Anda di halaman 1dari 14

Approved by:

(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Use of
Motorized
vehicles

Mobilization of
Equipments

Risk Assessment (RA)


Existing Risk Controls

Damage to plant
/Equipment /
Personnel due to hit by
vehicle.

Possible
Injury

Drivers License,
Use of Seat Belts, Speed Limit
Recommendations, Markings
for Pedestrian & Vehicle traffic,

No access to
Emergency Services

Possible
Injury

Designated Parking Only, Area


Barricade, Markings for
Pedestrian & Vehicle traffic.

Fall of Tools &


Equipment during
transportation

Possible
Injury

Secure of All tools &


Equipments with chains,
binders & hooks to prevent
them from falling or misplacing,
Dont Overload the Truck,

Adherence of traffic
Safety Rules,

Driver/
Project
Coordinator /
Site
Supervisor

Falling object from


crane or forklift when
loading/Unloading from
truck.

Possible
Injury

Safe rigging/lifting Practice,


Drivers Licence & Competency
Certificate of Operator,

Driver/Site
Supervisor

Vehicle Accident
during transportation

Possible
Injury

Licensed Driver, Use of seat


belts, Follow of Traffic safety
rules, No over speeding

10

VH

Do not violate traffic


rules, Drive slowly

Driver/
Project
coordinator

Crane/Vehicle Entry
Pass,
Entry Check list,

Site
Supervisor/
Safety
Executive

Safety Harness to be
strictly used while
working @ height
more than 1.8meter

Crane / Vehicle Entry

F-SP-HSE06-01 Rev. 03

Risk Control (RC)

Possible
injury/
Ill-health

Hazard

Possible
Injury

Safe access to
the job location
working @
height

Name:
Date:

Possible
Injury
Fall from height

Drivers License, competency


certificate, crane/Vehicle
inspection check list,
Use of Seat Belts, Speed Limit
Recommendations,
Tool box to be conducted at
site prior to start of activity
Safety harness to be use
while working @ height
secure loose tools to avoid
drop object

Issue date: July 14, 2011

Risk
level

Additional Controls

Risk
level

Responsible
person

Vehicle Entry Pass


Personnel Entry
Pass, Check list for
Vehicle

Plant Specific Safety


Induction

Site
Supervisor/
Project
Coordinator

Remarks

Legal
requirement

Legal
requirement

Page 1 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Falling object from


crane or forklift during
Rigging/Lifting
Operation

Equipment
Setup at Site

Shifting of tools
and tackles on
job location

Blinding activity

Pinch points

Possible
injury/
Ill-health

Existing Risk Controls

Possible
Injury

Safe rigging/lifting Practice,


Drivers Licence & Competency
Certificate of Operator, Area
Barricading

Possible
Injury

Risk Control (RC)


S

Risk
level

Additional Controls

Use of PPE, Safe Hand & Foot


Placement,

Be ensure while
removal or installation
of bolts or nuts aware
of pinch points of
figure and hand avoid
body injury
-

Structural or
Equipment Damage
during rigging lifting
operations

Possible
Injury

Safe rigging/lifting Practice,


Drivers Licence & Competency
Certificate of Operator,

Drop Object

Possible
Injury

Barricade the drop zone area ,


take the material to the top by
lifting bag,

Working at height

F-SP-HSE06-01 Rev. 03

Risk Assessment (RA)

Possible
Injury

Permit to work System, Safety


Harness with double lanyard &
shock absorber, Scaffoldings
must be certified as Fit for Use

Expose to toxic gases

Ill Health

Follow LOTO system , Zero


energy Demonstration to be
carried out

Slip, Trip & fall from


safe level

Possible
Injury

Good Housekeeping, Safe lay


of all cables, hoses & cords,
only equipment required at the
time to be on the platform,

Pinch points

Possible
Injury

Use of PPE, Safe Hand & Foot


Placement,

Issue date: July 14, 2011

Name:
Date:

Risk
level

Responsible
person

Remarks

Site
Supervisor/
Rigging
Supervisor/
Safety
Executive

Site
Supervisor

Anchor the harness


all the time while
working @ height

Avoid bodily injury


engage your mind
before engage your
hand

Site
Supervisor/
Site Safety
Representati
ve

Page 2 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Back-up
availability for
prompt rescue of
persons in case
of emergency.

