Anda di halaman 1dari 2

Subsystem

HA03-06

Punch List

Print Date
2016-10-04

Subsystem Description

Boiler Sealing Air System Unit #3

CATEGORY "A" : Shall be Cleared before commissioning of Related (Sub-System).


CATEGORY "B" : Shall be completed prior to Preliminary Acceptance Certificate.
CATEGORY "C" : Shall be completed prior to Final Acceptance
Certificate.
C

PL No

Tag/Line/Cable

Raised By

a Status
t

Punch Item Description

Dis
.

Cause

Action
Area
By Grp

Req'd by
date

PC-M26_B64077

03HCW11AN001

ABDEEN

Active

Equipment should be properly cleaning required

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64078

03HCW11AN001

ABDEEN

Active

Expansion gap to be maintained after installation of pipe

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64079

03HCW11AN001

ABDEEN

Active

Lubrication grease nipple should be clean covering with


cap

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64080

03HCW11AN001

ABDEEN

Active

Electrical connection need to be done

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64081

03HCW11AN001

ABDEEN

Active

Motor rotation should required before commissioning

BI

INSTALLATION

BI

PB

10/10/2016

PC-M26_B64082

03HCW12AN001

ABDEEN

Active

Equipment should be properly cleaning required

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64083

03HCW12AN001

ABDEEN

Active

Expansion gap to be maintained after installation of pipe

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64084

03HCW12AN001

ABDEEN

Active

Lubrication grease nipple should be clean covering with


cap

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64085

03HCW12AN001

ABDEEN

Active

Electrical connection need to be done

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64086

03HCW12AN001

ABDEEN

Active

Motor rotation should required before commissioning

BI

INSTALLATION

BI

PB

10/10/2016

PC-M26_B64087

03HHQ10AN001

ABDEEN

Active

Equipment should be properly cleaning required

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64088

03HHQ10AN001

ABDEEN

Active

Expansion gap to be maintained after installation of pipe

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64089

03HHQ10AN001

ABDEEN

Active

Proper oilling should required to remove the rust on the


bolts

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64090

03HHQ10AN001

ABDEEN

Active

Electrical connection need to be done

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64091

03HHQ10AN001

ABDEEN

Active

Motor rotation should required before commissioning

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64092

03HHQ10AN001

ABDEEN

Active

Paint damage area need to rectified

BI

INSTALLATION

BI

PB

10/10/2016

PC-M26_B64093

03HHQ10AN002

ABDEEN

Active

Equipment should be properly cleaning required

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64094

03HHQ10AN002

ABDEEN

Active

Expansion gap to be maintained after installation of pipe

BI

INSTALLATION

BI

PB

10/10/2016

1/2

Cleared

Verified

Subsystem
HA03-06

Punch List

Print Date
2016-10-04

Subsystem Description

Boiler Sealing Air System Unit #3

CATEGORY "A" : Shall be Cleared before commissioning of Related (Sub-System).


CATEGORY "B" : Shall be completed prior to Preliminary Acceptance Certificate.
CATEGORY "C" : Shall be completed prior to Final Acceptance
Certificate.
C

PL No

Tag/Line/Cable

Raised By

a Status
Punch Item Description
t
Proper oilling should required to remove the rust on the

Dis
.

Cause

Action
Area
By Grp

Req'd by
date

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64095

03HHQ10AN002

ABDEEN

Active

PB-M26_B64096

03HHQ10AN002

ABDEEN

Active

Electrical connection need to be done

BI

INSTALLATION

BI

PB

10/10/2016

PA-M26_B64097

03HHQ10AN002

ABDEEN

Active

Motor rotation should required before commissioning

BI

INSTALLATION

BI

PB

10/10/2016

PB-M26_B64098

03HHQ10AN002

ABDEEN

Active

Paint damage area need to rectified

BI

INSTALLATION

BI

PB

10/10/2016

bolts

Name
Signature
Date

2/2

Cleared

Verified

Anda mungkin juga menyukai