20
20.40
20.30
19.90
20.90
20.20
19.60
19.80

Program Shutdown Kiln


Program Shutdown Kiln
Program Shutdown Kiln
Kiln Stop
Kiln Stop
Kiln Stop
Ganti Carbon Brush K1P16 4
pcs
kiln stop
kiln stop
kiln stop
-

28 Agustus 2016
29 Agustus 2016
30 Agustus 2016
31 Agustus 2016

36.90
-

80
80
80
80

19.60
-

Kiln stop
Kiln stop
Kiln stop

Hasil pencatatan harian emisi cerobong raw mill bulan agustus 2016

Tanggal

01 Agustus 2016
02 Agustus 2016

NOx
(mg/
m)
52.30
-

Baku Mutu

SOx

Baku Mutu

Keterangan

(mg/ m)
1000
1000

(mg/ m)
43.10
-

(mg/ m)
800
800

Kiln stop

03 Agustus 2016
04 Agustus 2016
05 Agustus 2016
06 Agustus 2016
07 Agustus 2016
08 Agustus 2016

46.10

1000
1000
1000
1000
1000
1000

31.00

800
800
800
800
800
800

Kiln stop
Kiln stop
Kiln stop
Kiln stop
Dosimat Lime Stone abnormal
-

09 Agustus 2016

46.10

1000

31.20

800

10 Agustus 2016

1000

800

11 Agustus 2016

1000

800

Ganti motor rake car reclaimer


Limestone
Kiln stop

12 Agustus 2016

1000

800

13 Agustus 2016
14 Agustus 2016
15 Agustus 2016

41.30
47.50
47.50

1000
1000
1000

17.00
32.30
32.20

800
800
800

16 Agustus 2016

1000

800

17 Agustus 2016
18 Agustus 2016
19 Agustus 2016
20 Agustus 2016
21 Agustus 2016
22 Agustus 2016
23 Agustus 2016

43.20
-

1000
1000
1000
1000
1000
1000
1000

21.20
-

800
800
800
800
800
800
800

Ganti tali bearing dosimat


Limestone
Bersihkan lantai Bucket
Towing, perbaikan Traversing
Reclaimer Limeston
Kiln Stop
Kiln Stop
Kiln stop
Kiln stop
-

Perbaikan Support Bledder


Pedestal I
-

24 Agustus 2016

1000

800

25 Agustus 2016
26 Agustus 2016
27 Agustus 2016

48.60
51.20
54.50

1000
1000
1000

40.10
48.90
53.30

800
800
800

28 Agustus 2016

59.10

1000

54.90

800

29 Agustus 2016
30 Agustus 2016

1000
1000

800
800

Persiapan Operasi 4 Roller


Kiln stop

31 Agustus 2016

1000

800

Kiln stop