F-SP-HSE06-01 Rev. 03

Possible
injury/
Ill-health

Existing Risk Controls

Use of Tool bags, tray or


buckets to keep loose items,
secure all tools & equipments
use at height,
Follow blind list, Barricade area,
lines must be
drained/depressurised prior to
opening,
Gas test, Personnel Shall Stand
opposite of upwind direction,
Authorised Personnel only,

Drop objects

Possible
Injury

Being exposed to high


pressure/Temperature

Possible
Injury

Release of hazardous
gas

Ill health

Hazardous material
spillage

Ill health

Being exposed to high


pressure lines of
hydraulic or pneumatic
equipments

Possible
Injury

Being hit by hand tools

Possible
Injury

Lowering/lifting of tools
& equipment

Possible
Injury

Secure all tools & equipment


from free fall prior to lowering or
lifting,

Possible
Injury

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
grounding, Proper lying of cable
to protect them from damage,

Electrocution

Risk Assessment (RA)

Absence of adequate
rescue equipment

Ill health

Use tray to collect any spill,


Personnel Always stand clear
off lines,
Pre job Inspection of all
pressurised equipment, Clearly
identified with high pressure
tag,
Safe work Practice, Use of
Cricket helmet during
hammering, safe hand & foot
placement

Availability of Oxy-Viva,
Inspection of all rescue devices
prior to confined space entry

Issue date: July 14, 2011

Name:
Date:

Risk Control (RC)


S

Risk
level

Additional Controls

Barricade the drop


zone area
Clear identification of
process equipment by
relevant process or
operations personnel,
Follow LOTO system
, zero energy
demonstration by RIL

Risk
level

All hoses and


equipment to be
certify prior

Engage your mind


before engage your
hand

Always stand clear off


the place where
lowering & lifting
operation is going on

Use of Inspected &


certified type
appliances only,

Display Rescue Plan

Responsible
person

Remarks

Site
Supervisor/
Site Safety
Representati
ve/
Electrician
Site
Supervisor/
Site Safety
Representati
ve
Page 3 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Confined Space
Entry
Preparation

Top Tray
Opening

10

Confined Space
Entry under
normal
atmosphere for
vacuuming 1st
bed catalyst

Risk Control (RC)

Possible
injury/
Ill-health

Existing Risk Controls

Ill health

Gas test to be conducted O2


19.5% to 23.5% other gases
NIL

Pinch points

Possible
Injury

Use of PPE, Safe Hand & Foot


Placement,

Slip & Trip

Possible
Injury

Proper hand & Foot placement,


safe lay of all cords, cables &
hoses with identification tag,

Possible
Injury

Permit to work System, Safety


Harness with double lanyard &
shock absorber, Self retracting
device, pneumatic winches with
valid certificates,
Adequate Ventilation, Personnel
rotation, liquid intake

Hazard

Lack of O2

Fall from height

Heat stress

Possible
Injury

Oxygen Deficiency

Possible
Injury

Falling object

Possible
Injury

Presence of
flammable/hazardous
atmosphere

Ill health

Electrocution

F-SP-HSE06-01 Rev. 03

Risk Assessment (RA)

Possible
Injury

All entry to be done after gas


test , Adequate Ventilation,
continuous gas monitoring
Secure all tools & equipment
from free fall while working at
height or transferring to
Reactor,
Adequate ventilation, Continue
gas monitor

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
Issue date: July 14, 2011

Name:
Date:

Risk
level

Avoid bodily injury


engage your mind
before engage your
hand

Anchor the harness


all the time

Temperature >40 C,

Continue gas monitor,

No loose item near by


manway

Risk
level

Additional Controls

Responsible
person

Remarks

Use of Inspected &


certified type
appliances only,

Site
Supervisor/
Site Safety
Representati
ve /Manhole
watcher

Page 4 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Risk Assessment (RA)


Possible
injury/
Ill-health

Existing Risk Controls

Name:
Date:

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Responsible
person

Remarks

grounding, Proper lay of cable


to protect them from damage,
Keep Welding Machines outside
of confined space

11

12

13

14

2nd bed Tray


Opening

Strain due to limited


access or limited work
space

Ill health

Authorised Entry, Work break,


job rotation,

Pinch points

Possible
Injury

Use of PPE, Safe Hand & Foot


Placement,

Pinch point, hand


injury

Possible
Injury

Use of PPE, Safe Hand & Foot


Placement,

slip trip and fall due to


spillage of catalyst

Possible
Injury

CR Supervisor to remind and


ensure workers to clean the
spillage catalyst ASAP to avoiud
slip trip and fall

Opening of
Dumping Nozzle

Opening of
Bags/Drums

Unloading of
catalyst through
Dumping nozzle
for 2nd bed

Being exposed to dust

Possible
Injury

Use of PPE by referring MSDS

Slip and fall due to


catalyst spillage

Possible
Injury

CR to wet and clean up spillage


immediately to avoid slip,
trip,fall hazard.

Pinch point, hand


injury

Possible
Injury

CR supervisor to remind worker


to keep finger away from being
crushed by during handeling of
drums

Spent Catalyst drums to be


kept in designated place, CR to
arrange the flow drums so that
there is no congestion

Congestion at work
site

F-SP-HSE06-01 Rev. 03

Issue date: July 14, 2011

Avoid bodily injury


engage your mind
before engage your
hand
Avoid bodily injury
engage your mind
before engage your
hand
Ensure good house
keeping all the time

Site
Supervisor/
Site Safety
Representati
ve

Page 5 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

15

Area / Activity /
Process /
Machine / Material

Confined Space
Entry under
normal
atmosphere for
vacuuming
remaining
catalyst

Hazard

Possible
injury/
Ill-health

Existing Risk Controls

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Catalyst dust
inhalation and skin
contact

At drumming point : CR workers


to wear filter mask and tyvek
suit and gloves

House Keeping

During unloading of catalyst


spillage to be clear from ground
to avoid Slip, trip , Fall

Possible
Injury

Proper hand & Foot placement,


safe lay of all cords, cables &
hoses with identification tag,

Possible
Injury

Permit to work System, Safety


Harness with double lanyard &
shock absorber, Self retracting
device, pneumatic winches with
valid certificates,

Anchor the harness


all the time

Adequate Ventilation, Personnel


rotation, liquid intake

Temperature >40 C,

Continue gas monitor,

No loose item near by


manway

Slip & Trip

Fall from height

Heat stress

Possible
Injury

Oxygen Deficiency

Possible
Injury

Falling object

Possible
Injury

Presence of
flammable/hazardous
atmosphere

Ill health

Electrocution

F-SP-HSE06-01 Rev. 03

Risk Assessment (RA)

Name:
Date:

Possible
Injury

All entry to be done after gas


test , Adequate Ventilation,
continuous gas monitoring
Secure all tools & equipment
from free fall while working at
height or transferring to
Reactor,
Adequate ventilation, Continue
gas monitor

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
grounding, Proper lay of cable
to protect them from damage,
Keep Welding Machines outside

Issue date: July 14, 2011

Use of Inspected &


certified type
appliances only,

Responsible
person

Remarks

Page 6 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Risk Assessment (RA)


Possible
injury/
Ill-health

Existing Risk Controls

Name:
Date:

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Responsible
person

Remarks

of confined space
Strain due to limited
access or limited work
space

16

Cleaning &
Inspection

Ill health

Authorised Entry, Work break,


job rotation,

Working At Height

Major

Permit to work System, Safety


Harness with double lanyard &
shock absorber, Self retracting
device, pneumatic winches with
valid certificates,

Sprain or Strain

Moderate

Personnel Rotation

Low Illumination

Moderate

Adequate lighting, use of only


approved type 24V lamps,

Use body harness all the time


and anchor to anchorage point

Follow working at
height procedure

Falling from height


17

18

Loading
Preparation and
Dense machine
set up

Transferring of
Catalyst from
Bag/Drums to
Hooper

F-SP-HSE06-01 Rev. 03

Possible
Injury

Site Safety
Representati
ve / Site
Supervisor

Chute may dislodge


under its own weight

Possible
Injury

Use metal pipe ( which is rigged


by chain block and slings) for all
of chute except the canvas sock

Inspect all the


equipment prior to
start the activity

pinch point

Possible
Injury

be aware of pinch point

Use of PPEs

Exposure to Chemical
dust

Possible
Injury

Use of PPE by referring MSDS

Site Safety
Representati
ve/Site
Supervisor

Pushing/Pulling of
Load, Manual
Handling, Pinch points,

Possible
Injury

Safe work posture, Safe manual


handling practice

Use tag line to control


the load or hopper

Site Safety
Representati
ve

Issue date: July 14, 2011

Page 7 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

19

20

Area / Activity /
Process /
Machine / Material

Lifting of Hooper

Inert ball loading


for bottom bed

Catalyst loading
through dense
loading 2nd bed

F-SP-HSE06-01 Rev. 03

Risk Control (RC)

Possible
injury/
Ill-health

Existing Risk Controls

Falling object, pinch


points, Pushing &
Pulling of load

Possible
Injury

Annual Testing & Certification of


lifting tools & tackles, Safe
rigging/lifting practice,

Being exposed to dust,


Oxygen Deficiency,

Moderate

Use of Mask or filter referred by


MSDS, Use of single breathing
line with compressor backup,

Improper working
Posture/Fatigue while
using rope ladder

Moderate

Selection of Persons fit for the


job, Rescue arrangements in
place

Major

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
grounding, Secure & Proper lay
of cable to protect them from
damage, avoid Naked joints,
use appropriate sockets,

Hazard

Electrocution

Poor visibility

21

Risk Assessment (RA)


S

Risk
level

Additional Controls

Risk
level

Use tag line to control


the load or hopper,

Constant observer &


rescue person,

Use aluminium ladder


instead of rope ladder
wherever possible

Use of Inspected &


certified type
appliances only,

Control rate of
catalyst loading such
that visibility is
ensured by avoiding
excess dust formation

Moderate

Sufficient illumination provided,

Falling Tools/Drop
Objects

Major

Hard Barricade in the region of


the Manhole Opening, all tools
& equipments shall be kept at
distance from man hole to
prevent any drop object,

Secure all tools &


equipments while
lifting & lowering
through manhole to
protect them from
free fall,

Being exposed to dust,


Oxygen Deficiency,

Ill health

Use of Mask or filter referred by


MSDS, Use of single breathing
line with compressor backup,

Constant observer &


rescue person,

Issue date: July 14, 2011

Name:
Date:

Responsible
person

Remarks

Site Safety
Representati
ve/Site
Supervisor
Site Safety
Representati
ve/Site
Supervisor/
Man Hole
watcher

Site Safety
Representati
ve/Site

Page 8 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Improper working
Posture/Fatigue while
using rope ladder

Electrocution

Poor visibility

Falling Tools/Drop
Objects

22

23

Removal of
Dense machine
set up

Cleaning and
Tray Box up of

F-SP-HSE06-01 Rev. 03

Falling from height

Risk Assessment (RA)

Risk Control (RC)

Possible
injury/
Ill-health

Existing Risk Controls

Possible
Injury

Selection of Persons fit for the


job, Rescue arrangements in
place

Possible
Injury

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
grounding, Secure & Proper lay
of cable to protect them from
damage, avoid Naked joints,
use appropriate sockets,

Possible
Injury

Sufficient illumination provided,

Possible
Injury

Hard Barricade in the region of


the Manhole Opening, all tools
& equipments shall be kept at
distance from man hole to
prevent any drop object,

Possible
Injury

Name:
Date:

Use body harness all the time


and anchor to anchorage point

Risk
level

Additional Controls

Risk
level

Use aluminium ladder


instead of rope ladder
wherever possible

Use of Inspected &


certified type
appliances only,

Control rate of
catalyst loading such
that visibility is
ensured by avoiding
excess dust formation

Secure all tools &


equipments while
lifting & lowering
through manhole to
protect them from
free fall,

Follow working at
height procedure

Possible
Injury

Use metal pipe ( which is rigged


by chain block and slings) for all
of chute except the canvas sock

Inspect all the


equipment prior to
start the activity

pinch point

Possible
Injury

be aware of pinch point

Use of PPEs

Pre Job Inspection of


Equipments & Use only when
assess safe,

Inspection &
certification tag shall
be check prior to use

Possible
Injury

Issue date: July 14, 2011

Remarks

Supervisor/
Man Hole
watcher

Chute may dislodge


under its own weight

Use of
Electrical/Pneumatic
Equipments,

Responsible
person

Site Safety
Representati
ve / Site
Supervisor

Site Safety
Representati
ve/Site
Page 9 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

2nd bed

Hazard

24

25

Transferring of
Catalyst from
Bag/Drums to
Hooper

Possible
Injury

Drop Objects

Possible
Injury

Sharp Edges

Possible
Injury

Possible
Injury

Existing Risk Controls

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Use of PPE, Safe Hand & Foot


Placement,

Engage your mind


before engage your
hand

Use of PPE, Secure all tools &


equipment to protect them from
free fall,

Stand clear of place


where lifting/lowering
operation is going on

Use of PPE, Marking of Sharp


edges by Fluorescent colour,

Covering of sharp
edges,

Use body harness all the time


and anchor to anchorage point

Follow working at
height procedure

Responsible
person

Site Safety
Representati
ve / Site
Supervisor

Possible
Injury

Use metal pipe ( which is rigged


by chain block and slings) for all
of chute except the canvas sock

Inspect all the


equipment prior to
start the activity

pinch point

Possible
Injury

be aware of pinch point

Use of PPEs

Exposure to Chemical
dust

Possible
Injury

Use of PPE by referring MSDS

Site Safety
Representati
ve/Site
Supervisor

Pushing/Pulling of
Load, Manual
Handling, Pinch points,

Possible
Injury

Safe work posture, Safe manual


handling practice

Use tag line to control


the load or hopper

Site Safety
Representati
ve

Possible
Injury

Annual Testing & Certification of


lifting tools & tackles, Safe
rigging/lifting practice,

Use tag line to control


the load or hopper,

26

Lifting of Hooper

27

Inert ball loading


for top bed

Being exposed to dust,


Oxygen Deficiency,

Moderate

Use of Mask or filter referred by


MSDS, Use of single breathing
line with compressor backup,

Issue date: July 14, 2011

Constant observer &


rescue person,

Remarks

Supervisor

Chute may dislodge


under its own weight

Falling object, pinch


points, Pushing &
Pulling of load

F-SP-HSE06-01 Rev. 03

Possible
injury/
Ill-health

Pinch Points

Falling from height


Dense machine
set up for top
bed

Risk Assessment (RA)

Name:
Date:

Site Safety
Representati
ve/Site
Supervisor
Site Safety
Representati
ve/Site
Supervisor/
Man Hole
Page 10 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Risk Assessment (RA)


Possible
injury/
Ill-health

Existing Risk Controls

Name:
Date:

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Responsible
person

Remarks

watcher
Improper working
Posture/Fatigue while
using rope ladder

Electrocution

Poor visibility

28

Catalyst loading
through dense
loading for top
bed

Selection of Persons fit for the


job, Rescue arrangements in
place

Use aluminium ladder


instead of rope ladder
wherever possible

Major

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
grounding, Secure & Proper lay
of cable to protect them from
damage, avoid Naked joints,
use appropriate sockets,

Use of Inspected &


certified type
appliances only,

Control rate of
catalyst loading such
that visibility is
ensured by avoiding
excess dust formation

Moderate

Sufficient illumination provided,

Falling Tools/Drop
Objects

Major

Hard Barricade in the region of


the Manhole Opening, all tools
& equipments shall be kept at
distance from man hole to
prevent any drop object,

Secure all tools &


equipments while
lifting & lowering
through manhole to
protect them from
free fall,

Being exposed to dust,


Oxygen Deficiency,

Ill health

Use of Mask or filter referred by


MSDS, Use of single breathing
line with compressor backup,

Constant observer &


rescue person,

Improper working
Posture/Fatigue while
using rope ladder

Possible
Injury

Selection of Persons fit for the


job, Rescue arrangements in
place

Use aluminium ladder


instead of rope ladder
wherever possible

Electrocution

F-SP-HSE06-01 Rev. 03

Moderate

Possible
Injury

Inspection of cables for any


worn or damage condition, Use
of ELCB/ECB, Proper
Issue date: July 14, 2011

Use of Inspected &


certified type
appliances only,

Site Safety
Representati
ve/Site
Supervisor/
Man Hole
watcher

Page 11 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Risk Assessment (RA)


Possible
injury/
Ill-health

Existing Risk Controls

Name:
Date:

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Control rate of
catalyst loading such
that visibility is
ensured by avoiding
excess dust formation

Secure all tools &


equipments while
lifting & lowering
through manhole to
protect them from
free fall,

Responsible
person

Remarks

grounding, Secure & Proper lay


of cable to protect them from
damage, avoid Naked joints,
use appropriate sockets,

Poor visibility

Falling Tools/Drop
Objects

29

30

Removal of
Dense machine
set up

Cleaning and
Tray Box up

Falling from height

Sufficient illumination provided,

Possible
Injury

Hard Barricade in the region of


the Manhole Opening, all tools
& equipments shall be kept at
distance from man hole to
prevent any drop object,

Possible
Injury

Use body harness all the time


and anchor to anchorage point

Follow working at
height procedure

Chute may dislodge


under its own weight

Possible
Injury

Use metal pipe ( which is rigged


by chain block and slings) for all
of chute except the canvas sock

Inspect all the


equipment prior to
start the activity

pinch point

Possible
Injury

be aware of pinch point

Use of PPEs

Use of
Electrical/Pneumatic
Equipments,

Possible
Injury

Pre Job Inspection of


Equipments & Use only when
assess safe,

Inspection &
certification tag shall
be check prior to use

Pinch Points

F-SP-HSE06-01 Rev. 03

Possible
Injury

Possible
Injury

Use of PPE, Safe Hand & Foot


Placement,

Issue date: July 14, 2011

Engage your mind


before engage your
hand

Site Safety
Representati
ve / Site
Supervisor

Site Safety
Representati
ve/Site
Supervisor

Page 12 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Possible
Injury

Sharp Edges

Possible
Injury

Working at height

Possible
Injury

Pinch points

31

Drop objects

Possible
Injury

Possible
Injury
Possible
Injury

Being exposed to high


pressure/Temperature

Possible
Injury

Release of hazardous
gas

Ill health

Hazardous material
spillage

Ill health

Being exposed to high


pressure lines of
hydraulic or pneumatic
equipments

F-SP-HSE06-01 Rev. 03

Possible
injury/
Ill-health

Drop Objects

Slip, Trip & fall from


safe level

elbow box up
De-blinding If
required as per
suggestion by
client

Risk Assessment (RA)

Possible
Injury

Existing Risk Controls

Name:
Date:

Risk Control (RC)


S

Risk
level

Additional Controls

Risk
level

Use of PPE, Secure all tools &


equipment to protect them from
free fall,

Stand clear of place


where lifting/lowering
operation is going on

Use of PPE, Marking of Sharp


edges by Fluorescent colour,

Covering of sharp
edges,

Permit to work System, Safety


Harness with double lanyard &
shock absorber,

Anchor the harness


all the time at the
anchor point

Good Housekeeping, Safe


laying of all cables, hoses,
cords,

Use of PPE, Safe Hand & Foot


Placement,

Use of Tool bags, tray or


buckets to keep loose items,
secure all tools & equipments
use at height,

Make blind list available at site,


Barricade area,
Personnel Shall Stand opposite
of upwind direction & shall carry
O2 meters with them,
Authorised Personnel only,
Use of drip tray to collect any
spill, Personnel Always stand
clear off lines,
Pre job Inspection of all
pressurised equipment, Clearly
identified with high pressure
tag,

Issue date: July 14, 2011

Clear identification of
process equipment by
relevant process or
operations personnel,

Continuous gas
monitoring

Responsible
person

Remarks

Site Safety
Representati
ve/Site
Supervisor

Page 13 of 14

Approved by:
(Signature)

Hazard Identification And Risk Assessment


Business Unit : RIL Barodra
Division/Department/Location: PGH 2214101
CRAI Ref No: CRAI-CD-HSE-12/15

Prepared by :Vikreshvar Behra

Hazard Identification (HI)


No

Area / Activity /
Process /
Machine / Material

Hazard

Being hit by hand tools

Lowering/lifting of tools
& equipment

Risk Assessment (RA)


Possible
injury/
Ill-health

Possible
Injury
Possible
Injury
Possible
Injury

Electrocution

Falling object from


crane or forklift when
loading to truck.

32

Site Restoration
House keeping

Fall of Tools &


Equipment during
transportation

Vehicle Accident
during transportation

F-SP-HSE06-01 Rev. 03

Possible
Injury te
Possible
Injury

Possible
Injury

Existing Risk Controls

Name:
Date:

Risk Control (RC)


S

Risk
level

Safe work Practice, Use of


Cricket helmet during
hammering, safe hand & foot
placement

Secure all tools & equipment


from free fall prior to lowering or
lifting,

Inspection of cables for any


worn or damage condition, Use
of ELCB / ECB, Proper
grounding, Proper lay of cable
to protect them from damage,

Safe rigging/lifting Practice,


Drivers Licence & Competency
Certificate of Operator,

Additional Controls

Tie the rope to the


spanner to avoid
drop object of
spanner
Always stand clear off
the place where
lowering & lifting
operation is going on

Risk
level

Use of Inspected &


certified type
appliances only,

Secure all tools & Equipments


with chains, binders & hooks to
prevent them from falling or
misplacing, Dont Overload the
Truck,

Adherence of traffic
Safety Rules,

Licensed Driver, Use of seat


belts, Follow of Traffic safety
rules, No over speeding, vehicle
check list,

Follow traffic rules ,


drive slowly

Issue date: July 14, 2011

Responsible
person

Remarks

Site Safety
Representati
ve/Site
Supervisor/
Electrician

Site Safety
Representati
ve/Site
Supervisor/
Electrician/
Project
Coordinator

Page 14 of 14